OPERASIONAL
PENAMBANGAN
ORIENTASI GL PROD
PERTANYAAN !
ORIENTASI GL PROD
Pokok bahasan
1 OPERATION
2 LOADING
3 SPOTTING
4 HAULING / HAULING ROAD
5 DISPOSAL
6 MANAGEMENT
1. OPERATION
Sasaran
Meningkatkan Produktifitas
Mengendalikan Biaya
ORIENTASI GL PROD
Struktur Organisasi
Project Manager
Equip Support
Group Leader Group Leader Group Leader
Drill & Blast
Manusia
Material
Alat
Plan Data
Waktu
Control
Review Do
PRODUKTIFITAS
• Spotting Time
• Loading Time
• Idle Time
• Root Causes of lost time
2. LOADING
WAKTU PEMUATAN
COAL SEAM
ORIENTASI GL PROD
KESIMPULAN HASIL PENGAMATAN / HAMBATAN TERIDENTIFIKASI
MENGETAHUI PRODUKSI
15
A. 1x heap = 100%
B. 90%
C. 75 % - 80 %
16
Kapasitas Excavator (BCM) 1 HEAP
17
HAUL TRUCK Capacity (BCM)
18
CONTOH KASUS I
BUCKET FILL FACTOR 75%
Kapasitas bucket DX700LC = 4,5 M3
Material sand clay ( swell 0,80 )
Berapa produktity alat muat perjamnya?
Contoh kasus II
Bucket Fill Factor 90%
4,5 x 3600/24 x 0,90 x 45/60 x 0,80 = 364,5 bcm / jam
19
Rumusnya : kapasitas bucket x fill factor x conversi material (bcm)
20
ALAT ANGKUT
PRODUKTIVITY PERJAM :
KAPASITAS VESSEL X 60 : CT X EFF WAKTU
X Jumlah alat angkut
Kasus I
Kapasitas vessel 20 bcm
Ct 17 menit
Berapa productivity alat angkut perjam ?
20 x 60:17 x 0,75 = 52,5 BCM
X 4 dt = 210 bcm perjam.
21
Cara Monitor
• Night shift
•Start awal shift(sore) ?
•Stop sebelum istirahat makan malam ?
•Start setelah istirahat makan malam ?
•Stop akhir shift malam(pagi) ?
Kesimpulan Umum
ORIENTASI GL PROD
SPOTTING TIME DAN/ATAU WAKTU MUAT YANG JELEK =
WAKTU EDAR YANG SEMAKIN LAMA
BCM/HOUR
FLEET MATCH ALAT LOADING DAN ALAT HAULING
ORIENTASI GL PROD
CARA MEMASUKI LOADING POINT ( HD - 465 UP )
CABIN
2
COAL SEAM
1
LOADING POINT
1
SUB
2 BERLAWANAN
KONT.
LOADING POINT ARAH PUTARAN
JARUM JAM
CABIN
JIKA KONDISI LOADING POINT MEMUNGKINKAN,
COAL SEAM
COAL SEAM
LOADING POINT
32
CYCLE TIME
COAL SEAM
DUMP TIME
(1.00 minutes)
COAL SEAM
COAL SEAM
LOAD
TIME
SPOTTING
TIME
(0.50 minutes)
COAL SEAM
TRAVEL UNLOADED
PC / EX
LOADING
METODE DUMPING
DUMPINGLAH MATERIAL
DIBAGIAN PINGGIR/TEPI
DARI DUMPING AREA, AGAR SAFETY BERM
KERJA DOZER
BISA MENJADI LEBIH EFFEKTIVE
UNTUK KEAMANANNYA, AKAN
SEGERA DIPASANG
SAFETY BERM PADA BAGIAN SISI
DUMPING AREA DUMPING AREA
SETELAH DARI DUMPING AREA,
JANGANLAH BERBONDONG-BONDONG
MENUJU KE LOADING POINT.
AKIBATNYA AKAN MEMPERLAMBAT CYCLE TIME
DAN MENURUNKAN PRODUKSI
AM
SE
L
A
CO
COAL SEAM
LOADING POINT
AM
L SE
COA
M
EA
A LS
CO
DUMPING AREA
4. HAULING ROAD
Maksud & Tujuan :
ROAD MAINTENANCE
TUJUAN :
TINDAKAN!
KESIMPULAN DARI :