RAB SPAM IKK Wilayah Pematang Panjang
RAB SPAM IKK Wilayah Pematang Panjang
PEKERJAAN : DED Sistem Penyediaan Air Minum (SPAM) Ibu Kota Kecamatan (IKK)
PAKET : I, II, III
B. PAKET I
a) Ruas I - Pamanjatan
### Err:509
b) Jalan Pematang - Pamanjatan - Arah Intake Manarap
C. PAKET II
a) Desa Cintapuri Darussalam
b) Simpang Madurejo arah Danau Salak (Martapura)
KOTA/KAB. : Banjar
PROVINSI : Kalimantan Selatan
T.A : 2018
B. PAKET I
a) Ruas I - Pamanjatan 20,585,764,490.44
b) Jalan Pematang - Pamanjatan - Arah Intake Manarap 4,569,666,769.23
SUB TOTAL = 25,155,431,259.67
C. PAKET II
a) Desa Cintapuri Darussalam Err:509
SUB TOTAL = Err:509
[A] TOTAL KESELURUHAN = Err:509
[B] PPN 10% = Err:509
[C] TOTAL = [A] + [B] = Err:509
[D] PEMBULATAN = [C] = Err:509
Terbilang : Err:509
..................................
Direktur
REKAPITULASI
PEKERJAAN : DED SPAM IKK Desa Kayu Bawang
PAKET : I
LOKASI : Jalan Irigasi, Desa Kayu Bawang, Kecamatan Gambut
KOTA/KAB. : Banjar
PROVINSI : Kalimantan Selatan
T.A : 2018
VI PEKERJAAN LAIN-LAIN -
SUB TOTAL = -
[A] TOTAL KESELURUHAN = -
[B] PPN 10% = -
[C] TOTAL = [A] + [B] = -
[D] PEMBULATAN = [C] = -
Terbilang : Rupiah.
NO. HARGA
NO. URAIAN PEKERJAAN VOLUME
ANALISA SATUAN (Rp)
(1) (2) (3) (4) (5)
VI PEKERJAAN LAIN-LAIN
1 Pengetesan pipa HDPE S-8 PN.10 Ø 160 mm / Ø 6" 25 - m 2,653.30
2 Pekerjaan interkoneksi dengan pipa eksisting -- 1.00 Ls 1,200,000.00
Total VI
CANA ANGGARAN BIAYA (RAB)
JUMLAH HARGA
(Rp)
(6)
-
20,000,000.00
1,500,000.00
500,000.00
3,000,000.00
2,590,260.00
2,760,000.00
92,000.00
797,500.00
229,080.00
1,088,820.00
3,634,230.00
276,000.00
5,157,750.00
1,287,000.00
343,620.00
1,211,410.00
2,760,000.00
797,500.00
725,880.00
46,000.00
229,080.00
-
JUMLAH HARGA
(Rp)
(6)
351,784,664.90
1,781,294.29
2,779,003.54
-
1,200,000.00
RINCIAN BIAYA PEMBANGUNAN
JEMBATAN PIPA Jb1
JEMBATAN PIPA 160 MM DENGAN BENTANG 13 M
NO. HARGA
NO. URAIAN PEKERJAAN VOLUME JUMLAH HARGA (Rp)
ANALISA SATUAN (Rp)
II PEKERJAAN STRUKTUR
1 Lantai kerja tebal 5 cm (K-175) 9 0.23 m3 1,055,651.87 245,043.19
2 Abutmen Utama
Beton (K-200) 10 7.03 m3 1,032,323.23 7,253,103.00
Besi 11 573.13 kg 14,220.13 8,149,977.42
Bekisting 12 28.06 m 2
413,440.40 11,601,137.62
3 Abutmen Penyangga Pipa
Beton (K-200) 10 0.21 m3 1,032,323.23 211,884.34
Besi 11 19.17 kg 14,220.13 272,573.35
Bekisting 12 1.22 m2 413,440.40 504,397.29
4 Pemasangan baja WF 200.100.5,5.8 mm -- 277.33 kg 30,432.75 8,440,016.87
5 Balok penyangga kayu ulin 8/16 -- 0.02 m 3
9,472,100.00 236,423.62
6 Angkur baut Ø 22 mm -- 52.00 bh 91,162.50 4,740,450.00
7 Klem penjepit dari plat -- 13.00 Ls 125,000.00 1,625,000.00
8 Pagar pengaman baja L Ø 12 mm -- 2.00 Ls 750,000.00 1,500,000.00
