Anda di halaman 1dari 315

TUGAS BESAR

PROYEK EVALUASI DAN REHABILITASI STRUKTUR


BANGUNAN SIPIL
VC-191632

DISUSUN OLEH:
NAMA : SONIA INDAH NOR
YANTI NRP : 10111910010049
KELAS : TRPPBS - B

DOSEN PENGAMPU:

Dr. Nur Ahmad Husin, S.T., M.T.


Raden Buyung Anugraha Affandhie, S.T., M.T.

DOSEN ASISTENSI:
Ir. Sungkono, CES

PROGRAM STUDI SARJANA TERAPAN TEKNOLOGI REKAYASA


PENGELOLAAN DAN PEMELIHARAAN BANGUNAN SIPIL
DEPARTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
SURABAYA
2022
TUGAS BESAR
PROYEK EVALUASI DAN REHABILITASI STRUKTUR
BANGUNAN SIPIL
VC-191632

DISUSUN OLEH:
NAMA : SONIA INDAH NOR
YANTI NRP : 10111910010049
KELAS : TRPPBS - B

DOSEN PENGAMPU:

Dr. Nur Ahmad Husin, S.T., M.T.


Raden Buyung Anugraha Affandhie, S.T., M.T.

DOSEN ASISTENSI:
Ir. Sungkono, CES

PROGRAM STUDI SARJANA TERAPAN TEKNOLOGI REKAYASA


PENGELOLAAN DAN PEMELIHARAAN BANGUNAN SIPIL
DEPARTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
SURABAYA
2022
TUGAS BESAR
PROYEK EVALUASI DAN REHABILITASI STRUKTUR
BANGUNAN SIPIL
VC-191632

DISUSUN OLEH:
NAMA : SONIA INDAH NOR
YANTI NRP : 10111910010049
KELAS : TRPPBS - B

DOSEN PENGAMPU:

Dr. Nur Ahmad Husin, S.T., M.T.


Raden Buyung Anugraha Affandhie, S.T., M.T.

DOSEN ASISTENSI:
Ir. Sungkono, CES

PROGRAM STUDI SARJANA TERAPAN TEKNOLOGI REKAYASA


PENGELOLAAN DAN PEMELIHARAAN BANGUNAN SIPIL
DEPARTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
SURABAYA
2022
LEMBAR TUGAS

ii
iii
iv
v
LEMBAR ASISTENSI
Nama : Sonia Indah Nor Yanti

NRP 10111910010049

Jenis Tugas : Proyek Evaluasi dan Rehabilitasi Struktur Bangunan Sipil

Paraf
No. Tanggal Tugas / Mateti yang Dibahas Dokumentasi
Dosen
- Pembahasan lembar soal tugas
- Pembahasan target mingguan
dan minimal asistensi
1. 4/3/2022
- Pembahasan literatur yang
dipakai dalam perhitungan
momen kapasitas
- Momen kapasitas tiap elemen
2. 10/3/2022 baik balok, kolom, pelat, dan
sloof
- Pemodelan struktur pada SAP
2000
- Input luas tulangan pada SAP
3. 18/3/2022
2000
- Kerangka laporan proyek
- Analisa gaya pada SAP 2000

- Analisa gaya dalam pada SAP


2000
4. 8/4/2022 - Analisa berat sendiri struktur
- Analisa modal load
participation ratios

vi
LEMBAR ASISTENSI
Nama : Sonia Indah Nor Yanti

NRP 10111910010049

Jenis Tugas : Proyek Evaluasi dan Rehabilitasi Struktur Bangunan Sipil

Paraf
No. Tanggal Tugas / Mateti yang Dibahas Dokumentasi
Dosen
- Rekapitulasi gaya dalam
output SAP 2000
- Perkuatan pada balok
5. 14/4/2022
- Perkuatan pada pelat
- Verifikasi gaya dalam tiap
elemen
- Perkuatan pada balok
- Perkuatan pada pelat
6. 13/5/2022
- Penggambaran perkuatan
pada balok dan pelat

- RAB (Rencana Anggaran


7. 10/6/2022 Biaya)
- Metode Pelaksanaan

- Pengumpulan Laporan dan


8. 19/6/2022
Gambar Final (Hardcopy)

vii
KATA PENGANTAR
Puji syukur kehadirat Allah SWT yang telah memberikan rahmat serta hidayah-
Nya, sehingga Laporan Tugas Besar Proyek Proyek Evaluasi dan Rehabilitasi Struktur
Bangunasn Sipil ini dapat terselesaikan dengan baik.
Laporan ini dibuat berdasarkan data eksisting bangunan yang dialihfungsikan
menjadi ruang arsip dan komputer (server) dan perolehan referensi dari berbagai literatur
serta peraturan yang berfungsi sebagai penunjang kegiatan perkuliahan mahasiswa pada
mata kuliah Proyek Evaluasi dan Rehabilitasi Struktur Bangunan Sipil. Sehingga dengan
adanya laporan ini diharapkan dapat membantu kita untuk memahami lebih dalam tentang
langkah-langkah dalam perencanaan metode perkuatan pada struktur beton eksisting.
Pada kesempatan ini, atas segala bimbingan, pengarahan, dan petunjuk
sehingga laporan ini dapat terselesaikan, penyusun mengucapkan terima kasih sebesar-
besarnya kepada:
1. Bapak Dr. Nur Ahmad Husin, S.T., M.T. dan Bapak Raden Buyung Anugraha
Affandhie, S.T., M.T. selaku dosen pengampu mata kuliah Proyek Evaluasi dan
Rehabilitasi Struktur Bangunan Sipil.
2. Bapak Ir. Sungkono, CES selaku dosen asistensi mata kuliah Proyek Evaluasi dan
Rehabilitasi Struktur Bangunan Sipil.
3. Rekan-rekan Mahasiswa Progran D-IV TRPPBS yang telah memberikan dukungan dan
semangat bagi penulis untuk menulis laporan ini yang tidak bisa disebutkan satu persatu.
Kami menyadari bahwa meskipun kami telah berusaha sebaik mungkin dalam
menyelesaikan laporan ini, hasilnya belum sempurna dan tentu masih banyak kekurangan.
Oleh sebab itu, kami mengharapkan kritik dan saran yang membangun dari pembaca demi
perbaikan laporan ini. Kami mengucapkan terima kasih kepada dosen pembimbing yang
telah memberikan materi dan arahan dalam mengerjakan laporan ini. Semoga laporan ini
dapat bermanfaat dan membantu para pembaca dalam memperoleh pengetahuan mengenai
perencanaan metode perkuatan pada struktur beton eksisting.

Surabaya, 19 Februari 2022

Penulis

viii
DAFTAR ISI
LEMBAR TUGAS............................................................................................................................ii
LEMBAR ASISTENSI....................................................................................................................vi
LEMBAR ASISTENSI...................................................................................................................vii
KATA PENGANTAR...................................................................................................................viii
DAFTAR ISI.....................................................................................................................................ix
DAFTAR GAMBAR......................................................................................................................xiv
DAFTAR TABEL..........................................................................................................................xvi
DAFTAR GRAFIK......................................................................................................................xviii
BAB I PENDAHULUAN..................................................................................................................1
1.1. Latar Belakang.....................................................................................................................1
1.2. Rumusan Masalah................................................................................................................2
1.3. Batasan Masalah...................................................................................................................2
1.4. Tujuan...................................................................................................................................3
1.5. Lokasi Bangunan..................................................................................................................3
BAB II METODOLOGI...................................................................................................................4
2.1. Studi Literatur......................................................................................................................4
2.2. Pengumpulan Data...............................................................................................................4
2.3. Analisa Kapasitas Elemen Struktur Eksisting..................................................................6
2.3.1. Perhitungan Kapasitas Penampang Pelat..................................................................6
2.3.2. Perhitungan Kapasitas Penampang Balok.................................................................7
2.3.3. Perhitungan Kapasitas Penampang Kolom.............................................................10
2.3.4. Perhitungan Kapasitas Penampang Sloof................................................................14
2.4. Jenis Pembebanan Struktur..............................................................................................19
2.4.1. Beban Mati (DL).........................................................................................................19
2.4.2. Beban Hidup (LL).......................................................................................................20
2.4.3. Beban Gempa (E)........................................................................................................21
2.4.4. Beban Angin (W).........................................................................................................25
2.4.5. Beban Hujan (R).........................................................................................................25
2.5. Pemodelan Struktur dan Analisa Gaya Dalam...............................................................26
2.6. Analisa Struktur Kapasitas Penampang dengan Gaya Dalam......................................26
2.7. Perencanaan Desain Perkuatan........................................................................................27
2.8. Gambar Desain Perkuatan................................................................................................27

ix
2.9. Perhitungan Rencana Anggaran Biaya............................................................................28
2.10. Alur Perencanaan Kekuatan.............................................................................................29
BAB III PEMBEBANAN...............................................................................................................31
3.1. Beban Mati (DL).................................................................................................................31
3.1.1. Beban Sendiri Struktur (Self Weight Dead).............................................................31
3.1.2. Beban Mati Tambahan (Super Dead).......................................................................31
3.2. Beban Hidup (LL)..............................................................................................................34
3.2.1. Beban Hidup Atap......................................................................................................34
3.2.2. Beban Hidup Lantai...................................................................................................34
3.3. Beban Air Hujan (R)..........................................................................................................34
3.4. Beban Angin (W)................................................................................................................35
3.5. Beban Gempa (E)...............................................................................................................37
3.5.1. Kategori Risiko Bangunan.........................................................................................38
3.5.2. Faktor Keutamaan Gempa........................................................................................38
3.5.3. Kelas Situs...................................................................................................................38
3.5.4. Parameter Percepatan Gempa..................................................................................40
3.5.5. Koefisien Situs.............................................................................................................41
3.5.6. Parameter Respon Spektral Percepatan Gempa SMS dan SM1...........................41
3.5.7. Parameter Percepatan Spektral Desain SDS dan SD1............................................41
3.5.8. Nilai Periode Panjang (TL).........................................................................................42
3.5.9. Kategori Desain Seismik............................................................................................42
3.5.10. Parameter Struktur....................................................................................................42
3.5.11. Perhitungan Faktor Skala..........................................................................................43
3.5.12. Analisa Respon Spektrum..........................................................................................43
3.5.13. Tabel Respon Spektrum.............................................................................................45
3.6. Kombinasi Pembebanan....................................................................................................47
BAB IV DATA BANGUNAN.........................................................................................................48
4.1. Data Umum Bangunan......................................................................................................48
4.1.1. Data Geometri Bangunan..........................................................................................48
4.1.2. Data Elemen Struktur................................................................................................48
4.1.3. Konfigurasi Tulangan................................................................................................49
4.2. Denah Eksisting Bangunan................................................................................................49
4.3. Denah Alih Fungsi Bangunan...........................................................................................53
4.4. Data Uji Tanah Eksisting...................................................................................................55

x
BAB V ANALISA STRUKTUR....................................................................................................56
5.1. Analisa Kapasitas Penampang..........................................................................................56
5.1.1. Kapasitas Penampang Pelat.......................................................................................56
5.1.2. Kapasitas Penampang Balok.....................................................................................62
5.1.3. Kapasitas Penampang Kolom....................................................................................68
5.1.4. Kapasitas Penampang Sloof.......................................................................................86
5.2. Perhitungan Gaya Dalam................................................................................................103
5.2.1. Permodelan Struktur................................................................................................103
5.2.2. Besaran Massa..........................................................................................................104
5.2.3. Peninjauan Terhadap Pengaruh Gempa................................................................105
5.2.4. Faktor Skala Gaya Beban Gempa dengan Respons Spektrum..............................93
5.3. Kontrol Berat Bangunan (Self Weight)............................................................................93
5.3.1. Pelat Lantai dan Pelat Atap.......................................................................................93
5.3.2. Sloof..............................................................................................................................93
5.3.3. Kolom...........................................................................................................................94
5.3.4. Balok............................................................................................................................94
5.3.5. Rekapitulasi.................................................................................................................94
5.3.6. Kontrol pada SAP 2000..............................................................................................95
5.4. Kontrol Gaya Dalam..........................................................................................................95
5.5. Verifikasi Hasil Gaya Dalam.............................................................................................97
5.5.1. Elemen Pelat Eksisting...............................................................................................97
5.5.2. Elemen Pelat Alih Fungsi.........................................................................................101
5.5.3. Elemen Balok............................................................................................................105
BAB VI EVALUASI KONDISI STRUKTUR............................................................................145
6.1. Evaluasi Elemen Pelat......................................................................................................145
6.1.1. Evaluasi Elemen Pelat Akibat Gaya Momen.........................................................145
6.2. Evaluasi Elemen Balok....................................................................................................148
6.2.1. Evaluasi Elemen Balok Akibat Gaya Momen........................................................149
6.2.2. Evaluasi Elemen Balok Akibat Gaya Geser...........................................................170
6.3. Evaluasi Elemen Kolom...................................................................................................192
6.3.1. Evaluasi Elemen Kolom Akibat Momen dan Aksial.............................................192
6.4. Evaluasi Elemen Sloof......................................................................................................195
6.4.1. Evaluasi Elemen Sloof Akibat Gaya Momen.........................................................195
6.5. Rekapitulasi Evaluasi Elemen Pelat...............................................................................197

xi
6.6. Rekapitulasi Evaluasi Elemen Balok Lentur.................................................................198
6.7. Rekapitulasi Evaluasi Elemen Balok Geser...................................................................199
BAB VII DESAIN PERKUATAN...............................................................................................201
7.1. Konsep Perkuatan Struktur............................................................................................201
7.1.1. Carbon Fiber Reinforced Polymer (CFRP).............................................................201
7.1.2. Struktur Komposit....................................................................................................202
7.2. Perencanaan Perkuatan Lentur......................................................................................202
7.2.1. Perencanaan Perkuatan Lentur pada Balok..........................................................202
7.2.2. Perencanaan Perkuatan Lentur pada Pelat...........................................................211
7.3. Perencanaan Perkuatan Geser pada Balok...................................................................219
7.4. Rekapitulasi Hasil Perkuatan..........................................................................................223
7.4.1. Rekapitulasi Perkuatan Lentur Pelat.....................................................................223
7.4.2. Rekapitulasi Perkuatan Lentur Balok....................................................................224
7.4.3. Rekapitulasi Perkuatan Geser Balok......................................................................225
7.5. Metode Pelaksanaan Perkuatan Lentur.........................................................................226
7.5.1. Persiapan Permukaan..............................................................................................226
7.5.2. Material yang Digunakan........................................................................................227
7.5.3. Prosedur Pelaksanaan..............................................................................................227
7.6. Metode Pelaksanaan Perkuatan Geser...........................................................................228
7.6.1. Persiapan Permukaan..............................................................................................228
7.6.2. Material yang Digunakan........................................................................................230
7.6.3. Prosedur Pelaksanaan..............................................................................................230
7.7. Rencana Anggaran Biaya Perkuatan.............................................................................232
7.7.1. Perhitungan Volume Sikadur..................................................................................232
7.7.2. Perhitungan Volume Sika Wrap.............................................................................234
7.7.3. Perhitungan Volume Pembongkaran Dinding.......................................................236
7.7.4. Perhitungan Volume Pembongkaran Keramik.....................................................237
7.7.5. Daftar Harga.............................................................................................................238
7.7.6. Analisa Harga Satuan Pekerjaan............................................................................239
7.7.7. Estimasi Biaya Perkuatan........................................................................................246
BAB VIII KESIMPULAN............................................................................................................247
8.1. Kesimpulan.......................................................................................................................247
8.2. Saran..................................................................................................................................247
DAFTAR PUSTAKA....................................................................................................................248

xii
PERNYATAAN.............................................................................................................................249
LAMPIRAN 1 LEMBAR TUGAS..............................................................................................250
LAMPIRAN 2 SPESIFIKASI MATERIAL PERKUATAN....................................................258
LAMPIRAN 3 GAMBAR RENCANA PERKUATAN.............................................................271

xiii
DAFTAR GAMBAR
Gambar 1.1 : Lokasi Bangunan.........................................................................................................3
Gambar 2.1 : Perspektif Struktur Bangunan......................................................................................5
Gambar 2.2 : Flowchart Perhitungan Momen Kapasitas Pelat..........................................................7
Gambar 2.3 : Flowchart Perhitungan Momen Kapasitas Balok Tunggal..........................................8
Gambar 2.4 : Flowchart Perhitungan Geser Balok Tunggal.............................................................9
Gambar 2.5 : Flowchart Perhitungan Kapasitas Kolom Kondisi Aksial Murni..............................10
Gambar 2.6 : Flowchart Perhitungan Kapasitas Kolom Kondisi Tekan Menentukan....................12
Gambar 2.7 : Flowchart Perhitungan Kapasitas Kolom Kondisi Seimbang...................................13
Gambar 2.8 : Flowchart Perhitungan Kapasitas Kolom Kondisi Tarik Menentukan......................14
Gambar 2.9 : Flowchart Perhitungan Kapasitas Sloof Kondisi Aksial Murni................................15
Gambar 2.10 : Flowchart Perhitungan Kapasitas Sloof Kondisi Tekan Menentukan.....................17
Gambar 2.11 : Flowchart Perhitungan Kapasitas Sloof Kondisi Seimbang....................................18
Gambar 2.12 : Flowchart Perhitungan Kapasitas Sloof Kondisi Tarik Menentukan......................19
Gambar 2.13 : Beban Mati Desain Minimum.................................................................................20
Gambar 2.14 : Beban Hidup Terdistribusi Merata dan Beban Hidup Terpusat Minimum.............21
Gambar 2.15 : Permodelan Struktur pada SAP2000 v.14.2.2.........................................................26
Gambar 2.16 : Perkuatan lentur dengan C-FRP Laminate.............................................................28
Gambar 2.17 : Perkuatan geser dengan C-FRP Wrap.....................................................................28
Gambar 2.18 : Perkuatan dengan balok WF komposit....................................................................28
Gambar 2.19 : Flowchart Perencanaan Perkuatan...........................................................................30
Gambar 3.1 : Parameter Gerak Tanah Ss, Gempa Maksimum yang di Pertimbangkan Risiko
Tertarget Wilayah Indonesia untuk Spektrum Respons 0.2 Detik Menurut SNI 1726 – 2019
.23
Gambar 3.2 : Parameter Gerak Tanah S1, Gempa Maksimum yang di Pertimbangkan Risiko
Tertarget Wilayah Indonesia untuk Spektrum Respons 0.2 Detik Menurut SNI 1726 – 2019.........24
Gambar 3.3 : Peta transisi periode panjang, TL, wilayah Indonesia..............................................25
Gambar 3.4 : Berat Jenis Material...................................................................................................31
Gambar 3.5 : Brosur Cition Berat Bata Ringan...............................................................................32
Gambar 3.6 : Parameter Gerak Tanah Ss, Gempa Maksimum yang di Pertimbangkan Risiko
Tertarget Wilayah Indonesia untuk Spektrum Respons 0.2 Detik Menurut SNI 1726 - 2019.........40
Gambar 3.7 : Parameter Gerak Tanah S1, Gempa Maksimum yang di Pertimbangkan Risiko
Tertarget Wilayah Indonesia untuk Spektrum Respons 0.2 Detik Menurut SNI 1726 - 2019.........40
Gambar 3.8 : Peta transisi periode panjang, TL, wilayah Indonesia..............................................42
Gambar 4.1 : Denah Sloof...............................................................................................................49

xiv
Gambar 4.2 : Denah Pembalokan Lt 2............................................................................................50
Gambar 4.3 : Denah Pembalokan Lt 3............................................................................................50
Gambar 4.4 : Denah Pembalokan Atap...........................................................................................50
Gambar 4.5 : Denah Kolom Lt 1.....................................................................................................51
Gambar 4.6 : Denah Kolom Lt 2.....................................................................................................51
Gambar 4.7 : Denah Kolom Lt 3.....................................................................................................51
Gambar 4.8 : Denah Pelat Lt 2........................................................................................................52
Gambar 4.9 : Denah Pelat Lt 3........................................................................................................52
Gambar 4.10 : Denah Pelat Atap.....................................................................................................52
Gambar 4.11 : Denah Alih Fungsi Lt 2...........................................................................................53
Gambar 4.12 : Denah Alih Fungsi Lt 3...........................................................................................53
Gambar 4.13 : Denah Alih Fungsi Lt Atap.....................................................................................54
Gambar 4.14 : Denah Ruangan Lt 1................................................................................................54
Gambar 4.15 : Denah Ruangan Alih Fungsi Lt 2............................................................................54
Gambar 4.16 : Denah Ruangan Lt. 3...............................................................................................55
Gambar 4.17 : Data Uji Tanah........................................................................................................55
Gambar 5.1 : Kondisi dengan P Konsentris....................................................................................69
Gambar 5.2 : Permodelan Struktur Bangunan...............................................................................104
Gambar 5.3 : Mass Source SAP2000............................................................................................105
Gambar 5.4 : Balok yang Ditinjau...................................................................................................95
Gambar 7.1 : Data Material CFRP................................................................................................203
Gambar 7.2 : Type dan Material Properties FRP..........................................................................203
Gambar 7.3 : Tabel 9.4 pada ACI 440 2R-17................................................................................204
Gambar 7.4 : Persamaan 10.1.1. ACI 440-2R-17..........................................................................206
Gambar 7.6 : Pembongkaran Pelat................................................................................................226
Gambar 7.7 : Perataan Sika Carbodur dengan Roller....................................................................227

xv
DAFTAR TABEL
Tabel 2.1 : Rekapitulasi Tulangan Terpasang....................................................................................5
Tabel 2.2 : Klasifikasi Situs.............................................................................................................22
Tabel 2.3 : Kategori risiko bangunan gedung dan non gedung untuk beban gempa........................22
Tabel 2.4 : Faktor Keutamaan Gempa..............................................................................................23
Tabel 3.1 : Koefisien Situs, Fa Menurut SNI 1726 - 2019...............................................................24
Tabel 3.2 : Koefisien Situs, Fv Menurut SNI 1726 - 2019..............................................................24
Tabel 3.3 : Rekapitulasi Beban Angin..............................................................................................37
Tabel 3.4 : Kategori Risiko Bangunan Gedung dan Nongedung untuk Beban Gempa...................38
Tabel 3.5 : Faktor Keutamaan Gempa..............................................................................................38
Tabel 3.6 : Rata-rata Nilai N-SPT....................................................................................................39
Tabel 3.7 : Klasifikasi Situs.............................................................................................................40
Tabel 3.8 : Koefisien Situs, Fa Menurut SNI 1726 - 2019...............................................................41
Tabel 3.9 : Koefisien Situs, Fv Menurut SNI 1726 - 2019..............................................................41
Tabel 3.10 : Kategori desain seismik parameter respons percepatan pada Periode Pendek............42
Tabel 3.11 : Kategori desain seismik parameter respons percepatan pada Periode 1 detik.............42
Tabel 3.12 : Parameter Struktur untuk Sistem Pemikul Gaya Seismik Menurut SNI 1726:2019. . .43
Tabel 3.13 : Nilai Percepatan Gempa...............................................................................................45
Tabel 4.1 : Data Rekap penulangan Eksisting Terpasang................................................................49
Tabel 4.2 : Rekapitulasi Perhitungan Sloof 1.................................................................................100
Tabel 4.3 : Rekapitulasi Perhitungan Sloof 2.................................................................................101
Tabel 5.1 : Rekapitulasi Luas Tulangan Pelat..................................................................................58
Tabel 5.2 : Rekapitulasi Tinggi Efektif Pelat...................................................................................58
Tabel 5.3 : Rekapitulasi Perhitungan Momen Kapasitas Pelat........................................................62
Tabel 5.4 : Data Tulangan Balok Tumpuan Terpasang....................................................................62
Tabel 5.5 : Data Tulangan Balok Lapangan Terpasang...................................................................63
Tabel 5.6 : Rekapitulasi Luas Tulangan Balok................................................................................63
Tabel 5.7 : Rekapitulasi Tinggi Efektif (d)......................................................................................63
Tabel 5.8 : Rekapitulasi Tinggi Blok Tekan Balok..........................................................................64
Tabel 5.9 : Rekapitulasi Momen Kapasitas Balok...........................................................................64
Tabel 5.10 : Rekapitulasi Luas Tulangan Geser...............................................................................65
Tabel 5.11 : Rekapitulasi Tinggi Efektif Balok...............................................................................66
Tabel 5.12 : Rekapitulasi Gaya Geser Tulangan (Vs)......................................................................66
Tabel 5.13 : Rekapitulasi Kapasitas Geser Balok (Vn)....................................................................67

xvi
Tabel 5.14 : Rekapitulasi φVn..........................................................................................................67
Tabel 5.15 : Rekapitulasi Perhitungan Kolom 1..............................................................................82
Tabel 5.16 : Rekapitulasi Perhitungan Kolom 2..............................................................................82
Tabel 5.17 : Self Weight Pelat Lantai dan Pelat Atap......................................................................93
Tabel 5.18 : Self Weight Sloof.........................................................................................................93
Tabel 5.19 : Self Weight Kolom......................................................................................................94
Tabel 5.20 : Self Weight Balok........................................................................................................94
Tabel 5.21 : Rekapitulasi Self Weight..............................................................................................94
Tabel 5.22 : Rekapitulasi Verifikasi Momen Pelat Lantai 2 Eksisting............................................97
Tabel 5.23 : Rekapitulasi Verifikasi Momen Pelat Lantai 3 Eksisting............................................98
Tabel 5.24 : Rekapitulasi Verifikasi Momen Pelat Atap Eksisting................................................100
Tabel 5.25 : Rekapitulasi Verifikasi Momen Pelat Lantai 2 Alih Fungsi......................................101
Tabel 5.26 : Rekapitulasi Verifikasi Momen Pelat Lantai 3 Alih Fungsi......................................102
Tabel 5.27 : Rekapitulasi Verifikasi Momen Pelat Atap Alih Fungsi............................................104
Tabel 5.28 : Rekapitulasi Verifikasi Momen Balok 1....................................................................105
Tabel 5.29 : Rekapitulasi Verifikasi Geser Balok 1.......................................................................108
Tabel 5.30 : Rekapitulasi Verifikasi Momen Balok 2....................................................................111
Tabel 5.31 : Rekapitulasi Verifikasi Geser Balok 2.......................................................................118
Tabel 5.32 : Rekapitulasi Verifikasi Momen Balok 3....................................................................125
Tabel 5.33 : Rekapitulasi Verifikasi Geser Balok 3.......................................................................129
Tabel 5.34 : Rekapitulasi Verifikasi Momen Balok 4....................................................................133
Tabel 5.35 : Rekapitulasi Verifikasi Geser Balok 4.......................................................................139
Tabel 6.1 : Rekapitulasi Evaluasi Momen Ultimate Elemen Struktur Pelat..................................145
Tabel 6.2 : Rekapitulasi Evaluasi Momen Ultimate Elemen Struktur Balok.................................149
Tabel 6.3 : Rekapitulasi Evaluasi Elemen Balok...........................................................................198
Tabel 7.1 : Rekapitulasi Perkuatan Lentur Pelat............................................................................223
Tabel 7.2 : Rekapitulasi Perkuatan Lentur Balok...........................................................................224
Tabel 7.3 : Rekapitulasi Perkuatan Geser Balok............................................................................225
Tabel 7.4 : Volume Kebutuhan CFRP S 812 untuk Perkuatan Lentur Balok................................232
Tabel 7.5 : Volume Kebutuhan CFRP S 512 untuk Perkuatan Lentur Balok................................233
Tabel 7.6 : Volume Kebutuhan CFRP S 512 untuk Perkuatan Pelat.............................................233
Tabel 7.7 : Volume Kebutuhan Sika Wrap untuk Perkuatan Geser Balok....................................234
Tabel 7.8 : Volume Pembongkaran Dinding..................................................................................236
Tabel 7.9 : Volume Pembongkaran Keramik.................................................................................237
Tabel 7.10 : Daftar Harga Berdasarkan Survey.............................................................................238

xvii
Tabel 7.11 : AHSP Pembongkaran Dinding dan Keramik.............................................................239
Tabel 7.12 : AHSP Pemasangan SikaCarbodur S 512...................................................................240
Tabel 7.13 : AHSP Pemasangan SikaCarbodur S 812...................................................................241
Tabel 7.14 : AHSP Pemasangan SikaWrap 301C..........................................................................242
Tabel 7.15 : AHSP Pemasangan SikaWrap 600C..........................................................................243
Tabel 7.16 : AHSP Pemasangan Dinding Kembali........................................................................244
Tabel 7.17 : AHSP Pemasangan Keramik Lantai..........................................................................245
Tabel 7.18 : Estimasi Biaya Perkuatan...........................................................................................246

DAFTAR GRAFIK
Grafik 3.1 : Grafik Data N-SPT.......................................................................................................39
Grafik 3.2 : Respon Spektrum Surabaya..........................................................................................46
Grafik 3.3 : Respon Spektrum Surabaya SAP 2000........................................................................46
Grafik 5.3 : Diagram Interaksi Sloof 1 dan Sloof 2.......................................................................101
Grafik 5.1 : Diagram Interaksi Kolom 1 dan Kolom 2....................................................................83
Grafik 5.2 : Diagram Interaksi Sloof 1 dan Sloof 2.......................................................................101
Grafik 6.1 : Evaluasi Kolom Lantai 1 Akibat Gaya Aksial dan Momen.......................................192
Grafik 6.2 : Evaluasi Kolom Lantai 2 Akibat Gaya Aksial dan Momen.......................................193
Grafik 6.3 : Evaluasi Kolom Lantai 3 Akibat Gaya Aksial dan Momen.......................................194
Grafik 6.4 : Evaluasi Sloof 1 Akibat Gaya Aksial dan Momen....................................................195
Grafik 6.5 : Evaluasi Sloof 2 Akibat Gaya Aksial dan Momen....................................................196

xviii
BAB I
PENDAHULU
AN
1.1. Latar Belakang
Bangunan gedung adalah wujud fisik dari hasil pekerjaan konstruksi yang menyatu
dengan tempat kedudukannya, yang berfungsi sebagai tempat manusia melakukan
kegiatannya, baik untuk hunian atau tempat tinggal, kegiatan keagamaan, kegiatan usaha,
kegiatan sosial, budaya, maupun kegiatan khusus (Permen PU Nomor 30/PRT/M/2006).
Sedangkan, Gedung perkantoran merupakan tempat untuk melaksanakan aktivitas
perekonomian. Umumnya ruang kerja gedung perkantoran tidak berpindah-pindah karena
telah dilengkapi ruang-ruang fasilitas penunjang seperti untuk ruang mesin, ruang arsip,
kantin dan aktivitas penunjang lainnya.
Pergantian fungsi pada suatu bangunan sering menjadi pilihan untuk memebuhi
kebutuhan penggunaan bangunan. Alih fungsi bangunan menyebabkan perubahan
beban yang telah direncanakan dikarenakan perbedaannya itulah sehingga beban yang
diterima oleh bangunan akan berbeda. Sehingga bangunan perlu dievaluasi dan
direncanakan perkuatan tambahan apabila elemen struktur tidak mampu menahan beban
yang bekerja.
Pada Tugas Besar Proyek Evaluasi dan Rehabilitasi Struktur Bangunan Sipil ini studi
kasus dilakukan pada Gedung Perkantoran 3 lantai yang terletak di Surabaya dialih
fungsikan menjadi Ruang Arsip dan Komputer serta pertambahan fungsi lantai atap
dengan beban tandon air dan outdoor AC (Chiller dan Cooling Tower. Alih fungsi
bangunan menyebabkan adanya perubahan pembebahan hidup berdasarkan fungsi
bangunannya yaitu dari Perkantoran (2,4 kN/m²) menjadi ruang arsip dan komputer (4.79
kN/m²) (SNI 1727:2019).
Apabila setelah dievaluasi dan struktur tidak mampu menahan beban yang ditambahkan
terhadap gedung tersebut, maka dibutuhkan perkuatan elemen struktur yang mengalami
kegagalan atau tidak mampu menahan beban yang ditambahkan. Perkuatan tersebut dapat
menggunakan metode perkuatan struktur dengan FRP (Fiber Reinforced Polymer). Metode
perkuatan dengan FRP ini diaplikasikan bersama resin epoxy. Epoxy adalah perekat yang
berfungsi merekatkan FRP dengan bahan lain seperti beton, baja, pipa, dan lain-lain. FRP

1
adalah material komposit berbentuk seperti lembaran kain anyaman yang fleksibel dan
berfungsi menambah kekuatan dibagian tarik dari suatu struktur. FRP dibagi berdasarkan
jenis bahan yaitu glass, carbon dan aramid. FRP yang akan digunakan terbuat dari Carbon
yaitu CFRP (Carbon Fiber Reinforced Polymer)

1.2. Rumusan Masalah


Dalam Laporan Evaluasi dan Rehabilitasi Struktur Bangunan Sipil, perumusan
masalah yang didapatkan dari penjabaran latar belakang adalah sebagai berikut.
1. Bagaimana menganalisis struktur bangunan akibat alih fungsi Ruang Perkantoran
menjadi Ruang Arsip dan Komputer (server) sesuai dengan peraturan yang
berlaku?
2. Bagaimana merencanakan perkuatan elemen eksisting struktur bangunan?
3. Bagaimana metode pelaksanaan perkuatan yang sesuai dengan kebutuhan struktur
eksisting akibat pergantian alih fungsi bangunan??
4. Bagaimana detail penggambaran hasil perkuatan struktur bangunan?
5. Berapa estimasi biaya evaluasi dan rehabilitasi bangunan sipil yang direncanakan ?

1.3. Batasan Masalah


Pembatasan suatu masalah digunakan untuk menghindari adanya penyimpangan
maupun pelebaran pokok masalah yang akan dibahas dalam laporan sehingga lebih terarah
dan memudahkan dalam pembahasan serta tujuan dari laporan ini akan tercapai.
Berdasarkan kondisi tersebut, maka penulisan laporan ini dibatasi oleh batasan-batasan
sebagai berikut.
1. Analisa model struktu gedung beton bertulang dengan Sistem Rangka Pemikul
Momen Khusus (SRPMK).
2. Elemen struktur yang ditinjau hanya berfokus pada elemen plat lantai dan balok.
3. Tidak meninjau struktur pondasi
4. Rencana anggaran biaya hanya pada metode perkuatan yang diterapkan.
5. Tidak memperhitungkan sistem utilitas bangunan, perencanaan pembuangan
saluran
air bersih dan kotor, instalasi/jaringan listrik, finishing dan hal bersifat arsitektural
lainnya.

2
1.4. Tujuan
Adapun tujuan dari pengerjaan Tugas Besar ini adalah sebagai berikut.
1. Mampu menganalisa dan mengevaluasi sistem struktur bangunan sesuai keadaan
eksisting struktur dalam menahan beban ruang arsip dan komputer yang bekerja.
2. Mampu merencanakan metode perkuatan yang sesuai dengan kebutuhan struktur
eksisting akibat pergantian alih fungsi bangunan.
3. Mempu menjelaskan metode pelaksanaan perkuatan struktur di lapangan.
4. Mampu menggambar detail hasil perencanaan metode perkuatan menjadi bentuk
gambar kerja dengan program bantu Autocad.
5. Mampu mengetahui rencana anggaran biaya (RAB) untuk metode perkuatan yang
diterapkan.

1.5. Lokasi Bangunan


Lokasi bangunan yang dilakukan penilaian atau evaluasi berada di Kota Surabaya,
Jawa Timur, Indonesia. Data detail lokasi tidak diberikan seperti titik koordinat,
kecamatan, kelurahan, dan nomor bangunan.

Gambar 1.1 : Lokasi Bangunan

3
BAB II
METODOLO
GI
2.1. Studi Literatur
Dalam melakukan perhitungan evaluasi dan perkuatan bangunan perkantoran ini
harus dilakukan teknik penyusunan yang sistematis untuk memudahkan langkah-langkah
yang akan diambil. Begitu pula yang dilakukan penulis dalam laporan ini, langkah pertama
yaitu dengan melakukan studi literatur pada peraturan- peraturan yang berlaku. Peraturan
dan bahan ajar yang akan digunakan sebagai acuan dalam perencanaan perkuatan struktur
ini antara lain adalah sebagai berikut.
1. Badan Standarisasi Nasional: SNI 1727-2020 “Beban Minimum untuk Perancangan
Bangunan Gedung dan Struktur Lain”.
2. Badan Standarisasi Nasional: SNI 1726-2019 “Tata Cara Perencanaan Ketahanan
Gempa untuk Struktur Bangunan Gedung dan Nongedung”.
3. Badan Standarisasi Nasional: SNI 2847-2019 “Persyaratan Beton Struktural untuk
Bangunan Gedung”.
4. ACI 440.2R-17 Guide for the Design and Construction Of Externally Bonded FRP
Systems for Strethening Concrete Structures.
2.2. Pengumpulan Data
Pengumpulan data bangunan pada Proyek Tugas Besar Evaluasi dan Rehabilitasi
Struktur Bangunan Sipil adalah sebagai berikut.
- Gambar layout dan gambar eksisting struktur bangunan (Terlampir)
- Data tanah A (Terlampir)
- Data As Built Drawing (Terlampir)
- Brosur CFRP SIKA CorboDur, SIKA Wrap, dan perekat epoxy SIKADUR (Terlampir)
1. Fungsi Bangunan : Perkantoran
2. Lokasi : Surabaya
3. Data Tanah : A
4. Mutu Baja Tulangan :
- Tulangan Lentur (fy) = 390 MPa
- Tulangan Geser (fy) = 240 MPa
5. Mutu Beton (fc') = 35 MPa
6. Panjang Bangunan = 32 m (5 m; 6 m; 6 m; 5 m; 5 m; 5
m)
7. Lebar Bangunan = 9 m (3 m; 3 m; 3 m)

4
8. Tinggi Bangunan = 12 m (4 m; 4 m; 4 m)

5
Gambar 2.1 : Perspektif Struktur Bangunan

1. Tebal Plat :
- Plat Lantai 2 dan 3 (ts) = 120 mm
- Plat Atap (tr) = 100 mm
2. Dimensi Kolom :
- Kolom 1 = 500 x 500
- Kolom 2 = 400 x 400
3. Dimensi Balok dan Sloof : b/
- Balok 1 = 450 3
- Balok 2 =
- Balok 3
- Balok 4
- Sloof 1
- Slo
4.

Tabel 2.1 : Rekapitulasi Tulangan Terpasang


TULANGAN LONGITUDINAL TUL. TRANSVERSAL /
TUL.
ELEMEN TUMPUAN LAPANGAN GESER
TORSI
ATAS BAWAH ATAS BAWAH TUMP. LAP.
B1 450.800 5 D 16 3 D 16 3 D 16 5 D 16 D 13 D13 - 150 D13 - 200
B2 300.500 4 D 16 3 D 16 2 D 16 3 D 16 Ø 10 Ø10 - 150 Ø10 - 200
B3 300.450 5 D 16 3 D 16 2 D 16 4 D 16 Ø 10 Ø10 - 150 Ø10 - 200
B4 200.350 3 D 16 2 D 16 2 D 16 2 D 16 Ø 8 Ø8 - 150 Ø8 - 200
Plat Lantai Ø 10 - 150 Ø 10 - 150
Plat Atap Ø 10 - 150 Ø 10 - 150
K1 500.500 16 D 1 Ø10 - 150 Ø10 - 200
9
K2 400.400 12 D 1 Ø10 - 150 Ø10 - 200
9
S1 300.450 5 D 16 5 D 16 5 D 16 5 D 16 Ø 10 Ø10 - 150 Ø10 - 200
S2 250.400 5 D 16 5 D 16 5 D 16 5 D 16 Ø 10 Ø10 - 150 Ø10 - 200

6
5. Tebal Selimut Beton
- Pelat = 30 mm
- Balok, Kolom, dan Sloof = 40 mm
6. Beban tandon air = 1,2 ton/m2
7. Beban Outdoor AC (Chiller dan
= 1,5 ton/m2
Cooling Tower)

2.3. Analisa Kapasitas Elemen Struktur Eksisting


Berdasarkan data hasil As Built Drawing dan data bangunan lainnya maka dapat
diketahui dimensi struktur, jenis material yang digunakan, dan jumlah material tulangan
yang terpasang. Sehingga dari data-data yang diperoleh tersebut dapat dianalisa/dihitung
kapasitas penampang struktur eksisting mengacu pada peraturan SNI 2847:2019.

2.3.1. Perhitungan Kapasitas Penampang Pelat


Pelat merupakan elemen struktur yang secara langsung menerima beban yang
bekerja terutama beban mati dan beban hidup yang akan bekerja pada sebuah struktur.
Pelat dalam hal ini dibagi atas beberapa bagian yang disebut “Panel”. Panel pada pelat
adalah luasan tertentu pada bagian pelat yang dibatasi balok di sekelilingnya. Perhitungan
kapasitas penampang pelat diilustrasikan pada flowchart berikut ini.

7
Gambar 2.2 : Flowchart Perhitungan Momen Kapasitas Pelat

2.3.2. Perhitungan Kapasitas Penampang Balok


Balok merupakan elemen struktur yang menerima beban momen lentur. Sehingga
balok harus didesain untuk mampu menahan beban tersebut, berdasarkan analisa
kemampuan kapasitas penampang balok. Kapasitas penampang balok sangat dipengaruhi
oleh luasan tulangan yang terpasang, serta jarak tulangan terhadap garis netral, dimana hal
ini akan dipengaruhi oleh tinggi balok tersebut. Perhitungan kapasitas penampang balok
diilustrasikan pada flowchart berikut ini.

8
Gambar 2.3 : Flowchart Perhitungan Momen Kapasitas Balok Tunggal

9
Gambar 2.4 : Flowchart Perhitungan Geser Balok Tunggal

10
2.3.3. Perhitungan Kapasitas Penampang Kolom
Analisa perhitungan kolom, dibagi menjadi lima kondisi yaitu : kondisi dengan
beban aksial (P) konsentris, kondisi tekan menentukan, kondisi balance, kondisi tarik
menentukan, dan lentur murni. Berikut penjelasannya untuk masing – masing dari kondisi
keruntuhan pada kolom.

2.3.3.1. Kondisi dengan Beban Aksial (P) Konsentris / Aksial Murni


Kondisi ini didapat ketika eksentrisitas akibat beban aksial (P) dengan beban momen
(M) lebih kecil dari eksentrisitas minimum. Perhitungan analisa penampang kolom
konsentris ini diilustrasikan pada flowchart berikut ini.

Gambar 2.5 : Flowchart Perhitungan Kapasitas Kolom Kondisi Aksial Murni

11
2.3.3.2. Kondisi Tekan Menentukan
Setalah diketahui nilai eb (eksetrisitas balance), nilai ini harus dibandingkan
dengan konsentrisitas penampang kolom. Jika eksentrisitas lebih besar, maka kolom dalam
kondisi tekan menentukan. Analisa dari kondisi ini diilustrasikan pada flowchart berikut
ini.

12
Gambar 2.6 : Flowchart Perhitungan Kapasitas Kolom Kondisi Tekan Menentukan

2.3.3.3. Kondisi Seimbang (Balance)


Kondisi balance di analisa untuk mengetahui nilai dari eksentrisitas balance (eb)
dari suatu penampang, apabila eksentrisitas penampang lebih kecil dari eb, maka tergolong
tekan menentukan, bila eksentrisitas penampang lebih besar dari eb maka tergolong tarik
menentukan. Analisa dari kondisi ini diilustrasikan pada flowchart berikut ini.

13
Gambar 2.7 : Flowchart Perhitungan Kapasitas Kolom Kondisi Seimbang

2.3.3.4. Kondisi Tarik Menentukan


Setalah diketahui nilai eb, nilai ini harus dibandingkan dengan konsentrisitas
penampang kolom. Jika eksentrisitas lebih kecil, maka kolom dalam kondisi tarik
menentukan. Analisa dari kondisi ini diilustrasikan pada flowchart berikut ini.

14
Gambar 2.8 : Flowchart Perhitungan Kapasitas Kolom Kondisi Tarik Menentukan

2.3.4. Perhitungan Kapasitas Penampang Sloof


Sloof merupakan elemen struktur yang menerima beban aksial dan tarik. Analisa
perhitungan kapasitas pada penampang sloof sama dengan analisa pada kolom yaitu
dengan menggunakan lima kondisi. Perhitungan kapasitas penampang sloof diilustrasikan
pada flowchart berikut ini.

15
2.3.4.1. Kondisi dengan Beban Aksial (P) Konsentris / Aksial Murni
Kondisi ini didapat ketika eksentrisitas akibat beban aksial (P) dengan beban momen
(M) lebih kecil dari eksentrisitas minimum. Perhitungan analisa penampang sloof
konsentris ini diilustrasikan pada flowchart berikut ini.

Gambar 2.9 : Flowchart Perhitungan Kapasitas Sloof Kondisi Aksial Murni

16
2.3.4.2. Kondisi Tekan Menentukan
Setalah diketahui nilai eb (eksetrisitas balance), nilai ini harus dibandingkan
dengan konsentrisitas penampang sloof. Jika eksentrisitas lebih besar, maka sloof dalam
kondisi tekan menentukan. Analisa dari kondisi ini diilustrasikan pada flowchart berikut
ini.

17
Gambar 2.10 : Flowchart Perhitungan Kapasitas Sloof Kondisi Tekan Menentukan

2.3.4.3. Kondisi Seimbang (Balance)


Kondisi balance di analisa untuk mengetahui nilai dari eksentrisitas balance (eb)
dari suatu penampang, apabila eksentrisitas penampang lebih kecil dari eb, maka tergolong
tekan menentukan, bila eksentrisitas penampang lebih besar dari eb maka tergolong tarik
menentukan. Analisa dari kondisi ini diilustrasikan pada flowchart berikut ini.

18
Gambar 2.11 : Flowchart Perhitungan Kapasitas Sloof Kondisi Seimbang

2.3.4.4. Kondisi Tarik Menentukan


Setalah diketahui nilai eb, nilai ini harus dibandingkan dengan konsentrisitas
penampang sloof. Jika eksentrisitas lebih kecil, maka kolom dalam kondisi tarik
menentukan. Analisa dari kondisi ini diilustrasikan pada flowchart berikut ini.

19
Gambar 2.12 : Flowchart Perhitungan Kapasitas Sloof Kondisi Tarik Menentukan

2.4. Jenis Pembebanan Struktur


Jenis pembebanan struktur merupakan analisis beban yang bekerja pada bangunan.
Pembebanan ini dianalisis sesuai dengan peraturan yang berlaku. Beban – beban yang
bekerja pada gedung ini dapat diklasifikasikan ke dalam beberapa jenis beban berikut ini.

2.4.1. Beban Mati (DL)


Beban mati adalah berat seluruh bahan konstruksi bangunan gedung yang
terpasang, bersifat tetap termasuk berat sendiri struktur. Contoh dari beban mati adalah
berat sendiri balok, kolom, pelat lantai. Adapun beban mati tambahan sebagai contoh
beban dinding,

20
lantai, atap, plafon, tangga, dinding partisi tetap, finishing, klading gedung, dan komponen
arsitektural dan struktural lainnya serta peralatan layan terpasang lain termasuk berat derek
dan sistem pengangkut material. Berikut adalah contoh beberapa beban mati minimum
yang terdapat pda Tabel C3.1-1 SNI 1727:2020.

Gambar 2.13 : Beban Mati Desain Minimum

2.4.2. Beban Hidup (LL)


Beban hidup adalah beban yang bekerja pada struktur dan memiliki sifat dapat
berpindah – pindah (beban berjalan), atau beban yang bersifat sementara yang ditempatkan
pada suatu tempat tertentu di dalam gedung. Contoh dari beban hidup adalah beban
kelengkapan seperti meja, kursi pada kantor, dinding partisi, beban manusia yang berada di
dalam gedung dan lain sebagainya. Beban hidup yang digunakan dalam perancangan
bangunan gedung dan struktur lain harus merupakan beban maksimum yang diharapkan
terjadi akibat penghunian dan penggunaan bangunan gedung, akan tetapi tidak boleh
kurang dari beban merata minimum yang ditetapkan dalam Tabel 4.3-1 SNI 1727 : 2020.
Berikut adalah contoh Tabel 4.3-1.

21
Gambar 2.14 : Beban Hidup Terdistribusi Merata dan Beban Hidup Terpusat Minimum

2.4.3. Beban Gempa (E)


Beban gempa adalah beban yang bekerja pada struktur akibat dari pergerakan
tanah yang disebabkan karena adanya gempa bumi (baik itu gempa tektonik atau vulkanik)
yang mempengaruhi struktur tersebut. Gempa mengakibatkan beban pada struktur karena
interaksi tanah dengan struktur dan karakteristik respons struktur. Beban gempa juga
merupakan beban yang terpengaruh dengan fungsi dari waktu, sehingga respons yang
terjadi pada suatu struktur juga tergantung dari riwayat waktu pembebanan tersebut.
Percepatan tanah akibat beban gempa pun juga tergantung dari riwayat waktu pembebanan
tersebut dan berupa suatu rekaman percepatan sehingga untuk setiap waktu tertentu akan
mempunyai harga percepatan tanah tertentu.

2.4.3.1. Kelas Situs


Pada perencanaan konstruksi bangunan, pengujian dan penelitian tanah pada lokasi
yang sedang direncanakan sangat diperlukan sebagai data desain untuk mengetahui
karakteristik tanah serta penentuan-penentuan parameter yang diperlukan untuk desain.

22
Salah satu contohnya adalah mengklasifikasikan kelas situs tanah. Berdasarkan SNI 1726-
2019 Pasal 5.1, dibutuhkan data tanah minimal 30 m paling atas melalui pemyelidikan
tanah di lapangan dan di laboratorium.

Tabel 2.2 : Klasifikasi Situs

2.4.3.2. Kategori Risiko Gempa


Bangunan yang didesain perlu diklasifikasikan termasuk dalam kategori resiko mana
agar dapat mengetahui nilai Ie atau important factor sebagai parameter desain respon
spektrum
bangunan.

Tabel 2.3 : Kategori risiko bangunan gedung dan non gedung untuk beban gempa

23
2.4.3.3. Faktor Keutamaan Gempa (Ie)
Faktor keutamaan gempa merupakan faktor parameter desain respon gempa yang
bergantung pada tipe kategori resiko bangunan yang didesain. Nilai Ie ditapkan
berdasarkan SNI 1726-2019 Tabel 4.

Tabel 2.4 : Faktor Keutamaan Gempa

2.4.3.4. Parameter Percepatan Gempa


Parameter Ss (Percepatan batuan dasar pada periode pendek) dan S1 (percepatan
batuan dasar pada periode 1 detik) ditetapkan merujuk pada gambar 15 dan gambar 16
pada SNI 1726:2019 masing-masing nilai. Dalam analisia beban gempa struktur bangunan
ini diperoleh nilai SS dan S1 sebagai berikut.

Gambar 3.1 : Parameter Gerak Tanah Ss, Gempa Maksimum yang di Pertimbangkan Risiko Tertarget Wilayah Indonesia
untuk Spektrum Respons 0.2 Detik Menurut SNI 1726 - 2019

24
Gambar 3.2 : Parameter Gerak Tanah S1, Gempa Maksimum yang di Pertimbangkan Risiko Tertarget Wilayah Indonesia
untuk Spektrum Respons 0.2 Detik Menurut SNI 1726 – 2019

2.4.3.5. Koefisien Situs


Nilai Fa dan Fv dapat diperoleh berdasarkan SNI 1726-2019 Tabel 6 dan Tabel 7
berikut ini.

Tabel 3.1 : Koefisien Situs, Fa Menurut SNI 1726 - 2019

Tabel 3.2 : Koefisien Situs, Fv Menurut SNI 1726 - 2019

2.4.3.6. Parameter Respon Spektral Percepatan Gempa SMS dan SM1


Berdasakan SNI 1726-2019 Pasal 6.2. dapat ditentukan nilai parameter respons
spektral percepatan pada periode pendek (S MS) dan periode 1 detik (SM1) menggunakan
Persamaan 7 dan Persamaan 8, nilai SMS dan SM1 dapat diperoleh sebagai berikut.

SMS = Fa × SS SM1 = Fv × S1

25
2.4.3.7. Parameter Percepatan Spektral Desain SDS dan SD1
Berdasakan SNI 1726-2019 Pasal 6.3. Persamaan 9 dan Persamaan 10, dapat
ditentukan nilai parameter percepatan spektral desain untuk periode pendek (Sds) dan
periode 1 detik (Sd1) yaitu sebagai berikut.

SDS =(2 × )𝑆 SD1 =(2 × 𝑆)


3 𝑀𝑆 3 𝑀1

2.4.3.8. Nilai Periode Panjang (TL)


Berdasakan SNI 1726-2019 Gambar 20, nilai periode panjang TL untuk wilayah
Surabaya adalah sebagai berikut.

Gambar 3.3 : Peta transisi periode panjang, TL, wilayah Indonesia

2.4.4. Beban Angin (W)


Beban angin adalah beban yang bekerja pada suatu struktur, akibat pengaruh
struktur yang menghalangi aliran angin, sehingga energi kinetik angin akan dikonversi
menjadi tekanan energi potensial, yang menyebabkan terjadinya beban angin. Efek beban
angin pada suatu struktur bergantung pada berat jenis dan kecepatan udara, sudut luas
angin, bentuk dan kekakuan struktur, kemiringan atap, dan faktor-faktor yang lain.

2.4.5. Beban Hujan (R)


Beban hujan adalah beban yang bekerja pada suatu struktur, akibat pengaruh air
hujan. Pengaruh dari beban hujan ini tergantung pada kelandaian konstruksi atap dan
bahan penutup atap yang digunakan. Setiap bangunan dari atap harus dirancang untuk
mampu menahan beban dari air hujan. Berdasarkan SNI 1727-2020 Pasal 8.3 beban hujan
desain dihitung dengan rumus berikut.
R=0,0098 × (ds + dh)

26
2.5. Pemodelan Struktur dan Analisa Gaya Dalam
Permodelan struktur dilakukan dengan tujuan untuk mengetahui gaya – gaya dalam
yang terjadi pada struktur. Permodelan struktur pada tugas besar ini dibuat dengan
program bantu SAP2000 v.22. permodelan struktur yang telah dibuat nantinya akan
dibebani oleh beban – beban yang telah dibahas pada sub bab sebelumnya yaitu sub bab
2.4. struktur bangunan yang telah dibebani kemudian di masukkan kombinasi pembebanan
sesuai dengan peraturan.

Gambar 2.15 : Permodelan Struktur pada SAP2000 v.14.2.2

2.6. Analisa Struktur Kapasitas Penampang dengan Gaya Dalam


Dari hasil analisa gaya dalam yang terdapat pada program bantu SAP 2000, maka
akan dievaluasi dengan peraturan standar nasional yang meliputi evaluasi balok dan pelat
lantai. Sehingga dari tahap ini diharapkan dapat mengetahui elemen struktur mana yang

27
sudah tidak mampu memikul beban yang ada maupun memikul beban akibat alih fungsi
bangunan.
Komponen struktur dinyatakan tidak mampu memikul beban akibat alih fungsi
bangunan apabila nilai kuat nominal terhadap lentur (Mn) dan geser (Vn) akibat beban
alih fungsi bangunan lebih besar dibandingkan dengan nilai kuat nominal terhadap lentur
(Mn) dan geser (Vn) kapasitas eksisting bangunan. Dengan keterangan “(OKE)” yang
artinya elemen struktur masih kuat dan “(NOT OKE)” berarti elemen struktur tersebut
tidak kuat dan membutuhkan perkuatan.

2.7. Perencanaan Desain Perkuatan


Alih fungsi bangunan akan berdampak pada kinerja struktur yang tidak akan
memenuhi desain yang baik dari segi keamanan bangunan. Perubahan fungsi bangunan ini
secara langsung akan menambah beban pada elemen struktur bangunan. Sehingga terdapat
kemungkinan bangunan akan mengalami kegagaglan apabila beban yang ditambahkan
melampaui kapasitas yang mampu dipikul oleh elemen struktur. Oleh karena itu
diperlukan perkuatan struktur pada bangunan yang akan dialih fungsikan.
Dari hasil analisa yang sudah ada sebelumnya diketahui elemen struktur mana saja
yang masih memenuhi persyaratan dan mana saja yang harus dilakukan perkuatan
struktur. Sehingga elemen struktur yang tidak memenuhi akan dilakukan perencanaan
perkuatan baik dengan CFRP (Carbon Fiber Reinforced Polymer) maupun dengan baja
komposit.

