Anda di halaman 1dari 34

DAFTAR Kg PEMBESIAN BETON

Ø 6 = 0.2 Kg
Ø 8 = 0.4 Kg Ø 6 = 0.22
Ø 10 = 1 Kg Ø 8 = 0.39
Ø 12 = 1 Kg CATATAN Ø 10 = 0.62
Ø 14 = 1 Kg PANJANG HOOK 4 X 2 = 8 CM Ø 12 = 0.89
Ø 16 = 2 Kg SELIMUT BETON 2 X 2 = 4 CM Ø 14 = 1.21
Ø 16 = 1.58

JUMLAH DALAM M3 BANYAK BESI BERAT


NO KOLOM Kp Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

1 13/13 Cm Ø 8 10,000 13 13 = 59.172 x 4 Btg = 236.686 x 0.39 = 92.308

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 59.172 0.150 = 394.477 x 0.44 Btg = 173.570 x 0.22 = 38.185
JUMLAH = 130.493

JUMLAH DALAM M3 BANYAK BESI BERAT


NO KOLOM Kp Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

1 13/13 Cm Ø 10 10,000 13 13 = 59.172 x 4 Btg = 236.686 x 0.62 = 146.746

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 59.172 0.150 = 394.477 x 0.44 Btg = 173.570 x 0.22 = 38.185
JUMLAH = 184.931

JUMLAH DALAM M3 BANYAK BESI BERAT


NO KOLOM Kp Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

1 13/13 Cm Ø 12 10,000 13 13 = 59.172 x 4 Btg = 236.686 x 0.89 = 210.651

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 59.172 0.150 = 394.477 x 0.44 Btg = 173.570 x 0.22 = 38.185
JUMLAH = 248.836

JUMLAH DALAM M3 BANYAK BESI BERAT


NO KOLOM Kp Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

1 15/15 Cm Ø 12 10,000 15 15 = 44.444 x 4 Btg = 177.778 x 0.89 = 158.222

M3 Jml / M3 Jarak Cincin P. Cincin 0.44


Cincin Ø 6 10,000 44.444 0.150 = 296.296 x 0.52 Btg = 154.074 x 0.22 = 33.896 0.08
JUMLAH = 192.119 0.52

S1 RUMUS LINGKARAN
JUMLAH DALAM M3 BANYAK BESI BERAT 30/30
NO SLOOF Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

2 20/35 Cm Ø 16 10,000 20 35 = 14.286 x 8 Btg = 114.286 x 0.89 = 101.714

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 8 10,000 14.286 0.150 = 95.238 x 1.02 Btg = 97.143 x 0.39 = 37.886
JUMLAH = 139.600 113.956

K1
JUMLAH DALAM M3 BANYAK BESI BERAT
NO KOLOM Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

2 30/40 Cm Ø 16 10,000 30 40 = 8.333 x 10 Btg = 83.333 x 1.58 = 131.667

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 8 10,000 8.333 0.150 = 55.556 x 1.32 Btg = 73.333 x 0.39 = 28.600
JUMLAH = 160.267 1 33.33333
K2

JUMLAH DALAM M3 BANYAK BESI BERAT


NO KOLOM Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

3 30/30 Cm Ø 10 10,000 30 30 = 11.111 x 8 Btg = 88.889 x 0.62 = 55.111

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 11.111 0.150 = 74.074 x 1.12 Btg = 82.963 x 0.22 = 18.252
JUMLAH = 73.363 1.72 126.1843

B1

JUMLAH DALAM M3 BANYAK BESI BERAT


NO RING BALOK R1 Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

1 15/20 Cm Ø 8 10,000 15 20 = 33.333 x 4 Btg = 133.333 x 0.39 = 52.000

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 33.333 0.150 = 222.222 x 0.62 Btg = 137.778 x 0.22 = 30.311
JUMLAH = 82.311 1 51.28205

B1

JUMLAH DALAM M3 BANYAK BESI BERAT


NO SLOOF BETON Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

1 15/20 Cm Ø 10 10,000 15 20 = 33.333 x 4 Btg = 133.333 x 0.62 = 82.667

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 33.333 0.150 = 222.222 x 0.62 Btg = 137.778 x 0.22 = 30.311
JUMLAH = 112.978 1 51.28205

B1

JUMLAH DALAM M3 BANYAK BESI BERAT


NO RING BALOK R1 Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

1 15/25 Cm Ø 10 10,000 15 20 = 33.333 x 6 Btg = 200.000 x 0.62 = 124.000

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 33.333 0.150 = 222.222 x 0.64 Btg = 142.222 x 0.22 = 31.289
JUMLAH = 155.289 1 51.28205

B2
JUMLAH DALAM M3 BANYAK BESI BERAT
NO BALOK B2 Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

1 20/25 Cm Ø 10 10,000 20 25 = 20.000 x 6 Btg = 120.000 x 0.62 = 74.400

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 20.000 0.150 = 133.333 x 0.82 Btg = 109.333 x 0.22 = 24.053
JUMLAH = 98.453
JUMLAH DALAM M3 BANYAK BESI BERAT
NO BALOK Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

1 13/20 Cm Ø 10 10,000 13 20 = 38.462 x 4 Btg = 153.846 x 0.62 = 95.385

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 38.462 0.150 = 256.410 x 0.42 Btg = 107.692 x 0.22 = 23.692
JUMLAH = 119.077

JUMLAH DALAM M3 BANYAK BESI BERAT


NO BALOK Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI 0.09
0.09
1 13/55 Cm Ø 10 10,000 13 40 = 19.231 x 8 Btg = 153.846 x 0.62 = 95.385 0.36
0.36
M3 Jml / M3 Jarak Cincin P. Cincin 0.08
Cincin Ø 6 10,000 19.231 0.150 = 128.205 x 0.98 Btg = 125.641 x 0.22 = 27.641 0.98
JUMLAH = 123.026

JUMLAH DALAM M3 BANYAK BESI BERAT


NO KOLOM PRAKTIS Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

1 13/13 Cm Ø 10 10,000 13 13 = 59.172 x 4 Btg = 236.686 x 0.62 = 146.746

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 59.172 0.150 = 394.477 x 0.44 Btg = 173.570 x 0.22 = 38.185
JUMLAH = 184.931

JUMLAH DALAM M3 BANYAK BESI BERAT


NO BALOK B1 Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

1 13/15 Cm Ø 10 10,000 13 15 = 51.282 x 4 Btg = 205.128 x 0.62 = 127.179

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 51.282 0.150 = 341.880 x 0.48 Btg = 164.103 x 0.22 = 36.103
JUMLAH = 163.282

JUMLAH DALAM M3 BANYAK BESI BERAT


NO KOLOM K1 Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

2 15/20 Cm Ø 10 10,000 15 20 = 33.333 x 6 Btg = 200.000 x 0.62 = 124.000

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 33.333 0.150 = 222.222 x 0.72 Btg = 160.000 x 0.22 = 35.200
JUMLAH = 159.200
JUMLAH DALAM M3 BANYAK BESI BERAT
NO KOLOM K1 Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

1 20/25 Cm Ø 12 10,000 20 20 = 25.000 x 8 Btg = 200.000 x 0.89 = 178.000


8 10,000 10 30 = 33.333 x 4 btg = 133.333 x 0.39 = 52.000
M3 Jml / M3 Jarak Cincin P. Cincin
Cincin Ø 6 10,000 25.000 0.100 = 250.000 x 1.4 Btg = 350.000 x 0.22 = 77.000
307.000

JUMLAH DALAM M3 BANYAK BESI BERAT


NO KOLOM K1 Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

1 18/20 Cm Ø 10 10,000 18 20 = 27.778 x 6 Btg = 166.667 x 0.62 = 103.333

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 27.778 0.100 = 277.778 x 0.62 Btg = 172.222 x 0.22 = 37.889
JUMLAH = 141.222

JUMLAH DALAM M3 BANYAK BESI BERAT


NO KOLOM K1 Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

1 15/25 Cm Ø 10 10,000 15 25 = 26.667 x 6 Btg = 160.000 x 0.62 = 99.200

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 26.667 0.150 = 177.778 x 0.62 Btg = 110.222 x 0.22 = 24.249
JUMLAH = 123.449

JUMLAH DALAM M3 BANYAK BESI BERAT


NO KOLOM K5 Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI

3 20/30 Cm Ø 12 10,000 20 30 = 16.667 x 8 Btg = 133.333 x 0.89 = 118.667

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 16.667 0.125 = 133.333 x 0.22 Btg = 29.333 x 0.39 = 11.440
JUMLAH = 130.107

JUMLAH DALAM M3 BANYAK BESI BERAT


NO KOLOM KL 3 Ø BESI JUMLAH
M3 P T Jml / M3 Jml Satuan Jml BESI

1 20/20 Cm Ø 10 10,000 20 20 = 25.000 x 4 Btg = 100.000 x 0.62 = 62.000

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 25.000 0.150 = 166.667 x 0.72 Btg = 120.000 x 0.22 = 26.400
JUMLAH = 88.400

JUMLAH DALAM M3 BANYAK BESI BERAT


NO KOLOM K3 Ø BESI JUMLAH
M3 P T Jml / M3 Jml Satuan Jml BESI

1 20/25 Cm Ø 12 10,000 20 25 = 20.000 x 6 Btg = 120.000 x 0.89 = 106.800

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 20.000 0.150 = 133.333 x 0.82 Btg = 109.333 x 0.22 = 24.053
JUMLAH = 130.853
JUMLAH DALAM M3 BANYAK BESI BERAT
NO KOLOM K3 Ø BESI JUMLAH
M3 P T Jml / M3 Jml Satuan Jml BESI

