1. PENGECEKAN MODEL
A. Perhitungan volume
Komparasi perhitungan volume kita dan volume customer.
Proses perhitungan volume pada aplikasi minescape
( stratmodel ) :
Proses 1 Æ Penyiapan data dasar untuk perhitungan
Data yang dibutuhkan adalah data desain, data topografi
dan schema
Pembuatan triangle
Model Æ Triangles Æ Design
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Bdy
Nama
Nama table
Click OK. Berlakukan hal yang sama dengan file topografinya
Proses 2 Æ Proses Perhitungan
Reserve Æ Sample Æ Polygon Tebal
batubara
minimal yang
dihitung
Seam Interval
Note : Harus urut untuk intervalnya karena jika tidak urut
akan saling menghilangkan secara volume.
Click OK
Reserve Æ Evaluate Æ mining Reserves
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
2 3
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Reserve
Geological
Intervals
Evaluate
Samples
Tentukan Table File name dan Output Table –nya pada jendela
Accumulate Samples yang muncul seperti tampak pada gambar
Coal berikut :
Dilution
Coal
loses
Kemudian Reserve Æ Reformat samples Æ interval
Kemudian pilih Reserves Æ Accumulate Samples
Seperti pada gambar berikut :
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
4 5
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Selanjutnya akan muncul jendela Reformat Interval Record seperti
tampak pada gambar berikut :
Selesaikan dengan meng‐klick OK
Input B. Pengecekan Parameter
Table
Reserves B1. Coal Loses Volume
Cara pengecekan telah dijelaskan sebelumnya.
Output Tab Other B2. Coal Dilution Volume
Table File
Cara pengecekan telah dijelaskan sebelumnya.
B3. Tebal Batubara Minimal yang diproduksi
Cara pengecekan telah dijelaskan sebelumnya.
B4. Density coal
Tentukan Input reserve table dan nama output file table‐nya. Minescape Explorer ÆQuality Defaults
Lanjutkan dengan meng‐ click Tab Other untuk memunculkan
halaman seperti tampak pada gambar berikut :
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
6 7
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Selanjutnya akan muncul jendela “Create a Section Through a
Schema” seperti tampak pada gambar di bawah :
C. Section
Tab
Sections
Tentukan output design
file‐nya sekaligus layer‐
nya.
Cara Pengecekan adalah :
a. Disamakan antara floor desain dengan floor batubara
b. Disamakan antara batubara data drill holenya
Pilih Graphic > Section > Stratmodel seperti tampak pada gambar
berikut : Lanjutkan dengan meng‐klik Tab Sections untuk memunculkan
halaman seperti berikut :
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
8 9
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Tab Tab
Controls Controls
Isikan line ID dari section yang diinginkan pada kolom Id dan tentukan
pula X dan Y originnya agar penempatan section sesuai dengan yang
Anda inginkan.
Lanjutkan dengan memilih Tab Controls, kemudian lakukan seting
terakhir pada Tab Display.
Selesaikan dan tutup jendela dengan meng‐klik tombol OK.
Tab Display
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
10 11
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
2. PEMBUATAN BATTER BLOCK Selanjutnya akan muncul jendela “Generate Strips”
Garis Pandu Strips
dan block
Bila selesai, maka hasilnya seperti tampak pada gambar berikut :
Mulai dengan memilih menu :
Strips_Design Æ Generate Strips
Sebaiknya
digabungikan agar
jangan ada A dan B
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
12 13
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Melakukan Penggabungan Block
Minescape expolorer Æuser commads Æ bbmerge
Stripsname
Blockname
bbmerge
Bagian dari block
name yang
diambil
Layer Name
Bagian dari strips
name yang
Nama depan diambil
gabungan
block strips
Rename strips
3. Pembuatan Solid
Penggabungan Block strips Strip_Design Æ project solid
Strip_Design Æ strip intersection
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
14 15
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
4. Perhitungan volume
Solid dimatchkan
ke surface design
Solid diproject ke
atas ke surface
topo design
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
16 17
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
18 19
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Data mentah sebelum diproses
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
20 21
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Hasil Akhir
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
22 23
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
5. Transfer Polygon Graphic
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
24 25
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
26 27
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
6. Menyiapkan Database XPAC
Click New Project
Sebaiknya disiapkan dulu 1 folder yang diisi dengan file x‐pac kosong,
csv volume dan csv polygon.