2.8. Gambar Desain Perkuatan


Setelah perhitungan perkuatan menggunakan CFRP (Carbon Fiber Reinforced
Polymer) maupun dengan baja komposit selesai dilakukan, selanjutnya penggambaran
teknik desain perkuatan sesuai perencanaan perhitungan. Perkuatan menggunakan FRP
Laminates dan FRP wrap. Untuk momen lentur tumpuan maupun lapangan perkuatan
yang dipakai adalah FRP Laminates sedangkan untuk gaya geser perkuatam memakai FRP
Wrap. Hasil dari perhitungan perkuatan struktur di atas dituangkan dalam gambar
teknik (shop drawing). Hasil akhir dari keseluruhan prosesi tugas besar ini nantinya berupa
gambar detail perkuatanstruktur dan gambar detail penulangan
untuk struktur. Untuk mempermudah dalam penggambaran pada tugas
besar ini, digunakan software AutoCAD.
Berikut adalah contoh perkuatan struktur di lapangan.

28
Gambar 2.16 : Perkuatan lentur dengan C-FRP Laminate

Gambar 2.17 : Perkuatan geser dengan C-FRP Wrap

Gambar 2.18 : Perkuatan dengan balok WF komposit

2.9. Perhitungan Rencana Anggaran Biaya


Berdasarkan desain perkuatan yang telah dilakukan, dapat diketahui volume
perkuatan yang dibutuhkan. Sehingga langkah selanjutnya adalah perhitungan besaran
anggaran biaya perkuatan yang harus dikeluarkan. RAB (Rencana Anggaran Biaya) adalah
perhitungan banyaknya biaya yang dibutuhkan baik upah maupun bahan dalam sebuah
perkerjaan perkuatan elemen struktur. Dengan adanya evaluasi dan penambahan perkuatan
maka biaya akan diperhitungkan sesuai harga satuan yang ada.
Perhitungan rencana biaya mengikuti acuan HSPK dan AHSP sebagai acuan harga
terbesar dengan cara mengambil koefisien yang sudah ditetapkan oleh HSPK namun untuk
biaya pekerja, biaya alat, dan biaya bahan dilakukan surveying harga melalui internet.

29
2.10. Alur Perencanaan Kekuatan
Metodologi dalam penyelesaian tugas besar ini akan menguraikan dan menjelaskan
alur perencanaan perkuatan. Diagram alir proyek ini disajikan dalam gambar flowchart
dibawah ini. Selanjutnya untuk penjelasan mengenai langkah-langkah dalam flowchart,
dijelaskan dalam bab IV sampai dengan bab VII.

30
Gambar 2.19 : Flowchart Perencanaan Perkuatan

..

31
BAB III
PEMBEBAN
AN
3.1. Beban Mati (DL)
Beban mati terdiri dari berat sendiri seluruh elemen struktur dan perlengkapan
permanen pada gedung. Adapun beban mati yang terjadi akan diterapkan pada perhitungan
dan program bantu SAP2000 v.14. Beban mati terbagi menjadi dua macam yaitu sebagai
berikut.

3.1.1. Beban Sendiri Struktur (Self Weight Dead)


Berat sendiri adalah berat struktur utama yang terbuat dari beton bertulang dan baja
dengan berat jenis sebagai berikut.
Berat beton bertulang = 2400 kg/m³
Baja = 7850 kg/m³

Gambar 3.4 : Berat Jenis Material

3.1.2. Beban Mati Tambahan (Super Dead)


Beban mati tambahan (super dead load) adalah berat komponen non struktural pada
bangunan gedung. Adapun beban mati tambahan berdasarkan SNI 1727-2020 Tabel C3.1-
1 yang digunakan dalam desain adalah sebagai berikut.
• Ceramic on 13 mm mortar bed (Keramik) = 0,77 kN/m2
• Mechanical duct allowance (MEP) = 0,19 kN/m2
• Acoustical fiberboard (Plafond) = 0,05 kN/m2
• Suspended steel channel system (Penggantung Plafond) = 0,1 kN/m2
• Concrete fill finish = 0,023 kN/m2
• Waterproof : Liquid applied (Pelapis) = 0,05 kN/m2
• Dinding Bata Ringan (Brosur Citicon) = 6 kN/m3

32
Gambar 3.5 : Brosur Cition Berat Bata Ringan

Berdasarkan soal diketahui bahwa beban mati tambahan adalah sebagai berikut.
• Tandon Air = 12 kN/m2
• Outdoor AC (Chiller dan Cooling Tower ) = 15 kN/m2

Perhitungan Beban Dinding:


• Digunakan tebal bata ringan t = 125 mm
= 0,125 m
• Plesteran = 0,24 kN/m3
Digunakan tebal plesteran t = 2 cm = Bj Plesteran x t
= 0,24 × 0,02
= 0,0048 kN/m2

Sehingga, beban dinding bata ringan yang diinputkan pada program bantu SAP 2000
adalah sebagai berikut.
• Dinding Bata Ringan pada Balok 1
bj bata x t x ln = 6 × 0,125 × 3,2
= 2,4 kN/m
Total beban dinding = 2,4 + 0,0048
= 2,4048 kN/m

• Dinding Bata Ringan pada Balok 2


bj bata x t x ln = 6 × 0,125 × 3,5
= 2,6250 kN/m
= 2,6250 + 0,0048
= 2,6298 kN/m

• Dinding Bata Ringan pada Balok 3


bj bata x t x ln = 6 × 0,125 × 3,55
= 2,6625 kN/m
= 2,6625 + 0,0048
= 2,6673 kN/m

• Dinding Bata Ringan pada Balok 4


bj bata x t x ln = 6 × 0,125 × 3,65
= 2,7375 kN/m
= 2,7375 + 0,0048
= 2,7423 kN/m

33
Berikut adalah rincian beban mati tambahan yang diiput di program SAP2000.

1. Beban Pelat Lantai Ruang Kantor (Eksisting)


Jenis Beban Berat (kN/m²)
Ceramic on 13 mm mortar bed 0,77
Mechanical duct allowance 0,19
Acoustical fiberboard (Plafond) 0,05
Penggantung Plafond 0,1
Total 1,110

2. Beban Pelat Atap (Ekstisting)


Jenis Beban Berat (kN/m²)
Concrete fill finish (Plester) 0,023
Mechanical duct allowance 0,19
Acoustical fiberboard (Plafond) 0,05
Penggantung Plafond 0,1
Waterproof (Pelapis) 0,05
Total 0,4130

3. Beban Pelat Lantai Ruang Arsip dan Komputer (Alih Fungsi)


Jenis Beban Berat (kN/m²)
Ceramic on 13 mm mortar bed 0,77
Mechanical duct allowance 0,19
Acoustical fiberboard (Plafond) 0,05
Penggantung Plafond 0,1
Total 1,110

4. Beban Pelat Lantai 3 + Outdoor AC (Chiller dan Cooling Tower)


Jenis Beban Berat (kN/m²)
Concrete fill finish 0,023
Mechanical duct allowance 0,19
Acoustical fiberboard (Plafond) 0,05
Penggantung Plafond 0,1
Waterproof (Pelapis) 0,05
Outdoor AC (Chiller dan Cooling
15
Tower)
Total 15,4130

34
5. Beban Pelat Atap + Tandon Air
Jenis Beban Berat (kN/m²)
Concrete fill finish 0,023
Mechanical duct allowance 0,19
Acoustical fiberboard (Plafond) 0,05
Penggantung Plafond 0,1
Waterproof (Pelapis) 0,05
Tandon Air 12
Total 12,4130
3.2. Beban Hidup (LL)
Beban hidup (live load) adalah beban yang diakibatkan oleh pengguna dan penghuni
bangunan gedung yang berasal dari struktur lain atau orang atau benda yang bergerak.
Berdasarkan SNI 1727-2020 Tabel 4.3.1, beban hidup untuk desain bangunan gedung ini
yaitu.

3.2.1. Beban Hidup Atap


Berdasarkan SNI 1727:2020 Tabel 4.3-1 diketahui bahwa beban hidup atap datar
adalah sebagai berikut.

• Atap = 0,96 kN/m


2

3.2.2. Beban Hidup Lantai


Berdasarkan SNI 1727:2020 Tabel 4.3-1 diketahui bahwa beban lantai berdasarkan
fungsi bangunan atau ruangannya adalah sebagai berikut.

• Lobi dan Koridor lt 1 = 4,79 k


• Lobi dan Koridor diatas lt 1 =
• Kantor
• Ruang Arsip d
• K

3.3. Beban Air Hujan (R)


Setiap bangunan dari atap harus dirancang untuk mampu menahan beban dari air
hujan. Berdasarkan SNI 1727-2020 Pasal 8.3 beban hujan desain dihitung dengan rumus
berikut.
R=0,0098 × (ds + dh)

35
dimana
:R =
Beban air hujan pada atap yang tidak melendut.Apabila istilah "atap yang tidak
melendut" digunakan, lendutan dari beban (termasuk beban mati) tidak perlu
diperhitungkan ketika menentukan jumlah air hujan pada atap. (kN/m2)
ds = Tinggi statis, kedalaman air pada atap yang tidak melendut meningkat ke sistem
sekunder apabila sistem drainase primer tertutup. (mm)
dh = Kepala hidraulik, tambahan kedalaman air pada atap yang tidak melendut di
atas lubang masuk sistem drainase sekunder pada aliran desainnya. (mm)
direncanakan
ds = 10 mm
dh = 20 mm

R = 0,0098
=

3.4. Beban Angin (W)


Beban angin struktur bangunan ditentukan sebagai berikut:
- Beban angin harus diambil dengan prosedur yang sesuai dengan SNI 1727 - 2020 Pasal
26.1.2.1, berdasarkan pasal tersebut ditetapkan prosedur pengarah untuk pemilihan
perhitungan beban angin pada tugas ini. Prosedur pengarahan ini diperuntukkan untuk
semua ketinggian bangunan.
- Prosedur terarah untuk bangunan gedung seluruh ketinggian disyaratkan dalam pasal
27. Berikut ini langkah-langkah untuk menentukan beban angin pada Sistem
Penahan
Gaya Angin Utama (SPGAU) bangunan gedung seluruh ketinggian.

a. Kategori resiko bangunan = II (SNI 1727-2020 Tabel 1.5-1)


b. Kecepatan angin dasar (HB 212-2002)

V = 40,9 m/s
c. Parameter beban angin
- Faktor angin Kd = 0,85 (SNI 1727-2020 Tabel 26.6.1)
- Kz = 0,76 (SNI 1727-2020 Tabel 26.7.3)
- Kategori eksposur = B (SNI 1727-2020 Tabel 26.7.3)
- Faktor topografi Kzt = 1 (SNI 1727-2020 Pasal 26.8.2)
- Faktor Ke Ke = 1 (SNI 1727-2020 Pasal 26.10.1)
- Koefisien eksposur tekanan kecepatan, Kz
Eksposur = B
α = 7 (SNI 1727-2020 Tabel 26.11.1)
Zg = 365,76 (SNI 1727-2020 Tabel 26.11.1)
- Faktor arah angin (G) untuk bangunan gedung = 0,85 (SNI 1727-2020 Pasal 26.11.1)

36
37
f. Rekapitulasi Beban
Tabel 3.3 : Rekapitulasi Beban Angin

Tek. Velositas
hVKzKd Kzt GcpicpfgcpigcpfQ L
Arah angin
m m/s kN/m² kN/m
4 40,9 0,57 0,85 1,0 0,50 0,85 0,18 0,8 0,153 0
4 40,9 0,57 0,85 1,0 0,50 0,85 0,18 0,
4 40,9 0,57 0,85 1,0 0,50 0,8
4 40,9 0,57 0,85 1,0 0,
Depan
8 40,9 0,67 0,85
8 40,9

3.5. Beban Gempa (E)


Peninjauan beban pada perencanaan struktur bangunan ini ditinjau secara analisa
dinamis tiga dimensi. Pembebanan gempa pada perencanaan bangunan ini menggunakan
analisis respons spektrum (Response Spectrum Analysis). Fungsi respons spektrum
ditetapkan sesuai peta wilayah gempa berdasarkan dengan lokasi bangunan yaitu di daerah
Surabaya. Perhitungan beban gempa ditentukan berdasarkan peraturan SNI 1726-2019
“Tata Cara Perencanaan Ketahanan Gempa Untuk Struktur Bangunan Gedung dan Non-
Gedung”. Berikut ini adalah parameter-parameter yang digunakan untuk pembebanan
gempa pada bangunan perkantoran yang terletak di Surabaya.

38
3.5.1. Kategori Risiko Bangunan
Kategori risiko struktur bangunan gedung sesuai Tabel 3 di peraturan SNI 1726 -
2019 "Tata cara perencanaan ketahanan gempa untuk struktur bangunan gedung dan
nongedung", untuk bangunan perkantoran berada pada :
Kategori=II
Tabel 3.4 : Kategori Risiko Bangunan Gedung dan Nongedung untuk Beban Gempa

3.5.2. Faktor Keutamaan Gempa


Faktor keutamaan gempa untuk struktur bangunan dengan kategori II adalah 1
sesuai Tabel 4 SNI 1726 -2019.
Ie= 1
Tabel 3.5 : Faktor Keutamaan Gempa

3.5.3. Kelas Situs


Penentuan klasifikasi tanah salah satunya adalah Nspt rata rata. Berdasarkan SNI
1726-2019 Pasal 5.1, dibutuhkan data tanah minimal 30 m paling atas melalui
pemyelidikan tanah di lapangan dan di laboratorium. Berdasarkan hasil tes SPT (Standard
Peneteration Test) pada data tanah yang telah diberikan, diperoleh data berikut ini.

39
Grafik 3.1 : Grafik Data N-SPT

Tabel 3.6 : Rata-rata Nilai N-SPT


Ketebalan
Depth Nilai
(m) Deskripsi Tanah Ni di/Ni
N-SPT
m di
2,5 Lanau Berlempung Berpasir 1
5 2 2,50
5 Abu-Abu (Very Soft) 3
8 1
10,5 9
13 12
15,5 16
18 Lempung Berlanau Abu-Abu 15
20,5 25 16 14,7 1,70
(Very Soft s/d Very Stiff)
23 18
25,5 16
28 18
30 26
Jumlah 30 4,20

40
Σdi
N = Σdi/Ni
30
= 4,20
= 7,14
Tabel 3.7 : Klasifikasi Situs

Termasuk dalam kategori SE (tanah lunak) dikarenakan N < 15


(SNI 1726-2019 Tabel 5)

3.5.4. Parameter Percepatan Gempa


Parameter Ss (Percepatan batuan dasar pada periode pendek) dan S1 (percepatan
batuan dasar pada periode 1 detik) ditetapkan merujuk pada gambar 15 dan gambar 16
pada SNI 1726:2019 masing-masing nilai. Dalam analisia beban gempa struktur bangunan
ini diperoleh nilai SS dan S1 sebagai berikut.

SS=0,7g

Gambar 3.6 : Parameter Gerak Tanah Ss, Gempa Maksimum yang di Pertimbangkan Risiko Tertarget Wilayah Indonesia
untuk Spektrum Respons 0.2 Detik Menurut SNI 1726 - 2019

S1=0,3g

Gambar 3.7 : Parameter Gerak Tanah S1, Gempa Maksimum yang di Pertimbangkan Risiko Tertarget Wilayah Indonesia
untuk Spektrum Respons 0.2 Detik Menurut SNI 1726 - 2019

41
3.5.5. Koefisien Situs
Nilai Fa dan Fv dapat diperoleh berdasarkan SNI 1726-2019 Tabel 6 dan Tabel 7
berikut ini.
Tabel 3.8 : Koefisien Situs, Fa Menurut SNI 1726 - 2019

Fa=1,37

Tabel 3.9 : Koefisien Situs, Fv Menurut SNI 1726 - 2019

Fv=2,8

3.5.6. Parameter Respon Spektral Percepatan Gempa SMS dan SM1


Berdasakan SNI 1726-2019 Pasal 6.2. dapat ditentukan nilai parameter respons
spektral percepatan pada periode pendek (S MS) dan periode 1 detik (SM1) menggunakan
Persamaan 7 dan Persamaan 8, nilai SMS dan SM1 dapat diperoleh sebagai berikut.

SMS == Fa × SS SM1 = F
0,967

3.5.7. Parameter Percepatan Spektral Desain SDS dan SD1


Berdasakan SNI 1726-2019 Pasal 6.3. Persamaan 9 dan Persamaan 10, dapat
ditentukan nilai parameter percepatan spektral desain untuk periode pendek (Sds) dan
periode 1 detik (Sd1) yaitu sebagai berikut.
2 2
( )×𝑆 ( )× 𝑆
SDS = 𝑀𝑆 SD1 = 𝑀1
3 3
= 0,645 = 0,565

42
3.5.8. Nilai Periode Panjang (TL)
Berdasakan SNI 1726-2019 Gambar 20, nilai periode panjang TL untuk wilayah
Surabaya adalah sebagai berikut.

TL=20detik

Gambar 3.8 : Peta transisi periode panjang, TL, wilayah Indonesia

3.5.9. Kategori Desain Seismik


Penenetuan Kategori Desain Seismik berdasarkan parameter respon percepatan
pada tabel 8 dan 9 di SNI 1726 – 2019. Berdasarkan tabel di atas Kategori Risiko adalah.
KDS=D

Tabel 3.10 : Kategori desain seismik berdasarkan parameter respons percepatan pada Periode Pendek

Tabel 3.11 : Kategori desain seismik berdasarkan parameter respons percepatan pada Periode 1 detik

3.5.10. Parameter Struktur


Sistem pemikul gaya seismik digunakan menahan gaya seismik di masing-masing
arah kedua sumbu. Masing-masin nilai R, C d dan Ω0 harus diterapkan pada setiap sistem
yang termuat pada Tabel 12 SNI 1726 :2019. Berdasarkkan tabel tersebut yang digunakan
adalah Sistem Rangka Pemikul Momen Khusus (SRMPK).
R = 8

Cd = 5½

Ω0 = 3

43
Tabel 3.12 : Parameter Struktur untuk Sistem Pemikul Gaya Seismik Menurut SNI 1726:2019

3.5.11. Perhitungan Faktor Skala


Faktor skala dapat dihitung menggunakan rumus berikut.

I x g
Faktor Skala
R
=

Keterangan:
g = percepatan gravitasi (m/s²) = 9,8 m/s²
I = Faktor keutamaan bangunan = 1
R = Faktor koefisien modifikasi = 8

I x g
Faktor Skala =
R
1 x 9,8
=
8
= 1,225

3.5.12. Analisa Respon Spektrum


Perhitungan spektrum respon desain diperlukan untuk dimasukkan ke dalam
permodelan sebagai beban gempa. Perhitungan menggunakan data pada sebelumnya,
perhitungan tanah.

44
𝑆𝐷1
T0 = 0,2 × ( )
𝑆𝐷𝑆
T=0 detik = 0,175 detik
𝑆𝐷1
TS= 𝐷𝑆
= 𝑆
0,876
detik

• T < T0 , nilai Sa diambil dari persamaan (11)


𝑇 S× (0,4 + 0,6)
Sa = 𝐷𝑆
= 𝑇0
0,2579

• Ts < T ≤ TL , nilai Sa diambil dari persamaan (12)


𝑆𝐷1
Sa
=
𝑇
• T > TL , nilai Sa diambil dari persamaan (13)
𝑆𝐷1 × 𝑇𝐿
Sa
=
𝑇2

45
3.5.13. Tabel Respon Spektrum
Tabel 3.13 : Nilai Percepatan Gempa

T ke- T Sa T T Sa
(s) (s) (g) ke- (s) (g)
0 0 0,2579 (s)
T0 0,175 0,6448 Ts + 12,5 13,376 0,0422
Ts 0,876 0,6448 Ts + 13 13,876 0,0407
Ts + 0,5 1,376 0,4105 Ts + 13,5 14,376 0,0393
Ts + 1 1,876 0,3011 Ts + 14 14,876 0,0380
Ts + 1,5 2,376 0,2377 Ts + 14,5 15,376 0,0367
Ts + 2 2,876 0,1964 Ts + 15 15,876 0,0356
Ts + 2,5 3,376 0,1673 Ts + 15,5 16,376 0,0345
Ts + 3 3,876 0,1457 Ts + 16 16,876 0,0335
Ts + 3,5 4,376 0,1291 Ts + 16,5 17,376 0,0325
Ts + 4 4,876 0,1158 Ts + 17 17,876 0,0316
Ts + 4,5 5,376 0,1051 Ts + 17,5 18,376 0,0307
Ts + 5 5,876 0,0961 Ts + 18 18,876 0,0299
Ts + 5,5 6,376 0,0886 Ts + 18,5 19,376 0,0291
Ts + 6 6,876 0,0821 Ts + 19 19,876 0,0284
Ts + 6,5 7,376 0,0766 Ts + 19,5 20,376 0,0277
Ts + 7 7,876 0,0717 Ts + 20 20,876 0,0271
Ts + 7,5 8,376 0,0674 Ts + 20,5 21,376 0,0264
Ts + 8 8,876 0,0636 Ts + 21 21,876 0,0258
Ts + 8,5 9,376 0,0602 Ts + 21,5 22,376 0,0252
Ts + 9 9,876 0,0572 Ts + 22 22,876 0,0247
Ts + 9,5 10,376 0,0544 Ts + 22,5 23,376 0,0242
Ts + 10 10,876 0,0519 Ts + 23 23,876 0,0237
Ts + 10,5 11,376 0,0496 Ts + 23,5 24,376 0,0232
Ts + 11 11,876 0,0476 Ts + 24 24,876 0,0227
Ts + 11,5 12,376 0,0456 Ts + 24,5 25,376 0,0223
Ts + 12 12,876 0,0439 Ts + 25 25,876 0,0218

Sehingga dari rekapitulasi tersebut, dapat digambarkan grafik respon spektrum berikut.

46
Grafik Respon Spektrum Surabaya
0,7
0,6
Percepatan Respon Spektra,

0,5
0,4
0,3
Sa (g)

0,2
0,1
0,0

0 1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728
Periode, T (detik) Grafik T terhadap Sa TL

Grafik 3.2 : Respon Spektrum Surabaya

Grafik 3.3 : Respon Spektrum Surabaya SAP 2000

47
3.6. Kombinasi Pembebanan
Kombinasi beban untuk metode ultimit struktur, komponen struktur dan elemen
pondasi harus dirancang sedemikian rupa hingga rencananya sama atau melebihi pengaruh
beban terfaktor. Berdasarakan SNI 1726 - 2019 Pasal 4.2.2.1, kombinasi pembebanan
terfaktor yaitu sebagai berikut.

1 1D + 1L
Keterangan: 15 1,2 D + 1 L - 1 EQX + 0,3 EQY
D 2 : 1,4Dead
D Load 16 1,2 D + 1 L - 1 EQX - 0,3 EQY
L 3 : 1,2Live
D +Load
1,6 L 17 1,2 D + 1 L + 0,3 EQX + 1 EQY
Lr 4 : 1,2Roof
D +Live
1,6 L + 0,5 Lr 18 1,2 D + 1 L + 0,3 EQX - 1 EQY
W 5 : 1,2Wind
D + Load
1,6 L + 0,5 R 19 1,2 D + 1 L - 0,3 EQX + 1 EQY
R 6 : 1,2Rain Load
D + 1,6 Lr + 0,5 L 20 1,2 D + 1 L - 0,3 EQX - 1 EQY
EXQ7 : 1,2Earthquake X + 0,5 R
D + 1,6 Lr 21 0,9 D + 1 L + 1 EQX + 0,3 EQY
EQY8 : 1,2Earthquake
D + 1,6 RY + 0,5 Lr 22 0,9 D + 1 L + 1 EQX - 0,3 EQY
9 1,2 D + 1,6 R + 0,5 W 23 0,9 D + 1 L - 1 EQX + 0,3 EQY
10 1,2 D + 1 W + L + 0,5 Lr 24 0,9 D + 1 L - 1 EQX - 0,3 EQY
11 1,2 D + 1 W + L + 0,5 R 25 0,9 D + 1 L + 0,3 EQX + 1 EQY
12 0,9 D + 1 W 26 0,9 D + 1 L + 0,3 EQX - 1 EQY
13 1,2 D + 1 L + 1 EQX + 0,3 EQY 27 0,9 D + 1 L 0,3 EQX + 1 EQY
14 1,2 D + 1 L + 1 EQX - 0,3 EQY 28 0,9 D + 1 L - 0,3 EQX - 1 EQY

48
BAB IV
DATA
BANGUNAN
4.1. Data Umum
Bangunan
Laporan ini menganalisa permasalahan bangunan konstruksi eksisting yang akan
dilakukan alih fungsi dan penambahan beban sehingga proses evaluasi dan rehabilitasi
bangunan diperlukan. Bangunan eksisting yang dimaksud adalah gedung perkantoran yang
sudah terbangun dan akan dialihfungsikan menjadi gedung arsip dan pusat komputer serta
adanya penambahan beban berupa beban tandon air dan beban chilling tower.

4.1.1. Data Geometri Bangunan


1. Fungsi Bangunan : Perkantoran
2. Lokasi : Surabaya
3. Data Tanah : A
4. Panjang Bangunan : 32 m (5 m; 6 m; 6 m; 5 m; 5 m; 5
m)
5. Lebar Bangunan : 9 m (3 m; 3 m; 3 m)
6. Tinggi Bangunan : 12 m (4 m; 4 m; 4 m)
4.1.2. Data Elemen Struktur

49
4.1.3. Konfigurasi Tulangan
Tulangan atau reinforcement yang merupakan bagian dari penyusun komponen
struktur bangunan berperan penting dalam memikul gaya yang diakibatkan oleh beban.
Susunan tulangan yang digunakan pada setiap elemen struktur disajikan dalam tabel di
bawah ini dengan keterangan notasi dalam tabel sebagai berkut :
Keterangan:
• D = Tulangan tipe deform atau tulangan ulir
• ᴓ = Tulangan tipe polos
Tabel 4.1 : Data Rekap penulangan Eksisting Terpasang
TULANGAN LONGITUDINAL TUL. TRANSVERSAL /
TUL.
ELEMEN TUMPUAN LAPANGAN GESER
ATAS BAWAH ATAS BAWAH TORSI TUMP. LAP.
B1 450.800 5 D 16 3 D 16 3 D 16 5 D 16 D 13 D 13 - 150 D 13 - 200
B2 300.500 4 D 16 3 D 16 2 D 16 3 D 16 Ø 10 Ø 10 - 150 Ø 10 - 200
B3 300.450 5 D 16 3 D 16 2 D 16 4 D 16 Ø 10 Ø 10 - 150 Ø 10 - 200
B4 200.350 3 D 16 2 D 16 2 D 16 2 D 16 Ø 8 Ø 8 - 150 Ø 8 - 200
Plat Lantai Ø 10 - 150 Ø 10 - 150
Plat Atap Ø 10 - 150 Ø 10 - 150
K1 500.500 16 D 19 Ø 10 - 150 Ø 10 - 200
K2 400.400 12 D 19 Ø 10 - 150 Ø 10 - 200
S1 300.450 5 D 16 5 D 16 5 D 16 5 D 16 Ø 10 Ø 10 - 150 Ø 10 - 200
S2 250.400 5 D 16 5 D 16 5 D 16 5 D 16 Ø 10 Ø 10 - 150 Ø 10 - 200

4.2. Denah Eksisting Bangunan


Denah eksisting bangunan sangat diperlukan untuk mengetahui letak denah
pembalokan agar sesuai dengan kondisi eksisting. Berikut adalah denah pembalokan,
kolom, dan pelat untuk setiap lantai.

Gambar 4.1 : Denah Sloof

50
Gambar 4.2 : Denah Pembalokan Lt 2

Gambar 4.3 : Denah Pembalokan Lt 3

Gambar 4.4 : Denah Pembalokan Atap

51
Gambar 4.5 : Denah Kolom Lt 1

Gambar 4.6 : Denah Kolom Lt 2

Gambar 4.7 : Denah Kolom Lt 3

52
Gambar 4.8 : Denah Pelat Lt 2

Gambar 4.9 : Denah Pelat Lt 3

Gambar 4.10 : Denah Pelat Atap

53
4.3. Denah Alih Fungsi Bangunan
Alih fungsi yang dimaksudkan adalah perubahan fungsi ruang dari ruang
perkantoran menjadi ruang arsip pada lantai ke-2. Alih fungsi ini tidak akan menambah
jumlah lantai. Maupun bangunan yang lainnya. Sehingga alih fungsi ini menyebabkan
perubahan beban hidup dari 240 kg/m2 menjadi 479 kg/m2. Selain itu, terdapat juga
penambahan beban outdoor AC (Chiller and Cooling Tower) pada lantai 3. Serta
penambahan tandon air pada lantai atap. Berikut adalah denah alih fungsinya.

Gambar 4.11 : Denah Alih Fungsi Lt 2

Gambar 4.12 : Denah Alih Fungsi Lt 3

54
Gambar 4.13 : Denah Alih Fungsi Lt Atap

Gambar 4.14 : Denah Ruangan Lt 1

Gambar 4.15 : Denah Ruangan Alih Fungsi Lt 2

55
Gambar 4.16 : Denah Ruangan Lt. 3

4.4. Data Uji Tanah Eksisting


Data tanah yang digunakan merupakan hasil pengujian Uji Boring pada lokasi
bangunan eksisting yang berdiri. Dalam tugas ini gedung berada di lokasi Surabaya dan
diberikan data hasil uji boring yang mempunyai data parameter yang diperlukan seperti
data N-SPT yang digunakan sebagai penentu Kelas Situs Tanah.

Gambar 4.17 : Data Uji Tanah

56
BAB V
ANALISA
STRUKTUR
5.1. Analisa Kapasitas Penampang
Dari data As Build Drawing diketahui dimensi balok, sloof, kolom, ketebalan pelat
beserta jumlah tulangan yang terpasang didalamnya, maka dari itu dapat dihitung kapasitas
dari setiap elemen struktur tersebut. Berikut adalah perhitungan kapasitas penampang
meliputi kapasitas pelat, balok, kolom, dan sloof.

5.1.1. Kapasitas Penampang Pelat


5.1.1.1.Data Eksisting Struktur Pelat
• Tebal Plat
- Plat Lantai t = mm
120
- Plat Atap t = 100 mm
• Data Tulangan Tumpuan
- Tulangan Plat Lantai
- Diameter Ø = mm
10
- Jarak tulangan s = mm 150
- Tulangan Plat Atap
- Diameter Ø = mm
10
- Jarak tulangan s = mm
150
• Data Tulangan Lapangan
- Tulangan Plat Lantai
- Diameter Ø = mm
10
- Jarak tulangan s = mm
150
- Tulangan Plat Atap
- Diameter Ø = mm 10
- Jarak tulangan s = mm 150
• Tebal Selimut ts 30
mm
= 35
MPa
• Mutu Beton fc'
= 240 MPa
• Mutu Baja 390 MPa
- Tulangan Geser fyv = 1000 mm
- Tulangan Lentur fyl =
• Lebar Plat (asumsi) b =

57
Untuk : 17 ≤ fc' ≤ 28 MPa, β1 = -
Untuk : 28 < fc' < 55 MPa, β1 = 0,8
Untuk : fc' ≥ 55 MPa, β1 = -
• Faktor bentuk distribusi tegangan beton β1 = 0,8

58
5.1.1.2. Perhitungan Kapasitas Penampang

1. Perhitungan Luas Tulangan (As)


Luas tulangan (As) didapatkan dari persamaan:

=0,25 × π × d² × b
As
s

PLAT LANTAI

Plat lantai tumpuan


=0,25 × π × d² × b
As s
0,25 x πx 10 ² x1000
=
150
As=523,60mm²

Plat lantai lapangan


=0,25 × π × d² × b
As s
0,25 x πx 10 ² x1000
=
150
As=523,60mm²

PLAT ATAP

Plat atap tumpuan


=0,25 × π × d² × b
As s
0,25 x πx 10 ² x1000
=
150
As=523,60mm²

Plat atap lapangan


=0,25 × π × d² × b
As s
0,25 x πx 10 ² x1000
=
150
As=523,60mm²

Sehingga didapatkan rekapitulasi luas tulangan (As) sebagai berikut.

59
Tabel 5.1 : Rekapitulasi Luas Tulangan Pelat
Luas Tulangan (As)
Plat Tumpuan Lapangan
mm² mm²
Plat Lantai 523,60 523,60
Plat Atap 523,60 523,60

2. Perhitungan Tinggi Efektif


Tinggi efektif plat arah X didapatkan dengan persamaan:

dx =efektif
Tinggi Tebal
platpelat
arah -Yselimut betondengan
didapatkan - 1/2Øtul.
persamaan:

PLAT LANTAI

dx= Tebal pelat - selimut beton - 1/2Øtul.


= 120 -30 -5
=
85mm
dy= Tebal pelat - selimut beton - Øtul. - 1/2Øtul.
= 120 -30 -10-5
=
75mm
PLAT ATAP

dx= Tebal pelat - selimut beton - 1/2Øtul.


= 100 -30 -5
= 65mm

dy= Tebal pelat - selimut beton - Øtul. - 1/2Øtul.


= 100 -30 -10-5
= 55mm

Sehingga didapatkan rekapitulasi tinggi efektif plat sebagai berikut.


Tabel 5.2 : Rekapitulasi Tinggi Efektif Pelat
Tinggi Efektif
Plat dx dy
mm mm
Plat Lantai 85 75
Plat Atap 65 55

60
3. Perhitungan Rasio Tulangan (ρ)
Dikarenakan luas tulangan (As) daerah tumpuan dan lapangan sama, maka hanya
dilakukan satu perhitungan sebagai berikut.

PLAT LANTAI PLAT ATAP


4. Perhitungan Rn
• Arah Rn
Persamaan x dapat dicari menggunakan persamaan
• Arah xrho (ρ) yaitu:
As As
ρx 1 = b 2𝑅𝑛. 𝑚
x dx ρx = b x dx
ρ = × 1− 1−
𝑚 523,60 523,60
= 1000ƒ𝑦 x 85 = 1000 x 65
fy
m == 0,006 = 13,11
denganρx ρx = 0,008
0,85 x fc'
• Arah
Sehingga y
didapatkan persamaan Rn sebagai •berikut:
Arah y
As As
Rn =1ρy− 1=− (𝜌.b 𝑚)x 2 dy
ƒ𝑦 ρy = b x dy
2𝑚
523,60 523,60
= 1000 = 1000 x
Dikarenakan rasio tulangan lapangan dan tumpuan memiliki hasil yang55
x 75 sama sesuai
ρy = 0,007 ρy = 0,01
dengan arahnya, maka hanya dilakukan satu perhitungan sebagai berikut:

61
PLAT LANTAI

Rn Arah x
3
Rn x= ( 1 - (1 -0,006 x13 )²)x
= (1 -
0,85 ) x 14,88
Rn x = 2,305 N/mm²

Rn Arah y

Rn y= ( 1-(1 x
-0,007
(1-0,83)x
=
Rn y = 2,598 N/mm²

PLA

Rn Arah x

Rn x= ( 1

= (
=
Rn x

Rn Arah
Rn

5. Perhitungan Momen Kapasitas Terfaktor


Perhitungan momen bisa dicari menggunakan rumus Rn sebagai berikut:
= Mn
Rn
bd²
Sehingga didapatkan persamaan Mn sebagai berikut:

Dikarenakan
Mn = Rn xRn daerah lapangan dan tumpuan memiliki hasil yang sama sesuai dengan
arahnya, maka hanya dilakukan satu perhitungan sebagai berikut.

62
PLAT ATAP

Mn Arah x
Mn x=Rnxx bd²
=2975,717x0,004
Mn x = 12,6 kN.m
Mu x= φ Mnx
= 0,9x 12,6
Mu x = 11,3 kN.m

Mn Arah y
Mn y=Rnyx bd²
=3481,114x0,003
Mn y = 10,5 kN.m
Mu y= φ Mnx
= 0,9x 10,5
Mu y = 9,5 kN.m

63
5.1.1.3. Rekapitulasi Perhitungan Momen Kapasitas Pelat
Tabel 5.3 : Rekapitulasi Perhitungan Momen Kapasitas Pelat

5.1.2. Kapasitas Penampang Balok


5.1.2.1.Data Eksisting Struktur
Balok 35 MPa
• Mutu Beton fc'
= 390 MPa
• Mutu Baja Tulangan 240 MPa
- Tulangan Lentur fyl 40 mm
= 0,8
0,9
- Tulangan Geser fyv
0,75
=
0,75
• Tebal Selimut ts
=
• Koefisien β1
=
• φ Lentur
=
• φ Geser
=
• φ Torsi
=
Tabel 5.4 : Data Tulangan Balok Tumpuan Terpasang
• Data Tulangan Tumpuan
Lentur Atas Lentur Bawah Torsi Geser
b h
Balok D n D n D D s
mm mm mm buah mm buah mm mm mm
B1 450 800 16 5 16 3 13 13 150

64
B2 300 500 16 4 16 3 10 10 150
B3 300 450 16 5 16 3 10 10 150
B4 200 350 16 3 16 2 8 8 150

65
Tabel 5.5 : Data Tulangan Balok Lapangan Terpasang
• Data Tulangan Lapangan
Lentur Atas Lentur Bawah Torsi
b h
Balok D n D n
mm mm mm buah mm
B1 450 800 16 3
B2 300 500 16
B3 300 4
B4

5.1.2.2. Perhitungan Momen Kapasitas Balok


Contoh perhitungan berikut meninjau pada tumpuan balok B1.

1. Perhitungan Luas Tulangan Tarik (As)

Sehingga, pada penampang balok lainnya didapatkan luas tulangan (As) sebagai
berikut.

Tabel 5.6 : Rekapitulasi Luas Tulangan Balok


Luas Tulangan (As)
Balok Tump. Atas Tump. Bawah Lap. Atas Lap. Bawah
mm² mm² mm² mm²
B1 1005,31 603,19 603,19 1005,31
B2 804,25 603,19 402,12 603,19
B3 1005,31 603,19 402,12 804,25
B4 603,19 402,12 402,12 402,12

2. Perhitungan Tinggi Efektif (d)


d = h - ts - Ø tulangan geser - 1/2D tulangan lentur
= 800 - 40 - 13 - 8
d = 739 mm
Sehingga, pada penampang balok lainnya didapatkan tinggi efektif (d) sebagai berikut.
Tabel 5.7 : Rekapitulasi Tinggi Efektif (d)
Tinggi Efektif (d) Tinggi Efektif (d)
Balok Tumpuan Lapangan
mm mm
B1 739 739
B2 442 442
B3 392 392
B4 294 294

66
3. Perhitungan Tinggi Blok Tekan Balok (a)

Sehingga, pada penampang balok lainnya didapatkan tinggi blok tekan balok (a)
sebagai berikut.
Tabel 5.8 : Rekapitulasi Tinggi Blok Tekan Balok

4. Perhitungan Momen Kapasitas Balok


𝑎
Mn= 𝐴𝑠 × 1,25 × ƒ𝑦 𝑑 −
2
= 1005,31 488 (
x

Mn= 353 kN.m

φMn =φx
=
φM

Sehingga, pada penampang balok lainnya didapatkan kapasitas penampang balok


(φMn) sebagai berikut.
Tabel 5.9 : Rekapitulasi Momen Kapasitas Balok
Momen Kapasitas (φMKap)
φMkap⁻ φMkap⁺ φMkap⁺ φMkap⁻
Balok Tump. Atas Tump. Bawah Lap. Atas Lap. Bawah
kN.m kN.m kN.m kN.m
B1 317,88 192,67 192,67 317,88
B2 148,22 112,61 76,05 112,61
B3 160,79 99,38 67,22 130,57
B4 71,27 48,96 48,96 48,96

67
5.1.2.3. Perhitungan Kapasitas Geser Balok
Berdasarkan SNI 2847-2019 pasal 22.5 penentuan kapasitas geser didasarkan pada.

dimana:
Vn = Vs + Vc
Vs = Gaya geser tulangan
Vc = Gaya geser beton

1. Perhitungan Luas Tulangan Geser (Av)


Kapasitas geser merupakan kemampuan beton bertulang dalam menahan gaya geser
yang terjadi akibat beban-beban yang bekerja. Luas tulangan geser (Av) didapatkan
menggunakan rumus.
Av=1× π × D² × n
4
Maka dengan menggunakan rumus diatas, dengan meninjau pada daerah tumpuan balok
B1 didapatkan perhitungan Luas tulangan geser (Av) sebagai berikut.
1
Av =
4 × π × D² × n
1
=4
x π x 13 x 2
Av=265,5 mm²

Sehingga pada penampang balok lainnya didapatkan luasan tulangan geser (Av) sebagai
berikut.
Tabel 5.10 : Rekapitulasi Luas Tulangan Geser
Luas Tulangan Geser (Av)
Balok Tumpuan Lapangan
mm² mm²
B1 265,46 265,46
B2 157,08 157,08
B3 157,08 157,08
B4 100,53 100,53

2. Perhitungan Tinggi Efektif Tulangan Geser (d)


Maka dengan menggunakan rumus diatas, dengan meninjau pada daerah tumpuan balok
d = h - ts - 1/2Ø tulangan geser
B1 didapatkan perhitungan tinggi efektif tulangan geser (d) sebagai berikut.

68
d = h - Ts - φ/2
d = 800 - 40 - 6,5
d =753,5mm

Sehingga pada penampang balok lainnya didapatkan tinggi efektif tulangan geser (d)
sebagai berikut.
Tabel 5.11 : Rekapitulasi Tinggi Efektif Balok
Tinggi Efektif (d) Tinggi Efektif (d)
Balok Tumpuan Lapangan
mm mm
B1 754 754
B2 455 455
B3 405 405
B4 306 306

3. Perhitungan Gaya Geser Tulangan (Vs)


Gaya geser tulangan (Vs) didapatkan dari perhitungan rumus:
=Av × fyt × d
Vs
s

Maka dengan menggunakan rumus diatas, dengan meninjau pada daerah tumpuan balok
B1 didapatkan perhitungan gaya geser tulangan (Vs) sebagai berikut.

Vs = Av × fyt × d
s
265,5 x 240 x 754
= 150
Vs=320,04 kN

Sehingga pada penampang balok lainnya didapatkan gaya geser tulangan (Vs) sebagai
berikut.
Tabel 5.12 : Rekapitulasi Gaya Geser Tulangan (Vs)
Gaya Geser Tulangan (Vs)
Balok Tumpuan Lapangan
kN kN
B1 320,04 240,03
B2 114,35 85,77
B3 101,79 76,34
B4 49,22 36,91
Dari perhitungan diatas maka bisa didapatkan.

69
Vn = Vs + Vc
Vn = Vs + 0
Vn = Vs
Sehingga momen kapasitas geser balok (Vn) bisa dilihat pada tabel berikut.
Tabel 5.13 : Rekapitulasi Kapasitas Geser Balok (Vn)
Kapasitas geser balok (Vn)
Balok Tumpuan Lapangan
kN kN
B1 320,04 240,03
B2 114,35 85,77
B3 101,79 76,34
B4 49,22 36,91

Tabel 5.14 : Rekapitulasi φVn


Kapasitas geser balok (φ Vn)
Balok Tumpuan Lapangan
kN kN
B1 240,03 180,02
B2 85,77 64,32
B3 76,34 57,26
B4 36,91 27,69

70
5.1.3. Kapasitas Penampang Kolom
5.1.3.1.Data Eksisting Struktur Kolom
 Mutu Beton fc' = 35 MPa
 Mutu Baja Tulangan
- Tulangan Lentur fyl = 390 MPa
- Tulangan Geser fyv = 240 MPa
 Dimensi Kolom :
Kolom K1 = 500x500
Kolom K2 = 400x400
 Data Tulangan :
Tulangan
Kolom Lentur Geser Tump. Geser Lap.
D n Ø s Ø s
K1 19 16 10 150 10 200
K2 19 12 10 150 10 200

 Tebal Selimut ts = 40 mm

 Tinggi Efektif ke Tul. Tarik d = h - ts - Ø tulangan geser - 1/2D tulangan lentur


d
Kolom
mm
K1 440,50
K2 340,50

 Tinggi Efektif ke Tul. Teka d' = h-d


d'
Kolom
mm
K1 59,50
K2 59,50

 Luas Kotor Ag = bx h
Ag
Kolom
mm²
K1 250000
K2 160000

 Luas Tulangan Atas As = 0,25 x π x D² x n


As
Kolom
mm²
K1 1417,64
K2 1134,11

71
 Luas Tulangan Bawah As' = 0,25 x π x D² x n
As'
Kolom
mm²
K1 1417,64
K2 1134,11

 Luas Tulangan Ast = As + As'


Ast
Kolom
mm²
K1 2835,29
K2 2268,23

 Koefisien β1 = 0,80

5.1.3.2. Ketentuan Perhitungan

 E
c
= 4700 √fc' = 27805,6
 E = = 200000 MPa
s
0,00195
 εy fy 390
= = =
E 200000
s
 fs nilai ini digunakan untuk
εs =
Es menentukan faktor reduksi.
 φ lentu = 0,9
 φ geser = 0,65
 εs' εcu , nilai ini digunakan untuk
= c - d'
c menentukan fs'.
 Apabila εs' < εy, maka digunakan fs'.
 Apabila εs' > εy, maka digunakan fy.

5.1.3.3. Perhitungan Kondisi dengan P Konsentris

Kondisi pada beban aksial sentris adalah


kondisi di mana Mn = 0 dan Pn pada
kondisi maksimum. Berikut langkah
perhitungannya:

72
Gambar 5.1 : Kondisi dengan P Konsentris

73
1. Perhitungan Nilai Po

Maka, dari perhitungan di atas didapatkan nilai Po untuk kolom K1 sebesar:


Po =
0,85 x fc' Ag + ( Ast fy )
=
0,85 x 250000 x 390
=
8543,26kN x 35 + ( 2835
x x

Sehingga pada penampang kolom lainnya didapatkan nilai Po sebesar:


Po φPo
Kolom
mm mm
K1 8543,26 6834,61
K2 5644,61 4515,69
5.1.3.4. Perhitungan Kondisi Balance
1. Perhitungan Nilai Garis Netral Balanced
600 x d
cb =
600 + fy
Maka, dari perhitungan di atas didapatkan nilai cb untuk kolom K1 sebesar:
600 x 440,5
cb =
600 + 390
= 266,97mm
Sehingga, untuk penampang kolom lainnya didapatkan nilai sebesar:
cb
Kolom
mm
K1 266,97
K2 206,36
2. Perhitungan Tinggi Blok Tegangan Tekan Beton (ab)
Maka, dari perhitungan di atas didapatkan nilai ab untuk kolom K1 sebesar:
ab = β1 x cb
ab = β1 x cb
= 0,80 266,97
x
213,576mm
=
Sehingga, untuk penampang kolom lainnya didapatkan nilai sebesar:

74
ab
Kolom
mm
K1 213,58
K2 165,09
3. Perhitungan Regangan Baja Tekan (εs')

Maka, dari perhitungan di atas didapatkan nilai εs' untuk kolom K1 sebesar:

εs ' > εy
maka, fs'

Sehingga, untuk penampang kolom lainnya didapatkan nilai sebesar:


Kolom εs ' ket.
K1 0,0023 > εy
K2 0,0021 > εy
4. Perhitungan Gaya Tekan Beton (Cc’)
Maka, didapatkan besar gaya tekan beton (Cc') pada kolom K1 sebesar:
Cc' = 0,85 x fc' x a x b
Cc' = 0,85 x fc' x a x b
Cc' = 0,85 x 35 x 213,58 x 500
Cc' = 3176,94 kN
Sehingga, didapatkan besar gaya tekan beton (Cc') pada masing-masing penampang
kolom sebesar:
Cc'
Kolom
kN
K1 3176,94
K2 1964,58
5. Perhitungan Gaya Tekan Baja (Cs’) dan Gaya Tarik Baja (Ts)
Dikarenakan regangan baja tekan memiliki nilai yang sama dengan fy, maka gaya
tekan baja (Cs') dan gaya tarik baja (Ts) juga memiliki nilai yang sama, dengan
perhitungan sebagai berikut .

75
Maka, didapatkan besar gaya tekan baja (Cs') pada kolom K1 sebesar:
Cs' = Ts = As' x fs'
Cs' = Ts = 1417,64 x 390
Cs' = Ts = 552,9 kN
Sehingga, didapatkan besar gaya tekan baja (Cs') pada masing-masing penampang
kolom sebesar:
Cs' Ts
Kolom
kN kN
K1 552,9 552,9
K2 442,3 442,3
6. Perhitungan Kapasitas Aksial Nomina (Nnb)
Kapasitas aksial penampang (φPn) didapatkan dari perhitungan:

Maka, didapatkan besar kapasitas aksial penampang (φPn) pada kolom K1 sebesar:
Nnb
= ( Cc' + Cs' - Ts )
= ( 3176,94 + 552,88 - 552,9
= 3176,939 kN

φ Nnb = φ x Nnb
= 0,90 x 3176,94
= 2859,25kN
Sehingga, didapatkan besar kapasitas aksial nominal (Nnb) pada masing-masing
kolom sebesar:
Nnb φNnb
Kolom
kN kN
K1 3176,94 2859,25
K2 1964,58 1768,12
7. Perhitungan Kapasitas Momen Nominal (Mnb)
Kapasitas nominal penampang lentur (φMn) didapatkan dari perhitungan:

Mn = Cc′ ha h h
− + Cs + Ts
22 − d′ − d′

2 2

Maka, didapatkan besar kapasitas nominal lentur penampang (Mn) pada kolom K1
sebesar:

76
Sehingga, didapatkan besar kapasitas nominal lentur penampang (φMn) pada masing-
masing penampang kolom sebesar:
Kolom Mn φMn
kN.m
K1 6
K2

5.1.3.5. Perhitungan Kondisi Keruntuhan Tekan


1. Perhitungan Tinggi Blok Tegangan Tekan Beton (a)
 Mencari Garis Netral (c)

Diasumsikan c > cb, sehingga didapatkan nilai garis netral pada masing masing
kolom sebesar:

c
Kolom
mm
K1 381
K2 281
 Mencari Tinggi Blok Tegangan Tekan Beton
a = β1 x c
Maka, dari perhitungan di atas didapatkan nilai ab untuk kolom K1 sebesar:
a = β1 x c
= 0,80 x 381
= 304,8mm
Sehingga, untuk penampang kolom lainnya didapatkan nilai sebesar:
a
Kolom
mm
K1 304,80
K2 224,80

77
2. Perhitungan Regangan Baja Tarik (εs)

Maka, dari perhitungan di atas didapatkan nilai εs' untuk kolom K1 sebesar:
d
ε = - c
s c x εcu'
440,5 - 381
= 381 x 0,003
= 0,0005
εs > εy
Sehingga, untuk penampang kolom lainnya didapatkan nilai sebesar:
Kolom K1 εs ket.
K2 0,000

Maka, Tegangan Baja Tarik bisa didapatkan dengan persamaan:


fs =
εs x E
= 0,0005

3. Perhitungan Regangan Baja Tekan (εs’)


c - d'
εs' = x εcu'
c
Maka, dari perhitungan di atas didapatkan nilai εs' untuk kolom K1 sebesar:
c - d'
εs' = x εcu'
c
381
- 59,5
= x 0,003
381
= 0,0025
εs' > εy
Sehingga, untuk penampang kolom lainnya didapatkan nilai sebesar:
Kolom εs ' ket.
K1 0,0025 > εy
K2 0,0024 > εy
Maka, Tegangan Baja Tekan bisa didapatkan dengan:
fs' = fy = 390 MPa

78
4. Perhitungan Kapasitas Aksial Nominal (Nn)
dimana:
Nn = ( Cc' + Cs' - Ts )
Cc'
= Gaya tekan beton
Cs'
= Gaya tekan baja
Ts
= Gaya tarik baja

 Mencari Gaya tekan beton


Gaya tekan beton (Cc') didapatkan dari perhitungan:
Maka, didapatkan besar gaya tekan beton (Cc') pada kolom K1 sebesar:
Cc' = 0,85 x fc' x a x b
Cc' = 0,85 x fc' x a x b
Cc' = 0,85 x 35 x 304,8 x 500
Cc' = 4533,90 kN
Sehingga, didapatkan besar gaya tekan beton (Cc') pada masing-masing penampang
kolom sebesar:
Kolom Cc'

K1

Gaya tekan baja


 Mencari Gaya(Cs') didapatkan
tekan baja dari perhitungan:

Cs' = As' x fs'


Maka, didapatkan besar gaya tekan baja (Cs') pada kolom K1 sebesar:
Cs'
= As' x fs'
Cs'
= 1417,64 x 390
Cs'
= 552,88 kN
Sehingga, didapatkan besar gaya tekan baja (Cs') pada masing-masing penampang
kolom sebesar:
Cs'
Kolom
kN
K1 552,88
K2 442,30

79
 Mencari Gaya Tarik Baja
Gaya Tarik baja (Ts) didapatkan dari perhitungan:
Maka, didapatkan besar gaya tarik baja (Ts) pada kolom K1 sebesar:
Ts = As x fs
Ts = As x fs
Ts = 1417,64 x 94
Ts =

80
132,83 kN
Sehingga, didapatkan besar gaya tarik baja (Ts) pada masing-masing penampang
kolom sebesar:
Ts
Kolom
kN
K1 132,83
K2 106,27
Setelah didapatkan perhitungan diatas, maka kapasitas aksial nominal (Nn) pada
penampang kolom K1 bisa dicari sebagai berikut:
Nn = ( Cc' + Cs' - Ts )
Nn = ( 4534 + 552,88
Nn = 4953,95 kN
φ Nn = φ x
=

Nn φNn
Kolom
kN kN
K1 4953,95 4458,55
K2 3011,16 2710,04
5. Perhitungan Kapasitas Momen Nominal (Mn)

ha hh
Mn=Cc′
22− + Cs′− 2d′+ Ts− d′ 2

Setelah didapatkan perhitungan diatas, maka kapasitas momen nominal (Mn) pada
penampang kolom K1 bisa dicari.

81
h
ha h + Ts − d′
Mn = Cc′ + Cs
22− − d′ 2

2
500 500 500
= 4534 304,80 + 552,88 + 132,83
2 - 2 - 59,50 - 59,50
2 2

Mn =
573,14kN.m
φ Mn =
φ x Mnb
= 0,90 x 573,14
= 515,82 kN
Sehingga, didapatkan besar kapasitas nominal lentur penampang (φMn) pada masing-
masing penampang kolom sebesar:
Mn φMn
Kolom
kN.m kN.m
K1 573,14 515,82
K2 311,41 280,27

5.1.3.6. Perhitungan Kondisi Keruntuhan Tarik


1. Perhitungan Tinggi Blok Tegangan Tekan Beton (a)
 Mencari Garis Netral (c)
Diasumsikan c > cb, sehingga didapatkan nilai garis netral pada masing masing
kolom sebesasar:
c
Kolom mm
K1 K2 90
90
 Mencari Tinggi Blok Tegangan Tekan Beton (a)

Maka,
a dari=perhitungan
β1 x di atas didapatkan nilai ab untuk kolom K1 sebesar:
a = β1 x c
= 0,80 x 90
= 72 mm
Sehingga, untuk penampang kolom lainnya didapatkan nilai sebesar:
a
Kolom
mm
K1 72
K2 72

82
2. Perhitungan
= d-c x
εs εcu'
c
Maka, dari perhitungan di atas didapatkan nilai εs' untuk kolom K1 sebesar:
d
ε =
s - c x εcu'
c
440,5
= 90 - 90
x 0,003
= 0,0117
εs > εy
Sehingga, untuk penampang kolom lainnya didapatkan nilai sebesar:
Kolom εs ket.
K1 0,0117 > εy
K2 0,0084 > εy
Maka, Tegangan Baja Tarik bisa didapatkan dengan persamaan:
fs = fy
= 390 Mpa
3. Perhitungan Regangan Baja Tekan (εs')
c-d' x
εs' = εcu'
c
Maka, dari perhitungan di atas didapatkan nilai εs' untuk kolom K1 sebesar:
c- d'
εs' = x εcu'
c
90 - 59,5
=
90 x 0,003
= 0,0010
εs' < εy
Sehingga, untuk penampang kolom lainnya didapatkan nilai sebesar:
Kolom εs ' ket.
K1 0,0010 < εy
K2 0,0010 < εy
Maka, Tegangan Baja Tekan bisa didapatkan dengan:

83
4. Perhitungan Kapasitas Aksial Nominal (Nn)
dimana:
Nn = ( Cc + Cs - Ts )
Cc = Gaya tekan beton
Cs = Gaya tekan baja
Ts = Gaya tarik baja

 Mencari Gaya tekan beton


Gaya tekan beton (Cc) didapatkan dari perhitungan:
Maka, didapatkan besar gaya tekan beton (Cc) pada kolom K1 sebesar:
Cc = 0,85 x fc' x a x b
Cc = 0,85 x fc' x a x b
Cc = 0,85 x 35 x 72 x 500
Cc = 1071kN
Sehingga, didapatkan besar gaya tekan beton (Cc) pada masing-masing penampang
kolom sebesar:
Cc
Kolom
kN
K1 1071,0
K2 856,8

 Cs'
Mencari=Gaya As'
tekan baja
x fs'
Maka, didapatkan besar gaya tekan baja (Cs) pada kolom K1 sebesar:
Cs'
= As' x fs'
Cs'
= 1417,64 x 203
Cs'
= 288,25 kN
Sehingga, didapatkan besar gaya tekan baja (Cs) pada masing-masing penampang
kolom sebesar:
Cs'
Kolom
kN
K1 288,25
K2 230,60

84
 Mencari Gaya Tarik Baja (Ts)
Gaya Tarik baja (Ts) didapatkan dari perhitungan:
Maka, didapatkan besar gaya tarik baja (Ts) pada kolom K1 sebesar:
Ts = As x fs
Ts
As x fs
1417,64 x 390
=
Ts

=
Ts

=
552,88 kN
Sehingga, didapatkan besar gaya tarik baja (Ts) pada masing-masing penampang
kolom sebesar:
Kolom Ts

K1

Setelah didapatkan perhitungan diatas, maka kapasitas aksial nominal (Nn) pada
penampang kolom K1 bisa dicari sebagai berikut:
Nn = ( Cc + Cs - Ts )
Nn = ( 1071 + 288,25 - 552,9
Nn = 806,37 kN
φ Nn = φ x Nnb
= 0,90 x 806,37
= 725,74 kN
Nn φNn
Kolom
kN kN
K1 806,37 725,74
K2 645,10 580,59
5. Perhitungan Kapasitas Momen Nominal (Mn)

ha hh
Mn=Cc′
22− + Cs′− 2d′+ Ts− d′ 2

Setelah didapatkan perhitungan diatas, maka kapasitas momen nominal (Mn) pada
penampang kolom K1 bisa dicari.