1 30/50 Cm Ø 10 10,000 30 50 = 6.667 x 8 Btg = 53.333 x 0.62 = 33.067

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 6.667 0.130 = 51.282 x 1.52 Btg = 77.949 x 0.22 = 17.149
JUMLAH = 50.215

JUMLAH DALAM M3 BANYAK BESI BERAT


NO KOLOM K3 Ø BESI JUMLAH
M3 P T Jml / M3 Jml Satuan Jml BESI

1 30/50/50 Cm Ø 10 10,000 30 50 = 6.667 x 10 Btg = 66.667 x 0.62 = 41.333

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 6 10,000 6.667 0.130 = 51.282 x 2.16 Btg = 110.769 x 0.22 = 24.369
JUMLAH = 65.703

JUMLAH DALAM M3 BANYAK BESI BERAT


NO KOLOM K4/K6 Ø BESI JUMLAH
M3 P T Jml / M3 Jml Satuan Jml BESI

1 10 x 43 Cm Ø 8 10,000 15 20 = 33.333 x 4 Btg = 133.333 x 0.39 = 52.000


0.06
M3 Jml / M3 Jarak Cincin P. Cincin 0.06
Cincin Ø 6 10,000 33.333 0.150 = 222.222 x 0.4 Btg = 88.889 x 0.22 = 19.556 0.39
JUMLAH = 71.556 0.39
0.08
0.98
JUMLAH DALAM M3 BANYAK BESI BERAT
NO KOLOM K2 Ø BESI JUMLAH
M3 P T Jml / M3 Jml Satuan Jml BESI

1 40 Cm Ø 16 10,000 40 40 = 6.250 x 8 Btg = 50.000 x 1.58 = 79.000

M3 Jml / M3 Jarak Cincin P. Cincin


Cincin Ø 8 10,000 6.250 0.125 = 50.000 x 1.52 Btg = 76.000 x 0.39 = 29.640
JUMLAH = 108.640
JUMLAH DALAM M3 BANYAK BESI BERAT
NO PLAT POER Ø BESI JUMLAH
M3 Vol / M3 L Jml / M3 Jml Satuan Jml BESI

1 15/80/80 Ø 12 10,000 128 = 78.125 x 1.04 Btg = 81.250 x 0.89 = 72.313

JUMLAH = 72.313

JUMLAH DALAM M3 BANYAK BESI BERAT


NO PLAT POER Ø BESI JUMLAH
M3 Vol / M3 L Jml / M3 Jml Satuan Jml BESI

1 15/80/80 Ø 10 10,000 128 = 78.125 x 1.04 Btg = 81.250 x 0.62 = 50.375

JUMLAH = 50.375

JUMLAH DALAM M3 BANYAK BESI BERAT


NO PLAT POER Ø BESI JUMLAH
M3 Vol / M3 L Jml / M3 Jml Satuan Jml BESI

1 15/80/80 Ø8 10,000 128 = 78.125 x 1.04 Btg = 81.250 x 0.39 = 31.688

JUMLAH = 31.688

2 pokok
2 bagi
JUMLAH DALAM M2 BANYAK BESI BERAT
NO PLAT lantai, 12 Cm Ø BESI JUMLAH JML x 0.12 JML x 1.05
M2 Jarak start 0 Btg / 1M2 Jml/1m2 Satuan Jml BESI

1 Tb.12 Cm-Bagi Ø10-15 pokok 100 15 1 = 7.67 x 2 Btg = 15.333 x 0.62 = 9.507 79.222 83.18
2 Tb.12 Cm-Bagi Ø8-15 bagi 100 15 1 = 7.67 x 2 Btg = 15.333 x 0.39 = 5.980 49.833 52.33

JUMLAH = 15.487 129.056 135.51

2 pokok
2 bagi
JUMLAH DALAM M2 BANYAK BESI BERAT
NO PLAT lantai, 10 Cm Ø BESI JUMLAH JML x 0.10 JML x 1.05
M2 Jarak start 0 Btg / 1M2 Jml/1m2 Satuan Jml BESI

1 Tb.10 Cm-Bagi Ø8-20 pokok 100 20 1 = 6.00 x 2 Btg = 12.000 x 0.39 = 4.680 46.800 49.14
2 Tb.10 Cm-Bagi Ø8-20 bagi 100 20 1 = 6.00 x 2 Btg = 12.000 x 0.39 = 4.680 46.800 49.14

JUMLAH = 9.360 93.600 98.28

JUMLAH DALAM M2 BANYAK BESI BERAT


NO PLAT lantai, 20 Cm Ø BESI JUMLAH JML x 0.10 JML x 1.05
M2 Jarak start 0 Btg / 1M2 Jml/1m2 Satuan Jml BESI

1 Tb.20 Cm-Bagi Ø12-20 pokok 100 15 1 = 7.67 x 2 Btg = 15.333 x 0.89 = 13.647 136.467 143.29
2 Tb.20 Cm-Bagi Ø12-20 bagi 100 15 1 = 7.67 x 2 Btg = 15.333 x 0.89 = 13.647 136.467 143.29

JUMLAH = 27.293 272.933 286.58

JUMLAH DALAM M2 BANYAK BESI BERAT


NO PLAT lantai, 8 Cm Ø BESI JUMLAH JML x 08 JML x 1.05
M2 Jarak start 0 Btg / 1M2 Jml/1m2 Satuan Jml BESI

1 Tb.8 Cm-Bagi Ø8-20 pokok 100 20 1 = 6.00 x 2 Btg = 12.000 x 0.39 = 4.680 58.500 61.43

JUMLAH = 4.680 58.500 61.43


DAFTAR HARGA SATUAN BAHAN & UPAH

PEKERJAAN : Belanja Rehab Lapangan Tenis


LOKASI : Kabupaten Kaur
SUMBER DANA : APBD-P
TAHUN ANGGARAN 2021

I. UPAH

No URAIAN SAT UPAH/HARI JUMLAH HARGA ( Rp ),-


( Rp ),-
1 Mandor /Hari 167,000.00 167,000.00
2 Kepala Tukang /Hari 155,000.00 155,000.00
3 Tukang /Hari 138,000.00 138,000.00
4 Pekerja /Hari 100,000.00 100,000.00

II. B A H A N

HARGA SATUAN
No URAIAN SAT JUMLAH HARGA ( Rp ).-
( Rp ),-

II.1 BAHAN PASANGAN


1 Pasir Beton /m3 185,000.00 185,000.00
2 Pasir Pasang /m3 185,000.00 185,000.00
3 Pasir Urug /m3 150,000.00 150,000.00
4 Pasir Beton /Kg 132.14 132.14
5 Batu Pecah /Kg 280.74 280.74
6 Tanah Urug /m3 100,000.00 100,000.00
8 Semen Type I ( 50 Kg ) /Kg 1,400.00 1,400.00
9 Semen Putih/Warna /Kg 4,000.00 4,000.00
10 Batu Pecah 1 - 2 cm /m3 397,000.00 397,000.00
11 Batu Pecah 2 - 3 cm /m3 379,000.00 379,000.00
12 Sirtu /m3 212,000.00 212,000.00
13 Koral /m3 262,000.00 262,000.00
14 Koral /m3 194.07 194.07
15 Batu Kali/belah /m3 300,000.00 300,000.00

II.2 BAHAN LANTAI


1 Keramik 40 X 40 cm /Bh 12,000.00 12,000.00
2 Keramik 40 X 40 cmn anti slip /Bh 12,500.00 12,500.00
3 Kuku Keramik /m' 15,000.00 15,000.00

II.3 BAHAN DINDING


1 Batu Bata /Bh 700.00 700.00
2 Paving Block /Bh 2,500.00 2,500.00
3 Batako /Bh 2,400.00 2,400.00
4 Batu Rooster 20 x 20 cm /bh 25,000.00 25,000.00
5 Glass Block /bh 27,000.00 27,000.00
II.4 PENUTUP LANGIT LANGIT
1 Plywood 4 mm /Lbr 72,500.00 72,500.00
2 Plywood 3 mm /Lbr 66,000.00 66,000.00
II.5 BAHAN PENUTUP ATAP
1 Seng Plat BJLS 30 L = 30 - 40 cm /m' 20,000.00 20,000.00
2 Seng Plat BJLS 30 /m2 45,000.00 45,000.00
3 Seng Gelombang BJLS 20 /Lbr 55,000.00 55,000.00
4 Seng Gelombang BJLS 30 /Lbr 82,500.00 82,500.00
5 Seng Spandek /m2 72,500.00 72,500.00
6 Bubungan Genteng Metal MC Bulat /m1 33,000.00 33,000.00
7 Bubungan Spandek /m1 32,000.00 32,000.00
8 Genteng Metal Multi Collour /Lbr 65,000.00 65,000.00
9 Genteng Metal Multi Collour tebal 0,25 mm /Lbr 34,200.00 34,200.00
10 Nok Samping Genteng Metal /m' 33,000.00 33,000.00

