100
10
I. DIMENSI PLAT
1.1 Beton
► Panjang Plat (Pp) = 3 M
►Lebar Lebar Plat (Lp) = 0.7 M
►Tebal Plat (tp) = 0.1 M
6 P me lint ang
5
P Me ma njang
5 5
5 5
P Me ma njang
Tulangan Melintang
6 P melin tan g
5
P Meman jan g
5 5
5 5
P Meman jan g
P Memanj ang
5 5
5 5
P Memanj ang
1.2 Tulangan
►Jarak Tulangan = 0.15 M
►Berat Tulangan Ø 10 BT Ø 10 = 0.617 Kg/M
II. VOLUME
2.1 Beton
►Vol Plat beton = (Pp) x (Lp) x (tp)
= 3M x 0.7 M x 0.1 M
= 0.21 M3
Plat Gorong-gorong
20 20
10 10
60
20 20
I. DIMENSI
۩ Pasangan Batu
► Panjang Pas Batu = 6 M
► Lebar Pas batu = 0.2 M
► Tinggi Pas Batu = 0.6 M
► Banyak Sisi Pas Batu = 2 Sisi
۩ Galian Tanah
► Panjang Galian = 6 M
► Lebar Galian = 0.825 M
► Kedalaman Galian = 0.6 M
II. VOLUME
۩ Galian Tanah
►Vol Galian Tanah gorong-gorong (Vpb) = 6M x 0.825 M x 0.6 M
= 2.97 M3
۩ Pasangan Batu
►Vol Pas Batu (Vpb) = 6M x 0.2 M x 0.6 M x 2 Sisi
= 1.44 M3
۩ Cor Beton
►Vol Cor Beton tumbuk (Vbt) = 0.05 M x 0.3 M x 6 M
= 0.09 M3
ANALISA SNI.
Harga
Bahan Upah Jumlah Harga
Kode Uraian Pekerjaan Satuan
(Rp.) (Rp.) (Rp.) (Rp.)
Tenaga
0.2000 OH Pekerja #REF! #REF!
0.1000 OH Tukang Batu #REF! #REF!
0.0100 OH Kepala Tukang Batu #REF! #REF!
0.0100 OH Mandor #REF! #REF!
#REF! #REF! #REF!
Analisa EI-311
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume tanah (lepas) D 1.60 ton/m3 1.40 - 1.80
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83
Faktor konversi , kedalaman < 40 % Fv 0.90 Faktor konversi
Waktu siklus Ts1 menit dihapus, masuk
- Menggali , memuat T1 0.320 menit dalam waktu siklus
- Lain lain T2 0.100 menit disesuaikam
Waktu siklus = T1 x Fv Ts1 0.42 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 91.89 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 643.25 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0218 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0109 Jam
Rp. D. / M3
Kontraktor Pelaksana
CV. INVESTINDO KARYA BERSAMA
SITI SAFITRI
Direktur
BUKU CATATAN HARIAN STANDARD
Tanggal : 2022
4 Cerah
5 Lain - Lain
1 Direksi Orang
2 Kontraktor / Pelaksana Orang
3 Pengawas Lapangan Konsultan Orang
Diperiksa Oleh Pengawas Anggota Tim Teknis Dinas Perumahan ANTUNG TRINIA RACHMAYANTI, ST
Rakyat Dan Kawasan Permukiman
\
KONTRAKTOR PELAKSANA LAPORAN MINGGUAN P
CV. INVESTINDO KARYA BERSAMA Minggu ke : 1 ( Satu )
Tanggal : 26 Mei 2016
KEGIATAN : Urusan Penyelenggaraan PSU Perumahan
PEKERJAAN : PEMBANGUNAN PSU DRAINASE JALAN KAWITAN I RT. 16 KELURAHAN SIDORE
LOKASI : KECAMATAN ARUT SELATAN
KONTRAKTOR : CV. INVESTINDO KARYA BERSAMA
REALI
No URAIAN PEKERJAAN VOLUME BOBOT % MINGGU LALU
VOLUME
I PEKERJAAN PERSIAPAN
1 Papan nama kegiatan 1.00 Bh 0.44
2 Mobilisasi dan Demobilisasi 1.00 Ls 0.50