Sub Total 44,780,006.69
IV PEKERJAAN LAIN-LAIN
1 Pengecetan pipa dan besi yang tampak (3x cat) 32 24.12 m2 483,398.66 11,657,436.24
2 Pengaman dari pipa besi Ø 300 mm -- 1.00 Ls 100,000.00 100,000.00
3 Pembersihan lokasi/izin -- 1.00 Ls 150,000.00 150,000.00
Sub Total 11,907,436.24
TOTAL 351,784,664.90
REKAPITULASI
PEKERJAAN : DED SPAM IKK Desa Gambut
PAKET : I
LOKASI : a) Ruas I - Pamanjatan
b) Jalan Pematang - Pamanjatan - Arah Intake Manarap
KOTA/KAB. : Banjar
PROVINSI : Kalimantan Selatan
T.A : 2018
A Ruas I - Pamanjatan
I PEKERJAAN PERSIAPAN 33,728,631.85
A Ruas I - Pamanjatan
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan patok di sepanjang jalur pipa 1 8,615.00 m 1,013.19 8,728,631.85
2 Mobilisasi dan demobilisasi -- 1.00 Ls 20,000,000.00 20,000,000.00
3 Pembuatan rambu pengaman lalu lintas -- 3.00 Ls 500,000.00 1,500,000.00
4 Dokumentasi foto 3 phase -- 1.00 set 500,000.00 500,000.00
5 Pembersihan lokasi pekerjaan -- 1.00 Ls 3,000,000.00 3,000,000.00
Total I 33,728,631.85
VI PEKERJAAN LAIN-LAIN
1 Pengetesan pipa HDPE S-8 PN.10 Ø 400 mm / Ø 16" 29 8,615.00 m 5,521.94 47,571,508.79
2 Pekerjaan interkoneksi dengan pipa eksisting -- 1.00 Ls 1,200,000.00 1,200,000.00
Total VI 48,771,508.79
IV PEKERJAAN LAIN-LAIN
1 Pengetesan pipa HDPE S-8 PN.10 Ø 300 mm / Ø 12" 29 3,230.00 m 5,521.94 17,835,864.59
2 Pekerjaan interkoneksi dengan pipa eksisting -- 1.00 Ls 1,200,000.00 1,200,000.00
Total VI 19,035,864.59
RINCIAN BIAYA PEMBANGUNAN
JEMBATAN PIPA Jb1
JEMBATAN PIPA 400 MM DENGAN BENTANG 3 M
II PEKERJAAN STRUKTUR
1 Lantai kerja tebal 5 cm (K-175) 9 0.10 m3 1,055,651.87 105,697.14
2 Abutmen Utama
Beton (K-200) 10 0.51 m3 1,032,323.23 524,420.20
Besi 11 80.49 kg 14,220.13 1,144,623.77
Bekisting 12 4.92 m 2
413,440.40 2,034,126.77
3 Abutmen Penyangga Pipa
Beton (K-200) 10 0.21 m3 1,032,323.23 211,884.34
Besi 11 19.17 kg 14,220.13 272,573.35
Bekisting 12 1.22 m2 413,440.40 504,397.29
Sub Total 4,797,722.86
IV PEKERJAAN LAIN-LAIN
1 Pengecetan pipa dan besi yang tampak (3x cat) 34 10.18 m2 201,487.00 2,050,887.86
2 Pengaman dari pipa besi Ø 400 mm -- 1.00 Ls 400,000.00 400,000.00
3 Pembersihan lokasi/izin -- 1.00 Ls 150,000.00 150,000.00
Sub Total 2,600,887.86
TOTAL 133,600,203.77
RINCIAN BIAYA PEMBANGUNAN
JEMBATAN PIPA Jb2 (1 titik, Jb4)
JEMBATAN PIPA 400 MM DENGAN BENTANG 4 M
II PEKERJAAN STRUKTUR
1 Lantai kerja tebal 5 cm (K-175) 9 0.10 m3 1,055,651.87 105,697.14
2 Abutmen Utama
Beton (K-200) 10 0.51 m3 1,032,323.23 524,420.20
Besi 11 80.49 kg 14,220.13 1,144,623.77
Bekisting 12 4.92 m 2
413,440.40 2,034,126.77
3 Abutmen Penyangga Pipa
Beton (K-200) 10 0.21 m3 1,032,323.23 211,884.34