II.6 BAHAN KAYU


1 Kayu Balok kualitas baik /M3 2,700,000.00 2,700,000.00
2 Kayu Profil Kualitas baik /M3 2,700,000.00 2,700,000.00
3 Kayu Papan Kualitas baik /M3 2,700,000.00 2,700,000.00
4 Kayu Balok dan Papan klas III /M3 2,400,000.00 2,400,000.00
5 Kayu Dolken diameter 5 - 10 cm /btg 10,000.00 10,000.00
6 Bambu 6-8/600 cm /btg 9,000.00 9,000.00
7 Kayu Balok dan Papan Klas IV /M3 190,000.00 1,900,000.00
8 Kayu Lapis 12 mm Uk 8 " x 4 " /Lbr 185,000.00 185,000.00
9 Kayu Profil List Plafond A4 /M1 10,000.00 10,000.00
8 Multiplek 6 mm Uk 8 " x 4 " /Lbr 115,000.00 115,000.00
9 Multiplek 9 mm Uk 8 " x 4 " /Lbr 121,000.00 121,000.00
II.9 BAHAN FINISHING/ CAT
1 Cat Besi /Kg 45,000.00 45,000.00
2 Cat Tembok /Kg 42,500.00 42,500.00
3 Cat Kayu /Kg 42,000.00 42,000.00
4 Cat Coating /Ltr 52,500.00 52,500.00
4 Minyak Cat /Ltr 28,000.00 28,000.00
5 Thiner Super /Ltr 25,000.00 25,000.00
6 Compound /Kg 4,750.00 4,750.00
7 Sirlak /Kg 56,000.00 56,000.00
8 Plamir /Kg 15,000.00 15,000.00
9 Politur /Ltr 35,000.00 35,000.00
10 Politur Jadi /Ltr 60,000.00 60,000.00
11 Lem Kayu /Kg 23,000.00 23,000.00
12 Dempul Kayu /Kg 57,000.00 57,000.00
13 Minyak Begisting /Ltr 10,500.00 10,500.00
14 Vernis /Ltr 30,000.00 30,000.00
15 Dempul /Kg 28,000.00 28,000.00
16 Top Coat Playing Surface Sekw. Rebound Ace /Kg 55,200.00 55,200.00
17 Acrylic Line Marking (Coat warna Putih lebar garis 5 cm) /Kg 66,000.00 66,000.00
18 Air /Ltr 50.00 50.00
19 Cat Menie /Kg 26,250.00 26,250.00
II.10 BAHAN KUNCI / PENGGANTUNG
1 Kunci Tanam 2 Slaag Besar /Bh 165,000.00 165,000.00
2 Kunci Tanam 2 Slaag Kecil /Bh 105,000.00 105,000.00
3 Engsel Pintu Nylon Kuningan /Bh 12,000.00 12,000.00
4 Grendel Pintu /Bh 10,000.00 10,000.00
5 Grendel Jendela /Bh 7,500.00 7,500.00
6 Engsel Jendela Nylon Kuningan /Bh 7,500.00 7,500.00
7 Handle/Tarikan Jendela /Bh 600.00 600.00
8 Tarikan Pintu /psg 150,000.00 150,000.00
9 Hak Angin Jendela /Bh 7,500.00 7,500.00

II.11 BAHAN LISTRIK


1 Instalasi Listrik Titik Api Kabel NYA 2 s 2.5 mm /titik 125,000.00 125,000.00
2 Bola Lampu TL 1 x 20 Watt /Bh 50,000.00 50,000.00
3 Bola Lampu TL 2 x 20 Watt /Bh 80,000.00 80,000.00
4 Bola Lampu pijar 25 Watt /Bh 11,000.00 11,000.00
5 Lampu Hemat Energi XL 18 Watt /Bh 45,000.00 45,000.00
6 Lampu Hemat Energi XL 14 Watt /Bh 25,000.00 25,000.00
7 Stop Kontak /Bh 26,000.00 26,000.00
8 Saklar Tunggal /Bh 18,000.00 18,000.00
9 Saklar Ganda /Bh 27,000.00 27,000.00
10 MCB 4 Group /Bh 175,000.00 175,000.00
11 MCB 3 Group /Bh 150,000.00 150,000.00
12 MCB 2 Group /Bh 125,000.00 125,000.00
13 MCB 1 Group /Bh 100,000.00 100,000.00

II.10 BAHAN LAIN LAIN


1 Kaca Bening 5 mm /m2 132,000.00 132,000.00
2 Kaca Bening 3 mm /m2 80,000.00 80,000.00

Bintuhan. November 2021


PEJABAT PEMBUAT KOMITMEN (PPK)
Dinas Pariwisata Pemuda dan Olahraga
Kabupaten Kaur

JON HARIMOL,M.Si
NIP. 19720401 199403 1 006
DAFTAR ANALISA

PEKERJAAN Belanja Rehab Lapangan Tenis


LOKASI Kabupaten Kaur

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

A.2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1 m


No Uraian Kode Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.750 100,000.00 75,000.00
Mandor L.04 OH 0.025 167,000.00 4,175.00
JUMLAH TENAGA KERJA 79,175.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
Cangkul,Garpu Paket 10,000.00 -
JUMLAH HARGA ALAT -

C Jumlah (A+B) 79,175.00


D Overhead & Profit 12 % 12 %x C 9,501.00
E Harga Satuan Pekerjaan (C+D) 88,676.00

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


A.4.1.1.1 Membuat 1 m³ beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87
No Uraian Kode Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang Batu L.02 OH 0.275 138,000.00 37,950.00
Kepala Tukang L.03 OH 0.028 155,000.00 4,340.00
Mandor L.04 OH 0.083 167,000.00 13,861.00
JUMLAH TENAGA KERJA 221,151.00
B BAHAN
Semen portland Kg 247.000 1,400.00 345,800.00
Pasir beton Kg 869 132.14 114,832.14
Kerikil (Maks 30 mm) Kg 999 280.74 280,460.00
Air Liter 215 50.00 10,750.00
JUMLAH HARGA BAHAN 751,842.14
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 972,993.14


E Overhead & Profit 12 % 12 %x D 116,759.18
F Harga Satuan Pekerjaan (D+E) 1,089,752.32

A.4.1.1.5 Membuat 1 m³ beton


No Uraian Kode Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang Batu L.02 OH 0.275 138,000.00 37,950.00
Kepala Tukang L.03 OH 0.028 155,000.00 4,340.00
Mandor L.04 OH 0.083 167,000.00 13,861.00
JUMLAH TENAGA KERJA 221,151.00
B BAHAN
Semen portland Kg 326.000 1,400.00 456,400.00
Pasir beton Kg 760 132.14 100,428.57
Kerikil Max 30 mm Kg 1029 280.74 288,882.22
Air Liter 215 50.00 10,750.00
JUMLAH HARGA BAHAN 856,460.79
C PERALATAN
alat bantu paket 10,000.00 -
JUMLAH HARGA ALAT -

C Jumlah (A+B) 1,077,611.79


D Overhead & Profit 12 % 12 %x C 129,313.42
E Harga Satuan Pekerjaan (C+D) 1,206,925.21
A.4.1.1.5a Membuat 1 m³ beton (K175)
No Uraian Kode Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang Batu L.02 OH 0.275 138,000.00 37,950.00
Kepala Tukang L.03 OH 0.028 155,000.00 4,340.00
Mandor L.04 OH 0.083 167,000.00 13,861.00
JUMLAH TENAGA KERJA 221,151.00
B BAHAN
Semen portland Kg 326.000 1,400.00 456,400.00
Pasir beton Kg 760 132.14 100,428.57
Batu Pecah Kg 1029 280.74 288,882.22
Air Liter 215 50.00 10,750.00
JUMLAH HARGA BAHAN 856,460.79
C PERALATAN
alat bantu paket 10,000.00 -
JUMLAH HARGA ALAT -

C Jumlah (A+B) 1,077,611.79


D Overhead & Profit 12 % 12 %x C 129,313.42
E Harga Satuan Pekerjaan (C+D) 1,206,925.21
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.4.1.9 Pemasangan 1 m² dinding bata merah tebal ½ batu campuran 1SP : 4PP
No Uraian Kode Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang Batu L.02 OH 0.100 138,000.00 13,800.00
Kepala Tukang L.03 OH 0.010 155,000.00 1,550.00
Mandor L.04 OH 0.015 167,000.00 2,505.00
JUMLAH TENAGA KERJA 47,855.00
B BAHAN
Bata merah m³ 70.000 700.00 49,000.00
Semen Portland Kg 11.500 1,400.00 16,100.00
Pasir pasang m³ 0.043 185,000.00 7,955.00
JUMLAH HARGA BAHAN 73,055.00
C PERALATAN
JUMLAH HARGA ALAT -

C Jumlah (A+B) 120,910.00


D Overhead & Profit 12 % 12 %x C 14,509.20
E Harga Satuan Pekerjaan (C+D) 135,419.20
Untuk 1 m3 = 10 x nya 1,354,192.00

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

A.4.4.2.4 Pemasangan 1 m² plesteran 1SP : 4PP tebal 15 mm


No Uraian Kode Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang Batu L.02 OH 0.150 138,000.00 20,700.00
Kepala Tukang L.03 OH 0.015 155,000.00 2,325.00
Mandor L.04 OH 0.015 167,000.00 2,505.00
JUMLAH TENAGA KERJA 55,530.00
B BAHAN
Semen portland Kg 6.240 1,400.00 8,736.00
Pasir pasang m³ 0.024 185,000.00 4,440.00
JUMLAH HARGA BAHAN 13,176.00
C PERALATAN
JUMLAH HARGA ALAT -

