NPSN : 20320372
Kolom unit 10 10 0.00 0.00 0.00 0.00 0.00 0.85 0.00 85% 10.00% 8.50%
Balok unit 4 4 0.00 0.00 0.00 0.00 0.00 0.85 0.00 85% 8.00% 6.80%
Atap % 100 90% 0.00 0.00 0.00 0.00 0.00 0.77 0.00 77% 7.00% 5.36%
2 ARSITEKTUR Dinding / Partisi % 100 82% 0.00 0.00 0.00 0.00 0.00 0.70 0.00 70% 21.50% 14.99%
Plafond % 100 95% 0.00 0.00 0.00 0.00 0.00 0.81 0.00 81% 10.00% 8.08%
Lantai % 100 100% 0.00 0.00 0.00 0.00 0.00 0.85 0.00 85% 14.50% 12.33%
Kusen unit 1 1 0.00 0.00 0.00 0.00 0.00 0.85 0.00 85% 1.00% 0.85%
Pintu unit 1 1 0.00 0.00 0.00 0.00 0.00 0.85 0.00 85% 1.50% 1.28%
Jendela unit 1 1 0.00 0.00 0.00 0.00 0.00 0.85 0.00 85% 2.00% 1.70%
Finishing Plafond % 100 90% 0.00 0.00 0.00 0.00 0.00 0.77 0.00 77% 3.00% 2.30%
Finishing Dinding % 100 80% 0.00 0.00 0.00 0.00 0.00 0.68 0.00 68% 4.00% 2.72%
Finishing Kusen & Pintu % 100 90% 0.00 0.00 0.00 0.00 0.00 0.77 0.00 77% 2.00% 1.53%
Sebagian besar komponen panel-panel LP rusak, sebagian besar kabel
3 UTILITAS Instalasi Listrik Estimasi instalasi shortage, sebagian besar armature rusak, sehingga biaya 70% 1.00% 0.70%
perbaikan 50-65 % dari instalasi baru
Sebagian besar pompa, sebagian besar motor terbakar, pipa utama bocor
Instalasi Air Bersih Estimasi namun ditempat terbuka, beberapa keran tidak berfungsi, sehingga biaya 70% 1.00% 0.70%
perbaikan 50-65% dari biaya instalasi baru
Drainase Limbah m1 1 1 0.00 0.00 0.00 0.00 0.00 0.85 0.00 85% 1.50% 1.28%
Cek Kerusakan Komponen TOTAL NILAI KERUSAKAN
75.09%
Lain MASSA BANGUNAN / RUANGAN=
Ringan : ≤ 30%
SKETSA DENAH BANGUNAN
Sedang : > 30% - 45%
Berat : > 45%
TIM SURVEI :
Petugas Survey
(.................................................)
MENYETUJUI
Dinas PU Kab/Kota/Provinsi*
(.................................................)
MENGETAHUI
Dinas Kebudayaan Pendidikan
Kab/Kota/Provinsi
(.................................................)
Note :
* : Dinas PU/Dinas yang menangani Bangunan Gedung