Besi 11 19.17 kg 14,220.13 272,573.35
Bekisting 12 1.22 m 2
413,440.40 504,397.29
Sub Total 4,797,722.86
IV PEKERJAAN LAIN-LAIN
1 Pengecetan pipa dan besi yang tampak (3x cat) 34 19.73 m2 201,487.00 3,975,177.70
2 Pengaman dari pipa besi Ø 400 mm -- 1.00 Ls 400,000.00 400,000.00
3 Pembersihan lokasi/izin -- 1.00 Ls 150,000.00 150,000.00
Sub Total 4,525,177.70
TOTAL 178,947,725.41
RINCIAN BIAYA PEMBANGUNAN
JEMBATAN PIPA Jb3 (1 titik, Jb6)
JEMBATAN PIPA 400 MM DENGAN BENTANG 8 M
II PEKERJAAN STRUKTUR
1 Lantai kerja tebal 5 cm (K-175) 9 0.23 m3 1,055,651.87 245,043.19
2 Abutmen Utama
Beton (K-200) 10 7.03 m3 1,032,323.23 7,253,103.00
Besi 11 573.13 kg 14,220.13 8,149,977.42
Bekisting 12 28.06 m 2
413,440.40 11,601,137.62
3 Abutmen Penyangga Pipa
Beton (K-200) 10 0.21 m3 1,044,678.35 214,420.23
Besi 11 19.17 kg 14,220.13 272,573.35
Bekisting 12 1.22 m2 413,440.40 504,397.29
4 Pemasangan baja WF 2× 250.150.6.9 mm -- 473.33 kg 30,432.75 14,404,836.48
5 Balok penyangga kayu ulin 8/16 -- 0.06 m3 9,472,100.00 533,468.67
6 Angkur baut Ø 22 mm -- 32.00 bh 91,162.50 2,917,200.00
7 Klem penjepit dari plat -- 8.00 Ls 125,000.00 1,000,000.00
8 Pagar pengaman baja L Ø 12 mm -- 2.00 Ls 750,000.00 1,500,000.00
Sub Total 48,596,157.25
IV PEKERJAAN LAIN-LAIN
1 Pengecetan pipa dan besi yang tampak (3x cat) 34 22.41 m2 201,487.00 4,514,378.38
2 Pengaman dari pipa besi Ø 400 mm -- 1.00 Ls 400,000.00 400,000.00
3 Pembersihan lokasi/izin -- 1.00 Ls 150,000.00 150,000.00
Sub Total 5,064,378.38
TOTAL 206,070,294.63
RINCIAN BIAYA PEMBANGUNAN
JEMBATAN PIPA Jb4 (1 titik, Jb2)
JEMBATAN PIPA 400 MM DENGAN BENTANG 10 M
II PEKERJAAN STRUKTUR
1 Lantai kerja tebal 5 cm (K-175) 9 0.23 m3 1,055,651.87
2 Abutmen Utama
Beton (K-200) 10 7.03 m3 1,032,323.23
Besi 11 573.13 kg 14,220.13
Bekisting 12 28.06 m 2
382,070.60
3 Abutmen Penyangga Pipa
Beton (K-200) 10 0.21 m3 1,032,323.23
Besi 11 19.17 kg 14,220.13
Bekisting 12 1.22 m2 382,070.60
4 Pemasangan baja WF 2× 250.150.6.9 mm -- 591.67 kg 30,432.75
5 Balok penyangga kayu ulin 8/16 -- 0.07 m3 9,472,100.00
6 Angkur baut Ø 22 mm -- 80.00 bh 91,162.50
7 Klem penjepit dari plat -- 10.00 Ls 125,000.00
8 Pagar pengaman baja L Ø 12 mm -- 2.00 Ls 750,000.00
Sub Total
IV PEKERJAAN LAIN-LAIN
1 Pengecetan pipa dan besi yang tampak (3x cat) 34 45.27 m2 201,487.00
2 Pengaman dari pipa besi Ø 400 mm -- 1.00 Ls 400,000.00
3 Pembersihan lokasi/izin -- 1.00 Ls 150,000.00
Sub Total
TOTAL
CIAN BIAYA PEMBANGUNAN
EMBATAN PIPA Jb4 (1 titik, Jb2)
ATAN PIPA 400 MM DENGAN BENTANG 10 M
(6)
1,427,421.34
344,252.69
86,811.50
1,865,746.00
3,724,231.54
245,043.19
7,253,103.00
8,149,977.42
10,720,901.04
211,884.34
272,573.35
466,126.13
18,006,045.60