C Jumlah (A+B) 68,706.00


D Overhead & Profit 12 % 12 %x C 8,244.72
E Harga Satuan Pekerjaan (C+D) 76,950.72
A.4.4.2.27 Pemasangan 1 m² acian
No Uraian Kode Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang Batu L.02 OH 0.010 138,000.00 1,380.00
Kepala Tukang L.03 OH 0.010 155,000.00 1,550.00
Mandor L.04 OH 0.010 167,000.00 1,670.00
JUMLAH TENAGA KERJA 14,600.00
B BAHAN
Semen portland Kg 3.250 1,400.00 4,550.00
JUMLAH HARGA BAHAN 4,550.00
C PERALATAN
JUMLAH HARGA ALAT -

C Jumlah (A+B+C) 19,150.00


D Overhead & Profit 12 % 12 %x C 2,298.00
E Harga Satuan Pekerjaan (D+E) 21,448.00
A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

A.4.5.1.5 Pemasangan 1 m² langit-langit Plywood ukuran (60 x 120) cm, tebal 3 mm, 4 mm dan 6 mm
No Uraian Kode Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang Kayu L.02 OH 0.100 138,000.00 13,800.00
Kepala Tukang L.03 OH 0.010 155,000.00 1,550.00
Mandor L.04 OH 0.005 167,000.00 835.00
JUMLAH TENAGA KERJA 26,185.00
B BAHAN
Plywood 4 mm Lbr 0.375 72,500.00 27,187.50
Paku Plywood Kg 0.030 20,000.00 600.00
JUMLAH HARGA BAHAN 27,787.50
C PERALATAN
JUMLAH HARGA ALAT -

C Jumlah (A+B+C) 53,972.50


D Overhead & Profit 12 % 12 %x C 6,476.70
E Harga Satuan Pekerjaan (D+E) 60,449.20
A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP

A.4.5.2.32 Pemasangan 1 m² Genteng Metal


No Uraian Kode Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang Kayu L.02 OH 0.250 138,000.00 34,500.00
Kepala Tukang L.03 OH 0.025 155,000.00 3,875.00
Mandor L.04 OH 0.075 167,000.00 12,525.00
JUMLAH TENAGA KERJA 65,900.00
B BAHAN
Genteng Metal Bh 0.80 34,200.00 27,360.00
Paku biasa ½" - 1" Kg 0.04 32,500.00 1,300.00
JUMLAH HARGA BAHAN 28,660.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 94,560.00


D Overhead & Profit 12 % 12 %x C 11,347.20
F Harga Satuan Pekerjaan (D+E) 105,907.20

A.4.6.1.6 Pembuatan dan pemasangan 1 m² pintu dan jendela kaca, kayu kualitas baik
No Uraian Kode Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.800 100,000.00 80,000.00
Tukang Kayu L.02 OH 2.400 138,000.00 331,200.00
Kepala Tukang L.03 OH 0.240 155,000.00 37,200.00
Mandor L.04 OH 0.040 167,000.00 6,680.00
JUMLAH TENAGA KERJA 455,080.00
B BAHAN
Papan kayu m³ 0.024 2,700,000.00 64,800.00
Kaca 5 mm m2 1.000 132,000.00 132,000.00
Lem Kayu Kg 0.300 23,000.00 6,900.00
JUMLAH HARGA BAHAN 203,700.00
C PERALATAN
JUMLAH HARGA ALAT -

C Jumlah (A+B+C) 658,780.00


D Overhead & Profit 12 % 12 %x C 79,053.60
E Harga Satuan Pekerjaan (D+E) 737,833.60
A.4.6.1.19 Pemasangan 1 m² rangka langit-langit (60 x 120) cm, kayu keualitas baik
No Uraian Kode Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang Kayu L.02 OH 0.300 138,000.00 41,400.00
Kepala Tukang L.03 OH 0.030 155,000.00 4,650.00
Mandor L.04 OH 0.075 167,000.00 12,525.00
JUMLAH TENAGA KERJA 73,575.00
B BAHAN
Kaso-kaso 5 x 7 cm m³ 0.0154 2,700,000.00 41,580.00
Paku 7 - 10 cm Kg 0.200 19,000.00 3,800.00
JUMLAH HARGA BAHAN 45,380.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 118,955.00


D Overhead & Profit 12 % 12 %x C 14,274.60
F Harga Satuan Pekerjaan (D+E) 133,229.60

A.4.6.1.21 Pemasangan 1 m² lisplank (3 x 24) cm, kayu kualitas baik


No Uraian Kode Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang Kayu L.02 OH 0.200 138,000.00 27,600.00
Kepala Tukang L.03 OH 0.020 155,000.00 3,100.00
Mandor L.04 OH 0.005 167,000.00 835.00
JUMLAH TENAGA KERJA 41,535.00
B BAHAN
Papan kayu m³ 0.0108 2,700,000.00 29,160.00
Paku 5 dan 7 cm Kg 0.100 19,000.00 1,900.00
JUMLAH HARGA BAHAN 31,060.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 72,595.00


E Overhead & Profit 12 % 12 %x D 8,711.40
F Harga Satuan Pekerjaan (D+E) 81,306.40

A.4.7.1.4 1 m² pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.07 100,000.00 7,000.00
Tukang cat L.02 OH 0.009 138,000.00 1,242.00
Kepala tukang L.03 OH 0.006 155,000.00 930.00
Mandor L.04 OH 0.003 167,000.00 501.00
JUMLAH TENAGA KERJA 9,673.00
B BAHAN
Cat menie Kg 0.20 26,250.00 5,250.00
Plamuur Kg 0.15 15,000.00 2,250.00
Cat dasar Kg 0.17 42,000.00 7,140.00
Cat penutup Kg 0.26 42,000.00 10,920.00
Kuas Bh 0.01 15,750.00 157.50
Pengecer Kg 0.03 28,000.00 840.00
Ampelas Lbr 0.2 6,000.00 1,200.00
JUMLAH HARGA BAHAN 27,757.50
C PERALATAN
JUMLAH HARGA ALAT -

C Jumlah (A+B) 37,430.50


D Overhead & Profit 12 % 12 %x C 4,491.66
E Harga Satuan Pekerjaan (C+D) 41,922.16
A.4.7.1.10b Top Coat Playing Surface Sekw. Rebound Ace
No Uraian Kode Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.02 100,000.00 2,000.00
Tukang cat L.02 OH 0.063 138,000.00 8,694.00
Kepala tukang L.03 OH 0.0063 155,000.00 976.50
Mandor L.04 OH 0.003 167,000.00 501.00
JUMLAH TENAGA KERJA 12,171.50
B BAHAN
Cat dasar Kg 0.10 55,200.00 5,520.00
Cat penutup Kg 0.26 55,200.00 14,352.00
JUMLAH HARGA BAHAN 19,872.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 32,043.50
E Overhead & Profit 12 % 12 %x D 3,845.22
F Harga Satuan Pekerjaan (D+E) 35,888.72
A.4.7.1.10c Acrylic Line Marking (Coat warna Putih lebar garis 5 cm)
No Uraian Kode Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.02 100,000.00 2,000.00
Tukang cat L.02 OH 0.063 138,000.00 8,694.00
Kepala tukang L.03 OH 0.0063 155,000.00 976.50
Mandor L.04 OH 0.003 167,000.00 501.00
JUMLAH TENAGA KERJA 12,171.50
B BAHAN
Cat dasar Kg 0.10 66,000.00 6,600.00
Cat penutup Kg 0.26 66,000.00 17,160.00
JUMLAH HARGA BAHAN 23,760.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 35,931.50


E Overhead & Profit 12 % 12 %x D 4,311.78
F Harga Satuan Pekerjaan (D+E) 40,243.28
RENCANA ANGGARAN BIAYA ( RAB )

PEKERJAAN : Perencanaan Pembangunan Kios Cinderamata di Pantai Wayhawang 3 Unit (DAK)


LOKASI : Kawasan Wisata Pantai Wayhawang Kec.Maje Kab.Kaur
SUMBER DANA : DAK
TAHUN ANGGARAN : 2020