Jumlah 100.00
REALI
No URAIAN PEKERJAAN VOLUME BOBOT % MINGGU LALU
VOLUME
I PEKERJAAN PERSIAPAN
1 Papan nama kegiatan 1.00 Bh 0.44 1.00
2 Mobilisasi dan Demobilisasi 1.00 Ls 0.50 0.50
Jumlah 100.00
Diperiksa
: Disetujui Oleh Oleh : Diperiksa Oleh Diperiksa Oleh : : Diperiksa Oleh
Pejabat Pelaksana Teknis Kegiatan
Koordinator Tim Teknis Tim Teknis Anggota Tim Teknis Konsultan Pengawas
Konsultan Pengawas
DINAS PEKERJAAN
DINAS PEKERJAANUMUM UMUM DINAS PEKERJAAN
DINAS PEKERJAAN UMUMCV. PRIMA CIPTA
UMUM CV.DESIGN
PRIMA CIPTA DESIGN
REALI
No URAIAN PEKERJAAN VOLUME BOBOT % MINGGU LALU
VOLUME
I PEKERJAAN PERSIAPAN
1 Papan nama kegiatan 1.00 Bh 0.44 1.00
2 Mobilisasi dan Demobilisasi 1.00 Ls 0.50 0.50
Jumlah 100.00
Diperiksa
: Disetujui Oleh Oleh : Diperiksa Oleh Diperiksa Oleh : : Diperiksa Oleh
Pejabat Pelaksana Teknis Kegiatan
Koordinator Tim Teknis Tim Teknis Anggota Tim Teknis Konsultan Pengawas
Konsultan Pengawas
DINAS PEKERJAAN
DINAS PEKERJAANUMUM UMUM DINAS PEKERJAAN
DINAS PEKERJAAN UMUMCV. PRIMA CIPTA
UMUM CV.DESIGN
PRIMA CIPTA DESIGN
REALI
No URAIAN PEKERJAAN VOLUME BOBOT % MINGGU LALU
VOLUME
I PEKERJAAN PERSIAPAN
1 Papan nama kegiatan 1.00 Bh 0.44 1.00
2 Mobilisasi dan Demobilisasi 1.00 Ls 0.50 0.50
Jumlah 100.00
Diperiksa
: Disetujui Oleh Oleh : Diperiksa Oleh Diperiksa Oleh : : Diperiksa Oleh
Pejabat Pelaksana Teknis Kegiatan
Koordinator Tim Teknis Tim Teknis Anggota Tim Teknis Konsultan Pengawas
Konsultan Pengawas
DINAS PEKERJAAN
DINAS PEKERJAANUMUM UMUM DINAS PEKERJAAN
DINAS PEKERJAAN UMUMCV. PRIMA CIPTA
UMUM CV.DESIGN
PRIMA CIPTA DESIGN
REALI
No URAIAN PEKERJAAN VOLUME BOBOT % MINGGU LALU
VOLUME
I PEKERJAAN PERSIAPAN
1 Papan nama kegiatan 1.00 Bh 0.44 1.00
2 Mobilisasi dan Demobilisasi 1.00 Ls 0.50 0.50
Jumlah 100.00
Diperiksa
: Disetujui Oleh Oleh : Diperiksa Oleh Diperiksa Oleh : : Diperiksa Oleh
Pejabat Pelaksana Teknis Kegiatan
Koordinator Tim Teknis Tim Teknis Anggota Tim Teknis Konsultan Pengawas
Konsultan Pengawas
DINAS PEKERJAAN
DINAS PEKERJAANUMUM UMUM DINAS PEKERJAAN
DINAS PEKERJAAN UMUMCV. PRIMA CIPTA
UMUM CV.DESIGN
PRIMA CIPTA DESIGN
REALI
No URAIAN PEKERJAAN VOLUME BOBOT % MINGGU LALU
VOLUME
I PEKERJAAN PERSIAPAN
1 Papan nama kegiatan 1.00 Bh 0.44 1.00
2 Mobilisasi dan Demobilisasi 1.00 Ls 0.50 0.50
Jumlah 100.00
Diperiksa
: Disetujui Oleh Oleh : Diperiksa Oleh Diperiksa Oleh : : Diperiksa Oleh
Pejabat Pelaksana Teknis Kegiatan
Koordinator Tim Teknis Tim Teknis Anggota Tim Teknis Konsultan Pengawas
Konsultan Pengawas
DINAS PEKERJAAN
DINAS PEKERJAANUMUM UMUM DINAS PEKERJAAN
DINAS PEKERJAAN UMUMCV. PRIMA CIPTA
UMUM CV.DESIGN
PRIMA CIPTA DESIGN
REALI
No URAIAN PEKERJAAN VOLUME BOBOT % MINGGU LALU
VOLUME
