Ø 6 = 0.2 Kg
Ø 8 = 0.4 Kg Ø 6 = 0.22
Ø 10 = 1 Kg Ø 8 = 0.39
Ø 12 = 1 Kg CATATAN Ø 10 = 0.62
Ø 14 = 1 Kg PANJANG HOOK 4 X 2 = 8 CM Ø 12 = 0.89
Ø 16 = 2 Kg SELIMUT BETON 2 X 2 = 4 CM Ø 14 = 1.21
Ø 16 = 1.58
S1 RUMUS LINGKARAN
JUMLAH DALAM M3 BANYAK BESI BERAT 30/30
NO SLOOF Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI
K1
JUMLAH DALAM M3 BANYAK BESI BERAT
NO KOLOM Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI
B1
B1
B1
B2
JUMLAH DALAM M3 BANYAK BESI BERAT
NO BALOK B2 Ø BESI JUMLAH
M3 P L Jml / M3 Jml Satuan Jml BESI
JUMLAH = 72.313
JUMLAH = 50.375
JUMLAH = 31.688
2 pokok
2 bagi
JUMLAH DALAM M2 BANYAK BESI BERAT
NO PLAT lantai, 12 Cm Ø BESI JUMLAH JML x 0.12 JML x 1.05
M2 Jarak start 0 Btg / 1M2 Jml/1m2 Satuan Jml BESI
1 Tb.12 Cm-Bagi Ø10-15 pokok 100 15 1 = 7.67 x 2 Btg = 15.333 x 0.62 = 9.507 79.222 83.18
2 Tb.12 Cm-Bagi Ø8-15 bagi 100 15 1 = 7.67 x 2 Btg = 15.333 x 0.39 = 5.980 49.833 52.33
2 pokok
2 bagi
JUMLAH DALAM M2 BANYAK BESI BERAT
NO PLAT lantai, 10 Cm Ø BESI JUMLAH JML x 0.10 JML x 1.05
M2 Jarak start 0 Btg / 1M2 Jml/1m2 Satuan Jml BESI
1 Tb.10 Cm-Bagi Ø8-20 pokok 100 20 1 = 6.00 x 2 Btg = 12.000 x 0.39 = 4.680 46.800 49.14
2 Tb.10 Cm-Bagi Ø8-20 bagi 100 20 1 = 6.00 x 2 Btg = 12.000 x 0.39 = 4.680 46.800 49.14
1 Tb.20 Cm-Bagi Ø12-20 pokok 100 15 1 = 7.67 x 2 Btg = 15.333 x 0.89 = 13.647 136.467 143.29
2 Tb.20 Cm-Bagi Ø12-20 bagi 100 15 1 = 7.67 x 2 Btg = 15.333 x 0.89 = 13.647 136.467 143.29
1 Tb.8 Cm-Bagi Ø8-20 pokok 100 20 1 = 6.00 x 2 Btg = 12.000 x 0.39 = 4.680 58.500 61.43
I. UPAH
II. B A H A N
HARGA SATUAN
No URAIAN SAT JUMLAH HARGA ( Rp ).-
( Rp ),-
JON HARIMOL,M.Si
NIP. 19720401 199403 1 006
DAFTAR ANALISA
A.4.5.1.5 Pemasangan 1 m² langit-langit Plywood ukuran (60 x 120) cm, tebal 3 mm, 4 mm dan 6 mm
No Uraian Kode Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang Kayu L.02 OH 0.100 138,000.00 13,800.00
Kepala Tukang L.03 OH 0.010 155,000.00 1,550.00
Mandor L.04 OH 0.005 167,000.00 835.00
JUMLAH TENAGA KERJA 26,185.00
B BAHAN
Plywood 4 mm Lbr 0.375 72,500.00 27,187.50
Paku Plywood Kg 0.030 20,000.00 600.00
JUMLAH HARGA BAHAN 27,787.50
C PERALATAN
JUMLAH HARGA ALAT -
A.4.6.1.6 Pembuatan dan pemasangan 1 m² pintu dan jendela kaca, kayu kualitas baik
No Uraian Kode Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.800 100,000.00 80,000.00
Tukang Kayu L.02 OH 2.400 138,000.00 331,200.00
Kepala Tukang L.03 OH 0.240 155,000.00 37,200.00
Mandor L.04 OH 0.040 167,000.00 6,680.00
JUMLAH TENAGA KERJA 455,080.00
B BAHAN
Papan kayu m³ 0.024 2,700,000.00 64,800.00
Kaca 5 mm m2 1.000 132,000.00 132,000.00
Lem Kayu Kg 0.300 23,000.00 6,900.00
JUMLAH HARGA BAHAN 203,700.00
C PERALATAN
JUMLAH HARGA ALAT -
A.4.7.1.4 1 m² pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefesien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.07 100,000.00 7,000.00
Tukang cat L.02 OH 0.009 138,000.00 1,242.00
Kepala tukang L.03 OH 0.006 155,000.00 930.00
Mandor L.04 OH 0.003 167,000.00 501.00
JUMLAH TENAGA KERJA 9,673.00
B BAHAN
Cat menie Kg 0.20 26,250.00 5,250.00
