Anda di halaman 1dari 4

E:\PICTURE\UWG 2.

JPG
0.80 q = 7 kN/m
UNIVERSITAS WIDYAGAMA MALANG
FAKULTAS TEKNIK
P = 1000 kN JURUSAN TEKNIK SIPIL
1.20 LAPISAN 1
H = 150 kN ƴ = 18,0 kN/m³ TUGAS
1 0.30 φ = 35º
1 ƴ sat= 19,7 kN/m³
1 2 PERANCANGAN PONDASI
1 0.40 c = 0 kN/m³
1
0.30 5.00 H4
SKALA GAMBAR
7.00 H5 1 : 100
DIGAMBAR
1.70
Nama : Yulio Ayub Loba
B1 N I M :181222018151426
H3 2.00 DIPERIKSA
1.00
LAPISAN 2
ƴ sat= 16,7 kN/m³ Dr. AGUS TUGAS SUDJIANTO., ST., MT
φ =0º
LAPISAN 2
ƴ air= 10,0 kN/m³
H2 2.10
1.95 KETERANGAN
H1 1.00
1. Semua Satuan dalam meter
5.60
B2
PONDASI TIANG
SKALA 1 : 100
q = 6.5 kN/m²
LAPISAN 1 (Tanah Pasir)
ƴ = 17.5 kN/m³
φ = 37º TIE ROD H4 = 2.8 m
ƴ sat= 15.7 kN/m³
c = 0 kN/m³
H1 = 5.9 m
Hair 1 = 6.3 m Hair 2 = 5.6 m
H3 = 8.1 m
BLOK ANGKUR
LAPISAN 2 (Tanah Pasir)
ƴ = 19.3 kN/m³
φ = 32º
ƴ sat= 15.5 kN/m³
H2 = 2.2 m c = 0 kN/m³
LAPISAN 3
ƴ = 19, 9 kN/m³
φ = 34º
ƴ sat= 15,7 kN/m³
c = 2,30 kN/m³

Anda mungkin juga menyukai