(HPS)
Paket Pekerjaan :
Lokasi Pekerjaan :
2022
Sumber Dana :
PEN
DAFTAR HARGA MATERIAL BAHAN DAN UPAH KERJA
HARGA SATUAN
NO. TENAGA KERJA SATUAN KETERANGAN
(Rp.)
1 Pekerja Org/Hr 113,636.36
2 Tukang Org/Hr 136,363.64
3 Tukang Tukang Org/Hr 136,363.64
4 Mandor Org/Hr 136,363.64
5 Tukang Batu Org/Hr 136,363.64
6 Tukang Kayu Org/Hr 136,363.64
7 Tukang Besi Org/Hr 136,363.64
8 Tukang Cet Org/Hr 136,363.64
9 Tukang Listrik Org/Hr 136,363.64
10 Tukang Pipa Org/Hr 136,363.64
11 Kepala Tukang Batu Org/Hr 159,090.91
12 Kepala Tukang Kayu Org/Hr 159,090.91
13 Kepala Tukang Besi Org/Hr 159,090.91
14 Kepala Tukang Cet Org/Hr 159,090.91
15 Kepala Tukang Listrik Org/Hr 159,090.91
16 Kepala Tukang Pipa Org/Hr 159,090.91
17 Penjaga Malam Org/Hr 113,636.36
18 Sopir Org/Hr 136,363.64
19 Pembantu Supir Org/Hr 109,090.91
20 Oprator Alat Berat Org/Hr 159,090.91
21 Pembantu Oprator Alat Berat Org/Hr 113,636.36
DAFTAR HARGA MATERIAL BAHAN DAN UPAH KERJA
Zona 2 (Soyojaya) dan Zona 3 (Bungku Utara, Mamosalato)
HARGA SATUAN
NO. U R A I A N SATUAN KETERANGAN
(Rp.)
1 2 3 4.00 5
A. PONDASI
1 Pasir
Pasir pasang m3 150,000.00 107.14 /Kg
Pasir beton m3 150,000.00 107.14 /Kg
Pasir urug m3 150,000.00
2 Tanah Urug
Tasirtu m3 150,000.00
Tanah Urug m3 150,000.00
Tanah Urug Taman m3 150,000.00
3 Kerikil/ Hasil Saringan m3 377,272.73 279.46 /Kg
4 Batu Pecah
Ukuran 1/2 cm m3 581,818.18 430.98 /Kg
Ukuran 2/3 cm m3 572,727.27 424.24 /Kg
Ukuran 3/5 cm m3 563,636.36 417.51 /Kg
Ukuran 5/7 cm m3 545,454.55 404.04 /Kg
5 Batu-Batuan
Batu Kali m3 150,000.00
Batu Gunung m3 251,818.18
B. BAHAN DINDING
6 Batu Cetak
batu bata Bh 1,145.45
batako Bh 4,545.45
roster beton 20/20 Bh 8,877.27
Paving Blok Bh 3,636.36
roster beton 25/25 Bh 9,204.55
pion pagar Bh 19,090.91
pion teras Bh 17,181.82
pilar teras segi Bh 472,500.00
7 kapur .
Pabrikan/olahan 25 kg Kg 63,000.00
8 Semen portland Kg 2,400.00 Setara tonasa
9 semen warna/semen nat Kg 32,727.27
C. BAHAN ATAP
9 Seng gelombang besar
BJLS 0,18 Lbr 63,000.00
BJLS 0,20 Lbr 64,909.09
Multi roof Lbr 37,227.27
sakura roof Lbr 42,000.00
Atap Spandek 0.45 mm m2 90,000.00
nook genteng multi roof Bh 74,454.55
nook genteng sakura roof Bh 28,636.36
HARGA SATUAN
NO. U R A I A N SATUAN KETERANGAN
(Rp.)
1 2 3 4.00 5
nook Spandek Bh 45,818.18
HARGA SATUAN
NO. U R A I A N SATUAN KETERANGAN
(Rp.)
1 2 3 4.00 5
10 seng gelombang kecil
BJLS 0,18 Lbr 64,909.09 45,075.76 /M2
BJLS 0,20 Lbr 82,090.91
11 seng plat
BJLS 0,18 Lbr 18,136.36
BJLS 0,20 Lbr 21,954.55
BJLS 0,30 Lbr 23,863.64
12 Seng Plastik
Glm. Bsr Fiber Klas Lbr 68,727.27
Glm. Bsr Besar Biasa Lbr 68,727.27
Baja Ringan
Baja Ringan Taso 0,65 mm Panjang 6 m m 14,820.91
Baja Ringan Taso 0,70 mm Panjang 6 m m 15,284.55
Baja Ringan Taso 0,75 mm Panjang 6 m m 15,593.64
Baja Ringan Taso 1,00 mm Panjang 6 m m 23,320.91
Baja Ringan Reng R 33 - 0,45 Galvalum/Zinca m 9,411.82
13 Rangka atap baja ringan (ex. Prima struss) m2 133,636.36
Papan Ukuran 3 cm x 20cm P 400 cm M 67,729.55
E. BAHAN BESI
16 besi beton polos
Ø : 4 mm Kg 17,000.00
Ø : 6 mm Kg 17,000.00
Ø : 8 mm Kg 17,000.00
Ø : 10 mm Kg 17,000.00
Ø : 12 mm Kg 17,000.00
Ø : 14 mm Kg 17,000.00
Ø : 16 mm Kg 17,000.00
Ø : 19 mm Kg 17,000.00
besi beton ulir
Ø : 10 mm Kg 22,727.27
Ø : 12 mm Kg 22,727.27
Ø : 16 mm Kg 22,727.27
Ø : 19 mm Kg 22,727.27
Ø : 32 mm Kg 22,727.27
besi beton Polos Ulir Kg 17,000.00
Besi Plat
Tebal : 2 mm Lbr 796,090.91
Tebal : 4 mm Lbr 1,638,000.00
Tebal : 6 mm Lbr 2,475,136.36
Tebal : 8 mm Lbr 3,414,409.09
Kawat Beton
kawat p. Beton kg 24,818.18
kawat duri 50 m roll 128,863.64
kawat nyamuk logam m2 30,909.09
k.n dari plastik m2 6,363.64
k. Harmonika m2 30,909.09
K. Jaring/ayahkan m2 30,909.09
k. Bronjong 50 kg roll 900,000.00
Besi siku
30 x 30 x 3 mm, p 6 m btg 91,636.36
50 x 50 x 5 mm, p 6 m btg 163,227.27
70 x 70 x 7 mm, p 6 m btg 198,545.45
100 x 100 x 10 mm, p 6 m btg 248,181.82
besi baja profil Kg 16,500.00
HARGA SATUAN
NO. U R A I A N SATUAN KETERANGAN
(Rp.)
1 2 3 4.00 5
HARGA SATUAN
NO. U R A I A N SATUAN KETERANGAN
(Rp.)
1 2 3 4.00 5
F. KUSEN
17 Kusen Alumunium 4" Putih m 120,000.00
Kusen Alumunium, alexindo m 105,000.00
Rangka pintu alumunium m 116,550.00
Rangka jendela alumunium m 55,440.00
kusen & pintu PVC Toilet maspion unit 847,636.36
Panil Spandrel Aluminium m2 82,500.00
Slimar Aluminium (putih) m 42,350.00
Sealent Karet Kaca Tube 31,818.18
Skrup Pixer Bh 270.00
Jendela Naco Bh 150,000.00
Set Rel sliding jendela geser+ roda + acc m' 163,636.36