Beton K225
Tanah Asli
POTONGAN A – A :
A = ( 15,7 + 1.3,5 ) 3,5
= 67,2 m2
P = 15,7 + 2.3,5 ( 12 + 1 ) 0,5
= 25,599 m
R = A/P = 67,2/25,599 = 2,625 m
Qhitung = V x A
= 1/N. (R)2/3.(S)1/2. A
= 1/0,013. ( 2,625 )2/3.(0,00457)1/2 .67,2
= 664,972 m3/dt
Vhitung = 1/N. (R)2/3.(S)1/2
= 1/0,013. ( 2,625 )2/3.(0,00457)1/2
= 9,895 m/dt
Beton K225
Tanah Asli
POTONGAN B – B :
A = ( 15,7 + 1.4,31 ) 4,31
= 86,2431 m2
P = 15,7 + 2.4,31 ( 12 + 1 ) 0,5
= 27,89 m
R = A/P = 86,2431/27,89 = 3,092 m
Qhitung = V x A
= 1/N. (R)2/3.(S)1/2. A
= 1/0,013. ( 3,092 )2/3.(0,00457)1/2 .86,2431
= 951, 843 m3/dt
Vhitung = 1/N. (R)2/3.(S)1/2
= 1/0,013. ( 3,092 )2/3.(0,00457)1/2
= 11,036 m/dt
Q25th rencana = V.A
144,69 = V. 86,2431
Vrencana = 1,677 m/dt
ALTERNATIF 1 :
Beton K225
Tanah Asli
POTONGAN A – A :
A = ( 15,7 + 1.3,5 ) 3,5
= 67,2 m2
P = 15,7 + 2.3,5 ( 12 + 1 ) 0,5
= 25,599 m
R = A/P = 67,2/25,599 = 2,625 m
Qhitung = V x A
= 1/N. (R)2/3.(S)1/2. A
= 1/0,013. ( 2,625 )2/3.(0,00457)1/2 .67,2
= 664,972 m3/dt
Vhitung = 1/N. (R)2/3.(S)1/2
= 1/0,013. ( 2,625 )2/3.(0,00457)1/2
= 9,895 m/dt
Beton K225
Tanah Asli
POTONGAN C-C :
A = ( 15,7 + 1.4,07 ) 4,07
= 80,4639 m2
P = 15,7 + 2.4,07 ( 12 + 1 ) 0,5
= 27,211 m
R = A/P = 80,4639/27,211= 2,957 m
Qhitung = V x A
= 1/N. (R)2/3.(S)1/2. A
= 1/0,013. ( 2,957 )2/3.(0,00457)1/2 .80,4639
= 862,018 m3/dt
Vhitung = 1/N. (R)2/3.(S)1/2
= 1/0,013. ( 2,957 )2/3.(0,00457)1/2
= 10,713 m/dt
Q25th rencana = V.A
144,69 = V. 80,4639
Vrencana = 1,798 m/dt
Hasil perhitungan :
Alternatif 1 :
Potongan A – A : Potongan C – C :
Qhitung = 664,972 m3/dt Qhitung = 951,843 m3/dt
Vhitung = 9,895 m/dt Vhitung = 11,036 m/dt
V25th = 2,153 m/dt V25th = 1,677 m/dt
V50th = 2,248 m/dt V50th = 1,751 m/dt
Alternatif 2 :
Potongan A – A : Potongan B – B :
Qhitung = 664,972 m3/dt Qhitung = 862,018 m3/dt
Vhitung = 9,895 m/dt Vhitung = 10,713 m/dt
V25th = 2,153 m/dt V25th = 1,798 m/dt
V50th = 2,248 m/dt V50th = 1,865 m/dt