I PEKERJAAN PERSIAPAN
1 Papan nama kegiatan 1.00 Bh 0.44 1.00
2 Mobilisasi dan Demobilisasi 1.00 Ls 0.50 0.50
Jumlah 100.00
Diperiksa
: Disetujui Oleh Oleh : Diperiksa Oleh Diperiksa Oleh : : Diperiksa Oleh
Pejabat Pelaksana Teknis Kegiatan
Koordinator Tim Teknis Tim Teknis Anggota Tim Teknis Konsultan Pengawas
Konsultan Pengawas
DINAS PEKERJAAN
DINAS PEKERJAANUMUM UMUM DINAS PEKERJAAN
DINAS PEKERJAAN UMUMCV. PRIMA CIPTA
UMUM CV.DESIGN
PRIMA CIPTA DESIGN
UNAN PSU DRAINASE JALAN KAWITAN I RT. 16 KELURAHAN SIDOREJO (ARUT SELATAN)
REALISASI
MINGGU LALU MINGGU INI S/D MINGGU INI KET
BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)
- 0.69 0.69
UNAN PSU DRAINASE JALAN KAWITAN I RT. 16 KELURAHAN SIDOREJO (ARUT SELATAN)
REALISASI
MINGGU LALU MINGGU INI S/D MINGGU INI KET
BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)
UNAN PSU DRAINASE JALAN KAWITAN I RT. 16 KELURAHAN SIDOREJO (ARUT SELATAN)
REALISASI
MINGGU LALU MINGGU INI S/D MINGGU INI KET
BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)
UNAN PSU DRAINASE JALAN KAWITAN I RT. 16 KELURAHAN SIDOREJO (ARUT SELATAN)
REALISASI
MINGGU LALU MINGGU INI S/D MINGGU INI KET
BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)
FATKHUL KHASAN, SH
Direktur
UNAN PSU DRAINASE JALAN KAWITAN I RT. 16 KELURAHAN SIDOREJO (ARUT SELATAN)
REALISASI
MINGGU LALU MINGGU INI S/D MINGGU INI KET
BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)
UNAN PSU DRAINASE JALAN KAWITAN I RT. 16 KELURAHAN SIDOREJO (ARUT SELATAN)
REALISASI
MINGGU LALU MINGGU INI S/D MINGGU INI KET
BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)
UNAN PSU DRAINASE JALAN KAWITAN I RT. 16 KELURAHAN SIDOREJO (ARUT SELATAN)
REALISASI
MINGGU LALU MINGGU INI S/D MINGGU INI KET
BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)
REALIS
VOLUME
No URAIAN PEKERJAAN BOBOT % BULAN LALU
KONTRAK
VOLUME
I PEKERJAAN PERSIAPAN
1 Papan nama kegiatan 1.00 Bh 0.44
2 Mobilisasi dan Demobilisasi 1.00 Ls 0.50
Jumlah 100.00
REALIS
VOLUME
No URAIAN PEKERJAAN BOBOT % BULAN LALU
KONTRAK
VOLUME
I PEKERJAAN PERSIAPAN
1 Papan nama kegiatan 1.00 Bh 0.44 1.00
2 Mobilisasi dan Demobilisasi 1.00 Ls 0.50 0.50
Jumlah 100.00
REALISASI FISIK
BULAN LALU BULAN INI S/D BULAN INI KET
BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)
- 52.64 52.64
Diperiksa Oleh
: Diperiksa Oleh: : Diperiksa Oleh Dibuat Oleh :
: Dibuat Oleh
Konsultan
Konsultan Pengawas
Pengawas Konsultan Pengawas Kontraktor Pelaksana
Konsultan Pengawas
CV. PRIMA
CV. PRIMA CIPTADESIGN
CIPTA DESIGN CV. PRIMA CIPTA DESIGN CV. PRIMA CIPTA
CV. NORMA
DESIGN ABADI
REALISASI FISIK
BULAN LALU BULAN INI S/D BULAN INI KET
BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)
Diperiksa Oleh