NO URAIAN PEKERJAAN VOLUME ANALISA H. SATUAN JUMLAH


( Rp ) ( Rp )
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan dan Pas Bowplank 1.00 Unit Ls 1,500,000.00 1,500,000.00
2 Pek. Papan Nama Proyek 1.00 Unit Ls 450,000.00 450,000.00
3 Pek. Barak Kerja/Gudang/Sewa 1.00 Unit Ls 3,500,000.00 3,500,000.00
4 Pek. Pengadaan Air Kerja 1.00 Unit Ls 2,500,000.00 2,500,000.00
5 Pek. PPPK dan Jamsostek BPJS 1.00 Unit Ls 700,000.00 700,000.00
SUB JUMLAH I 8,650,000.00
II PEKERJAAN TANAH/PASIR
1 Pek. Galian Tanah Pondasi Batu Kali + Galian Tanah Plat Setempat 53.29 m3 A.2.3.1.1 88,676.00 4,725,650.45
2 Pek. Urugan Tanah Kembali 26.65 m3 A.2.3.1.9 65,352.00 1,741,343.25
3 Pek. Urugan Pasir Bawah Pondasi Batu Kali & Plat Setempat 2.25 m3 A.2.3.1.11 237,070.40 534,072.20
4 Pek. Urugan Pasir Bawah Lantai 5.40 m3 A.2.3.1.11 237,070.40 1,280,180.16
SUB JUMLAH II 8,281,246.06
III PEKERJAAN PASANGAN/BETON
1 Pek. Pas. Pondasi Batu Kali 1 : 4 37.12 m3 A.3.2.1.4 1,077,496.00 39,996,651.52
2 Pek. Pas. Dinding Batu Bata 1 : 4 208.26 m2 A.4.4.1.9 135,419.20 28,202,944.27
3 Pek. Plesteran Dinding 416.53 m2 A.4.4.2.4 82,958.70 34,554,621.39
4 Pek. Pas. Batu Bata 1 : 4 (Pondasi Rolag) 30.00 m2 A.4.4.1.9 135,419.20 4,062,576.00
5 Pek. Plesteran Dinding 30.00 m2 A.4.4.2.4 82,958.70 2,488,761.00
6 Pek. Acian 416.53 m2 A.4.4.2.27 21,448.00 8,933,692.54
7 Pek. Beton Tumbuk Bawah Lantai 1 : 3 : 5 5.40 m3 A.4.1.1.1 1,089,752.32 5,884,662.53
8 Pek. Rabat Beton Keliling Bangunan 1 : 3 : 5 2.50 m3 A.4.1.1.1 1,089,752.32 2,724,380.80
9 PEK. BETON BERTULANG 1 : 2 : 3
- Pek. Pondasi Plat Setempat 1.54 m3 A.4.1.1.36.Ps.b 5,685,100.15 8,755,054.24
- Pek. Sloof 15/20 cm 2.54 m3 A.4.1.1.36.S.b 5,306,373.83 13,451,657.66
- Pek. Kolom Struktur 20/20 cm 2.56 m3 A.4.1.1.36.Ks 6,269,462.88 16,049,824.97
- Pek. Ring balk 10/15 cm 43.00 m' A.4.1.1.36 122,071.04 5,249,054.72
- Pek. Ring balk 15/20 cm 0.48 m3 A.4.1.1.36 6,266,609.71 3,007,972.66
- Pek. Kolom Praktis 13/13 cm 0.24 m3 A.4.1.1.36.Kp.b 7,752,936.87 1,860,704.85
10 Pek. Lantai Keramik 40 x 40 cm 108.00 m2 A.4.4.3.9 171,629.92 18,536,031.36
SUB JUMLAH III 193,758,590.51
IV PEKERJAAN KAYU/KACA
1 Pek. Kusen Pintu & Jendela 0.16 m3 A.4.6.1.2 7,503,832.00 1,200,613.12
2 Pek. Daun Pintu & Daun Jendela 11.74 m2 A.4.6.1.6 737,833.60 8,659,215.13
3 Pas. Ventilasi Roster 21.00 bh Ls 20,000.00 420,000.00
4 Pek. Rangka Plafond 154.00 m2 A.4.6.1.19 133,229.60 20,517,358.40
5 Pek. Plafond Triplek 4 mm 154.00 m2 A.4.5.1.5 60,449.20 9,309,176.80
6 Pek. List Plafond Profil 153.00 m' A.4.5.1.9 26,729.92 4,089,677.76
7 Rolling Door 28.50 m2 A.4.2.1.7 803,602.24 22,902,663.84
SUB JUMLAH IV 67,098,705.05
V PEKERJAAN ATAP
1 Pek. Rangka kuda2 bj ringan zincalume C.75 mm + Reng U.45 mm 188.03 m2 A.4.5.2.32a 195,619.20 36,783,097.44
2 Pek. Atap Genteng Metal 188.03 m2 A.4.5.2.32 105,907.20 19,914,174.36
3 Pek. Pas. Nok Atas, Samping Seng Plat BJLS 0.25 mm 30.00 m' A.4.5.2.36 97,939.52 2,938,185.60
4 Pek List Plang 50.00 m2 A.4.6.1.21 81,306.40 4,065,320.00
SUB JUMLAH V 63,700,777.39
VI PEKERJAAN INSTALASI LISTRIK
1 Pek. MCB ( 3 Group ) + Box Transparan (Komplit) 1.00 Unit Ls 320,000.00 320,000.00
2 Pek. Instalasi Listrik Kabel 2.5 mm (Standar PLN) 3.00 Unit Ls 1,200,000.00 3,600,000.00
3 Pek. Lampu SL 15 Watt + Piting Ornamen Standar Segi Empat 12.00 bh Ls 65,000.00 780,000.00
4 Pek. Saklar Ganda 3.00 bh Ls 35,000.00 105,000.00
5 Pek. Saklar Tunggal 3.00 bh Ls 35,000.00 105,000.00
6 Pek. Stop Kontak 6.00 bh Ls 35,000.00 210,000.00
7 Pek. Meteran Listrik 1300 Watt 1.00 bh Ls 3,000,000.00 3,000,000.00
SUB JUMLAH VII 8,120,000.00
VII PEKERJAAN PENGECATAN
1 Pek. Cat Warna Kayu Kusen Pintu/Jendela, Daun Pintu, 5.89 m2 A.4.7.1.4 41,922.16 246,921.52
2 Pek. Cat Tembok 446.43 m2 A.4.7.1.10a 30,768.08 13,735,793.95
3 Pek. Cat Plafond 154.00 m2 A.4.7.1.10a 30,768.08 4,738,284.32
4 Pek. Cat List Plang 50.00 m2 A.4.7.1.4 41,922.16 2,096,108.00
SUB JUMLAH IV 20,817,107.80
VIII PEKERJAAN KUNCI / PENGGANTUNG
1 Pek. Kunci Tanam 2 Slaag 6.00 Bh A.4.6.2.2 272,815.20 1,636,891.20
2 Pek. Engsel Pintu Nylon 12.00 Bh A.4.6.2.5 41,057.63 492,691.58
3 Pek. Grendel Pintu 6.00 Bh A.4.6.2.9.gp 29,652.28 177,913.68
SUB JUMLAH IX 2,307,496.46
IX PEKERJAAN LAIN LAIN
1 Pek. Biaya Administrasi, Dokumentasi, & Pelaporan 1.00 Unit Ls 1,761,000.00 1,761,000.00
3 Pek. Pembersihan Akhir dan Finising 1.00 Unit Ls 1,000,000.00 1,000,000.00
SUB JUMLAH IV 2,761,000.00
REKAPITULASI

PEKERJAAN : Perencanaan Pembangunan Kios Cinderamata di Pantai Wayhawang 3 Unit (DAK)


LOKASI : Kawasan Wisata Pantai Wayhawang Kec.Maje Kab.Kaur
TAHUN ANGGARAN : 2020

NO URAIAN PEKERJAAN JUMLAH


( Rp )
I PEKERJAAN PERSIAPAN 8,650,000.00
II PEKERJAAN TANAH/PASIR 8,281,246.06
III PEKERJAAN PASANGAN/BETON 193,758,590.51
IV PEKERJAAN KAYU/KACA 67,098,705.05
V PEKERJAAN ATAP 63,700,777.39
VI PEKERJAAN INSTALASI LISTRIK 8,120,000.00
VII PEKERJAAN PENGECATAN 20,817,107.80
VIII PEKERJAAN KUNCI / PENGGANTUNG 2,307,496.46
IX PEKERJAAN LAIN LAIN 2,761,000.00

A JUMLAH FISIK 375,494,923.28


B PPN ( 10 % x A ) 37,549,492.33
C JUMLAH A + B 413,044,415.60
D DIBULATKAN 413,044,000.00

TERBILANG : Empat Ratus Tiga Belas Juta Empat Puluh Empat Ribu Rupiah

Bintuhan 2020
Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Perencana
Dinas Pariwisata Pemuda dan Olahraga PT. TATA POLA CONSULTANT
Kabupaten Kaur

REFUAN, S.Sos TOKIRAN


NIP. 19720719 199402 1 001 Direktur

Pejabat Pembuat Komitmen (PPK)


Dinas Pariwisata Pemuda dan Olahraga
Kabupaten Kaur

JON HARIMOL,M.Si
NIP. 19720401 199403 1 006
Rekapitulasi
OPD : Dinas Pariwisata
Pekerjaan : Peningkatan Lapangan Tenis
Lokasi : Kabupaten Kaur
Tahun Anggaran : 2021

NO. URAIAN PEKERJAAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN Rp 73,916,515.63

II. PEKERJAAN TANAH & PASIR Rp 26,170,395.73

III. PEKERJAAN BETON DAN PASANGAN Rp 150,105,297.78

IV. PEKERJAAN ALUMUNIUM, BESI DAN KACA Rp 10,686,417.12

V. PEKERJAAN PLAFOND Rp 3,486,218.40

VI. PEKERJAAN FINISHING Rp 47,393,914.75

VII. PEKERJAAN INSTALASI LISTRIK Rp 13,062,000.00

VIII. PEKERJAAN LAIN-LAIN Rp 47,000,000.00

A. Jumlah = ( I+II+III+IV+V+VI+VII+VIII+IX+X+XI) Rp 371,820,759.41


B. PPN 10% = ( A x 10 % ) Rp 37,182,075.94
C. Total = ( A + B ) Rp 409,002,835.35
Dibulatkan Rp 409,000,000.00

Terbilang :

Kaur, 2021

Dibuat Oleh
KONSULTAN PERENCANA
CV. BERINGIN ENGINEERING CONSULTANT

ERLAN
WAKIL DIREKTUR
Rencana Anggaran Biaya
OPD :Dinas Pariwisata
Pekerjaan :Peningkatan Lapangan Tenis
Lokasi :Kabupaten Kaur
Tahun Anggaran :2021

HARGA SAT JUMLAH HARGA


NO. URAIAN PEKERJAAN ANALISA VOLUME SATUAN
(Rp) (Rp)

