Anda di halaman 1dari 73

LAPORAN SAMBUNGAN BARU

Per Tahun 2020


Mutasi
No Tanggal URAIAN SALDO
Debet Kredit
1 24-09-20 Penerimaan Non Air SR (Andi S. Batari) 1.650.000.00 1.650.000.00
2 24-09-20 Pengeluaran Biaya Kerja SR (Andi S. Batari) 400.000.00 1.250.000.00
3 24-09-20 Pengeluaran Aksesoris SR 180.000.00 1.070.000.00
4 2/10/2020 Penerimaan Non Air SR (Dian Lestari S) 1.650.000.00 2.720.000.00
5 2/10/2020 Pengeluaran Aksesoris SR 400.000.00 2.540.000.00
6 2/10/2020 Pengeluaran Biaya Kerja SR 180.000.00 2.140.000.00
7 13-10-20 Penerimaan Sambungan Baru (Rachmat Mado) 1.650.000.00 3.790.000.00
8 13-10-20 Penerimaan Sambungan Baru (Muh. Afif Alfatih) 1.650.000.00 5.440.000.00
9 13-10-20 Pengeluaran Pembelian Pipa dll (Rachmat Mado) 200.000.00 5.240.000.00
10 13-10-20 Pengeluaran Biaya Kerja SR (Racmat Mado) 400.000.00 4.840.000.00
11 13-10-20 Pengeluaran Pembelian Pipa dll (Muh. Afif Alfatih) 200.000.00 4.640.000.00
12 13-10-20 Pengeluaran Biaya Kerja SR (Muh. Afif Alfatih) 400.000.00 4.240.000.00
13 13-10-20 Penerimaan Sambungan Baru (Sudarmin) 1.650.000.00 5.890.000.00
14 13-10-20 Pengeluaran Pembelian Pipa dll (Sudarmin) 190.000.00 5.700.000.00
15 13-10-20 Pengeluarann Biaya Kerja SR (Sudarmin) 400.000.00 5.300.000.00
16 14-01-20 Penerimaan Sambungan Baru (Asrin Lahuki) 1.650.000.00 6.950.000.00
17 14-01-20 Pengeluaran Pembelian Pipa dll (Asrin Lahuki) 190.000.00 6.760.000.00
18 14-01-20 Pengeluarann Biaya Kerja SR (Asrin Lahuki) 400.000.00 6.360.000.00
19 19-10-20 Penerimaan Sambungan Baru (La Djunaidin Dae) 1.650.000.00 8.010.000.00
20 19-10-20 Pengeluaran Pembelian Pipa dll (La Djunaidin Dae) 400.000.00 7.610.000.00
21 19-10-20 Pengeluarann Biaya Kerja SR (La Djunaidin Dae) 185.000.00 7.425.000.00
22 23-10-20 Penerimaan Sambungan Baru (Wa Huri) 1.650.000.00 9.075.000.00
23 23-10-20 Pengeluarann Biaya Kerja (Wa Huri) 400.000.00 8.675.000.00
24 23-10-20 Pengeluaran Pembelian Pipa dll (Wa Huri) 200.000.00 8.475.000.00
25 23-10-20 Penerimaan Sambungan Baru (Arisandi La Isa) 1.650.000.00 10.125.000.00
26 23-10-20 Pengeluarann Biaya Kerja (Arisandi La Isa) 400.000.00 9.725.000.00
27 23-10-20 Pengeluaran Pembelian Pipa dll (Arisandi La Isa) 175.000.00 9.550.000.00
28 26-10-20 Penerimaan Sambungan Baru (Sadidu) 1.650.000.00 11.200.000.00
29 26-10-20 Pengeluarann Biaya Kerja (Sadidu) 400.000.00 10.800.000.00
30 26-10-20 Pengeluaran Pembelian Pipa dll (Sadidu) 180.000.00 10.620.000.00
31 10/11/2020 Penerimaan Sambungan Baru (Udin) 1.650.000.00 12.270.000.00
32 10/11/2020 Pengeluarann Biaya Kerja (Udin) 300.000.00 11.970.000.00
33 10/11/2020 Pengeluaran Pembelian Pipa dll (Udin) 180.000.00 11.790.000.00
34 13-11-20 Penerimaan Sambungan Baru (Hermawan Rahman) 1.650.000.00 13.440.000.00
35 13-11-20 Pengeluarann Biaya Kerja (Hermawan Rahman) 300.000.00 13.140.000.00
36 13-11-20 Pengeluaran Pembelian Pipa dll (Hermawan Rahman) 195.000.00 12.945.000.00
37 11/12/2020 Penerimaan Sambungan Baru (Marsudin Hasanudin.S.E) 1.650.000.00 14.595.000.00
38 11/12/2020 Pengeluarann Biaya Kerja (Marsudin Hasanudin.S.E) 300.000.00 14.295.000.00
39 11/12/2020 Pengeluaran Pembelian Pipa dll (Marsudin Hasanudin.S.E) 200.000.00 14.095.000.00
40 26-12-20 Penerimaan Sambungan Baru (Sutra) 1.650.000.00 15.745.000.00
41 26-12-20 Pengeluarann Biaya Kerja (Sutra) 300.000.00 15.445.000.00
42 26-12-20 Pengeluaran Pembelian Pipa dll (Sutra) 200.000.00 15.245.000.00
Rekapitulasi Rekening Air

Bulan : Maret 2020

Alamat Will/Blok Pelanggan M³


Fangahu BB.1.01 343 3,395.00
Salenga BB.1.02 143 1,623.00
Badadi BB.1.03 76 1,159.00
Sangadji BB.1.04 74 441.00
Unabua BB.1.05 59 355.00
Tikomia BB.1.06 141 1,783.00
Tamundo BB.1.07 41 272.00
Tanjung Sari BB.1.08 80 349.00
Ratahaya BB.1.09 32 -
Kilong BB.1.10 17 671.00
Jumlah 1006 10048.00

Rekapitulasi Rekening Air


Bulan : April 2020

Alamat Will/Blok Pelanggan M³


Fangahu BB.1.01 358 3,950.00
Salenga BB.1.02 146 1,365.00
Badadi BB.1.03 76 1,150.00
Sangadji BB.1.04 74 436.00
Unabua BB.1.05 60 407.00
Tikomia BB.1.06 143 1,732.00
Tamundo BB.1.07 41 305.00
Tanjung Sari BB.1.08 81 256.00
Ratahaya BB.1.09 32 -
Kilong BB.1.10 20 140.00
Jumlah 1031 9741.00
Rekapitulasi Rekening Air
Bulan : Mei 2020

Alamat Will/Blok Pelanggan M³


Fangahu BB.1.01 358 3.644
Salenga BB.1.02 146 1.630
Badadi BB.1.03 76 1.508
Sangadji BB.1.04 74 899
Unabua BB.1.05 60 512
Tikomia BB.1.06 143 2.193
Tamundo BB.1.07 41 359
Tanjung Sari BB.1.08 81 386
Ratahaya BB.1.09 32 -
Kilong BB.1.10 20 65
Jumlah 1031 2,230

Rekapitulasi Rekening Air


Bulan : Juni 2020

Alamat Will/Blok Pelanggan M³


Fangahu BB.1.01 359 3.992
Salenga BB.1.02 146 1.250
Badadi BB.1.03 76 1.411
Sangadji BB.1.04 74 618
Unabua BB.1.05 60 412
Tikomia BB.1.06 143 2.417
Tamundo BB.1.07 41 346
Tanjung Sari BB.1.08 81 382
Ratahaya BB.1.09 32 -
Kilong BB.1.10 20 63
Jumlah 1032 1,830
Rekapitulasi Rekening Air
Bulan : September 2020

Alamat Will/Blok Pelanggan M³


Fangahu BB.1.01 374 3.830
Salenga BB.1.02 147 1.472
Badadi BB.1.03 73 1.242
Sangadji BB.1.04 73 437
Unabua BB.1.05 60 411
Tikomia BB.1.06 143 1.621
Tamundo BB.1.07 41 246
Tanjung Sari BB.1.08 82 328
Ratahaya BB.1.09 32 -
Kilong BB.1.10 20 37
Jumlah 1045 1,467