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
28 29
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Diisi manual
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
30 31
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Click design mode ( ctrl D )
Diisi Manual
Design Mode
Import Data Volume
File > Import > data seperti tampak pada gambar berikut :
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
32 33
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Pilih nama file :
Pada jendela Import, lakukan seting sesuai dengan gambar berikut :
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
34 35
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Import Poligon
Pilih menu File > Import > Polygon seperti tampak pada gambar
berikut :
Selanjutnya akan muncul jendela Polygon Import seperti berikut : Lanjtkan dengan meng‐klik tombol Next.
Lanjutkan dengan meng‐klik tombol Next. Selesaikan dengan menekan tombol Finish.
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
36 37
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Melakukan setup Polygon Graphic : Pada Tab Shading, lakukan seting seperti tampak pada gambar
berikut :
Pada icon bar, klik icon Polygon Graphic untuk menampilkan
jendela Polygon Graphic Templates seperti tampak pada gambar
berikut :
Lanjutkan dengan Tab Polygon :
Selesaikan dengan meng‐klik tombol OK.
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
38 39
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Selanjutnya, pada menu bar, pilih Tools Æ Calendar Wizard.
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
40 41
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Membuat Resource
Click new untuk membuat resource
baru dan langsung direname sesuai
unitnya, tapi harus pada all item saat
pada schedule setup
Membuat Input path
Click new untuk membuat input path
baru dan langsung direname sesuai
unitnya, tapi harus pada all item saat
pada schedule setup
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Pembuatan Scheduling dan animasi
Pada icon bar, klik icon Display Polygon Graphic :
Display
Polygon
Graphic
Pada jendela Polygon Graphic Templates yang muncul, klik tombol
select pada salah satu template yang sudah dibuat.
Diisi manual, mengacu ke kalender
Diisi manual, mengacu ke kalender
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
44 45
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Tampilkan jendela Transfer View dan Show Input Path View dengan
cara seperti tampak pada gambar berikut :
Harus Dicentang manual
Harus Dicentang agar
area yang dipilih hilang Harus Dicentang agar
resource muncul
Lakukan click pada area yang ingin diloading dan jangan lupa tekan
tombol Ctrl. Kemudian click transfer input path.
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Melihat hasil animasi :
Run
scenario
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
Membuat schedule report
Pada menu bar, pilih View > Schedule Reports.
Hasil Dari schedule Report
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
50 51
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
EXPORT XPAC FACE POSITION TO MINESCAPE 3. Aktifkan Range yg sudah dibuat untuk pengecekan
1. Supaya mudah, aktifkan graphic database
4. Export Range yg sudah benar
2. Beri nama untuk face position yg akan dieksport (berdasar pada
akhir periode)
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
52 53
Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012 Engineering Training “Xpac-Scheduling “, 12 – 22, Maret, 2012
Engineering Division Engineering Division
5. Setting output grafis
Demikian modul ini disusun dengan aplikatif, Semoga Modul ini
dapat dijadikan acuan untuk pengerjaan scheduling, baik 3 Month
Rolling Mine Plan, Yearly Plan maupun sampai periode Life of Mine
(LOM).
Hal terpenting sebelum pembuatan scheduling dengan software
adalah pembuatan stage plan dari aktivitas penambangan sesuai
dengan actual kondisi dilapangan, type alat produksi dan jenis
material.
Dari apa yg diajarkan juga dapat digunakan sebagai acuan saat
ada event Joint Mine plan dengan customer . Selain itu dengan
pemanfaatan aplikasi XPAC ini diharapkan semua Engineer dapat
6. Cek Hasilnya dan kemudian import ke minescape lebih cepat dan mudah dalam pembuatan opsi ‐ opsi sequence
tambang sehingga dapat dijadikan bahan diskusi untuk mendapatkan
hasil yg terbaik untuk PT.BUMA
Terima kasih,
Team Panitia
Basic XPAC 2012
Module only For internal PT. BUMA!! Module only For internal PT. BUMA!
54 55