85
h
ha h + Ts − d′
Mn = Cc′ 22− + Cs
− d′ 2

722 500 500
= 1071 # 2 - + 288,25 - 59,5 + 552,88 - 59,5
2 2 2

Mn = 389,43 kN.m
φ Mn = φ x Mnb
= 0,90 x 389,43
= 350,49 kN
Sehingga, didapatkan besar kapasitas nominal lentur penampang (φMn) pada masing-
masing penampang kolom sebesar:

5.1.3.7. Perhitungan Kondisi Lentur Murni


1. Perhitungan Tinggi Blok Tegangan Tekan Beton (a)
Tinggi blok tegangan tekan beton (a) didapatkan dari perhitungan rumus:
As × fy
a =
0,85 × fc' × b
Maka, dengan menggunakan rumus di atas didapatkan perhitungan tinggi blok tegangan
tekan beton (a) pada kolom K1 sebagai berikut:
As x fy
a =
0,85 x fc' x b
1417,6 x 390
=
0,85 x 35 x 500
= 37,17 mm
Sehingga, didapatkan besar tinggi blok tegangan tekan beton (a) pada masing-masing
penampang kolom sebesar:
a
Kolom
mm
K1 37,17
K2 37,17

86
2. Perhitungan Kapasitas Momen Nominal (Mn)
Momen nominal (Mn) didapatkan dari perhitungan rumus:
-a
Mn= As ×fy d
2

Maka, dengan menggunakan rumus di atas didapatkan perhitungan momen nominal


(Mn) pada kolom K1 sebagai berikut:

Mn = a
As × fy d - 2
= 37,17
1417,64 × 390 440,5 - 2
= 233,27 kN.m
φMn = φ × Mn
= 0,9 × 233,27
= 209,94 kN.m
Sehingga, pada penampang balok lainnya didapatkan kapasitas penampang nominal
(Mn) sebagai berikut:
Mn φMn
Kolom
kN.m kN.m
K1 233,27 209,94
K2 142,38 128,15

5.1.3.8. Rekapitulasi Kondisi Penampang Kolom


Tabel 5.15 : Rekapitulasi Perhitungan Kolom 1
Rekapitulasi Pehitungan Diagram
K1 500 x 500
Interaksi
Kondisi φ Pn (kN) φ Mn (kN.m)
1. Pada Beban Aksial Sentris 8543,26 0,00
2. Keruntuhan Tekan 4458,55 515,82
3. Keruntuhan Seimbang 2859,25 599,06
4. Keruntuhan Tarik 725,74 350,49
5. Lentur Murni 0,00 209,94

Tabel 5.16 : Rekapitulasi Perhitungan Kolom 2


Rekapitulasi Pehitungan Diagram
K2 400 x 400
Interaksi
Kondisi φ Pn (kN) φ Mn (kN.m)
1. Pada Beban Aksial Sentris 5644,61 0,00
2. Keruntuhan Tekan 4458,55 280,27
3. Keruntuhan Seimbang 2859,25 319,53
4. Keruntuhan Tarik 725,74 211,55
5. Lentur Murni 0,00 128,15

87
Grafik 5.1 : Diagram Interaksi Kolom 1 dan Kolom 2

88
5.1.3.9. Perhitungan Kapasitas Geser Kolom
Step KOLOM 1 (50 / 50)
Perhitungan luas tulangan geser
1 2
As = n 𝜋 D
Step 1 4
As = 157 mm2
Perhitungan kapasitas geser baja (Vs)
Av fyv d
Vs = s
a. Pada tumpuan
Step 2 157 240 441
Vs = 150 = 111 kN
b. Pada lapangan
157 240 441
Vs = 200 = 83 kN

Perhitungan kapasitas geser beton (Vc)


Desain gedung ini adalah SRPMK maka kekuatan nominal geser
Step 3 balok hanya ditentukan oleh kekuatan bajanya saja
Vc = 0,29𝜆 ƒ𝑐′𝑏w𝑑 = 0 kN

Perhitungan Vu
Mnb = Diambil pada konsisi lentur murni = 169 kN.m
Mnt = Diambil pada konsisi lentur murni = 169 kN.m
Step 4
lu = Panjang total kolom / tinggi = 4 m

Mnl + Mnb
Vu = = 85 kN
lu

89
Step KOLOM 2 (40 / 40)
Perhitungan luas tulangan geser
1 2
As = n 𝜋 D
Step 1 4
As = 157 mm2
Perhitungan kapasitas geser baja (Vs)
Av fyv d
Vs = s
a. Pada tumpuan
Step 2 157 240 341
Vs = 150 = 85,5 kN
b. Pada lapangan
157 240 341
Vs = 200 = 64,2 kN

Perhitungan kapasitas geser beton (Vc)


Desain gedung ini adalah SRPMK maka kekuatan nominal
Step 3 geser balok hanya ditentukan oleh kekuatan bajanya saja
Vc = 0,29𝜆 ƒ𝑐′𝑏w𝑑 = 0 kN

Perhitungan Vu
Mnb = Diambil pada konsisi lentur murni = 128 kN.m
Mnt = Diambil pada konsisi lentur murni = 128 kN.m
Step 4
lu = Panjang total kolom / tinggi = 4 m

Mnl + Mnb
Vu = = 64 kN
lu

90
5.1.4. Kapasitas Penampang Sloof
5.1.4.1.Data Eksisting Struktur Sloof
 Mutu Beton fc' = 35 MPa
 Mutu Baja Tulangan
- Tulangan Lentur fyl = 390 MPa
- Tulangan Geser fyv = 240 MPa
 Dimensi Sloof :
Sloof S1 = 300x450
Sloof S2 = 250x400
 Data Tulangan :
Tulangan
Sloof Lentur Tum & Geser Tump. Geser Lap. Torsi
Lap Ø
D n Ø s Ø s
S1 16 5 10 150 10 200 10
S2 16 5 10 150 10 200 10

 Tebal Selimut ts = 40 mm

 Tinggi Efektif ke Tul. Tarik d = h - ts - Ø tulangan geser - 1/2D tulangan lentur


d
Sloof
mm
S1 392,00
S2 342,00

 Tinggi Efektif ke Tul. Tekan d' = h-d


d'
Sloff
mm
S1 58,00
S2 58,00

 Luas Kotor Ag = b x h
Ag
Sloof
mm²
S1 135000
S2 100000

 Luas Tulangan Tarik As = 0,25 x π x D² x n


As
Sloof
mm²
S1 1005,31
S2 1005,31

91
5.1.4.2. Ketentuan Perhitungan

 E
c
= 4700 √fc' = 27805,6
 E = = 200000 MPa
s
0,00195
 εy fy 390
= = =
E 200000
s
 fs nilai ini digunakan untuk
εs =
Es menentukan faktor reduksi.
 φ lentu = 0,9
 φ geser = 0,65
 εs' εcu , nilai ini digunakan untuk
= c - d'
c menentukan fs'.
 Apabila εs' < εy, maka digunakan fs'.
 Apabila εs' > εy, maka digunakan fy.

5.1.4.3. Perhitungan Kondisi dengan P Konsentris

Kondisi pada beban aksial sentris adalah


kondisi di mana Mn = 0 dan Pn pada kondisi
maksimum. Berikut langkah perhitungannya:

92
Gambar 5.2 : Kondisi dengan P Konsentris

93
1. Perhitungan Nilai Po

Maka, dari perhitungan di atas didapatkan nilai Po untuk sloof S1 sebesar:

Sehingga pada penampang sloof lainnya didapatkan nilai Po sebesar:


Po φPo
Sloof
mm mm
S1 4800,39 3840,31
S2 3759,14 3007,31

5.1.4.4. Perhitungan Kondisi Balance


1. Perhitungan Nilai Garis Netral Balanced
600 x d
cb =
600 + fy
Maka, dari perhitungan di atas didapatkan nilai cb untuk sloof S1 sebesar:
600 x 392,0
cb =
600 + 390
= 237,58mm
Sehingga, untuk penampang sloof lainnya didapatkan nilai sebesar:
cb
Sloof
mm
S1 237,58
S2 207,27
2. Perhitungan Tinggi Blok Tegangan Tekan Beton (ab)
Maka, dari perhitungan di atas didapatkan nilai ab untuk sloof S1 sebesar:
ab = β1 x cb
ab = β1 x cb
= 0,80 237,576
x
190,061mm
=
Sehingga, untuk penampang sloof lainnya didapatkan nilai sebesar:

94
ab
Sloof
mm
S1 190,06
S2 165,82
3. Perhitungan Regangan Baja Tekan (εs')

Maka, dari perhitungan di atas didapatkan nilai εs' untuk sloof S1 sebesar:
cb - d'
εs' x εcu'
cb
=
237,58 - 58,00 x 0,003 εs ' > εy
=
237,58 maka, fs'
= 0,0023
Sehingga, untuk penampang kolom lainnya didapatkan nilai sebesar:
Sloof εs ' ket.
S1 0,0023 > εy
S2 0,0022 > εy
4. Perhitungan Gaya Tekan Beton (Cc’)
Maka, didapatkan besar gaya tekan beton (Cc') pada sloof S1 sebesar:
Cc' = 0,85 x fc' x a x b
Cc' = 0,85 x fc' x a x b
Cc' = 0,85 x 35 x 190,06 x 300
Cc' = 1696,29 kN
Sehingga, didapatkan besar gaya tekan beton (Cc') pada masing-masing penampang
sloof sebesar:
Cc'
Sloof
kN
S1 1696,29
S2 1233,27
5. Perhitungan Gaya Tekan Baja (Cs’) dan Gaya Tarik Baja (Ts)
Dikarenakan regangan baja tekan memiliki nilai yang sama dengan fy, maka gaya
tekan baja (Cs') dan gaya tarik baja (Ts) juga memiliki nilai yang sama, dengan
perhitungan sebagai berikut .

95
Maka, didapatkan besar gaya tekan baja (Cs') pada sloof S1 sebesar:

Sehingga, didapatkan besar gaya tekan baja (Cs') pada masing-masing penampang
sloof sebesar:
Cs' Ts
Sloff
kN kN
S1 392,1 392,1
S2 392,1 392,1
6. Perhitungan Kapasitas Aksial Nomina (Nnb)
Kapasitas aksial penampang (φPn) didapatkan dari perhitungan:

Maka, didapatkan besar kapasitas aksial penampang (φPn) pada sloof S1 sebesar:
Nnb
= ( Cc' + Cs' - Ts )
= ( 1696,29 + 392,07 - 392,1
= 1696,291 kN

φ Nnb = φ x Nnb
= 0,90 1696,29
x
1526,66kN
=
Sehingga, didapatkan besar kapasitas aksial nominal (Nnb) pada masing-masing sloof
sebesar:
Nnb φNnb
Sloof
kN kN
S1 1696,29 1526,66
S2 1233,27 1109,95
7. Perhitungan Kapasitas Momen Nominal (Mnb)
Kapasitas nominal penampang lentur (φMn) didapatkan dari perhitungan:

Mn = Cc′ ha h h
− + Cs + Ts
22 − d′ − d′

2 2

96
Maka, didapatkan besar kapasitas nominal lentur penampang (Mn) pada sloof S1
sebesar:

97
Sehingga, didapatkan besar kapasitas nominal lentur penampang (φMn) pada masing-
masing penampang sloof sebesar:
Mn φMn
Sloof
kN.m kN.m
S1 351,42 316,28
S2 255,75 230,18
5.1.4.5. Perhitungan Kondisi Keruntuhan Tekan
1. Perhitungan Tinggi Blok Tegangan Tekan Beton (a)
 Mencari Garis Netral (c)

Diasumsikan c > cb, sehingga didapatkan nilai garis netral pada masing masing sloof
sebesar:

c
Sloof
mm
S1 184
S2 134
 Mencari Tinggi Blok Tegangan Tekan Beton
a = β1 x c
Maka, dari perhitungan di atas didapatkan nilai ab untuk sloof S1 sebesar:
a = β1 x c
= 0,80 x 184
= 147,2 mm
Sehingga, untuk penampang sloof lainnya didapatkan nilai sebesar:
a
Sloof
mm
S1 147,20
S2 107,20

98
2. Perhitungan Regangan Baja Tarik (εs)

Maka, dari perhitungan di atas didapatkan nilai εs' untuk sloof S1 sebesar:

Sehingga, untuk penampang sloof lainnya didapatkan nilai sebesar:


Sloof εs ket.
S1 0,0034 > εy
S2 0,0047 > εy
Maka, Tegangan Baja Tarik bisa didapatkan dengan persamaan:
fs =
εs x Es
=
= 678 MPa x
0,0034 200000

3. Perhitungan Regangan Baja Tekan (εs’)


c - d'
εs' = x εcu'
c
Maka, dari perhitungan di atas didapatkan nilai εs' untuk sloof S1 sebesar:
c - d'
ε' = c x εcu'
s
184 - 58,0
= 184 x 0,003
= 0,0021
εs' > εy
Sehingga, untuk penampang sloof lainnya didapatkan nilai sebesar:
Sloof εs ' ket.
S1 0,0021 > εy
S2 0,0017 > εy
Maka, Tegangan Baja Tekan bisa didapatkan dengan:
fs' = fy = 390 MPa

99
4. Perhitungan Kapasitas Aksial Nominal (Nn)
dimana:
Nn = ( Cc' + Cs' - Ts )
Cc'
= Gaya tekan beton
Cs'
= Gaya tekan baja
Ts
= Gaya tarik baja

 Mencari Gaya tekan beton


Gaya tekan beton (Cc') didapatkan dari perhitungan:
Maka, didapatkan besar gaya tekan beton (Cc') pada sloof S1 sebesar:
Cc' = 0,85 x fc' x a x b

Sehingga, didapatkan besar gaya tekan beton (Cc') pada masing-masing penampang
sloof sebesar:
Cc'
Sloof
kN
S1 1313,76
S2 797,30

Gaya tekan baja


 Mencari Gaya(Cs') didapatkan
tekan baja dari perhitungan:

Cs' = As' x fs'


Maka, didapatkan besar gaya tekan baja (Cs') pada sloof S1 sebesar:
Cs'
As x fs'
'
=
Cs' = 1005,31 x 390
Cs' = 392,07 kN
Sehingga, didapatkan besar gaya tekan baja (Cs') pada masing-masing penampang
kolom sebesar:
Cs'
Sloof
k
S1

10
 Mencari Gaya Tarik Baja
Gaya Tarik baja (Ts) didapatkan dari perhitungan:
Maka, didapatkan besar gaya tarik baja (Ts) pada sloof S1 sebesar:
Ts = As x fs
Ts =
As x fs
Ts =
1005,31 x 678
Ts =
681,86kN
Sehingga, didapatkan besar gaya tarik baja (Ts) pada masing-masing penampang sloof
sebesar:
Sloof Ts
k
S1

Setelah didapatkan perhitungan diatas, maka kapasitas aksial nominal (Nn) pada
penampang sloof S1 bisa dicari sebagai berikut:
Nn = ( Cc' + Cs' - Ts )
Nn = ( 1314 + 392,07 - 681,9
Nn = 1023,97 kN
φ Nn = φ x Nnb
= 0,90 x 1023,97
= 921,57kN
Nn φNn
Sloof
kN kN
S1 1023,97 921,57
S2 507,51 456,76
5. Perhitungan Kapasitas Momen Nominal (Mn)

ha hh
Mn=Cc′
22− + Cs′− 2d′+ Ts− d′ 2

Setelah didapatkan perhitungan diatas, maka kapasitas momen nominal (Mn) pada
penampang sloof S1 bisa dicari.

10
h
ha h + Ts − d′
Mn = Cc′ + Cs′ − d′
22− 2
450 2
= 1314 450 450
147,20 + 392,07 + 681,86
2 - 2 - 58,00 - 58,00
2 2

Mn =
378,25kN.m
φ Mn =
φ x Mnb
= 0,90 378,25
340,43 kN
x
=

Sehingga, didapatkan besar kapasitas nominal lentur penampang (φMn) pada masing-
masing penampang sloof sebesar:

5.1.4.6. Perhitungan Kondisi Keruntuhan Tarik


1. Perhitungan Tinggi Blok Tegangan Tekan Beton (a)
Mencari G

Diasumsikan c > cb, sehingga didapatkan nilai garis netral pada masing masing sloof
sebesasar:

c
Sloof
mm
S1 90
S2 90
 Mencari Tinggi Blok Tegangan Tekan Beton
a = β1 x
Maka, dari perhitungan di atas didapatkan nilai ab untuk sloof S1 sebesar:
a = β1 x c
= 0,80 x 90
= 72 mm
Sehingga, untuk penampang kolom lainnya didapatkan nilai sebesar:
a
Sloof
mm
S1 72
S2 72

10
2. Perhitungan Regangan Baja Tarik (εs')
= d-c x
εs εcu'
c
Maka, dari perhitungan di atas didapatkan nilai εs' untuk sloof S1 sebesar:

Sehingga, untuk penampang sloof lainnya didapatkan nilai sebesar:


Sloof S1 εs ket.
S2 0,0101

Maka, Tegangan Baja Tarik bisa didapatkan dengan persamaan:


fs = fy
= 390 Mpa
3. Perhitungan Regangan Baja Tekan (εs')
c-d' x
εs' = εcu'
c
Maka, dari perhitungan di atas didapatkan nilai εs' untuk sloof S1 sebesar:
c - d'
εs' = x εcu'
c
90 - 58
= x 0,003
90
= 0,0011
εs' < εy
Sehingga, untuk penampang sloof lainnya didapatkan nilai sebesar:
Sloof S1 εs' ket.
S2 0,00

Maka, Tegangan Baja Tekan bisa didapatkan dengan:

10
4. Perhitungan Kapasitas Aksial Nominal (Nn)
dimana:
Nn = ( Cc + Cs - Ts )
Cc = Gaya tekan beton
Cs = Gaya tekan baja
Ts = Gaya tarik baja

 Mencari Gaya tekan beton


Gaya tekan beton (Cc) didapatkan dari perhitungan:
Maka, didapatkan besar gaya tekan beton (Cc) pada sloof S1 sebesar:
Cc = 0,85 x fc' x a x b
Cc = 0,85 x fc' x a x b
Cc = 0,85 x 35 x 72 x 300
Cc = 642,6 kN
Sehingga, didapatkan besar gaya tekan beton (Cc) pada masing-masing penampang
sloof sebesar:
Cc
Sloof
kN
S1 642,6
S2 535,5

 Cs'
Mencari=Gaya As'
tekan baja
x fs'
Maka, didapatkan besar gaya tekan baja (Cs) pada sloof S1 sebesar:
Cs' =
As' x fs'
Cs' =
1005,31 x 213
Cs' =
214,47kN
Sehingga, didapatkan besar gaya tekan baja (Cs) pada masing-masing penampang
sloof sebesar:
Cs'
Sloof
kN
S1 214,47
S2 214,47

10
 Mencari Gaya Tarik Baja (Ts)
Gaya Tarik baja (Ts) didapatkan dari perhitungan:
Maka, didapatkan besar gaya tarik baja (Ts) pada sloof S1 sebesar:
Ts = As x fs
Ts
As x fs
1005,31 x 390
=
Ts

=
Ts

=
392,07kN
Sehingga, didapatkan besar gaya tarik baja (Ts) pada masing-masing penampang sloof
sebesar:
Sloof Ts
k
S1

Setelah didapatkan perhitungan diatas, maka kapasitas aksial nominal (Nn) pada
penampang sloof S1 bisa dicari sebagai berikut:
Nn = ( Cc + Cs - Ts )
Nn = ( 643 + 214,47 - 392,1
Nn = 464,995 kN
φ Nn = φ x Nnb
= 0,90 x 465,00
= 418,50 kN
Nn φNn
Sloof
kN kN
S1 464,995 418,50
S2 357,90 322,11
5. Perhitungan Kapasitas Momen Nominal (Mn)

ha hh
Mn=Cc′
22− + Cs′− 2d′+ Ts− d′ 2

Setelah didapatkan perhitungan diatas, maka kapasitas momen nominal (Mn) pada
penampang sloof S1 bisa dicari.

10
h
ha h + Ts − d′
Mn = Cc′ + Cs′ − d′
22− 2
2 450 450
= 643 72 + 214,47 + 392,07
450 - - 58,0 - 58,0
2 2 2
2
Mn =
222,74kN.m
φ Mn = φ
x Mnb
= 0,90 222,74
200,47kN
x
=

Sehingga, didapatkan besar kapasitas nominal lentur penampang (φMn) pada masing-
masing penampang sloof sebesar:

5.1.4.7. Perhitungan Kondisi Lentur Murni


1. Perhitungan Tinggi Blok Tegangan Tekan Beton (a)
Tinggi blok tegangan tekan beton (a) didapatkan dari perhitungan rumus:
As × fy
a =
0,85 × fc' × b
Maka, dengan menggunakan rumus di atas didapatkan perhitungan tinggi blok tegangan
tekan beton (a) pada sloof S1 sebagai berikut:

As x fy
a = 0,85 x fc' x b
1005,3 x 390
= 0,85 x 35 x 300
= 43,93mm
Sehingga, didapatkan besar tinggi blok tegangan tekan beton (a) pada masing-masing
penampang sloof sebesar:
a
Sloof
mm
S1 43,93
S2 52,72

10
2. Perhitungan Kapasitas Momen Nominal (Mn)
Momen nominal (Mn) didapatkan dari perhitungan rumus:
-a
Mn= As ×fy d
2

Maka, dengan menggunakan rumus di atas didapatkan perhitungan momen nominal


(Mn) pada sloof S1 sebagai berikut:

Mn = As × fy a
d - 2
43,93
= 1005,31 × 390 392,0 - 2
= 145,08 kN.m
φMn = φ × Mn
= 0,9 × 145,08
= 130,57 kN.m
Sehingga, pada penampang sloof lainnya didapatkan kapasitas penampang nominal
(Mn) sebagai berikut:
Mn φMn
Sloof
kN.m kN.m
S1 145,08 130,57
S2 123,75 111,38

5.1.4.8. Rekapitulasi Kondisi Penampang Sloof


Tabel 4.2 : Rekapitulasi Perhitungan Sloof 1

Rekapitulasi Pehitungan Diagram


S1 300 x 450
Interaksi
Kondisi φ Pn (kN) φ Mn (kN.m)
1. Pada Beban Aksial Sentris 4800,39 0,00
3. Keruntuhan Seimbang 1526,66 316,28
2. Keruntuhan Tekan 921,57 340,43
4. Keruntuhan Tarik 418,50 200,47
5. Lentur Murni 0,00 130,57

10
Tabel 4.3 : Rekapitulasi Perhitungan Sloof 2
Rekapitulasi Pehitungan
Diagram Interaksi S2 250 x 40
Kondisi φ Pn (kN)
1. Pada Beban Aksial
Sentris
3. Keruntuhan Seimbang
2. Keruntuhan Tekan
4. Keruntuha
5. L

Grafik 5.2 : Diagram Interaksi Sloof 1 dan Sloof 2

10
5.1.4.9. Kapasitas Geser Sloof
Step SLOOF 1
Perhitungan luas tulangan geser
1
Step 1 As = n 𝜋 D2
4
=157mm2
As
Perhitungan kapasitas geser baja (Vs)
Avfyvd
Vs =
s
a. Pada tumpuan
Step 2
157240392
Vs =
150
b. Pada lapangan
=15724
Vs
Perhitungan kapasitas Desain gedung ini ad balok hanya diten
Vc=
Step 3 Perhitun
Mnb M

Step 4

10
Step SLOOF 2
Perhitungan luas tulangan geser
1 2
As = n 𝜋 D
Step 1 4
As = 157 mm2
Perhitungan kapasitas geser baja (Vs)
Av fyv d
Vs = s
a. Pada tumpuan
Step 2 157 240 342
Vs = 150 = 85,9 kN
b. Pada lapangan
157 240 342
Vs = 200 = 64,4 kN

Perhitungan kapasitas geser beton (Vc)


Desain gedung ini adalah SRPMK maka kekuatan nominal geser
Step 3 balok hanya ditentukan oleh kekuatan bajanya saja
Vc = 0,29𝜆 ƒ𝑐′𝑏w𝑑 = 0 kN

Perhitungan Vu
Mnb = Diambil pada konsisi lentur murni = 111 kN.m
Mnt = Diambil pada konsisi lentur murni = 111 kN.m
Step 4
lu = Panjang total sloof = 6 m

Mnl + Mnb
Vu = = 37 kN
lu

5.2. Perhitungan Gaya Dalam


Untuk membandingkan kapasitas elemen pada struktur maka dibutuhkan gaya dalam
yang diakibatkan beban-beban yang berada pada struktur dan dijelasakan sebagai
berikut.

5.2.1. Permodelan Struktur


Permodelan struktur bangunan dengan SRMPK dapat dilihat pada gambar dibawah
ini yang merupakan permodelan yang dilakukan dengan program bantu SAP2000 v.14.2.2

11
Gambar 5.3 : Permodelan Struktur Bangunan

5.2.2. Besaran Massa


Besaran massa elemen struktur (mass source) adalah massa struktur pada program
bantu SAP2000 v.14.2.2 yang digunakan pada perhitungan untuk analisa modal
menggunakan pilihan "mass definition: from element and additional masses and loads"
dimana berat sendiri akan dihitung oleh struktur sedangkan beban. tambahan ditambahkan
dengan
pembesaran sesuai dengan jenis bebannya. Massa-massa yang dimasukkan adalah
sebagai berikut.

- Beban mati (DEAD) : 1,0


- Beban mati tambahan (SDL) : 1,0
- Beban hidup (LIVE) : 0,5
- Beban hidup atap (LIVE ROOF) : 0,5

11
Gambar 5.4 : Mass Source SAP2000

5.2.3. Peninjauan Terhadap Pengaruh Gempa


Peninjauan gempa horizontal dibagi menjadi dua arah yaitu:

1. Gempa arah X dengan komposisi 100% EQX + 30% EQY


2. Gempa arah Y dengan komposisi 100% EQY + 30% EQX
Setiap kombinasi gempa, diasumsukan gempa datang dari segala arah. Sehingga
arah gempa yang terjadi adalah sebagai berikut.
1. + +
2. + -
3. - +
4. - -

11
5.2.4. Faktor Skala Gaya Beban Gempa dengan Respons Spektrum
Faktor skala dapat dihitung dengan rumus berikut.

= Ixg
Faktor Skala
R

Keterangan:
g = percepatan gravitasi (m/s²) = 9,8 m/s²
I = Faktor keutamaan bangunan = 1
R = Faktor koefisien modifikasi = 8

5.3. Kontrol Berat Bangunan (Self Weight)


Berikut adalah perhitungan berat sendiri bangunan (self weight) lalu dibandingkan
dengan besarnya berat bangunan pada program bantu SAP 2000. Apabila hasilnya sama,
maka define material, define frame section, dan area section dikatakan benar.

5.3.1. Pelat Lantai dan Pelat Atap


Tabel 5.17 : Self Weight Pelat Lantai dan Pelat Atap
Berat Jenis P L t Berat
Beban Jenis Beban Jumlah
kg/m3 (m) (m) (m) (Ton)
Pelat Pelat Lantai 2 2400 32 9 0,12 1 82,944
Lantai Pelat Lantai 3 2400 10 9 0,12 1 25,92
Pelat Pelat Atap 2400 10 9 0,10 1 21,6
Atap Pelat Atap Lt 3 2400 22 9 0,10 1 47,52
TOTAL 177,984

5.3.2. Sloof
Tabel 5.18 : Self Weight Sloof
Berat Jenis b h L Berat
Beban Jenis Beban Jumlah
kg/m3 (m) (m) (m) (Ton)
2400 0,3 0,45 9 7 20,412
Sloof 1 2400 0,3 0,45 32 2 20,736
Sloof 2400 0,3 0,45 10 2 6,48
Sloof 2 2400 0,25 0,4 22 2 10,56
TOTAL 58,188

93
5.3.3. Kolom
Tabel 5.19 : Self Weight Kolom
Berat Jenis b h T Berat
Beban Jenis Beban Jumlah
kg/m3 (m) (m) (m) (Ton)
2400 0,5 0,5 4 44 105,6
Kolom 1
Kolom 2400 0,5 0,5 1 22 13,2
Kolom 2 2400 0,4 0,4 4 12 18,432
TOTAL 137,232

5.3.4. Balok
Tabel 5.20 : Self Weight Balok
Berat Jenis b h L Berat
Beban Jenis Beban Jumlah
kg/m3 (m) (m) (m) (Ton)
Balok 1 Lt 2 2400 0,45 0,8 9 5 38,88
Balok 1 Lt 3 2400 0,45 0,8 9 5 38,88
2400 0,3 0,5 9 2 6,48
Balok 2 Lt 2
2400 0,3 0,5 32 2 23,04
2400 0,3 0,5 9 2 6,48
Balok 2 Lt 3
2400 0,3 0,5 32 2 23,04
2400 0,3 0,5 10 2 7,2
Balok Balok 2 Atap
2400 0,3 0,5 9 3 9,72
Balok 3 Lt 2 2400 0,3 0,45 32 2 20,736
Balok 3 Lt 3 2400 0,3 0,45 32 2 20,736
Balok 3 Lt Atap 2400 0,3 0,45 10 2 6,48
Balok 4 Lt 2 2400 0,2 0,35 9 6 9,072
Balok 4 Lt 3 2400 0,2 0,35 9 6 9,072
Balok 4 Lt Atap 2400 0,2 0,35 9 2 3,024
TOTAL 222,840

5.3.5. Rekapitulasi
Tabel 5.21 : Rekapitulasi Self Weight
Berat Jenis Berat
Beban
kg/m 3 (Ton)
Pelat 2400 177,984
Sloof 2400 58,188
Balok 2400 222,84
Kolom 2400 137,232
TOTAL 596,244

94
5.3.6. Kontrol pada SAP 2000

5.4. Kontrol Gaya Dalam


Untuk melakukan kontrol gaya dalam yang terjadi pada program bantu SAP 2000,
maka dilakukan pengecekan pada balok (B1) sebagai berikut.

Gambar 5.5 : Balok yang Ditinjau

1. Beban Mati

- Berat B1 = V x BJ
= p x l x t
= 9 x 0,45 x 0,8 x 24
= 77,76 kN
- Berat Plat = V x BJ
= p x l x t
= 9 x 6 x 0,1 x 24
= 155,52 kN

- Beban Ma = 1,11 kN/m²


= A x W
= 54 x 1,11
= 59,94 kN
Jumlah = 293,22 kN

95
2. Beban Hidup

W = 2,4 kN/m²
= A x W
= 54 x
2,4 W = 129,6 kN

Maka, beban mati dan hidup total per satuan panjang adalah:
W 32,6kN/m
DL = 293,2
L = 9 =

W
LL =
129,6 14,4kN/m
L = 9 =
Wu = 1,2 DL + 1,6L
Wu = 62,136 kN/m

Untuk menghitung momen yang terjadi pada balok, digunakan metode analisis
sebagai berikut.

+ =
M
Wu x 62,14 x 81
= 14
L2
14
+
M = 359,5 kN.m

-
M =
Wu x 62,14 x 81
-
= 314,56 =
kN.m 16
M L2
16
= 338 kN.m (SAP Kombinasi 1,2 DL + 1,6 L)
+
M = 347 kN.m (SAP Kombinasi 1,2 DL + 1,6 L)
-
M

Selisih M+

= 360 - 338
33
8
= 6% < 20% (OKE)

96
Selisih M-
315 - 347
=
34
7
= 9% < 20% (OKE)

97
5.5. Verifikasi Hasil Gaya Dalam
5.5.1. Elemen Pelat Eksisting
A. PELAT LANTAI 2
Momen Ultimate (Mu) pelat merupakan output dari Program Bantu SAP 2000.
Berikut adalah rekapitulasi verifikasi momen pelat lantai 2 eksisting.

Tabel 5.22 : Rekapitulasi Verifikasi Momen Pelat Lantai 2 Eksisting


Tumpuan Lapangan
Nama As Kombinasi Check Check
Letak Arah φMn Mu eksisting φMn Mu eksesting
Elemen Bangunan Beban
(kN.m) (kN.m) Mu af ≤ φMn (kN.m) (kN.m) Mu af ≤ φMn
X 14,9908 10,9226 (OKE) 14,9908 3,1806 (OKE)
A - A' 1 - 2 ENVELOPE
Y 13,1530 7,4652 (OKE) 13,1530 2,5243 (OKE)
X 14,9908 10,7746 (OKE) 14,9908 2,9892 (OKE)
Lantai 2 A - A' 2 - 3 ENVELOPE
Y 13,1530 7,0213 (OKE) 13,1530 2,627 (OKE)
X 14,9908 10,9153 (OKE) 14,9908 3,1803 (OKE)
A - A' 3 - 4 ENVELOPE
Y 13,1530 7,4349 (OKE) 13,1530 2,9124 (OKE)
X 14,9908 9,2394 (OKE) 14,9908 2,7583 (OKE)
A' - B 1 - 2 ENVELOPE
Y 13,1530 7,8863 (OKE) 13,1530 3,1853 (OKE)
X 14,9908 4,0183 (OKE) 14,9908 3,1251 (OKE)
Lantai 2 A' - B 2 - 3 ENVELOPE
Y 13,1530 1,3035 (OKE) 13,1530 3,5418 (OKE)
X 14,9908 9,2449 (OKE) 14,9908 2,7572 (OKE)
A' - B 3 - 4 ENVELOPE
Y 13,1530 7,8843 (OKE) 13,1530 3,185 (OKE)
X 14,9908 6,1817 (OKE) 14,9908 3,7267 (OKE)
B - B' 1 - 2 ENVELOPE
Y 13,1530 4,8818 (OKE) 13,1530 3,6051 (OKE)
X 14,9908 3,0467 (OKE) 14,9908 4,4033 (OKE)
Lantai 2 B - B' 2 - 3 ENVELOPE
Y 13,1530 0,9714 (OKE) 13,1530 5,0728 (OKE)
X 14,9908 6,1785 (OKE) 14,9908 3,7275 (OKE)
B - B' 3 - 4 ENVELOPE
Y 13,1530 4,8788 (OKE) 13,1530 3,6065 (OKE)
X 14,9908 9,943 (OKE) 14,9908 3,5525 (OKE)
B' - C 1 - 2 ENVELOPE
Y 13,1530 8,6857 (OKE) 13,1530 3,5092 (OKE)
X 14,9908 7,4049 (OKE) 14,9908 3,9613 (OKE)
Pl
at

Lantai 2 B' - C 2 - 3 ENVELOPE


L

Y 13,1530 1,0784 (OKE) 13,1530 5,0788 (OKE)


X 14,9908 9,9409 (OKE) 14,9908 3,553 (OKE)
B' - C 3 - 4 ENVELOPE
Y 13,1530 8,6807 (OKE) 13,1530 3,5108 (OKE)
X 14,9908 6,577 (OKE) 14,9908 3,9046 (OKE)
C - C' 1 - 2 ENVELOPE
Y 13,1530 4,827 (OKE) 13,1530 3,5321 (OKE)
X 14,9908 4,5094 (OKE) 14,9908 3,9703 (OKE)
Lantai 2 C - C' 2 - 3 ENVELOPE
Y 13,1530 1,0592 (OKE) 13,1530 5,1236 (OKE)
X 14,9908 6,577 (OKE) 14,9908 3,9044 (OKE)
C - C' 3 - 4 ENVELOPE
Y 13,1530 4,826 (OKE) 13,1530 3,5329 (OKE)
X 14,9908 8,9616 (OKE) 14,9908 3,7617 (OKE)
C' - D 1 - 2 ENVELOPE
Y 13,1530 8,0332 (OKE) 13,1530 3,6622 (OKE)
X 14,9908 6,1467 (OKE) 14,9908 4,4557 (OKE)
Lantai 2 C' - D 2 - 3 ENVELOPE
Y 13,1530 0,8683 (OKE) 13,1530 5,1826 (OKE)
X 14,9908 8,9633 (OKE) 14,9908 3,7613 (OKE)
C' - D 3 - 4 ENVELOPE
Y 13,1530 8,0376 (OKE) 13,1530 3,6617 (OKE)
X 14,9908 9,0638 (OKE) 14,9908 2,8993 (OKE)
D - D' 1 - 2 ENVELOPE
Y 13,1530 8,1746 (OKE) 13,1530 3,4266 (OKE)
X 14,9908 3,9579 (OKE) 14,9908 3,3163 (OKE)
Lantai 2 D - D' 2 - 3 ENVELOPE
Y 13,1530 1,03 (OKE) 13,1530 3,687 (OKE)
X 14,9908 9,0621 (OKE) 14,9908 2,8994 (OKE)
D - D' 3 - 4 ENVELOPE
Y 13,1530 8,1779 (OKE) 13,1530 3,0312 (OKE)

98
Tumpuan Lapangan
Nama As Kombinasi Check Check
Letak Arah φMn Mu eksisting φMn Mu eksesting
Elemen Bangunan Beban
(kN.m) (kN.m) Mu af ≤ φMn (kN.m) (kN.m) Mu af ≤ φMn
X 14,9908 10,9071 (OKE) 14,9908 2,7609 (OKE)
D' - E 1 - 2 ENVELOPE
Y 13,1530 5,2573 (OKE) 13,1530 2,2154 (OKE)
X 14,9908 10,7551 (OKE) 14,9908 2,8492 (OKE)
Lantai 2 D' - E 2 - 3 ENVELOPE
Y 13,1530 4,9168 (OKE) 13,1530 2,689 (OKE)
X 14,9908 10,906 (OKE) 14,9908 2,7604 (OKE)
D' - E 3 - 4 ENVELOPE
Y 13,1530 5,2536 (OKE) 13,1530 2,2147 (OKE)
X 14,9908 9,4159 (OKE) 14,9908 3,0941 (OKE)
E - E' 1 - 2 ENVELOPE
Y 13,1530 4,495 (OKE) 13,1530 2,1441 (OKE)
X 14,9908 9,3944 (OKE) 14,9908 3,0604 (OKE)
Lantai 2 E - E' 2 - 3 ENVELOPE
Y 13,1530 4,2863 (OKE) 13,1530 1,8478 (OKE)
X 14,9908 9,4141 (OKE) 14,9908 3,0944 (OKE)
E - E' 3 - 4 ENVELOPE
Y 13,1530 4,4911 (OKE) 13,1530 2,1439 (OKE)
X 14,9908 8,788 (OKE) 14,9908 3,1452 (OKE)
E' - F 1 - 2 ENVELOPE
Y 13,1530 4,3956 (OKE) 13,1530 2,1599 (OKE)
X 14,9908 8,7199 14,9908 3,1709
Lant
Plat

(OKE) (OKE)
ai

Lantai 2 E' - F 2 - 3 ENVELOPE


Y 13,1530 4,1368 (OKE) 13,1530 1,8849 (OKE)
X 14,9908 8,7882 (OKE) 14,9908 3,1447 (OKE)
E' - F 3 - 4 ENVELOPE
Y 13,1530 4,3941 (OKE) 13,1530 2,1596 (OKE)
X 14,9908 9,8096 (OKE) 14,9908 3,2782 (OKE)
F - F' 1 - 2 ENVELOPE
Y 13,1530 4,6437 (OKE) 13,1530 2,2049 (OKE)
X 14,9908 9,7862 (OKE) 14,9908 3,3773 (OKE)
Lantai 2 F - F' 2 - 3 ENVELOPE
Y 13,1530 4,4307 (OKE) 13,1530 1,9524 (OKE)
X 14,9908 9,8081 (OKE) 14,9908 3,2786 (OKE)
F - F' 3 - 4 ENVELOPE
Y 13,1530 4,6418 (OKE) 13,1530 2,205 (OKE)
X 14,9908 10,5149 (OKE) 14,9908 3,6514 (OKE)
F' - G 1 - 2 ENVELOPE
Y 13,1530 7,9534 (OKE) 13,1530 3,9015 (OKE)
X 14,9908 10,4173 (OKE) 14,9908 3,7891 (OKE)
Lantai 2 F' - G 2 - 3 ENVELOPE
Y 13,1530 7,5831 (OKE) 13,1530 2,6567 (OKE)
X 14,9908 10,5162 (OKE) 14,9908 3,6507 (OKE)
F' - G 3 - 4 ENVELOPE
Y 13,1530 7,9548 (OKE) 13,1530 3,9017 (OKE)

B. PELAT LANTAI 3
Momen Ultimate (Mu) pelat merupakan output dari Program Bantu SAP 2000.
Berikut adalah rekapitulasi verifikasi momen pelat lantai 3 eksisting.

Tabel 5.23 : Rekapitulasi Verifikasi Momen Pelat Lantai 3 Eksisting


Tumpuan Lapangan
Nama As Kombinasi Check Check
Letak Arah φMn Mu eksisting φMn Mu eksesting
Elemen Bangunan Beban
(kN.m) (kN.m) Mu af ≤ φMn (kN.m) (kN.m) Mu af ≤ φMn
X 14,9908 3,9525 (OKE) 14,9908 1,3218 (OKE)
A - A' 1 - 2 ENVELOPE
Y 13,1530 2,2269 (OKE) 13,1530 1,2838 (OKE)
X 14,9908 3,9226 (OKE) 14,9908 1,242 (OKE)
Lantai 3 A - A' 2 - 3 ENVELOPE
Y 13,1530 2,1225 (OKE) 13,1530 1,3081 (OKE)
X 14,9908 3,9515 (OKE) 14,9908 1,3222 (OKE)
A - A' 3 - 4 ENVELOPE
Lantai

Y 13,1530 2,2266 13,1530 1,284


Plat

(OKE) (OKE)
X 14,9908 3,2424 (OKE) 14,9908 1,4164 (OKE)
A' - B 1 - 2 ENVELOPE
Y 13,1530 2,718 (OKE) 13,1530 1,5348 (OKE)
X 14,9908 1,7293 (OKE) 14,9908 1,6926 (OKE)
Lantai 3 A' - B 2 - 3 ENVELOPE
Y 13,1530 0,8485 (OKE) 13,1530 1,8583 (OKE)
X 14,9908 3,2433 (OKE) 14,9908 1,4163 (OKE)
A' - B 3 - 4 ENVELOPE
Y 13,1530 2,7191 (OKE) 13,1530 1,5348 (OKE)

99
Tumpuan Lapangan
Nama As Kombinasi Check Check
Letak Arah φMn Mu eksisting φMn Mu eksesting
Elemen Bangunan Beban
(kN.m) (kN.m) Mu af ≤ φMn (kN.m) (kN.m) Mu af ≤ φMn
X 14,9908 2,0501 (OKE) 14,9908 1,8379 (OKE)
B - B' 1 - 2 ENVELOPE
Y 13,1530 2,5155 (OKE) 13,1530 1,9322 (OKE)
X 14,9908 1,2444 (OKE) 14,9908 2,1982 (OKE)
Lantai 3 B - B' 2 - 3 ENVELOPE
Y 13,1530 0,871 (OKE) 13,1530 2,6079 (OKE)
X 14,9908 2,0501 (OKE) 14,9908 1,8378 (OKE)
B - B' 3 - 4 ENVELOPE
Y 13,1530 2,5157 (OKE) 13,1530 1,9319 (OKE)
X 14,9908 4,4875 (OKE) 14,9908 1,7003 (OKE)
B' - C 1 - 2 ENVELOPE
Y 13,1530 3,085 (OKE) 13,1530 1,9036 (OKE)
X 14,9908 3,6723 (OKE) 14,9908 2,01 (OKE)
Lantai 3 B' - C 2 - 3 ENVELOPE
Y 13,1530 0,9106 (OKE) 13,1530 2,6178 (OKE)
X 14,9908 4,4878 (OKE) 14,9908 1,7001 (OKE)
B' - C 3 - 4 ENVELOPE
Y 13,1530 3,0856 (OKE) 13,1530 1,9034 (OKE)
14,9908 2,2755 (OKE) 14,9908 1,7263 (OKE)
C - C' 1 - 2 ENVELOPE
13,1530 2,5076 (OKE) 13,1530 1,9008 (OKE)
X 14,9908 1,8224 (OKE) 14,9908 2,016 (OKE)
Lantai 3 C - C' 2 - 3 ENVELOPE
Y 13,1530 0,9138 (OKE) 13,1530 2,6129 (OKE)
X 14,9908 2,2756 (OKE) 14,9908 1,7264 (OKE)
C - C' 3 - 4 ENVELOPE
Y 13,1530 2,5977 (OKE) 13,1530 1,9007 (OKE)
X 14,9908 4,0061 (OKE) 14,9908 1,8356 (OKE)
C' - D 1 - 2 ENVELOPE
Y 13,1530 2,6047 (OKE) 13,1530 1,9227 (OKE)
X 14,9908 3,3039 (OKE) 14,9908 2,1981 (OKE)
Lantai 3 C' - D 2 - 3 ENVELOPE
Y 13,1530 0,8874 (OKE) 13,1530 2,5934 (OKE)
X 14,9908 4,0057 (OKE) 14,9908 1,8357 (OKE)
C' - D 3 - 4 ENVELOPE
Y 13,1530 2,6043 (OKE) 13,1530 1,9228 (OKE)
X 14,9908 3,1985 (OKE) 14,9908 1,3698 (OKE)
D - D' 1 - 2 ENVELOPE
Y 13,1530 2,6784 (OKE) 13,1530 1,5165 (OKE)
X 14,9908 1,6919 (OKE) 14,9908 1,6172 (OKE)
Lantai 3 D - D' 2 - 3 ENVELOPE
Y 13,1530 0,8896 (OKE) 13,1530 1,8131 (OKE)
X 14,9908 3,1983 (OKE) 14,9908 1,3698 (OKE)
D - D' 3 - 4 ENVELOPE
Y 13,1530 2,6781 13,1530 1,3739
P

(OKE) (OKE)
a
l

X 14,9908 4,0347 (OKE) 14,9908 1,1138 (OKE)


D' - E 1 - 2 ENVELOPE
Y 13,1530 2,1109 (OKE) 13,1530 1,15 (OKE)
X 14,9908 4,8504 (OKE) 14,9908 1,0419 (OKE)
Lantai 3 D' - E 2 - 3 ENVELOPE
Y 13,1530 1,9399 (OKE) 13,1530 1,1748 (OKE)
X 14,9908 4,0349 (OKE) 14,9908 1,1138 (OKE)
D' - E 3 - 4 ENVELOPE
Y 13,1530 2,111 (OKE) 13,1530 1,15 (OKE)
X 14,9908 7,8853 (OKE) 14,9908 2,9094 (OKE)
E - E' 1 - 2 ENVELOPE
Y 13,1530 3,2587 (OKE) 13,1530 2,1836 (OKE)
X 14,9908 7,9628 (OKE) 14,9908 2,9154 (OKE)
Lantai 3 E - E' 2 - 3 ENVELOPE
Y 13,1530 3,4729 (OKE) 13,1530 1,9408 (OKE)
X 14,9908 7,8855 (OKE) 14,9908 2,9093 (OKE)
E - E' 3 - 4 ENVELOPE
Y 13,1530 3,2589 (OKE) 13,1530 2,1836 (OKE)
X 14,9908 7,6441 (OKE) 14,9908 2,8842 (OKE)
E' - F 1 - 2 ENVELOPE
Y 13,1530 3,2724 (OKE) 13,1530 2,1665 (OKE)
X 14,9908 7,6598 (OKE) 14,9908 2,9192 (OKE)
Lantai 3 E' - F 2 - 3 ENVELOPE
Y 13,1530 3,5081 (OKE) 13,1530 1,9277 (OKE)
X 14,9908 7,6441 (OKE) 14,9908 2,8842 (OKE)
E' - F 3 - 4 ENVELOPE
Y 13,1530 3,2725 (OKE) 13,1530 2,1664 (OKE)
X 14,9908 8,0022 (OKE) 14,9908 2,9065 (OKE)
F - F' 1 - 2 ENVELOPE
Y 13,1530 3,3279 (OKE) 13,1530 2,1721 (OKE)
X 14,9908 8,078 (OKE) 14,9908 2,9404 (OKE)
Lantai 3 F - F' 2 - 3 ENVELOPE
Y 13,1530 3,6243 (OKE) 13,1530 1,9348 (OKE)
X 14,9908 8,0023 (OKE) 14,9908 2,9064 (OKE)
F - F' 3 - 4 ENVELOPE
Y 13,1530 3,328 (OKE) 13,1530 2,1721 (OKE)
X 14,9908 8,4846 (OKE) 14,9908 3,2497 (OKE)
F' - G 1 - 2 ENVELOPE
Y 13,1530 5,8183 (OKE) 13,1530 2,4341 (OKE)
X 14,9908 8,4431 (OKE) 14,9908 3,3124 (OKE)
Lantai 3 F' - G 2 - 3 ENVELOPE
Y 13,1530 5,7978 (OKE) 13,1530 2,1931 (OKE)
X 14,9908 8,4845 (OKE) 14,9908 3,2497 (OKE)
F' - G 3 - 4 ENVELOPE
Y 13,1530 5,8183 (OKE) 13,1530 2,4341 (OKE)

10
C. PELAT ATAP
Momen Ultimate (Mu) pelat merupakan output dari Program Bantu SAP 2000.
Berikut adalah rekapitulasi verifikasi momen pelat atap eksisting.

Tabel 5.24 : Rekapitulasi Verifikasi Momen Pelat Atap Eksisting


Tumpuan Lapangan
Nama As Kombinasi Check Check
Letak Arah φMn Mu eksisting φMn Mu eksesting
Elemen Bangunan Beban
(kN.m) (kN.m) Mu af ≤ φMn (kN.m) (kN.m) Mu af ≤ φMn
X 11,3152 2,3608 (OKE) 11,3152 1,5785 (OKE)
E - E' 1 - 2 ENVELOPE
Y 9,4773 1,604 (OKE) 9,4773 1,3268 (OKE)
Lantai E - E' 2 - 3 ENVELOPE X 11,3152 2,3969 (OKE) 11,3152 1,688 (OKE)
Atap Y 9,4773 1,6485 (OKE) 9,4773 1,2386 (OKE)
X 11,3152 2,3609 (OKE) 11,3152 1,5785 (OKE)
E - E' 3 - 4 ENVELOPE
Y 9,4773 1,6039 (OKE) 9,4773 1,3268 (OKE)
X 11,3152 3,0815 (OKE) 11,3152 1,2924 (OKE)
E' - F 1 - 2 ENVELOPE
Y 9,4773 1,8588 (OKE) 9,4773 1,2366 (OKE)
Lantai E' - F 2 - 3 ENVELOPE X 11,3152 3,4047 (OKE) 11,3152 1,3032 (OKE)
Atap Y 9,4773 1,8906 (OKE) 9,4773 1,0941 (OKE)
X 11,3152 3,0815 (OKE) 11,3152 1,2924 (OKE)
E' - F 3 - 4 ENVELOPE
Y 9,4773 1,8589 9,4773 1,2366
Pelat
Atap

(OKE) (OKE)
X 11,3152 3,1131 (OKE) 11,3152 1,2609 (OKE)
F - F' 1 - 2 ENVELOPE
Y 9,4773 1,8877 (OKE) 9,4773 1,2271 (OKE)
Lantai F - F' 2 - 3 ENVELOPE X 11,3152 3,4208 (OKE) 11,3152 1,2659 (OKE)
Atap Y 9,4773 1,9064 (OKE) 9,4773 1,0747 (OKE)
X 11,3152 3,1131 (OKE) 11,3152 1,2609 (OKE)
F - F' 3 - 4 ENVELOPE
Y 9,4773 1,8878 (OKE) 9,4773 1,2271 (OKE)
X 11,3152 2,3658 (OKE) 11,3152 1,5679 (OKE)
F' - G 1 - 2 ENVELOPE
Y 9,4773 1,5858 (OKE) 9,4773 1,3212 (OKE)
Lantai F' - G 2 - 3 ENVELOPE X 11,3152 2,3517 (OKE) 11,3152 1,6571 (OKE)
Atap Y 9,4773 1,6806 (OKE) 9,4773 1,2127 (OKE)
X 11,3152 2,3658 (OKE) 11,3152 1,5679 (OKE)
F' - G 3 - 4 ENVELOPE
Y 9,4773 1,5858 (OKE) 9,4773 1,3212 (OKE)

10
5.5.2. Elemen Pelat Alih Fungsi
A. PELAT LANTAI 2
Momen Ultimate (Mu) pelat merupakan output dari Program Bantu SAP 2000.
Berikut adalah rekapitulasi verifikasi momen pelat lantai 2 alih fungsi.