666,835.84
7,293,000.00
1,250,000.00
1,500,000.00
56,035,489.91
118,536,250.00
14,639,040.00
2,590,260.00
16,541,600.00
14,636,358.41
2,760,000.00
1,909,000.00
720,935.00
9,392,740.00
321,080.00
483,398.66
JUMLAH HARGA (Rp)
(6)
971,750.00
51,750.00
805,000.00
1,518,000.00
82,800.00
185,959,962.07
6,302,884.35
5,610,150.60
1,051,903.24
225,000.00
3,200,000.00
16,389,938.19
9,121,119.89
400,000.00
150,000.00
9,671,119.89
271,780,741.59
RINCIAN BIAYA PEMBANGUNAN
JEMBATAN PIPA Jb5 (1 titik)
JEMBATAN PIPA 300 MM DENGAN BENTANG 7 M
II PEKERJAAN STRUKTUR
1 Lantai kerja tebal 5 cm (K-175) 9 0.23 m3 1,055,651.87 245,043.19
2 Abutmen Utama
Beton (K-200) 10 7.03 m3 1,032,323.23 7,253,103.00
Besi 11 573.13 kg 14,220.13 8,149,977.42
Bekisting 12 28.06 m 2
413,440.40 11,601,137.62
3 Abutmen Penyangga Pipa
Beton (K-200) 10 0.21 m3 1,032,323.23 211,884.34
Besi 11 19.17 kg 14,220.13 272,573.35
Bekisting 12 1.22 m 2
413,440.40 504,397.29
4 Pemasangan baja WF 2× 250.150.6.9 mm -- 414.17 kg 30,432.75 12,604,231.92
5 Balok penyangga kayu ulin 8/16 -- 0.05 m 3
9,472,100.00 466,785.09
6 Angkur baut Ø 22 mm -- 28.00 bh 91,162.50 2,552,550.00
7 Klem penjepit dari plat -- 7.00 Ls 125,000.00 875,000.00
8 Pagar pengaman baja L Ø 12 mm -- 2.00 Ls 750,000.00 1,500,000.00
Sub Total 46,236,683.22
IV PEKERJAAN LAIN-LAIN
1 Pengecetan pipa dan besi yang tampak (3x cat) 34 29.80 m2 201,487.00 6,004,133.89
2 Pengaman dari pipa besi Ø 400 mm -- 1.00 Ls 400,000.00 400,000.00
3 Pembersihan lokasi/izin -- 1.00 Ls 150,000.00 150,000.00
Sub Total 6,554,133.89
TOTAL 241,606,082.41
RINCIAN BIAYA PEMBANGUNAN
JEMBATAN PIPA Jb7 (1 titik)
JEMBATAN PIPA 400 MM DENGAN BENTANG 12 M
II PEKERJAAN STRUKTUR
1 Lantai kerja tebal 5 cm (K-175) 9 0.23 m3 1,055,651.87
2 Abutmen Utama
Beton (K-200) 10 7.03 m3 1,032,323.23
Besi 11 573.13 kg 14,220.13
Bekisting 12 28.06 m 2
413,440.40
3 Abutmen Penyangga Pipa
Beton (K-200) 10 0.21 m3 1,044,678.35
Besi 11 19.17 kg 13,528.00
Bekisting 12 1.22 m 2
413,440.40
4 Pemasangan baja WF 2× 250.150.6.9 mm -- 710.00 kg 30,432.75
5 Balok penyangga kayu ulin 8/16 -- 0.08 m 3
9,472,100.00
6 Angkur baut Ø 22 mm -- 96.00 bh 91,162.50
7 Klem penjepit dari plat -- 12.00 Ls 125,000.00
8 Pagar pengaman baja L Ø 12 mm -- 2.00 Ls 750,000.00
Sub Total
IV PEKERJAAN LAIN-LAIN
1 Pengecetan pipa dan besi yang tampak (3x cat) 34 51.38 m2 201,487.00
2 Pengaman dari pipa besi Ø 400 mm -- 1.00 Ls 400,000.00
3 Pembersihan lokasi/izin -- 1.00 Ls 150,000.00
Sub Total
TOTAL
CIAN BIAYA PEMBANGUNAN
JEMBATAN PIPA Jb7 (1 titik)
ATAN PIPA 400 MM DENGAN BENTANG 12 M
(6)
1,427,421.34
344,252.69
86,811.50
1,865,746.00
3,724,231.54
245,043.19
7,253,103.00
8,149,977.42