I. PEKERJAAN PERSIAPAN
1. Pembersihan Lokasi Pekerjaan Ls 1.00 Unit 10,000,000.00 10,000,000.00
2. Pengukuran Leveling Lantai Ls 1.00 M¹ 4,000,000.00 4,000,000.00
3. Pembuatan Bedeng Pekerja Ls 1.00 Unit 7,000,000.00 7,000,000.00
4. Pembuatan gudang semen dan peralatan Ls 1.00 Unit 700,000.00 700,000.00
5. Pek. Listrik dan Air Kerja Ls 1.00 Unit 1,000,000.00 1,000,000.00
6. Pek. Papan Nama Proyek Ls 1.00 Unit 500,000.00 500,000.00
7. Pek. Administrasi dan Dokumentasi Ls 1.00 Unit 2,500,000.00 2,500,000.00
8. Pek. Bongkaran Lapisan Beton Lap. Tenis Ls 774.56 M² 62,250.00 48,216,515.63
SUB TOTAL I. 73,916,515.63

II. PEKERJAAN TANAH & PASIR


1. Pek. Galian Tanah Pondasi A.2.3.1.1. 42.00 M³ 88,676.00 3,724,392.00
2. Pek. Urugan Tanah Kembali Bekas Galian A.2.3.1.9. 23.10 M³ 65,352.00 1,509,631.20
3. Pek. Urugan Tanah Bawah Lantai yang didatangkan A.2.3.1.10 84.75 M³ 199,752.00 16,928,982.00
4. Pek. Urugan Pasir Bawah Pondasi A.2.3.1.11. 2.10 M³ 237,070.40 497,847.84
5. Pek. Urugan Pasir Bawah Lantai A.2.3.1.14 12.15 M³ 288,851.25 3,509,542.69
SUB TOTAL II. 26,170,395.73

III. PEKERJAAN BETON DAN PASANGAN


1.Pas. Pondasi Batu Kosong A.3.2.1.9. 6.30 M³ 637,479.36 4,016,119.97
2.Pas. Pondasi Batu Kali (campuran 1SP : 4PP) A.3.2.1.2. 18.90 M³ 1,077,496.00 20,364,674.40
3.Pembuatan Sloof 15/25 A.4.1.1.36.S.b 1.97 M³ 5,306,373.83 10,446,923.48
4.Pembuatan Beton bawah Lantai (K.175) t=15cm A.4.1.1.5a 18.23 M³ 1,206,925.21 21,996,211.93
5 Pembuatan Plesteran Lantai lapangan (tebal 15 mm, ad. 1:2) A.4.4.2.2. 892.12 M² 76,950.72 68,649,276.33
6.Pekerjaan Acian Lantai Lapangan (AKA Mortar 300) A.4.4.2.27. 892.12 M² 21,448.00 19,134,189.76
7.Pem Lantai Beton Rabat A.4.1.1.3 5.04 M³ 1,091,720.00 5,497,901.92
SUB TOTAL III. 150,105,297.78
IV. PEKERJAAN ALUMUNIUM, BESI DAN KACA
1 Pemasangan Kusen Pintu Kayu A.4.6.1.2. 0.66 M³ 7,100,632.00 4,686,417.12
2 Pintu Kamar Ganti Ls 2.00 Unit 2,000,000.00 4,000,000.00
3 Pintu Kamar Mandi/ PVC Ls 2.00 Unit 1,000,000.00 2,000,000.00
SUB TOTAL IV. 10,686,417.12

V PEKERJAAN PLAFOND
1 . Pek. Pas. Plafond Plywood ukuran (60 x 120) cm , 4mm A.4.5.1.7. 18.00 M² 60,449.20 1,088,085.60
2 . Pek. Pas. Rangka Plafond Kayu A.4.6.1.20. 18.00 M² 133,229.60 2,398,132.80
SUB TOTAL VII. 3,486,218.40

VI PEKERJAAN FINISHING
1 . Top Coat Playing Surface Sekw. Rebound Ace A.4.7.1.10b 896.06 M² 35,888.72 32,158,536.17
a. Area Permainan Warna Hijau
b. Area Luar Permainan Warna Merah
2 . Acrylic Line Marking (Coat warna Putih lebar garis 5 cm) A.4.7.1.10c 157.29 M¹ 40,243.28 6,329,865.51
3 . Pek. Pengecatan Gedung Lama A.4.7.1.10a 289.44 M² 30,768.08 8,905,513.08
4 . Pek. Pengecatan Plafond A.4.7.1.4 18.00 M² 41,922.16 754,598.88
SUB TOTAL IX. 47,393,914.75

HARGA SAT JUMLAH HARGA


NO. URAIAN PEKERJAAN ANALISA VOLUME SATUAN
(Rp) (Rp)
VII PEKERJAAN INSTALASI LISTRIK
1 . KWH Daya 2200 Ls 1.00 Unit 3,850,000.00 3,850,000.00
2 . Lampu Sorot 200 Watt LED Ls 9.00 Titik 575,000.00 5,175,000.00
3 . Grup MCB Lampu Sorot Ls 4.00 Titik 200,000.00 800,000.00
4 . Pas. Stop Kontak Ls 4.00 Buah 111,000.00 444,000.00
5 . Pas Saklar Ganda (one Way Schneider) include Box Ls 6.00 Buah 90,500.00 543,000.00
6 . Pas.Lampu TL T8 Philips Tube Ecofit LED 2x16 W Ls 4.00 Buah 420,000.00 1,680,000.00
7 . Pas. Lampu LED Ceiling Plafond DL Philips 12 Watt Ls 6.00 Buah 95,000.00 570,000.00
SUB TOTAL X. 13,062,000.00
VIII PEKERJAAN LAIN-LAIN
1 . Pekerjaan Perbaikan Toilet / Ruang Ganti Ls 2.00 Unit 5,000,000.00 10,000,000.00
2 . Pek. Perbaikan Sanitasi Ls 1.00 Unit 6,000,000.00 6,000,000.00
3 Pek. Perbaikan Rangka Tower Lampu Ls 9.00 Unit 1,500,000.00 13,500,000.00
4 Pek. Penambahan Besi Dan Kawat Harmonika Ls 1.00 Unit 12,000,000.00 12,000,000.00
5 Pek. Pengecatan Besi Dan Kawat Harmonika Ls 1.00 Unit 3,500,000.00 3,500,000.00
6 . Pekerjaan Pembersihan Akhir Ls 1.00 Unit 2,000,000.00 2,000,000.00
SUB TOTAL XIII. 47,000,000.00

GRAND TOTAL 371,820,759.41


Engineering Estimate (EE)
OPD : Dinas Pariwisata Pemuda Dan Olah Raga
Pekerjaan : Belanja Rehab Lapangan Tenis (Pembuatan 2 Unit Septic Tank)
Lokasi : Kabupaten Kaur
Tahun Anggara: 2021

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Satuan Volume Kode Analisa
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
III PEMBANGUNAN SEPTIC TANK
A PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah M³ 6.75 A.2.3.1.1 88,676.00 598,563.00
2 Pek. Urugan Pasir/Koral Bawah Lantai M³ 0.60 A.2.3.1.11 237,070.40 142,242.24
Sub Total A 740,805.24
B PEKERJAAN PASANGAN DAN LANTAI
1 Pas. Rolag Batu Bata 1 : 2 M² 12.00 A.4.4.1.9 135,419.20 1,625,030.40
2 Pek. pemasangan plesteran 1SP : 2 PP tebal 15 mm M² 12.00 A.4.4.2.4 76,950.72 923,408.64
3 Pek. Acian M² 12.00 A.4.4.2.27 21,448.00 257,376.00
Sub Total B 2,805,815.04
C PEKERJAAN BETON
1 Pek. Beton Lantai 1:3:5 M³ 0.68 A.4.1.1.1 1,089,752.32 735,582.82
2 Pek. pemasangan beton Plat t: 15 cm M³ 0.87 A.4.1.1.5 1,206,925.21 1,046,404.16
Sub Total C 1,781,986.97
D PEKERJAAN SANITASI
1 Pek. Pipa Udara ∅ 3" Bh 2.00 Ls 100,000.00 200,000.00
2 Pek. Pas. Elbow Pipa 3" Bh 2.00 A.5.1.1 32. 113,000.00 226,000.00
3 Pek. Pas Pipa Air Kotor/Limbah Ɵ 3" M' 4.00 A.5.1.1 32. 113,000.00 452,000.00
Sub Total D 878,000.00
Rekapitulasi pembangunan Septic Tank
OPD : Dinas Pariwisata Pemuda Dan Olah Raga
Pekerjaan : Belanja Rehab Lapangan Tenis (Pembuatan 2 Unit Septic Tank)
Lokasi : Kabupaten Kaur
Tahun Anggara: 2021

Jumlah Harga
No Uraian Pekerjaan
( Rp. )

A PEKERJAAN TANAH DAN PASIR 740,805.24

B PEKERJAAN PASANGAN DAN LANTAI 2,805,815.04

C PEKERJAAN BETON 1,781,986.97

D PEKERJAAN SANITASI 878,000.00

Jumlah 6,206,607.25
Dibulatkan 6,206,000.00

Terbilang : ###
Harga Perkiraan Sendiri (HPS)
OPD : Dinas Pariwisata Pemuda Dan Olah Raga
Pekerjaan : Belanja Rehab Lapangan Tenis
Lokasi : Kabupaten Kaur
Tahun Anggaran : 2021

HARGA SAT JUMLAH HARGA


NO. URAIAN PEKERJAAN ANALISA VOLUME SATUAN
(Rp) (Rp)