Tabel 5.25 : Rekapitulasi Verifikasi Momen Pelat Lantai 2 Alih Fungsi


Tumpuan Lapangan
Nama Kombinasi
Letak As Bangunan Arah φMn Mualihfungs Check φMn Mualihfungsi Check
Elemen Beban
(kN.m) i (kN.m) Mu af ≤ φMn (kN.m) (kN.m) Mu af ≤ φMn
X 14,9908 13,5286 (OKE) 14,9908 4,1222 (OKE)
A - A' 1-2 ENVELOPE
Y 13,1530 8,7331 (OKE) 13,1530 3,456 (OKE)
X 14,9908 13,4707 (OKE) 14,9908 3,8312 (OKE)
Lantai 2 A - A' 2-3 ENVELOPE
Y 13,1530 8,3086 (OKE) 13,1530 3,5172 (OKE)
X 14,9908 13,6944 (OKE) 14,9908 4,1191 (OKE)
A - A' 3-4 ENVELOPE
Y 13,1530 8,8436 (OKE) 13,1530 3,4565 (OKE)
X 14,9908 11,33249 (OKE) 14,9908 3,6783 (OKE)
A' - B 1-2 ENVELOPE
Y 13,1530 9,5347 (OKE) 13,1530 4,2081 (OKE)
X 14,9908 5,3378 (OKE) 14,9908 4,4381 (OKE)
Lantai 2 A' - B 2-3 ENVELOPE
Y 13,1530 1,9857 (OKE) 13,1530 4,9277 (OKE)
X 14,9908 11,4026 (OKE) 14,9908 3,6783 (OKE)
A' - B 3-4 ENVELOPE
Y 13,1530 9,6491 (OKE) 13,1530 4,2083 (OKE)
X 14,9908 11,8503 (OKE) 14,9908 5,1926 (OKE)
B - B' 1-2 ENVELOPE
Y 13,1530 9,2566 (OKE) 13,1530 5,0234 (OKE)
X 14,9908 8,9638 (OKE) 14,9908 6,1629 (OKE)
Lantai 2 B - B' 2-3 ENVELOPE
Y 13,1530 1,6801 (OKE) 13,1530 6,9761 (OKE)
X 14,9908 11,8507 (OKE) 14,9908 5,1926 (OKE)
B - B' 3-4 ENVELOPE
Y 13,1530 9,2562 (OKE) 13,1530 5,0235 (OKE)
X 14,9908 13,3192 (OKE) 14,9908 5,2791 (OKE)
B' - C 1-2 ENVELOPE
Y 13,1530 10,8015 (OKE) 13,1530 4,8127 (OKE)
X 14,9908 10,5369 (OKE) 14,9908 5,5768 (OKE)
Pl
at
L

Lantai 2 B' - C 2-3 ENVELOPE


Y 13,1530 1,9794 (OKE) 13,1530 6,9087 (OKE)
X 14,9908 13,3185 (OKE) 14,9908 5,2793 (OKE)
B' - C 3-4 ENVELOPE
Y 13,1530 10,8025 (OKE) 13,1530 4,8122 (OKE)
X 14,9908 13,7054 (OKE) 14,9908 5,1534 (OKE)
C - C' 1-2 ENVELOPE
Y 13,1530 11,1542 (OKE) 13,1530 4,6943 (OKE)
X 14,9908 10,5495 (OKE) 14,9908 5,427 (OKE)
Lantai 2 C - C' 2-3 ENVELOPE
Y 13,1530 2,075 (OKE) 13,1530 6,7707 (OKE)
X 14,9908 13,7073 (OKE) 14,9908 5,1521 (OKE)
C - C' 3-4 ENVELOPE
Y 13,1530 11,1592 (OKE) 13,1530 4,6916 (OKE)
X 14,9908 11,8486 (OKE) 14,9908 5,0966 (OKE)
C' - D 1-2 ENVELOPE
Y 13,1530 9,6422 (OKE) 13,1530 4,7632 (OKE)
X 14,9908 9,2676 (OKE) 14,9908 6,0285 (OKE)
Lantai 2 C' - D 2-3 ENVELOPE
Y 13,1530 2,0001 (OKE) 13,1530 6,6993 (OKE)
X 14,9908 11,858 (OKE) 14,9908 5,095 (OKE)
C' - D 3-4 ENVELOPE
Y 13,1530 9,6793 (OKE) 13,1530 4,7581 (OKE)
X 14,9908 10,0182 (OKE) 14,9908 2,953 (OKE)
D - D' 1-2 ENVELOPE
Y 13,1530 9,6912 (OKE) 13,1530 3,8361 (OKE)
X 14,9908 5,265 (OKE) 14,9908 3,5667 (OKE)
Lantai 2 D - D' 2-3 ENVELOPE
Y 13,1530 1,6804 (OKE) 13,1530 4,2709 (OKE)
X 14,9908 10,097 (OKE) 14,9908 2,9488 (OKE)
D - D' 3-4 ENVELOPE
Y 13,1530 9,7257 (OKE) 13,1530 3,8336 (OKE)

10
Tumpuan Lapangan
Nama As Kombinasi
Letak Arah φMn Mualihfungs Check φMn Mualihfungsi Check
Elemen Bangunan Beban
(kN.m) i (kN.m) Mu af ≤ φMn (kN.m) (kN.m) Mu af ≤ φMn
X 14,9908 12,0717 (OKE) 14,9908 2,8882 (OKE)
D' - E 1 - 2 ENVELOPE
Y 13,1530 5,7591 (OKE) 13,1530 2,1579 (OKE)
X 14,9908 11,9914 (OKE) 14,9908 3,1792 (OKE)
Lantai 2 D' - E 2 - 3 ENVELOPE Y 13,1530 5,6047 (OKE) 13,1530 3,0625 (OKE)
X 14,9908 12,0419 (OKE) 14,9908 2,8955 (OKE)
D' - E 3 - 4 ENVELOPE
Y 13,1530 5,6794 (OKE) 13,1530 2,1686 (OKE)
X 14,9908 10,722 (OKE) 14,9908 3,9368 (OKE)
E - E' 1 - 2 ENVELOPE
Y 13,1530 5,2147 (OKE) 13,1530 2,6936 (OKE)
X 14,9908 10,8048 (OKE) 14,9908 4,0117 (OKE)
Lantai 2 E - E' 2 - 3 ENVELOPE Y 13,1530 5,0029 (OKE) 13,1530 2,3983 (OKE)
X 14,9908 10,7138 (OKE) 14,9908 3,9382 (OKE)
E - E' 3 - 4 ENVELOPE
Y 13,1530 5,2815 (OKE) 13,1530 2,7105 (OKE)
X 14,9908 10,5736 (OKE) 14,9908 3,9054 (OKE)
E' - F 1 - 2 ENVELOPE
Y 13,1530 5,203 (OKE) 13,1530 2,7263 (OKE)
X 14,9908 10,525 (OKE) 14,9908 3,9873 (OKE)
Pla

La

Lantai 2 E' - F 2 - 3 ENVELOPE


t

Y 13,1530 5,0429 (OKE) 13,1530 2,4464 (OKE)


X 14,9908 10,5112 (OKE) 14,9908 3,9292 (OKE)
E' - F 3 - 4 ENVELOPE
Y 13,1530 5,2181 (OKE) 13,1530 2,7562 (OKE)
X 14,9908 10,3663 (OKE) 14,9908 3,3765 (OKE)
F - F' 1 - 2 ENVELOPE
Y 13,1530 5,3429 (OKE) 13,1530 2,1976 (OKE)
X 14,9908 10,4002 (OKE) 14,9908 3,2193 (OKE)
Lantai 2 F - F' 2 - 3 ENVELOPE Y 13,1530 4,9846 (OKE) 13,1530 1,4244 (OKE)
X 14,9908 10,3974 (OKE) 14,9908 3,5392 (OKE)
F - F' 3 - 4 ENVELOPE
Y 13,1530 5,455 (OKE) 13,1530 2,3779 (OKE)
X 14,9908 10,9689 (OKE) 14,9908 3,8881 (OKE)
F' - G 1 - 2 ENVELOPE
Y 13,1530 9,2412 (OKE) 13,1530 5,6565 (OKE)
X 14,9908 10,8821 (OKE) 14,9908 3,5201 (OKE)
Lantai 2 F' - G 2 - 3 ENVELOPE Y 13,1530 8,733 (OKE) 13,1530 4,5035 (OKE)
X 14,9908 11,1225 (OKE) 14,9908 4,0366 (OKE)
F' - G 3 - 4 ENVELOPE Y 13,1530 9,3386 (OKE) 13,1530 5,424 (OKE)

B. PELAT LANTAI 3
Momen Ultimate (Mu) pelat merupakan output dari Program Bantu SAP 2000.
Berikut adalah rekapitulasi verifikasi momen pelat lantai 3 alih fungsi.

Tabel 5.26 : Rekapitulasi Verifikasi Momen Pelat Lantai 3 Alih Fungsi


Tumpuan Lapangan
Nama As Kombinasi Check Check
Letak Arah φMn Mualihfungs φMn Mualihfungsi
Elemen Bangunan Beban
(kN.m) i (kN.m) Mu af ≤ φMn (kN.m) (kN.m) Mu af ≤ φMn
X 14,9908 4,3894 (OKE) 14,9908 1,4525 (OKE)
A - A' 1 - 2 ENVELOPE
Y 13,1530 2,345 (OKE) 13,1530 1,2719 (OKE)
X 14,9908 4,403 (OKE) 14,9908 1,3685 (OKE)
Lantai 3 A - A' 2 - 3 ENVELOPE Y 13,1530 2,3438 (OKE) 13,1530 1,2805 (OKE)
Pelat Lantai

X 14,9908 4,4428 (OKE) 14,9908 1,4509 (OKE)


A - A' 3 - 4 ENVELOPE
Y 13,1530 2,3904 (OKE) 13,1530 1,2718 (OKE)
X 14,9908 3,3338 (OKE) 14,9908 1,4272 (OKE)
A' - B 1 - 2 ENVELOPE
Y 13,1530 2,7839 (OKE) 13,1530 1,4618 (OKE)
X 14,9908 1,7989 (OKE) 14,9908 1,6339 (OKE)
Lantai 3 A' - B 2 - 3 ENVELOPE Y 13,1530 0,8921 (OKE) 13,1530 1,8203 (OKE)
X 14,9908 3,3574 (OKE) 14,9908 1,4276 (OKE)
A' - B 3 - 4 ENVELOPE
Y 13,1530 2,8235 (OKE) 13,1530 1,462 (OKE)

10
Tumpuan Lapangan
Nama As Kombinasi
Letak Arah φMn Mualihfungs i Check φMn Mualihfungsi Check
Elemen Bangunan Beban
(kN.m) (kN.m) Mu af ≤ φMn (kN.m) (kN.m) Mu af ≤ φMn
X 14,9908 4,13 (OKE) 14,9908 1,5196 (OKE)
B - B' 1 - 2 ENVELOPE
Y 13,1530 2,4002 (OKE) 13,1530 1,9434 (OKE)
X 14,9908 3,9403 (OKE) 14,9908 1,6627 (OKE)
Lantai 3 B - B' 2 - 3 ENVELOPE Y 13,1530 0,7631 (OKE) 13,1530 2,735 (OKE)
X 14,9908 4,1323 (OKE) 14,9908 1,519 (OKE)
B - B' 3 - 4 ENVELOPE
Y 13,1530 2,3932 (OKE) 13,1530 1,9424 (OKE)
X 14,9908 6,1481 (OKE) 14,9908 1,0953 (OKE)
B' - C 1 - 2 ENVELOPE
Y 13,1530 6,2814 (OKE) 13,1530 4,0128 (OKE)
X 14,9908 3,9716 (OKE) 14,9908 1,1198 (OKE)
Lantai 3 B' - C 2 - 3 ENVELOPE Y 13,1530 0,3577 (OKE) 13,1530 3,272 (OKE)
X 14,9908 6,1477 (OKE) 14,9908 1,0952 (OKE)
B' - C 3 - 4 ENVELOPE
Y 13,1530 6,2847 (OKE) 13,1530 4,0132 (OKE)
14,9908 17,6589 (NOT OKE) 14,9908 8,8634 (OKE)
C - C' 1 - 2 ENVELOPE
13,1530 11,381 (OKE) 13,1530 8,4513 (OKE)
X 14,9908 16,6242 (NOT OKE) 14,9908 9,8522 (OKE)
Lantai 3 C - C' 2 - 3 ENVELOPE Y 13,1530 6,908 (OKE) 13,1530 10,4686 (OKE)
X 14,9908 17,6583 (NOT OKE) 14,9908 8,461 (OKE)
C - C' 3 - 4 ENVELOPE
Y 13,1530 11,3843 (OKE) 13,1530 8,4482 (OKE)
X 14,9908 17,6881 (NOT OKE) 14,9908 8,5072 (OKE)
C' - D 1 - 2 ENVELOPE
Y 13,1530 12,1601 (OKE) 13,1530 8,5432 (OKE)
X 14,9908 14,9547 (OKE) 14,9908 10,1086 (OKE)
Lantai 3 C' - D 2 - 3 ENVELOPE Y 13,1530 6,3146 (OKE) 13,1530 10,8338 (OKE)
X 14,9908 17,7016 (NOT OKE) 14,9908 8,5013 (OKE)
C' - D 3 - 4 ENVELOPE
Y 13,1530 12,1658 (OKE) 13,1530 8,5389 (OKE)
X 14,9908 14,7015 (OKE) 14,9908 6,3716 (OKE)
D - D' 1 - 2 ENVELOPE
Y 13,1530 9,5175 (OKE) 13,1530 6,2151 (OKE)
X 14,9908 9,3945 (OKE) 14,9908 7,3655 (OKE)
Lantai 3 D - D' 2 - 3 ENVELOPE Y 13,1530 5,4642 (OKE) 13,1530 7,821 (OKE)
X 14,9908 14,7674 (OKE) 14,9908 6,3651 (OKE)
D - D' 3 - 4 ENVELOPE
Y 13,1530 9,5359 (OKE) 13,1530 6,2187 (OKE)
P
e
l

X 14,9908 16,408 (NOT OKE) 14,9908 5,5349 (OKE)


D' - E 1 - 2 ENVELOPE
Y 13,1530 9,6481 (OKE) 13,1530 5,5521 (OKE)
X 14,9908 20,0273 (NOT OKE) 14,9908 4,9144 (OKE)
Lantai 3 D' - E 2 - 3 ENVELOPE Y 13,1530 8,2105 (OKE) 13,1530 5,4543 (OKE)
X 14,9908 16,3233 (NOT OKE) 14,9908 5,5809 (OKE)
D' - E 3 - 4 ENVELOPE
Y 13,1530 9,5679 (OKE) 13,1530 5,5762 (OKE)
X 14,9908 12,994 (OKE) 14,9908 3,007 (OKE)
E - E' 1 - 2 ENVELOPE
Y 13,1530 5,376 (OKE) 13,1530 2,8943 (OKE)
X 14,9908 13,2612 (OKE) 14,9908 2,8864 (OKE)
Lantai 3 E - E' 2 - 3 ENVELOPE Y 13,1530 5,9001 (OKE) 13,1530 2,38 (OKE)
X 14,9908 13,1943 (OKE) 14,9908 2,9817 (OKE)
E - E' 3 - 4 ENVELOPE
Y 13,1530 5,3165 (OKE) 13,1530 2,9031 (OKE)
X 14,9908 9,0116 (OKE) 14,9908 3,8539 (OKE)
E' - F 1 - 2 ENVELOPE
Y 13,1530 3,9754 (OKE) 13,1530 3,125 (OKE)
X 14,9908 8,868 (OKE) 14,9908 3,9815 (OKE)
Lantai 3 E' - F 2 - 3 ENVELOPE Y 13,1530 4,2773 (OKE) 13,1530 2,7921 (OKE)
X 14,9908 8,985 (OKE) 14,9908 3,9517 (OKE)
E' - F 3 - 4 ENVELOPE
Y 13,1530 4,1062 (OKE) 13,1530 3,1823 (OKE)
X 14,9908 10,0054 (OKE) 14,9908 3,798 (OKE)
F - F' 1 - 2 ENVELOPE
Y 13,1530 4,4428 (OKE) 13,1530 3,2526 (OKE)
X 14,9908 9,3188 (OKE) 14,9908 3,0561 (OKE)
Lantai 3 F - F' 2 - 3 ENVELOPE Y 13,1530 4,4775 (OKE) 13,1530 1,3896 (OKE)
X 14,9908 9,9924 (OKE) 14,9908 3,8844 (OKE)
F - F' 3 - 4 ENVELOPE
Y 13,1530 4,618 (OKE) 13,1530 3,3032 (OKE)
X 14,9908 9,7667 (OKE) 14,9908 4,3053 (OKE)
F' - G 1 - 2 ENVELOPE
Y 13,1530 7,5289 (OKE) 13,1530 3,6337 (OKE)
X 14,9908 9,8426 (OKE) 14,9908 3,0473 (OKE)
Lantai 3 F' - G 2 - 3 ENVELOPE Y 13,1530 7,3202 (OKE) 13,1530 2,8821 (OKE)
X 14,9908 10,1555 (OKE) 14,9908 4,2635 (OKE)
F' - G 3 - 4 ENVELOPE
Y 13,1530 7,678 (OKE) 13,1530 3,623 (OKE)

10
C. PELAT ATAP
Momen Ultimate (Mu) pelat merupakan output dari Program Bantu SAP 2000.
Berikut adalah rekapitulasi verifikasi momen pelat atap alih fungsi.

Tabel 5.27 : Rekapitulasi Verifikasi Momen Pelat Atap Alih Fungsi


Tumpuan Lapangan
Nama Kombinasi Check Check
Letak As Bangunan Arah φMn Mualihfungsi φMn Mualihfungsi
Elemen Beban
(kN.m) (kN.m) Mu af ≤ φMn (kN.m) (kN.m) Mu af ≤ φMn
X 11,3152 4,05 (OKE) 11,3152 2,3981 (OKE)
E - E' 1 - 2 ENVELOPE
Y 9,4773 2,1185 (OKE) 9,4773 1,1117 (OKE)
Lantai X 11,3152 8,5905 (OKE) 11,3152 6,2926 (OKE)
E - E' 2 - 3 ENVELOPE
Atap Y 9,4773 6,4007 (OKE) 9,4773 5,0647 (OKE)
X 11,3152 8,6019 (OKE) 11,3152 6,0949 (OKE)
E - E' 3 - 4 ENVELOPE
Y 9,4773 6,6064 (OKE) 9,4773 5,1999 (OKE)
X 11,3152 6,3459 (OKE) 11,3152 2,8393 (OKE)
E' - F 1 - 2 ENVELOPE
Y 9,4773 3,4005 (OKE) 9,4773 0,9095 (OKE)
Lantai X 11,3152 12,4789 (NOT OKE) 11,3152 5,0872 (OKE)
E' - F 2 - 3 ENVELOPE
Atap Y 9,4773 7,3837 (OKE) 9,4773 4,6409 (OKE)
X 11,3152 11,9557 (NOT OKE) 11,3152 5,0873 (OKE)
E' - F 3 - 4 ENVELOPE
Pelat
Atap

Y 9,4773 7,4727 (OKE) 9,4773 4,8909 (OKE)


X 11,3152 6,4699 (OKE) 11,3152 2,7182 (OKE)
F - F' 1 - 2 ENVELOPE
Y 9,4773 3,4438 (OKE) 9,4773 0,872 (OKE)
Lantai X 11,3152 12,5792 (NOT OKE) 11,3152 4,918 (OKE)
F - F' 2 - 3 ENVELOPE
Atap Y 9,4773 7,506 (OKE) 9,4773 4,562 (OKE)
X 11,3152 12,1123 (NOT OKE) 11,3152 4,9483 (OKE)
F - F' 3 - 4 ENVELOPE
Y 9,4773 7,6066 (OKE) 9,4773 4,8537 (OKE)
X 11,3152 4,1478 (OKE) 11,3152 2,2416 (OKE)
F' - G 1 - 2 ENVELOPE
Y 9,4773 2,4981 (OKE) 9,4773 1,2245 (OKE)
Lantai X 11,3152 8,6472 (OKE) 11,3152 6,1547 (OKE)
F' - G 2 - 3 ENVELOPE
Atap Y 9,4773 6,5163 (OKE) 9,4773 4,9723 (OKE)
X 11,3152 8,5521 (OKE) 11,3152 6,0666 (OKE)
F' - G 3 - 4 ENVELOPE
Y 9,4773 6,3883 (OKE) 9,4773 5,1905 (OKE)

10
5.5.3. Elemen Balok
A. BALOK 1
1. Momen Ultimate (Mu)
Tabel 5.28 : Rekapitulasi Verifikasi Momen Balok 1
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (1) 330,1024 317,88 390,9294 (NOT OKE)
Lantai 2 B 1-4 55 ENVELOPE Lapangan 288,535 317,88 386,6114 (NOT OKE)
Tumpuan Kanan (4) 329,7774 317,88 393,1262 (NOT OKE)
Tumpuan Kiri (1) 376,1281 317,88 481,9331 (NOT OKE)
Lantai 2 C 1-4 58 ENVELOPE Lapangan 347,5923 317,88 439,0337 (NOT OKE)
Tumpuan Kanan (4) 375,6873 317,88 482,0899 (NOT OKE)
Tumpuan Kiri (1) 355,1082 317,88 462,6926 (NOT OKE)
Lantai 2 D 1-4 61 ENVELOPE Lapangan 307,1565 317,88 337,3398 (NOT OKE)
450.800

Tumpuan Kanan (4) 355,4514 317,88 463,7831 (NOT OKE)


B1

Tumpuan Kiri (1) 138,9190 317,88 184,9639 (OKE)


Lantai 2 E 1-2 66 ENVELOPE Lapangan 44,7968 317,88 51,1117 (OKE)
Tumpuan Kanan (2) 99,7199 317,88 110,7853 (OKE)
Tumpuan Kiri (2) 104,4674 317,88 125,7615 (OKE)
Lantai 2 E 2-3 65 ENVELOPE Lapangan 19,3566 317,88 30,1733 (OKE)
Tumpuan Kanan (3) 104,6286 317,88 120,3667 (OKE)
Tumpuan Kiri (3) 99,5494 317,88 107,2007 (OKE)
Lantai 2 E 3-4 64 ENVELOPE Lapangan 45,4215 317,88 53,1026 (OKE)
Tumpuan Kanan (4) 139,1722 317,88 187,1109 (OKE)

10
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (1) 148,9268 317,88 195,2965 (OKE)
Lantai 2 F 1-2 69 ENVELOPE Lapangan 44,6746 317,88 51,9961 (OKE)
Tumpuan Kanan (2) 102,9917 317,88 124,7716 (OKE)
Tumpuan Kiri (2) 109,5666 317,88 141,0353 (OKE)
Lantai 2 F 2-3 68 ENVELOPE Lapangan 17,5342 317,88 19,5581 (OKE)
Tumpuan Kanan (3) 109,6365 317,88 127,2548 (OKE)
Tumpuan Kiri (3) 102,9148 317,88 116,6778 (OKE)
Lantai 2 F 3-4 67 ENVELOPE Lapangan 45,3505 317,88 56,8528 (OKE)
Tumpuan Kanan (4) 149,0391 317,88 196,8430 (OKE)
175,6468 317,88
450.800

Tumpuan Kiri (1) 185,4123 (OKE)


B1

Lantai 3 B 1-4 182 ENVELOPE Lapangan 240,2910 317,88 238,6781 (OKE)


Tumpuan Kanan (4) 175,7533 317,88 187,0505 (OKE)
Tumpuan Kiri (1) 198,0544 317,88 382,0371 (NOT OKE)
Lantai 3 C 1-4 185 ENVELOPE Lapangan 288,3439 317,88 460,4608 (NOT OKE)
Tumpuan Kanan (4) 198,1250 317,88 382,7154 (NOT OKE)
Tumpuan Kiri (1) 179,9195 317,88 475,3420 (NOT OKE)
Lantai 3 D 1-4 188 ENVELOPE Lapangan 234,9455 317,88 508,2934 (NOT OKE)
Tumpuan Kanan (4) 179,8764 317,88 476,0045 (NOT OKE)
Tumpuan Kiri (1) 84,4041 317,88 114,3425 (OKE)
Lantai 3 E 1-2 193 ENVELOPE Lapangan 36,1041 317,88 66,7013 (OKE)
Tumpuan Kanan (2) 48,1141 317,88 74,1714 (OKE)

10
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (2) 70,7152 317,88 109,4954 (OKE)
Lantai 3 E 2-3 192 ENVELOPE Lapangan 21,4538 317,88 44,8238 (OKE)
Tumpuan Kanan (3) 70,7335 317,88 95,7468 (OKE)
Tumpuan Kiri (3) 48,1306 317,88 65,5214 (OKE)
Lantai 3 E 3-4 191 ENVELOPE Lapangan 36,3663 317,88 69,2884 (OKE)
Tumpuan Kanan (4) 84,3889 317,88 119,0280 (OKE)
Tumpuan Kiri (1) 94,5816 317,88 137,8328
450.800

(OKE)
B1

Lantai 3 F 1-2 196 ENVELOPE Lapangan 38,6529 317,88 50,7425 (OKE)


Tumpuan Kanan (2) 53,6357 317,88 68,7789 (OKE)
Tumpuan Kiri (2) 78,2709 317,88 115,3529 (OKE)
Lantai 3 F 2-3 195 ENVELOPE Lapangan 22,1522 317,88 26,6045 (OKE)
Tumpuan Kanan (3) 78,2785 317,88 86,9455 (OKE)
Tumpuan Kiri (3) 39,2912 317,88 80,9181 (OKE)
Lantai 3 F 3-4 194 ENVELOPE Lapangan 39,0230 317,88 56,2846 (OKE)
Tumpuan Kanan (4) 94,5771 317,88 145,2971 (OKE)

10
2. Geser Ultimate (Vu)
Tabel 5.29 : Rekapitulasi Verifikasi Geser Balok 1

Rekap Geser Kapasitas Rekap Geser Alih


Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kiri (1) 214,7480 240,03 280,8660 (NOT OKE)
Lantai 2 B 1-4 55 ENVELOPE Lapangan 23,1600 180,02 27,5280 (OKE)
Tumpuan Kanan (4) 214,6670 240,03 280,8300 (NOT OKE)
Tumpuan Kiri (1) 252,9120 240,03 332,7520 (NOT OKE)
Lantai 2 C 1-4 58 ENVELOPE Lapangan 24,6810 180,02 30,1470 (OKE)
Tumpuan Kanan (4) 252,8040 240,03 332,8000 (NOT OKE)
Tumpuan Kiri (1) 230,6410 240,03 278,0950 (NOT OKE)
Lantai 2 D 1-4 61 ENVELOPE Lapangan 24,4210 180,02 30,3520 (OKE)
Tumpuan Kanan (4) 230,7260 240,03 278,5230 (NOT OKE)
Tumpuan Kiri (1) 111,4710 240,03 138,7390
450.800

(OKE)
B1

Lantai 2 E 1-2 66 ENVELOPE Lapangan 75,8300 180,02 87,2750 (OKE)


Tumpuan Kanan (2) 113,3250 240,03 125,6650 (OKE)
Tumpuan Kiri (2) 97,3940 240,03 118,5550 (OKE)
Lantai 2 E 2-3 65 ENVELOPE Lapangan 62,0050 180,02 76,5350 (OKE)
Tumpuan Kanan (3) 97,5000 240,03 115,2830 (OKE)
Tumpuan Kiri (3) 113,1850 240,03 123,3190 (OKE)
Lantai 2 E 3-4 64 ENVELOPE Lapangan 72,7950 180,02 100,8060 (OKE)
Tumpuan Kanan (4) 111,6100 240,03 141,2640 (OKE)
Tumpuan Kiri (1) 115,6110 240,03 142,3030 (OKE)
Lantai 2 F 1-2 69 ENVELOPE Lapangan 78,2780 180,02 96,7130 (OKE)
Tumpuan Kanan (2) 115,2170 240,03 135,0440 (OKE)

10
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kiri (2) 98,0470 240,03 120,1950 (OKE)
Lantai 2 F 2-3 68 ENVELOPE Lapangan 65,1380 180,02 79,2610 (OKE)
Tumpuan Kanan (3) 98,0930 240,03 111,2040 (OKE)
Tumpuan Kiri (3) 115,1540 240,03 132,4110 (OKE)
Lantai 2 F 3-4 67 ENVELOPE Lapangan 78,2200 180,02 106,8560 (OKE)
Tumpuan Kanan (4) 115,6730 240,03 146,2580 (OKE)
Tumpuan Kiri (1) 151,5810 240,03 148,9940 (OKE)
Lantai 3 B 1-4 182 ENVELOPE Lapangan 10,7770 180,02 12,8700 (OKE)
Tumpuan Kanan (4) 151,6080 240,03 149,0600 (OKE)
Tumpuan Kiri (1) 176,4970 240,03 381,4810 (NOT OKE)
Lantai 3 C 1-4 185 ENVELOPE Lapangan 11,4460 180,02 20,2420 (OKE)
450.800

Tumpuan Kanan (4) 176,5140 240,03 381,6330 (NOT OKE)


B1

Tumpuan Kiri (1) 149,7890 240,03 501,6520 (NOT OKE)


Lantai 3 D 1-4 188 ENVELOPE Lapangan 11,5340 180,02 25,6950 (OKE)
Tumpuan Kanan (4) 149,7780 240,03 502,2030 (NOT OKE)
Tumpuan Kiri (1) 75,4300 240,03 118,7450 (OKE)
Lantai 3 E 1-2 193 ENVELOPE Lapangan 39,0300 180,02 64,8210 (OKE)
Tumpuan Kanan (2) 71,0950 240,03 118,3910 (OKE)
Tumpuan Kiri (2) 75,6580 240,03 127,4420 (OKE)
Lantai 3 E 2-3 192 ENVELOPE Lapangan 42,6040 180,02 60,5660 (OKE)
Tumpuan Kanan (3) 75,6700 240,03 117,9610 (OKE)
Tumpuan Kiri (3) 71,1060 240,03 114,3850 (OKE)
Lantai 3 E 3-4 191 ENVELOPE Lapangan 42,1810 180,02 65,3590 (OKE)
Tumpuan Kanan (4) 75,4190 240,03 122,8320 (OKE)

11
Rekap GeserKapasitasRekap Geser Alih EksistingPenampangFungsi
Nama As Kombinasi Beban
ElemenLetak Bangunan Frame Seksi Balok

Vu (kN) φV (kN)
81,2010
Tumpuan Kiri (1) Lapangan Tumpuan Kanan
Lantai 3F1 - 2 196 ENVELOPE Tum 44,

Lantai 3F2 - 3195ENVELO


B1

Lantai 3

11
B. BALOK 2
1. Momen Ultimate (Mu)
Tabel 5.30 : Rekapitulasi Verifikasi Momen Balok 2
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kanan (2) 58,6138 148,22 67,8760 (OKE)
Lantai 2 A 1-2 54 ENVELOPE Lapangan 10,7611 112,61 12,6814 (OKE)
Tumpuan Kiri (1) 61,4457 148,22 70,2835 (OKE)
Tumpuan Kanan (3) 55,3920 148,22 64,0969 (OKE)
Lantai 2 A 2-3 53 ENVELOPE Lapangan 7,4991 112,61 9,5062 (OKE)
Tumpuan Kiri (2) 55,0479 148,22 63,8763 (OKE)
Tumpuan Kanan (4) 61,8877 148,22 70,7216 (OKE)
Lantai 2 A 3-4 52 ENVELOPE Lapangan 11,1123 112,61 13,1769 (OKE)
Tumpuan Kiri (3) 58,2225 148,22 67,8197 (OKE)
300.5

Tumpuan Kanan (2) 70,1337 148,22 88,4617 (OKE)


Lantai 2 G 1-2 73 ENVELOPE Lapangan 11,2217 112,61 12,0675 (OKE)
Tumpuan Kiri (1) 77,9813 148,22 100,5604 (OKE)
Tumpuan Kanan (3) 68,0183 148,22 84,3743 (OKE)
Lantai 2 G 2-3 72 ENVELOPE Lapangan 6,9113 112,61 6,2074 (OKE)
Tumpuan Kiri (2) 68,03 148,22 86,13 (OKE)
Tumpuan Kanan (4) 77,9656 148,22 102,0853 (OKE)
Lantai 2 G 3-4 71 ENVELOPE Lapangan 11,6870 112,61 13,3060 (OKE)
Tumpuan Kiri (3) 70,1473 148,22 87,4935 (OKE)

11
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (A) 94,4277 148,22 117,1178 (OKE)
Lantai 2 1 A-B 92 ENVELOPE Lapangan 24,5293 112,61 28,9307 (OKE)
Tumpuan Kanan (B) 100,7237 148,22 125,1498 (OKE)
Tumpuan Kiri (B) 96,5826 148,22 124,0788 (OKE)
Lantai 2 1 B-C 93 ENVELOPE Lapangan 36,9245 112,61 49,4165 (OKE)
Tumpuan Kanan (C) 104,3827 148,22 117,3796 (OKE)
Tumpuan Kiri (C) 104,3071 148,22 136,5582 (OKE)
Lantai 2 1 C-D 94 ENVELOPE Lapangan 37,1865 112,61 45,7365 (OKE)
Tumpuan Kanan 98,0566 148,22 114,7067 (OKE)
(D)
300.500

Tumpuan Kiri (D) 96,8247 148,22 105,5971 (OKE)


B2

Lantai 2 1 D-E 95 ENVELOPE Lapangan 21,7287 112,61 20,5348 (OKE)


Tumpuan Kanan (E) 87,6969 148,22 110,1004 (OKE)
Tumpuan Kiri (E) 92,1565 148,22 109,8035 (OKE)
Lantai 2 1 E-F 96 ENVELOPE Lapangan 20,5443 112,61 25,8888 (OKE)
Tumpuan Kanan (F) 89,3002 148,22 106,9550 (OKE)
Tumpuan Kiri (F) 94,9263 148,22 112,7396 (OKE)
Lantai 2 1 F-G 97 ENVELOPE Lapangan 12,8418 112,61 12,2070 (OKE)
Tumpuan Kanan (G) 97,5332 148,22 112,5910 (OKE)
Tumpuan Kiri (A) 94,3545 148,22 117,7001 (OKE)
Lantai 2 4 A-B 74 ENVELOPE Lapangan 24,5254 112,61 29,0196 (OKE)
Tumpuan Kanan (B) 100,8228 148,22 125,7048 (OKE)

11
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (B) 96,5368 148,22 124,5721 (OKE)
Lantai 2 4 B-C 75 ENVELOPE Lapangan 36,9384 112,61 49,4292 (OKE)
Tumpuan Kanan (C) 104,3993 148,22 117,7016 (OKE)
Tumpuan Kiri (C) 137,2028 148,22 137,2028 (OKE)
Lantai 2 4 C-D 76 ENVELOPE Lapangan 37,1796 112,61 45,7230 (OKE)
Tumpuan Kanan 98,0669 148,22 115,1392 (OKE)
(D)
Tumpuan Kiri (D) 96,7810 148,22 106,7412 (OKE)
Lantai 2 4 D-E 77 ENVELOPE Lapangan 21,7299 112,61 20,4029 (OKE)
Tumpuan Kanan (E) 87,7367 148,22 110,2524 (OKE)
300.500

Tumpuan Kiri (E) 92,1203 148,22 110,9437 (OKE)


B2

Lantai 2 4 E-F 78 ENVELOPE Lapangan 20,5447 112,61 25,9443 (OKE)


Tumpuan Kanan (F) 89,3382 148,22 106,9907 (OKE)
Tumpuan Kiri (F) 94,8847 148,22 113,7584 (OKE)
Lantai 2 4 F-G 79 ENVELOPE Lapangan 24,2295 112,61 24,7156 (OKE)
Tumpuan Kanan (G) 97,5811 148,22 114,6483 (OKE)
Tumpuan Kanan (2) 25,1456 148,22 28,4816 (OKE)
Lantai 3 A 1-2 181 ENVELOPE Lapangan 6,1933 112,61 6,4333 (OKE)
Tumpuan Kiri (1) 26,7032 148,22 32,5130 (OKE)
Tumpuan Kanan (3) 25,1372 148,22 28,8828 (OKE)
Lantai 3 A 2-3 180 ENVELOPE Lapangan 4,8666 112,61 4,7971 (OKE)
Tumpuan Kiri (2) 25,1211 148,22 29,0717 (OKE)

11
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kanan (4) 26,7030 148,22 32,4560 (OKE)
Lantai 3 A 3-4 179 ENVELOPE Lapangan 11,8135 112,61 14,6551 (OKE)
Tumpuan Kiri (3) 25,1354 148,22 28,7824 (OKE)
Tumpuan Kanan (2) 46,8649 148,22 64,0093 (OKE)
Lantai 3 G 1-2 199 ENVELOPE Lapangan 10,3650 112,61 13,8032 (OKE)
Tumpuan Kiri (1) 53,5598 148,22 76,9699 (OKE)
Tumpuan Kanan (3) 48,7170 148,22 62,7944 (OKE)
Lantai 3 G 2-3 198 ENVELOPE Lapangan 7,0099 112,61 6,4773 (OKE)
Tumpuan Kiri (2) 48,7179 148,22 68,5132 (OKE)
Tumpuan Kanan (4) 53,5595 148,22 79,8748 (OKE)
300.500

Lantai 3 G 3-4 197 ENVELOPE Lapangan 10,6561 112,61 14,1121 (OKE)


B2

Tumpuan Kiri (3) 46,8654 148,22 62,3543 (OKE)


Tumpuan Kiri (A) 55,7326 148,22 73,2287 (OKE)
Lantai 3 1 A-B 218 ENVELOPE Lapangan 4,6690 112,61 3,8231 (OKE)
Tumpuan Kanan (B) 58,5464 148,22 63,4962 (OKE)
Tumpuan Kiri (B) 52,8729 148,22 48,4069 (OKE)
Lantai 3 1 B-C 219 ENVELOPE Lapangan 25,0373 112,61 12,1078 (OKE)
Tumpuan Kanan (C) 60,7022 148,22 103,7304 (OKE)
Tumpuan Kiri (C) 60,2168 148,22 119,6530 (OKE)
Lantai 3 1 C-D 220 ENVELOPE Lapangan 25,2865 112,61 101,0946 (OKE)
Tumpuan Kanan 53,2124 148,22 136,9592 (OKE)
(D)

11
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (D) 56,9081 148,22 141,6876 (OKE)
Lantai 3 1 D-E 221 ENVELOPE Lapangan 13,4582 112,61 48,2210 (OKE)
Tumpuan Kanan (E) 59,2450 148,22 95,2812 (OKE)
Tumpuan Kiri (E) 74,1233 148,22 109,2441 (OKE)
Lantai 3 1 E-F 222 ENVELOPE Lapangan 22,3324 112,61 23,2335 (OKE)
Tumpuan Kanan (F) 74,1460 148,22 85,3156 (OKE)
Tumpuan Kiri (F) 78,7750 148,22 102,5834 (OKE)
Lantai 3 1 F-G 223 ENVELOPE Lapangan 23,9702 112,61 31,4617 (OKE)
Tumpuan Kanan (G) 77,7963 148,22 94,9418 (OKE)
Tumpuan Kiri (A) 55,7030 148,22 73,6332 (OKE)
300.500

Lantai 3 4 A-B 200 ENVELOPE Lapangan 15,3909 112,61 17,2832 (OKE)


B2

Tumpuan Kanan (B) 58,5678 148,22 63,7407 (OKE)


Tumpuan Kiri (B) 52,8702 148,22 48,7456 (OKE)
Lantai 3 4 B-C 201 ENVELOPE Lapangan 21,9068 112,61 13,3861 (OKE)
Tumpuan Kanan (C) 60,7120 148,22 103,8522 (OKE)
Tumpuan Kiri (C) 60,2183 148,22 119,8849 (OKE)
Lantai 3 4 C-D 202 ENVELOPE Lapangan 25,2895 112,61 100,9524 (OKE)
Tumpuan Kanan 53,2036 148,22 137,4507 (OKE)
(D)
Tumpuan Kiri (D) 56,9125 148,22 144,2985 (OKE)
Lantai 3 4 D-E 203 ENVELOPE Lapangan 13,4582 112,61 48,8842 (OKE)
Tumpuan Kanan (E) 59,2407 148,22 94,6304 (OKE)

11
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (E) 74,1254 148,22 116,0568 (OKE)
Lantai 3 4 E-F 204 ENVELOPE Lapangan 22,3320 112,61 23,0158 (OKE)
Tumpuan Kanan (F) 74,1442 148,22 85,7393 (OKE)
Tumpuan Kiri (F) 78,7780 148,22 103,3295 (OKE)
Lantai 3 4 F-G 205 ENVELOPE Lapangan 23,9709 112,61 30,9431 (OKE)
Tumpuan Kanan (G) 77,7917 148,22 103,1676 (OKE)
Tumpuan Kanan (2) 14,7617 148,22 24,5442 (OKE)
Lantai
E 1-2 246 ENVELOPE Lapangan 8,0791 112,61 6,6054 (OKE)
Atap
Tumpuan Kiri (1) 21,9591 148,22 36,5668 (OKE)
18,8065 148,22
300.500

Tumpuan Kanan (3) 37,0783 (OKE)


Lantai
B2

E 2-3 245 ENVELOPE Lapangan 4,9387 112,61 17,1782 (OKE)


Atap
Tumpuan Kiri (2) 18,8042 148,22 29,4579 (OKE)
Tumpuan Kanan (4) 21,9574 148,22 35,9882 (OKE)
Lantai
E 3-4 244 ENVELOPE Lapangan 8,1377 112,61 21,3497 (OKE)
Atap
Tumpuan Kiri (3) 14,7644 148,22 31,3326 (OKE)
Tumpuan Kanan (2) 18,8845 148,22 37,0647 (OKE)
Lantai
F 1-2 254 ENVELOPE Lapangan 10,9269 112,61 7,0721 (OKE)
Atap
Tumpuan Kiri (1) 22,8853 148,22 34,5815 (OKE)
Tumpuan Kanan (3) 23,0750 148,22 54,2988 (OKE)
Lantai
F 2-3 253 ENVELOPE Lapangan 7,1891 112,61 29,0413 (OKE)
Atap
Tumpuan Kiri (2) 23,0740 148,22 42,5734 (OKE)

11
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kanan (4) 22,8850 148,22 35,4684 (OKE)
Lantai
F 3-4 252 ENVELOPE Lapangan 11,0635 112,61 36,4835 (OKE)
Atap
Tumpuan Kiri (3) 18,8853 148,22 50,9789 (OKE)
Tumpuan Kiri (1) 22,4419 148,22 34,8537 (OKE)
Lantai
G 1-2 249 ENVELOPE Lapangan 8,0694 112,61 6,6187 (OKE)
Atap
Tumpuan Kanan (2) 18,3243 148,22 33,9082 (OKE)
Tumpuan Kiri (2) 20,1088 148,22 33,9488 (OKE)
Lantai
G 2-3 250 ENVELOPE Lapangan 4,2731 112,61 15,0739 (OKE)
Atap
Tumpuan Kanan (3) 20,1092 148,22 40,5708 (OKE)
Tumpuan Kiri (3) 18,3235 148,22 40,1767 (OKE)
Lantai
G 3-4 251 ENVELOPE Lapangan 7,9948 112,61 21,4680 (OKE)
300.500

Atap
Tumpuan Kanan (4) 22,4427 148,22 34,4637 (OKE)
B2

Tumpuan Kiri (E) 36,4584 148,22 44,9378 (OKE)


Lantai
1 E-F 247 ENVELOPE Lapangan 18,3699 112,61 20,4996 (OKE)
Atap
Tumpuan Kanan (F) 40,3243 148,22 46,0977 (OKE)
Tumpuan Kiri (F) 40,1977 148,22 51,3457 (OKE)
Lantai
1 F-G 248 ENVELOPE Lapangan 17,8247 112,61 18,3266 (OKE)
Atap
Tumpuan Kanan (G) 33,0632 148,22 36,3792 (OKE)
Tumpuan Kanan (F) 40,3247 148,22 96,9294 (OKE)
Lantai
4 E-F 243 ENVELOPE Lapangan 18,2873 112,61 54,2924 (OKE)
Atap
Tumpuan Kiri (E) 36,4575 148,22 66,2494 (OKE)
Tumpuan Kanan (G) 33,0641 148,22 57,1718 (OKE)
Lantai
4 F-G 242 ENVELOPE Lapangan 17,8798 112,61 52,8064 (OKE)
Atap
Tumpuan Kiri (F) 40,1974 148,22 101,8694 (OKE)

11
2. Geser Ultimate (Vu)
Tabel 5.31 : Rekapitulasi Verifikasi Geser Balok 2

Rekap Geser Kapasitas Rekap Geser Alih


Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kanan (2) 54,9460 85,77 63,4670 (OKE)
Lantai 2 A 1-2 54 ENVELOPE Lapangan 35,7420 64,32 41,7190 (OKE)
Tumpuan Kiri (1) 52,8210 85,77 60,5940 (OKE)
Tumpuan Kanan (3) 50,6880 85,77 58,5380 (OKE)
Lantai 2 A 2-3 53 ENVELOPE Lapangan 30,4640 64,32 35,5480 (OKE)
Tumpuan Kiri (2) 50,4560 85,77 58,2300 (OKE)
Tumpuan Kanan (4) 53,1010 85,77 60,6780 (OKE)
Lantai 2 A 3-4 52 ENVELOPE Lapangan 33,2140 64,32 38,2590 (OKE)
Tumpuan Kiri (3) 54,6650 85,77 63,4720 (OKE)
Tumpuan Kanan (2) 63,3240 85,77 75,9750
300.500

(OKE)
B2

Lantai 2 G 1-2 73 ENVELOPE Lapangan 43,2890 64,32 55,8250 (OKE)


Tumpuan Kiri (1) 62,9080 85,77 76,7340 (OKE)
Tumpuan Kanan (3) 58,5210 85,77 67,6080 (OKE)
Lantai 2 G 2-3 72 ENVELOPE Lapangan 38,5750 64,32 49,5250 (OKE)
Tumpuan Kiri (2) 58,53 85,77 68,92 (OKE)
Tumpuan Kanan (4) 62,8980 85,77 78,0000 (OKE)
Lantai 2 G 3-4 71 ENVELOPE Lapangan 43,0940 64,32 57,8540 (OKE)
Tumpuan Kiri (3) 63,3340 85,77 76,1530 (OKE)
Tumpuan Kiri (A) 57,2500 85,77 68,8730 (OKE)
Lantai 2 1 A-B 92 ENVELOPE Lapangan 27,6340 64,32 35,0610 (OKE)
Tumpuan Kanan (B) 65,6050 85,77 79,3560 (OKE)

11
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kiri (B) 62,6500 85,77 77,7680 (OKE)
Lantai 2 1 B-C 93 ENVELOPE Lapangan 20,5740 64,32 28,5960 (OKE)
Tumpuan Kanan (C) 63,7890 85,77 72,9470 (OKE)
Tumpuan Kiri (C) 63,8060 85,77 78,7230 (OKE)
Lantai 2 1 C-D 94 ENVELOPE Lapangan 23,2630 64,32 31,4300 (OKE)
Tumpuan Kanan 63,3550 85,77 72,7060 (OKE)
(D)
Tumpuan Kiri (D) 62,6000 85,77 65,3600 (OKE)
Lantai 2 1 D-E 95 ENVELOPE Lapangan 28,7820 64,32 31,9660 (OKE)
Tumpuan Kanan (E) 52,6130 85,77 61,0390 (OKE)
Tumpuan Kiri (E) 56,0270 85,77 65,5340 (OKE)
B2 300.500

Lantai 2 1 E-F 96 ENVELOPE Lapangan 28,3770 64,32 35,2260 (OKE)


Tumpuan Kanan (F) 55,4500 85,77 64,7720 (OKE)
Tumpuan Kiri (F) 59,9440 85,77 66,2710 (OKE)
Lantai 2 1 F-G 97 ENVELOPE Lapangan 31,5160 64,32 38,6410 (OKE)
Tumpuan Kanan (G) 60,8620 85,77 65,5210 (OKE)
Tumpuan Kiri (A) 57,2200 85,77 69,0310 (OKE)
Lantai 2 4 A-B 74 ENVELOPE Lapangan 27,6010 64,32 35,3130 (OKE)
Tumpuan Kanan (B) 65,6490 85,77 79,6020 (OKE)
Tumpuan Kiri (B) 62,6380 85,77 77,9910 (OKE)
Lantai 2 4 B-C 75 ENVELOPE Lapangan 20,5650 64,32 28,7640 (OKE)
Tumpuan Kanan (C) 63,8010 85,77 73,0570 (OKE)
Tumpuan Kiri (C) 63,8100 85,77 78,9880 (OKE)
Lantai 2 4 C-D 76 ENVELOPE Lapangan 23,2630 64,32 31,6360 (OKE)
Tumpuan Kanan 63,3540 85,77 72,8440 (OKE)
(D)

12
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kiri (D) 62,5810 85,77 65,7760 (OKE)
Lantai 2 4 D-E 77 ENVELOPE Lapangan 28,7670 64,32 32,3370 (OKE)
Tumpuan Kanan (E) 52,6310 85,77 61,1220 (OKE)
Tumpuan Kiri (E) 56,0120 85,77 66,0910 (OKE)
Lantai 2 4 E-F 78 ENVELOPE Lapangan 28,3630 64,32 35,6860 (OKE)
Tumpuan Kanan (F) 55,4670 85,77 64,8680 (OKE)
Tumpuan Kiri (F) 59,9260 85,77 67,5700 (OKE)
Lantai 2 4 F-G 79 ENVELOPE Lapangan 31,4990 64,32 39,0490 (OKE)
Tumpuan Kanan (G) 60,8820 85,77 67,2670 (OKE)
Tumpuan Kanan (2) 25,5240 85,77 27,8850 (OKE)
Lantai 3 A 1-2 181 ENVELOPE Lapangan 15,6410 64,32 18,0160 (OKE)
300.500

Tumpuan Kiri (1) 24,2630 85,77 27,8000 (OKE)


B2

Tumpuan Kanan (3) 24,3250 85,77 26,8590 (OKE)


Lantai 3 A 2-3 180 ENVELOPE Lapangan 13,9060 64,32 16,4630 (OKE)
Tumpuan Kiri (2) 24,3130 85,77 26,8990 (OKE)
Tumpuan Kanan (4) 24,2650 85,77 27,6540 (OKE)
Lantai 3 A 3-4 179 ENVELOPE Lapangan 14,1780 64,32 17,5430 (OKE)
Tumpuan Kiri (3) 25,5210 85,77 28,1310 (OKE)
Tumpuan Kanan (2) 46,8640 85,77 61,6850 (OKE)
Lantai 3 G 1-2 199 ENVELOPE Lapangan 27,9270 64,32 40,0020 (OKE)
Tumpuan Kiri (1) 47,3770 85,77 64,6110 (OKE)
Tumpuan Kanan (3) 45,3270 85,77 52,3270 (OKE)
Lantai 3 G 2-3 198 ENVELOPE Lapangan 22,7040 64,32 36,3360 (OKE)
Tumpuan Kiri (2) 45,3280 85,77 56,3450 (OKE)

12
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kanan (4) 47,3770 85,77 66,0850 (OKE)
Lantai 3 G 3-4 197 ENVELOPE Lapangan 28,2560 64,32 44,0300 (OKE)
Tumpuan Kiri (3) 46,8640 85,77 60,6800 (OKE)
Tumpuan Kiri (A) 32,4510 85,77 39,1710 (OKE)
Lantai 3 1 A-B 218 ENVELOPE Lapangan 17,0960 64,32 23,7250 (OKE)
Tumpuan Kanan (B) 38,3090 85,77 40,8740 (OKE)
Tumpuan Kiri (B) 34,8720 85,77 28,3200 (OKE)
Lantai 3 1 B-C 219 ENVELOPE Lapangan 6,0210 64,32 15,8200 (OKE)
Tumpuan Kanan (C) 36,7730 85,77 46,9810 (OKE)
Tumpuan Kiri (C) 36,6530 85,77 100,1120 (NOT OKE)
Lantai 3 1 C-D 220 ENVELOPE Lapangan 14,9250 64,32 31,7170 (OKE)
300.500

Tumpuan Kanan 34,9870 85,77 108,5660 (NOT OKE)


B2

(D)
Tumpuan Kiri (D) 36,1640 85,77 97,8370 (NOT OKE)
Lantai 3 1 D-E 221 ENVELOPE Lapangan 18,4340 64,32 46,6690 (OKE)
Tumpuan Kanan (E) 32,4600 85,77 67,7350 (OKE)
Tumpuan Kiri (E) 49,8440 85,77 63,0530 (OKE)
Lantai 3 1 E-F 222 ENVELOPE Lapangan 21,7070 64,32 33,6750 (OKE)
Tumpuan Kanan (F) 50,0340 85,77 55,6080 (OKE)
Tumpuan Kiri (F) 53,4080 85,77 66,6350 (OKE)
Lantai 3 1 F-G 223 ENVELOPE Lapangan 25,0660 64,32 34,4890 (OKE)
Tumpuan Kanan (G) 53,1300 85,77 63,3650 (OKE)
Tumpuan Kiri (A) 32,4410 85,77 39,2880 (OKE)
Lantai 3 4 A-B 200 ENVELOPE Lapangan 17,0860 64,32 23,8880 (OKE)
Tumpuan Kanan (B) 38,3190 85,77 40,9910 (OKE)

12
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kiri (B) 34,8690 85,77 28,4570 (OKE)
Lantai 3 4 B-C 201 ENVELOPE Lapangan 6,0230 64,32 15,8660 (OKE)
Tumpuan Kanan (C) 36,7750 85,77 47,0210 (OKE)
Tumpuan Kiri (C) 36,6540 85,77 100,0510 (NOT OKE)
Lantai 3 4 C-D 202 ENVELOPE Lapangan 14,9260 64,32 31,7460 (OKE)
Tumpuan Kanan 34,9850 85,77 108,6250 (NOT OKE)
(D)
Tumpuan Kiri (D) 36,1650 85,77 99,2730 (NOT OKE)
Lantai 3 4 D-E 203 ENVELOPE Lapangan 18,4360 64,32 48,0800 (OKE)
Tumpuan Kanan (E) 32,4580 85,77 67,5760 (OKE)
Tumpuan Kiri (E) 49,8450 85,77 65,7430 (OKE)
Lantai 3 4 E-F 204 ENVELOPE Lapangan 21,7070 64,32 36,1710
300.500

(OKE)
B2

Tumpuan Kanan (F) 50,0330 85,77 55,8280 (OKE)


Tumpuan Kiri (F) 53,4100 85,77 67,0290 (OKE)
Lantai 3 4 F-G 205 ENVELOPE Lapangan 25,0670 64,32 34,5950 (OKE)
Tumpuan Kanan (G) 53,1280 85,77 66,4170 (OKE)
Tumpuan Kanan (2) 19,7800 85,77 25,2640 (OKE)
Lantai
E 1-2 246 ENVELOPE Lapangan 9,1970 64,32 15,9230 (OKE)
Atap
Tumpuan Kiri (1) 20,6540 85,77 26,8600 (OKE)
Tumpuan Kanan (3) 19,9840 85,77 45,4700 (OKE)
Lantai
E 2-3 245 ENVELOPE Lapangan 10,3580 64,32 22,1060 (OKE)
Atap
Tumpuan Kiri (2) 19,9830 85,77 40,2610 (OKE)
Tumpuan Kanan (4) 20,6530 85,77 42,2460 (OKE)
Lantai
E 3-4 244 ENVELOPE Lapangan 11,0550 64,32 19,5050 (OKE)
Atap
Tumpuan Kiri (3) 19,7810 85,77 45,8740 (OKE)

12
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kanan (2) 26,0660 85,77 35,5610 (OKE)
Lantai
F 1-2 254 ENVELOPE Lapangan 12,6120 64,32 21,8750 (OKE)
Atap
Tumpuan Kiri (1) 24,7010 85,77 27,9450 (OKE)
Tumpuan Kanan (3) 25,6370 85,77 72,3180 (OKE)
Lantai
F 2-3 253 ENVELOPE Lapangan 11,9510 64,32 29,4010 (OKE)
Atap
Tumpuan Kiri (2) 25,6360 85,77 64,6460 (OKE)
Tumpuan Kanan (4) 24,7010 85,77 60,4360 (OKE)
Lantai
F 3-4 252 ENVELOPE Lapangan 11,2010 64,32 18,0810 (OKE)
Atap
Tumpuan Kiri (3) 26,0670 85,77 76,8350 (OKE)
Tumpuan Kiri (1) 20,8440 85,77 25,3910 (OKE)
Lantai
G 1-2 249 ENVELOPE Lapangan 10,3810 64,32 19,9550 (OKE)
300.500

Atap
Tumpuan Kanan (2) 22,1490 85,77 31,3780 (OKE)
B2

Tumpuan Kiri (2) 20,4530 85,77 41,8710 (OKE)


Lantai
G 2-3 250 ENVELOPE Lapangan 10,7910 64,32 18,8460 (OKE)
Atap
Tumpuan Kanan (3) 20,4540 85,77 46,4580 (OKE)
Tumpuan Kiri (3) 22,1490 85,77 51,8800 (OKE)
Lantai
G 3-4 251 ENVELOPE Lapangan 12,4180 64,32 28,2320 (OKE)
Atap
Tumpuan Kanan (4) 20,8450 85,77 41,1170 (OKE)
Tumpuan Kiri (E) 26,8180 85,77 30,6760 (OKE)
Lantai
1 E-F 247 ENVELOPE Lapangan 10,4250 64,32 13,1050 (OKE)
Atap
Tumpuan Kanan (F) 30,6380 85,77 33,3110 (OKE)
Tumpuan Kiri (F) 30,4260 85,77 34,8160 (OKE)
Lantai
1 F-G 248 ENVELOPE Lapangan 14,5600 64,32 19,4420 (OKE)
Atap
Tumpuan Kanan (G) 25,3120 85,77 26,4680 (OKE)

12
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kanan (F) 30,6380 85,77 77,0680 (OKE)
Lantai
B2 300.500

4 E-F 243 ENVELOPE Lapangan 14,8620 64,32 37,9320 (OKE)


Atap
Tumpuan Kiri (E) 26,8170 85,77 62,5100 (OKE)
Tumpuan Kanan (G) 25,3120 85,77 58,1440 (OKE)
Lantai
4 F-G 242 ENVELOPE Lapangan 9,1300 64,32 16,5230 (OKE)
Atap
Tumpuan Kiri (F) 30,4260 85,77 78,4860 (OKE)

12
C. BALOK 3
1. Momen Ultimate (Mu)
Tabel 5.32 : Rekapitulasi Verifikasi Momen Balok 3
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (A) 105,8666 160,79 132,4395 (OKE)
Lantai 2 2 A-B 86 ENVELOPE Lapangan 32,4314 130,57 40,9450 (OKE)
Tumpuan Kanan (B) 39,6447 160,79 50,3647 (OKE)
Tumpuan Kiri (B) 46,9555 160,79 63,9476 (OKE)
Lantai 2 2 B-C 87 ENVELOPE Lapangan 44,1204 130,57 61,3208 (OKE)
Tumpuan Kanan (C) 67,7608 160,79 91,2605 (OKE)
Tumpuan Kiri (C) 68,2717 160,79 92,9812 (OKE)
Lantai 2 2 C-D 88 ENVELOPE Lapangan 44,0298 130,57 59,7387 (OKE)
300.450

