30" Penghalusan
30" Penghalusan
O-505
(Grinding O-105
(Grinding
0.1 % Machine) 0.1 % Machine)
Assembling – 3
Kawat Las
Cat
40" Pengecetan
O-107
0% (Spray Gun)
Assembling – 4
Baut 2mm x 7mm (4 pcs)
Mur (4 pcs)
Ring 2.5mm (4 pcs)
60" Assembling 100 dan
O-108 900
(Benchwork
0% Tools)
Assembling – 5 Baut 2mm x 7mm (4 pcs)
Mur (4 pcs)
Ring 2.5mm (4 pcs)
60" Assembling 100 dan
O-109 1000 , Pemeriksaan
I-07
1-101 (Benchwork)
0%
Assembling – 6
Assembling 100
60" dan 1300,
O-112 Pemeriksaan
I-07 TIARADIA IHSAN, S.T
1-02 (Benchwork)
0% ASISTEN ASISTEN
Ringkasan
Kegiatan Jumlah Waktu (detik)
Operasi 25 580 S
Assembling
1. Perakitan Kaki Depan Kiri dan Join Plat Kiri Depan
2. Perakitan O-103 dan Join Plat Kanan Depan
3. Perakitan O-104 dan O-04
Join Plat Kanan Depan (300) Join Plat Kiri Depan(200) 4. Perakitan O-106 dan O-702
Gantungan Tas (900) Papan Meja (800) Papan Belakang (700) Kaki Kanan Belakang (600) Kaki Bawah (500) Kaki Kiri Belakang (400) Kaki Depan Kiri (100) 5. Perakitan I-101 dan Papan Meja
Laci Meja (1000) (Besi) (Besi) (Tabung Besi) (Plat Besi) (Plat Besi)
Plastik Wrap Sticker QC & Label (Tabung Besi) (Tabung Besi) (Tabung Besi) (Tabung Besi) 6. Perakitan O-107 dan Gantungan Tas
Penutup Karet (1100) (Plastik) L=650mm W=450mm L=2440m W=1220m L=4000mm W=70mm L=4000mm W=70mm
(1300) (1200) 6000mm x ø 5mm 6000mm x ø 20mm 6000mm x ø 20mm 6000mm x ø 20mm T=5mm T=5mm 6000mm x ø 20mm 7. Perakitan O-108 dan Laci Meja
T=30mm T=10mm 8. Perakitan O-109 dan Penutup Karet
Mal Ukur Mal Ukur Mal Ukur Mal Ukur Mal Ukur Mal Ukur 9. Perakitan O-110 dan Sticker QC
Mal Ukur Mal Ukur
10. Perakitan O-111 dan Plastik Wraping
Diukur dan Dipotong Diukur dan Dipotong Diukur dan Dipotong
Diukur dan Dipotong Diukur dan Dipotong Diukur dan Dipotong Diukur dan Dipotong Diukur dan Dipotong
10" 15" 10" L=94mm W=70mm
10" 20" L=130mm W=420mm 1120mm x ø 20mm 1190mm x ø 20mm 1190mm x ø 20mm 10" L=94mm W=70mm 10" 15"
1460mm x ø 20mm
350mm x ø 5mm T=10mm T=5mm ø10mm SubAssembling
O-901 O-701 O-601 O-501 O-401 O-301 T=5mm ø10mm O-201 O-101
(Hydraulic Press 1. Perakitan O-403 dan Kaki Bawah
0.8 % (Circural Saw) 1.9 % (Circural Saw) 0.8 % (Circural Saw) 6% (Circural Saw) 0.8 % (Circural Saw) 1.3 % (Hydraulic Press 1.3 % 0.02 % (Circural Saw) 2. Perakitan Kaki Kiri Belakang dan Kaki Kanan Belakang
Machine)
Machine)
Amplas Gerinda
20" Pembentukan 20" Penghalusan 20" Pembentukan 20" Pembentukan 20" Pembentukan 20" Pembentukan
O-902 O-702 O-602 O-502 (Banding O-402 O-102
(Banding (Banding (Banding
(Grinding 0% 0% Machine) 0% 0% (Banding
0% Machine) 0.01 % Machine) Machine)
Machine) Sub Assembling - 1 Machine)
Kawat Las Mata Bor ø 10mm Assembling - 1
Kawat Las Kawat Las
Melubangi
30" 10" Sub Assembling 400 dan Assembling 100 dan
Pengelasan ø 10mm T=10mm 30" 30"
500 200
O-903 O-702 O-403 O-103
(Las TIG) (Drilling (Las TIG) (Las TIG)
0% 6% Sub Assembling - 2 0% 0%
Machine)
Amplas Gerinda Cat
Kawat Las
15" Penghalusan 45" Kawat Las Assembling - 2
Painting
O-904 30"
Sub Assembling 500 dan
30" Assembling 100 dan
(Grinding O-703 600 300
0.1 % Machine) (Spray Gun) O-404
0% O-104
Cat (Las TIG) 0% (Las TIG)
0%
45" Painting Assembling - 3
Cat
60" Painting
O-106
0% (Spray Gun)
Assembling - 4
Baut 2mm x 15mm (4Pcs)
Mur (4Pcs)
Ring 2.5mm (4Pcs)
Assembling 100 dan
60"
700
O-107
0% (Benchwork
Tools)
20" Inspeksi
I-101
Assembling - 5
(Benchwork)
Baut 2mm x 15mm (4Pcs)
Mur (4Pcs)
Ring 2.5mm (4Pcs)
60" Assembling 100 dan
800
O-108 (Benchwork
0%
Assembling - 6 Tools)
Baut 2mm x 15mm (4Pcs)
Mur (4Pcs)
Ring 2.5mm (4Pcs)
Assembling 100 dan
60" 900
O-109
0% (Benchwork
Assembling - 7 Tools)
Baut 2mm x 20mm (4Pcs)
Assembling 100 dan
60" 1000
O-110
0% (Benchwork)
Assembling - 8
Assembling - 9
Assembling - 10
Inspeksi dan
60"
O-113 Packaging
I-16
I-102
(Benchwork)
Storage
TANDA TANGAN
INSTRUKTUR
Ringkasan
Kegiatan Jumlah Waktu (detik)
Operasi 28 885
TIARADIA IHSAN, S.T
ASISTEN ASISTEN
Inspeksi 1 20