: Diperiksa Oleh: : Diperiksa Oleh Dibuat Oleh :
: Dibuat Oleh
Konsultan
Konsultan Pengawas
Pengawas Konsultan Pengawas Kontraktor Pelaksana
Konsultan Pengawas
CV. PRIMA
CV. PRIMA CIPTADESIGN
CIPTA DESIGN CV. PRIMA CIPTA DESIGN CV. PRIMA CIPTA
CV. NORMA
DESIGN ABADI
BULAN
NO URAIAN PEKERJAAN BIAYA BOBOT I
MINGGU KE
( Rp ) (%) 1 2 3 4
I PEKERJAAN PERSIAPAN
1 Papan nama kegiatan 350,000.00 0.44 0.44
2 Mobilisasi dan Demobilisasi 400,000.00 0.50 0.25
KETERANGAN :
Rencana Kerja :
Realisasi Kerja :
1 kolom = 1 Minggu
: Menyetujui : Disetujui Oleh : Diperiksa Oleh : Diperiksa Oleh
Kuasa Pengguna Anggaran Pejabat Pelaksana Teknis Kegiatan Tim Teknis Konsultan Pengawas
DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM CV. PRIMA CIPTA DESIGN
BULAN
NO URAIAN PEKERJAAN BIAYA BOBOT I
MINGGU KE
( Rp ) (%) 1 2 3 4
I PEKERJAAN PERSIAPAN
1 Papan nama kegiatan 350,000.00 0.44 0.44
2 Mobilisasi dan Demobilisasi 400,000.00 0.50 0.25
KETERANGAN :
Rencana Kerja :
Realisasi Kerja :
1 kolom = 1 Minggu
: Menyetujui : Disetujui Oleh : Diperiksa Oleh : Diperiksa Oleh
Kuasa Pengguna Anggaran Pejabat Pelaksana Teknis Kegiatan Tim Teknis Konsultan Pengawas
DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM CV. PRIMA CIPTA DESIGN
Bulan Ke : 1 ( Satu )
Tanggal : 26 Mei 2016 s/d 22 Juni 2016
BULAN
II III BOBOT
MINGGU KE
5 6 7 8 9 10 11 12 (%)
100
0.25
80`
MASA PEMELIHARAAN
60
9.58 9.58
2.73 2.73 2.73
40
5.61 5.61
20
5.72 5.72 5.72 5.72
4.59 4.59 4.59 4.59
3.12 3.12 3.12 0
0.98 0.98 0.98
Bulan Ke : 2 (dua)
Tanggal : 23 Juni 2016 s/d 10 Juli 2016
BULAN
II III BOBOT
MINGGU KE
5 6 7 8 9 10 11 12 (%)
100
0.25
MASA PEMELIHARAAN
80`
9.58 9.58 60
2.73 2.73 2.73
5.61 5.61
40
50
10
70
10 10
50
6 P melin tang
5
P M emanj ang
5 5
5 5
P M emanj ang
6 P melin tang
5
P Memanjang
5 5
5 5
P Memanjang
50
60
50
10
10 30 10
10 10
30
50
NO PANJANG LEBAR (L) VOLUME
KETERANGAN
(M') (M') (M2)
3 Ø 10 3 Ø 10
Tulangan U
Tulangan Memanjang
3 Ø 10
10 30 10
50
NO PANJANG TINGGI 50% VOLUME
KETERANGAN
(M') (M') (M2) (M3)
Q
NO. URAIAN PEKERJAAN VOLUME BOBOT ( % ) BULAN LALU
VOLUME
I PEKERJAAN PERSIAPAN
1 Papan nama kegiatan 1.00 Bh 0.44
2 Mobilisasi dan Demobilisasi 1.00 Ls 0.50
Q
NO. URAIAN PEKERJAAN VOLUME BOBOT ( % ) BULAN LALU
VOLUME
I PEKERJAAN PERSIAPAN
1 Papan nama kegiatan 1.00 Bh 0.44 1.00
2 Mobilisasi dan Demobilisasi 1.00 Ls 0.50 0.50
QUANTITAS TERLAKSANA
BULAN INI S/DBULAN INI PRESTASI
VOLUME VOLUME (%)
QUANTITAS TERLAKSANA
BULAN INI S/DBULAN INI PRESTASI
VOLUME VOLUME (%)
1.00 100.00
0.50 1.00 100.00
13.79 100.00
0.44 100.00
842.24 100.00
5.76 5.76 100.00
38.64 100.00
23.19 100.00
225.63 1,005.63 100.00
12.89 12.89 100.00
42.95 42.95 100.00
111.67 111.67 100.00