Rekapitulasi Rekening Air


Bulan : Oktober 2020

Alamat Will/Blok Pelanggan M³


Fangahu BB.1.01 379 6.199
Salenga BB.1.02 141 2.873
Badadi BB.1.03 74 1.564
Sangadji BB.1.04 73 1.108
Unabua BB.1.05 59 897
Tikomia BB.1.06 143 2.272
Tamundo BB.1.07 41 358
Tanjung Sari BB.1.08 82 944
Ratahaya BB.1.09 32 313.00
Kilong BB.1.10 20 154
Jumlah 1044 2,680
Rekapitulasi Volume Air Tahun 2021

Bulan M³
Januari 10.462
Februari 12.655
Maret 10.048
April 9.741
Mei 11.196
Juni 10.891
Juli 7.338
Agustus 6.997
September 9.624
Oktober 16.690
November 15.855
Desember 15.836
Total 137.333
Rekapitulasi Rekening Air

Bulan : Januari 2020

Alamat Will/Blok Pelanggan M³


Fangahu BB.1.01 337 3,893.00
Salenga BB.1.02 141 1,731.00
Badadi BB.1.03 75 1,208.00
Sangadji BB.1.04 74 620.00
Unabua BB.1.05 59 368.00
Tikomia BB.1.06 141 1,918.00
Tamundo BB.1.07 41 314.00
Tanjung Sari BB.1.08 75 262.00
Ratahaya BB.1.09 32 -
Kilong BB.1.10 17 112.00
Jumlah 992 10426.00

Rekapitulasi Rekening Air


Bulan : Februari 2020

Alamat Will/Blok Pelanggan M³


Fangahu BB.1.01 338 6,079.00
Salenga BB.1.02 142 1,584.00
Badadi BB.1.03 75 1,138.00
Sangadji BB.1.04 74 523.00
Unabua BB.1.05 59 382.00
Tikomia BB.1.06 141 1,885.00
Tamundo BB.1.07 41 321.00
Tanjung Sari BB.1.08 78 304.00
Ratahaya BB.1.09 32 -
Kilong BB.1.10 17 439.00
Jumlah 997 12655.00
Rekapitulasi Rekening Air
Bulan : Juli 2020

Alamat Will/Blok Pelanggan M³


Fangahu BB.1.01 360 2.396
Salenga BB.1.02 147 1.407
Badadi BB.1.03 76 737.000
Sangadji BB.1.04 74 536
Unabua BB.1.05 60 220
Tikomia BB.1.06 143 1.481
Tamundo BB.1.07 41 235
Tanjung Sari BB.1.08 81 287
Ratahaya BB.1.09 32 -
Kilong BB.1.10 20 39
Jumlah 1034 2,059

Rekapitulasi Rekening Air


Bulan : Agustus 2020

Alamat Will/Blok Pelanggan M³


Fangahu BB.1.01 369 3.183
Salenga BB.1.02 146 922.000
Badadi BB.1.03 76 746.000
Sangadji BB.1.04 74 121
Unabua BB.1.05 60 326
Tikomia BB.1.06 143 1.116
Tamundo BB.1.07 41 158
Tanjung Sari BB.1.08 81 327
Ratahaya BB.1.09 32 -
Kilong BB.1.10 20 98
Jumlah 1042 2,702
Rekapitulasi Rekening Air
Bulan : November 2020

Alamat Will/Blok Pelanggan M³


Fangahu BB.1.01 388 6.174
Salenga BB.1.02 137 2.339
Badadi BB.1.03 74 1.776
Sangadji BB.1.04 73 966
Unabua BB.1.05 59 845
Tikomia BB.1.06 145 1.987
Tamundo BB.1.07 43 354
Tanjung Sari BB.1.08 82 807
Ratahaya BB.1.09 32 341.00
Kilong BB.1.10 21 266
Jumlah 1054 3,591

Rekapitulasi Rekening Air


Bulan : Desember 2020

Alamat Will/Blok Pelanggan M³


Fangahu BB.1.01 389 5.692
Salenga BB.1.02 135 2.675
Badadi BB.1.03 74 1.431
Sangadji BB.1.04 73 948
Unabua BB.1.05 57 826
Tikomia BB.1.06 145 2.484
Tamundo BB.1.07 43 450
Tanjung Sari BB.1.08 81 862
Ratahaya BB.1.09 32 341.00
Kilong BB.1.10 21 127
Jumlah 1050 3,566
No Uraian/Kriteria

Cakupan
1
Pelayanan (%)

Konsumen SR
2
(I/o/h)
Konsumen HU
3
(I/o/h)

4 Jumlah Jiwa/SR

Jumlah
5
Jiwa/HU

6 SR : HU (%)

Kehilangan Air
7
(%)
Faktor Max
8
Day

Faktor Peak
9
Hour

10 Jam Operasi
Kategori
Metro Besar Sedang Kecil
(500-1 jt)
(> 1 Juta Jiwa) (100–500) Jiwa (20-100) jiwa
Jiwa
90 90 90 90
Perpipaan 60 Perpipaan 60 Perpipaan 60 Perpipaan 60
BJP 30 BJP 30 BJP 30 BJP 30

190 170 150 130

30 30 30 30

5 5 6 6

100 100 100 (100-200)

50:50 s/d 50:50 s/d


80:20:00 70:30:00
80:20:00 80:20:00

(20-30) (20-30) (15-20) (15-20)

1.1 1.1 1.1 1.1

1.5 1.5 1.5 1.5

24 24 24 24
Jumlah KK
Desa
2019 (jiwa) 2020 (jiwa) 2021 (jiwa)
Bobong 1.692 2.420 2.610
Wayo 1.532 1.735 1.936
Kramat 936 1.232 1.350
Talo 856 1.127 1.276
Jumlah 3.224 6.514 7.172

SAMBUNGAN RUMAH TANGGA (SR)

Tingkat Pelayanan = 70% (Sumber : Kriteria Perencanaan Ditjen Cipta Karya Dinas PU, 1996)

Jumlah Terlayani = Jumlah Penduduk x Tingkat Pelayanan

Jumlah Terlayani = 3.224 x 70%

Jumlah Terlayani = 2.2568 Jiwa

konsumsi Unit Sambungan Rumah (SR) (liter/org/hari) = 60 - 80 (liter/org/hari)

Asumsi 80 (liter/org/hari)
Jumlah Pemakaian = Jumlah terlayani x Konsumsi Air rata-rata

Jumlah Pemakaian = 2.2568 x 80


= 180.544 liter/hari

Jumlah Kebutuhan air = 180.544 / 8640


= 47.855 liter/detik

Hidran Umum

Tingkat Pelayanan = 30% (Sumber : Kriteria Perencanaan Ditjen Cipta Karya Dinas PU, 1996)

Jumlah Terlayani = Jumlah Penduduk x Tingkat Pelayanan

Jumlah Terlayani = 3.224 x 30


= 96.720 Jiwa

Konsumsi Hidran Umum (HU) (liter/org/hari) = 20 - 40 (liter/org/hari)


Asumsi = 30 (liter/org/hari)

Jumlah Pemakaian = Jumlah terlayani x konsumsi air rata-rata

Jumlah Pemakaian = 96.720 x 30


= 2901.6 liter/hari

Jumlah kebutuhan air = 2901.6 / 8640


= 2.9777 liter/detik

Kebutuhan Air Nondomestik

Fasilitas Pendidikan

Konsumsi Air rata-rata (liter/org/hari) = 10 (liter/org/hari)

Jumlah pemakaian = Jumlah siswa x Konsumsi air rata-rata

Jumlah pemakaian = 4520 x 10


= 45200 liter/hari

Jumlah kebutuhan air = 45200 / 8640


= 5.231 liter/detik

Fasilitas Peribadatan

Konsumsi Air rata-rata (liter/unit/hari) = 3000 (liter/org/hari)

Jumlah pemakaian = Jumlah Mesjid x Konsumsi air rata-rata

Jumlah Pemakaian = 1 x 3000 + 10 x 2000


= 23000 liter/hari

Jumlah kebutuhan air = 23000 / 8640


= 2.66204 liter/detik

Fasilitas Pasar

Konsumsi air rata-rata (liter/ha/hari) = 12000 (liter/ha/hari)

Standar Kebutuhan = 36000 x 120000

Jumlah Pemakaian = Jumlah Penduduk x Standar Kebutuhan

Jumlah Pemakaian = 3.224 x 36000 / 120000


= 0.9672 liter/hari

Jumlah Kebutuhan Air = 0.967 / 8640


= 0.000112 liter/detik

Fasilitas Rumah Sakit

Konsumsi air rata-rata (liter/unit/hari) = 2000 (liter/unit/hari)

