B IFA 13-10-2021 GA AN BB
A IFR 17-09-2021 GA AN BB
LEMBAR KOMENTAR
B 8 Revisi asumsi
PENYUSUNAN BASIC DESIGN
PEMBANGUNAN PIPA
TRANSMISI GAS BUMI RUAS
CIREBON SEMARANG
Judul Dokumen : No. Dokumen :
Fire Water Pump Sizing SMR-CRB-HSE-CAL-003 Rev : Halaman :
B 2
SKG
DAFTAR ISI
1. PENDAHULUAN ................................................................................................................... 3
2. TUJUAN ................................................................................................................................ 3
3. REFERENSI DOKUMEN ...................................................................................................... 3
4. SATUAN ................................................................................................................................ 4
5. DESKRIPSI PROYEK & LOKASI ........................................................................................ 4
6. DESAIN DATA ...................................................................................................................... 6
7. METODE PERHITUNGAN.................................................................................................... 9
8. HASIL .................................................................................................................................. 10
LAMPIRAN A LEMBAR PERHITUNGAN UKURAN POMPA.................................................. 11
PENYUSUNAN BASIC DESIGN
PEMBANGUNAN PIPA
TRANSMISI GAS BUMI RUAS
CIREBON SEMARANG
Judul Dokumen : No. Dokumen :
Fire Water Pump Sizing SMR-CRB-HSE-CAL-003 Rev : Halaman :
B 3
SKG
1. PENDAHULUAN
Berdasarkan hasil lelang tahun 2006 yang dilakukan BPH Migas, direncanakan
pembangunan ruas Transmisi Cirebon - Semarang yang dibangun sepanjang 230 km,
diameter 28 inchi dan kapasitas 350 – 500 MMSCFD. Sejak 2006 sampai dengan saat ini
belum dilakukan pembangunan infrastruktur pipa tersebut, karena saat ini dibutuhkan
integrasi supply dari Jawa Bagian Tengah ke Jawa Bagian Barat. Oleh karena itu
diperlukan keterlibatan Pemerintah untuk mempercepat pembangunan infrastruktur gas
bumi melalui pembangunan pipa transmisi. Berdasarkan hal tersebut maka kementerian
ESDM bermaksud membangun pipa transmisi Semarang-Cirebon untuk dapat mensuplai
gas di sepanjang jalur pipa transmisi. Ruas yang akan dibangun di tahap pertama adalah
ruas pipa transmisi Semarang- Batang
2. TUJUAN
Dokumen ini menyajikan metode dan hasil perhitungan pompa air pemadam dan pompa
jockey-nya. Pompa air pemadam adalah pompa yang menyalurkan air dari tangki air
pemadam kebakaran menuju alat pemadam kebakaran ketika dibutuhkan. Pompa jockey
adalah pompa pembantu untuk menjaga tekanan air pada alat pemadam kebakaran saat
posisi stand-by. Hasil perhitungan dokumen ini adalah perhitungan awal dan perlu
diverifikasi kembali oleh pelaksana pekerjaan pada tahap Detail Desain dan Konstruksi.
3. REFERENSI DOKUMEN
1) SMR-CRB-PRO-PFD-001~003 Diagram Alir Proses
4. SATUAN
Tabel 1 Satuan Unit
Besaran
Satuan Penjelasan
Satuan
Temperatur F Derajat Fahrenheit
Tekanan psi pounds per square inch
million metric standard cubic
Laju Alir MMSCFD
feet per day
Kecepatan ft/s feet per detik
Densitas kg/m3 kilogram per meter kubik
Daya kW / hp kilowatt / horse power
Panas Btu British-thermal-unit
Diameter Pipa in inch
Kekasaran Pipa in inch
Jarak/Panjang km kilometer / meter
Elevasi ft feet
Konduktivitas British-thermal-unit per jam per
Btu/hr-ft-F
Termal feet per Derajat Fahrenheit
Pembangunan Tahap 2
Fasilitas yang sudah Tersedia KPSBU
Pembangunan Tahap 1
Compressor Gas
Gambar 2.
PENYUSUNAN BASIC DESIGN
PEMBANGUNAN PIPA
TRANSMISI GAS BUMI RUAS
CIREBON SEMARANG
Judul Dokumen : No. Dokumen :
Fire Water Pump Sizing SMR-CRB-HSE-CAL-003 Rev : Halaman :
B 6
SKG
Cirebon
JTB
Pembangunan Tahap 2
Fasilitas yang sudah Tersedia KPSBU
Pembangunan Tahap 1
Compressor Gas
6. DESAIN DATA
Gambar berikut menunjukkan skema umum pengadaan air pemadam di SKG Semarang.
