Tabel Monitoring Implementasi Contractor Safety Management System (CSMS) di PT

JUDUL PELAKSANA JENIS TANGGAL MULAI TANGGAL BERAKHIR


NO
PEKERJAAN PEKERJAAN PEKERJAAN KONTRAK KONTRAK

Jasa Konsultasi
FEED Proyek
CONTOH Penggantian PT ABCD Non Rutin 13-Des 20 13-Des 21
Pipa Minyak Blok
Rokan
ment System (CSMS) di PT Pertamina Gas
RISK ASSESSMENT

DURASI KONTRAK DIREKSI PENGAWAS


AREA FUNGSI RISIKO TANGGAL
DALAM HARI PEKERJAAN PEKERJAAN
PEKERJA PERSETUJU DISETUJUI
OLEH
AN AN

Project
365 JKT Managem DTO Project M 10-Nov-20 VP Technical
Management Management
ent
QUALIFICATION
SELECTION PRE JOB
ASSESSMENT

EVALUASI HSSE PLAN BRIDGING HSSE PLAN


KUALIFIKASI AKHIR
TANGGAL
SERTIFIKAT MASA KICK OFF
KONTRAKTO BERLAKU
MEETING
R SERTIFIKAT TANGGAL TANGGAL
TANGGAL
PELAKSANA NILAI PELAKSANA PERSETUJU
PENILAIAN
AN AN

H 24-Jan-21 20-Nov-20 HSE Project 85% 14-Des 20 15-Des 20 20-Des 19


PRE JOB ASSESSMENT WORK IN PROGRES

ING HSSE PLAN PENILAIAN PRA MOBILISASI PENILAIAN MOBILISASI


HASIL PJA
RATA-
RATA WIP TANGGAL
KE-
(bobot
DISETUJU PELAKSA PELAKSA 20%)
TANGGAL % NILAI TANGGAL % NILAI
I OLEH NA NA

1 3-Jun-21
Project 22-Des 20 Superviso 75% 3-Jan-21 Superviso 87% 16%
Manager r dan HSE r dan HSE

2 5-Nov-21
WORK IN PROGRESS ASSESSMENT FINAL EVALUATION

HASIL
LEADING HSSE LEADING HSSE
WIP
INDICATO WORK INDICATO WORK
ASSESSM
HASIL PJA R PRACTICE HASIL PJA R PRACTICE
ENT
RATA- RATA-
PELAKSA RATA TANGGAL PELAKSA RATA
NA % % NA % %
(bobot (bobot
20%) PENCAPA PENCAPA % TOTAL 20%) PENCAPA PENCAPA
IAN IAN PENCAPA IAN IAN
(bobot (bobot IAN (bobot (bobot
35%) 45%) 35%) 45%)

Superviso
16% 21% 25% 62%
r dan HSE
05-Des 21 Superviso 16% 34% 41%
r dan HSE

Superviso
r dan HSE 16% 28% 28% 72%
EVALUASI
AKHIR KRITERIA
MEMENU
HI
SYARAT ≥
90.00%
% TOTAL
PENCAPA
IAN

MEMENU
91.20% HI
SYARAT