I. PEKERJAAN PERSIAPAN
1. Pembersihan Lokasi Pekerjaan Ls 1.00 Unit 4,000,000.00 4,000,000.00
2. Pengukuran Leveling Lantai Ls 1.00 M¹ 1,000,000.00 1,000,000.00
3. Pek. Listrik dan Air Kerja Ls 1.00 Unit 2,500,000.00 2,500,000.00
4. Pek. Papan Nama Proyek Ls 1.00 Unit 500,000.00 500,000.00
5. Pek. Administrasi dan Dokumentasi Ls 1.00 Unit 1,590,000.00 1,590,000.00
SUB TOTAL I. 9,590,000.00

III. PEKERJAAN BETON DAN PASANGAN


1 Pembuatan Beton Lapangan Tenis T= 6 cm A.4.1.1.5 46.47 M² 1,206,925.21 56,090,340.43
2 . Pem Lantai Beton Rabat A.4.1.1.1 5.04 M³ 1,089,752.32 5,487,992.68
SUB TOTAL III. 61,578,333.11
IV. PEKERJAAN ALUMUNIUM, BESI DAN KACA
1 Pintu Kamar Ganti Ls 2.00 Unit 1,200,000.00 2,400,000.00
2 Pintu Utama Ls 2.00 Unit 2,000,000.00 4,000,000.00
3 Pintu Kamar Mandi/ PVC Ls 2.00 Unit 447,000.00 894,000.00
SUB TOTAL IV. 7,294,000.00

V PEKERJAAN PLAFOND DAN ATAP


1 . Pek. Pas. Plafond Plywood ukuran (60 x 120) cm , 4mm A.4.5.1.5 18.00 M² 60,449.20 1,088,085.60
2 . Pek. Pas. Rangka Plafond Kayu A.4.6.1.19 18.00 M² 133,229.60 2,398,132.80
3 . Pek. Pas. Atap Genteng Metal A.4.5.2.32 3.85 M² 105,907.20 407,742.72
SUB TOTAL VII. 3,893,961.12

VI PEKERJAAN FINISHING
1 . Top Coat Playing Surface Sekw. Rebound Ace A.4.7.1.10b 774.56 M² 35,888.72 27,798,056.69
a. Area Permainan Warna Hijau
b. Area Luar Permainan Warna Merah
2 . Acrylic Line Marking (Coat warna Putih lebar garis 5 cm) A.4.7.1.10c 157.29 M¹ 40,243.28 6,329,865.51
3 . Pek. Pengecatan Gedung Lama A.4.7.1.10a 289.44 M² 30,768.08 8,905,513.08
4 . Pek. Pengecatan Plafond A.4.7.1.4 18.00 M² 41,922.16 754,598.88
SUB TOTAL IX. 43,788,034.15
VII PEKERJAAN INSTALASI LISTRIK
1 . KWH Daya 2200 Ls 1.00 Unit 3,900,000.00 3,900,000.00
2 . Lampu Sorot 200 Watt LED Ls 6.00 Titik 550,000.00 3,300,000.00
3 . Grup MCB Lampu Sorot Ls 4.00 Titik 200,000.00 800,000.00
4 . Pas. Stop Kontak Ls 4.00 Buah 85,000.00 340,000.00
5 . Pas Saklar Ganda (one Way Schneider) include Box Ls 6.00 Buah 92,000.00 552,000.00
6 . Pas.Lampu TL T8 Philips Tube Ecofit LED 2x16 W Ls 4.00 Buah 425,000.00 1,700,000.00
7 . Pas. Lampu LED Ceiling Plafond DL Philips 12 Watt Ls 6.00 Buah 95,000.00 570,000.00
SUB TOTAL X. 11,162,000.00

VIII PEKERJAAN LAIN-LAIN


1 . Pek. Pembuatan 2 Unit Septictank Ls 2.00 Unit 3,000,000.00 6,000,000.00
1 . Pekerjaan Perbaikan Toilet / Ruang Ganti Ls 2.00 Unit 1,600,000.00 3,200,000.00
2 . Pek. Perbaikan Sanitasi Ls 1.00 Unit 1,500,000.00 1,500,000.00
3 Pek. Pemasangan Rangka Tower Lampu Ls 6.00 Unit 750,000.00 4,500,000.00
4 Pek. Penambahan Besi Dan Kawat Harmonika Ls 99.00 m2 250,000.00 24,750,000.00
5 Pek. Pengecatan Besi Dan Kawat Harmonika Ls 1.00 Unit 2,500,000.00 2,500,000.00
6 . Pekerjaan Pembersihan Akhir Ls 1.00 Unit 1,500,000.00 1,500,000.00
SUB TOTAL XIII. 43,950,000.00

GRAND TOTAL 181,256,328.38


Rekapitulasi HPS
OPD : Dinas Pariwisata Pemuda Dan Olah Raga
Pekerjaan : Belanja Rehab Lapangan Tenis
Lokasi : Kabupaten Kaur
Tahun Anggaran : 2021

NO. URAIAN PEKERJAAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN Rp 9,590,000.00

II PEKERJAAN BETON DAN PASANGAN Rp 61,578,333.11

III PEKERJAAN ALUMUNIUM, BESI DAN KACA Rp 7,294,000.00

IV PEKERJAAN PLAFOND Rp 3,893,961.12

V PEKERJAAN FINISHING Rp 43,788,034.15

VI PEKERJAAN INSTALASI LISTRIK Rp 11,162,000.00

VII PEKERJAAN LAIN-LAIN Rp 43,950,000.00

A. Jumlah = ( I+II+III+IV+V+VI+VII ) Rp 181,256,328.38


B. PPN 10% = ( A x 10 % ) Rp 18,125,632.84
C. Total = ( A + B ) Rp 199,381,961.22
Dibulatkan Rp 199,380,000.00

Terbilang : Seratus Sembilan Puluh Sembilan Juta Tiga Ratus Delapan Puluh Ribu Rupiah

Kaur, 2021
PEJABAT PEMBUAT KOMITMEN (PPK)
Dinas Pariwisata Pemuda dan Olahraga
Kabupaten Kaur

JON HARIMOL, M.Si


NIP. 19720401 199403 1 006
OPD : Rumah Sakit Umum Daerah Kabupaten Kaur
PEKERJAAN : Pembangunan Gedung Instalasi Darurat
LOKASI : Kabupaten Kaur
TAHUN ANGGARAN : 2019

BACK UP DATA
NO NAMA PEKERJAAN DAN GAMBAR PERHITUNGAN VOLUME

A B C
1 Galian Pondasi Batu Kali

Lebar = 0.80 m¹
Panjang Pondasi = 52.50 m¹
Tinggi = 1.00 m¹
30 S loof 15/25
15

Tan ah Ur ug

P as.B atu Kali

Volume = 42.00 m³

80
Pas.B atu Kosong

5 15
Lan tai Kerja

10 60 10

80

Total Galian = 42.00 m³


4 Pek. Pondasi Batu kali
Total Panjang 52.50 m¹
Lebar Atas = 0.3 m¹
Lebar Bawah = 0.6 m¹
30
15
Sloof 15/25
Tinggi = 0.80 m¹
Tanah Urug

Pas.Batu Kali

80
Pas.Batu Kosong Luas = L.A + L.B x Tinggi

5 15
Lantai Kerja

10 60 10

2
80

= 0,3+0,6
x 0.80 = 0.36 m²
2
Volume = Luas x Panjang Pondasi
= 0.36 m² x 52.50 m¹
Vol Batu Kali = 18.90 m³

Batu Kosong
Panjang = 52.50 m¹
Lebar = 0.80 m¹
Pas.Batu Kos ong Tinggi = 0.15 m¹

15
80

Vol Batu kosong = 6.30 m³

Pasir Urug bw Ponadsi


Panjang = 52.50 m¹
Lebar = 0.80 m¹
pasir urug
Tinggi = 0.05 m¹

5
10 60 10

Urugan Bw Pondasi B. Kali = 2.10 m³


80

Total Urugan Pasir Bw Pondasi = 2.10 m³


5 Pek. Timbunan Tanah Untuk Pondasi

23

Urugan tanah kem bali


70 bekas gali an

10 60 10
80

Volume Timbunan untuk pondasi = volume galian - volume pondasi batu kali

Volume Timbunan untuk pondasi = 23.10 m³

6 Pek. Lantai tambahan 6 meter


Luas Lantai = 121.50 m³

Perhitungan Pasir Pasang Bawah Lantai Perhitungan Urugan Tanah Bawah Lantai
Tebal = 0.10 m¹ Tebal = variasi
Volume = 12.15 m³ Volume = 84.75 m³

Perhitungan Beton Cor Bawah Lantai


Tebal = 0.15 m¹
Volume = 18.23 m³

Perhitungan Rabat Beton


luas Rabat = 25.18
Tebal = 0.20 m¹
Volume = 5.04 m³

8 Pekerjaan Sloof 15/25

Panjang = 52.50 m¹
Dimensi = 0.15 x 0.25

Volume Sloof = 1.97 m³

13 Pembuatan Pas. Batu Bata (tebal 1:4)


Panjang Dinding = 52.50 m¹
Tinggi Dinding = 4.40 m¹
= 231.00 m²

Luas Kusen = 107.12 m²

Luas Pas. Batu Bata 1:4 = 123.89 m²

pengecatan gedung lama luas = 14.00 + 18.18 + 4


tinggi = 4.00

Luas Total = 289.44 m² -

Luas Plasteran 1:4 = 892.12 m²

Luas Acian = 892.12 m²

Pekerjaan Plafon

Luas Plafond = 18.00 M²

pekerjaan Kusen Panjang Kusen = 0.66


volum Daun Pintu kamar ganti = 0.13 m³
volume total = 0.79 M²
=
RENCANA ANGGARAN BIAYA (RAB)
OPD : Dinas Pariwisata Pemuda Dan Olah Raga
PEKERJAAN : Pembuatan Parkir Lapangan Tenis
LOKASI : KABUPATEN KAUR
TAHUN ANGGARAN : 2021