Tumpuan Kanan 45,6860 160,79 64,4346 (OKE)


(D)
B3

Tumpuan Kiri (D) 38,1403 160,79 50,3460 (OKE)


Lantai 2 2 D-E 89 ENVELOPE Lapangan 29,9396 130,57 30,7968 (OKE)
Tumpuan Kanan (E) 110,2519 160,79 123,8945 (OKE)
Tumpuan Kiri (E) 93,2376 160,79 106,8766 (OKE)
Lantai 2 2 E-F 90 ENVELOPE Lapangan 29,3298 130,57 38,3625 (OKE)
Tumpuan Kanan (F) 85,6567 160,79 103,9688 (OKE)
Tumpuan Kiri (F) 94,9549 160,79 103,3075 (OKE)
Lantai 2 2 F-G 91 ENVELOPE Lapangan 36,2897 130,57 28,461 (OKE)
Tumpuan Kanan (G) 96,6104 160,79 103,3151 (OKE)

12
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (A) 105,8892 160,79 132,7970 (OKE)
Lantai 2 3 A-B 80 ENVELOPE Lapangan 32,4234 130,57 40,9017 (OKE)
Tumpuan Kanan (B) 39,6418 160,79 50,6115 (OKE)
Tumpuan Kiri (B) 46,9471 160,79 63,9474 (OKE)
Lantai 2 3 B-C 81 ENVELOPE Lapangan 44,1211 130,57 61,3246 (OKE)
Tumpuan Kanan (C) 67,7558 160,79 91,2523 (OKE)
Tumpuan Kiri (C) 68,2608 160,79 92,9791 (OKE)
Lantai 2 3 C-D 82 ENVELOPE Lapangan 44,0271 130,57 59,7384 (OKE)
Tumpuan Kanan 45,6988 160,79 64,5054 (OKE)
(D)
Tumpuan Kiri (D) 38,1441 160,79 50,5914 (OKE)
B3 300.450

Lantai 2 3 D-E 83 ENVELOPE Lapangan 29,9408 130,57 30,6628 (OKE)


Tumpuan Kanan (E) 110,2517 160,79 123,6021 (OKE)
Tumpuan Kiri (E) 93,2296 160,79 106,7557 (OKE)
Lantai 2 3 E-F 84 ENVELOPE Lapangan 29,3294 130,57 38,1738 (OKE)
Tumpuan Kanan (F) 85,6653 160,79 103,2957 (OKE)
Tumpuan Kiri (F) 94,9443 160,79 103,6040 (OKE)
Lantai 2 3 F-G 85 ENVELOPE Lapangan 36,2892 130,57 29,1733 (OKE)
Tumpuan Kanan (G) 96,6223 160,79 103,7691 (OKE)
Tumpuan Kiri (A) 68,0950 160,79 77,6944 (OKE)
Lantai 3 2 A-B 212 ENVELOPE Lapangan 22,9635 130,57 22,9635 (OKE)
Tumpuan Kanan (B) 22,5117 160,79 27,8636 (OKE)
Tumpuan Kiri (B) 33,0657 160,79 40,3429 (OKE)
Lantai 3 2 B-C 213 ENVELOPE Lapangan 32,7365 130,57 12,7021 (OKE)
Tumpuan Kanan (C) 48,1382 160,79 85,9722 (OKE)

12
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (C) 47,7999 160,79 144,3949 (OKE)
Lantai 3 2 C-D 214 ENVELOPE Lapangan 32,7713 130,57 152,8088 (NOT OKE)
Tumpuan Kanan 33,1355 160,79 125,2090 (OKE)
(D)
Tumpuan Kiri (D) 21,7857 160,79 73,6593 (OKE)
Lantai 3 2 D-E 215 ENVELOPE Lapangan 17,4596 130,57 74,3743 (OKE)
Tumpuan Kanan (E) 72,0296 160,79 215,7393 (NOT OKE)
Tumpuan Kiri (E) 77,0331 160,79 132,4951 (OKE)
Lantai 3 2 E-F 216 ENVELOPE Lapangan 31,5234 130,57 35,9705 (OKE)
Tumpuan Kanan (F) 73,6307 160,79 81,7626 (OKE)
Tumpuan Kiri (F) 77,5518 160,79 90,5735 (OKE)
Lantai 3 2 F-G 217 ENVELOPE Lapangan 33,668 130,57 33,5376
B3 300.450

(OKE)
Tumpuan Kanan (G) 77,1436 160,79 91,2164 (OKE)
Tumpuan Kiri (A) 68,0772 160,79 77,8399 (OKE)
Lantai 3 3 A-B 206 ENVELOPE Lapangan 22,0402 130,57 22,9482 (OKE)
Tumpuan Kanan (B) 22,5201 160,79 27,9972 (OKE)
Tumpuan Kiri (B) 33,0684 160,79 40,3578 (OKE)
Lantai 3 3 B-C 207 ENVELOPE Lapangan 32,7362 130,57 12,7088 (OKE)
Tumpuan Kanan (C) 48,1402 160,79 85,9476 (OKE)
Tumpuan Kiri (C) 47,8024 160,79 144,3562 (OKE)
Lantai 3 3 C-D 208 ENVELOPE Lapangan 32,7722 130,57 152,7646 (NOT OKE)
Tumpuan Kanan 33,1322 160,79 125,4858 (OKE)
(D)
Tumpuan Kiri (D) 21,7844 160,79 74,5444 (OKE)
Lantai 3 3 D-E 209 ENVELOPE Lapangan 17,4597 130,57 74,4965 (OKE)
Tumpuan Kanan (E) 72,0307 160,79 214,1892 (NOT OKE)

12
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (E) 77,0346 160,79 134,8869 (OKE)
Lantai 3 3 E-F 210 ENVELOPE Lapangan 31,5237 130,57 35,4285 (OKE)
Tumpuan Kanan (F) 73,6301 160,79 80,3194 (OKE)
Tumpuan Kiri (F) 77,5531 160,79 89,1364 (OKE)
Lantai 3 3 F-G 211 ENVELOPE Lapangan 33,6683 130,57 32,7156 (OKE)
Tumpuan Kanan (G) 77,1420 160,79 94,4207 (OKE)
Tumpuan Kiri (E) 36,5024 160,79 58,9473 (OKE)
Lantai
2 E-F 257 ENVELOPE Lapangan 28,1081 130,57 60,5451 (OKE)
Atap
300.450

Tumpuan Kanan (F) 46,7624 160,79 98,9424 (OKE)


B3

Tumpuan Kiri (F) 46,7257 160,79 101,9626 (OKE)


Lantai
2 F-G 258 ENVELOPE Lapangan 27,3895 130,57 57,6044 (OKE)
Atap
Tumpuan Kanan (G) 35,6622 160,79 58,7750 (OKE)
Tumpuan Kiri (E) 36,5025 160,79 80,2280 (OKE)
Lantai
3 E-F 255 ENVELOPE Lapangan 28,1084 130,57 92,5553 (OKE)
Atap
Tumpuan Kanan (F) 46,7626 160,79 142,3167 (OKE)
Tumpuan Kiri (F) 46,7258 160,79 145,3049 (OKE)
Lantai
3 F-G 256 ENVELOPE Lapangan 27,3894 130,57 89,6466 (OKE)
Atap
Tumpuan Kanan (G) 35,6624 160,79 79,6658 (OKE)

12
2. Geser Ultimate (Vu)
Tabel 5.33 : Rekapitulasi Verifikasi Geser Balok 3

Rekap Geser Kapasitas Rekap Geser Alih


Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kiri (A) 65,8200 76,34 82,2410 (NOT OKE)
Lantai 2 2 A-B 86 ENVELOPE Lapangan 27,5540 57,26 34,6530 (OKE)
Tumpuan Kanan (B) 38,6300 76,34 49,0410 (OKE)
Tumpuan Kiri (B) 47,0850 76,34 64,2370 (OKE)
Lantai 2 2 B-C 87 ENVELOPE Lapangan 8,9220 57,26 11,8090 (OKE)
Tumpuan Kanan (C) 54,3170 76,34 74,0440 (OKE)
Tumpuan Kiri (C) 54,4660 76,34 73,7000 (OKE)
Lantai 2 2 C-D 88 ENVELOPE Lapangan 14,7370 57,26 18,8390 (OKE)
Tumpuan Kanan 46,6170 76,34 64,1620 (OKE)
(D)
300.450

Tumpuan Kiri (D) 40,8470 76,34 46,5520 (OKE)


B3

Lantai 2 2 D-E 89 ENVELOPE Lapangan 9,1120 57,26 12,7850 (OKE)


Tumpuan Kanan (E) 67,2290 76,34 72,7550 (OKE)
Tumpuan Kiri (E) 59,6690 76,34 69,0460 (OKE)
Lantai 2 2 E-F 90 ENVELOPE Lapangan 28,7380 57,26 34,0290 (OKE)
Tumpuan Kanan (F) 57,2120 76,34 68,8280 (OKE)
Tumpuan Kiri (F) 66,976 76,34 66,378 (OKE)
Lantai 2 2 F-G 91 ENVELOPE Lapangan 29,484 57,26 33,06 (OKE)
Tumpuan Kanan (G) 70,693 76,34 69,12 (OKE)
Tumpuan Kiri (A) 65,8290 76,34 82,4320 (NOT OKE)
Lantai 2 3 A-B 80 ENVELOPE Lapangan 27,5570 57,26 34,7580 (OKE)
Tumpuan Kanan (B) 38,6240 76,34 49,0320 (OKE)

13
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kiri (B) 47,0830 76,34 64,2360 (OKE)
Lantai 2 3 B-C 81 ENVELOPE Lapangan 8,9200 57,26 11,7930 (OKE)
Tumpuan Kanan (C) 54,3150 76,34 74,0440 (OKE)
Tumpuan Kiri (C) 54,4610 76,34 73,6980 (OKE)
Lantai 2 3 C-D 82 ENVELOPE Lapangan 14,7340 57,26 18,8410 (OKE)
Tumpuan Kanan 46,6200 76,34 64,1960 (OKE)
(D)
Tumpuan Kiri (D) 40,8500 76,34 46,5870 (OKE)
Lantai 2 3 D-E 83 ENVELOPE Lapangan 9,1120 57,26 12,8110 (OKE)
Tumpuan Kanan (E) 67,2280 76,34 72,5920 (OKE)
Tumpuan Kiri (E) 59,6650 76,34 68,8890 (OKE)
Lantai 2 3 E-F 84 ENVELOPE Lapangan 28,7350 57,26 33,9580
B3 300.450

(OKE)
Tumpuan Kanan (F) 57,2150 76,34 68,3770 (OKE)
Tumpuan Kiri (F) 66,9720 76,34 66,9740 (OKE)
Lantai 2 3 F-G 85 ENVELOPE Lapangan 29,4800 57,26 33,1290 (OKE)
Tumpuan Kanan (G) 70,6980 76,34 69,8060 (OKE)
Tumpuan Kiri (A) 42,3270 76,34 43,6380 (OKE)
Lantai 3 2 A-B 212 ENVELOPE Lapangan 19,2900 57,26 21,7170 (OKE)
Tumpuan Kanan (B) 26,1140 76,34 27,7260 (OKE)
Tumpuan Kiri (B) 35,3260 76,34 31,5360 (OKE)
Lantai 3 2 B-C 213 ENVELOPE Lapangan 10,8150 57,26 17,9560 (OKE)
Tumpuan Kanan (C) 40,4760 76,34 46,4200 (OKE)
Tumpuan Kiri (C) 40,4380 76,34 149,1240 (NOT OKE)
Lantai 3 2 C-D 214 ENVELOPE Lapangan 10,1440 57,26 35,8530 (OKE)
Tumpuan Kanan 35,3810 76,34 141,8920 (NOT OKE)
(D)

13
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kiri (D) 24,5210 76,34 96,6350 (NOT OKE)
Lantai 3 2 D-E 215 ENVELOPE Lapangan 6,0540 57,26 18,4270 (OKE)
Tumpuan Kanan (E) 42,4770 76,34 155,6650 (NOT OKE)
Tumpuan Kiri (E) 54,2280 76,34 79,2510 (NOT OKE)
Lantai 3 2 E-F 216 ENVELOPE Lapangan 23,2570 57,26 39,7360 (OKE)
Tumpuan Kanan (F) 52,9280 76,34 59,6540 (OKE)
Tumpuan Kiri (F) 55,64 76,34 61,046 (OKE)
Lantai 3 2 F-G 217 ENVELOPE Lapangan 25,139 57,26 30,16 (OKE)
Tumpuan Kanan (G) 58,375 76,34 64,142 (OKE)
Tumpuan Kiri (A) 42,3200 76,34 43,7130 (OKE)
Lantai 3 3 A-B 206 ENVELOPE Lapangan 19,2840 57,26 21,7670 (OKE)
B3 300.450

Tumpuan Kanan (B) 26,1190 76,34 27,7800 (OKE)


Tumpuan Kiri (B) 35,3270 76,34 31,5420 (OKE)
Lantai 3 3 B-C 207 ENVELOPE Lapangan 5,6830 57,26 3,4080 (OKE)
Tumpuan Kanan (C) 40,4760 76,34 46,4160 (OKE)
Tumpuan Kiri (C) 40,4390 76,34 149,0980 (NOT OKE)
Lantai 3 3 C-D 208 ENVELOPE Lapangan 10,1450 57,26 35,8250 (OKE)
Tumpuan Kanan 35,3800 76,34 141,9880 (NOT OKE)
(D)
Tumpuan Kiri (D) 24,5200 76,34 96,9970 (NOT OKE)
Lantai 3 3 D-E 209 ENVELOPE Lapangan 6,0530 57,26 18,8540 (OKE)
Tumpuan Kanan (E) 42,4770 76,34 154,5720 (NOT OKE)
Tumpuan Kiri (E) 54,2290 76,34 79,9760 (NOT OKE)
Lantai 3 3 E-F 210 ENVELOPE Lapangan 23,2570 57,26 40,4110 (OKE)
Tumpuan Kanan (F) 52,9280 76,34 58,5670 (OKE)

13
Rekap GeserKapasitasRekap Geser Alih EksistingPenampangFungsi
Nama As Kombinasi Beban
ElemenLetak Bangunan Frame Seksi Balok

Vu (kN) φV (kN) V
55,6400
Tumpuan Kiri (F) Lapangan 76,34
Lantai 33F - G211 ENVELOPE Tumpuan Kanan (G) 25,1400
Tumpuan Kiri (E) 57,26
Lapangan
Tumpuan Kanan Tumpuan 58,3750
L 31,4990
Lantai
Atap 2 E-F 257 ENVELOPE

Lantai
Atap 2 F - G258 ENVELOPE
B3

Lantai
Atap 3 E-F 2

Lanta

13
D. BALOK 4
1. Momen Ultimate (Mu)
Tabel 5.34 : Rekapitulasi Verifikasi Momen Balok 4
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kanan (2) 3,8346 71,27 4,9467 (OKE)
Lantai 2 A' 1-2 100 ENVELOPE Lapangan 7,2969 48,96 10,1540 (OKE)
Tumpuan Kiri (1) 5,6021 71,27 6,8709 (OKE)
Tumpuan Kanan (3) 3,1240 71,27 4,0541 (OKE)
Lantai 2 A' 2-3 99 ENVELOPE Lapangan 8,9875 48,96 12,4515 (OKE)
Tumpuan Kiri (2) 3,1193 71,27 4,1366 (OKE)
Tumpuan Kanan (4) 5,6105 71,27 6,9471 (OKE)
Lantai 2 A' 3-4 98 ENVELOPE Lapangan 7,3011 48,96 10,1202 (OKE)
Tumpuan Kiri (3) 3,8301 71,27 4,9451 (OKE)
200.3

Tumpuan Kanan (2) 5,7839 71,27 6,3371 (OKE)


Lantai 2 B' 1-2 103 ENVELOPE Lapangan 9,7477 48,96 13,3854 (OKE)
Tumpuan Kiri (1) 6,6247 71,27 8,8507 (OKE)
Tumpuan Kanan (3) 5,6986 71,27 6,1693 (OKE)
Lantai 2 B' 2-3 102 ENVELOPE Lapangan 16,2453 48,96 21,6888 (OKE)
Tumpuan Kiri (2) 5,6929 71,27 6,1915 (OKE)
Tumpuan Kanan (4) 6,6193 71,27 8,8507 (OKE)
Lantai 2 B' 3-4 101 ENVELOPE Lapangan 9,5988 48,96 13,1582 (OKE)
Tumpuan Kiri (3) 5,7894 71,27 6,3422 (OKE)

13
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kanan (2) 2,2218 71,27 1,6687 (OKE)
Lantai 2 C' 1-2 106 ENVELOPE Lapangan 9,9017 48,96 12,7279 (OKE)
Tumpuan Kiri (1) 6,1563 71,27 5,9211 (OKE)
Tumpuan Kanan (3) 6,0767 71,27 5,6866 (OKE)
Lantai 2 C' 2-3 105 ENVELOPE Lapangan 16,5796 48,96 20,8953 (OKE)
Tumpuan Kiri (2) 6,0761 71,27 5,6948 (OKE)
Tumpuan Kanan (4) 6,7495 71,27 9,3468 (OKE)
Lantai 2 C' 3-4 104 ENVELOPE Lapangan 9,7406 48,96 12,4872 (OKE)
Tumpuan Kiri (3) 6,1577 71,27 5,8978 (OKE)
Tumpuan Kanan (2) 3,0168 71,27 4,3827 (OKE)
Lantai 2 D' 1-2 109 ENVELOPE Lapangan 7,2351 48,96 6,7628 (OKE)
200.350

Tumpuan Kiri (1) 5,2297 71,27 5,9264 (OKE)


B4

Tumpuan Kanan (3) 2,2257 71,27 3,3276 (OKE)


Lantai 2 D' 2-3 108 ENVELOPE Lapangan 9,2000 48,96 11,2459 (OKE)
Tumpuan Kiri (2) 2,2227 71,27 3,3557 (OKE)
Tumpuan Kanan (4) 5,2330 71,27 5,9334 (OKE)
Lantai 2 D' 3-4 107 ENVELOPE Lapangan 7,1972 48,96 6,7588 (OKE)
Tumpuan Kiri (3) 3,0197 71,27 4,3595 (OKE)
Tumpuan Kanan (2) 6,0593 71,27 7,0646 (OKE)
Lantai 2 E' 1-2 112 ENVELOPE Lapangan 6,0811 48,96 7,6065 (OKE)
Tumpuan Kiri (1) 3,6262 71,27 4,7822 (OKE)
Tumpuan Kanan (3) 6,2233 71,27 7,1935 (OKE)
Lantai 2 E' 2-3 111 ENVELOPE Lapangan 4,1806 48,96 5,6082 (OKE)
Tumpuan Kiri (2) 6,2225 71,27 7,4295 (OKE)

13
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kanan (4) 3,6280 71,27 4,7725 (OKE)
Lantai 2 E' 3-4 110 ENVELOPE Lapangan 6,1321 48,96 7,7685 (OKE)
Tumpuan Kiri (3) 6,0592 71,27 6,8350 (OKE)
Tumpuan Kanan (2) 5,2018 71,27 4,5772 (OKE)
Lantai 2 F' 1-2 115 ENVELOPE Lapangan 6,1855 48,96 6,3655 (OKE)
Tumpuan Kiri (1) 5,3232 71,27 5,7624 (OKE)
Tumpuan Kanan (3) 5,7104 71,27 4,8081 (OKE)
Lantai 2 F' 2-3 114 ENVELOPE Lapangan 4,4809 48,96 3,2041 (OKE)
Tumpuan Kiri (2) 5,7103 71,27 5,1247 (OKE)
Tumpuan Kanan (4) 5,3235 71,27 5,9566 (OKE)
Lantai 2 F' 3-4 113 ENVELOPE Lapangan 6,2288 48,96 7,0404 (OKE)
200.35

Tumpuan Kiri (3) 5,2018 71,27 4,3937 (OKE)


B4

Tumpuan Kanan (2) 2,0717 71,27 3,0480 (OKE)


Lantai 3 A' 1-2 226 ENVELOPE Lapangan 6,1133 48,96 6,0826 (OKE)
Tumpuan Kiri (1) 3,9052 71,27 3,8711 (OKE)
Tumpuan Kanan (3) 1,6075 71,27 2,2409 (OKE)
Lantai 3 A' 2-3 225 ENVELOPE Lapangan 7,5929 48,96 7,3901 (OKE)
Tumpuan Kiri (2) 1,6082 71,27 2,3045 (OKE)
Tumpuan Kanan (4) 3,9060 71,27 3,9263 (OKE)
Lantai 3 A' 3-4 224 ENVELOPE Lapangan 6,0917 48,96 6,0666 (OKE)
Tumpuan Kiri (3) 2,0713 71,27 3,0510 (OKE)
Tumpuan Kanan (2) 5,0715 71,27 7,1032 (OKE)
Lantai 3 B' 1-2 229 ENVELOPE Lapangan 8,5269 48,96 10,4484 (OKE)
Tumpuan Kiri (1) 5,4051 71,27 3,3635 (OKE)

13
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kanan (3) 4,6955 71,27 8,8585 (OKE)
Lantai 3 B' 2-3 228 ENVELOPE Lapangan 13,6176 48,96 17,7449 (OKE)
Tumpuan Kiri (2) 4,6971 71,27 8,8639 (OKE)
Tumpuan Kanan (4) 5,4066 71,27 3,3696 (OKE)
Lantai 3 B' 3-4 227 ENVELOPE Lapangan 8,4298 48,96 10,3488 (OKE)
Tumpuan Kiri (3) 5,0701 71,27 7,0950 (OKE)
Tumpuan Kanan (2) 2,6392 71,27 13,8282 (OKE)
Lantai 3 C' 1-2 232 ENVELOPE Lapangan 8,4784 48,96 34,5521 (OKE)
Tumpuan Kiri (1) 5,4250 71,27 22,4448 (OKE)
Tumpuan Kanan (3) 4,6113 71,27 9,4089 (OKE)
Lantai 3 C' 2-3 231 ENVELOPE Lapangan 13,5291 48,96 48,2494 (OKE)
200.350

Tumpuan Kiri (2) 4,6114 71,27 9,4525 (OKE)


B4

Tumpuan Kanan (4) 5,4249 71,27 22,4602 (OKE)


Lantai 3 C' 3-4 230 ENVELOPE Lapangan 8,3832 48,96 34,2023 (OKE)
Tumpuan Kiri (3) 4,9959 71,27 13,5030 (OKE)
Tumpuan Kanan (2) 2,3113 71,27 9,3896 (OKE)
Lantai 3 D' 1-2 235 ENVELOPE Lapangan 5,9806 48,96 26,1110 (OKE)
Tumpuan Kiri (1) 3,4110 71,27 13,2591 (OKE)
Tumpuan Kanan (3) 1,6555 71,27 8,1310 (OKE)
Lantai 3 D' 2-3 234 ENVELOPE Lapangan 7,3530 48,96 29,8582 (OKE)
Tumpuan Kiri (2) 1,6557 71,27 8,3812 (OKE)
Tumpuan Kanan (4) 3,4106 71,27 13,3083 (OKE)
Lantai 3 D' 3-4 233 ENVELOPE Lapangan 5,9652 48,96 26,1626 (OKE)
Tumpuan Kiri (3) 2,3111 71,27 9,1672 (OKE)

13
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kanan (2) 5,7089 71,27 8,7041 (OKE)
Lantai 3 E' 1-2 238 ENVELOPE Lapangan 6,1454 48,96 8,7688 (OKE)
Tumpuan Kiri (1) 3,2592 71,27 3,5138 (OKE)
Tumpuan Kanan (3) 5,9412 71,27 8,3695 (OKE)
Lantai 3 E' 2-3 237 ENVELOPE Lapangan 4,4746 48,96 6,1763 (OKE)
Tumpuan Kiri (2) 5,9409 71,27 8,8020 (OKE)
Tumpuan Kanan (4) 3,2591 71,27 3,5668 (OKE)
Lantai 3 E' 3-4 236 ENVELOPE Lapangan 6,1883 48,96 9,0303 (OKE)
Tumpuan Kiri (3) 5,7092 71,27 8,2761 (OKE)
Tumpuan Kanan (2) 5,6504 71,27 6,4346 (OKE)
Lantai 3 F' 1-2 241 ENVELOPE Lapangan 6,2513 48,96 10,1065 (OKE)
200.350

Tumpuan Kiri (1) 4,1355 71,27 5,2360 (OKE)


B4

Tumpuan Kanan (3) 5,9884 71,27 5,7511 (OKE)


Lantai 3 F' 2-3 240 ENVELOPE Lapangan 4,5403 48,96 3,3565 (OKE)
Tumpuan Kiri (2) 5,9884 71,27 6,2017 (OKE)
Tumpuan Kanan (4) 4,1354 71,27 5,3736 (OKE)
Lantai 3 F' 3-4 239 ENVELOPE Lapangan 6,2911 48,96 10,2876 (OKE)
Tumpuan Kiri (3) 5,6505 71,27 6,0031 (OKE)
Tumpuan Kanan (2) 3,9518 71,27 8,5746 (OKE)
Lantai
E' 1-2 261 ENVELOPE Lapangan 5,2386 48,96 1,7200 (OKE)
Atap
Tumpuan Kiri (1) 3,3412 71,27 6,1069 (OKE)
Tumpuan Kanan (3) 4,5362 71,27 14,1473 (OKE)
Lantai
E' 2-3 260 ENVELOPE Lapangan 3,8767 48,96 17,9062 (OKE)
Atap
Tumpuan Kiri (2) 4,5359 71,27 12,9909 (OKE)

13
13
2. Geser Ultimate (Vu)
Tabel 5.35 : Rekapitulasi Verifikasi Geser Balok 4

Rekap Geser Kapasitas Rekap Geser Alih


Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kanan (2) 9,8720 36,91 13,8260 (OKE)
Lantai 2 A' 1-2 100 ENVELOPE Lapangan 2,3390 27,69 3,0440 (OKE)
Tumpuan Kiri (1) 10,5420 36,91 14,7560 (OKE)
Tumpuan Kanan (3) 10,9510 36,91 15,2000 (OKE)
Lantai 2 A' 2-3 99 ENVELOPE Lapangan 2,4980 27,69 3,1890 (OKE)
Tumpuan Kiri (2) 10,9510 36,91 15,1980 (OKE)
Tumpuan Kanan (4) 10,5440 36,91 14,7570 (OKE)
Lantai 2 A' 3-4 98 ENVELOPE Lapangan 3,0880 27,69 4,0580 (OKE)
Tumpuan Kiri (3) 9,8710 36,91 13,8260 (OKE)
Tumpuan Kanan (2) 7,0780 36,91 10,2490
200.350

(OKE)
B4

Lantai 2 B' 1-2 103 ENVELOPE Lapangan 1,9480 27,69 2,1490 (OKE)
Tumpuan Kiri (1) 13,1280 36,91 18,0990 (OKE)
Tumpuan Kanan (3) 11,0860 36,91 15,4110 (OKE)
Lantai 2 B' 2-3 102 ENVELOPE Lapangan 2,4940 27,69 3,2360 (OKE)
Tumpuan Kiri (2) 11,0890 36,91 15,4100 (OKE)
Tumpuan Kanan (4) 13,1300 36,91 18,0980 (OKE)
Lantai 2 B' 3-4 101 ENVELOPE Lapangan 5,7210 27,69 7,7800 (OKE)
Tumpuan Kiri (3) 7,0790 36,91 10,2490 (OKE)
Tumpuan Kanan (2) 6,9500 36,91 10,2580 (OKE)
Lantai 2 C' 1-2 106 ENVELOPE Lapangan 2,0860 27,69 2,1350 (OKE)
Tumpuan Kiri (1) 13,2110 36,91 17,9180 (OKE)

14
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kanan (3) 11,1050 36,91 15,3770 (OKE)
Lantai 2 C' 2-3 105 ENVELOPE Lapangan 2,5390 27,69 3,3150 (OKE)
Tumpuan Kiri (2) 11,1050 36,91 15,3670 (OKE)
Tumpuan Kanan (4) 13,2120 36,91 17,9120 (OKE)
Lantai 2 C' 3-4 104 ENVELOPE Lapangan 5,8530 27,69 7,7330 (OKE)
Tumpuan Kiri (3) 6,9500 36,91 10,2590 (OKE)
Tumpuan Kanan (2) 9,2920 36,91 9,2590 (OKE)
Lantai 2 D' 1-2 109 ENVELOPE Lapangan 1,6330 27,69 2,0720 (OKE)
Tumpuan Kiri (1) 10,5920 36,91 10,2000 (OKE)
Tumpuan Kanan (3) 10,5550 36,91 13,2720 (OKE)
Lantai 2 D' 2-3 108 ENVELOPE Lapangan 2,0840 27,69 2,5630 (OKE)
200.350

Tumpuan Kiri (2) 10,5530 36,91 13,3010 (OKE)


B4

Tumpuan Kanan (4) 10,5910 36,91 10,2180 (OKE)


Lantai 2 D' 3-4 107 ENVELOPE Lapangan 3,1420 27,69 3,2050 (OKE)
Tumpuan Kiri (3) 9,2920 36,91 9,2360 (OKE)
Tumpuan Kanan (2) 11,4150 36,91 13,8710 (OKE)
Lantai 2 E' 1-2 112 ENVELOPE Lapangan 3,1150 27,69 3,5070 (OKE)
Tumpuan Kiri (1) 9,5900 36,91 12,0440 (OKE)
Tumpuan Kanan (3) 10,3800 36,91 12,7160 (OKE)
Lantai 2 E' 2-3 111 ENVELOPE Lapangan 1,9130 27,69 2,2850 (OKE)
Tumpuan Kiri (2) 10,3800 36,91 12,8420 (OKE)
Tumpuan Kanan (4) 9,5900 36,91 12,1080 (OKE)
Lantai 2 E' 3-4 110 ENVELOPE Lapangan 1,1370 27,69 1,8060 (OKE)
Tumpuan Kiri (3) 11,4150 36,91 13,8090 (OKE)

14
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kanan (2) 10,9280 36,91 10,0630 (OKE)
Lantai 2 F' 1-2 115 ENVELOPE Lapangan 3,4140 27,69 3,5730 (OKE)
Tumpuan Kiri (1) 9,9640 36,91 9,3000 (OKE)
Tumpuan Kanan (3) 10,1150 36,91 6,8930 (OKE)
Lantai 2 F' 2-3 114 ENVELOPE Lapangan 2,3200 27,69 1,9490 (OKE)
Tumpuan Kiri (2) 10,1150 36,91 7,1000 (OKE)
Tumpuan Kanan (4) 9,9640 36,91 10,2360 (OKE)
Lantai 2 F' 3-4 113 ENVELOPE Lapangan 2,3370 27,69 3,0240 (OKE)
Tumpuan Kiri (3) 10,9280 36,91 10,7970 (OKE)
Tumpuan Kanan (2) 8,0040 36,91 8,2220 (OKE)
Lantai 3 A' 1-2 226 ENVELOPE Lapangan 1,2370 27,69 1,7580 (OKE)
200.35

Tumpuan Kiri (1) 9,3030 36,91 9,1180 (OKE)


B4

Tumpuan Kanan (3) 8,9230 36,91 8,9680 (OKE)


Lantai 3 A' 2-3 225 ENVELOPE Lapangan 1,5840 27,69 1,6130 (OKE)
Tumpuan Kiri (2) 8,9230 36,91 8,9660 (OKE)
Tumpuan Kanan (4) 9,3030 36,91 9,1160 (OKE)
Lantai 3 A' 3-4 224 ENVELOPE Lapangan 2,3920 27,69 2,3680 (OKE)
Tumpuan Kiri (3) 8,0030 36,91 8,2230 (OKE)
Tumpuan Kanan (2) 5,6690 36,91 5,5360 (OKE)
Lantai 3 B' 1-2 229 ENVELOPE Lapangan 2,0720 27,69 1,9370 (OKE)
Tumpuan Kiri (1) 11,7740 36,91 11,8310 (OKE)
Tumpuan Kanan (3) 9,0540 36,91 9,6090 (OKE)
Lantai 3 B' 2-3 228 ENVELOPE Lapangan 2,6200 27,69 3,6060 (OKE)
Tumpuan Kiri (2) 9,0530 36,91 9,6060 (OKE)

14
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kanan (4) 11,7730 36,91 11,8290 (OKE)
Lantai 3 B' 3-4 227 ENVELOPE Lapangan 5,1670 27,69 5,0230 (OKE)
Tumpuan Kiri (3) 5,6690 36,91 5,5350 (OKE)
Tumpuan Kanan (2) 5,6860 36,91 27,1630 (OKE)
Lantai 3 C' 1-2 232 ENVELOPE Lapangan 2,0500 27,69 3,5690 (OKE)
Tumpuan Kiri (1) 11,7550 36,91 47,9200 (NOT OKE)
Tumpuan Kanan (3) 9,0490 36,91 37,5990 (NOT OKE)
Lantai 3 C' 2-3 231 ENVELOPE Lapangan 1,6890 27,69 8,5510 (OKE)
Tumpuan Kiri (2) 9,0490 36,91 36,5740 (OKE)
Tumpuan Kanan (4) 11,7540 36,91 47,9140 (NOT OKE)
Lantai 3 C' 3-4 230 ENVELOPE Lapangan 5,1490 27,69 20,6900 (OKE)
200.350

Tumpuan Kiri (3) 5,6860 36,91 27,1680 (OKE)


B4

Tumpuan Kanan (2) 8,1370 36,91 35,2770 (OKE)


Lantai 3 D' 1-2 235 ENVELOPE Lapangan 1,2510 27,69 6,4670 (OKE)
Tumpuan Kiri (1) 9,0750 36,91 36,8620 (OKE)
Tumpuan Kanan (3) 8,9120 36,91 36,8720 (OKE)
Lantai 3 D' 2-3 234 ENVELOPE Lapangan 1,5560 27,69 7,8350 (OKE)
Tumpuan Kiri (2) 8,9120 36,91 36,8860 (OKE)
Tumpuan Kanan (4) 9,0750 36,91 36,8430 (OKE)
Lantai 3 D' 3-4 233 ENVELOPE Lapangan 2,0790 27,69 9,3890 (OKE)
Tumpuan Kiri (3) 8,1370 36,91 35,1600 (OKE)
Tumpuan Kanan (2) 11,2620 36,91 16,1250 (OKE)
Lantai 3 E' 1-2 238 ENVELOPE Lapangan 2,7370 27,69 4,4900 (OKE)
Tumpuan Kiri (1) 9,7440 36,91 13,2990 (OKE)

14
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kanan (3) 10,3900 36,91 14,4440 (OKE)
Lantai 3 E' 2-3 237 ENVELOPE Lapangan 1,9180 27,69 2,5180 (OKE)
Tumpuan Kiri (2) 10,3890 36,91 14,6710 (OKE)
Tumpuan Kanan (4) 9,7440 36,91 13,4190 (OKE)
Lantai 3 E' 3-4 236 ENVELOPE Lapangan 0,9430 27,69 1,0400 (OKE)
Tumpuan Kiri (3) 11,2620 36,91 15,9950 (OKE)
Tumpuan Kanan (2) 11,2990 36,91 15,8200 (OKE)
Lantai 3 F' 1-2 241 ENVELOPE Lapangan 3,0750 27,69 3,9810 (OKE)
Tumpuan Kiri (1) 9,8740 36,91 14,1550 (OKE)
Tumpuan Kanan (3) 10,4300 36,91 7,2560 (OKE)
Lantai 3 F' 2-3 240 ENVELOPE Lapangan 1,2580 27,69 1,4270 (OKE)
200.350

Tumpuan Kiri (2) 10,4300 36,91 7,5110 (OKE)


B4

Tumpuan Kanan (4) 9,8740 36,91 14,2740 (OKE)


Lantai 3 F' 3-4 239 ENVELOPE Lapangan 1,5670 27,69 2,7240 (OKE)
Tumpuan Kiri (3) 11,2990 36,91 15,6700 (OKE)
Tumpuan Kanan (2) 9,2000 36,91 9,6900 (OKE)
Lantai
E' 1-2 261 ENVELOPE Lapangan 1,9650 27,69 2,9420 (OKE)
Atap
Tumpuan Kiri (1) 8,5290 36,91 7,5640 (OKE)
Tumpuan Kanan (3) 8,6200 36,91 31,2280 (OKE)
Lantai
E' 2-3 260 ENVELOPE Lapangan 1,5900 27,69 7,1620 (OKE)
Atap
Tumpuan Kiri (2) 8,6200 36,91 30,9480 (OKE)
Tumpuan Kanan (4) 8,5290 36,91 30,3980 (OKE)
Lantai
E' 3-4 259 ENVELOPE Lapangan 1,3230 27,69 5,4980 (OKE)
Atap
Tumpuan Kiri (3) 9,2000 36,91 32,1530 (OKE)

14
14
BAB
VI
EVALUASI KONDISI
STRUKTUR
6.1. Evaluasi Elemen Pelat
Evaluasi elemen plat bertujuan untuk dapat mengetahui elemen struktur mana yang
sudah tidak mampu memikul beban yang ada maupun memikul beban akibat alih fungsi.
Dengan keterangan “(OKE)” yang artinya elemen struktur masih mampu memikul beban
yang ada dan keterangan “(NOT OKE)” yang berarti elemen struktur tersebut tidak kuat
memikul beban yang ada dan membutuhkan perkuatan.

6.1.1. Evaluasi Elemen Pelat Akibat Gaya Momen


Berikut adalah hasil evaluasi momen ultimate pada pelat saat kondisi alih fungsi
ruang arsip dan komputer (server) serta penambahan beban tandon air.

Tabel 6.1 : Rekapitulasi Evaluasi Momen Ultimate Elemen Struktur Pelat


Tumpuan Lapangan
Nama Kombinasi Check Check
Letak As Bangunan Arah φMn Mualihfungsi φMn Mualihfungsi
Elemen Beban
(kN.m) (kN.m) Mu af ≤ φMn (kN.m) (kN.m) Mu af ≤ φMn
X 14,9908 13,5286 (OKE) 14,9908 4,1222 (OKE)
A - A' 1 - 2 ENVELOPE
Y 13,1530 8,7331 (OKE) 13,1530 3,456 (OKE)
X 14,9908 13,4707 (OKE) 14,9908 3,8312 (OKE)
Lantai 2 A - A' 2 - 3 ENVELOPE
Y 13,1530 8,3086 (OKE) 13,1530 3,5172 (OKE)
X 14,9908 13,6944 (OKE) 14,9908 4,1191 (OKE)
A - A' 3 - 4 ENVELOPE
Y 13,1530 8,8436 (OKE) 13,1530 3,4565 (OKE)
X 14,9908 11,33249 (OKE) 14,9908 3,6783 (OKE)
A' - B 1 - 2 ENVELOPE
Y 13,1530 9,5347 (OKE) 13,1530 4,2081 (OKE)
X 14,9908 5,3378 (OKE) 14,9908 4,4381 (OKE)
Lantai 2 A' - B 2 - 3 ENVELOPE
Y 13,1530 1,9857 (OKE) 13,1530 4,9277 (OKE)
X 14,9908 11,4026 (OKE) 14,9908 3,6783 (OKE)
A' - B 3 - 4 ENVELOPE
Y 13,1530 9,6491 (OKE) 13,1530 4,2083 (OKE)
X 14,9908 11,8503 (OKE) 14,9908 5,1926 (OKE)
B - B' 1 - 2 ENVELOPE
Y 13,1530 9,2566 (OKE) 13,1530 5,0234 (OKE)
X 14,9908 8,9638 14,9908 6,1629
Lant

(OKE) (OKE)
Plat

ai

Lantai 2 B - B' 2 - 3 ENVELOPE


Y 13,1530 1,6801 (OKE) 13,1530 6,9761 (OKE)
X 14,9908 11,8507 (OKE) 14,9908 5,1926 (OKE)
B - B' 3 - 4 ENVELOPE
Y 13,1530 9,2562 (OKE) 13,1530 5,0235 (OKE)
X 14,9908 13,3192 (OKE) 14,9908 5,2791 (OKE)
B' - C 1 - 2 ENVELOPE
Y 13,1530 10,8015 (OKE) 13,1530 4,8127 (OKE)
X 14,9908 10,5369 (OKE) 14,9908 5,5768 (OKE)
Lantai 2 B' - C 2 - 3 ENVELOPE
Y 13,1530 1,9794 (OKE) 13,1530 6,9087 (OKE)
X 14,9908 13,3185 (OKE) 14,9908 5,2793 (OKE)
B' - C 3 - 4 ENVELOPE
Y 13,1530 10,8025 (OKE) 13,1530 4,8122 (OKE)
X 14,9908 13,7054 (OKE) 14,9908 5,1534 (OKE)
C - C' 1 - 2 ENVELOPE
Y 13,1530 11,1542 (OKE) 13,1530 4,6943 (OKE)
X 14,9908 10,5495 (OKE) 14,9908 5,427 (OKE)
Lantai 2 C - C' 2 - 3 ENVELOPE
Y 13,1530 2,075 (OKE) 13,1530 6,7707 (OKE)
X 14,9908 13,7073 (OKE) 14,9908 5,1521 (OKE)
C - C' 3 - 4 ENVELOPE
Y 13,1530 11,1592 (OKE) 13,1530 4,6916 (OKE)

14
Tumpuan Lapangan
Nama Kombinasi Check Check
Letak As Bangunan Arah φMn Mualihfungsi φMn Mualihfungsi
Elemen Beban
(kN.m) (kN.m) Mu af ≤ φMn (kN.m) (kN.m) Mu af ≤ φMn
X 14,9908 11,8486 (OKE) 14,9908 5,0966 (OKE)
C' - D 1 - 2 ENVELOPE
Y 13,1530 9,6422 (OKE) 13,1530 4,7632 (OKE)
X 14,9908 9,2676 (OKE) 14,9908 6,0285 (OKE)
Lantai 2 C' - D 2 - 3 ENVELOPE
Y 13,1530 2,0001 (OKE) 13,1530 6,6993 (OKE)
X 14,9908 11,858 (OKE) 14,9908 5,095 (OKE)
C' - D 3 - 4 ENVELOPE
Y 13,1530 9,6793 (OKE) 13,1530 4,7581 (OKE)
X 14,9908 10,0182 (OKE) 14,9908 2,953 (OKE)
D - D' 1 - 2 ENVELOPE
Y 13,1530 9,6912 (OKE) 13,1530 3,8361 (OKE)
X 14,9908 5,265 (OKE) 14,9908 3,5667 (OKE)
Lantai 2 D - D' 2 - 3 ENVELOPE
Y 13,1530 1,6804 (OKE) 13,1530 4,2709 (OKE)
X 14,9908 10,097 (OKE) 14,9908 2,9488 (OKE)
D - D' 3 - 4 ENVELOPE
Y 13,1530 9,7257 (OKE) 13,1530 3,8336 (OKE)
X 14,9908 12,0717 (OKE) 14,9908 2,8882 (OKE)
D' - E 1 - 2 ENVELOPE
Y 13,1530 5,7591 (OKE) 13,1530 2,1579 (OKE)
X 14,9908 11,9914 (OKE) 14,9908 3,1792 (OKE)
Lantai 2 D' - E 2 - 3 ENVELOPE
Y 13,1530 5,6047 (OKE) 13,1530 3,0625 (OKE)
X 14,9908 12,0419 (OKE) 14,9908 2,8955 (OKE)
D' - E 3 - 4 ENVELOPE
Y 13,1530 5,6794 (OKE) 13,1530 2,1686 (OKE)
X 14,9908 10,722 (OKE) 14,9908 3,9368 (OKE)
E - E' 1 - 2 ENVELOPE
Y 13,1530 5,2147 (OKE) 13,1530 2,6936 (OKE)
X 14,9908 10,8048 (OKE) 14,9908 4,0117 (OKE)
Lantai 2 E - E' 2 - 3 ENVELOPE
Y 13,1530 5,0029 (OKE) 13,1530 2,3983 (OKE)
X 14,9908 10,7138 (OKE) 14,9908 3,9382 (OKE)
E - E' 3 - 4 ENVELOPE
Y 13,1530 5,2815 (OKE) 13,1530 2,7105 (OKE)
X 14,9908 10,5736 (OKE) 14,9908 3,9054 (OKE)
E' - F 1 - 2 ENVELOPE
Y 13,1530 5,203 (OKE) 13,1530 2,7263 (OKE)
X 14,9908 10,525 (OKE) 14,9908 3,9873 (OKE)
Lantai 2 E' - F 2 - 3 ENVELOPE
Y 13,1530 5,0429 (OKE) 13,1530 2,4464 (OKE)
X 14,9908 10,5112 (OKE) 14,9908 3,9292 (OKE)
E' - F 3 - 4 ENVELOPE
P

Y 13,1530 5,2181 13,1530 2,7562


a

(OKE) (OKE)
l

X 14,9908 10,3663 (OKE) 14,9908 3,3765 (OKE)


F - F' 1 - 2 ENVELOPE
Y 13,1530 5,3429 (OKE) 13,1530 2,1976 (OKE)
X 14,9908 10,4002 (OKE) 14,9908 3,2193 (OKE)
Lantai 2 F - F' 2 - 3 ENVELOPE
Y 13,1530 4,9846 (OKE) 13,1530 1,4244 (OKE)
X 14,9908 10,3974 (OKE) 14,9908 3,5392 (OKE)
F - F' 3 - 4 ENVELOPE
Y 13,1530 5,455 (OKE) 13,1530 2,3779 (OKE)
X 14,9908 10,9689 (OKE) 14,9908 3,8881 (OKE)
F' - G 1 - 2 ENVELOPE
Y 13,1530 9,2412 (OKE) 13,1530 5,6565 (OKE)
X 14,9908 10,8821 (OKE) 14,9908 3,5201 (OKE)
Lantai 2 F' - G 2 - 3 ENVELOPE
Y 13,1530 8,733 (OKE) 13,1530 4,5035 (OKE)
X 14,9908 11,1225 (OKE) 14,9908 4,0366 (OKE)
F' - G 3 - 4 ENVELOPE
Y 13,1530 9,3386 (OKE) 13,1530 5,424 (OKE)
X 14,9908 4,3894 (OKE) 14,9908 1,4525 (OKE)
A - A' 1 - 2 ENVELOPE
Y 13,1530 2,345 (OKE) 13,1530 1,2719 (OKE)
X 14,9908 4,403 (OKE) 14,9908 1,3685 (OKE)
Lantai 3 A - A' 2 - 3 ENVELOPE
Y 13,1530 2,3438 (OKE) 13,1530 1,2805 (OKE)
X 14,9908 4,4428 (OKE) 14,9908 1,4509 (OKE)
A - A' 3 - 4 ENVELOPE
Y 13,1530 2,3904 (OKE) 13,1530 1,2718 (OKE)
X 14,9908 3,3338 (OKE) 14,9908 1,4272 (OKE)
A' - B 1 - 2 ENVELOPE
Y 13,1530 2,7839 (OKE) 13,1530 1,4618 (OKE)
X 14,9908 1,7989 (OKE) 14,9908 1,6339 (OKE)
Lantai 3 A' - B 2 - 3 ENVELOPE
Y 13,1530 0,8921 (OKE) 13,1530 1,8203 (OKE)
X 14,9908 3,3574 (OKE) 14,9908 1,4276 (OKE)
A' - B 3 - 4 ENVELOPE
Y 13,1530 2,8235 (OKE) 13,1530 1,462 (OKE)
X 14,9908 4,13 (OKE) 14,9908 1,5196 (OKE)
B - B' 1 - 2 ENVELOPE
Y 13,1530 2,4002 (OKE) 13,1530 1,9434 (OKE)
X 14,9908 3,9403 (OKE) 14,9908 1,6627 (OKE)
Lantai 3 B - B' 2 - 3 ENVELOPE
Y 13,1530 0,7631 (OKE) 13,1530 2,735 (OKE)
X 14,9908 4,1323 (OKE) 14,9908 1,519 (OKE)
B - B' 3 - 4 ENVELOPE
Y 13,1530 2,3932 (OKE) 13,1530 1,9424 (OKE)

14
Tumpuan Lapangan
Nama Kombinasi Check Check
Letak As Bangunan Arah φMn Mualihfungsi φMn Mualihfungsi
Elemen Beban
(kN.m) (kN.m) Mu af ≤ φMn (kN.m) (kN.m) Mu af ≤ φMn
X 14,9908 6,1481 (OKE) 14,9908 1,0953 (OKE)
B' - C 1 - 2 ENVELOPE
Y 13,1530 6,2814 (OKE) 13,1530 4,0128 (OKE)
X 14,9908 3,9716 (OKE) 14,9908 1,1198 (OKE)
Lantai 3 B' - C 2 - 3 ENVELOPE
Y 13,1530 0,3577 (OKE) 13,1530 3,272 (OKE)
X 14,9908 6,1477 (OKE) 14,9908 1,0952 (OKE)
B' - C 3 - 4 ENVELOPE
Y 13,1530 6,2847 (OKE) 13,1530 4,0132 (OKE)
14,9908 17,6589 (NOT OKE) 14,9908 8,8634 (OKE)
C - C' 1 - 2 ENVELOPE
13,1530 11,381 (OKE) 13,1530 8,4513 (OKE)
X 14,9908 16,6242 (NOT OKE) 14,9908 9,8522 (OKE)
Lantai 3 C - C' 2 - 3 ENVELOPE
Y 13,1530 6,908 (OKE) 13,1530 10,4686 (OKE)
X 14,9908 17,6583 (NOT OKE) 14,9908 8,461 (OKE)
C - C' 3 - 4 ENVELOPE
Y 13,1530 11,3843 (OKE) 13,1530 8,4482 (OKE)
X 14,9908 17,6881 (NOT OKE) 14,9908 8,5072 (OKE)
C' - D 1 - 2 ENVELOPE
Y 13,1530 12,1601 (OKE) 13,1530 8,5432 (OKE)
X 14,9908 14,9547 (OKE) 14,9908 10,1086 (OKE)
Lantai 3 C' - D 2 - 3 ENVELOPE
Y 13,1530 6,3146 (OKE) 13,1530 10,8338 (OKE)
X 14,9908 17,7016 (NOT OKE) 14,9908 8,5013 (OKE)
C' - D 3 - 4 ENVELOPE
Y 13,1530 12,1658 (OKE) 13,1530 8,5389 (OKE)
X 14,9908 14,7015 (OKE) 14,9908 6,3716 (OKE)
D - D' 1 - 2 ENVELOPE
Y 13,1530 9,5175 (OKE) 13,1530 6,2151 (OKE)
X 14,9908 9,3945 (OKE) 14,9908 7,3655 (OKE)
Lantai 3 D - D' 2 - 3 ENVELOPE
Y 13,1530 5,4642 (OKE) 13,1530 7,821 (OKE)
X 14,9908 14,7674 (OKE) 14,9908 6,3651 (OKE)
D - D' 3 - 4 ENVELOPE
Y 13,1530 9,5359 (OKE) 13,1530 6,2187 (OKE)
X 14,9908 16,408 (NOT OKE) 14,9908 5,5349 (OKE)
D' - E 1 - 2 ENVELOPE
Y 13,1530 9,6481 (OKE) 13,1530 5,5521 (OKE)
X 14,9908 20,0273 (NOT OKE) 14,9908 4,9144 (OKE)
P

a
l

Lantai 3 D' - E 2 - 3 ENVELOPE


Y 13,1530 8,2105 (OKE) 13,1530 5,4543 (OKE)
X 14,9908 16,3233 (NOT OKE) 14,9908 5,5809 (OKE)
D' - E 3 - 4 ENVELOPE
Y 13,1530 9,5679 (OKE) 13,1530 5,5762 (OKE)
X 14,9908 12,994 (OKE) 14,9908 3,007 (OKE)
E - E' 1 - 2 ENVELOPE
Y 13,1530 5,376 (OKE) 13,1530 2,8943 (OKE)
X 14,9908 13,2612 (OKE) 14,9908 2,8864 (OKE)
Lantai 3 E - E' 2 - 3 ENVELOPE
Y 13,1530 5,9001 (OKE) 13,1530 2,38 (OKE)
X 14,9908 13,1943 (OKE) 14,9908 2,9817 (OKE)
E - E' 3 - 4 ENVELOPE
Y 13,1530 5,3165 (OKE) 13,1530 2,9031 (OKE)
X 14,9908 9,0116 (OKE) 14,9908 3,8539 (OKE)
E' - F 1 - 2 ENVELOPE
Y 13,1530 3,9754 (OKE) 13,1530 3,125 (OKE)
X 14,9908 8,868 (OKE) 14,9908 3,9815 (OKE)
Lantai 3 E' - F 2 - 3 ENVELOPE
Y 13,1530 4,2773 (OKE) 13,1530 2,7921 (OKE)
X 14,9908 8,985 (OKE) 14,9908 3,9517 (OKE)
E' - F 3 - 4 ENVELOPE
Y 13,1530 4,1062 (OKE) 13,1530 3,1823 (OKE)
X 14,9908 10,0054 (OKE) 14,9908 3,798 (OKE)
F - F' 1 - 2 ENVELOPE
Y 13,1530 4,4428 (OKE) 13,1530 3,2526 (OKE)
X 14,9908 9,3188 (OKE) 14,9908 3,0561 (OKE)
Lantai 3 F - F' 2 - 3 ENVELOPE
Y 13,1530 4,4775 (OKE) 13,1530 1,3896 (OKE)
X 14,9908 9,9924 (OKE) 14,9908 3,8844 (OKE)
F - F' 3 - 4 ENVELOPE
Y 13,1530 4,618 (OKE) 13,1530 3,3032 (OKE)
X 14,9908 9,7667 (OKE) 14,9908 4,3053 (OKE)
F' - G 1 - 2 ENVELOPE
Y 13,1530 7,5289 (OKE) 13,1530 3,6337 (OKE)
X 14,9908 9,8426 (OKE) 14,9908 3,0473 (OKE)
Lantai 3 F' - G 2 - 3 ENVELOPE
Y 13,1530 7,3202 (OKE) 13,1530 2,8821 (OKE)
X 14,9908 10,1555 (OKE) 14,9908 4,2635 (OKE)
F' - G 3 - 4 ENVELOPE
Y 13,1530 7,678 (OKE) 13,1530 3,623 (OKE)

14
Tumpuan Lapangan
Nama Kombinasi Check Check
Letak As Bangunan Arah φMn Mualihfungsi φMn Mualihfungsi
Elemen Beban
(kN.m) (kN.m) Mu af ≤ φMn (kN.m) (kN.m) Mu af ≤ φMn
X 11,3152 4,05 (OKE) 11,3152 2,3981 (OKE)
E - E' 1 - 2 ENVELOPE
Y 9,4773 2,1185 (OKE) 9,4773 1,1117 (OKE)
Lantai X 11,3152 8,5905 (OKE) 11,3152 6,2926 (OKE)
E - E' 2 - 3 ENVELOPE
Atap Y 9,4773 6,4007 (OKE) 9,4773 5,0647 (OKE)
X 11,3152 8,6019 (OKE) 11,3152 6,0949 (OKE)
E - E' 3 - 4 ENVELOPE
Y 9,4773 6,6064 (OKE) 9,4773 5,1999 (OKE)
X 11,3152 6,3459 (OKE) 11,3152 2,8393 (OKE)
E' - F 1 - 2 ENVELOPE
Y 9,4773 3,4005 (OKE) 9,4773 0,9095 (OKE)
Lantai X 11,3152 12,4789 (NOT OKE) 11,3152 5,0872 (OKE)
E' - F 2 - 3 ENVELOPE
Atap Y 9,4773 7,3837 (OKE) 9,4773 4,6409 (OKE)
X 11,3152 11,9557 (NOT OKE) 11,3152 5,0873 (OKE)
E' - F 3 - 4 ENVELOPE
Y 9,4773 7,4727 9,4773 4,8909
Pelat
Atap

(OKE) (OKE)
X 11,3152 6,4699 (OKE) 11,3152 2,7182 (OKE)
F - F' 1 - 2 ENVELOPE
Y 9,4773 3,4438 (OKE) 9,4773 0,872 (OKE)
Lantai X 11,3152 12,5792 (NOT OKE) 11,3152 4,918 (OKE)
F - F' 2 - 3 ENVELOPE
Atap Y 9,4773 7,506 (OKE) 9,4773 4,562 (OKE)
X 11,3152 12,1123 (NOT OKE) 11,3152 4,9483 (OKE)
F - F' 3 - 4 ENVELOPE
Y 9,4773 7,6066 (OKE) 9,4773 4,8537 (OKE)
X 11,3152 4,1478 (OKE) 11,3152 2,2416 (OKE)
F' - G 1 - 2 ENVELOPE
Y 9,4773 2,4981 (OKE) 9,4773 1,2245 (OKE)
Lantai X 11,3152 8,6472 (OKE) 11,3152 6,1547 (OKE)
F' - G 2 - 3 ENVELOPE
Atap Y 9,4773 6,5163 (OKE) 9,4773 4,9723 (OKE)
X 11,3152 8,5521 (OKE) 11,3152 6,0666 (OKE)
F' - G 3 - 4 ENVELOPE
Y 9,4773 6,3883 (OKE) 9,4773 5,1905 (OKE)

Tabel 6.2 : Rekapitulasi Evaluasi Elemen Pelat butuh Perkuatan


Kapasitas Momen
Kapasitas
Arah SAP Alih (1D+1SDL)
Nama Penampang
Letak As Bangunan Fungsi Cek (Output SAP)
Elemen
φMKap φMKap
Tumpuan Mu (kN.m)
(kN.m) (kN.m)
C - C' 1-2 X 14,9908 17,6589 (BUTUH PERKUATAN) 12,6135
C - C' 2-3 X 14,9908 16,6242 (BUTUH PERKUATAN) 11,8744
Pelat Lantai

C - C' 3-4 X 14,9908 17,6583 (BUTUH PERKUATAN) 12,6131


C' - D 1-2 X 14,9908 17,6583 (BUTUH PERKUATAN) 12,6344
Lantai 3 C' - D 3-4 X 14,9908 17,7016 (BUTUH PERKUATAN) 12,6440
D' - E 1-2 X 14,9908 16,4080 (BUTUH PERKUATAN) 11,7200
D' - E 2-3 X 14,9908 20,0273 (BUTUH PERKUATAN) 14,3052
D' - E 3-4 X 14,9908 16,3233 (BUTUH PERKUATAN) 11,6595
Pelat Atap

E' - F 2-3 X 11,3152 12,4789 (BUTUH PERKUATAN) 8,9135


Lantai E' - F 3-4 X 11,3152 11,9557 (BUTUH PERKUATAN) 8,5398
Atap F - F' 2-3 X 11,3152 12,5792 (BUTUH PERKUATAN) 8,9851
F - F' 3-4 X 11,3152 12,1123 (BUTUH PERKUATAN) 8,6517

6.2. Evaluasi Elemen Balok


Evaluasi elemen balok bertujuan untuk dapat mengetahui elemen struktur mana yang
sudah tidak mampu memikul beban yang ada maupun memikul beban akibat alih fungsi.
Dengan keterangan “(OKE)” yang artinya elemen struktur masih mampu memikul beban
yang ada dan keterangan “(NOT OKE)” yang berarti elemen struktur tersebut tidak kuat
memikul beban yang ada dan membutuhkan perkuatan.