11,601,137.62
214,420.23
259,306.51
504,397.29
21,607,254.72
800,203.01
8,751,600.00
1,500,000.00
1,500,000.00
62,386,442.99
129,461,250.00
14,639,040.00
2,590,260.00
16,541,600.00
14,636,358.41
2,760,000.00
1,909,000.00
720,935.00
9,392,740.00
321,080.00
483,398.66
JUMLAH HARGA (Rp)
(6)
971,750.00
51,750.00
805,000.00
1,518,000.00
82,800.00
196,884,962.07
6,883,795.35
5,610,150.60
1,051,903.24
225,000.00
3,200,000.00
16,970,849.19
10,352,865.15
400,000.00
150,000.00
10,902,865.15
290,869,350.93
REKAPITULASI
PEKERJAAN : DED SPAM IKK Desa Sungkai Kecamatan Simpang Empat Kab. Banjar (PDAM)
PAKET : II
LOKASI : a) Desa Cintapuri Darussalam
b) Simpang Madurejo arah Danau Salak (Martapura)
KOTA/KAB. : Banjar
PROVINSI : Kalimantan Selatan
T.A : 2018
Terbilang : Err:509
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : DED SPAM IKK Desa Sungkai Kecamatan Simpang Empat Kab. Banjar (PDAM)
PAKET : II
LOKASI : a) Desa Cintapuri Darussalam
b) Simpang Madurejo arah Danau Salak (Martapura)
KOTA/KAB. : Banjar
PROVINSI : Kalimantan Selatan
T.A. : 2018
VI PEKERJAAN LAIN-LAIN
1 Pengetesan pipa HDPE S-8 PN.10 Ø 400 mm / Ø 16" 29 32,948.00 m 5,521.94
2 Pekerjaan interkoneksi dengan pipa eksisting -- 1.00 Ls 1,200,000.00
Total VI
CANA ANGGARAN BIAYA (RAB)
(6)
24,513,312.00
20,000,000.00
3,000,000.00
1,000,000.00
3,000,000.00
51,513,312.00
39,623,083,586.00
39,623,083,586.00
7,491,790.00
3,036,000.00
Err:509
Err:509
Err:509
59,934,320.00
Err:509
29,967,160.00
Err:509
Err:509
18,729,475.00
Err:509
Err:509
90,000.00
Err:509
Err:509
Err:509
1,470,205,656.00
1,470,205,656.00
3,824,316,524.82
3,824,316,524.82
971,879,217.08
971,879,217.08
6,266,401,397.90
JUMLAH HARGA (Rp)
(6)
534,400,815.09
548,815,578.76
357,895,450.82
308,329,352.80
326,510,185.35
290,869,350.93
271,780,741.59
278,797,793.69
314,182,002.57
3,231,581,271.61
405,993.00
633,391.12
1,039,384.12
1,969,742.39
17,666,413.60
19,636,155.99
20,675,540.11
181,936,862.65
1,200,000.00
183,136,862.65
RINCIAN BIAYA PEMBANGUNAN
JEMBATAN PIPA Jb7
JEMBATAN PIPA 400 MM DENGAN BENTANG 3,60 M
II PEKERJAAN STRUKTUR
1 Lantai kerja tebal 5 cm (K-175) 9 0.10 m3 1,055,651.87 105,697.14
2 Abutmen Utama
Beton (K-200) 10 0.51 m3 1,032,323.23 524,420.20
Besi 11 80.49 kg 14,220.13 1,144,623.77
Bekisting 12 4.92 m 2
413,440.40 2,034,126.77
3 Abutmen Penyangga Pipa
Beton (K-200) 10 0.21 m3 1,032,323.23 211,884.34
Besi 11 19.17 kg 14,220.13 272,573.35
Bekisting 12 1.22 m 2
413,440.40 504,397.29
Sub Total 4,797,722.86
IV PEKERJAAN LAIN-LAIN
1 Pengecetan pipa dan besi yang tampak (3x cat) 34 10.93 m2 201,487.00 2,202,805.47
2 Pengaman dari pipa besi Ø 400 mm -- 1.00 Ls 400,000.00 400,000.00