Jumlah Pemakaian = Jumlah Puskemas x Konsumsi air rata-rata

Jumlah Pemakaian = 4 x 2000


= 8000 liter/hari

Jumlah Kebutuhan Air = 8000 / 8640


= 0.9259 liter/detik

Fasilitas Perkantoran

Konsumsi air rata-rata (liter/pegawai/hari) = 10 (liter/pegawai/hari)

Jumlah Pemakaian = Jumlah Pegawai x Konsumsi air rata-rata

Jumlah Pemakaian = 320 x 10


= 3200 liter/hari

Jumlah kebutuhan air = 3200 / 8640


= 0.3704 liter/detik
Tahun Jumlah Tingkat Pelayanan Jiwa Terlayani

2026 4,507 Jiwa 50% 2,253


2031 10,592 Jiwa 70% 7,414
2036 20,411 Jiwa 80% 16,329

1. Peritungan Kebutuhan Air Untuk Tahun 2026


a. Kebutuhan Air Domestik
1). Perhitungan Jumlah SR dan HU
Jumlah Penduduk = 4,507 Jiwa
Cakupan Pelayanan = 50% x 4,507 = 2,253
a.) Pelayanan dengan SR 50%
(( 50% x 4,507 )/ 5 ) = 450.66
b.) Pelayanan Dengan HU 50%
(( 50% x 4,507 )/ 100 ) = 22.5332

2). Kebutuhan Air


a). Kebutuhan Untuk SR
450.66 x 130 x 5 = 292,932.2 1/Hari
b.) Kebutuhan Untuk HU
22.533 x 30 x 100 = 67,599.74 1/Hari
c.) Kebutuhan Total Domestik
292,932.2 + 67,599.74 = 360,531.94 1/Hari

b. Kebutuhan Air Non Domestik


1). PLAYGROUP/TK/RA 3 Buah
Terdiri dari 4 kelas dengan jumlah murid rata-rata tiap kelas 20
dengan jumlah guru rata-rata 3 orang. Tingkat pelayanan 50%

Jumlah Jiwa = (( 3 x 4 x 20
( 3 x 3 ))

= 249 Jiwa

Kebutuhan Air = ( 50% x 249 ) x

= 1,245 1/Hari
2). SD/MI 5 Buah
Terdiri dari 6 Kelas dengan jumlah siswa rata-rata tiap kelas 25
dengan jumlah guru rata-rata 13 orang.Tingkat pelayanan 50%

Jumlah Jiwa = (( 5 x 6 x 25
( 5 x 13 ))

= 815 Jiwa

Kebutuhan Air = ( 50% x 815 ) x

= 4,075 1/Hari

3). SMP/MTS 5 Buah


Terdiri Dari 9 kelas dengan jumlah siswa rata-rata tiap kelas 30
dengan jumlah guru rata-rata 20 orang. Tingkat pelayanan 50%

Jumlah Jiwa = (( 5 x 9 x 30
( 5 x 20 ))

= 1,450 Jiwa

Kebutuhan Air = ( 50% x 1,450 ) x

= 7,250 1/Hari

4). PUSKESMAS 4 Unit

Cakupan Pelayanan = 100% x ( 4 x


= 8,000 1/Hari

5). MASJID 6 Unit

Tingkat Pelayanan = 50%


Kebutuhan Air = ( 50% x 6 )
1000
= 3,000 1/Hari
6). Jumlah Kebutuhan Air Non Domestik

= 1,245 + 4,075 + 7,250 + 8,000 +


= 23,570 1/Hari

7). Jumlah Kebutuhan


= Kebutuhan Domestik + Kebutuhan Non Domestik
= 360,531.94 + 23,570
= 384,101.94 1/Hari

8). Kehilangan Air 20%


= 20% x 384,101.94
= 76,820.39 1/Hari

9). Kebutuhan Air Rata-rata


= 384,101.94 + 76,820.39
= 460,922.33 1/Hari

10). Kebutuhan Hari Maksimum 1.1


= 460,922.33 x 1.1
= 507,014.56 1/Hari

11). Kebutuhan Jam Puncak 1.17


= 460,922.33 x 1.17
= 539,279.12 1/Hari

2. Peritungan Kebutuhan Air Untuk Tahun 2031


a. Kebutuhan Air Domestik
1). Perhitungan Jumlah SR dan HU
Jumlah Penduduk = 10,592 Jiwa
Cakupan Pelayanan = 70% x 10,592 = 7,414
a.) Pelayanan dengan SR 70%
(( 70% x 10,592 )/ 5 ) = 1,483
b.) Pelayanan Dengan HU 30%
(( 70% x 10,592 )/ 100 ) = 74.140651291
2). Kebutuhan Air
a). Kebutuhan Untuk SR
1,483 x 130 x 5 = 963,828.5 1/Hari
b.) Kebutuhan Untuk HU
74.141 x 30 x 100 = 222,421.95 1/Hari
c.) Kebutuhan Total Domestik
963,828.5 + 222,421.95 = 1,186,250.42 1/Hari

b. Kebutuhan Air Non Domestik


1). PLAYGROUP/TK/RA 6 Buah
Terdiri dari 4 kelas dengan jumlah murid rata-rata tiap kelas 20
dengan jumlah guru rata-rata 3 orang. Tingkat pelayanan 70%

Jumlah Jiwa = (( 6 x 4 x 20
( 6 x 3 ))

= 498 Jiwa

Kebutuhan Air = ( 70% x 498 ) x

= 3,486 1/Hari

2). SD/MI 6 Buah


Terdiri dari 6 Kelas dengan jumlah siswa rata-rata tiap kelas 25
dengan jumlah guru rata-rata 13 orang.Tingkat pelayanan 70%

Jumlah Jiwa = (( 6 x 6 x 25
( 6 x 13 ))

= 978 Jiwa

Kebutuhan Air = ( 70% x 978 ) x

= 6,846 1/Hari

3). SMP/MTS 5 Buah


Terdiri Dari 9 kelas dengan jumlah siswa rata-rata tiap kelas 30
dengan jumlah guru rata-rata 20 orang. Tingkat pelayanan 70%
Jumlah Jiwa = (( 5 x 9 x 30
( 5 x 20 ))

= 1,450 Jiwa

Kebutuhan Air = ( 70% x 1,450 ) x

= 10,150 1/Hari

4). PUSKESMAS 4 Unit

Cakupan Pelayanan = 100% x ( 4 x


= 8,000 1/Hari

5). MASJID 6 Unit

Tingkat Pelayanan = 70%


Kebutuhan Air = ( 25% x 6 )
1000
= 1,500 1/Hari

6). Jumlah Kebutuhan Air Non Domestik

= 3,486 + 6,846 + 10,150 + 8,000 +


= 29,982 1/Hari

7). Jumlah Kebutuhan


= Kebutuhan Domestik + Kebutuhan Non Domestik
= 1,186,250.42 + 29,982
= 1,216,232.42 1/Hari

8). Kehilangan Air 20%


= 20% x 1,216,232.42
= 243,246.48 1/Hari

9). Kebutuhan Air Rata-rata


= 1,216,232.42 + 243,246.48
= 1,459,478.90 1/Hari

10). Kebutuhan Hari Maksimum 1.1


= 1,459,478.90 x 1.1
= 1,605,426.80 1/Hari

11). Kebutuhan Jam Puncak 1.17


= 1,459,478.90 x 1.17
= 1,707,590.32 1/Hari

3. Peritungan Kebutuhan Air Untuk Tahun 2036


a. Kebutuhan Air Domestik
1). Perhitungan Jumlah SR dan HU
Jumlah Penduduk = 20,411 Jiwa
Cakupan Pelayanan = 80% x 20,411 = 16,329
a.) Pelayanan dengan SR 80%
(( 80% x 20,411 )/ 5 ) = 3,266
b.) Pelayanan Dengan HU 20%
(( 80% x 20,411 )/ 100 ) = 163.29174576

2). Kebutuhan Air


a). Kebutuhan Untuk SR
3,266 x 130 x 5 = 2,122,792.7 1/Hari
b.) Kebutuhan Untuk HU
163.29 x 30 x 100 = 489,875.24 1/Hari
c.) Kebutuhan Total Domestik
2,122,792.7 + 489,875.24 = 2,612,667.93 1/Hari

b. Kebutuhan Air Non Domestik


1). PLAYGROUP/TK/RA 6 Buah
Terdiri dari 4 kelas dengan jumlah murid rata-rata tiap kelas 20
dengan jumlah guru rata-rata 3 orang. Tingkat pelayanan 80%