L=328 ft
16.4 ft
Fire Water Tank
9.8 ft
L=13.12 ft
Berdasarkan skematik di atas, berikut data pipa dan hilang tekan yang digunakan dalam
perhitungan.
Discharge Condition
Elevation Difference ft 16.4
Pipe ID in 2
Pipe Length ft 328
6.2 ASUMSI
a. Perhitungan kapasitas laju alir pompa pemadam menggunakan 110% laju alir
kebutuhan.
b. Margin hilang tekan pada suction dan discharge pompa sebesar 20%.
c. Tekanan discharge pompa minimal 145 psig.
d. Efisiensi pompa 60%.
e. Laju kebocoran yang harus diatasi oleh pompa jockey sebesar 1% dari laju alir pompa
pemadam atau 25 gpm, dipilih nilai yang paling tinggi.
7. METODE PERHITUNGAN
1) Menghitung kecepatan aliran dan hilang tekan fluida di sisi suction dan discharge
pompa dan membandingkan dengan kriteria acceptance
2) Menghitung hilang tekan karena fittings, seperti strainer, elbow, tee, dan valve, baik
pada scution maupun discharge pompa
3) Menghitung total hilang tekan pada masing-masing suction dan discharge pompa
4) Menghitung break horse power yang diperlukan
5) Menentukan break horse power pompa sesuai dengan kapasitas motor yang tersedia
secara umum
6) Menghitung NPSHA dan NPSHR
PENYUSUNAN BASIC DESIGN
PEMBANGUNAN PIPA
TRANSMISI GAS BUMI RUAS
CIREBON SEMARANG
Judul Dokumen : No. Dokumen :
Fire Water Pump Sizing SMR-CRB-HSE-CAL-003 Rev : Halaman :
B 10
SKG
8. HASIL
Berikut adalah ringkasan hasil perhitungan pompa pemadam dan jockey. Rincian
perhitungan ditampilkan pada Lampiran A.
LAMPIRAN A
LEMBAR PERHITUNGAN UKURAN POMPA
PENYUSUNAN BASIC DESIGN
PEMBANGUNAN PIPA
TRANSMISI GAS BUMI RUAS
CIREBON SEMARANG
Judul Dokumen : No. Dokumen :
Fire Water Pump Sizing SMR-CRB-HSE-CAL-003 Rev : Halaman :
B 12
SKG
Tag No: -
Deskripsi Fire Water Pump
Lokasi SKG Semarang-Cirebon
DATA RESULTS
Laju alir 5678 L/min Suction Hydraulic
Densitas 995.83 kg/m3 Pipe ID 0.835 ft
Temperatur alir 85 F Velocity 6.103 ft/s
Viskositas 0.80 cP Velocity acceptance 8 ft/s (max)
8.00.E-04 Nm2/s Reynold number 772506
Tekanan uap 15.3 psia Pipe DP 0.4523005 psi/100ft
Efisiensi pompa 60% Pipe DP acceptance 2.21 psi/100ft
Static head 4.227 psi
SUCTION Pipe friction loss 0.059 psi
Tekanan pond minimal 0 psig Fitting friction loss 1.907 psi
Tekanan pond minimal 0 psig Suction Pressure 2.260 psig
Static head 9.8 ft Result OK
Length 13.12 ft assumption
Pipe size 10 in Discharge Hydraulic
Schedule 40 Pipe ID 0.665 ft
Fittings Velocity 9.622 ft/s
Qty K DP Velocity acceptance 14 ft/s (max)
Elbow 90 LR 2 0.22 0.1099250 Reynold number 1,076,651
Elbow 45 LR 0 0.22 0.0000000 Pipe DP 1.435511 psi/100ft
Tee thru 0 0.28 0.0000000 Pipe DP acceptance 2 psi/100ft
Tee branch 1 0.84 0.2098568 Static head 7.075 psi
Ball valve 0 0.04 0.0000000 Line losses 4.708 psi
Butterfly valve 0 0.63 0.0000000 Fitting & eqp losses 5.440 psi
Gate valve 0 0.11 0.0000000 Discharge Pressure 162.224 psig
Globe valve 0 4.80 0.0000000 Result OK
Check valve 1 1.40 0.3497614
Plug valve 0 1.26 0.0000000 Pump Data
Pipe entrance 1 0.78 0.1948671 Suction Pressure 2.26 psig
Suction strainer 1 0.7250000 Discharge Pressure 162.22 psig
Total, psi 1.5894103 Selected disc. Pressure 162.22 psig
Contingency 20% Differential Pressure 159.96 psi
Total + Contingency 1.9072923 Differential Head 370.87 ft