3 Pembersihan lokasi/izin -- 1.00 Ls 150,000.00 150,000.00
Sub Total 2,752,805.47
TOTAL 137,203,894.69
RINCIAN BIAYA PEMBANGUNAN
JEMBATAN PIPA Jb8
JEMBATAN PIPA 400 MM DENGAN BENTANG 18 M
II PEKERJAAN STRUKTUR
1 Lantai kerja tebal 5 cm (K-175) 9 0.23 m3 1,055,651.87 245,043.19
2 Abutmen Utama
Beton (K-200) 10 7.03 m3 1,032,323.23 7,253,103.00
Besi 11 573.13 kg 14,220.13 8,149,977.42
Bekisting 12 28.06 m 2
413,440.40 11,601,137.62
3 Abutmen Penyangga Pipa
Beton (K-200) 10 0.21 m3 1,017,548.33 208,851.79
Besi 11 19.17 kg 14,220.13 272,573.35
Bekisting 12 1.22 m 2
413,440.40 504,397.29
4 Pemasangan baja WF 2× 250.150.6.9 mm -- 1,065.00 kg 30,432.75 32,410,882.08
5 Balok penyangga kayu ulin 8/16 -- 0.13 m 3
9,472,100.00 1,200,304.51
6 Angkur baut Ø 22 mm -- 144.00 bh 91,162.50 13,127,400.00
7 Klem penjepit dari plat -- 18.00 Ls 125,000.00 2,250,000.00
8 Pagar pengaman baja L Ø 12 mm -- 2.00 Ls 750,000.00 1,500,000.00
Sub Total 78,723,670.25
IV PEKERJAAN LAIN-LAIN
1 Pengecetan pipa dan besi yang tampak (3x cat) 34 62.18 m2 201,487.00 12,528,924.75
2 Pengaman dari pipa besi Ø 400 mm -- 1.00 Ls 400,000.00 400,000.00
3 Pembersihan lokasi/izin -- 1.00 Ls 150,000.00 150,000.00
Sub Total 13,078,924.75
TOTAL 308,329,352.80
RINCIAN BIAYA PEMBANGUNAN
JEMBATAN PIPA Jb9
JEMBATAN PIPA 400 MM DENGAN BENTANG 20 M
II PEKERJAAN STRUKTUR
1 Lantai kerja tebal 5 cm (K-175) 9 0.23 m3 1,055,651.87 245,043.19
2 Abutmen Utama
Beton (K-200) 10 7.03 m3 1,032,323.23 7,253,103.00
Besi 11 573.13 kg 14,220.13 8,149,977.42
Bekisting 12 28.06 m 2
413,440.40 11,601,137.62
3 Abutmen Penyangga Pipa
Beton (K-200) 10 0.21 m3 1,017,548.33 208,851.79
Besi 11 19.17 kg 14,220.13 272,573.35
Bekisting 12 1.22 m2 413,440.40 504,397.29
4 Pemasangan baja WF 2× 250.150.6.9 mm -- 1,183.33 kg 30,432.75 36,012,091.20
5 Balok penyangga kayu ulin 8/16 -- 0.14 m3 9,472,100.00 1,333,671.68
6 Angkur baut Ø 22 mm -- 160.00 bh 91,162.50 14,586,000.00
7 Klem penjepit dari plat -- 20.00 Ls 125,000.00 2,500,000.00
8 Pagar pengaman baja L Ø 12 mm -- 2.00 Ls 750,000.00 1,500,000.00
Sub Total 84,166,846.54
IV PEKERJAAN LAIN-LAIN
1 Pengecetan pipa dan besi yang tampak (3x cat) 34 68.30 m2 201,487.00 13,760,670.01
2 Pengaman dari pipa besi Ø 400 mm -- 1.00 Ls 400,000.00 400,000.00
3 Pembersihan lokasi/izin -- 1.00 Ls 150,000.00 150,000.00
Sub Total 14,310,670.01
TOTAL 326,510,185.35
RINCIAN BIAYA PEMBANGUNAN
JEMBATAN PIPA Jb10
JEMBATAN PIPA 400 MM DENGAN BENTANG 11 M
II PEKERJAAN STRUKTUR
1 Lantai kerja tebal 5 cm (K-175) 9 0.23 m3 1,055,651.87 245,043.19
2 Abutmen Utama
Beton (K-200) 10 7.03 m3 1,032,323.23 7,253,103.00
Besi 11 573.13 kg 14,220.13 8,149,977.42
Bekisting 12 28.06 m 2
382,070.60 10,720,901.04