Jumlah Jiwa = (( 6 x 4 x 20
( 6 x 3 ))

= 498 Jiwa
Kebutuhan Air = ( 80% x 498 ) x

= 3,984 1/Hari

2). SD/MI 6 Buah


Terdiri dari 6 Kelas dengan jumlah siswa rata-rata tiap kelas 25
dengan jumlah guru rata-rata 13 orang.Tingkat pelayanan 80%

Jumlah Jiwa = (( 6 x 6 x 25
( 6 x 13 ))

= 978 Jiwa

Kebutuhan Air = ( 80% x 978 ) x

= 7,824 1/Hari

3). SMP/MTS 5 Buah


Terdiri Dari 9 kelas dengan jumlah siswa rata-rata tiap kelas 30
dengan jumlah guru rata-rata 20 orang. Tingkat pelayanan 80%

Jumlah Jiwa = (( 5 x 9 x 30
( 5 x 20 ))

= 1,450 Jiwa

Kebutuhan Air = ( 80% x 1,450 ) x

= 11,600 1/Hari

4). PUSKESMAS 4 Unit

Cakupan Pelayanan = 100% x ( 4 x


= 8,000 1/Hari

5). MASJID 6 Unit


Tingkat Pelayanan = 80%
Kebutuhan Air = ( 25% x 6 )
1000
= 1,500 1/Hari

6). Jumlah Kebutuhan Air Non Domestik

= 3,984 + 7,824 + 11,600 + 8,000 +


= 32,908 1/Hari

7). Jumlah Kebutuhan


= Kebutuhan Domestik + Kebutuhan Non Domestik
= 2,612,667.93 + 32,908
= 2,645,575.93 1/Hari

8). Kehilangan Air 20%


= 20% x 2,645,575.93
= 529,115.19 1/Hari

9). Kebutuhan Air Rata-rata


= 2,645,575.93 + 529,115.19
= 3,174,691.12 1/Hari

10). Kebutuhan Hari Maksimum 1.1


= 3,174,691.12 x 1.1
= 3,492,160.23 1/Hari

11). Kebutuhan Jam Puncak 1.17


= 3,174,691.12 x 1.17
= 3,714,388.61 1/Hari

Tabel Perhitungan Kebutuhan Air Domest


TA
NO URAIAN SATUAN
2026
1 Jumlah Penduduk Jiwa 4,507 jiwa
2 Tingkat Pelayanan % 50%
3 Penduduk Terlayani Jiwa 2,253 jiwa
4 SR : HU % 50% : 50%
5 Penduduk dilayani dengan SR Jiwa 2,253 jiwa
6 Penduduk dilayani dengan HU Jiwa 22.5332 jiwa
7 Konsumsi unit SR 1/org/hari 130 1/org/hari
8 Konsumsi unit HU 1/org/hari 30 1/org/hari
9 Kebutuhan Air SR 1/hari 292,932 1/hari
10 Kebutuhan Air HU 1/hari 67,600 1/hari
11 Kebutuhan Air Domestik 1/hari 360,532 1/hari

Tabel Perhitungan Air Non Domesti


TA
NO URAIAN SATUAN
2026
1 Sekolah 1/org/hari 12,570 liter
2 Puskesmas 1/hari 8,000 liter
3 Masjid 1/hari 3,000 liter
4 Pasar 1/org/hari - liter
5 Jumlah K. Non 1/hari 23,570 liter

Tabel Rekapitulasi Kebutuhan Air Rata-Rata


TAHUN
NO URAIAN SAT
2026 2031
1 K. Domestik 1/hari 360,531.94 liter 1,186,250.42
2 K. Non domestik 1/hari 23,570 liter 29,982
3 J. Kebutuhan 1+2 1/hari 384,101.94 liter 1,216,232.42
4 Keh. Air 20% 1/hari 76,820.39 liter 243,246.48
5 Keb. Air Rata-rata III+IV1/hari 460,922.33 liter 1,459,478.90
6 Faktor H. maksimum 1.1 1/hari 507,014.56 liter 1,605,426.80
7 Faktor Jam puncak 1.17 1/hari 539,279.12 liter 1,707,590.32
8 Keb. Air Rata-rata 1/dtk 460,922 1/dtk 1,459,479
Jenis
Terlayani Standar Satuan Keterangan
Pemakaian
Jiwa Sambungan
130 I/org/hari
Jiwa Rumah (SR)
Jiwa Hidran Umum
30 I/org/hari
(HU)
PLAYGROUP, TK,
Pendidikan 10 I/hari
SD, SMP, SMA
Masjid 1000 I/hari
Perkantoran 10 I/org/hari
Jiwa Puskesmas 2000 I/hari
Pasar 2500 I/unit/hari
Jiwa Kehilangan Air 20 %
Pemakaian Air
110 %
HU maksimum
Pemakaian Air
117 %
Jam Puncak
50% : 50% Periode I
SR : HU 70% : 30% % Periode II
80% : 20% Periode III

orang

)) +

10
orang

)) +

10

orang

)) +

10

2000 )

x
3,000

Jiwa

Jiwa

HU
orang

)) +

10

orang

)) +

10

orang
)) +

10

2000 )

1,500
Jiwa

Jiwa

HU

orang

)) +
10

orang

)) +

10

orang

)) +

10

2000 )
x

1,500

tuhan Air Domestik


TAHUN
2031 2036
10,592 jiwa 20,411 jiwa
70% 80%
7,414 jiwa 16,329 jiwa
70% : 30% 80% : 20 %
7,414 jiwa 16,329 jiwa
74.1407 jiwa 163.2917 jiwa
130 1/org/hari 130 1/org/hari
30 1/org/hari 30 1/org/hari
963,828 1/hari 2,122,793 1/hari
222,422 1/hari 489,875 1/hari
1,186,250 1/hari 2,612,668 1/hari

n Air Non Domestik


TAHUN
2031 2036
20,482 liter 23,408 liter
8,000 liter 8,000 liter
1,500 liter 1,500 liter
- liter 2.500 liter
29,982 liter 32,911 liter

an Air Rata-Rata
TAHUN
2031 2036
liter 2,612,667.93 liter
liter 32,908 liter
liter 2,645,575.93 liter
liter 529,115.19 liter
liter 3,174,691.12 liter
liter 3,492,160.23 liter
liter 3,714,388.61 liter
1/dtk 3,174,691 1/dtk
1) perhitungan untuk mencari pemakaian air pukul 17.00
= Stand Awal - Stand Akhir
= 164.382 - 164.467
= 82.09 m3/jam
= 22.77 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.77
=
6.997
= 3.254

1) perhitungan untuk mencari pemakaian air pukul 18.00


= Stand Awal - Stand Akhir
= 164.432 - 164.589
= 82.16 m3/jam
= 22.82 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.82
=
7.00
= 3.261

1) perhitungan untuk mencari pemakaian air pukul 19.00


= Stand Awal - Stand Akhir
= 164.673 - 164.775
= 82.10 m3/jam
= 22.86 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.86
=
6.997
= 3.267
1) perhitungan untuk mencari pemakaian air pukul 20.00
= Stand Awal - Stand Akhir
= 164.764 - 164.782
= 82.02 m3/jam
= 22.78 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.78
=
6.997
= 3.256 I/dtk

1) perhitungan untuk mencari pemakaian air pukul 21.00


= Stand Awal - Stand Akhir
= 164.7 - 164.732
= 82.03 m3/jam
= 22.7 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.70
=
6.997
= 3.244 I/dtk

1) perhitungan untuk mencari pemakaian air pukul 22.00


= Stand Awal - Stand Akhir
= 164.74 - 164.892
= 82.15 m3/jam
= 22.81 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.81
=
6.997
= 3.260 I/dtk
1) perhitungan untuk mencari pemakaian air pukul 23.00
= Stand Awal - Stand Akhir
= 164.891 - 164.921
= 82.03 m3/jam
= 22.79 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.79
=
6.997
= 3.257 I/dtk