14
6.2.1. Evaluasi Elemen Balok Akibat Gaya Momen
Berikut adalah hasil evaluasi momen ultimate pada pelat saat kondisi beban eksisting bangunan perkantoran dan alih fungsi ruang
arsip dan komputer (server) serta penambahan beban tandon air.

Tabel 6.3 : Rekapitulasi Evaluasi Momen Ultimate Elemen Struktur Balok 1


Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (1) 330,1024 317,88 390,9294 (NOT OKE)
Lantai 2 B 1-4 55 ENVELOPE Lapangan 288,535 317,88 386,6114 (NOT OKE)
Tumpuan Kanan (4) 329,7774 317,88 393,1262 (NOT OKE)
Tumpuan Kiri (1) 376,1281 317,88 481,9331 (NOT OKE)
Lantai 2 C 1-4 58 ENVELOPE Lapangan 347,5923 317,88 439,0337 (NOT OKE)
Tumpuan Kanan (4) 375,6873 317,88 482,0899 (NOT OKE)
Tumpuan Kiri (1) 355,1082 317,88 462,6926 (NOT OKE)
Lantai 2 D 1-4 61 ENVELOPE Lapangan 307,1565 317,88 337,3398 (NOT OKE)
450.800

Tumpuan Kanan (4) 355,4514 317,88 463,7831 (NOT OKE)


B1

Tumpuan Kiri (1) 138,9190 317,88 184,9639 (OKE)


Lantai 2 E 1-2 66 ENVELOPE Lapangan 44,7968 317,88 51,1117 (OKE)
Tumpuan Kanan (2) 99,7199 317,88 110,7853 (OKE)
Tumpuan Kiri (2) 104,4674 317,88 125,7615 (OKE)
Lantai 2 E 2-3 65 ENVELOPE Lapangan 19,3566 317,88 30,1733 (OKE)
Tumpuan Kanan (3) 104,6286 317,88 120,3667 (OKE)
Tumpuan Kiri (3) 99,5494 317,88 107,2007 (OKE)
Lantai 2 E 3-4 64 ENVELOPE Lapangan 45,4215 317,88 53,1026 (OKE)
Tumpuan Kanan (4) 139,1722 317,88 187,1109 (OKE)

15
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (1) 148,9268 317,88 195,2965 (OKE)
Lantai 2 F 1-2 69 ENVELOPE Lapangan 44,6746 317,88 51,9961 (OKE)
Tumpuan Kanan (2) 102,9917 317,88 124,7716 (OKE)
Tumpuan Kiri (2) 109,5666 317,88 141,0353 (OKE)
Lantai 2 F 2-3 68 ENVELOPE Lapangan 17,5342 317,88 19,5581 (OKE)
Tumpuan Kanan (3) 109,6365 317,88 127,2548 (OKE)
Tumpuan Kiri (3) 102,9148 317,88 116,6778 (OKE)
Lantai 2 F 3-4 67 ENVELOPE Lapangan 45,3505 317,88 56,8528 (OKE)
Tumpuan Kanan (4) 149,0391 317,88 196,8430 (OKE)
Tumpuan Kiri (1) 175,6468 317,88 185,4123
450.800

(OKE)
B1

Lantai 3 B 1-4 182 ENVELOPE Lapangan 240,2910 317,88 238,6781 (OKE)


Tumpuan Kanan (4) 175,7533 317,88 187,0505 (OKE)
Tumpuan Kiri (1) 198,0544 317,88 382,0371 (NOT OKE)
Lantai 3 C 1-4 185 ENVELOPE Lapangan 288,3439 317,88 460,4608 (NOT OKE)
Tumpuan Kanan (4) 198,1250 317,88 382,7154 (NOT OKE)
Tumpuan Kiri (1) 179,9195 317,88 475,3420 (NOT OKE)
Lantai 3 D 1-4 188 ENVELOPE Lapangan 234,9455 317,88 508,2934 (NOT OKE)
Tumpuan Kanan (4) 179,8764 317,88 476,0045 (NOT OKE)
Tumpuan Kiri (1) 84,4041 317,88 114,3425 (OKE)
Lantai 3 E 1-2 193 ENVELOPE Lapangan 36,1041 317,88 66,7013 (OKE)
Tumpuan Kanan (2) 48,1141 317,88 74,1714 (OKE)

15
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (2) 70,7152 317,88 109,4954 (OKE)
Lantai 3 E 2-3 192 ENVELOPE Lapangan 21,4538 317,88 44,8238 (OKE)
Tumpuan Kanan (3) 70,7335 317,88 95,7468 (OKE)
Tumpuan Kiri (3) 48,1306 317,88 65,5214 (OKE)
Lantai 3 E 3-4 191 ENVELOPE Lapangan 36,3663 317,88 69,2884 (OKE)
Tumpuan Kanan (4) 84,3889 317,88 119,0280 (OKE)
Tumpuan Kiri (1) 94,5816 317,88 137,8328
450.800

(OKE)
B1

Lantai 3 F 1-2 196 ENVELOPE Lapangan 38,6529 317,88 50,7425 (OKE)


Tumpuan Kanan (2) 53,6357 317,88 68,7789 (OKE)
Tumpuan Kiri (2) 78,2709 317,88 115,3529 (OKE)
Lantai 3 F 2-3 195 ENVELOPE Lapangan 22,1522 317,88 26,6045 (OKE)
Tumpuan Kanan (3) 78,2785 317,88 86,9455 (OKE)
Tumpuan Kiri (3) 39,2912 317,88 80,9181 (OKE)
Lantai 3 F 3-4 194 ENVELOPE Lapangan 39,0230 317,88 56,2846 (OKE)
Tumpuan Kanan (4) 94,5771 317,88 145,2971 (OKE)

15
Tabel 6.4 : Rekapitulasi Evaluasi Momen Ultimate Elemen Struktur Balok 2
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kanan (2) 58,6138 148,22 67,8760 (OKE)
Lantai 2 A 1-2 54 ENVELOPE Lapangan 10,7611 112,61 12,6814 (OKE)
Tumpuan Kiri (1) 61,4457 148,22 70,2835 (OKE)
Tumpuan Kanan (3) 55,3920 148,22 64,0969 (OKE)
Lantai 2 A 2-3 53 ENVELOPE Lapangan 7,4991 112,61 9,5062 (OKE)
Tumpuan Kiri (2) 55,0479 148,22 63,8763 (OKE)
Tumpuan Kanan (4) 61,8877 148,22 70,7216 (OKE)
Lantai 2 A 3-4 52 ENVELOPE Lapangan 11,1123 112,61 13,1769 (OKE)
300.500

Tumpuan Kiri (3) 58,2225 148,22 67,8197 (OKE)


B2

Tumpuan Kanan (2) 70,1337 148,22 88,4617 (OKE)


Lantai 2 G 1-2 73 ENVELOPE Lapangan 11,2217 112,61 12,0675 (OKE)
Tumpuan Kiri (1) 77,9813 148,22 100,5604 (OKE)
Tumpuan Kanan (3) 68,0183 148,22 84,3743 (OKE)
Lantai 2 G 2-3 72 ENVELOPE Lapangan 6,9113 112,61 6,2074 (OKE)
Tumpuan Kiri (2) 68,03 148,22 86,13 (OKE)
Tumpuan Kanan (4) 77,9656 148,22 102,0853 (OKE)
Lantai 2 G 3-4 71 ENVELOPE Lapangan 11,6870 112,61 13,3060 (OKE)
Tumpuan Kiri (3) 70,1473 148,22 87,4935 (OKE)

15
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (A) 94,4277 148,22 117,1178 (OKE)
Lantai 2 1 A-B 92 ENVELOPE Lapangan 24,5293 112,61 28,9307 (OKE)
Tumpuan Kanan (B) 100,7237 148,22 125,1498 (OKE)
Tumpuan Kiri (B) 96,5826 148,22 124,0788 (OKE)
Lantai 2 1 B-C 93 ENVELOPE Lapangan 36,9245 112,61 49,4165 (OKE)
Tumpuan Kanan (C) 104,3827 148,22 117,3796 (OKE)
Tumpuan Kiri (C) 104,3071 148,22 136,5582 (OKE)
Lantai 2 1 C-D 94 ENVELOPE Lapangan 37,1865 112,61 45,7365 (OKE)
Tumpuan Kanan 98,0566 148,22 114,7067 (OKE)
(D)
300.500

Tumpuan Kiri (D) 96,8247 148,22 105,5971 (OKE)


B2

Lantai 2 1 D-E 95 ENVELOPE Lapangan 21,7287 112,61 20,5348 (OKE)


Tumpuan Kanan (E) 87,6969 148,22 110,1004 (OKE)
Tumpuan Kiri (E) 92,1565 148,22 109,8035 (OKE)
Lantai 2 1 E-F 96 ENVELOPE Lapangan 20,5443 112,61 25,8888 (OKE)
Tumpuan Kanan (F) 89,3002 148,22 106,9550 (OKE)
Tumpuan Kiri (F) 94,9263 148,22 112,7396 (OKE)
Lantai 2 1 F-G 97 ENVELOPE Lapangan 12,8418 112,61 12,2070 (OKE)
Tumpuan Kanan (G) 97,5332 148,22 112,5910 (OKE)
Tumpuan Kiri (A) 94,3545 148,22 117,7001 (OKE)
Lantai 2 4 A-B 74 ENVELOPE Lapangan 24,5254 112,61 29,0196 (OKE)
Tumpuan Kanan (B) 100,8228 148,22 125,7048 (OKE)

15
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (B) 96,5368 148,22 124,5721 (OKE)
Lantai 2 4 B-C 75 ENVELOPE Lapangan 36,9384 112,61 49,4292 (OKE)
Tumpuan Kanan (C) 104,3993 148,22 117,7016 (OKE)
Tumpuan Kiri (C) 137,2028 148,22 137,2028 (OKE)
Lantai 2 4 C-D 76 ENVELOPE Lapangan 37,1796 112,61 45,7230 (OKE)
Tumpuan Kanan 98,0669 148,22 115,1392 (OKE)
(D)
Tumpuan Kiri (D) 96,7810 148,22 106,7412 (OKE)
Lantai 2 4 D-E 77 ENVELOPE Lapangan 21,7299 112,61 20,4029 (OKE)
Tumpuan Kanan (E) 87,7367 148,22 110,2524 (OKE)
300.500

Tumpuan Kiri (E) 92,1203 148,22 110,9437 (OKE)


B2

Lantai 2 4 E-F 78 ENVELOPE Lapangan 20,5447 112,61 25,9443 (OKE)


Tumpuan Kanan (F) 89,3382 148,22 106,9907 (OKE)
Tumpuan Kiri (F) 94,8847 148,22 113,7584 (OKE)
Lantai 2 4 F-G 79 ENVELOPE Lapangan 24,2295 112,61 24,7156 (OKE)
Tumpuan Kanan (G) 97,5811 148,22 114,6483 (OKE)
Tumpuan Kanan (2) 25,1456 148,22 28,4816 (OKE)
Lantai 3 A 1-2 181 ENVELOPE Lapangan 6,1933 112,61 6,4333 (OKE)
Tumpuan Kiri (1) 26,7032 148,22 32,5130 (OKE)
Tumpuan Kanan (3) 25,1372 148,22 28,8828 (OKE)
Lantai 3 A 2-3 180 ENVELOPE Lapangan 4,8666 112,61 4,7971 (OKE)
Tumpuan Kiri (2) 25,1211 148,22 29,0717 (OKE)

15
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kanan (4) 26,7030 148,22 32,4560 (OKE)
Lantai 3 A 3-4 179 ENVELOPE Lapangan 11,8135 112,61 14,6551 (OKE)
Tumpuan Kiri (3) 25,1354 148,22 28,7824 (OKE)
Tumpuan Kanan (2) 46,8649 148,22 64,0093 (OKE)
Lantai 3 G 1-2 199 ENVELOPE Lapangan 10,3650 112,61 13,8032 (OKE)
Tumpuan Kiri (1) 53,5598 148,22 76,9699 (OKE)
Tumpuan Kanan (3) 48,7170 148,22 62,7944 (OKE)
Lantai 3 G 2-3 198 ENVELOPE Lapangan 7,0099 112,61 6,4773 (OKE)
Tumpuan Kiri (2) 48,7179 148,22 68,5132 (OKE)
Tumpuan Kanan (4) 53,5595 148,22 79,8748 (OKE)
300.500

Lantai 3 G 3-4 197 ENVELOPE Lapangan 10,6561 112,61 14,1121 (OKE)


B2

Tumpuan Kiri (3) 46,8654 148,22 62,3543 (OKE)


Tumpuan Kiri (A) 55,7326 148,22 73,2287 (OKE)
Lantai 3 1 A-B 218 ENVELOPE Lapangan 4,6690 112,61 3,8231 (OKE)
Tumpuan Kanan (B) 58,5464 148,22 63,4962 (OKE)
Tumpuan Kiri (B) 52,8729 148,22 48,4069 (OKE)
Lantai 3 1 B-C 219 ENVELOPE Lapangan 25,0373 112,61 12,1078 (OKE)
Tumpuan Kanan (C) 60,7022 148,22 103,7304 (OKE)
Tumpuan Kiri (C) 60,2168 148,22 119,6530 (OKE)
Lantai 3 1 C-D 220 ENVELOPE Lapangan 25,2865 112,61 101,0946 (OKE)
Tumpuan Kanan 53,2124 148,22 136,9592 (OKE)
(D)

15
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (D) 56,9081 148,22 141,6876 (OKE)
Lantai 3 1 D-E 221 ENVELOPE Lapangan 13,4582 112,61 48,2210 (OKE)
Tumpuan Kanan (E) 59,2450 148,22 95,2812 (OKE)
Tumpuan Kiri (E) 74,1233 148,22 109,2441 (OKE)
Lantai 3 1 E-F 222 ENVELOPE Lapangan 22,3324 112,61 23,2335 (OKE)
Tumpuan Kanan (F) 74,1460 148,22 85,3156 (OKE)
Tumpuan Kiri (F) 78,7750 148,22 102,5834 (OKE)
Lantai 3 1 F-G 223 ENVELOPE Lapangan 23,9702 112,61 31,4617 (OKE)
Tumpuan Kanan (G) 77,7963 148,22 94,9418 (OKE)
Tumpuan Kiri (A) 55,7030 148,22 73,6332 (OKE)
300.500

Lantai 3 4 A-B 200 ENVELOPE Lapangan 15,3909 112,61 17,2832 (OKE)


B2

Tumpuan Kanan (B) 58,5678 148,22 63,7407 (OKE)


Tumpuan Kiri (B) 52,8702 148,22 48,7456 (OKE)
Lantai 3 4 B-C 201 ENVELOPE Lapangan 21,9068 112,61 13,3861 (OKE)
Tumpuan Kanan (C) 60,7120 148,22 103,8522 (OKE)
Tumpuan Kiri (C) 60,2183 148,22 119,8849 (OKE)
Lantai 3 4 C-D 202 ENVELOPE Lapangan 25,2895 112,61 100,9524 (OKE)
Tumpuan Kanan 53,2036 148,22 137,4507 (OKE)
(D)
Tumpuan Kiri (D) 56,9125 148,22 144,2985 (OKE)
Lantai 3 4 D-E 203 ENVELOPE Lapangan 13,4582 112,61 48,8842 (OKE)
Tumpuan Kanan (E) 59,2407 148,22 94,6304 (OKE)

15
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (E) 74,1254 148,22 116,0568 (OKE)
Lantai 3 4 E-F 204 ENVELOPE Lapangan 22,3320 112,61 23,0158 (OKE)
Tumpuan Kanan (F) 74,1442 148,22 85,7393 (OKE)
Tumpuan Kiri (F) 78,7780 148,22 103,3295 (OKE)
Lantai 3 4 F-G 205 ENVELOPE Lapangan 23,9709 112,61 30,9431 (OKE)
Tumpuan Kanan (G) 77,7917 148,22 103,1676 (OKE)
Tumpuan Kanan (2) 14,7617 148,22 24,5442 (OKE)
Lantai
E 1-2 246 ENVELOPE Lapangan 8,0791 112,61 6,6054 (OKE)
Atap
Tumpuan Kiri (1) 21,9591 148,22 36,5668 (OKE)
Tumpuan Kanan (3) 18,8065 148,22 37,0783
300.500

(OKE)
Lantai
B2

E 2-3 245 ENVELOPE Lapangan 4,9387 112,61 17,1782 (OKE)


Atap
Tumpuan Kiri (2) 18,8042 148,22 29,4579 (OKE)
Tumpuan Kanan (4) 21,9574 148,22 35,9882 (OKE)
Lantai
E 3-4 244 ENVELOPE Lapangan 8,1377 112,61 21,3497 (OKE)
Atap
Tumpuan Kiri (3) 14,7644 148,22 31,3326 (OKE)
Tumpuan Kanan (2) 18,8845 148,22 37,0647 (OKE)
Lantai
F 1-2 254 ENVELOPE Lapangan 10,9269 112,61 7,0721 (OKE)
Atap
Tumpuan Kiri (1) 22,8853 148,22 34,5815 (OKE)
Tumpuan Kanan (3) 23,0750 148,22 54,2988 (OKE)
Lantai
F 2-3 253 ENVELOPE Lapangan 7,1891 112,61 29,0413 (OKE)
Atap
Tumpuan Kiri (2) 23,0740 148,22 42,5734 (OKE)

15
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kanan (4) 22,8850 148,22 35,4684 (OKE)
Lantai
F 3-4 252 ENVELOPE Lapangan 11,0635 112,61 36,4835 (OKE)
Atap
Tumpuan Kiri (3) 18,8853 148,22 50,9789 (OKE)
Tumpuan Kiri (1) 22,4419 148,22 34,8537 (OKE)
Lantai
G 1-2 249 ENVELOPE Lapangan 8,0694 112,61 6,6187 (OKE)
Atap
Tumpuan Kanan (2) 18,3243 148,22 33,9082 (OKE)
Tumpuan Kiri (2) 20,1088 148,22 33,9488 (OKE)
Lantai
G 2-3 250 ENVELOPE Lapangan 4,2731 112,61 15,0739 (OKE)
Atap
Tumpuan Kanan (3) 20,1092 148,22 40,5708 (OKE)
Tumpuan Kiri (3) 18,3235 148,22 40,1767 (OKE)
Lantai
G 3-4 251 ENVELOPE Lapangan 7,9948 112,61 21,4680 (OKE)
300.500

Atap
Tumpuan Kanan (4) 22,4427 148,22 34,4637 (OKE)
B2

Tumpuan Kiri (E) 36,4584 148,22 44,9378 (OKE)


Lantai
1 E-F 247 ENVELOPE Lapangan 18,3699 112,61 20,4996 (OKE)
Atap
Tumpuan Kanan (F) 40,3243 148,22 46,0977 (OKE)
Tumpuan Kiri (F) 40,1977 148,22 51,3457 (OKE)
Lantai
1 F-G 248 ENVELOPE Lapangan 17,8247 112,61 18,3266 (OKE)
Atap
Tumpuan Kanan (G) 33,0632 148,22 36,3792 (OKE)
Tumpuan Kanan (F) 40,3247 148,22 96,9294 (OKE)
Lantai
4 E-F 243 ENVELOPE Lapangan 18,2873 112,61 54,2924 (OKE)
Atap
Tumpuan Kiri (E) 36,4575 148,22 66,2494 (OKE)
Tumpuan Kanan (G) 33,0641 148,22 57,1718 (OKE)
Lantai
4 F-G 242 ENVELOPE Lapangan 17,8798 112,61 52,8064 (OKE)
Atap
Tumpuan Kiri (F) 40,1974 148,22 101,8694 (OKE)

15
Tabel 6.5 : Rekapitulasi Evaluasi Momen Ultimate Elemen Struktur Balok 3
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (A) 105,8666 160,79 132,4395 (OKE)
Lantai 2 2 A-B 86 ENVELOPE Lapangan 32,4314 130,57 40,9450 (OKE)
Tumpuan Kanan (B) 39,6447 160,79 50,3647 (OKE)
Tumpuan Kiri (B) 46,9555 160,79 63,9476 (OKE)
Lantai 2 2 B-C 87 ENVELOPE Lapangan 44,1204 130,57 61,3208 (OKE)
Tumpuan Kanan (C) 67,7608 160,79 91,2605 (OKE)
Tumpuan Kiri (C) 68,2717 160,79 92,9812 (OKE)
Lantai 2 2 C-D 88 ENVELOPE Lapangan 44,0298 130,57 59,7387 (OKE)
300.450

Tumpuan Kanan 45,6860 160,79 64,4346 (OKE)


(D)
B3

Tumpuan Kiri (D) 38,1403 160,79 50,3460 (OKE)


Lantai 2 2 D-E 89 ENVELOPE Lapangan 29,9396 130,57 30,7968 (OKE)
Tumpuan Kanan (E) 110,2519 160,79 123,8945 (OKE)
Tumpuan Kiri (E) 93,2376 160,79 106,8766 (OKE)
Lantai 2 2 E-F 90 ENVELOPE Lapangan 29,3298 130,57 38,3625 (OKE)
Tumpuan Kanan (F) 85,6567 160,79 103,9688 (OKE)
Tumpuan Kiri (F) 94,9549 160,79 103,3075 (OKE)
Lantai 2 2 F-G 91 ENVELOPE Lapangan 36,2897 130,57 28,461 (OKE)
Tumpuan Kanan (G) 96,6104 160,79 103,3151 (OKE)

16
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (A) 105,8892 160,79 132,7970 (OKE)
Lantai 2 3 A-B 80 ENVELOPE Lapangan 32,4234 130,57 40,9017 (OKE)
Tumpuan Kanan (B) 39,6418 160,79 50,6115 (OKE)
Tumpuan Kiri (B) 46,9471 160,79 63,9474 (OKE)
Lantai 2 3 B-C 81 ENVELOPE Lapangan 44,1211 130,57 61,3246 (OKE)
Tumpuan Kanan (C) 67,7558 160,79 91,2523 (OKE)
Tumpuan Kiri (C) 68,2608 160,79 92,9791 (OKE)
Lantai 2 3 C-D 82 ENVELOPE Lapangan 44,0271 130,57 59,7384 (OKE)
Tumpuan Kanan 45,6988 160,79 64,5054 (OKE)
(D)
Tumpuan Kiri (D) 38,1441 160,79 50,5914 (OKE)
B3 300.450

Lantai 2 3 D-E 83 ENVELOPE Lapangan 29,9408 130,57 30,6628 (OKE)


Tumpuan Kanan (E) 110,2517 160,79 123,6021 (OKE)
Tumpuan Kiri (E) 93,2296 160,79 106,7557 (OKE)
Lantai 2 3 E-F 84 ENVELOPE Lapangan 29,3294 130,57 38,1738 (OKE)
Tumpuan Kanan (F) 85,6653 160,79 103,2957 (OKE)
Tumpuan Kiri (F) 94,9443 160,79 103,6040 (OKE)
Lantai 2 3 F-G 85 ENVELOPE Lapangan 36,2892 130,57 29,1733 (OKE)
Tumpuan Kanan (G) 96,6223 160,79 103,7691 (OKE)
Tumpuan Kiri (A) 68,0950 160,79 77,6944 (OKE)
Lantai 3 2 A-B 212 ENVELOPE Lapangan 22,9635 130,57 22,9635 (OKE)
Tumpuan Kanan (B) 22,5117 160,79 27,8636 (OKE)
Tumpuan Kiri (B) 33,0657 160,79 40,3429 (OKE)
Lantai 3 2 B-C 213 ENVELOPE Lapangan 32,7365 130,57 12,7021 (OKE)
Tumpuan Kanan (C) 48,1382 160,79 85,9722 (OKE)

16
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (C) 47,7999 160,79 144,3949 (OKE)
Lantai 3 2 C-D 214 ENVELOPE Lapangan 32,7713 130,57 152,8088 (NOT OKE)
Tumpuan Kanan 33,1355 160,79 125,2090 (OKE)
(D)
Tumpuan Kiri (D) 21,7857 160,79 73,6593 (OKE)
Lantai 3 2 D-E 215 ENVELOPE Lapangan 17,4596 130,57 74,3743 (OKE)
Tumpuan Kanan (E) 72,0296 160,79 215,7393 (NOT OKE)
Tumpuan Kiri (E) 77,0331 160,79 132,4951 (OKE)
Lantai 3 2 E-F 216 ENVELOPE Lapangan 31,5234 130,57 35,9705 (OKE)
Tumpuan Kanan (F) 73,6307 160,79 81,7626 (OKE)
Tumpuan Kiri (F) 77,5518 160,79 90,5735 (OKE)
Lantai 3 2 F-G 217 ENVELOPE Lapangan 33,668 130,57 33,5376
B3 300.450

(OKE)
Tumpuan Kanan (G) 77,1436 160,79 91,2164 (OKE)
Tumpuan Kiri (A) 68,0772 160,79 77,8399 (OKE)
Lantai 3 3 A-B 206 ENVELOPE Lapangan 22,0402 130,57 22,9482 (OKE)
Tumpuan Kanan (B) 22,5201 160,79 27,9972 (OKE)
Tumpuan Kiri (B) 33,0684 160,79 40,3578 (OKE)
Lantai 3 3 B-C 207 ENVELOPE Lapangan 32,7362 130,57 12,7088 (OKE)
Tumpuan Kanan (C) 48,1402 160,79 85,9476 (OKE)
Tumpuan Kiri (C) 47,8024 160,79 144,3562 (OKE)
Lantai 3 3 C-D 208 ENVELOPE Lapangan 32,7722 130,57 152,7646 (NOT OKE)
Tumpuan Kanan 33,1322 160,79 125,4858 (OKE)
(D)
Tumpuan Kiri (D) 21,7844 160,79 74,5444 (OKE)
Lantai 3 3 D-E 209 ENVELOPE Lapangan 17,4597 130,57 74,4965 (OKE)
Tumpuan Kanan (E) 72,0307 160,79 214,1892 (NOT OKE)

16
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kiri (E) 77,0346 160,79 134,8869 (OKE)
Lantai 3 3 E-F 210 ENVELOPE Lapangan 31,5237 130,57 35,4285 (OKE)
Tumpuan Kanan (F) 73,6301 160,79 80,3194 (OKE)
Tumpuan Kiri (F) 77,5531 160,79 89,1364 (OKE)
Lantai 3 3 F-G 211 ENVELOPE Lapangan 33,6683 130,57 32,7156 (OKE)
Tumpuan Kanan (G) 77,1420 160,79 94,4207 (OKE)
Tumpuan Kiri (E) 36,5024 160,79 58,9473 (OKE)
Lantai
2 E-F 257 ENVELOPE Lapangan 28,1081 130,57 60,5451 (OKE)
Atap
300.450

Tumpuan Kanan (F) 46,7624 160,79 98,9424 (OKE)


B3

Tumpuan Kiri (F) 46,7257 160,79 101,9626 (OKE)


Lantai
2 F-G 258 ENVELOPE Lapangan 27,3895 130,57 57,6044 (OKE)
Atap
Tumpuan Kanan (G) 35,6622 160,79 58,7750 (OKE)
Tumpuan Kiri (E) 36,5025 160,79 80,2280 (OKE)
Lantai
3 E-F 255 ENVELOPE Lapangan 28,1084 130,57 92,5553 (OKE)
Atap
Tumpuan Kanan (F) 46,7626 160,79 142,3167 (OKE)
Tumpuan Kiri (F) 46,7258 160,79 145,3049 (OKE)
Lantai
3 F-G 256 ENVELOPE Lapangan 27,3894 130,57 89,6466 (OKE)
Atap
Tumpuan Kanan (G) 35,6624 160,79 79,6658 (OKE)

16
Tabel 6.6 : Rekapitulasi Evaluasi Momen Ultimate Elemen Struktur Balok 4
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kanan (2) 3,8346 71,27 4,9467 (OKE)
Lantai 2 A' 1-2 100 ENVELOPE Lapangan 7,2969 48,96 10,1540 (OKE)
Tumpuan Kiri (1) 5,6021 71,27 6,8709 (OKE)
Tumpuan Kanan (3) 3,1240 71,27 4,0541 (OKE)
Lantai 2 A' 2-3 99 ENVELOPE Lapangan 8,9875 48,96 12,4515 (OKE)
Tumpuan Kiri (2) 3,1193 71,27 4,1366 (OKE)
Tumpuan Kanan (4) 5,6105 71,27 6,9471 (OKE)
Lantai 2 A' 3-4 98 ENVELOPE Lapangan 7,3011 48,96 10,1202 (OKE)
200.350

Tumpuan Kiri (3) 3,8301 71,27 4,9451 (OKE)


B4

Tumpuan Kanan (2) 5,7839 71,27 6,3371 (OKE)


Lantai 2 B' 1-2 103 ENVELOPE Lapangan 9,7477 48,96 13,3854 (OKE)
Tumpuan Kiri (1) 6,6247 71,27 8,8507 (OKE)
Tumpuan Kanan (3) 5,6986 71,27 6,1693 (OKE)
Lantai 2 B' 2-3 102 ENVELOPE Lapangan 16,2453 48,96 21,6888 (OKE)
Tumpuan Kiri (2) 5,6929 71,27 6,1915 (OKE)
Tumpuan Kanan (4) 6,6193 71,27 8,8507 (OKE)
Lantai 2 B' 3-4 101 ENVELOPE Lapangan 9,5988 48,96 13,1582 (OKE)
Tumpuan Kiri (3) 5,7894 71,27 6,3422 (OKE)

16
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kanan (2) 2,2218 71,27 1,6687 (OKE)
Lantai 2 C' 1-2 106 ENVELOPE Lapangan 9,9017 48,96 12,7279 (OKE)
Tumpuan Kiri (1) 6,1563 71,27 5,9211 (OKE)
Tumpuan Kanan (3) 6,0767 71,27 5,6866 (OKE)
Lantai 2 C' 2-3 105 ENVELOPE Lapangan 16,5796 48,96 20,8953 (OKE)
Tumpuan Kiri (2) 6,0761 71,27 5,6948 (OKE)
Tumpuan Kanan (4) 6,7495 71,27 9,3468 (OKE)
Lantai 2 C' 3-4 104 ENVELOPE Lapangan 9,7406 48,96 12,4872 (OKE)
Tumpuan Kiri (3) 6,1577 71,27 5,8978 (OKE)
Tumpuan Kanan (2) 3,0168 71,27 4,3827 (OKE)
Lantai 2 D' 1-2 109 ENVELOPE Lapangan 7,2351 48,96 6,7628 (OKE)
200.350

Tumpuan Kiri (1) 5,2297 71,27 5,9264 (OKE)


B4

Tumpuan Kanan (3) 2,2257 71,27 3,3276 (OKE)


Lantai 2 D' 2-3 108 ENVELOPE Lapangan 9,2000 48,96 11,2459 (OKE)
Tumpuan Kiri (2) 2,2227 71,27 3,3557 (OKE)
Tumpuan Kanan (4) 5,2330 71,27 5,9334 (OKE)
Lantai 2 D' 3-4 107 ENVELOPE Lapangan 7,1972 48,96 6,7588 (OKE)
Tumpuan Kiri (3) 3,0197 71,27 4,3595 (OKE)
Tumpuan Kanan (2) 6,0593 71,27 7,0646 (OKE)
Lantai 2 E' 1-2 112 ENVELOPE Lapangan 6,0811 48,96 7,6065 (OKE)
Tumpuan Kiri (1) 3,6262 71,27 4,7822 (OKE)
Tumpuan Kanan (3) 6,2233 71,27 7,1935 (OKE)
Lantai 2 E' 2-3 111 ENVELOPE Lapangan 4,1806 48,96 5,6082 (OKE)
Tumpuan Kiri (2) 6,2225 71,27 7,4295 (OKE)

16
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kanan (4) 3,6280 71,27 4,7725 (OKE)
Lantai 2 E' 3-4 110 ENVELOPE Lapangan 6,1321 48,96 7,7685 (OKE)
Tumpuan Kiri (3) 6,0592 71,27 6,8350 (OKE)
Tumpuan Kanan (2) 5,2018 71,27 4,5772 (OKE)
Lantai 2 F' 1-2 115 ENVELOPE Lapangan 6,1855 48,96 6,3655 (OKE)
Tumpuan Kiri (1) 5,3232 71,27 5,7624 (OKE)
Tumpuan Kanan (3) 5,7104 71,27 4,8081 (OKE)
Lantai 2 F' 2-3 114 ENVELOPE Lapangan 4,4809 48,96 3,2041 (OKE)
Tumpuan Kiri (2) 5,7103 71,27 5,1247 (OKE)
Tumpuan Kanan (4) 5,3235 71,27 5,9566 (OKE)
Lantai 2 F' 3-4 113 ENVELOPE Lapangan 6,2288 48,96 7,0404 (OKE)
200.35

Tumpuan Kiri (3) 5,2018 71,27 4,3937 (OKE)


B4

Tumpuan Kanan (2) 2,0717 71,27 3,0480 (OKE)


Lantai 3 A' 1-2 226 ENVELOPE Lapangan 6,1133 48,96 6,0826 (OKE)
Tumpuan Kiri (1) 3,9052 71,27 3,8711 (OKE)
Tumpuan Kanan (3) 1,6075 71,27 2,2409 (OKE)
Lantai 3 A' 2-3 225 ENVELOPE Lapangan 7,5929 48,96 7,3901 (OKE)
Tumpuan Kiri (2) 1,6082 71,27 2,3045 (OKE)
Tumpuan Kanan (4) 3,9060 71,27 3,9263 (OKE)
Lantai 3 A' 3-4 224 ENVELOPE Lapangan 6,0917 48,96 6,0666 (OKE)
Tumpuan Kiri (3) 2,0713 71,27 3,0510 (OKE)
Tumpuan Kanan (2) 5,0715 71,27 7,1032 (OKE)
Lantai 3 B' 1-2 229 ENVELOPE Lapangan 8,5269 48,96 10,4484 (OKE)
Tumpuan Kiri (1) 5,4051 71,27 3,3635 (OKE)

16
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kanan (3) 4,6955 71,27 8,8585 (OKE)
Lantai 3 B' 2-3 228 ENVELOPE Lapangan 13,6176 48,96 17,7449 (OKE)
Tumpuan Kiri (2) 4,6971 71,27 8,8639 (OKE)
Tumpuan Kanan (4) 5,4066 71,27 3,3696 (OKE)
Lantai 3 B' 3-4 227 ENVELOPE Lapangan 8,4298 48,96 10,3488 (OKE)
Tumpuan Kiri (3) 5,0701 71,27 7,0950 (OKE)
Tumpuan Kanan (2) 2,6392 71,27 13,8282 (OKE)
Lantai 3 C' 1-2 232 ENVELOPE Lapangan 8,4784 48,96 34,5521 (OKE)
Tumpuan Kiri (1) 5,4250 71,27 22,4448 (OKE)
Tumpuan Kanan (3) 4,6113 71,27 9,4089 (OKE)
Lantai 3 C' 2-3 231 ENVELOPE Lapangan 13,5291 48,96 48,2494 (OKE)
200.350

Tumpuan Kiri (2) 4,6114 71,27 9,4525 (OKE)


B4

Tumpuan Kanan (4) 5,4249 71,27 22,4602 (OKE)


Lantai 3 C' 3-4 230 ENVELOPE Lapangan 8,3832 48,96 34,2023 (OKE)
Tumpuan Kiri (3) 4,9959 71,27 13,5030 (OKE)
Tumpuan Kanan (2) 2,3113 71,27 9,3896 (OKE)
Lantai 3 D' 1-2 235 ENVELOPE Lapangan 5,9806 48,96 26,1110 (OKE)
Tumpuan Kiri (1) 3,4110 71,27 13,2591 (OKE)
Tumpuan Kanan (3) 1,6555 71,27 8,1310 (OKE)
Lantai 3 D' 2-3 234 ENVELOPE Lapangan 7,3530 48,96 29,8582 (OKE)
Tumpuan Kiri (2) 1,6557 71,27 8,3812 (OKE)
Tumpuan Kanan (4) 3,4106 71,27 13,3083 (OKE)
Lantai 3 D' 3-4 233 ENVELOPE Lapangan 5,9652 48,96 26,1626 (OKE)
Tumpuan Kiri (3) 2,3111 71,27 9,1672 (OKE)

16
Gaya Dalam Gaya Dalam
Kapasitas
Nama As Kombinasi Momen SAP Momen SAP Alih Check
Letak Frame Seksi Balok Penampang
Elemen Bangunan Beban Eksisting Fungsi
Mu (kN.m) φMKap (kN.m) Mu (kN.m) Mu ≤ φMKap
Tumpuan Kanan (2) 5,7089 71,27 8,7041 (OKE)
Lantai 3 E' 1-2 238 ENVELOPE Lapangan 6,1454 48,96 8,7688 (OKE)
Tumpuan Kiri (1) 3,2592 71,27 3,5138 (OKE)
Tumpuan Kanan (3) 5,9412 71,27 8,3695 (OKE)
Lantai 3 E' 2-3 237 ENVELOPE Lapangan 4,4746 48,96 6,1763 (OKE)
Tumpuan Kiri (2) 5,9409 71,27 8,8020 (OKE)
Tumpuan Kanan (4) 3,2591 71,27 3,5668 (OKE)
Lantai 3 E' 3-4 236 ENVELOPE Lapangan 6,1883 48,96 9,0303 (OKE)
Tumpuan Kiri (3) 5,7092 71,27 8,2761 (OKE)
Tumpuan Kanan (2) 5,6504 71,27 6,4346 (OKE)
Lantai 3 F' 1-2 241 ENVELOPE Lapangan 6,2513 48,96 10,1065 (OKE)
200.350

Tumpuan Kiri (1) 4,1355 71,27 5,2360 (OKE)


B4

Tumpuan Kanan (3) 5,9884 71,27 5,7511 (OKE)


Lantai 3 F' 2-3 240 ENVELOPE Lapangan 4,5403 48,96 3,3565 (OKE)
Tumpuan Kiri (2) 5,9884 71,27 6,2017 (OKE)
Tumpuan Kanan (4) 4,1354 71,27 5,3736 (OKE)
Lantai 3 F' 3-4 239 ENVELOPE Lapangan 6,2911 48,96 10,2876 (OKE)
Tumpuan Kiri (3) 5,6505 71,27 6,0031 (OKE)
Tumpuan Kanan (2) 3,9518 71,27 8,5746 (OKE)
Lantai
E' 1-2 261 ENVELOPE Lapangan 5,2386 48,96 1,7200 (OKE)
Atap
Tumpuan Kiri (1) 3,3412 71,27 6,1069 (OKE)
Tumpuan Kanan (3) 4,5362 71,27 14,1473 (OKE)
Lantai
E' 2-3 260 ENVELOPE Lapangan 3,8767 48,96 17,9062 (OKE)
Atap
Tumpuan Kiri (2) 4,5359 71,27 12,9909 (OKE)

16
16
Tabel 6.7 : Rekapitulasi Evaluasi Elemen Balok butuh Perkuatan Lentur
Kapasitas Kapasitas SAP
Nama As Penampang Alih Fungsi
Letak Frame Seksi Balok Cek
Elemen Bangunan
φMKap (kN.m) Mu (kN.m)

Tumpuan Kiri (1) 317,88 390,9294 (BUTUH PERKUATAN)


B 1-4 55 Lapangan 317,88 386,6114 (BUTUH PERKUATAN)
Tumpuan Kanan (4) 317,88 393,1262 (BUTUH PERKUATAN)
Tumpuan Kiri (1) 317,88 481,9331 (BUTUH PERKUATAN)
Lantai C 1-4 58 Lapangan 317,88 439,0337 (BUTUH PERKUATAN)
2
Tumpuan Kanan (4) 317,88 482,0899 (BUTUH PERKUATAN)
Tumpuan Kiri (1) 317,88 462,6926 (BUTUH PERKUATAN)
450.800
B1

D 1-4 61 Lapangan 317,88 337,3398 (BUTUH PERKUATAN)


Tumpuan Kanan (4) 317,88 463,7831 (BUTUH PERKUATAN)
Tumpuan Kiri (1) 317,88 382,0371 (BUTUH PERKUATAN)
C 1-4 185 Lapangan 317,88 460,4608 (BUTUH PERKUATAN)
Lantai Tumpuan Kanan (4) 317,88 382,7154 (BUTUH PERKUATAN)
3 Tumpuan Kiri (1) 317,88 475,3420 (BUTUH PERKUATAN)
D 1-4 188 Lapangan 317,88 508,2934 (BUTUH PERKUATAN)
Tumpuan Kanan (4) 317,88 476,0045 (BUTUH PERKUATAN)
2 C-D 214 Lapangan 130,57 152,8088 (BUTUH PERKUATAN)
B3 300.450

Lantai 2 D-E 215 Tumpuan Kanan (E) 160,79 215,7393 (BUTUH PERKUATAN)
3 3 C-D 208 Lapangan 130,57 152,7646 (BUTUH PERKUATAN)
3 D-E 209 Tumpuan Kanan (E) 160,79 214,1892 (BUTUH PERKUATAN)

17
6.2.2. Evaluasi Elemen Balok Akibat Gaya Geser
Tabel 6.8 : Rekapitulasi Evaluasi Kekuatan Geser Ultimate Elemen Struktur Balok 1

Rekap Geser Kapasitas Rekap Geser Alih


Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kiri (1) 214,7480 240,03 280,8660 (NOT OKE)
Lantai 2 B 1-4 55 ENVELOPE Lapangan 23,1600 180,02 27,5280 (OKE)
Tumpuan Kanan (4) 214,6670 240,03 280,8300 (NOT OKE)
Tumpuan Kiri (1) 252,9120 240,03 332,7520 (NOT OKE)
Lantai 2 C 1-4 58 ENVELOPE Lapangan 24,6810 180,02 30,1470 (OKE)
Tumpuan Kanan (4) 252,8040 240,03 332,8000 (NOT OKE)
Tumpuan Kiri (1) 230,6410 240,03 278,0950 (NOT OKE)
Lantai 2 D 1-4 61 ENVELOPE Lapangan 24,4210 180,02 30,3520 (OKE)
Tumpuan Kanan (4) 230,7260 240,03 278,5230 (NOT OKE)
Tumpuan Kiri (1) 111,4710 240,03 138,7390
450.800

(OKE)
B1

Lantai 2 E 1-2 66 ENVELOPE Lapangan 75,8300 180,02 87,2750 (OKE)


Tumpuan Kanan (2) 113,3250 240,03 125,6650 (OKE)
Tumpuan Kiri (2) 97,3940 240,03 118,5550 (OKE)
Lantai 2 E 2-3 65 ENVELOPE Lapangan 62,0050 180,02 76,5350 (OKE)
Tumpuan Kanan (3) 97,5000 240,03 115,2830 (OKE)
Tumpuan Kiri (3) 113,1850 240,03 123,3190 (OKE)
Lantai 2 E 3-4 64 ENVELOPE Lapangan 72,7950 180,02 100,8060 (OKE)
Tumpuan Kanan (4) 111,6100 240,03 141,2640 (OKE)
Tumpuan Kiri (1) 115,6110 240,03 142,3030 (OKE)
Lantai 2 F 1-2 69 ENVELOPE Lapangan 78,2780 180,02 96,7130 (OKE)
Tumpuan Kanan (2) 115,2170 240,03 135,0440 (OKE)

17
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kiri (2) 98,0470 240,03 120,1950 (OKE)
Lantai 2 F 2-3 68 ENVELOPE Lapangan 65,1380 180,02 79,2610 (OKE)
Tumpuan Kanan (3) 98,0930 240,03 111,2040 (OKE)
Tumpuan Kiri (3) 115,1540 240,03 132,4110 (OKE)
Lantai 2 F 3-4 67 ENVELOPE Lapangan 78,2200 180,02 106,8560 (OKE)
Tumpuan Kanan (4) 115,6730 240,03 146,2580 (OKE)
Tumpuan Kiri (1) 151,5810 240,03 148,9940 (OKE)
Lantai 3 B 1-4 182 ENVELOPE Lapangan 10,7770 180,02 12,8700 (OKE)
Tumpuan Kanan (4) 151,6080 240,03 149,0600 (OKE)
Tumpuan Kiri (1) 176,4970 240,03 381,4810 (NOT OKE)
Lantai 3 C 1-4 185 ENVELOPE Lapangan 11,4460 180,02 20,2420 (OKE)
450.800

Tumpuan Kanan (4) 176,5140 240,03 381,6330 (NOT OKE)


B1

Tumpuan Kiri (1) 149,7890 240,03 501,6520 (NOT OKE)


Lantai 3 D 1-4 188 ENVELOPE Lapangan 11,5340 180,02 25,6950 (OKE)
Tumpuan Kanan (4) 149,7780 240,03 502,2030 (NOT OKE)
Tumpuan Kiri (1) 75,4300 240,03 118,7450 (OKE)
Lantai 3 E 1-2 193 ENVELOPE Lapangan 39,0300 180,02 64,8210 (OKE)
Tumpuan Kanan (2) 71,0950 240,03 118,3910 (OKE)
Tumpuan Kiri (2) 75,6580 240,03 127,4420 (OKE)
Lantai 3 E 2-3 192 ENVELOPE Lapangan 42,6040 180,02 60,5660 (OKE)
Tumpuan Kanan (3) 75,6700 240,03 117,9610 (OKE)
Tumpuan Kiri (3) 71,1060 240,03 114,3850 (OKE)
Lantai 3 E 3-4 191 ENVELOPE Lapangan 42,1810 180,02 65,3590 (OKE)
Tumpuan Kanan (4) 75,4190 240,03 122,8320 (OKE)

17
Rekap GeserKapasitasRekap Geser Alih EksistingPenampangFungsi
Nama As Kombinasi Beban φV (kN)
ElemenLetak Bangunan Frame Seksi Balok

Vu (kN)
81,2010
Tumpuan Kiri (1) Lapangan Tumpuan Kanan
Lantai 3F1 - 2 196 ENVELOPE Tum 44,

Lantai 3F2 - 3 195 ENVELO


B1

Lantai 3

17
Tabel 6.9 : Rekapitulasi Evaluasi Kekuatan Geser Ultimate Elemen Struktur Balok 2

Rekap Geser Kapasitas Rekap Geser Alih


Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kanan (2) 54,9460 85,77 63,4670 (OKE)
Lantai 2 A 1-2 54 ENVELOPE Lapangan 35,7420 64,32 41,7190 (OKE)
Tumpuan Kiri (1) 52,8210 85,77 60,5940 (OKE)
Tumpuan Kanan (3) 50,6880 85,77 58,5380 (OKE)
Lantai 2 A 2-3 53 ENVELOPE Lapangan 30,4640 64,32 35,5480 (OKE)
Tumpuan Kiri (2) 50,4560 85,77 58,2300 (OKE)
Tumpuan Kanan (4) 53,1010 85,77 60,6780 (OKE)
Lantai 2 A 3-4 52 ENVELOPE Lapangan 33,2140 64,32 38,2590 (OKE)
Tumpuan Kiri (3) 54,6650 85,77 63,4720 (OKE)
Tumpuan Kanan (2) 63,3240 85,77 75,9750
300.500

(OKE)
B2

Lantai 2 G 1-2 73 ENVELOPE Lapangan 43,2890 64,32 55,8250 (OKE)


Tumpuan Kiri (1) 62,9080 85,77 76,7340 (OKE)
Tumpuan Kanan (3) 58,5210 85,77 67,6080 (OKE)
Lantai 2 G 2-3 72 ENVELOPE Lapangan 38,5750 64,32 49,5250 (OKE)
Tumpuan Kiri (2) 58,53 85,77 68,92 (OKE)
Tumpuan Kanan (4) 62,8980 85,77 78,0000 (OKE)
Lantai 2 G 3-4 71 ENVELOPE Lapangan 43,0940 64,32 57,8540 (OKE)
Tumpuan Kiri (3) 63,3340 85,77 76,1530 (OKE)
Tumpuan Kiri (A) 57,2500 85,77 68,8730 (OKE)
Lantai 2 1 A-B 92 ENVELOPE Lapangan 27,6340 64,32 35,0610 (OKE)
Tumpuan Kanan (B) 65,6050 85,77 79,3560 (OKE)

17
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kiri (B) 62,6500 85,77 77,7680 (OKE)
Lantai 2 1 B-C 93 ENVELOPE Lapangan 20,5740 64,32 28,5960 (OKE)
Tumpuan Kanan (C) 63,7890 85,77 72,9470 (OKE)
Tumpuan Kiri (C) 63,8060 85,77 78,7230 (OKE)
Lantai 2 1 C-D 94 ENVELOPE Lapangan 23,2630 64,32 31,4300 (OKE)
Tumpuan Kanan 63,3550 85,77 72,7060 (OKE)
(D)
Tumpuan Kiri (D) 62,6000 85,77 65,3600 (OKE)
Lantai 2 1 D-E 95 ENVELOPE Lapangan 28,7820 64,32 31,9660 (OKE)
Tumpuan Kanan (E) 52,6130 85,77 61,0390 (OKE)
Tumpuan Kiri (E) 56,0270 85,77 65,5340 (OKE)
B2 300.500

Lantai 2 1 E-F 96 ENVELOPE Lapangan 28,3770 64,32 35,2260 (OKE)


Tumpuan Kanan (F) 55,4500 85,77 64,7720 (OKE)
Tumpuan Kiri (F) 59,9440 85,77 66,2710 (OKE)
Lantai 2 1 F-G 97 ENVELOPE Lapangan 31,5160 64,32 38,6410 (OKE)
Tumpuan Kanan (G) 60,8620 85,77 65,5210 (OKE)
Tumpuan Kiri (A) 57,2200 85,77 69,0310 (OKE)
Lantai 2 4 A-B 74 ENVELOPE Lapangan 27,6010 64,32 35,3130 (OKE)
Tumpuan Kanan (B) 65,6490 85,77 79,6020 (OKE)
Tumpuan Kiri (B) 62,6380 85,77 77,9910 (OKE)
Lantai 2 4 B-C 75 ENVELOPE Lapangan 20,5650 64,32 28,7640 (OKE)
Tumpuan Kanan (C) 63,8010 85,77 73,0570 (OKE)
Tumpuan Kiri (C) 63,8100 85,77 78,9880 (OKE)
Lantai 2 4 C-D 76 ENVELOPE Lapangan 23,2630 64,32 31,6360 (OKE)
Tumpuan Kanan 63,3540 85,77 72,8440 (OKE)
(D)

17
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kiri (D) 62,5810 85,77 65,7760 (OKE)
Lantai 2 4 D-E 77 ENVELOPE Lapangan 28,7670 64,32 32,3370 (OKE)
Tumpuan Kanan (E) 52,6310 85,77 61,1220 (OKE)
Tumpuan Kiri (E) 56,0120 85,77 66,0910 (OKE)
Lantai 2 4 E-F 78 ENVELOPE Lapangan 28,3630 64,32 35,6860 (OKE)
Tumpuan Kanan (F) 55,4670 85,77 64,8680 (OKE)
Tumpuan Kiri (F) 59,9260 85,77 67,5700 (OKE)
Lantai 2 4 F-G 79 ENVELOPE Lapangan 31,4990 64,32 39,0490 (OKE)
Tumpuan Kanan (G) 60,8820 85,77 67,2670 (OKE)
Tumpuan Kanan (2) 25,5240 85,77 27,8850 (OKE)
Lantai 3 A 1-2 181 ENVELOPE Lapangan 15,6410 64,32 18,0160 (OKE)
300.500

Tumpuan Kiri (1) 24,2630 85,77 27,8000 (OKE)


B2

Tumpuan Kanan (3) 24,3250 85,77 26,8590 (OKE)


Lantai 3 A 2-3 180 ENVELOPE Lapangan 13,9060 64,32 16,4630 (OKE)
Tumpuan Kiri (2) 24,3130 85,77 26,8990 (OKE)
Tumpuan Kanan (4) 24,2650 85,77 27,6540 (OKE)
Lantai 3 A 3-4 179 ENVELOPE Lapangan 14,1780 64,32 17,5430 (OKE)
Tumpuan Kiri (3) 25,5210 85,77 28,1310 (OKE)
Tumpuan Kanan (2) 46,8640 85,77 61,6850 (OKE)
Lantai 3 G 1-2 199 ENVELOPE Lapangan 27,9270 64,32 40,0020 (OKE)
Tumpuan Kiri (1) 47,3770 85,77 64,6110 (OKE)
Tumpuan Kanan (3) 45,3270 85,77 52,3270 (OKE)
Lantai 3 G 2-3 198 ENVELOPE Lapangan 22,7040 64,32 36,3360 (OKE)
Tumpuan Kiri (2) 45,3280 85,77 56,3450 (OKE)

17
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kanan (4) 47,3770 85,77 66,0850 (OKE)
Lantai 3 G 3-4 197 ENVELOPE Lapangan 28,2560 64,32 44,0300 (OKE)
Tumpuan Kiri (3) 46,8640 85,77 60,6800 (OKE)
Tumpuan Kiri (A) 32,4510 85,77 39,1710 (OKE)
Lantai 3 1 A-B 218 ENVELOPE Lapangan 17,0960 64,32 23,7250 (OKE)
Tumpuan Kanan (B) 38,3090 85,77 40,8740 (OKE)
Tumpuan Kiri (B) 34,8720 85,77 28,3200 (OKE)
Lantai 3 1 B-C 219 ENVELOPE Lapangan 6,0210 64,32 15,8200 (OKE)
Tumpuan Kanan (C) 36,7730 85,77 46,9810 (OKE)
Tumpuan Kiri (C) 36,6530 85,77 100,1120 (NOT OKE)
Lantai 3 1 C-D 220 ENVELOPE Lapangan 14,9250 64,32 31,7170 (OKE)
300.500

Tumpuan Kanan 34,9870 85,77 108,5660 (NOT OKE)