3 Abutmen Penyangga Pipa
Beton (K-200) 10 0.21 m3 1,032,323.23 211,884.34
Besi 11 19.17 kg 14,220.13 272,573.35
Bekisting 12 1.22 m 2
382,070.60 466,126.13
4 Pemasangan baja WF 2× 250.150.6.9 mm -- 650.83 kg 30,432.75 19,806,650.16
5 Balok penyangga kayu ulin 8/16 -- 0.08 m 3
9,472,100.00 733,519.42
6 Angkur baut Ø 22 mm -- 88.00 bh 91,162.50 8,022,300.00
7 Klem penjepit dari plat -- 11.00 Ls 125,000.00 1,375,000.00
8 Pagar pengaman baja L Ø 12 mm -- 2.00 Ls 750,000.00 1,500,000.00
Sub Total 58,757,078.05
IV PEKERJAAN LAIN-LAIN
1 Pengecetan pipa dan besi yang tampak (3x cat) 34 48.33 m2 158,583.00 7,663,628.35
2 Pengaman dari pipa besi Ø 400 mm -- 1.00 Ls 400,000.00 400,000.00
3 Pembersihan lokasi/izin -- 1.00 Ls 150,000.00 150,000.00
Sub Total 8,213,628.35
TOTAL 278,797,793.69
RINCIAN BIAYA PEMBANGUNAN
JEMBATAN PIPA Jb10
JEMBATAN PIPA 400 MM DENGAN BENTANG 15 M
II PEKERJAAN STRUKTUR
1 Lantai kerja tebal 5 cm (K-175) 9 0.23 m3 1,055,651.87 245,043.19
2 Abutmen Utama
Beton (K-200) 10 7.03 m3 1,032,323.23 7,253,103.00
Besi 11 573.13 kg 14,220.13 8,149,977.42
Bekisting 12 28.06 m 2
382,070.60 10,720,901.04
3 Abutmen Penyangga Pipa
Beton (K-200) 10 0.21 m3 1,032,323.23 211,884.34
Besi 11 19.17 kg 14,220.13 272,573.35
Bekisting 12 1.22 m 2
382,070.60 466,126.13
4 Pemasangan baja WF 2× 250.150.6.9 mm -- 887.50 kg 30,432.75 27,009,068.40
5 Balok penyangga kayu ulin 8/16 -- 0.11 m 3
9,472,100.00 1,000,253.76
6 Angkur baut Ø 22 mm -- 120.00 bh 91,162.50 10,939,500.00
7 Klem penjepit dari plat -- 15.00 Ls 125,000.00 1,875,000.00
8 Pagar pengaman baja L Ø 12 mm -- 2.00 Ls 750,000.00 1,500,000.00
Sub Total 69,643,430.63
IV PEKERJAAN LAIN-LAIN
1 Pengecetan pipa dan besi yang tampak (3x cat) 32 60.55 m2 158,583.00 9,602,551.05
2 Pengaman dari pipa besi Ø 400 mm -- 1.00 Ls 400,000.00 400,000.00
3 Pembersihan lokasi/izin -- 1.00 Ls 150,000.00 150,000.00
Sub Total 10,152,551.05
TOTAL 314,182,002.57
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN
Harga Satuan
No. Uraian Satuan Harga Upah (Rp) Harga Bahan (Rp)
(Rp)
(1) (2) (3) (4) (5) (6)
Jumlah (Rp)
(7)
823,200.00
54,990.00
100,000.00
35,000.00
1,013,190.00
1,013.19
102,900.00
4,582.50
107,482.50
95,000.00
4,160.00
99,160.00
68,600.00
9,165.00
77,765.00
41,160.00
1,833.00
144,000.00
186,993.00
45,276.00
1,300.00
46,576.00
633,365.00
43,290.00
676,655.00
4,750.00
360.00
183.30
733.20
3,750.00
800.00
800.00
11,376.50
226,380.00
33,000.00
3,640.00
15,213.90
489,000.00
87,942.86
157,475.11
43,000.00
1,055,651.87
Jumlah (Rp)
(7)
156,750.00
46,282.50
5,132.40
10,790.00
528,000.00
84,587.14
157,781.19
43,000.00
1,032,323.23
9,604.00
11,781.00
1,283.10
733.20
115,500.00