Hydraulic Power 104.4013 kW
DISCHARGE Pump BHP 174.0022 kW
Target Pressure 145 psig Rated Power (calculated) 191.4025 kW
Static head 16.404199 ft note 2 Rated Power (selected) 200.00 kW
Length 328.08399 ft NPSHa 3.8 ft
Pipe size 8 in NPSHr 0.54 ft
Schedule 40
Fittings Shut in Pressure
Qty K DP P shut in 207.95 psig
Elbow 90 LR 4 0.22 0.5464945
Elbow 45 LR 0 0.22 0.0000000
Tee thru 0 0.28 0.0000000
Tee branch 5 0.84 2.6082693
Ball valve 1 0.04 0.0248407
Butterfly valve 0 0.63 0.0000000
Gate valve 0 0.11 0.0000000
Globe valve 0 4.80 0.0000000
Check valve 1 1.40 0.8694231
Plug valve 0 1.26 0.0000000
Pipe entrance 1 0.78 0.4843929
Flow orifice 0 0.0000000
Total, psi 4.5334205
Contingency 20%
Total + contingency, barg 5.4401045
PENYUSUNAN BASIC DESIGN
PEMBANGUNAN PIPA
TRANSMISI GAS BUMI RUAS
CIREBON SEMARANG
Judul Dokumen : No. Dokumen :
Fire Water Pump Sizing SMR-CRB-HSE-CAL-003 Rev : Halaman :
B 13
SKG
Tag No: -
Deskripsi Jockey Pump
Lokasi SKG Semarang-Cirebon
DATA RESULTS
Laju alir 95 L/min Suction Hydraulic
Densitas 995.83 kg/m3 Pipe ID 0.173 ft
Temperatur alir 85 F Velocity 2.393 ft/s
Viskositas 0.80 cP Velocity acceptance 3 ft/s (max)
8.00.E-04 Nm2/s Reynold number 59846
Tekanan uap 15.3 psia Pipe DP 0.5277406 psi/100ft
Efisiensi pompa 60% Pipe DP acceptance 0.6 psi/100ft
Static head 4.227 psi
SUCTION Pipe friction loss 0.069 psi
Tekanan pond minimal 0 psig Fitting friction loss 1.074 psi
Tekanan pond minimal 0 psig Suction Pressure 3.084 psig
Static head 9.8 ft Result OK
Length 13.12 ft assumption
Pipe size 2 in Discharge Hydraulic
Schedule 40 Pipe ID 0.173 ft
Fittings Velocity 2.393 ft/s
Qty K DP Velocity acceptance 6 ft/s (max)
Elbow 90 LR 2 0.30 0.0230369 Reynold number 119,692
Elbow 45 LR 0 0.30 0.0000000 Pipe DP 0.489498 psi/100ft
Tee thru 0 0.38 0.0000000 Pipe DP acceptance 1.6 psi/100ft
Tee branch 1 1.14 0.0437700 Static head 7.075 psi
Ball valve 0 0.06 0.0000000 Line losses 1.606 psi
Butterfly valve 0 0.86 0.0000000 Fitting & eqp losses 0.444 psi
Gate valve 0 0.15 0.0000000 Discharge Pressure 154.125 psig
Globe valve 0 6.50 0.0000000 Result OK
Check valve 1 1.90 0.0729500
Plug valve 0 1.71 0.0000000 Pump Data
Pipe entrance 1 0.78 0.0299479 Suction Pressure 3.08 psig
Suction strainer 1 0.7250000 Discharge Pressure 154.13 psig
Total, psi 0.8947048 Selected disc. Pressure 154.13 psig
Contingency 20% Differential Pressure 151.04 psi
Total + Contingency 1.0736458 Differential Head 350.19 ft
Hydraulic Power 1.6493 kW
DISCHARGE Pump BHP 2.7488 kW
Target Pressure 145 psig Rated Power (calculated) 3.4360 kW
Static head 16.404199 ft note 2 Rated Power (selected) 3.70 kW
Length 328.08399 ft NPSHa 5.7 ft
Pipe size 2 in NPSHr 2.45 ft
Schedule 40
Fittings Shut in Pressure
Qty K DP P shut in 196.35 psig
Elbow 90 LR 4 0.30 0.0460737
Elbow 45 LR 0 0.30 0.0000000
Tee thru 0 0.38 0.0000000
Tee branch 5 1.14 0.2188501
Ball valve 1 0.06 0.0023037
Butterfly valve 0 0.86 0.0000000
Gate valve 0 0.15 0.0000000
Globe valve 0 6.50 0.0000000
Check valve 1 1.90 0.0729500
Plug valve 0 1.71 0.0000000
Pipe entrance 1 0.78 0.0299479
Flow orifice 0 0.0000000
Total, psi 0.3701254
Contingency 20%
Total + contingency, barg 0.4441505