Plamuur Kg 0.15 15,000.00 2,250.00
Cat dasar Kg 0.17 42,000.00 7,140.00
Cat penutup Kg 0.26 42,000.00 10,920.00
Kuas Bh 0.01 15,750.00 157.50
Pengecer Kg 0.03 28,000.00 840.00
Ampelas Lbr 0.2 6,000.00 1,200.00
JUMLAH HARGA BAHAN 27,757.50
C PERALATAN
JUMLAH HARGA ALAT -
TERBILANG : Empat Ratus Tiga Belas Juta Empat Puluh Empat Ribu Rupiah
Bintuhan 2020
Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Perencana
Dinas Pariwisata Pemuda dan Olahraga PT. TATA POLA CONSULTANT
Kabupaten Kaur
JON HARIMOL,M.Si
NIP. 19720401 199403 1 006
Rekapitulasi
OPD : Dinas Pariwisata
Pekerjaan : Peningkatan Lapangan Tenis
Lokasi : Kabupaten Kaur
Tahun Anggaran : 2021
Terbilang :
Kaur, 2021
Dibuat Oleh
KONSULTAN PERENCANA
CV. BERINGIN ENGINEERING CONSULTANT
ERLAN
WAKIL DIREKTUR
Rencana Anggaran Biaya
OPD :Dinas Pariwisata
Pekerjaan :Peningkatan Lapangan Tenis
Lokasi :Kabupaten Kaur
Tahun Anggaran :2021
I. PEKERJAAN PERSIAPAN
1. Pembersihan Lokasi Pekerjaan Ls 1.00 Unit 10,000,000.00 10,000,000.00
2. Pengukuran Leveling Lantai Ls 1.00 M¹ 4,000,000.00 4,000,000.00
3. Pembuatan Bedeng Pekerja Ls 1.00 Unit 7,000,000.00 7,000,000.00
4. Pembuatan gudang semen dan peralatan Ls 1.00 Unit 700,000.00 700,000.00
5. Pek. Listrik dan Air Kerja Ls 1.00 Unit 1,000,000.00 1,000,000.00
6. Pek. Papan Nama Proyek Ls 1.00 Unit 500,000.00 500,000.00
7. Pek. Administrasi dan Dokumentasi Ls 1.00 Unit 2,500,000.00 2,500,000.00
8. Pek. Bongkaran Lapisan Beton Lap. Tenis Ls 774.56 M² 62,250.00 48,216,515.63
SUB TOTAL I. 73,916,515.63
V PEKERJAAN PLAFOND
1 . Pek. Pas. Plafond Plywood ukuran (60 x 120) cm , 4mm A.4.5.1.7. 18.00 M² 60,449.20 1,088,085.60
2 . Pek. Pas. Rangka Plafond Kayu A.4.6.1.20. 18.00 M² 133,229.60 2,398,132.80
SUB TOTAL VII. 3,486,218.40
VI PEKERJAAN FINISHING
1 . Top Coat Playing Surface Sekw. Rebound Ace A.4.7.1.10b 896.06 M² 35,888.72 32,158,536.17
a. Area Permainan Warna Hijau
b. Area Luar Permainan Warna Merah
2 . Acrylic Line Marking (Coat warna Putih lebar garis 5 cm) A.4.7.1.10c 157.29 M¹ 40,243.28 6,329,865.51
3 . Pek. Pengecatan Gedung Lama A.4.7.1.10a 289.44 M² 30,768.08 8,905,513.08
4 . Pek. Pengecatan Plafond A.4.7.1.4 18.00 M² 41,922.16 754,598.88
SUB TOTAL IX. 47,393,914.75
Jumlah Harga
No Uraian Pekerjaan
( Rp. )
Jumlah 6,206,607.25
Dibulatkan 6,206,000.00
Terbilang : ###
Harga Perkiraan Sendiri (HPS)
OPD : Dinas Pariwisata Pemuda Dan Olah Raga
Pekerjaan : Belanja Rehab Lapangan Tenis
Lokasi : Kabupaten Kaur
Tahun Anggaran : 2021
I. PEKERJAAN PERSIAPAN
1. Pembersihan Lokasi Pekerjaan Ls 1.00 Unit 4,000,000.00 4,000,000.00
2. Pengukuran Leveling Lantai Ls 1.00 M¹ 1,000,000.00 1,000,000.00
3. Pek. Listrik dan Air Kerja Ls 1.00 Unit 2,500,000.00 2,500,000.00
4. Pek. Papan Nama Proyek Ls 1.00 Unit 500,000.00 500,000.00
5. Pek. Administrasi dan Dokumentasi Ls 1.00 Unit 1,590,000.00 1,590,000.00
SUB TOTAL I. 9,590,000.00
VI PEKERJAAN FINISHING
1 . Top Coat Playing Surface Sekw. Rebound Ace A.4.7.1.10b 774.56 M² 35,888.72 27,798,056.69
a. Area Permainan Warna Hijau
b. Area Luar Permainan Warna Merah