B2

(D)
Tumpuan Kiri (D) 36,1640 85,77 97,8370 (NOT OKE)
Lantai 3 1 D-E 221 ENVELOPE Lapangan 18,4340 64,32 46,6690 (OKE)
Tumpuan Kanan (E) 32,4600 85,77 67,7350 (OKE)
Tumpuan Kiri (E) 49,8440 85,77 63,0530 (OKE)
Lantai 3 1 E-F 222 ENVELOPE Lapangan 21,7070 64,32 33,6750 (OKE)
Tumpuan Kanan (F) 50,0340 85,77 55,6080 (OKE)
Tumpuan Kiri (F) 53,4080 85,77 66,6350 (OKE)
Lantai 3 1 F-G 223 ENVELOPE Lapangan 25,0660 64,32 34,4890 (OKE)
Tumpuan Kanan (G) 53,1300 85,77 63,3650 (OKE)
Tumpuan Kiri (A) 32,4410 85,77 39,2880 (OKE)
Lantai 3 4 A-B 200 ENVELOPE Lapangan 17,0860 64,32 23,8880 (OKE)
Tumpuan Kanan (B) 38,3190 85,77 40,9910 (OKE)

17
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kiri (B) 34,8690 85,77 28,4570 (OKE)
Lantai 3 4 B-C 201 ENVELOPE Lapangan 6,0230 64,32 15,8660 (OKE)
Tumpuan Kanan (C) 36,7750 85,77 47,0210 (OKE)
Tumpuan Kiri (C) 36,6540 85,77 100,0510 (NOT OKE)
Lantai 3 4 C-D 202 ENVELOPE Lapangan 14,9260 64,32 31,7460 (OKE)
Tumpuan Kanan 34,9850 85,77 108,6250 (NOT OKE)
(D)
Tumpuan Kiri (D) 36,1650 85,77 99,2730 (NOT OKE)
Lantai 3 4 D-E 203 ENVELOPE Lapangan 18,4360 64,32 48,0800 (OKE)
Tumpuan Kanan (E) 32,4580 85,77 67,5760 (OKE)
Tumpuan Kiri (E) 49,8450 85,77 65,7430 (OKE)
Lantai 3 4 E-F 204 ENVELOPE Lapangan 21,7070 64,32 36,1710
300.500

(OKE)
B2

Tumpuan Kanan (F) 50,0330 85,77 55,8280 (OKE)


Tumpuan Kiri (F) 53,4100 85,77 67,0290 (OKE)
Lantai 3 4 F-G 205 ENVELOPE Lapangan 25,0670 64,32 34,5950 (OKE)
Tumpuan Kanan (G) 53,1280 85,77 66,4170 (OKE)
Tumpuan Kanan (2) 19,7800 85,77 25,2640 (OKE)
Lantai
E 1-2 246 ENVELOPE Lapangan 9,1970 64,32 15,9230 (OKE)
Atap
Tumpuan Kiri (1) 20,6540 85,77 26,8600 (OKE)
Tumpuan Kanan (3) 19,9840 85,77 45,4700 (OKE)
Lantai
E 2-3 245 ENVELOPE Lapangan 10,3580 64,32 22,1060 (OKE)
Atap
Tumpuan Kiri (2) 19,9830 85,77 40,2610 (OKE)
Tumpuan Kanan (4) 20,6530 85,77 42,2460 (OKE)
Lantai
E 3-4 244 ENVELOPE Lapangan 11,0550 64,32 19,5050 (OKE)
Atap
Tumpuan Kiri (3) 19,7810 85,77 45,8740 (OKE)

17
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kanan (2) 26,0660 85,77 35,5610 (OKE)
Lantai
F 1-2 254 ENVELOPE Lapangan 12,6120 64,32 21,8750 (OKE)
Atap
Tumpuan Kiri (1) 24,7010 85,77 27,9450 (OKE)
Tumpuan Kanan (3) 25,6370 85,77 72,3180 (OKE)
Lantai
F 2-3 253 ENVELOPE Lapangan 11,9510 64,32 29,4010 (OKE)
Atap
Tumpuan Kiri (2) 25,6360 85,77 64,6460 (OKE)
Tumpuan Kanan (4) 24,7010 85,77 60,4360 (OKE)
Lantai
F 3-4 252 ENVELOPE Lapangan 11,2010 64,32 18,0810 (OKE)
Atap
Tumpuan Kiri (3) 26,0670 85,77 76,8350 (OKE)
Tumpuan Kiri (1) 20,8440 85,77 25,3910 (OKE)
Lantai
G 1-2 249 ENVELOPE Lapangan 10,3810 64,32 19,9550 (OKE)
300.500

Atap
Tumpuan Kanan (2) 22,1490 85,77 31,3780 (OKE)
B2

Tumpuan Kiri (2) 20,4530 85,77 41,8710 (OKE)


Lantai
G 2-3 250 ENVELOPE Lapangan 10,7910 64,32 18,8460 (OKE)
Atap
Tumpuan Kanan (3) 20,4540 85,77 46,4580 (OKE)
Tumpuan Kiri (3) 22,1490 85,77 51,8800 (OKE)
Lantai
G 3-4 251 ENVELOPE Lapangan 12,4180 64,32 28,2320 (OKE)
Atap
Tumpuan Kanan (4) 20,8450 85,77 41,1170 (OKE)
Tumpuan Kiri (E) 26,8180 85,77 30,6760 (OKE)
Lantai
1 E-F 247 ENVELOPE Lapangan 10,4250 64,32 13,1050 (OKE)
Atap
Tumpuan Kanan (F) 30,6380 85,77 33,3110 (OKE)
Tumpuan Kiri (F) 30,4260 85,77 34,8160 (OKE)
Lantai
1 F-G 248 ENVELOPE Lapangan 14,5600 64,32 19,4420 (OKE)
Atap
Tumpuan Kanan (G) 25,3120 85,77 26,4680 (OKE)

17
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kanan (F) 30,6380 85,77 77,0680 (OKE)
Lantai
B2 300.500

4 E-F 243 ENVELOPE Lapangan 14,8620 64,32 37,9320 (OKE)


Atap
Tumpuan Kiri (E) 26,8170 85,77 62,5100 (OKE)
Tumpuan Kanan (G) 25,3120 85,77 58,1440 (OKE)
Lantai
4 F-G 242 ENVELOPE Lapangan 9,1300 64,32 16,5230 (OKE)
Atap
Tumpuan Kiri (F) 30,4260 85,77 78,4860 (OKE)

18
Tabel 6.10 : Rekapitulasi Evaluasi Kekuatan Geser Ultimate Elemen Struktur Balok 3

Rekap Geser Kapasitas Rekap Geser Alih


Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kiri (A) 65,8200 76,34 82,2410 (NOT OKE)
Lantai 2 2 A-B 86 ENVELOPE Lapangan 27,5540 57,26 34,6530 (OKE)
Tumpuan Kanan (B) 38,6300 76,34 49,0410 (OKE)
Tumpuan Kiri (B) 47,0850 76,34 64,2370 (OKE)
Lantai 2 2 B-C 87 ENVELOPE Lapangan 8,9220 57,26 11,8090 (OKE)
Tumpuan Kanan (C) 54,3170 76,34 74,0440 (OKE)
Tumpuan Kiri (C) 54,4660 76,34 73,7000 (OKE)
Lantai 2 2 C-D 88 ENVELOPE Lapangan 14,7370 57,26 18,8390 (OKE)
Tumpuan Kanan 46,6170 76,34 64,1620 (OKE)
(D)
300.450

Tumpuan Kiri (D) 40,8470 76,34 46,5520 (OKE)


B3

Lantai 2 2 D-E 89 ENVELOPE Lapangan 9,1120 57,26 12,7850 (OKE)


Tumpuan Kanan (E) 67,2290 76,34 72,7550 (OKE)
Tumpuan Kiri (E) 59,6690 76,34 69,0460 (OKE)
Lantai 2 2 E-F 90 ENVELOPE Lapangan 28,7380 57,26 34,0290 (OKE)
Tumpuan Kanan (F) 57,2120 76,34 68,8280 (OKE)
Tumpuan Kiri (F) 66,976 76,34 66,378 (OKE)
Lantai 2 2 F-G 91 ENVELOPE Lapangan 29,484 57,26 33,06 (OKE)
Tumpuan Kanan (G) 70,693 76,34 69,12 (OKE)
Tumpuan Kiri (A) 65,8290 76,34 82,4320 (NOT OKE)
Lantai 2 3 A-B 80 ENVELOPE Lapangan 27,5570 57,26 34,7580 (OKE)
Tumpuan Kanan (B) 38,6240 76,34 49,0320 (OKE)

18
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kiri (B) 47,0830 76,34 64,2360 (OKE)
Lantai 2 3 B-C 81 ENVELOPE Lapangan 8,9200 57,26 11,7930 (OKE)
Tumpuan Kanan (C) 54,3150 76,34 74,0440 (OKE)
Tumpuan Kiri (C) 54,4610 76,34 73,6980 (OKE)
Lantai 2 3 C-D 82 ENVELOPE Lapangan 14,7340 57,26 18,8410 (OKE)
Tumpuan Kanan 46,6200 76,34 64,1960 (OKE)
(D)
Tumpuan Kiri (D) 40,8500 76,34 46,5870 (OKE)
Lantai 2 3 D-E 83 ENVELOPE Lapangan 9,1120 57,26 12,8110 (OKE)
Tumpuan Kanan (E) 67,2280 76,34 72,5920 (OKE)
Tumpuan Kiri (E) 59,6650 76,34 68,8890 (OKE)
Lantai 2 3 E-F 84 ENVELOPE Lapangan 28,7350 57,26 33,9580
B3 300.450

(OKE)
Tumpuan Kanan (F) 57,2150 76,34 68,3770 (OKE)
Tumpuan Kiri (F) 66,9720 76,34 66,9740 (OKE)
Lantai 2 3 F-G 85 ENVELOPE Lapangan 29,4800 57,26 33,1290 (OKE)
Tumpuan Kanan (G) 70,6980 76,34 69,8060 (OKE)
Tumpuan Kiri (A) 42,3270 76,34 43,6380 (OKE)
Lantai 3 2 A-B 212 ENVELOPE Lapangan 19,2900 57,26 21,7170 (OKE)
Tumpuan Kanan (B) 26,1140 76,34 27,7260 (OKE)
Tumpuan Kiri (B) 35,3260 76,34 31,5360 (OKE)
Lantai 3 2 B-C 213 ENVELOPE Lapangan 10,8150 57,26 17,9560 (OKE)
Tumpuan Kanan (C) 40,4760 76,34 46,4200 (OKE)
Tumpuan Kiri (C) 40,4380 76,34 149,1240 (NOT OKE)
Lantai 3 2 C-D 214 ENVELOPE Lapangan 10,1440 57,26 35,8530 (OKE)
Tumpuan Kanan 35,3810 76,34 141,8920 (NOT OKE)
(D)

18
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kiri (D) 24,5210 76,34 96,6350 (NOT OKE)
Lantai 3 2 D-E 215 ENVELOPE Lapangan 6,0540 57,26 18,4270 (OKE)
Tumpuan Kanan (E) 42,4770 76,34 155,6650 (NOT OKE)
Tumpuan Kiri (E) 54,2280 76,34 79,2510 (NOT OKE)
Lantai 3 2 E-F 216 ENVELOPE Lapangan 23,2570 57,26 39,7360 (OKE)
Tumpuan Kanan (F) 52,9280 76,34 59,6540 (OKE)
Tumpuan Kiri (F) 55,64 76,34 61,046 (OKE)
Lantai 3 2 F-G 217 ENVELOPE Lapangan 25,139 57,26 30,16 (OKE)
Tumpuan Kanan (G) 58,375 76,34 64,142 (OKE)
Tumpuan Kiri (A) 42,3200 76,34 43,7130 (OKE)
Lantai 3 3 A-B 206 ENVELOPE Lapangan 19,2840 57,26 21,7670 (OKE)
B3 300.450

Tumpuan Kanan (B) 26,1190 76,34 27,7800 (OKE)


Tumpuan Kiri (B) 35,3270 76,34 31,5420 (OKE)
Lantai 3 3 B-C 207 ENVELOPE Lapangan 5,6830 57,26 3,4080 (OKE)
Tumpuan Kanan (C) 40,4760 76,34 46,4160 (OKE)
Tumpuan Kiri (C) 40,4390 76,34 149,0980 (NOT OKE)
Lantai 3 3 C-D 208 ENVELOPE Lapangan 10,1450 57,26 35,8250 (OKE)
Tumpuan Kanan 35,3800 76,34 141,9880 (NOT OKE)
(D)
Tumpuan Kiri (D) 24,5200 76,34 96,9970 (NOT OKE)
Lantai 3 3 D-E 209 ENVELOPE Lapangan 6,0530 57,26 18,8540 (OKE)
Tumpuan Kanan (E) 42,4770 76,34 154,5720 (NOT OKE)
Tumpuan Kiri (E) 54,2290 76,34 79,9760 (NOT OKE)
Lantai 3 3 E-F 210 ENVELOPE Lapangan 23,2570 57,26 40,4110 (OKE)
Tumpuan Kanan (F) 52,9280 76,34 58,5670 (OKE)

18
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kiri (F) 55,6400 76,34 59,8850 (OKE)
Lantai 3 3 F-G 211 ENVELOPE Lapangan 25,1400 57,26 29,5080 (OKE)
Tumpuan Kanan (G) 58,3750 76,34 65,1650 (OKE)
Tumpuan Kiri (E) 31,4990 76,34 63,3010 (OKE)
Lantai
2 E-F 257 ENVELOPE Lapangan 11,1780 57,26 18,9160 (OKE)
Atap
Tumpuan Kanan (F) 39,2510 76,34 82,0520 (NOT OKE)
Tumpuan Kiri (F) 39,4940 76,34 83,4090 (NOT OKE)
300.450

Lantai
2 F-G 258 ENVELOPE Lapangan 16,7300 57,26 37,4670
B3

(OKE)
Atap
Tumpuan Kanan (G) 31,1550 76,34 62,9190 (OKE)
Tumpuan Kiri (E) 31,4990 76,34 95,0150 (NOT OKE)
Lantai
3 E-F 255 ENVELOPE Lapangan 11,1780 57,26 26,0100 (OKE)
Atap
Tumpuan Kanan (F) 39,2510 76,34 127,3630 (NOT OKE)
Tumpuan Kiri (F) 39,4940 76,34 128,7290 (NOT OKE)
Lantai
3 F-G 256 ENVELOPE Lapangan 16,7300 57,26 52,7170 (OKE)
Atap
Tumpuan Kanan (G) 31,1550 76,34 94,9270 (NOT OKE)

18
Tabel 6.11 : Rekapitulasi Evaluasi Kekuatan Geser Ultimate Elemen Struktur Balok 4

Rekap Geser Kapasitas Rekap Geser Alih


Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kanan (2) 9,8720 36,91 13,8260 (OKE)
Lantai 2 A' 1-2 100 ENVELOPE Lapangan 2,3390 27,69 3,0440 (OKE)
Tumpuan Kiri (1) 10,5420 36,91 14,7560 (OKE)
Tumpuan Kanan (3) 10,9510 36,91 15,2000 (OKE)
Lantai 2 A' 2-3 99 ENVELOPE Lapangan 2,4980 27,69 3,1890 (OKE)
Tumpuan Kiri (2) 10,9510 36,91 15,1980 (OKE)
Tumpuan Kanan (4) 10,5440 36,91 14,7570 (OKE)
Lantai 2 A' 3-4 98 ENVELOPE Lapangan 3,0880 27,69 4,0580 (OKE)
Tumpuan Kiri (3) 9,8710 36,91 13,8260 (OKE)
Tumpuan Kanan (2) 7,0780 36,91 10,2490
200.350

(OKE)
B4

Lantai 2 B' 1-2 103 ENVELOPE Lapangan 1,9480 27,69 2,1490 (OKE)
Tumpuan Kiri (1) 13,1280 36,91 18,0990 (OKE)
Tumpuan Kanan (3) 11,0860 36,91 15,4110 (OKE)
Lantai 2 B' 2-3 102 ENVELOPE Lapangan 2,4940 27,69 3,2360 (OKE)
Tumpuan Kiri (2) 11,0890 36,91 15,4100 (OKE)
Tumpuan Kanan (4) 13,1300 36,91 18,0980 (OKE)
Lantai 2 B' 3-4 101 ENVELOPE Lapangan 5,7210 27,69 7,7800 (OKE)
Tumpuan Kiri (3) 7,0790 36,91 10,2490 (OKE)
Tumpuan Kanan (2) 6,9500 36,91 10,2580 (OKE)
Lantai 2 C' 1-2 106 ENVELOPE Lapangan 2,0860 27,69 2,1350 (OKE)
Tumpuan Kiri (1) 13,2110 36,91 17,9180 (OKE)

18
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kanan (3) 11,1050 36,91 15,3770 (OKE)
Lantai 2 C' 2-3 105 ENVELOPE Lapangan 2,5390 27,69 3,3150 (OKE)
Tumpuan Kiri (2) 11,1050 36,91 15,3670 (OKE)
Tumpuan Kanan (4) 13,2120 36,91 17,9120 (OKE)
Lantai 2 C' 3-4 104 ENVELOPE Lapangan 5,8530 27,69 7,7330 (OKE)
Tumpuan Kiri (3) 6,9500 36,91 10,2590 (OKE)
Tumpuan Kanan (2) 9,2920 36,91 9,2590 (OKE)
Lantai 2 D' 1-2 109 ENVELOPE Lapangan 1,6330 27,69 2,0720 (OKE)
Tumpuan Kiri (1) 10,5920 36,91 10,2000 (OKE)
Tumpuan Kanan (3) 10,5550 36,91 13,2720 (OKE)
Lantai 2 D' 2-3 108 ENVELOPE Lapangan 2,0840 27,69 2,5630 (OKE)
200.350

Tumpuan Kiri (2) 10,5530 36,91 13,3010 (OKE)


B4

Tumpuan Kanan (4) 10,5910 36,91 10,2180 (OKE)


Lantai 2 D' 3-4 107 ENVELOPE Lapangan 3,1420 27,69 3,2050 (OKE)
Tumpuan Kiri (3) 9,2920 36,91 9,2360 (OKE)
Tumpuan Kanan (2) 11,4150 36,91 13,8710 (OKE)
Lantai 2 E' 1-2 112 ENVELOPE Lapangan 3,1150 27,69 3,5070 (OKE)
Tumpuan Kiri (1) 9,5900 36,91 12,0440 (OKE)
Tumpuan Kanan (3) 10,3800 36,91 12,7160 (OKE)
Lantai 2 E' 2-3 111 ENVELOPE Lapangan 1,9130 27,69 2,2850 (OKE)
Tumpuan Kiri (2) 10,3800 36,91 12,8420 (OKE)
Tumpuan Kanan (4) 9,5900 36,91 12,1080 (OKE)
Lantai 2 E' 3-4 110 ENVELOPE Lapangan 1,1370 27,69 1,8060 (OKE)
Tumpuan Kiri (3) 11,4150 36,91 13,8090 (OKE)

18
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kanan (2) 10,9280 36,91 10,0630 (OKE)
Lantai 2 F' 1-2 115 ENVELOPE Lapangan 3,4140 27,69 3,5730 (OKE)
Tumpuan Kiri (1) 9,9640 36,91 9,3000 (OKE)
Tumpuan Kanan (3) 10,1150 36,91 6,8930 (OKE)
Lantai 2 F' 2-3 114 ENVELOPE Lapangan 2,3200 27,69 1,9490 (OKE)
Tumpuan Kiri (2) 10,1150 36,91 7,1000 (OKE)
Tumpuan Kanan (4) 9,9640 36,91 10,2360 (OKE)
Lantai 2 F' 3-4 113 ENVELOPE Lapangan 2,3370 27,69 3,0240 (OKE)
Tumpuan Kiri (3) 10,9280 36,91 10,7970 (OKE)
Tumpuan Kanan (2) 8,0040 36,91 8,2220 (OKE)
Lantai 3 A' 1-2 226 ENVELOPE Lapangan 1,2370 27,69 1,7580 (OKE)
200.35

Tumpuan Kiri (1) 9,3030 36,91 9,1180 (OKE)


B4

Tumpuan Kanan (3) 8,9230 36,91 8,9680 (OKE)


Lantai 3 A' 2-3 225 ENVELOPE Lapangan 1,5840 27,69 1,6130 (OKE)
Tumpuan Kiri (2) 8,9230 36,91 8,9660 (OKE)
Tumpuan Kanan (4) 9,3030 36,91 9,1160 (OKE)
Lantai 3 A' 3-4 224 ENVELOPE Lapangan 2,3920 27,69 2,3680 (OKE)
Tumpuan Kiri (3) 8,0030 36,91 8,2230 (OKE)
Tumpuan Kanan (2) 5,6690 36,91 5,5360 (OKE)
Lantai 3 B' 1-2 229 ENVELOPE Lapangan 2,0720 27,69 1,9370 (OKE)
Tumpuan Kiri (1) 11,7740 36,91 11,8310 (OKE)
Tumpuan Kanan (3) 9,0540 36,91 9,6090 (OKE)
Lantai 3 B' 2-3 228 ENVELOPE Lapangan 2,6200 27,69 3,6060 (OKE)
Tumpuan Kiri (2) 9,0530 36,91 9,6060 (OKE)

18
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kanan (4) 11,7730 36,91 11,8290 (OKE)
Lantai 3 B' 3-4 227 ENVELOPE Lapangan 5,1670 27,69 5,0230 (OKE)
Tumpuan Kiri (3) 5,6690 36,91 5,5350 (OKE)
Tumpuan Kanan (2) 5,6860 36,91 27,1630 (OKE)
Lantai 3 C' 1-2 232 ENVELOPE Lapangan 2,0500 27,69 3,5690 (OKE)
Tumpuan Kiri (1) 11,7550 36,91 47,9200 (NOT OKE)
Tumpuan Kanan (3) 9,0490 36,91 37,5990 (NOT OKE)
Lantai 3 C' 2-3 231 ENVELOPE Lapangan 1,6890 27,69 8,5510 (OKE)
Tumpuan Kiri (2) 9,0490 36,91 36,5740 (OKE)
Tumpuan Kanan (4) 11,7540 36,91 47,9140 (NOT OKE)
Lantai 3 C' 3-4 230 ENVELOPE Lapangan 5,1490 27,69 20,6900 (OKE)
200.350

Tumpuan Kiri (3) 5,6860 36,91 27,1680 (OKE)


B4

Tumpuan Kanan (2) 8,1370 36,91 35,2770 (OKE)


Lantai 3 D' 1-2 235 ENVELOPE Lapangan 1,2510 27,69 6,4670 (OKE)
Tumpuan Kiri (1) 9,0750 36,91 36,8620 (OKE)
Tumpuan Kanan (3) 8,9120 36,91 36,8720 (OKE)
Lantai 3 D' 2-3 234 ENVELOPE Lapangan 1,5560 27,69 7,8350 (OKE)
Tumpuan Kiri (2) 8,9120 36,91 36,8860 (OKE)
Tumpuan Kanan (4) 9,0750 36,91 36,8430 (OKE)
Lantai 3 D' 3-4 233 ENVELOPE Lapangan 2,0790 27,69 9,3890 (OKE)
Tumpuan Kiri (3) 8,1370 36,91 35,1600 (OKE)
Tumpuan Kanan (2) 11,2620 36,91 16,1250 (OKE)
Lantai 3 E' 1-2 238 ENVELOPE Lapangan 2,7370 27,69 4,4900 (OKE)
Tumpuan Kiri (1) 9,7440 36,91 13,2990 (OKE)

18
Rekap Geser Kapasitas Rekap Geser Alih
Nama As Kombinasi Check
Letak Frame Seksi Balok Eksisting Penampang Fungsi
Elemen Bangunan Beban
Vu (kN) φV (kN) Vu (kN) Vu ≤ φVKap
Tumpuan Kanan (3) 10,3900 36,91 14,4440 (OKE)
Lantai 3 E' 2-3 237 ENVELOPE Lapangan 1,9180 27,69 2,5180 (OKE)
Tumpuan Kiri (2) 10,3890 36,91 14,6710 (OKE)
Tumpuan Kanan (4) 9,7440 36,91 13,4190 (OKE)
Lantai 3 E' 3-4 236 ENVELOPE Lapangan 0,9430 27,69 1,0400 (OKE)
Tumpuan Kiri (3) 11,2620 36,91 15,9950 (OKE)
Tumpuan Kanan (2) 11,2990 36,91 15,8200 (OKE)
Lantai 3 F' 1-2 241 ENVELOPE Lapangan 3,0750 27,69 3,9810 (OKE)
Tumpuan Kiri (1) 9,8740 36,91 14,1550 (OKE)
Tumpuan Kanan (3) 10,4300 36,91 7,2560 (OKE)
Lantai 3 F' 2-3 240 ENVELOPE Lapangan 1,2580 27,69 1,4270 (OKE)
200.350

Tumpuan Kiri (2) 10,4300 36,91 7,5110 (OKE)


B4

Tumpuan Kanan (4) 9,8740 36,91 14,2740 (OKE)


Lantai 3 F' 3-4 239 ENVELOPE Lapangan 1,5670 27,69 2,7240 (OKE)
Tumpuan Kiri (3) 11,2990 36,91 15,6700 (OKE)
Tumpuan Kanan (2) 9,2000 36,91 9,6900 (OKE)
Lantai
E' 1-2 261 ENVELOPE Lapangan 1,9650 27,69 2,9420 (OKE)
Atap
Tumpuan Kiri (1) 8,5290 36,91 7,5640 (OKE)
Tumpuan Kanan (3) 8,6200 36,91 31,2280 (OKE)
Lantai
E' 2-3 260 ENVELOPE Lapangan 1,5900 27,69 7,1620 (OKE)
Atap
Tumpuan Kiri (2) 8,6200 36,91 30,9480 (OKE)
Tumpuan Kanan (4) 8,5290 36,91 30,3980 (OKE)
Lantai
E' 3-4 259 ENVELOPE Lapangan 1,3230 27,69 5,4980 (OKE)
Atap
Tumpuan Kiri (3) 9,2000 36,91 32,1530 (OKE)

18
19
Tabel 6.12 : Rekapitulasi Evaluasi Elemen Balok butuh Perkuatan Geser
Kapasitas Geser Alih
Nama Kapasitas Penampang
Letak As Bangunan Seksi Balok Fungsi Cek
Elemen
φVn (kN) Vu (kN)

Lantai 2 B 1-4 Tumpuan 240,03 280,8660 (BUTUH PERKUATAN)

Lantai 2 C 1-4 Tumpuan 240,03 332,8000 (BUTUH PERKUATAN)

B1 450.800 Lantai 2 D 1-4 Tumpuan 240,03 278,5230 (BUTUH PERKUATAN)

Lantai 3 C 1-4 Tumpuan 240,03 381,6330 (BUTUH PERKUATAN)

Lantai 3 D 1-4 Tumpuan 240,03 502,2030 (BUTUH PERKUATAN)

Lantai 3 1 C-D Tumpuan 85,77 108,5660 (BUTUH PERKUATAN)

Lantai 3 1 D-E Tumpuan 85,77 97,8370 (BUTUH PERKUATAN)


B2 300.500
Lantai 3 4 C-D Tumpuan 85,77 108,6250 (BUTUH PERKUATAN)

Lantai 3 4 D-E Tumpuan 85,77 99,2730 (BUTUH PERKUATAN)

Lantai 2 2 A-B Tumpuan 76,34 82,2410 (BUTUH PERKUATAN)

Lantai 2 3 A-B Tumpuan 76,34 82,4320 (BUTUH PERKUATAN)


B3 300.450
Lantai 3 2 C-D Tumpuan 76,34 149,1240 (BUTUH PERKUATAN)

Lantai 3 2 D-E Tumpuan 76,34 155,6650 (BUTUH PERKUATAN)

19
Kapasitas Geser Alih
Nama Kapasitas Penampang
Letak As Bangunan Seksi Balok Fungsi Cek
Elemen
φVn (kN) Vu (kN)

Lantai 3 2 E-F Tumpuan 76,34 79,2510 (BUTUH PERKUATAN)

Lantai 3 3 C-D Tumpuan 76,34 149,0980 (BUTUH PERKUATAN)

Lantai 3 3 D-E Tumpuan 76,34 154,5720 (BUTUH PERKUATAN)

Lantai 3 3 E-F Tumpuan 76,34 79,9760 (BUTUH PERKUATAN)


B3 300.450
Lantai Atap 2 E-F Tumpuan 76,34 82,0520 (BUTUH PERKUATAN)

Lantai Atap 2 F-G Tumpuan 76,34 83,4090 (BUTUH PERKUATAN)

Lantai Atap 3 E-F Tumpuan 76,34 127,3630 (BUTUH PERKUATAN)

Lantai Atap 3 F-G Tumpuan 76,34 128,7290 (BUTUH PERKUATAN)

Lantai 3 C' 1-2 Tumpuan 36,91 47,9200 (BUTUH PERKUATAN)

B4 200.350 Lantai 3 C' 2-3 Tumpuan 36,91 37,5990 (BUTUH PERKUATAN)

Lantai 3 C' 3-4 Tumpuan 36,91 47,9140 (BUTUH PERKUATAN)

19
6.3. Evaluasi Elemen Kolom
6.3.1. Evaluasi Elemen Kolom Akibat Momen dan Aksial

KOLOM LANTAI 1
9000,00

8000,00

7000,00

6000,00

5000,00

4000,00

3000,00

2000,00

1000,00

0,00
0,00 100,00 200,00 300,00 400,00 500,00 600,00 700,00
Grafik 6.1 : Evaluasi Kolom Lantai 1 Akibat Gaya Aksial dan Momen

19
KOLOM LANTAI 2
9000,00

8000,00

7000,00

6000,00

5000,00

4000,00

3000,00

2000,00

1000,00

0,00

0,00 100,00 200,00 300,00 400,00 500,00 600,00 700,00


Grafik 6.2 : Evaluasi Kolom Lantai 2 Akibat Gaya Aksial dan Momen

19
KOLOM LANTAI 3
9000,00

8000,00

7000,00

6000,00

5000,00

4000,00

3000,00

2000,00

1000,00

0,00
0,00 100,00 200,00 300,00 400,00 500,00 600,00 700,00
Grafik 6.3 : Evaluasi Kolom Lantai 3 Akibat Gaya Aksial dan Momen

19
6.4. Evaluasi Elemen Sloof
6.4.1. Evaluasi Elemen Sloof Akibat Gaya Momen

Sloof 1
6000,00

5000,00

4000,00

3000,00

2000,00

1000,00

0,00
0,00 50,00 100,00 150,00 200,00 250,00 300,00 350,00 400,00

Grafik 6.4 : Evaluasi Sloof 1 Akibat Gaya Aksial dan Momen

19
4000,00

3500,00

3000,00

2500,00

2000,00

1500,00

1000,00

500,00

0,00
0,00 50,00 100,00 150,00 200,00 250,00 300,00

Grafik 6.5 : Evaluasi Sloof 2 Akibat Gaya Aksial dan Momen

19
6.5. Rekapitulasi Evaluasi Elemen Pelat
Tabel 6.13 : Rekapitulasi Evaluasi Momen pada Elemen Pelat

Kapasitas Kapasitas SAP Momen 1D + 1SDL


Arah
Nama Penampang Alih Fungsi (Output SAP)
Letak As Bangunan Cek
Elemen
φMKap
Tumpuan Mu (kN.m) φMKap (kN.m)
(kN.m)
C - C' 1-2 X 14,9908 17,6589 (BUTUH PERKUATAN) 12,6135
C - C' 2-3 X 14,9908 16,6242 (BUTUH PERKUATAN) 11,8744
Pelat Lantai

C - C' 3-4 X 14,9908 17,6583 (BUTUH PERKUATAN) 12,6131


Lantai C' - D 1-2 X 14,9908 17,6583 (BUTUH PERKUATAN) 12,6344
3 C' - D 3-4 X 14,9908 17,7016 (BUTUH PERKUATAN) 12,6440
D' - E 1-2 X 14,9908 16,4080 (BUTUH PERKUATAN) 11,7200
D' - E 2-3 X 14,9908 20,0273 (BUTUH PERKUATAN) 14,3052
D' - E 3-4 X 14,9908 16,3233 (BUTUH PERKUATAN) 11,6595
E' - F 2-3 X 11,3152 12,4789 (BUTUH PERKUATAN) 8,9135
Pelat Atap

Lantai E' - F 3-4 X 11,3152 11,9557 (BUTUH PERKUATAN) 8,5398


Atap F - F' 2-3 X 11,3152 12,5792 (BUTUH PERKUATAN) 8,9851
F - F' 3-4 X 11,3152 12,1123 (BUTUH PERKUATAN) 8,6517

19
6.6. Rekapitulasi Evaluasi Elemen Balok Lentur
Tabel 6.14 : Rekapitulasi Evaluasi Momen pada Elemen Balok
Kapasitas Kapasitas SAP
Nama As Penampang Alih Fungsi
Letak Frame Seksi Balok Cek
Elemen Bangunan
φMKap (kN.m) Mu (kN.m)

Tumpuan Kiri (1) 317,88 390,9294 (BUTUH PERKUATAN)


B 1-4 55 Lapangan 317,88 386,6114 (BUTUH PERKUATAN)
Tumpuan Kanan (4) 317,88 393,1262 (BUTUH PERKUATAN)
Tumpuan Kiri (1) 317,88 481,9331 (BUTUH PERKUATAN)
Lantai C 1-4 58 Lapangan 317,88 439,0337 (BUTUH PERKUATAN)
2
Tumpuan Kanan (4) 317,88 482,0899 (BUTUH PERKUATAN)
Tumpuan Kiri (1) 317,88 462,6926 (BUTUH PERKUATAN)
450.800
B1

D 1-4 61 Lapangan 317,88 337,3398 (BUTUH PERKUATAN)


Tumpuan Kanan (4) 317,88 463,7831 (BUTUH PERKUATAN)
Tumpuan Kiri (1) 317,88 382,0371 (BUTUH PERKUATAN)
C 1-4 185 Lapangan 317,88 460,4608 (BUTUH PERKUATAN)
Lantai Tumpuan Kanan (4) 317,88 382,7154 (BUTUH PERKUATAN)
3 Tumpuan Kiri (1) 317,88 475,3420 (BUTUH PERKUATAN)
D 1-4 188 Lapangan 317,88 508,2934 (BUTUH PERKUATAN)
Tumpuan Kanan (4) 317,88 476,0045 (BUTUH PERKUATAN)
2 C-D 214 Lapangan 130,57 152,8088 (BUTUH PERKUATAN)
B3 300.450

Lantai 2 D-E 215 Tumpuan Kanan (E) 160,79 215,7393 (BUTUH PERKUATAN)
3 3 C-D 208 Lapangan 130,57 152,7646 (BUTUH PERKUATAN)
3 D-E 209 Tumpuan Kanan (E) 160,79 214,1892 (BUTUH PERKUATAN)

19
6.7. Rekapitulasi Evaluasi Elemen Balok Geser
Tabel 6.15 : Rekapitulasi Evaluasi Geser pada Elemen Balok
Kapasitas Geser Alih
Nama Kapasitas Penampang
Letak As Bangunan Seksi Balok Fungsi Cek
Elemen
φVn (kN) Vu (kN)

Lantai 2 B 1-4 Tumpuan 240,03 280,8660 (BUTUH PERKUATAN)

Lantai 2 C 1-4 Tumpuan 240,03 332,8000 (BUTUH PERKUATAN)

B1 450.800 Lantai 2 D 1-4 Tumpuan 240,03 278,5230 (BUTUH PERKUATAN)

Lantai 3 C 1-4 Tumpuan 240,03 381,6330 (BUTUH PERKUATAN)

Lantai 3 D 1-4 Tumpuan 240,03 502,2030 (BUTUH PERKUATAN)

Lantai 3 1 C-D Tumpuan 85,77 108,5660 (BUTUH PERKUATAN)

Lantai 3 1 D-E Tumpuan 85,77 97,8370 (BUTUH PERKUATAN)


B2 300.500
Lantai 3 4 C-D Tumpuan 85,77 108,6250 (BUTUH PERKUATAN)

Lantai 3 4 D-E Tumpuan 85,77 99,2730 (BUTUH PERKUATAN)

Lantai 2 2 A-B Tumpuan 76,34 82,2410 (BUTUH PERKUATAN)

Lantai 2 3 A-B Tumpuan 76,34 82,4320 (BUTUH PERKUATAN)


B3 300.450
Lantai 3 2 C-D Tumpuan 76,34 149,1240 (BUTUH PERKUATAN)

Lantai 3 2 D-E Tumpuan 76,34 155,6650 (BUTUH PERKUATAN)

20
Kapasitas Geser Alih
Nama Kapasitas Penampang
Letak As Bangunan Seksi Balok Fungsi Cek
Elemen
φVn (kN) Vu (kN)

Lantai 3 2 E-F Tumpuan 76,34 79,2510 (BUTUH PERKUATAN)

Lantai 3 3 C-D Tumpuan 76,34 149,0980 (BUTUH PERKUATAN)

Lantai 3 3 D-E Tumpuan 76,34 154,5720 (BUTUH PERKUATAN)

Lantai 3 3 E-F Tumpuan 76,34 79,9760 (BUTUH PERKUATAN)


B3 300.450
Lantai Atap 2 E-F Tumpuan 76,34 82,0520 (BUTUH PERKUATAN)

Lantai Atap 2 F-G Tumpuan 76,34 83,4090 (BUTUH PERKUATAN)

Lantai Atap 3 E-F Tumpuan 76,34 127,3630 (BUTUH PERKUATAN)

Lantai Atap 3 F-G Tumpuan 76,34 128,7290 (BUTUH PERKUATAN)

Lantai 3 C' 1-2 Tumpuan 36,91 47,9200 (BUTUH PERKUATAN)

B4 200.350 Lantai 3 C' 2-3 Tumpuan 36,91 37,5990 (BUTUH PERKUATAN)

Lantai 3 C' 3-4 Tumpuan 36,91 47,9140 (BUTUH PERKUATAN)

20
BAB VII
DESAIN
PERKUATAN
7.1. Konsep Perkuatan Struktur
Perubahan fungsi bangunan akan berdampak pada kinerja struktur yang tidak
memenuhi atau tidak mampu memikul beban-beban yang terjadi sehingga bangunan
menjadi tidak aman. Perubahan fungsi bangunan secara langsung akan menambah beban
pada elemen struktur bangunan. Sehingga terdapat kemungkinan bangunan akan
mengalami kegagalan apabila beban ditambahkan melampaui kapasitas yang mampu
dipikul oleh elemen struktur tersebut. oleh karena itu diperlukan perkuatan struktur pada
bangunan yang akan dialih fungsikan.
Terdapat dua jenis perbaikan yang dapat dilakukan pada pekerjaan retrofitting yaitu
repairing dan strengthening. Repairing diartikan sebagai usaha untuk mengembalikan
kembali kekuatan bangunan karena bangunan telah mengalami kerusakan dan mengalami
penurunan kekuatan. Sedangkan strengthening ialah usaha untuk menambah kekuatan
bangunan dalam menahan beban-beban yang bekerja pada bangunan dimana bangunan
tersebut dimungkinkan belum mengalami kerusakan. (Saruni, Dapas, Manalip, 2017).
Metode yang digunakan untuk menambah kekutan struktur (strengthening) dapat
dilakukan dengan dua cara yaitu Concrete Jacketing dan Fiber Reinforced Polymer (FRP).
Concrete Jacketing dilakukan dengan menyelubungkan baja atau steel jacketing.
Sedangkan FRP dilakukan dengan menyelubungkan material ringan fiber
komposit. Perencanaan perkuatan pada tugas besar ini mengacu pada ACI 440.2R-08
Guide for the Design and Construction of Externally Bonded FRP Systems for
Strengthening Concrete Structures. Perencanaan FRP ini meliputi: Perencanaan perkuatan
terhadap lentur (Flexural Strengthening), dan perkuatan terhadap geser (Shear
Strengthening).
Berikut adalah penjelasan tentang metode yang dapat digunakan untuk menambah
kekutan struktur adalah dengan cara menggunakan struktur komposit dan Fiber Reinforced
Polymer (FRP).

7.1.1. Carbon Fiber Reinforced Polymer (CFRP)


Carbon Fiber Reinforced Polymer (CFRP) merupakan material yang berasal dari
bahan yang ringan, mampu menahan kuat tarik tinggi dan tidak korosif. Serat karbon ini

20
mengandung setidaknya 90% berat karbon. Serat karbon tidak menunjukkan korosi atau

20
pecah pada suhu kamar. Perencanaan perkuatan FRP pada tugas besar ini mengacu pada
ACI 440.2R-08 Guide for the Design and Construction of Externally Bonded FRP Systems
for Strengthening Concrete Structures. Perencanaan perkuatan FRP ini meliputi
perencanaan perkuatan lentur dan perkuatan geser.
Dalam tugas besar ini digunakan CRFP produksi SIKA yaitu SIKA CarboDur untuk
perkuatan lentur yang berbentuk plat yang tebalnya 1,2 mm dengan bahan perekat
menggunakan epoxy SIKADUR 30. Serat karbon dalam kandungan CFRP minimal
terdapat 90% berat karbon. Serat karbon ini tidak akan pecah pada suhu kamar dan
terhindar dari korosi. Material ini memiliki berat jenis antara 1,5-1,6 gr/cm3.
Cara pemasangannya adalah dengan mengoleskan epoxy ke beton yang
permukaannya sudah dikasarkan. Epoxy juga dioleskan pada SIKA CarboDur, lalu
direkatkan pada beton. Untuk perkuatan geser digunakan SIKA Wrap yang berbentuk serat
yang tebalnya 0,129 mm dengan bahan perekat menggunakan SIKADUR 330. Cara
pemasangannya adalah dengan mengoleskan epoxy ke permukaan beton yang sudah
dikasarkan, SIKA Wrap ditempelkan pada permukaan beton dan ditekan dengan rol,
sehingga epoxy masuk ke dalam serat dan menjadi komposit.

7.1.2. Struktur Komposit


Struktur komposit merupakan suatu struktur yang terdiri dari dua elemen struktur
dengan bahan material yang berbeda dan bekerja bersama-sama membentuk suatu
kesatuan sehingga menghasilkan sifat gabungan yang lebih baik dari sebelumnya. Struktur
komposit baja dengan beton memiliki dasar pada kemampuan beton yang mempunyai
perilaku yang menguntungkan ketika menerima beban tekan dan perilaku yang kurang
menguntungkan ketika menerima beban tarik. Sedangkan untuk baja mempunyai
kemampuan bahan yang sama baik untuk beban tarik dan tekan tetapi harus diwaspadai
terhadap bahaya tekuk ketika menerima beban tekan.

7.2. Perencanaan Perkuatan Lentur


7.2.1. Perencanaan Perkuatan Lentur pada Balok
Setelah dilakukan analisa kapasitas struktur dan dilakukan evaluasi, didapatkan
beberapa elemen yang tidak memenuhi kekuatan lentur sehingga perlu dilakukan
perkuatan. Perkuatan lentur balok direncanakan menggunakan Carbon Fiber Reinforced
Polymer (CRFP).

20
Berikut adalah contoh perhitungan perkuatan lentur direncanakan menggunakan
Carbon Fiber Reinforced Polymer (CRFP) pada Balok lantai 2 As B 1-4 pada tumpuan
kiri (As 1).
Data Perencanaan
a. Momen pada balok
• Momen Ultimate
Mu = 390,9294 kN.m
• Momen Kapasitas
φMKap = 317,8843 kN.m
• Momen untuk Diperkuat
Mu - φMKap = 390,9294 - 317,8843
= 73,0451 kN.m
• Momen Akibat Beban Mati
MDL = 156,6183 kN.m

b. Data balok eksisting


• Mutu Beton fc' = 35 MPa
• Mutu Tulangan fy = 390 MPa
• Lebar Balok b = 450 mm
• Tinggi Balok h = 800 mm
• Tinggi Efektif d = 739 mm
• Tulangan lentur D = 16 mm
• Tulangan geser ɸ = 13 mm
• Tebal selimut ts = 40 mm

c. Data material FRP


Tipe CRFP yang digunakan Tipe_S = Sika CarboDur S 812

Gambar 7.1 : Data Material CFRP

Gambar 7.2 : Type dan Material Properties FRP

20
- Lebar FRP wf = 80 mm
- Tebal FRP tf = 1,2 mm
- Jumlah FRP = 4 buah (direncanakan)
- Jumlah Lapis FRP n = 1 lapis (direncanakan)
- Kuat Tarik FRP ffu* = 3100 MPa
Modulus elastisitas
- Ef = 165000 MPa
FRP
- Regangan Max εfu* = 1,8%
- Tinggi efektif FRP df = 800,6 mm

1. Perhitungan Desain Material Properties FRP


Berdasarkan Tabel 9.4 pada ACI 440 2R-17, dengan kondisi balok berada di dalam
(interior) dan menggunakan jenis Carbon FRP, maka faktor reduksi lingkungannya
adalah

Gambar 7.3 : Tabel 9.4 pada ACI 440 2R-17

CE = 0,95
ffu = CE x ffu*
= 0,95 x 3100
= 2945 N/mm²

εfu = CE x εfu*
= 0,95 x 1,8%
= 0,01710 mm/mm

20
2. Perhitungan Preliminary
• Properties dari beton:
fc' = 35 MPa
Berdasarkan SNI 2847-2019 Tabel 22.2.2.4.3, nilai β1 untuk fc' = 35 MPa
adalah β1 = 0,8

Modulus elastisitas beton


Ec = 4700ƒ𝑐′
= 27806 N/mm²

• Properties tulangan baja eksisting:


Luas tulangan
As = n tul. 1
x x π x D²
4
= 5 1 ²
x π x 16
x 4
= 1005,31 mm²
Modulus elastisitas baja
Es = 200000 N/mm²

• Properties FRP:
Af = n x tf x wf
= 1 x 4,8 x 80
= 384 mm²

3. Perhitungan Nilai Regangan Pemasangan (εbi)


Ketika dilakukan pemasangan CFRP sebisa mungkin beban hidup (Live
Load) dihilangkan, sehingga hanya beban mati (Dead Load) Struktur dan
beban mati tambahan (Superdead Load) yang berpengaruh
• Dari analisa SAP2000 didapatkan :
MDL 156,618 kN.m

• Momen Inersia Retak (Icr)


Icr = 1
x x b x
k h³ 12

= 0,334 1 450 x 512000000


x 12 x
= 6412800000 mm⁴

20
• Regangan Beton (εbi) yang terjadi
εbi = 𝑀𝐷𝐿 𝑑ƒ − 𝑘 × 𝑑
𝐼𝑐𝑟 × 𝐸𝑐
= 156,6183 800,6 − 0,334 739
6412800000 × 27806
= 86731,14246
178311591235388
= 0,0004864

4. Menentukan Regangan Desain FRP


Menurut ACI 440-2R-17, regangan desain FRP dapat dihitung menggunakan
persamaan 10.1.1 sebagai berikut.

Gambar 7.4 : Persamaan 10.1.1. ACI 440-2R-17

Regangan desain harus lebih kecil dari regangan tekan, maka:


fc'
εfd = 0,41 x
0,9 x εfu

n x Ef x tf
35
= 0,41 x ≤ 0,9 0,01710
x
1 x 165000 1,20
x ≤ 0,0154 (OKE)
= 0,005

5. Memperkirakan Letak Nilai c, Tinggi Garis Netral


Asumsi awal dikalikan 0.2, lalu nantinya akan disesuaikan setelah cek equilibrium
(kesetimbangan)
c = 0,1585 x d (asumsi)
= 0,1585 x 739
= 117 mm

20
6. Menghitung Nilai Regangan Efektif pada Perkuatan FRP
• Regangan Efektif pada Perkuatan FRP
Menurut ACI 440-2R-17, regangan desain FRP dapat dihitung menggunakan persam
10.2.5 sebagai berikut:
εfe = εcu df - c
x - εbi ≤ ε
c
= 0,003 800,6 - 117,1
x 117,1 - 0,0005
0,0170
=

Sehingga εfe = εfd


diambil

• Regangan Beton Saat Pe

εc =

7. Menghitung Regangan pada Tulangan Baja Eksisting


Menurut ACI 440-2R-17, regangan desain FRP dapat dihitung menggunakan
persamaan 10.2.1a sebagai berikut:

d - c
εs = εfd + εbi x
df - c
8. Menghitung Tegangan pada Tulangan Baja dan FRP
739 - 117,1
= 0,005 + 0,0005
• Tegangan pada Tulangan Baja x 800,6 - 117,1
Menurut ACI 440-2R-17, tegangan pada tulangan baja FRP dapat dihitung menggunakan
= 0,0054
persamaan 10.2.1b sebagai berikut:
fs = Es x εs ≤ fy
= 200000 x 0,0054 ≤ 390
= 1080,475 ≤/ 390

Oleh karena itu, nilai fs 390 N/mm2


=

20
• Tegangan pada FRP
ffe = Ef x εfe
= 165000 x 0,005
= 899,43 N/mm²

9. Menghitung Gaya Dalam dan Pemeriksaan Nilai Garis Netral (c)


1,7 x fc'
ε'c = Ec
1,7 x 35
= 27805,57498
= 0,002

4 x ε'c - εc
β₁ = 6 x ε'c - 2 x εc
4 x 0,0021 - 0,0010
= 6 x 0,0021 - 2 x 0,0010
= 0,698
3 x ε'c x εc - εc ²
α₁ = 3 x β₁ x ε'c ²
3 x 0,0021 x 0,0010 - 0,0010 ²
= 3 0,6981 x 0,0021 ²

x
= 0,57
Nilai garis netral akan diperiksa dengan perhitungan awal c dengan persamaan sebagai
berikut.

c = As x fs + Af x ffe
α₁ x fc' x β₁ x b
= 1005,31 x 390 + 384 x 899,43
0,57 x 35 x 0,698 x 450
= (OKE)
118 mm = 118 m

10. Menghitung Komponen Kekuatan Lentur


• Kontribusi Baja untuk Lentur:
β₁ xc
Mns = As x fs x d -
2
0,698x 118
= 1005,31 x 390 x 739 - 2
= 273592622
273,59 Nmm
=
kNm

21
• Kontribusi FRP untuk Lentur:
β₁ xc
Mnf = Af x ffe x df -
2
0,698x 118
= 384,00 x 899 x 800,6 - 2
= 262288517
262,29 Nmm
=
kNm

11. Menghitung Kekuatan Lentur Desain


Menurut ACI 440-2R-17, kekuatan lentur FRP dapat dihitung menggunakan
persamaan 10.2.10d dengan menggunakan faktor reduksi tambahan (ψf) sebesar 0,85
sebagai berikut.

φMn = φ x Mns + ψf x Mnf


= 0,9 x 273,59 + 0,85 x 262,29
= 446,88 kNm

Cek φMn terhadap Mu


φMn ≥ Mu
446,88 kN-m ≥ 390,93 kN-m (OKE)

12. Cek service stress pada tulangan baja dan FRP

k = 2 −
𝜌 𝐸𝑠 𝐸ƒ 𝐸𝑠 𝐸ƒ 𝑑ƒ 𝐸𝑠 + 𝐸ƒ
𝜌𝑠 𝐸𝑐 + 𝜌ƒ 𝐸𝑐 + 2 𝜌𝑠 𝐸𝑐 + 𝜌ƒ 𝐸𝑐𝑑 𝜌
𝑠 ƒ
𝐸𝑐 𝐸𝑐

diketahui:
Es = 200000 N/mm²
Ec = 27806 N/mm²
Ef = 165000 N/mm²
df = 800,6 mm
d = 739 mm
Menghitung rasio dari baja tulangan
(ρs) As
ρs =

b x d
1005,31
= 450 x 739
= 0,00302

21
Sehingga, nilai k adalah:
k = 8,18E-04 + 0,05833 - 0,0285962

= 0,243212906 - 0,0285962
= 0,2146
k= 158,60
Lakukan perhitungan stress level pada tulangan baja seperti pada persamaan 10.2.10.1
dan pastikan bahwa mendapatkan hasil kurang dari 0,8fy.
𝐾𝑑
𝑀𝑠 + s𝑏i. 𝐴ƒ. 𝐸ƒ 𝑑ƒ − 𝑑 − 𝑘𝑑 𝐸𝑠
fs,s = 3
𝑑ƒ − 𝐾𝑑𝑑 − 𝑘𝑑 𝐾𝑑
𝐴𝑠. 𝐸𝑠. + 𝐴ƒ. 𝐸ƒ 𝑑ƒ − (𝑑ƒ − 𝑘𝑑)
3 3
= 390,9294 + 0,00049 384 165000 800,6 - 52,9 739 - 158,60 200000
1005,31 200000 800,6 - 52,9 739 - 158,6 + 384 165000 747,7 580,40

= 2674979996259910
114754568924335
= 23,31

13. Perencanaan panjang penyaluran


Perhitungan panjang penyaluran yang direncanakan mengacu pada peraturan ACI
4402R 2017. Panjang penyaluran dipasang menerus ke arah lapangan dan ke arah
tumpuan sehingga melewati kolom.

nxEfxtf fc'
ldf =

1x165000x1,2
= 35

= 182,943 mm
= 200 mm

21
7.2.2. Perencanaan Perkuatan Lentur pada Pelat
Setelah dilakukan analisa kapasitas struktur dan dilakukan evaluasi, didapatkan
beberapa elemen yang tidak memenuhi kekuatan lentur sehingga perlu dilakukan
perkuatan. Perkuatan lentur pelat direncanakan menggunakan Carbon Fiber Reinforced
Polymer (CRFP).
Berikut adalah contoh perhitungan perkuatan lentur direncanakan menggunakan
Carbon Fiber Reinforced Polymer (CRFP) pada Pelat C-C’ 1-2.
Data Perencanaan
a. Momen pada balok
• Momen Ultimate
Mu = 17,6589 kN.m
• Momen Kapasitas
φMKap = 14,9908 kN.m
• Momen untuk Diperkuat
Mu - φMKap = 17,6589 - 14,9908
= 2,6681 kN.m
• Momen Akibat Beban Mati
MDL = 12,6135 kN.m

b. Data balok eksisting


• Mutu Beton fc' = 35 MPa
• Mutu Tulangan fy = 390 MPa
• Bentang Pelat L = 3000 Mm
• Lebar Pelat yang ditinjau b = 1000 mm
• Tebal Pelat h = 120 mm
• Tinggi Efektif d = 85 mm
• Tulangan lentur D = 10 mm
• Jarak antar Tulangan s = 150 mm
• Tebal selimut ts = 30 mm

c. Data material FRP


Tipe CRFP yang digunakan Tipe_S = Sika CarboDur S 512

Gambar 7.5 : Data Material CFRP

21
Gambar 7.6 : Type dan Material Properties FRP

- Lebar FRP wf = 50 mm
- Tebal FRP tf = 1,2 mm
- Jumlah FRP = 1 buah (direncanakan)
- Jumlah Lapis FRP n = 1 lapis (direncanakan)
- Kuat Tarik FRP ffu* = 3100 MPa
Modulus elastisitas
- Ef = 165000 MPa
FRP
- Regangan Max εfu* = 1,8%
- Tinggi efektif FRP df = 120,6 mm

1. Perhitungan Desain Material Properties FRP


Berdasarkan Tabel 9.4 pada ACI 440 2R-17, dengan kondisi balok berada di dalam
(interior) dan menggunakan jenis Carbon FRP, maka faktor reduksi lingkungannya
adalah

Gambar 7.7 : Tabel 9.4 pada ACI 440 2R-17

CE =
ffu = CE x ffu*
= 0,95 x 3100
= 2945 N/mm²

εfu = CE x εfu*
= 0,95 x 1,8%
= 0,01710 mm/mm

21
2. Perhitungan Preliminary
• Properties dari beton:
fc' = 35 MPa
Berdasarkan SNI 2847-2019 Tabel 22.2.2.4.3, nilai β1 untuk fc' = 35 MPa adalah
β1 = 0,8

Modulus elastisitas beton


Ec = 4700ƒ𝑐′
= 27806 N/mm²

• Properties tulangan baja eksisting:


Luas tulangan
0,25 × π × d² × b
As = s
0,25 x π x 10 ² x 1000
= 150
= 523,60 mm²
Modulus elastisitas baja
Es = 200000 N/mm²

• Properties FRP:
Af = n x tf x wf
= 1 x 1,2 x 50
= 60 mm²

3. Perhitungan Nilai Regangan Pemasangan (εbi)


Ketika dilakukan pemasangan CFRP sebisa mungkin beban hidup (Live
Load) dihilangkan, sehingga hanya beban mati (Dead Load) Struktur dan
beban mati tambahan (Superdead Load) yang berpengaruh
• Dari analisa SAP2000 didapatkan :
MDL 12,614 kN.m

• Momen Inersia Retak (Icr)


Icr = k x

21
• Regangan Beton (εbi) yang terjadi
εbi = 𝑀𝐷𝐿 𝑑ƒ − 𝑘 × 𝑑
𝐼𝑐𝑟 × 𝐸𝑐
= 12,6135 120,6 − 0,334 85
48096000 27806

×
= 1163,090835
1337336934265
= 0,0008697

4. Menentukan Regangan Desain FRP


Menurut ACI 440-2R-17, regangan desain FRP dapat dihitung menggunakan
persamaan 10.1.1 sebagai berikut.

