Lampiran
Lampiran
N HARGA
URAIANPEKERJAAN STN NORMA FISIK JUMLAH BIAYA
o SATUAN
Membangun Pembibitan Pre Nursery Kelapa Sawit Seluas 0,12 Ha (214.159 St =
178 bed)
A. Pengolahan Tanah / Persiapan Lapangan.
3 Transport Tanah Top Soil (400Plbg/M3) M3 21.000 Rp/M3 345 21.000 7.245.000
4 Bongkar/ Muat Tanah Top Soil M3 2,42 M3/Hk 345 5.634,71 1.943.975
13 Menyiram Bibit Di Bedengan(90 Hrx2 Rot) Plbg 10.000 Plbg/Hk 24.833.160 1,36 33.773.098
14 Menyiang Luar/Dalam Polybag(6 Rot) Plbg 10.000 Plbg/Hk 827.772 1,36 1.125.770
17 Mencampur Pupuk Unsur P Sebelum Tanam Plbg 3.000 Plbg/Hk 137.962 4,55 627.727
41
18 Menanam Kecambah Plbg 1.000 Plbg/Hk 137.962 13,64 1.881.802
22 Thining Out &Seleksi umur 4-8 Minggu Plbg 5.000 Plbg/Hk 137.962 2,73 376.636
23 Thining Out &Seleksi Umur 10-12 Minggu Plbg 5.000 Plbg/Hk 137.962 2,73 376.636
24 Penjarangan/Buang Atap Umur 1,5 Bln Bed 10 Bed/Hk 178 1.363,60 242.721
26 Penjarangan/Buang Atap Umur 2,5 Bln Bed 20 Bed/Hk 178 681,80 121.360
27 Meratakan tanah Tanjaan Untuk Pipa Air Mtr 40 Mtr/BU 100 11.168 1.116.800
31 Membuat paret ukuran 1 x 1 x 1 x 400 mtr Mtr 40 Mtr / Bu 400 10.541 4.216.400
JUMLAH-A 116.793.106
B BAHAN & ALAT-ALAT
3 Bambu 3'' Untuk Skat Bedeng Btg 4 Btg/Bed 712 14.000 9.968.000
18 Pembelian Pupuk NPK 15-15-6-4 Zak 0,2 Gram/Plbg 130.334 7.500 977.580
28 Bambu Penyangga Diatas Timur - Barat Btg 4 Btg/Bed 712 14.000 9.968.000
29 Bambu Penyangga Diatas Utara - Selatan Btg 4 Btg/Bed 712 14.000 9.968.000
JUMLAH 148.969.253
C Membangun Gudang Ukuran 3x4 Meter
22 Upah 5.000.000
23 Transport 4.000.000
J U M L A H -C 28.065.685
D Pengadaan &Pemasangan Mesin Pompa Air
1 Mesin Pompa Air Merk Yanmar Type TS.230 Unit 1 23.500.000 23.500.000
2 Pipa Besi Ukuran 3'' tebal 3mm (Pakai Drat) Btg 4 812.500 3.250.000
JUMLAH-D 40.710.000
Ppn 10 % 33.453.804
TOTAL 367.991.848
45
Lampiran 2. Total Keseluruhan Biaya Membagun Pembibitan Main Nursery Kelapa Sawit
HARGA JUMLAH
No URAIANPEKERJAAN STN NORMA FISIK
SATUAN BIAYA
PEMBIBITAN KELAPA SAWIT (MN) =194.011 ST LUAS
14,00 HA
A PERSIAPAN LAHAN
9 Menyiram Polybag Sebelum Tanam (5 Hari ) Pb 2.500 Pb/Hk 970.055 5,45 5.286.800
Hk/Ha/Ro
12 Menyiang Dalam & Luar Polybag (18 Rot ) Ha 20 t 252 272.720 68.725.440
13 Menyiram Bibit Pagi / Sore (270 Hr) Pb 2.000 Pb/Hk 104.765.940 6,82 714.503.711
Pb/Hk/Ro
14 Inventaris Bibit (2 Rot) Pb 3.000 t 388.022 4,55 1.765.500
Pb/Hk/Ro
15 Memupuk Pb 2.500 t 2.716.154 5,45 14.803.039
Hk/Ha/Ro
24 Pemberantasan Hama (24 Rot) Ha 2 t 252 27.272 6.872.544
49
Gram/Plb
35 Pembelian Pupuk NPK 15-15-6-4 Zak g 20.075 7.500 150.562.500
Gram/Plb
36 Pembelian Pupuk NPK 12-12-17-2 Zak g 15.176 7.300 110.784.800
Gram/Plb
37 Pembelian Pupuk Dolomit Zak g 19.195 700 13.436.500
Gram/Plb
38 Pembelian Pupuk Urea Zak g 8.289 3.000 24.867.000
JUMLAH - B
938.043.297
C. PENGADAAN & PEMASANGAN MESIN POMPA AIR
2 Pipa Besi Hisap Air Ukuran 4'' tebal 3 mm (pakai Drat) Btg 8 812.500 6.500.000
Ppn 10 % 210.420.951
TOTAL 2.314.630.463
50
51
Lampiran 3. Biaya Pembelian Pupuk untuk Pre Nursery
Asal Uraian Minggu Ke
Bibit 4 5 6 7 8 9 10 11 12 Total
PPKS Jumlah Bibit 72.167 72.167 72.167 72.167 72.167 67.932 67.932 67.932 67.932 67.932
Dosis (grm/bibit) C1-0,2 C1-0,2 C1-0,2 C1-0,2 C1-0,2 C1-0,2 C1-0,2 C1-0,2 C1-0,2
Jumlah Pupuk (kg) 14,433 14,433 14,433 14,433 14,433 13,586 13,586 13,586 13,586 126,509
Biaya Pupuk (Rp) 43.299 43.299 43.299 43.299 43.299 46.785 46.785 46.785 46.785 379.527
Socfindo Jumlah Bibit 133.163 133.163 133.163 133.163 133.163 126.121 126.121 126.121 126.121 126.121
Dosis (gram/bibit) C2-0,2 C1-0,2 C2-0,2 C1-0,2 C2-0,2 C1-0,2 C2-0,2 C1-0,2 C2-0,2
Jumlah Pupuk (kg) 26,632 26,632 26,632 26,632 26,632 25,224 25,224 25,224 25,244 234,05
Biaya Pupuk (Rp) 199.740 79.896 199.740 79.896 199.740 75.672 189.180 75.672 189.180 1.288.716
Total Pembelian Pupuk (Rp) 1.668.243
52