3,300.00
142,201.30
14,220.13
90,552.00
39,600.00
6,048.90
6,048.90
74,520.00
9,640.00
10,170.60
65,360.00
66,500.00
45,000.00
413,440.40
41,160.00
12,000.00
1,300.00
2,749.50
49,000.00
21,555.00
6,592.00
134,356.50
41,160.00
25,245.00
1,950.00
2,749.50
11,664.00
3,790.40
86,558.90
27,440.00
16,830.00
1,833.00
1,833.00
4,875.00
52,811.00
Jumlah (Rp)
(7)
22,597.65
13,860.00
7,547.65
8,701.47
2,549.02
424.84
743.46
1,107.85
57,531.93
24,010.00
14,726.25
8,019.38
15,662.65
6,372.55
424.84
849.67
1,211.71
71,277.04
22,166.67
19,635.00
10,692.50
24,364.12
12,107.84
1,699.35
3,186.27
13,848.08
107,699.83
29,555.56
26,180.00
10,111.11
24,364.12
12,107.84
1,699.35
3,186.27
13,848.08
121,052.33
54,880.00
33,660.00
18,330.00
33,761.71
17,205.88
424.84
743.46
1,107.85
160,113.74
Jumlah (Rp)
(7)
41,160.00
13,464.00
733.20
25,000.00
7,800.00
5,850.00
1,716.00
6,500.00
13,848.08
116,071.28
54,880.00
13,464.00
733.20
25,000.00
7,800.00
5,850.00
1,716.00
6,500.00
13,848.08
129,791.28
548,800.00
183,300.00
74,775.96
61,997.99
15,294.12
884,168.07
2,210.42
548,800.00
183,300.00
105,975.00
75,050.20
19,117.65
932,242.85
2,330.61
548,800.00
183,300.00
227,964.00
78,313.25
22,941.18
1,061,318.43
2,653.30
548,800.00
183,300.00
482,304.00
88,102.41
22,941.18
1,325,447.59
3,313.62
548,800.00
183,300.00
Jumlah (Rp)
(7)
753,600.00
94,628.51
22,941.18
1,603,269.69
4,008.17
548,800.00
183,300.00
1,313,600.00
94,628.51
22,941.18
2,163,269.69
5,408.17
611,363.20
207,220.00
127,760.10
1,004,800.00
2,632.50
255,000.00
2,208,775.80
5,521.94
18,302.48
12,207.78
30,510.26
823,200.00
183,300.00
260,000.00
190,000.00
120,000.00
95,000.00
39,240,000.00
35,000.00
100,000.00
41,046,500.00
273,643.33
5,159.16
16,890.43
19,951.82
116,397.25
325,000.00
483,398.66
3,800.00
3,366.00
366.60
260.00
4,000.00
2,550.00
1,320.00
12,240.00
27,902.60
2,790.26
Jumlah (Rp)
(7)
38,000.00
134,640.00
14,664.00
2,600.00
2,750.00
4,675.00
3,840.00
65.00
253.00
201,487.00
166,286.40
101,989.80
22,179.30
290,455.50
DAFTAR HARGA SATUAN UPAH DAN BAHAN
C HARGA PIPA
No. Uraian Pekerja Upah (Rp) Satuan
(1) (2) (3) (4)
1 Pipa HDPE S-8 PN.10 Ø 160 mm 323,082.50 m
2 Pipa HDPE S-8 PN.10 Ø 200 mm 504,319.50 m
3 Pipa HDPE S-8 PN.10 Ø 300 mm 1,202,594.50 m
4 Pipa HDPE S-8 PN.10 Ø 400 mm 1,934,131.50 m
5 Pipa GIP Medium A Ø 160 mm 621,000.00 m
6 Pipa GIP Medium A Ø 300 mm 2,147,441.00 m
7 Pipa GIP Medium A Ø 400 mm 5,462,500.00 m
7 Pipa PVC Ø 150 mm 232,794.50 m
E HARGA ALAT
1 Vibro 100,000.00 unit/jam
2 Alat bantu hotmix 35,000.00 Ls
3 Mesin sambung pipa BF/EF 52,000.00 jam
4 Genset 39,000.00 jam
5 Scrapper 26,000.00 jam
6 Chain Block (Takel) + kaki tiga 32,500.00 jam
7 Truck 211,875.62 jam