HARGA SATUAN JUMLAH


NO URAIAN PEKERJAAN VOLUME SATUAN ANALISA
(Rp) (Rp)
I PEKERJAAN PERSIAPAN
1 Pek Pembersihan Lokasi 1.00 unit Ls Rp 500,000.00 Rp 500,000.00
2 Pek Pas Bouwplank 1.00 unit Ls Rp 500,000.00 Rp 500,000.00
3 Pek. Listrik dan Air Kerja 1.00 unit Ls Rp 550,000.00 Rp 550,000.00
4 Papan Nama Proyek 1.00 unit Ls Rp 500,000.00 Rp 500,000.00
Sub Total I Rp 2,050,000.00
II PEKERJAAN TANAH DAN PASIR
1 Pek Galian Tanah Pondasi 25.48 m3 A.2.3.1.1. Rp 86,625.00 Rp 2,207,205.00
3 Pek Urugan Tanah Kembali 8.49 m3 A.2.3.1.9. Rp 31,625.00 Rp 268,601.67
3 Pek. Urugan Tanah Bawah Lantai didatangkan 11.32 m3 A.2.3.1.12. Rp 142,025.00 Rp 1,608,354.22
4 Pek Urugan Pasir Bawah Pondasi 1.82 m3 A.2.3.1.11. Rp 140,250.00 Rp 255,255.00
5 Pek Urugan Pasir Bawah Lantai 8.80 m3 A.2.3.1.11. Rp 140,250.00 Rp 1,234,200.00
Sub Total II Rp 5,573,615.89
III PEKERJAAN PASANGAN DAN LANTAI
1 Pek Pas Batu Kosong/Amstamping 7.28 m3 A.3.2.1.9. Rp 519,667.00 Rp 3,783,175.76
2 Pek Pas Pondasi Batu Kali 1 : 4 11.05 m3 A.3.2.1.9. Rp 962,835.00 Rp 10,639,326.75
3 Pek Plesteran 1 : 2 7.04 m2 A.4.4.1.9 Rp 72,240.00 Rp 508,569.60
4 Pem Lantai Beton Rabat f’= 12,2 MPa 8.40 m3 A.4.4.2.27. Rp 1,091,874.00 Rp 9,171,741.60
Sub Total III Rp 24,102,813.71
V PEKERJAAN KAYU DAN BESI
1 Lisplank GRC Lebar 30 cm 60.00 m' A.4.5.1.6.a Rp 86,968.00 Rp 5,218,080.00
2 Pipa Galvanis 3/4" tebal 2mm 49.05 m' Ls Rp 39,416.67 Rp 1,933,387.50
Sub Total V Rp 7,151,467.50
VI PEKERJAAN ATAP
1 Pek Rangka atap baja ringan (Truss C.75.75 SNI) 192.000 m2 A.4.2.1.24. Rp 186,033.00 Rp 35,718,336.00
2 Pemasangan atap seng gelombang 192.000 m2 A.4.5.2.39. Rp 59,752.00 Rp 11,472,384.00
3 Pemasangan nok atap seng 34.000 m' A.4.5.2.40. Rp 53,685.00 Rp 1,825,290.00
Sub Total VI Rp 49,016,010.00
VII PEKERJAAN LISTRIK
1 Pek Pas Instalasi Listrik Kabel 2,5 mm 1.000 unit Ls Rp 750,000.00 Rp 750,000.00
2 Pek Pas Lampu SL 20 Watt + fitting 4.000 bh Ls Rp 60,000.00 Rp 240,000.00
3 Pek Pas Shaklar Ganda Setara Broco 1.000 m' Ls Rp 25,000.00 Rp 25,000.00
Sub Total VII Rp 1,015,000.00
IX PEKERJAAN LAIN LAIN
1 Pek. Administrasi Dan Dokumentasi 1.00 Unit Ls Rp 1,500,000.00 Rp 1,500,000.00
2 Pek. Pembersihan Akhir Lapangan 1.00 Unit' Ls Rp 500,000.00 Rp 500,000.00
Sub Total IX Rp 2,000,000.00
REKAPITULASI
KEGIATAN : Dinas Pariwisata Pemuda Dan Olah Raga
PEKERJAAN : Pembuatan Parkir Lapangan Tenis
LOKASI : KABUPATEN KAUR
TAHUN ANGGARAN : 2021

NO URAIAN PEKERJAAN JUMLAH ( RP )

I PEKERJAAN PERSIAPAN Rp 2,050,000.00


II PEKERJAAN TANAH DAN PASIR Rp 5,573,615.89
III PEKERJAAN PASANGAN DAN LANTAI Rp 24,102,813.71
IV PEKERJAAN KAYU DAN BESI Rp 7,151,467.50
V PEKERJAAN ATAP Rp 49,016,010.00
VI PEKERJAAN LISTRIK Rp 1,015,000.00
VII PEKERJAAN LAIN LAIN Rp 2,000,000.00

JUMLAH Rp 90,908,907.10
PPN ( 10 % X A ) Rp 9,090,890.71
JUMLAH FISIK Rp 99,999,797.81
DIBULATKAN Rp 100,000,000.00

Terbilang : Seratus Juta Rupiah

Kaur, Agustus 2021

Dibuat Oleh
KONSULTAN PERENCANA
CV. BERINGIN ENGINEERING CONSULTANT

ERLAN
WAKIL DIREKTUR
OPD : Rumah Sakit Umum Daerah Kabupaten Kaur
PEKERJAAN : Pembangunan Gedung Instalasi Darurat
LOKASI : Kabupaten Kaur
TAHUN ANGGARAN : 2019

BACK UP DATA
NO NAMA PEKERJAAN DAN GAMBAR PERHITUNGAN VOLUME

A B C
1 Galian Pondasi Batu Kali

Lebar = 0.80 m¹
Panjang Pondasi = 70.00 m¹
Tinggi = 1.00 m¹
30 S loof 15/25
15

Tan ah Ur ug

P as.B atu Kali

Volume = 56.00 m³

80
Pas.B atu Kosong

5 15
Lan tai Kerja

10 60 10

80

Total Galian = 56.00 m³


4 Pek. Pondasi Batu kali
Total Panjang 70.00 m¹
Lebar Atas = 0.3 m¹
Lebar Bawah = 0.6 m¹
30
15
Sloof 15/25
Tinggi = 0.80 m¹
Tanah Urug

Pas.Batu Kali

80
Pas.Batu Kosong Luas = L.A + L.B x Tinggi

5 15
Lantai Kerja

10 60 10

2
80

= 0,3+0,6
x 0.80 = 0.36 m²
2
Volume = Luas x Panjang Pondasi
= 0.36 m² x 70.00 m¹
Vol Batu Kali = 25.20 m³

Batu Kosong
Panjang = 70.00 m¹
Lebar = 0.80 m¹
Pas.Batu Kos ong Tinggi = 0.15 m¹

15
80

Vol Batu kosong = 8.40 m³

Pasir Urug bw Ponadsi


Panjang = 70.00 m¹
Lebar = 0.80 m¹
pasir urug
Tinggi = 0.05 m¹

5
10 60 10

Urugan Bw Pondasi B. Kali = 2.80 m³


80

Total Urugan Pasir Bw Pondasi = 2.80 m³


5 Pek. Timbunan Tanah Untuk Pondasi

23

Urugan tanah kem bali


70 bekas gali an

10 60 10
80

Volume Timbunan untuk pondasi = volume galian - volume pondasi batu kali

Volume Timbunan untuk pondasi = 30.80 m³

6 Pek. Lantai tambahan 6 meter


Luas Lantai = 121.50 m³

Perhitungan Pasir Pasang Bawah Lantai Perhitungan Urugan Tanah Bawah Lantai
Tebal = 0.10 m¹ Tebal = variasi
Volume = 12.15 m³ Volume = 84.75 m³

Perhitungan Beton Cor Bawah Lantai


Tebal = 0.15 m¹
Volume = 18.23 m³

Perhitungan Rabat Beton


luas Rabat = 25.18
Tebal = 0.20 m¹
Volume = 5.04 m³

8 Pekerjaan Sloof 15/25

Panjang = 70.00 m¹
Dimensi = 0.15 x 0.25

Volume Sloof = 2.63 m³

13 Pembuatan Pas. Batu Bata (tebal 1:4)


Panjang Dinding = 70.00 m¹
Tinggi Dinding = 4.40 m¹
= 308.00 m²

Luas Kusen = 107.12 m²

Luas Pas. Batu Bata 1:4 = 200.89 m²

pengecatan gedung lama luas = 14.00 + 18.18 + 4


tinggi = 4.00

Luas Total = 289.44 m² -

Luas Plasteran 1:4 = 892.12 m²

Luas Acian = 892.12 m²

Pekerjaan Plafon

Luas Plafond = 18.00 M²

pekerjaan Kusen Panjang Kusen = 0.66


volum Daun Pintu kamar ganti = 0.13 m³
volume total = 0.79 M²
=