2 . Acrylic Line Marking (Coat warna Putih lebar garis 5 cm) A.4.7.1.10c 157.29 M¹ 40,243.28 6,329,865.51
3 . Pek. Pengecatan Gedung Lama A.4.7.1.10a 289.44 M² 30,768.08 8,905,513.08
4 . Pek. Pengecatan Plafond A.4.7.1.4 18.00 M² 41,922.16 754,598.88
SUB TOTAL IX. 43,788,034.15
VII PEKERJAAN INSTALASI LISTRIK
1 . KWH Daya 2200 Ls 1.00 Unit 3,900,000.00 3,900,000.00
2 . Lampu Sorot 200 Watt LED Ls 6.00 Titik 550,000.00 3,300,000.00
3 . Grup MCB Lampu Sorot Ls 4.00 Titik 200,000.00 800,000.00
4 . Pas. Stop Kontak Ls 4.00 Buah 85,000.00 340,000.00
5 . Pas Saklar Ganda (one Way Schneider) include Box Ls 6.00 Buah 92,000.00 552,000.00
6 . Pas.Lampu TL T8 Philips Tube Ecofit LED 2x16 W Ls 4.00 Buah 425,000.00 1,700,000.00
7 . Pas. Lampu LED Ceiling Plafond DL Philips 12 Watt Ls 6.00 Buah 95,000.00 570,000.00
SUB TOTAL X. 11,162,000.00
Terbilang : Seratus Sembilan Puluh Sembilan Juta Tiga Ratus Delapan Puluh Ribu Rupiah
Kaur, 2021
PEJABAT PEMBUAT KOMITMEN (PPK)
Dinas Pariwisata Pemuda dan Olahraga
Kabupaten Kaur
BACK UP DATA
NO NAMA PEKERJAAN DAN GAMBAR PERHITUNGAN VOLUME
A B C
1 Galian Pondasi Batu Kali
Lebar = 0.80 m¹
Panjang Pondasi = 52.50 m¹
Tinggi = 1.00 m¹
30 S loof 15/25
15
Tan ah Ur ug
Volume = 42.00 m³
80
Pas.B atu Kosong
5 15
Lan tai Kerja
10 60 10
80
Pas.Batu Kali
80
Pas.Batu Kosong Luas = L.A + L.B x Tinggi
5 15
Lantai Kerja
10 60 10
2
80
= 0,3+0,6
x 0.80 = 0.36 m²
2
Volume = Luas x Panjang Pondasi
= 0.36 m² x 52.50 m¹
Vol Batu Kali = 18.90 m³
Batu Kosong
Panjang = 52.50 m¹
Lebar = 0.80 m¹
Pas.Batu Kos ong Tinggi = 0.15 m¹
15
80
5
10 60 10
23
10 60 10
80
Volume Timbunan untuk pondasi = volume galian - volume pondasi batu kali
Perhitungan Pasir Pasang Bawah Lantai Perhitungan Urugan Tanah Bawah Lantai
Tebal = 0.10 m¹ Tebal = variasi
Volume = 12.15 m³ Volume = 84.75 m³
Panjang = 52.50 m¹
Dimensi = 0.15 x 0.25
Pekerjaan Plafon
JUMLAH Rp 90,908,907.10
PPN ( 10 % X A ) Rp 9,090,890.71
JUMLAH FISIK Rp 99,999,797.81
DIBULATKAN Rp 100,000,000.00
Dibuat Oleh
KONSULTAN PERENCANA
CV. BERINGIN ENGINEERING CONSULTANT
ERLAN
WAKIL DIREKTUR
OPD : Rumah Sakit Umum Daerah Kabupaten Kaur
PEKERJAAN : Pembangunan Gedung Instalasi Darurat
LOKASI : Kabupaten Kaur
TAHUN ANGGARAN : 2019
BACK UP DATA
NO NAMA PEKERJAAN DAN GAMBAR PERHITUNGAN VOLUME
A B C
1 Galian Pondasi Batu Kali
Lebar = 0.80 m¹
Panjang Pondasi = 70.00 m¹
Tinggi = 1.00 m¹
30 S loof 15/25
15
Tan ah Ur ug
Volume = 56.00 m³
80
Pas.B atu Kosong
5 15
Lan tai Kerja
10 60 10
80
Pas.Batu Kali
80
Pas.Batu Kosong Luas = L.A + L.B x Tinggi
5 15
Lantai Kerja
10 60 10
2
80
= 0,3+0,6
x 0.80 = 0.36 m²
2
Volume = Luas x Panjang Pondasi
= 0.36 m² x 70.00 m¹
Vol Batu Kali = 25.20 m³
Batu Kosong
Panjang = 70.00 m¹
Lebar = 0.80 m¹
Pas.Batu Kos ong Tinggi = 0.15 m¹
15
80
5
10 60 10
23
10 60 10
80
Volume Timbunan untuk pondasi = volume galian - volume pondasi batu kali
Perhitungan Pasir Pasang Bawah Lantai Perhitungan Urugan Tanah Bawah Lantai
Tebal = 0.10 m¹ Tebal = variasi
Volume = 12.15 m³ Volume = 84.75 m³
Panjang = 70.00 m¹
Dimensi = 0.15 x 0.25
Pekerjaan Plafon