1) perhitungan untuk mencari pemakaian air pukul 24.00


= Stand Awal - Stand Akhir
= 164.952 - 165.122
= 82.17 m3/jam
= 22.82 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.82
=
6.997
= 3.261 I/dtk
1) perhitungan untuk mencari pemakaian air pukul 01.00
= Stand Awal - Stand Akhir
= 165.009 - 165.07
= 82.06 m3/jam
= 22.74 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.74
=
6.997
= 3.250 I/dtk

1) perhitungan untuk mencari pemakaian air pukul 02.00


= Stand Awal - Stand Akhir
= 165.009 - 165.11
= 82.10 m3/jam
= 22.8 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.80
=
6.997
= 3.259 I/dtk

1) perhitungan untuk mencari pemakaian air pukul 03.00


= Stand Awal - Stand Akhir
= 165.21 - 165.129
= 82.08 m3/jam
= 22.98 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.98
=
6.997
= 3.284 I/dtk
1) perhitungan untuk mencari pemakaian air pukul 04.00
= Stand Awal - Stand Akhir
= 165.134 - 165.135
= 82.00 m3/jam
= 22.77 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.77
=
6.997
= 3.254 I/dtk

1) perhitungan untuk mencari pemakaian air pukul 05.00


= Stand Awal - Stand Akhir
= 165.135 - 165.145
= 82.01 m3/jam
= 22.75 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.75
=
6.997
= 3.251 I/dtk

1) perhitungan untuk mencari pemakaian air pukul 06.00


= Stand Awal - Stand Akhir
= 165.155 - 165.174
= 82.02 m3/jam
= 22.78 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.78
=
6.997
= 3.256 I/dtk

1) perhitungan untuk mencari pemakaian air pukul 07.00


= Stand Awal - Stand Akhir
= 165.185 - 165.195
= 82.01 m3/jam
= 22.79 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.79
=
6.997
= 3.257 I/dtk

1) perhitungan untuk mencari pemakaian air pukul 08.00


= Stand Awal - Stand Akhir
= 165.198 - 165.201
= 82.00 m3/jam
= 22.77 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari
22.77
=
6.997
= 3.254 I/dtk

1) perhitungan untuk mencari pemakaian air pukul 09.00


= Stand Awal - Stand Akhir
= 165.21 - 165.219
= 82.01 m3/jam
= 22.8 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.80
=
6.997
= 3.259 I/dtk

1) perhitungan untuk mencari pemakaian air pukul 10.00


= Stand Awal - Stand Akhir
= 165.222 - 165.235
= 82.01 m3/jam
= 22.78 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.78
=
6.997
= 3.256 I/dtk

1) perhitungan untuk mencari pemakaian air pukul 11.00


= Stand Awal - Stand Akhir
= 165.245 - 165.255
= 82.01 m3/jam
= 22.99 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.99
=
6.997
= 3.286 I/dtk

1) perhitungan untuk mencari pemakaian air pukul 12.00


= Stand Awal - Stand Akhir
= 165.263 - 165.28
= 82.02 m3/jam
= 22.81 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.81
=
6.997
= 3.260 I/dtk

1) perhitungan untuk mencari pemakaian air pukul 13.00


= Stand Awal - Stand Akhir
= 165.285 - 165.295
= 82.01 m3/jam
= 22.91 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.91
=
6.997
= 3.274 I/dtk

1) perhitungan untuk mencari pemakaian air pukul 14.00


= Stand Awal - Stand Akhir
= 165.264 - 165.283
= 82.02 m3/jam
= 22.78 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.78
=
6.997
= 3.256 I/dtk

1) perhitungan untuk mencari pemakaian air pukul 15.00


= Stand Awal - Stand Akhir
= 165.276 - 165.289
= 82.01 m3/jam
= 22.78 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.78
=
6.997
= 3.256 I/dtk
1) perhitungan untuk mencari pemakaian air pukul 16.00
= Stand Awal - Stand Akhir
= 165.278 - 165.295
= 82.02 m3/jam
= 22.78 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.78
=
6.997
= 3.256 I/dtk

Tabel Pola Pemakaian Air


Pemakaian Pola
No Jam Stand Awal Stand Akhir
m3/jam I/dtk Pemakaian
1 17.00 164.382 164.467 82.09 22.82 3.25
2 18.00 164.432 164.589 82.16 22.82 3.26
3 19.00 164.673 164.775 82.10 22.86 3.27
4 20.00 164.764 164.782 82.02 22.78 3.26
5 21.00 164.7 164.732 82.03 22.70 3.24
6 22.00 164.74 164.892 82.15 22.81 3.26
7 23.00 164.891 164.921 82.03 22.79 3.26
8 24.00 164.952 165.122 82.17 22.82 3.26
9 1.00 165.009 165.07 82.06 22.74 3.25
10 2.00 165.009 165.11 82.10 22.80 3.26
11 3.00 165.21 165.129 82.08 22.98 3.28
12 4.00 165.134 165.135 82.00 22.77 3.25
13 5.00 165.135 165.145 82.01 22.75 3.25
14 6.00 165.155 165.174 82.02 22.78 3.26
15 7.00 165.185 165.195 82.01 22.79 3.26
16 8.00 165.198 165.201 82.00 22.77 3.25
17 9.00 165.21 165.219 82.01 22.80 3.26
18 10.00 165.222 165.235 82.01 22.78 3.26
19 11.00 165.245 165.255 82.01 22.99 3.29
20 12.00 165.263 165.28 82.02 22.81 3.26
21 13.00 165.285 165.295 82.01 22.91 3.27
22 14.00 165.264 165.283 82.02 22.78 3.26
23 15.00 165.276 165.289 82.01 22.78 3.26
24 16.00 165.278 165.295 82.02 22.78 3.26
Rata-Rata 82.05 22.809 3.26
perhitungan persentaase selisih kumulatif jam 17.00
> % supply rata-rata perjam = 100 / 24 = 4.167 %
> perhitungan untuk mencari pemakaian air
= Stand Awal - Stand Akhir
= 164.382 - 164.467
= 82.09 m3/jam
= 22.77 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.77
=
6.997
= 3.25 % Diasumsikan dalam satuan % karena perhitungan akhir volume
reservoir dalam satuan % dari Q max day

> % pemakaian terhadap kebutuhan per hari:


% pemakaian air Qhour x 100
=
24
3.25 % x 100
=
24

= 13.56 %

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 3.254

= 0.91 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 0.91 + 0

= 0.91 % selisih kumulatif nilai 0 karena perhitungan pertama


perhitungan persentaase selisih kumulatif jam 18.00
> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 164.432 - 164.589
= 82.16 m3/jam
= 22.82 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.82
=
6.997
= 3.26 %

> % pemakaian terhadap kebutuhan per hari:


% pemakaian air Qhour x 100
=
24
3.26 % x 100
=
24

= 13.59 %

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 3.261

= 0.91 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 0.91 + 1

= 1.91

perhitungan persentaase selisih kumulatif jam 19.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 164.673 - 164.775
= 82.10 m3/jam
= 22.86 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.86
=
6.997
= 3.27 %

> % pemakaian terhadap kebutuhan per hari:


% pemakaian air Qhour x 100
=
24
3.27 % x 100
=
24

= 13.61 %

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 3.27

= 0.90 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 0.90 + 2

= 2.90

perhitungan persentaase selisih kumulatif jam 20.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 164.764 - 164.782
= 82.02 m3/jam
= 22.78 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.78
=
6.997
= 3.26 %
> % pemakaian terhadap kebutuhan per hari:
% pemakaian air Qhour x 100
=
24
3.26 % x 100
=
24

= 13.57 %

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 3.26

= 0.91 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 0.91 + 3

= 3.91

perhitungan persentaase selisih kumulatif jam 21.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 164.7 - 164.732
= 82.03 m3/jam
= 22.7 %
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.7
=
6.997
= 3.24 %

> % pemakaian terhadap kebutuhan per hari:


% pemakaian air Qhour x 100
=
24
3.24 % x 100
=
24

= 13.52 %
> % selisih antara supply terhadap pemakaian keb. Per hari
= % supply - % pemakaian ter keb. Per hari

= 4.167 - 3.24

= 0.92 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 0.92 + 4

= 4.92

perhitungan persentaase selisih kumulatif jam 22.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 164.74 - 164.892
= 82.15 m3/jam
= 22.81 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.81
=
6.997
= 3.260 I/dtk

> % pemakaian terhadap kebutuhan per hari:


% pemakaian air Qhour x 100
=
24
3.26 % x 100
=
24

= 13.58 %

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 3.26

= 0.91 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 0.91 + 5

= 5.91

perhitungan persentaase selisih kumulatif jam 24.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 164.952 - 165.122
= 82.17 m3/jam
= 22.82 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.82
=
6.997
= 3.261 %

> % pemakaian terhadap kebutuhan per hari:


% pemakaian air Qhour x 100
=
24
3.26 % x 100
=
24

= 13.59 %

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 3.26

= 0.91 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 0.91 + 6

= 6.91
perhitungan persentaase selisih kumulatif jam 01.00
> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 165.009 - 165.07
= 82.06 m3/jam
= 22.74 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.74
=
6.905
= 3.293 I/dtk

> % pemakaian terhadap kebutuhan per hari:


% pemakaian air Qhour x 100
=
24
3.29 % x 100
=
24

= 13.72 %

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 3.29

= 0.87 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 0.87 + 7

= 7.87

perhitungan persentaase selisih kumulatif jam 01.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 165.009 - 165.07
= 82.06 m3/jam
= 22.74 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.74
=
6.905
= 3.293 %

> % pemakaian terhadap kebutuhan per hari:


% pemakaian air Qhour x 100
=
24
3.29 % x 100
=
24

= 13.72 %
> % selisih antara supply terhadap pemakaian keb. Per hari
= % supply - % pemakaian ter keb. Per hari

= 4.167 - 3.29

= 0.87 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 0.87 + 8

= 8.87

perhitungan persentaase selisih kumulatif jam 02.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 165.009 - 165.11
= 82.10 m3/jam
= 22.8 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.80
=
6.905
= 3.302 %

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 82.10

= 4.07 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 4.07 + 9

= 13.07

perhitungan persentaase selisih kumulatif jam 03.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 165.21 - 165.129
= 82.08 m3/jam
= 22.98 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.98
=
6.905
= 3.328 I/dtk
> % selisih antara supply terhadap pemakaian keb. Per hari
= % supply - % pemakaian ter keb. Per hari

= 4.167 - 82.08

= 4.09 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 4.09 + 10

= 14.09

perhitungan persentaase selisih kumulatif jam 04.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 165.134 - 165.135
= 82.00 m3/jam
= 22.77 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.77
=
6.905
= 3.297 I/dtk

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 82.00

= 4.17 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 4.17 + 10

= 14.17

perhitungan persentaase selisih kumulatif jam 05.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 165.135 - 165.145
= 82.01 m3/jam
= 22.75 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.75
=
6.905
= 3.295 I/dtk

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari
= 4.167 - 82.01

= 4.16 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 4.16 + 11

= 15.16

perhitungan persentaase selisih kumulatif jam 06.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 165.155 - 165.174
= 82.02 m3/jam
= 22.78 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.78
=
6.905
= 3.299 I/dtk

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 82.02

= 4.15 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 4.15 + 12

= 16.15

perhitungan persentaase selisih kumulatif jam 07.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 165.185 - 165.195
= 82.01 m3/jam
= 22.79 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.79
=
6.905
= 3.300 I/dtk

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 82.01
= 4.16 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 4.16 + 13

= 17.16

perhitungan persentaase selisih kumulatif jam 08.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 165.198 - 165.201
= 82.00 m3/jam
= 22.77 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.77
=
6.905
= 3.297 I/dtk

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 82.00

= 4.16 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 4.16 + 14

= 18.16

perhitungan persentaase selisih kumulatif jam 09.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 165.21 - 165.219
= 82.01 m3/jam
= 22.8 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.80
=
6.905
= 3.302 I/dtk

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 82.01

= 4.16 %
> % selisih kumulatif:
= % selisih + % selisih kumulatif

= 4.16 + 15

= 19.16

perhitungan persentaase selisih kumulatif jam 10.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 165.222 - 165.235
= 82.01 m3/jam
= 22.78 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.78
=
6.905
= 3.299 I/dtk

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 82.01

= 4.15 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 4.15 + 16

= 20.15

perhitungan persentaase selisih kumulatif jam 11.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 165.245 - 165.255
= 82.01 m3/jam
= 22.99 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.99
=
6.905
= 3.329 I/dtk

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 82.01

= 4.16 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 4.16 + 17

= 21.16

perhitungan persentaase selisih kumulatif jam 12.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 165.263 - 165.28
= 82.02 m3/jam
= 22.81 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.81
=
6.905
= 3.303 I/dtk

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 82.02

= 4.15 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 4.15 + 18

= 22.15

perhitungan persentaase selisih kumulatif jam 13.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 165.285 - 165.295
= 82.01 m3/jam
= 22.91 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.91
=
6.905
= 3.318 I/dtk

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 82.01

= 4.16 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif
= 4.16 + 19

= 23.16

perhitungan persentaase selisih kumulatif jam 14.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 165.264 - 165.283
= 82.02 m3/jam
= 22.78 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.78
=
6.905
= 3.299 I/dtk

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 82.02

= 4.15 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 4.15 + 20

= 24.15

perhitungan persentaase selisih kumulatif jam 15.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 165.276 - 165.289
= 82.01 m3/jam
= 22.78 I/dtk
> perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.78
=
6.905
= 3.299 I/dtk

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 82.01

= 4.15 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 4.15 + 21
= 25.15

perhitungan persentaase selisih kumulatif jam 16.00


> % supply rata-rata perjam = 100 / 24 = 4.167 %
= Stand Awal - Stand Akhir
= 165.278 - 165.295
= 82.02 m3/jam
= 22.78 I/dtk
2) perhitungan untuk mencari pola pemakaian air
Debit perjam
=
Debit rata-rata dalam sehari

22.78
=
6.905
= 3.299 I/dtk

> % selisih antara supply terhadap pemakaian keb. Per hari


= % supply - % pemakaian ter keb. Per hari

= 4.167 - 82.02

= 4.15 %

> % selisih kumulatif:


= % selisih + % selisih kumulatif

= 4.15 + 22

= 26.15

Tabel Perhitungan Volume Fluktuatif reservoir

Supply % Pemakaian % Pemakaian Selisih


Waktu Selisih (%)
(%) Terhadap Q Hour Terhadap Keb. Per Hari Kumulatif (%)
1 2 3 4 5 6
17.00 4.17 3.25 13.56 0.91 0.91
18.00 4.17 3.26 13.59 0.91 1.91
19.00 4.17 3.27 13.61 0.90 2.90
20.00 4.17 3.26 13.57 0.91 3.91
21.00 4.17 3.24 13.52 0.92 4.92
22.00 4.17 3.26 13.58 0.91 5.91
23.00 4.17 3.26 13.59 0.91 6.91
1.00 4.17 3.29 13.72 0.87 8.87
2.00 4.17 3.30 4.09 0.87 13.07
3.00 4.17 3.33 4.09 0.87 14.09
4.00 4.17 3.30 4.17 0.87 14.17
5.00 4.17 3.29 4.16 0.87 15.16
6.00 4.17 3.30 4.15 0.87 16.15
7.00 4.17 3.30 4.16 0.87 17.16
8.00 4.17 3.30 4.16 0.87 18.16
9.00 4.17 3.30 4.16 0.87 19.16
10.00 4.17 3.30 4.15 0.87 20.15
11.00 4.17 3.33 4.16 0.87 21.16
12.00 4.17 3.30 4.15 0.87 22.15
13.00 4.17 3.32 4.16 0.87 23.16
14.00 4.17 3.30 4.15 0.87 24.15
15.00 4.17 3.30 4.15 0.87 25.15
16.00 4.17 3.30 4.15 0.87 26.15
Total 95.83 75.66 170.93
Max 26.15
Min 0.91

Volume res = (selisih kumulatif besar - terkecil) x Q max day

Volume res = ( 26.15 % - ( 0.91 % )) x ( 8.275011 / 1000 )

= 25.24 x 8.275011

= 208.84

= 209 m3
No Jam Stand Awal Stand Akhir Pemakaian
m3/jam I/dtk
1 17.00 164.38 164.47 82.09 22.82
2 18.00 164.43 164.59 82.16 22.82
3 19.00 164.67 164.78 82.10 22.86
4 20.00 164.76 164.78 82.02 22.78
5 21.00 164.7 164.73 82.03 22.7
6 22.00 164.74 164.89 82.15 22.81
7 23.00 164.89 164.92 82.03 22.79
8 24.00 164.95 165.12 82.17 22.82
9 1.00 165.01 165.07 82.06 22.74
10 2.00 165.01 165.11 82.10 22.8
11 3.00 165.21 165.13 82.08 22.98
12 4.00 165.13 165.14 82.00 22.77
13 5.00 165.14 165.15 82.01 22.75
14 6.00 165.16 165.17 82.02 22.78
15 7.00 165.19 165.2 82.01 22.79
16 8.00 165.2 165.2 82.00 22.77
17 9.00 165.21 165.22 82.01 22.8
18 10.00 165.22 165.24 82.01 22.78
19 11.00 165.25 165.26 82.01 22.99
20 12.00 165.26 165.28 82.02 22.81
21 13.00 165.29 165.3 82.01 22.91
22 14.00 165.26 165.28 82.02 22.78
23 15.00 165.28 165.29 82.01 22.78
24 16.00 165.28 165.3 82.02 22.78
Rata-Rata 82.05 22.81

Fluktuasi Pemakaian
3.29
3.28 3.29
3.28
3.27
3.27
3.27

3.26 3.26 3.26 3.26 3.26


3.26 3.26 3.26
3.25 3.26 3.25 3.26 3.26 3.25 3.26 3.26 3.26 3.26
3.25 3.25 3.25

3.24
3.24
3.28
3.27
3.27
3.27

3.26 3.26 3.26 3.26 3.26


3.26 3.26 3.26
3.25 3.26 3.25 3.26 3.26 3.25 3.26 3.26 3.26 3.26
3.25 3.25 3.25

3.24
3.24

3.23

3.22
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Pola
Pemakaian
3.25
3.26
3.27
3.26
3.24
3.26
3.26
3.26
3.25
3.26
3.28
3.25
3.25
3.26
3.26
3.25
3.26
3.26
3.29
3.26
3.27
3.26
3.26
3.26
3.26

3.26 3.26 3.26


7

3.26 3.26 3.26

22 23 24
Link ID Length (m)Diameter (m)Roughness Flow LPS Velocity m/s
Pipe 2 1000 14.6 130 69.12 412.89
Pipe 3 1000 14.6 130 24.9 148.74
Pipe 4 1000 14.6 130 24.9 148.74
Pipe 5 1000 10 130 3.73 47.52
Pipe 6 1000 12 130 3.4 30.1
Pipe 7 1000 12 130 3.4 30.1
Pipe 8 1000 10 130 2.4 30.61
Pipe 9 1000 8.2 130 0.39 7.48
Pipe 10 1000 8.2 130 0.39 7.48
Pipe 11 1000 8.2 130 0.18 3.42
Pipe 12 1000 8.2 130 0.22 4.1
Pipe 13 1000 12 130 1.88 16.61
Pipe 14 1000 10 130 2.07 26.31
Pipe 15 1000 14.6 130 8.13 48.58
Pipe 16 1000 8.2 130 2.93 55.4
Pipe 17 1000 10 130 1.01 12.9
Pipe 18 1000 10 130 1.19 15.15
Pipe 19 1000 12 130 2.66 23.54
Pipe 20 1000 14.6 130 14.72 87.94
Pipe 21 1000 10 130 7.2 91.67
Pipe 22 1000 12 130 0.79 7.02
Pipe 23 1000 12 130 0.79 7.02
Pipe 24 1000 8.2 130 1.65 31.31
Pipe 25 1000 12 130 1.54 13.59
Pipe 26 1000 12 130 0.54 4.75
Pipe 27 1000 8.2 130 2.26 42.75
Pipe 28 1000 12 130 1.5 13.27
Pipe 29 1000 10 130 3.83 48.71
Pipe 30 1000 10 130 5.71 72.69
Pipe 31 1000 8.2 130 1.72 32.57
Pipe 32 1000 8.2 130 0.47 8.91
Pipe 33 1000 8.2 130 1.76 33.29
Pipe 34 1000 8.2 130 1.29 24.39
Pipe 35 1000 8.2 130 2.33 44.03
Pipe 36 1000 8.2 130 2.61 49.47
Pipe 37 1000 8.2 130 3.27 61.99
Pipe 38 1000 10 130 5.67 72.19
Pipe 39 1000 8.2 130 4.45 84.22
Pipe 40 1000 8.2 130 0.12 2.2
Pipe 41 1000 8.2 130 1.26 23.91
Pipe 42 1000 8.2 130 1.26 23.91
Pipe 43 1000 8.2 130 0.74 13.96
Pipe 44 1000 10 130 7.71 98.16
Pipe 45 1000 8.2 130 5.27 99.86
Pipe 46 1000 12 130 9.84 87.02
Pipe 47 1000 12 130 19.55 172.87
Pipe 48 1000 10 130 3.89 49.48
Pipe 49 1000 10 130 2.41 30.65
Pipe 50 1000 10 130 1.41 17.92
Pipe 51 1000 10 130 1.41 17.92
Pipe 52 1000 10 130 1.41 17.92
Pipe 53 1000 12 130 0.15 1.32
Pipe 54 1000 10 130 2.15 27.36
Pipe 55 1000 10 130 0.56 7.08
Pipe 56 1000 10 130 11.87 151.09
Pipe 57 1000 14.6 130 68.88 411.4
Pipe 58 1000 8.2 130 8.3 157.15
Pipe 59 1000 10 130 10.42 132.71
Pipe 60 1000 14.6 130 59.58 355.86
Pipe 61 1000 22.7 130 143 353.34
Pipe 62 1000 12 130 11.82 104.49
Pipe 63 1000 12 130 6.82 60.31
Pipe 64 1000 12 130 2.16 19.12
Pipe 65 1000 12 130 2.16 19.12
Pipe 66 1000 12 130 1.7 15.07
Pipe 67 1000 12 130 0.89 7.9
Pipe 68 1000 12 130 1.15 10.21
Pipe 69 1000 12 130 3.61 31.96
Pipe 70 1000 12 130 0.45 4.01
Pipe 71 1000 12 130 6.01 53.18
Pipe 72 1000 12 130 4.17 36.85
Pipe 73 1000 12 130 5.1 45.06
Pipe 74 1000 12 130 1.03 9.07
Pipe 75 1000 12 130 2.6 22.97
Pipe 76 1000 12 130 1.29 11.39
Pipe 77 1000 12 130 0.89 7.83
Pipe 78 1000 12 130 0.36 3.14
Pipe 79 1000 12 130 1.36 12.04
Pipe 80 1000 12 130 2.11 18.69
Pipe 81 1000 12 130 1.89 16.68
Pipe 82 1000 12 130 0.11 1
Pipe 83 1000 12 130 0.75 6.65
Pipe 84 1000 12 130 0.75 6.65
Pipe 85 1000 12 130 0.75 6.65
Pipe 86 1000 12 130 4.47 39.51
Pipe 87 1000 12 130 12.18 107.72
Pipe 88 1000 12 130 2.14 18.95
Pipe 89 1000 12 130 2.66 23.5
Pipe 90 1000 12 130 2.4 21.25
Pipe 91 1000 12 130 2.53 22.37
Pipe 92 1000 12 130 2.07 18.3
Pipe 93 1000 12 130 1.54 13.63
Pipe 94 1000 12 130 5 44.18
Pipe 95 1000 12 130 4.07 35.97
Pipe 96 1000 12 130 26 229.89
Pipe 97 1000 12 130 28 247.57
Pipe 98 1000 12 130 30 265.26
Pipe 99 1000 12 130 32 282.94
Pipe 100 1000 12 130 34 300.62
Pipe 101 1000 12 130 34 300.62
Pipe 102 1000 12 130 36 318.31
Pipe 103 1000 12 130 38 335.99
Pipe 104 1000 12 130 40 353.68
Pipe 105 1000 12 130 42 371.36
Pipe 106 1000 12 130 44 389.04
Pipe 107 1000 12 130 46 406.73
Pipe 108 1000 12 130 49 433.25
Pipe 109 1000 12 130 51 450.94
Pipe 110 1000 12 130 51 450.94
Pipe 111 1000 12 130 54 477.46
Pipe 112 1000 12 130 56 495.15
Pipe 113 1000 12 130 59 521.67
Pipe 114 1000 12 130 60 530.51
Pipe 115 1000 12 130 62 548.2
Pipe 116 1000 12 130 62 548.2
Pipe 117 1000 12 130 64 565.88
Pipe 118 1000 12 130 66 583.57
Pipe 119 1000 12 130 66 583.57
Pipe 120 1000 12 130 68 601.25
Pipe 121 1000 12 130 22.67 200.46
Pipe 122 1000 12 130 0.67 5.94
Pipe 123 1000 12 130 20 176.84
Pipe 124 1000 12 130 18 159.15
Pipe 125 1000 12 130 16 141.47
Pipe 126 1000 12 130 14 123.79
Pipe 127 1000 12 130 12 106.1
Pipe 128 1000 12 130 12 106.1
Pipe 129 1000 12 130 10 88.42
Pipe 130 1000 12 130 8 70.74
Pipe 131 1000 12 130 6 53.05
Pipe 132 1000 12 130 6 53.05
Pipe 133 1000 12 130 2 17.68
Pipe 134 1000 12 130 2 17.68
Pipe 135 1000 12 130 2 17.68
Pipe 136 1000 12 130 2 17.68
Pipe 137 1000 12 130 2 17.68
Unit Headloss m/kmFriction Factor Status
8043406 0.014 Open
1214128 0.016 Open
1214128 0.016 Open
228202.5 0.02 Open
79157.78 0.021 Open
79157.78 0.021 Open
101013.2 0.021 Open
9179.36 0.027 Open
9178.14 0.027 Open
2053.13 0.03 Open
3072.38 0.029 Open
26333.5 0.022 Open
76323.14 0.022 Open
152860.9 0.019 Open
382227.8 0.02 Open
20392.34 0.024 Open
27411.27 0.024 Open
50231.04 0.021 Open
458678.9 0.017 Open
770439.3 0.018 Open
5346.19 0.026 Open
5346.19 0.026 Open
132841.6 0.022 Open
18164.86 0.023 Open
2593.24 0.027 Open
236439.5 0.021 Open
17367.5 0.023 Open
238862 0.02 Open
501427.7 0.019 Open
142906.1 0.022 Open
12950.34 0.026 Open
148782.6 0.022 Open
83571.28 0.023 Open
249717.8 0.021 Open
309912.1 0.02 Open
470672.2 0.02 Open
495035.4 0.019 Open
830202.1 0.019 Open
971.7 0.032 Open
80602.53 0.023 Open
80601.31 0.023 Open
29775.3 0.025 Open
874512.6 0.018 Open
1138168 0.018 Open
565564.9 0.018 Open
2016336 0.016 Open
245961.4 0.02 Open
101304.5 0.021 Open
37485.52 0.023 Open
37486.74 0.023 Open
37485.52 0.023 Open
241.4 0.033 Open
82097.27 0.022 Open
6720.23 0.026 Open
1943843 0.017 Open
7989967 0.014 Open
2635335 0.017 Open
1528716 0.017 Open
6107894 0.014 Open
3601540 0.013 Open
793650.4 0.017 Open
286814.4 0.019 Open
34176.61 0.022 Open
34176.61 0.022 Open
21984.62 0.023 Open
6651.96 0.025 Open
10689.95 0.024 Open
88465.15 0.02 Open
1892.2 0.028 Open
227219.9 0.019 Open
115170.5 0.02 Open
167137.7 0.019 Open
8602.67 0.025 Open
48007.22 0.021 Open
13108.84 0.024 Open
6534.91 0.025 Open
1209.45 0.029 Open
14493.85 0.024 Open
32752.59 0.022 Open
26549.3 0.022 Open
136.55 0.032 Open
4837.79 0.026 Open
4837.79 0.026 Open
4837.79 0.026 Open
131068.9 0.02 Open
839648.4 0.017 Open
33591.4 0.022 Open
50094.49 0.021 Open
41550.34 0.022 Open
45705.37 0.022 Open
31504.13 0.022 Open
18258.74 0.023 Open
161168.5 0.019 Open
110157.2 0.02 Open
3418598 0.015 Open
3921513 0.015 Open
4456010 0.015 Open
5021739 0.015 Open
5618444 0.015 Open
5618425 0.015 Open
6245816 0.015 Open
6903598 0.014 Open
7591578 0.014 Open
8309482 0.014 Open
9057134 0.014 Open
9834301 0.014 Open
1.11E+07 0.01 Open
1.19E+07 0.01 Open
1.19E+07 0.01 Open
1.32E+07 0.01 Open
1.42E+07 0.01 Open
1.56E+07 0.01 Open
1.61E+07 0.01 Open
1.71E+07 0.01 Open
1.71E+07 0.01 Open
1.81E+07 0.01 Open
1.92E+07 0.01 Open
1.92E+07 0.01 Open
2.03E+07 0.01 Open
2652543 0.016 Open
3916.07 0.026 Open
2102924 0.016 Open
1730139 0.016 Open
1391061 0.016 Open
1086289 0.017 Open
816508 0.017 Open
816508 0.017 Open
582526.4 0.018 Open
385335.5 0.018 Open
226178.7 0.019 Open
226181.1 0.019 Open
29568.04 0.022 Open
29568.04 0.022 Open
29568.04 0.022 Open
29568.04 0.022 Open
29568.04 0.022 Open
Network Table - Links
Status
Link ID
Pipe 2 Open
Pipe 3 Open
Pipe 4 Open
Pipe 5 Open
Pipe 6 Open
Pipe 7 Open
Pipe 8 Open
Pipe 9 Open
Pipe 10 Open
Pipe 11 Open
Pipe 12 Open
Pipe 13 Open
Pipe 14 Open
Pipe 15 Open
Pipe 16 Open
Pipe 17 Open
Pipe 18 Open
Pipe 19 Open
Pipe 20 Open
Pipe 21 Open
Pipe 22 Open
Pipe 23 Open
Pipe 24 Open
Pipe 25 Open
Pipe 26 Open
Pipe 27 Open
Pipe 28 Open
Pipe 29 Open
Pipe 30 Open
Pipe 31 Open
Pipe 32 Open
Pipe 33 Open
Pipe 34 Open
Pipe 35 Open
Pipe 36 Open
Pipe 37 Open
Pipe 38 Open
Pipe 39 Open
Pipe 40 Open
Pipe 41 Open
Pipe 42 Open
Pipe 43 Open
Pipe 44 Open
Pipe 45 Open
Pipe 46 Open
Pipe 47 Open
Pipe 48 Open
Pipe 49 Open
Pipe 50 Open
Pipe 51 Open
Pipe 52 Open
Pipe 53 Open
Pipe 54 Open
Pipe 55 Open
Pipe 56 Open
Pipe 57 Open
Pipe 58 Open
Pipe 59 Open
Pipe 60 Open
Pipe 61 Open
Pipe 62 Open
Pipe 63 Open
Pipe 64 Open
Pipe 65 Open
Pipe 66 Open
Pipe 67 Open
Pipe 68 Open
Pipe 69 Open
Pipe 70 Open
Pipe 71 Open
Pipe 72 Open
Pipe 73 Open
Pipe 74 Open
Pipe 75 Open
Pipe 76 Open
Pipe 77 Open
Pipe 78 Open
Pipe 79 Open
Pipe 80 Open
Pipe 81 Open
Pipe 82 Open
Pipe 83 Open
Pipe 84 Open
Pipe 85 Open
Pipe 86 Open
Pipe 87 Open
Pipe 88 Open
Pipe 89 Open
Pipe 90 Open
Pipe 91 Open
Pipe 92 Open
Pipe 93 Open
Pipe 94 Open
Pipe 95 Open
Pipe 96 Open
Pipe 97 Open
Pipe 98 Open
Pipe 99 Open
Pipe 100 Open
Pipe 101 Open
Pipe 102 Open
Pipe 103 Open
Pipe 104 Open
Pipe 105 Open
Pipe 106 Open
Pipe 107 Open
Pipe 108 Open
Pipe 109 Open
Pipe 110 Open
Pipe 111 Open
Pipe 112 Open
Pipe 113 Open
Pipe 114 Open
Pipe 115 Open
Pipe 116 Open
Pipe 117 Open
Pipe 118 Open
Pipe 119 Open
Pipe 120 Open
Pipe 121 Open
Pipe 122 Open
Pipe 123 Open
Pipe 124 Open
Pipe 125 Open
Pipe 126 Open
Pipe 127 Open
Pipe 128 Open
Pipe 129 Open
Pipe 130 Open
Pipe 131 Open
Pipe 132 Open
Pipe 133 Open
Pipe 134 Open
Pipe 135 Open
Pipe 136 Open
Pipe 137 Open

Anda mungkin juga menyukai