Gambar 7.8 : Persamaan 10.1.1. ACI 440-2R-17

Regangan desain harus lebih kecil dari regangan tekan, maka:


fc'
εfd = 0,41 x
0,9 x εfu

n x Ef x tf
35
= 0,41 x ≤ 0,9 0,01710
x
1 x 165000 1,20
x ≤ 0,0154 (OKE)
= 0,005

5. Memperkirakan Letak Nilai c, Tinggi Garis Netral


Asumsi awal dikalikan 0.2, lalu nantinya akan disesuaikan setelah cek equilibrium
(kesetimbangan)
c = 0,21 x d (asumsi)
= 0,21 x 85
= 18 mm

21
6. Menghitung Nilai Regangan Efektif pada Perkuatan FRP
• Regangan Efektif pada Perkuatan FRP
Menurut ACI 440-2R-17, regangan desain FRP dapat dihitung menggunakan persamaan 10.2.5 sebagai
berikut:
df - c
εfe = εcu x - εbi ≤
εfd c

= 0,003 120,6 - 17,9


x - 0,0009 ≤ 0,005
17,9
= 0,0164 ≥ 0,005 (NOT OK

Sehingga diambil
εfe = εfd 0,005
=

• Regangan Beton Saat Perkuatan FRP


c
εc = εfd + εbi x
df - c

= 0,005 + 0,0009 17,9


x 120,6 - 17,9
= 0,0011

7. Menghitung Regangan pada Tulangan Baja Eksisting


Menurut ACI 440-2R-17, regangan desain FRP dapat dihitung menggunakan
persamaan 10.2.1a sebagai berikut:
d-c
εs = εfd + εbi
x df-c
85-17,9
= 0,005 + 0,0009 x 120,6-17,9

= 0,0041

8. Menghitung Tegangan pada Tulangan Baja dan FRP


• Tegangan pada Tulangan Baja
Menurut ACI 440-2R-17, tegangan pada tulangan baja FRP dapat dihitung menggunakan
persamaan 10.2.1b sebagai berikut:
fs = Es x εs ≤ fy
= 200000 x 0,0041 ≤ 390
= 826,167 ≥ 390

Oleh karena itu, nilai fs 390 N/mm2


=

• Tegangan pada FRP


ffe = Ef x εfe
= 165000 x 0,005

21
= 899,43 N/mm²

21
9. Menghitung Gaya Dalam dan Pemeriksaan Nilai Garis Netral (c)
1,7 x fc'
ε'c = Ec
1,7 x 35
= 27805,57498
= 0,002
4 x ε'c - εc
β₁ = 6 x ε'c - 2 x εc
4 x 0,0021 - 0,0011
= 6 x 0,0021 - 2 x 0,0011
= 0,701
3 x ε'c x εc - εc ²
α₁ = 3 x β₁ x ε'c ²
3 x 0,0021 x 0,0011 - 0,0011 ²
= 3 0,7011 x 0,0021 ²

x
= 0,61
Nilai garis netral akan diperiksa dengan perhitungan awal c dengan persamaan sebagai
berikut.
As x fs + Af x ffe
c = α₁ x fc' x β₁ x b
523,60 x 390 + 60 x 899,43
= 0,61 35 0,701 1000

x x x
= 18 mm = 18 mm (OKE)

10. Menghitung Komponen Kekuatan Lentur


• Kontribusi Baja untuk Lentur:

β₁ x c
Mns = As x fs x d - 2
0,701 x 18
= 523,60 x 390 x 85 - 2
= 16068874 Nmm
= 16,07 kNm

21
• Kontribusi FRP untuk
Lentur:
β₁ xc
x df -
Mnf = Af x ffe 2
0,701x18
= 60,00 x 899 x 2
120,6 -

= 6167804 Nmm
= 6,17 kNm

11. Menghitung Kekuatan Lentur Desain


Menurut ACI 440-2R-17, kekuatan lentur FRP dapat dihitung menggunakan
persamaan 10.2.10d dengan menggunakan faktor reduksi tambahan (ψf) sebesar 0,85
sebagai berikut.

φMn = φ x Mns + ψf x Mnf


= 0,9 x 16,07 + 0,85 x
= 19,18 kNm

Cek φMn terhadap Mu


φMn
19

12. Cek service stress pada tulangan baja dan FRP

k = 2 −
𝜌 𝐸𝑠 𝐸ƒ 𝐸𝑠 𝐸ƒ 𝑑ƒ 𝐸𝑠 + 𝐸ƒ
𝜌𝑠 𝐸𝑐 + 𝜌ƒ 𝐸𝑐 + 2 𝜌𝑠 𝐸𝑐 + 𝜌ƒ 𝐸𝑐𝑑 𝜌
𝑠 ƒ
𝐸𝑐 𝐸𝑐

diketahui:
Es = 200000 N/mm²
Ec = 27806 N/mm²
Ef = 165000 N/mm²
df = 120,6 mm
d = 85 mm
Menghitung rasio dari baja tulangan
(ρs) As
ρs =
b x d
523,60
= 1000 x 85
= 0,00616

22
Lakukan perhitungan stress level pada tulangan baja seperti pada persamaan 10.2.10.1
dan pastikan bahwa mendapatkan hasil kurang dari 0,8fy.
𝐾𝑑
𝑀𝑠 + s𝑏i. 𝐴ƒ. 𝐸ƒ 𝑑ƒ − 𝑑 − 𝑘𝑑 𝐸𝑠
fs,s = 3
𝑑ƒ − 𝐾𝑑 𝑑 − 𝑘𝑑 𝐾𝑑
𝐴𝑠. 𝐸𝑠. + 𝐴ƒ. 𝐸ƒ 𝑑ƒ − (𝑑ƒ − 𝑘𝑑)
3
3
= 17,6589+0,0008760 165000 120,6-7,785-23,14 200000
523,602000007,7 120,6 - 85 -23,14 + 60 165000 112,9 61,86

= 12025843840147
800440696691
= 15,02

fs,s < 0,8fy


15,02 < 312 (OKE)

13. Perencanaan panjang penyaluran


Perhitungan panjang penyaluran yang direncanakan mengacu pada peraturan ACI
4402R 2017. Panjang penyaluran dipasang menerus ke arah lapangan dan ke arah
tumpuan sehingga melewati kolom.

nxEfxtf fc'
ldf =

1x165000x1,2
= 35

= 182,943 mm
= 200 mm

22
7.3. Perencanaan Perkuatan Geser pada Balok
Setelah dilakukan analisa kapasitas struktur dan dilakukan evaluasi, didapatkan
beberapa elemen yang tidak memenuhi kekuatan geser sehingga perlu dilakukan
perkuatan. Perkuatan lentur pelat direncanakan menggunakan Sika Wrap
Berikut adalah contoh perhitungan perkuatan lentur direncanakan menggunakan Sika
Wrap pada Balok lantai 2 As B 1-4 pada tumpuan.
Data Perencanaan
a. Momen pada balok
• Geser Ultimate
Vu = 280,8660 kN
• Geser Kapasitas
φVn = 240,0331 kN
• Geser Tulangan
Vs = 320,0441 kN
• Geser Beton
Vc = 0 kN

b. Data balok eksisting


• Mutu Beton fc' = 35 MPa
• Mutu Tulangan fyv = 240 MPa
• Lebar Balok b = 450 Mm
• Tinggi Balok h = 800 mm
• Tinggi Efektif d = 739 mm
• Tulangan lentur D = 16 mm
• Tulangan geser ɸ = 13 mm
• Tebal selimut ts = 40 mm
• Tebal pelat lt 3 tp = 120 mm
• Tinggi Efektif dfv = h – ts – tp – ɸ – D/2
= 800 – 40 – 120 – 13 – 16/2
= 619 mm
c. Data material FRP
Tipe CRFP yang digunakan Tipe = Sika Wrap 301 C

22
- Lebar FRP wf = 500 mm
- Tebal FRP tf = 0,167 mm
- Jumlah Lapis FRP n = 1 lapis (direncanakan)
- Kuat Tarik FRP ffu* = 4900 MPa
Modulus elastisitas
- Ef = 230000 MPa
FRP
- Regangan Max εfu* = 1,7%
- Tinggi efektif FRP df = 120,6 mm

1. Perhitungan Desain Material Properties FRP


Berdasarkan Tabel 9.4 pada ACI 440 2R-17, dengan kondisi balok berada di dalam
(interior) dan menggunakan jenis Carbon FRP, maka faktor reduksi lingkungannya
adalah

Gambar 7.9 : Tabel 9.4 pada ACI 440 2R-17

CE = 0,95
ffu = CE x ffu*
= 0,95 x 4900
= 4655 N/mm²

εfu = CE x εfu*
= 0,95 x 0,017
= 0,01615 mm/mm

22
2. Perhitungan Regangan Efektif FRP
23300
Le = 0,58
n x tf x Ef
23300
= 0,58
1 x 0,167 x 230000
23300
= 456,01
= 51,09
mm

⅔ dfv - Le
fc' k2 =
k1 = dfv
27
⅔ 619 - 51,09
35 = 619
=
27 = 0,917
= 1,19

k1 x k2 x Le
Kv = ≤
0,750
11900 εfu

x
1,19 x 0,92 x 51,09
= ≤ 0,750
11900 x 0,01615
= 0,2900 ≤ 0,750 (OKE)

• Regangan Efektif pada Perkuatan FRP


εfe = Kv x εfu ≤ 0,004
= 0,290 x 0,01615 ≤ 0,004
= 0,00468 ≥ 0,004 (NOT OKE)

Sehingga εfe = 0,0040


diambil
3. Perhitungan Kontribusi FRP terhadap Kekuatan Geser
• Luas Area FRP
Afv = 2 x n x tf x wf
= 2 x 1 x 0,167 x 500
= 167 mm²

22
• Tegangan Efektif pada FRP
ffe = Ef εfe
x 0,0040
= 230000
x
= 920 N/mm²

• Kontribusi Geser dari FRP


Afv x ffe x ( sin α + cos α ) x dfv
Vf = sf
dimana:
α = 90 °
sin α = 1
cos α = 0

Sehingga, nilai Vf adalah:


167 x 920 x( 1 + 0 ) x 619
Vf = 650
= 146313 N
= 146,31 kN
4. Perhitungan Kekuatan Geser Desain
ψf = 0,85 (untuk U-wraps)

φVn = φ x Vc + Vs + ψf x Vf
= 0,75 x 0,00 + 320,04 + 0,85 x 146,31
= 333,31 kN

Cek φVn terhadap Vu


φVn ≥ Vu
333,31 kN ≥ 280,87 kN (OKE)

Cek Batas Maksimum Perkuatan Geser


Vc Vf 0,66 x ƒ𝑐′ b x d

+ ≤ x
0,00 + 146,31 ≤ 0,66 x 5,9161 450 x 739

x
146,31 kN ≤ 1298,48 kN
146,31 kN ≤ 1298,48 kN (OKE)

22
7.4. Rekapitulasi Hasil Perkuatan
7.4.1. Rekapitulasi Perkuatan Lentur Pelat
Tabel 7.1 : Rekapitulasi Perkuatan Lentur Pelat
Kapasitas Kapasitas Kebutuhan CRFP
Panjang
Nama Arah SAP Alih Setelah
Letak As Bangunan Cek Jumlah Jumlah Penyaluran
Elemen Fungsi Perkuatan Tipe CFRP
Lapis FRP
Tumpuan Mu (kN.m) φMn (kN.m) Ldf (mm)
C - C' 1 - 2 X 17,6589 19,1804 (OKE) Sika CarboDur S 512 1 1 190
C - C' 2 - 3 X 16,6242 19,1810 (OKE) Sika CarboDur S 512 1 1 190
Pelat Lantai

C - C' 3 - 4 X 17,6583 19,1804 (OKE) Sika CarboDur S 512 1 1 190


C' - D 1 - 2 X 17,6583 19,1803 (OKE) Sika CarboDur S 512 1 1 190
Lantai 3 C' - D 3 - 4 X 17,7016 19,1803 (OKE) Sika CarboDur S 512 1 1 190
D' - E 1 - 2 X 16,4080 19,1812 (OKE) Sika CarboDur S 512 1 1 190
D' - E 2 - 3 X 20,0273 23,6967 (OKE) Sika CarboDur S 512 1 2 190
D' - E 3 - 4 X 16,3233 19,1812 (OKE) Sika CarboDur S 512 1 1 190
E' - F 2 - 3 X 12,4789 19,1837 (OKE) Sika CarboDur S 512 1 1 190
Lantai E' - F 3 - 4 X 11,9557 19,1841 (OKE) Sika CarboDur S 512 1 1 190
Pelat
Atap

Atap F - F' 2 - 3 X 12,5792 19,1837 (OKE) Sika CarboDur S 512 1 1 190


F - F' 3 - 4 X 12,1123 19,1840 (OKE) Sika CarboDur S 512 1 1 190

22
7.4.2. Rekapitulasi Perkuatan Lentur Balok
Tabel 7.2 : Rekapitulasi Perkuatan Lentur Balok
Kapasitas Kapasitas Kebutuhan CRFP
Panjang
Nama As SAP Alih Setelah
Letak Seksi Balok Cek Jumlah Jumlah Penyaluran
Elemen Bangunan Fungsi Perkuatan Tipe CFRP
Lapis FRP
Mu (kN.m) φMn (kN.m) Ldf (mm)
Tumpuan Kiri (1) 390,9294 446,8841 (OKE) Sika CarboDur S 812 1 4 200
B 1-4 Lapangan 386,6114 398,3417 (OKE) Sika CarboDur S 812 1 3 200
Tumpuan Kanan 393,1262 446,8841 (OKE) Sika CarboDur S 812 1 4 200
(4)
Lantai 2 Tumpuan Kiri (1) 481,9331 544,0478 (OKE) Sika CarboDur S 812 1 6 200
C 1-4 Lapangan 439,0337 447,0988 (OKE) Sika CarboDur S 812 1 4 200
Tumpuan Kanan 482,0899 544,0476 (OKE) Sika CarboDur S 812 1 6 200
(4)
Tumpuan Kiri (1) 462,6926 544,0459 (OKE) Sika CarboDur S 812 1 6 200
B1 450.800

D 1-4 Lapangan 337,3398 349,2327 (OKE) Sika CarboDur S 812 1 2 200


Tumpuan Kanan 463,7831 544,0445 (OKE) Sika CarboDur S 812 1 6 200
(4)
Tumpuan Kiri (1) 382,0371 447,4942 (OKE) Sika CarboDur S 812 1 4 200
C 1-4 Lapangan 460,4608 497,2566 (OKE) Sika CarboDur S 812 1 5 200
Tumpuan Kanan 382,7154 447,4939 (OKE) Sika CarboDur S 812 1 4 200
Lantai 3 (4)
Tumpuan Kiri (1) 475,3420 544,7674 (OKE) Sika CarboDur S 812 1 6 200
D 1-4 Lapangan 508,2934 521,5715 (OKE) Sika CarboDur S 812 2 4 300
Tumpuan Kanan 476,0045 544,7665 (OKE) Sika CarboDur S 812 1 6 200
(4)
2 C-D Lapangan 152,8088 281,4608 (OKE) Sika CarboDur S 512 1 1 200
300.450

2 D - E Tumpuan Kanan 215,7393 312,2834 (OKE) Sika CarboDur S 512 1 2 200


B3

Lantai 3 (E)
3 C-D Lapangan 152,7646 281,4608 (OKE) Sika CarboDur S 512 1 1 200

22
3 D - E Tumpuan Kanan 214,1892 312,5748 (OKE) Sika CarboDur S 512 1 2 200
(E)

22
7.4.3. Rekapitulasi Perkuatan Geser Balok
Tabel 7.3 : Rekapitulasi Perkuatan Geser Balok
Kapasitas SAP Kapasitas Setelah Kebutuhan CRFP
Nama Seksi
Letak As Bangunan Alih Fungsi Perkuatan Cek Jumlah
Elemen Balok Tipe CFRP
Vu (kN) Vu (kN) Lapis
B 1-4 Tumpuan 280,8660 333,3073 (OK) Sika Wrap 301C 1
Lantai 2 C 1-4 Tumpuan 332,8000 333,3073 (OK) Sika Wrap 301C 1
B1 D 1-4 Tumpuan 278,5230 333,3073 (OK) Sika Wrap 301C 1
450.800 C 1-4 Tumpuan 381,6330 390,4972 (OK) Sika Wrap 301C 2
Lantai 3 D 1-4 Tumpuan 502,2030 516,9801 (OK) Sika Wrap 600C 4
1 C-D Tumpuan 108,5660 134,2862 (OK) Sika Wrap 301C 1
B2 1 D-E Tumpuan 97,8370 134,2862 (OK) Sika Wrap 301C 1
Lantai 3 4 C-D Tumpuan 108,6250 134,2862 (OK) Sika Wrap 301C 1
300.500
4 D-E Tumpuan 99,2730 134,2862 (OK) Sika Wrap 301C 1
2 A-B Tumpuan 82,2410 117,3271 (OK) Sika Wrap 301C 1
Lantai 2 3 A-B Tumpuan 82,4320 117,3271 (OK) Sika Wrap 301C 1
2 C-D Tumpuan 149,1240 151,0723 (OK) Sika Wrap 301C 3
2 D-E Tumpuan 155,6650 161,7337 (OK) Sika Wrap 600C 2
2 E-F Tumpuan 79,2510 117,3271 (OK) Sika Wrap 301C 1
Lantai 3 3 C-D Tumpuan 149,0980 161,7337 (OK) Sika Wrap 600C 2
B3
3 D-E Tumpuan 154,5720 161,7337 (OK) Sika Wrap 600C 2
300.450
3 E-F Tumpuan 79,9760 120,3408 (OK) Sika Wrap 301C 1
2 E-F Tumpuan 82,0520 120,3408 (OK) Sika Wrap 301C 1
2 F-G Tumpuan 83,4090 120,3408 (OK) Sika Wrap 301C 1
Lantai Atap 3 E-F Tumpuan 127,3630 142,6732 (OK) Sika Wrap 301C 2
3 F-G Tumpuan 128,7290 142,6732 (OK) Sika Wrap 301C 2
C' 1-2 Tumpuan 47,9200 60,5496 (OK) Sika Wrap 301C 1
B4
Lantai 3 C' 2-3 Tumpuan 37,5990 60,5496 (OK) Sika Wrap 301C 1
200.350 C' 3-4 Tumpuan 47,9140 60,5496 (OK) Sika Wrap 301C 1

22
7.5. Metode Pelaksanaan Perkuatan Lentur
Penjelasan di bawah ini merupakan gambaran mengenai prosedur yang harus
dipenuhi untuk pelaksanaan perkuatan dengan serat carbon, Sika CarboDur Laminatess
yang harus dipenuhi untuk mendapatkan hasil yang dapat diterima. Gambaran prosedur
tersebut adalah sebagai berikut.

7.5.1. Persiapan Permukaan


- Persyaratan Teknis
1. Pekerjaan pembongkaran dinding dan lantai untuk memudahkan dalam pemasangan
CRFP pada permukaan beton pada balok dan plat
2. Permukaan beton yang akan diperkuat harus bersih, kering dan rata yakni tidak ada
bagian dari permukaan yang menonjol ataupun terdapat lubang. Menghilangkan
debu, minyak, senyawa kimia, partikel asing, dan bahan ikatan lainnya termasuk cat
dari permukaan beton dengan membersihkan atau cara mekanis yang lain sebelum
instalasi CRFP Laminates dilakukan.
3. Apabila terdapat permukaan beton yang kondisinya buruk harus diperbaiki terlebih
dahulu. Perbaikan yang dilakukan yaitu dengan chipping hingga mencapai bagian
beton yang padat dengan menggunakan alat manual atau mekanis, antara lain pahat
beton dan jack hammer kecil.
4. Bersihkan bagian yang telah diperbaiki dengan kompressor udara atau vacuum
cleaner.
5. Seluruh bagian bekisting harus dipasang dengan baik dan bebas dari kebocoran serta
harus diolesi dengan release agent untuk mempermudah pelepasan bekisting.
- Langkah Kerja
Langkah kerja pada persiapan permukaan adalah sebagai berikut :
1. Lakukan pembongkaran pelat yang akan dipasang CFRP sesuai dengan gambar pada
shop drawing.

Gambar 7.10 : Pembongkaran Pelat

23
2. Permukaan beton yang akan diberi perkuatan CFRP harus dibersihkan dan diratakan,
tidak terdapat bagian yang menonjol ataupun berlubang
3. Potong Sika Carbodur sesuai kebutuhan untuk dipasang di balok sesuai perhitungan.
4. Permukaan Sika Carbodur dengan kuas dan air secara hati - hati.
5. Tunggu sampai permukaan Sika Wrap benar-benar kering sebelum diberi bahan
perekat adhesif.
6. Oleskan Sikadur 30 sebagai bahan perekat pada Sika Wrap menggunakan spatula
khusus.

7.5.2. Material yang Digunakan


1. Bahan Perekat untuk melekatkan Sika CarboDur Laminates (Sikadur 30)
2. Sistem perkuatan yang ekstra kuat untuk beton bertulang (Sika CarboDur S
512/laminates & Sika CarboDur S 812). Sika CarboDur S 512 & CarboDur S 812
merupakan bahan perkuatan dari serat karbon yang berbentuk laminate yang
memenuhi persyaratan spesifikasi system perkuatan ekstra kuat untuk balok beton
bertulang.
3. Kuas dan Spatula.
4. Baut angkur M12.
5. Scaffolding.
6. Cutter, hammer, drill, spatula dll.

7.5.3. Prosedur Pelaksanaan


1. Oleskan Sikadur 30 sebagai bahan perekat pada Sika Carbodur S512 atau Sika
Carbodur S812 menggunakan spatula khusus.

Gambar 7.11 : Perataan Sika Carbodur dengan Roller

23
2. Tempelkan Sika Carbodur S512 atau Sika Carbodur S812 yang telah dilapisi bahan
perekat Sikadur 30 pada permukaan beton rencana.
3. Tekan menggunakan roller sampai lem keluar di kedua sisi Sika Carbodur S512 atau
Sika Carbodur S812 sehingga bahan menyatu sepenuhnya dengan beton.
4. Lakukan pengecekan dengan mengetuk - ngetuk permukaan Sika Carbodur S512
atau Sika Carbodur S812 untuk memastikan tidak ada bagian yang masih kosong.
5. Apabila masih ada bagian yang masih kosong, segera lakukan penambahan Sikadur
30 di bagian tersebut.
Quality Plan
1. Pastikan Sika Carbodur S512 atau Sika Carbodur S812 terpasang rapi dan rata (tidak
bergelombang).
2. Pastikan tidak ada bagian yang patah ataupun tertekuk pada Sika Carbodur S512 atau
Sika Carbodur S812.
3. Pastikan Sika Carbodur S512 atau Sika Carbodur S812 tidak terdapat Sikadur 30
pada bagian permukaan luarnya.
4. Bersihkan sisa – sisa sikadur 30 pada beton.
Analisa K3
1. Gunakan Alat Pelindung Diri (helm, masker dan sarung tangan) ketika bekerja.
2. Berhati – hatilah saat bekerja di ketinggian.
3. Bersihkan peralatan setelah selesai digunakan.

7.6. Metode Pelaksanaan Perkuatan Geser


7.6.1. Persiapan Permukaan
- Persyaratan Teknis
1. Pekerjaan pembongkaran plesteran untuk memudahkan dalam pemasangan CFRP
pada permukaan beton pada balok
2. Permukaan beton yang akan diperkuat harus bersih, kering dan rata yakni tidak ada
bagian dari permukaan yang menonjol ataupun terdapat lubang. Menghilangkan
debu, minyal, senyawa kimia, partikel asing, dan bahan ikatan lainnya termasuk cat
dari permukaan beton dengan membersihkan atau cara mekanis yang lain sebelum
instalasi CRFP Wrap dilakukan.
3. Permukaan beton harus dikasarkan dengan alat mekanis, antara lain Diamond Whell

23
Grinding untuk mendapatkan permukaan yang kasar.
4. Permukaan yang mengalami kerusakan atau terdapat lubang-lubang besar harus
diperbaiki dengan mengisi/menutup kerusakan tersebut.
5. Bersihkan permukaan dari debu dengan menggunakan kompressor udara atau
vacuum cleaner.

- Langkah Kerja
Langkah kerja pada persiapan permukaan adalah sebagai berikut.

Gambar 7.12 : Pembongkaran Dinding

1. Lakukan pembongkaran dinding atau komponen fasad yang terpasang di bawah


balok yang akan diperkuat.
2. Permukaan beton yang akan diperkuat harus dibersihkan dan diratakan, tidak
terdapat bagian yang menonjol ataupun berlubang
3. Potong Sika Wrap sesuai kebutuhan untuk dipasang di balok sesuai perhitungan.
4. Permukaan Sika Wrap dengan kuas dan air secara hati - hati sehingga tidak
terkontaminasi debu.
5. Tunggu sampai permukaan Sika Wrap benar-benar kering sebelum diberi bahan
perekat adhesif.

Gambar 7.13 : Pengaplikasian Sikadur 30 Pada Sika Wrap

23
6. Oleskan Sikadur 30 sebagai bahan perekat pada Sika Wrap menggunakan spatula
khusus.

7.6.2. Material yang Digunakan


1. Bahan Perekat Sikadur 30
2. CFRP Sika Wrap 301C dan 600C
3. Kuas dan Spatula
4. Baut angkur M12
5. Scaffolding
6. Cutter, hammer, drill, spatula dll.

7.6.3. Prosedur Pelaksanaan


1. Tempelkan Sika Wrap yang telah dilapisi bahan perekat Sikadur 30 pada permukaan
beton rencana.
2. Tekan menggunakan roller sampai lem keluar di kedua sisi Sika Wrap sehingga
bahan menyatu sepenuhnya dengan beton.

Gambar 7.14 : Pemasangan Sika Wrap pada Beton

3. Pasangkan baut angkur menggunakan bor pada bagian balok sesuai shop drawing

Gambar 7.15 : Pemasangan Baut Angkur Menggunakan Bor pada Bagian Balok

23
4. Lakukan pengecekan dengan mengetuk – ngetuk permukaan Sika Wrap untuk
memastikan tidak ada bagian yang masih kosong.
5. Apabila masih ada bagian yang masih kosong, segera lakukan penambahan Sikadur
30 di bagian tersebut.
Quality Plan
1. Pastikan Sika Wrap terpasang rapi dan rata (tidak bergelombang).
2. Pastikan Sika Wrap tidak terdapat Sikadur 30 pada bagian permukaan luarnya.
3. Bersihkan sisa – sisa sikadur 30 pada beton.
Analisa K3
1. Gunakan Alat Pelindung Diri (helm, masker dan sarung tangan) ketika bekerja.
2. Berhati – hatilah saat bekerja di ketinggian.
3. Bersihkan peralatan setelah selesai digunakan

23
7.7. Rencana Anggaran Biaya Perkuatan
7.7.1. Perhitungan Volume Sikadur
Tabel 7.4 : Volume Kebutuhan CFRP S 812 untuk Perkuatan Lentur Balok

Nama As Panjang Kebutuhan Panjang Panjang Panjang Panjang


Elemen
Letak Seksi Balok Tipe CFRP Pemasangan CRFP Kebutuhan Penyaluran Konektor Total
Bangunan
m Lapis Buah m m m m
Tumpuan Kiri (1) Sika CarboDur S 812 2,125 1 4 8,5 0,20 1,640 10,340
B 1-4 Lapangan Sika CarboDur S 812 4,250 1 3 12,75 0,40 0 13,150
Tumpuan Kanan (4) Sika CarboDur S 812 2,125 1 4 8,5 0,20 1,640 10,340
Lantai Tumpuan Kiri (1) Sika CarboDur S 812 2,125 1 6 12,75 0,20 1,960 14,910
C 1-4 Lapangan Sika CarboDur S 812 4,250 1 4 17 0,40 0 17,400
2
Tumpuan Kanan (4) Sika CarboDur S 812 2,125 1 6 12,75 0,20 1,960 14,910
B1 4 5 .80 0

Tumpuan Kiri (1) Sika CarboDur S 812 2,125 1 6 12,75 0,20 1,960 14,910
D 1-4 Lapangan Sika CarboDur S 812 4,250 1 2 8,5 0,40 0 8,900
Tumpuan Kanan (4) Sika CarboDur S 812 2,125 1 6 12,75 0,20 1,960 14,910
Tumpuan Kiri (1) Sika CarboDur S 812 2,125 1 4 8,5 0,20 1,640 10,340
C 1-4 Lapangan Sika CarboDur S 812 4,250 1 5 21,25 0,40 0 21,650
Lantai Tumpuan Kanan (4) Sika CarboDur S 812 2,125 1 4 8,5 0,20 1,640 10,340
3 Tumpuan Kiri (1) Sika CarboDur S 812 2,125 1 6 12,75 0,20 1,960 14,910
D 1-4 Lapangan Sika CarboDur S 812 4,250 2 4 34 0,60 0 34,600
Tumpuan Kanan (4) Sika CarboDur S 812 2,125 1 6 12,75 0,20 1,960 14,910
JUMLAH KEBUTUHAN CFRP S 812 226,52

23
Tabel 7.5 : Volume Kebutuhan CFRP S 512 untuk Perkuatan Lentur Balok

Tabel 7.6 : Volume Kebutuhan CFRP S 512 untuk Perkuatan Pelat


Panjang Lebar Panjang Kebutuhan Panjang Panjang Panjang
Nama Arah
Letak As Bangunan Tipe CFRP Pelat CFRP Pemasangan CRFP Kebutuhan Penyaluran Total
Elemen
Tumpuan m m m Lapis Buah m m m
C - C' 1-2 X Sika CarboDur S 512 3 0,05 0,75 1 1 0,75 0,2 0,94
C - C' 2-3 X Sika CarboDur S 512 3 0,05 0,75 1 1 0,75 0,2 0,94
Pelat Lantai

C - C' 3-4 X Sika CarboDur S 512 3 0,05 0,75 1 1 0,75 0,2 0,94
Lantai C' - D 1-2 X Sika CarboDur S 512 3 0,05 0,75 1 1 0,75 0,2 0,94
3 C' - D 3-4 X Sika CarboDur S 512 3 0,05 0,75 1 1 0,75 0,2 0,94
D' - E 1-2 X Sika CarboDur S 512 2,5 0,05 0,625 1 1 0,625 0,2 0,815
D' - E 2-3 X Sika CarboDur S 512 2,5 0,05 0,625 1 2 1,25 0,4 1,63
D' - E 3-4 X Sika CarboDur S 512 2,5 0,05 0,625 1 1 0,625 0,2 0,815
E' - F 2-3 X Sika CarboDur S 512 2,5 0,05 0,625 1 1 0,625 0,2 0,815
Pelat Atap

Lantai E' - F 3-4 X Sika CarboDur S 512 2,5 0,05 0,625 1 1 0,625 0,2 0,815
Atap F - F' 2-3 X Sika CarboDur S 512 2,5 0,05 0,625 1 1 0,625 0,2 0,815
F - F' 3-4 X Sika CarboDur S 512 2,5 0,05 0,625 1 1 0,625 0,2 0,815
JUMLAH KEBUTUHAN CFRP S 512 11,22

23
7.7.2. Perhitungan Volume Sika Wrap
Tabel 7.7 : Volume Kebutuhan Sika Wrap untuk Perkuatan Geser Balok
Lebar FRP Kebutuhan Panjang Total
Nama
Letak As Seksi Balok Tipe CFRP Wrap FRP Wrap Pemasangan Kebutuhan
Elemen Bangunan m lapis m 2
m
B 1-4 Tumpuan Sika Wrap 301C 0,5 1 1,81 0,905
B1 450.800

Lantai 2 C 1-4 Tumpuan Sika Wrap 301C 0,5 1 1,81 0,905


D 1-4 Tumpuan Sika Wrap 301C 0,5 1 1,81 0,905
C 1-4 Tumpuan Sika Wrap 301C 0,5 2 1,81 1,81
Lantai 3 D 1-4 Tumpuan Sika Wrap 600C 0,5 4 1,81 3,62
1 C-D Tumpuan Sika Wrap 301C 0,5 1 1,06 0,53
300.50

1 D-E Tumpuan Sika Wrap 301C 0,5 1 1,06 0,53


B2

Lantai 3 4 C-D Tumpuan Sika Wrap 301C 0,5 1 1,06 0,53


0

4 D-E Tumpuan Sika Wrap 301C 0,5 1 1,06 0,53


2 A-B Tumpuan Sika Wrap 301C 0,5 1 0,96 0,48
Lantai 2 3 A-B Tumpuan Sika Wrap 301C 0,5 1 0,96 0,48
2 C-D Tumpuan Sika Wrap 301C 0,5 3 0,96 1,44
2 D-E Tumpuan Sika Wrap 600C 0,5 2 0,96 0,96
2 E-F Tumpuan Sika Wrap 301C 0,5 1 0,96 0,48
300.450

Lantai 3 3 C-D Tumpuan Sika Wrap 600C 0,5 2 0,96 0,96


B3

3 D-E Tumpuan Sika Wrap 600C 0,5 2 0,96 0,96


3 E-F Tumpuan Sika Wrap 301C 0,5 1 0,96 0,48
2 E-F Tumpuan Sika Wrap 301C 0,5 1 1 0,5
Lantai 2 F-G Tumpuan Sika Wrap 301C 0,5 1 1 0,5
Atap 3 E-F Tumpuan Sika Wrap 301C 0,5 2 1 1
3 F-G Tumpuan Sika Wrap 301C 0,5 2 1 1

23
Lebar FRP Kebutuhan Panjang Total
Nama
Letak As Seksi Balok Tipe CFRP Wrap FRP Wrap Pemasangan Kebutuhan
Elemen Bangunan m lapis m 2
m
C' 1-2 Tumpuan Sika Wrap 301C 0,5 1 0,7 0,35
200.35
B4

Lantai 3 C' 2-3 Tumpuan Sika Wrap 301C 0,5 1 0,7 0,35
0

C' 3-4 Tumpuan Sika Wrap 301C 0,5 1 0,7 0,35


JUMLAH KEBUTUHAN SIKA WRAP 301C 14,055
JUMLAH KEBUTUHAN SIKA WRAP 600C 6,5

23
7.7.3. Perhitungan Volume Pembongkaran Dinding
Tabel 7.8 : Volume Pembongkaran Dinding

Panjang Panjang
Nama As
Letak Seksi Balok Total Pembongkaran
Elemen Bangunan
m m
Perkuatan Lentur
Pembongkaran tembok tidak dilakukan pada tembok penuh,
C
1 - 4 Lapangan 1,65 2,0 namun hanya pada setinggi 50 cm dari muka balok.
B1 450.800

Tumpuan Kiri (1) 2,33 2,5


Lantai 2
D 1 - 4 Lapangan 1,65 2,0
Volume pembongkaran = Panjang bongkar x tinggi bongkar
Tumpuan Kanan (4) 2,33 2,5
Lantai 3 D 1 - 4 Lapangan 4,85 5,0 = 35 x 0,5
TOTAL PANJANG PEMBONGKARAN 14 Volume pembongkaran = 17,5
Perkuatan Geser
C 1 - 4 Tumpuan 1 1,5
300.450 B2 300.500 450.800

Lantai 2
B1

D 1 - 4 Tumpuan 1 1,5
Lantai 3 D 1 - 4 Tumpuan 4 4,5
1 C - D Tumpuan 1 1,5
1 D - E Tumpuan 1 1,5
Lantai 3
4 C - D Tumpuan 1 1,5
4 D - E Tumpuan 1 1,5
2 D - E Tumpuan 2 3,0
B3

Lantai 3 2 E - F Tumpuan 1 1,5


3 D - E Tumpuan 2 3,0
TOTAL PANJANG PEMBONGKARAN 21

24
7.7.4. Perhitungan Volume Pembongkaran Keramik
Tabel 7.9 : Volume Pembongkaran Keramik

Kebutuhan Bongkar Keramik Volume


Nama As
Elemen
Letak Panjang Pemasangan (40 x 40 cm) Total
Bangunan
n Panjang (m) m²
C - C' 1-2 0,94 2 0,8 0,752
C - C' 2-3 0,94 2 0,8 0,752
Pelat Lantai

C - C' 3-4 0,94 2 0,8 0,752


C' - D 1-2 0,94 2 0,8 0,752
Lantai 3 C' - D 3-4 0,94 2 0,8 0,752
D' - E 1-2 0,82 2 0,8 0,652
D' - E 2-3 1,01 4 1,6 1,608
D' - E 3-4 0,82 2 0,8 0,652
Pelat Atap

E' - F 2-3 0,82 2 0,8 0,652


Lantai E' - F 3-4 0,82 2 0,8 0,652
Atap F - F' 2-3 0,82 2 0,8 0,652
F - F' 3-4 0,82 2 0,8 0,652
TOTAL PANJANG PEMBONGKARAN 9,28

24
7.7.5. Daftar Harga
Tabel 7.10 : Daftar Harga Berdasarkan Survey
A. UPAH TENAGA VOLUME SATUAN HARGA SUMBER
1 Mandor OH OH Rp 171.040,00 HSPK SURABAYA
2 Pekerja OH OH Rp 146.040,00 HSPK SURABAYA
3 Tukang Batu OH OH Rp 156.040,00 HSPK SURABAYA
4 Supervisor CFRP OH OH Rp 171.040,00 HSPK SURABAYA
B. BAHAN VOLUME SATUAN HARGA SUMBER
50 m' Rp 41.250.000,00
1 Sika Wrap 600 C SolusiTop
1 m' Rp 825.000,00
100 m' Rp 77.000.000,00
1 m' Rp 770.000,00
2 Sika Carbodur - S812 25 m' Rp 20.900.000,00
SolusiTop
1 m' Rp 836.000,00
100 m' Rp 52.250.000,00
1 m' Rp 522.500,00
3 Sika Carbodur - S512 25 m' Rp 14.300.000,00
SolusiTop
1 m' Rp 572.000,00
100 m' Rp 51.700.000,00
4 Sika Wrap 301 C SolusiTop
1 m' Rp 517.000,00
6 kg Rp 1.705.000,00
5 Sikadur 30 SolusiTop
1 kg Rp 284.166,67
5 kg Rp 2.475.000,00
6 Sikadur 330 SolusiTop
1 kg Rp 495.000,00

7 Bata Ringan 1 m3
Rp 590.000,00 Tokopedia

8 Semen Acian 40 kg 1 Sak Rp 63.000,00 Alitmix


Keramik Lantai Polos Uk.
9 1 box Rp 46.000,00 Tokopedia
40 x 40 cm (6pcs)
10 Pasir Pasang 1 Rp 190.000,00 Builder
m3

11 Semen Nat Keramik 1 kg Rp 14.000,00 Tokopedia

12 Semen Portland 40 kg 1 Sak Rp 52.500,00 Tokopedia

238
7.7.6. Analisa Harga Satuan Pekerjaan
Tabel 7.11 : AHSP Pembongkaran Dinding dan Keramik
Harga Durasi
No. Uraian Koef. Volume Satuan Jumlah Harga (Rp)
Satuan (Rp) (Hari)
I Pekerjaan Pembongkaran Dinding
A TENAGA
1 Mandor 0,3330 4 OH Rp 171.040 5 Rp 3.420.800,00
2 Pekerja 6,6670 28 OH Rp 146.040 5 Rp 20.445.600,00
Jumlah Harga Tenaga Kerja Rp 23.866.400,00
B BAHAN
Jumlah Harga Bahan Rp -
C PERALATAN
Jumlah Harga Alat Rp -
D Jumlah Harga Tenaga Kerja+Bahan/Material+Peralatan (A+B+C) Rp 23.866.400,00
E Overhead & Profit 15% 15% × D Rp 3.579.960,00
F Total Nilai Harga Satuan Pekerjaan (D + E) Rp 27.446.360,00
II Pekerjaan Pembongkaran Keramik
A TENAGA
1 Mandor 0,0100 1 OH Rp 171.040 1 Rp 171.040,00
2 Pekerja 0,0500 4 OH Rp 146.040 1 Rp 584.160,00
Jumlah Harga Tenaga Kerja Rp 755.200,00
B BAHAN
Jumlah Harga Bahan Rp -
C PERALATAN
Jumlah Harga Alat Rp -
D Jumlah Harga Tenaga Kerja+Bahan/Material+Peralatan (A+B+C) Rp 755.200,00
E Overhead & Profit 15% 15% × D Rp 113.280,00
F Total Nilai Harga Satuan Pekerjaan (D + E) Rp 868.480,00

23
Tabel 7.240 : AHSP Pemasangan SikaCarbodur S
Harga Durasi
No. Uraian Koef. Volume Satuan Jumlah Harga (Rp)
Satuan (Rp) (Hari)
III Pekerjaan Pemasangan CFRP Lentur SikaCarbodur S 512
A TENAGA
1 Supervisor CFRP 0,0150 2 OH Rp 171.040 1 Rp 342.080
2 Pekerja 0,0625 8 OH Rp 146.040 1 Rp 1.168.320
Jumlah Harga Tenaga Rp 1.510.400
Kerja
B BAHAN
1 Sika CarboDur S 512 1,1 24,92 m' Rp 522.500 Rp 14.322.770
2 Sikadur 30 0,0011 24,92 kg Rp 284.167 Rp 7.790
Jumlah Harga Bahan Rp 14.330.559,58
C PERALATAN
Cutter, Hammer Drill, Mixer,
1 1 Ls Rp 125.000 Rp 125.000,00
dll.
Jumlah Harga Alat Rp 125.000,00
D Jumlah Harga Tenaga Kerja+Bahan/Material+Peralatan (A+B+C) Rp 15.965.959,58
E Overhead & Profit 15% 15% × D Rp 2.394.893,94
F Total Nilai Harga Satuan Pekerjaan (D + E) Rp 18.360.853,51

24
Tabel 7.241 : AHSP Pemasangan SikaCarbodur S
Harga Durasi
No. Uraian Koef. Volume Satuan Jumlah Harga (Rp)
Satuan (Rp) (Hari)
IV Pekerjaan Pemasangan CFRP Lentur SikaCarbodur S812
A TENAGA
1 Supervisor CFRP 0,0150 1 OH Rp 171.040 4 Rp 684.160
2 Pekerja 0,0625 5 OH Rp 146.040 4 Rp 2.920.800
Jumlah Harga Tenaga Rp 3.604.960
Kerja
B BAHAN
1 Sika CarboDur S 812 1,1 226,52 m' Rp 770.000 Rp 191.862.440
2 Sikadur 30 0,0011 226,52 kg Rp 284.167 Rp 70.806
Jumlah Harga Bahan Rp 191.933.246,38
C PERALATAN
Cutter, Hammer Drill, Mixer,
1 1 Ls Rp 125.000 Rp 125.000,00
dll.
Jumlah Harga Alat Rp 125.000,00
D Jumlah Harga Tenaga Kerja+Bahan/Material+Peralatan (A+B+C) Rp 195.663.206,38
E Overhead & Profit 15% 15% × D Rp 29.349.480,96
F Total Nilai Harga Satuan Pekerjaan (D + E) Rp 225.012.687,33

24
Tabel 7.242 : AHSP Pemasangan SikaWrap
Harga Durasi
No. Uraian Koef. Volume Satuan Jumlah Harga (Rp)
Satuan (Rp) (Hari)
V Pekerjaan Pemasangan CFRP Geser SIKA WRAP 301C
A TENAGA
1 Supervisor CFRP 0,0150 1 OH Rp 171.040 1 Rp 171.040
2 Pekerja 0,0625 4 OH Rp 146.040 1 Rp 584.160
Jumlah Harga Tenaga Rp 755.200
Kerja
B BAHAN
1 Sika Wrap 301 C 1,1 28,11 m Rp 517.000 Rp 15.986.157
2 Sikadur 330 0,0011 28,11 kg Rp 495.000 Rp 15.306
Jumlah Harga Bahan Rp 16.001.462,90
C PERALATAN
Cutter, Hammer Drill,
1 1 Ls Rp 125.000 Rp 125.000,00
Mixer, dll.
Jumlah Harga Alat Rp 125.000,00
D Jumlah Harga Tenaga Kerja+Bahan/Material+Peralatan (A+B+C) Rp 16.881.662,90
E Overhead & Profit 15% 15% × D Rp 2.532.249,43
F Total Nilai Harga Satuan Pekerjaan (D + E) Rp 19.413.912,33

24
Tabel 7.243 : AHSP Pemasangan SikaWrap
Harga Durasi
No. Uraian Koef. Volume Satuan Jumlah Harga (Rp)
Satuan (Rp) (Hari)
VI Pekerjaan Pemasangan CFRP Geser SIKA WRAP 600 C
A TENAGA
1 Supervisor CFRP 0,0150 1 OH Rp 171.040 1 Rp 171.040
2 Pekerja 0,0625 4 OH Rp 146.040 1 Rp 584.160
Jumlah Harga Tenaga Rp 755.200
Kerja
B BAHAN
1 Sika Wrap 600 C 1,1 13,00 m Rp 825.000 Rp 11.797.500
2 Sikadur 330 0,0011 13,00 kg Rp 495.000 Rp 7.079
Jumlah Harga Bahan Rp 11.804.578,50
C PERALATAN
Cutter, Hammer Drill, Mixer,
1 1 Ls Rp 125.000 Rp 125.000,00
dll.
Jumlah Harga Alat Rp 125.000,00
D Jumlah Harga Tenaga Kerja+Bahan/Material+Peralatan (A+B+C) Rp 12.684.778,50
E Overhead & Profit 15% 15% × D Rp 1.902.716,78
F Total Nilai Harga Satuan Pekerjaan (D + E) Rp 14.587.495,28

24
Tabel 7.16 : AHSP Pemasangan Dinding
Harga Durasi
No. Uraian Koef. Volume Satuan Jumlah Harga (Rp)
Satuan (Rp) (Hari)
VII Pekerjaan Pemasangan Dinding Kembali
A TENAGA
1 Mandor 0,0030 4 OH Rp 171.040 2 Rp 1.368.320
2 Pekerja 0,6710 16 OH Rp 146.040 2 Rp 4.673.280
3 Tukang Batu 1,3000 8 OH Rp 156.040 2 Rp 2.496.640
Jumlah Harga Tenaga Rp 8.538.240
Kerja
B BAHAN
1 Bata Ringan 0,12 17,50 m3 Rp 590.000 Rp 1.239.000
2 Semen Acian 40 kg 0,063 17,50 Sak Rp 63.000 Rp 69.458
Jumlah Harga Bahan Rp 1.308.457,50
C PERALATAN
Jumlah Harga Alat Rp -
D Jumlah Harga Tenaga Kerja+Bahan/Material+Peralatan (A+B+C) Rp 9.846.697,50
E Overhead & Profit 15% 15% × D Rp 1.477.004,63
F Total Nilai Harga Satuan Pekerjaan (D + E) Rp 11.323.702,13

24
Tabel 7.17 : AHSP Pemasangan Keramik
Harga Durasi
No. Uraian Koef. Volume Satuan Jumlah Harga (Rp)
Satuan (Rp) (Hari)
VIII Pekerjaan Pemasangan Keramik Lantai Polos Uk. 40 x 40 cm
A TENAGA
1 Mandor 0,0350 3 OH Rp 171.040 1 Rp 513.120
2 Pekerja 0,7000 15 OH Rp 146.040 1 Rp 2.190.600
3 Tukang Batu 0,3500 6 OH Rp 156.040 1 Rp 936.240
Jumlah Harga Tenaga Rp 3.639.960
Kerja
B BAHAN
Keramik Lantai Polos Uk. 40
1x 1,0608 9,28 m² Rp 46.000 Rp 452.834
40 cm
2 Pasir Pasang 0,063 9,28 3 Rp 190.000 Rp 111.082
m
3 Semen Nat Keramik 1,063 9,28 Kg Rp 14.000 Rp 138.105
4 Semen PC 40 kg 2,063 9,28 Sak Rp 52.500 Rp 1.005.094
Jumlah Harga Bahan Rp 1.707.114,46
C PERALATAN
Jumlah Harga Alat Rp -
D Jumlah Harga Tenaga Kerja+Bahan/Material+Peralatan (A+B+C) Rp 5.347.074,46
E Overhead & Profit 15% 15% × D Rp 802.061,17
F Total Nilai Harga Satuan Pekerjaan (D + E) Rp 6.149.135,63

24
7.7.7. Estimasi Biaya Perkuatan
Tabel 7.18 : Estimasi Biaya Perkuatan

No Uraian Pekerjaan Volume Satuan Harga Satuan

Pekerjaan Pembongkaran
1 17,50 m² Rp 27.446.360,00
Dinding
Pekerjaan Pembongkaran
2 9,28 m² Rp 868.480,00
Keramik
Pekerjaan Pemasangan
3 CFRP Lentur Sika 24,92 m' Rp 18.360.853,51
Carbodur S 512
Pekerjaan Pemasangan
4 CFRP Lentur Sika 226,52 m' Rp 225.012.687,33
Carbodur S812
Pekerjaan Pemasangan
5 28,11 m' Rp 19.413.912,33
CFRP Geser Sika 301C
Pekerjaan Pemasangan
6 13,00 m' Rp 14.587.495,28
CFRP Geser Sika 600C
Pekerjaan Pemasangan
7 17,50 m² Rp 11.323.702,13
Dinding Kembali
Pekerjaan Pemasangan
8 Keramik Lantai Polos 9,28 m² Rp 6.149.135,63
Uk. 40 x 40 cm
Total Biaya Perkuatan Rp 323.162.626,21
Pembulatan Rp 323.170.000,00

Terbilang : Tiga Ratus Dua Puluh Tiga Juta Seratus Tujuh Puluh Ribu

24
BAB VIII
KESIMPUL
AN
8.1. Kesimpulan
Kesimpulan yang didapatkan dari laporan Tugas Besar Proyek Evaluasi dan
Rehabilitasi Struktur Bangunan Sipil adalah sebagai berikut.
1. Perkuatan yang dilakukan pada bangunan eksisting perkantoran ini adalah dengan cara
menambah material CFRP sebagai penambah kapasitas penampang elemen.
2. Berdasarkan evaluasi yang telah dilakukan terdapat 12 elemen pelat dan 23 elemen
balok yang mengalami kegagalan struktur, sehingga diperlukan perkuatan. Untuk
elemen struktur yang mengalami kegagalan lentur digunakan Perkuatan CFRP Sika
Carbodur, sedangkan untuk elemen struktur yang mengalami kegagalan pada geser
digunakan perkuatan CFRP Sika Wrap.
3. Estimasi biaya yang dibutuhkan untuk perkuatan struktur eksisting perkantoran dengan
CFRP Sika Carbodur S512, Sika Carbodur S812, Sika Wrap 301C, Sika Wrap 600C
sebesar Rp 323.162.626,21 dengan pembulatan estimasi harga ke atas sebesar Rp
323.170.000,00.
8.2. Saran
Adapun saran yang diberikan pada laporan Tugas Besar Proyek Evaluasi dan
Rehabilitasi Struktur Bangunan Sipil adalah sebagai berikut.
1. Pada saat melakukan perhitungan kapasitas eksisting diperlukan ketelitian untuk
meminimalisir terjadi kesalahan.
2. Pada saat permodelan dengan alat bantu SAP 2000 data yang diinput sebaiknya
dilakukan lebih teliti dan dilakukan crosscheck terhadap perhitungan manual.untuk
meminimalisir terjadi kesalahan.
3. Pada proses output perhitungan kapasitas alih fungsi dengan alat bantu SAP 2000
sebaiknya dilakukan lebih teliti untuk meminimalisir terjadi kesalahan evaluasi
masing – masing elemen.
4. Dalam menentukan metode pelaksanaan diperlukan survei pelaksanaan perkuatan
CFRP yang sesuai dengan kondisi di lapangan supaya tidak menyulitkan aplikator.
5. Dalam penggambaran rencana perkuatan CFRP hendaknya lebih didetailkan supaya
tidak menyulitkan aplikator.

24
DAFTAR PUSTAKA
Badan Standarisasi Nasional. 2019. SNI 2847-2019 Persyaratan Beton Struktural
untuk Bangunan Gedung. Jakarta: Badan Standarisasi Nasional.
Badan Standarisasi Nasional. 2019. SNI 1726-2019 Tata Cara Perencanaan
Ketahanan Gempa untuk Struktur Bangunan Gedung dan Nongedung. Jakarta: Badan
Standarisasi Nasional.
Badan Standarisasi Nasional. 2020. SNI 1727-2020 Beban Minimum dan Kriteria
Terkait untuk Bangunan Gedung dan Struktur Lain. Jakarta: Badan Standarisasi Nasional.
American Concrete Institute. 2008. ACI 440.2R-08 Guide for the Design and
Construction of Externally Bonded FRP Systems for Strengthening Concrete Structures.
Michigan: The American Concrete Institute Committee.

24
PERNYATAAN

Dengan ini saya, Sonia Indah Nor Yanti NRP 10111910010049


menyatakan dengan sesungguhnya bahwa tugas besar ini adalah
hasil pekerjaan saya sendiri.

24
LAMPIRAN 1
LEMBAR
TUGAS

Hal : Tugas Perbaikan dan Perkuatan


Lamp : 1 bendel

Surabaya, Februari 2022

Kepada
Yth. Bapak Dosen Asisten
MK Proyek Evaluasi dan Rehabilitasi Struktur Bamgunan Sipil
Program Studi D-IV Teknologi Rekayasa Pengelolaan dan Pemeliharaan
Bangunan Sipil

Dengan hormat,
Bersama dengan surat ini kami sampaikan jadwal kuliah dan asistensi serta mahasiswa
untuk mata kuliah Proyek Evaluasi dan Rehabilitasi Struktur Bamgunan Sipil semester
genap 2021/2022. Untuk asistensi telah dibuat secara terjadwal sesuai dengan
jadwal kuliah. Bila ada halangan pada hari dan jam yang ditetapkan, dosen
dapat mengganti pada waktu yang lain.
Perlu kami sampaikan bahwa untuk mata kuliah ini penekanannya adalah pada
penyelesaian dan pengerjaan tugas besar, serta tugas ini diprogram dan diharapkan
dapat diselesaikan dalam 1 semester. Konsentrasi tugas besar ini adalah
merencanakan metode perkuatan pada struktur beton eksisting, mohon
mengikuti jadwal yang sudah dilampirkan.
Demikian pemberitahuan dari kami, atas kerja samanya kami menyampaikan terima
kasih.
Hormat kami
Mengetahui
Kepala Departemen Koordinator MK
Proyek Evaluasi dan Rehabilitasi
Struktur Bangunan Sipil

Moh. Khoiri, ST., MT., Ph.D Nur Ahmad Husin, ST., MT

25
Proyek Evaluasi dan Rehabilitasi

Struktur Bangunan Sipil (VC191632)

Nama : Sonia Indah Nor Yanti


NRP 10111910010049

DosenPengampu :R.BuyungAnugrahaA,ST.,MT
TanggalPenyerahanTugas : 17 Februari 2022

Tanda Tangan Dosen :


………………………………………..........................................................

Tujuan:
Melaluitugasinimahasiswadiharapkan mampu menguasai perhitungan dan penggambaran
perkuatanstrukturbesertametodepelaksanaandanestimasibiayanya.

Struktur Bangunan tergambar seperti dibawah ini :

5
6 4

3
5
3

5
3

Gambar 1. Perspektif Struktur Bangunan

25
25
25
Data-data bangunan sbb :
1. Fungsi bangunan eksisting : Perkantoran / Sekolah
2. Lokasi : Surabaya / Malang
3. Data Tanah :A/B
4. - Mutu baja tulangan lentur fy (MPa) : 390 / 400
-
Mutu baja tulangan geser fy (MPa) : 240 / 320
-
Mutu beton fc’ (MPa) : 25 / 30 / 35
5. Plat lantai 1, 2 dan 3 (t = 120 mm); Plat atap (t = 100 mm)
6. Kolom lantai 1 dan 2 (K1 50/50); Kolom lantai 3 (K2 40/40)
7. Rekap penulangan terpasang:
TULANGAN
TULANGAN LONGITUDINAL TUL.
TRANSVERSAL
NAMA
NO TUMPUAN LAPANGAN TORSI TUMPUAN LAPANGAN
ELEMEN
ATAS BAWAH ATAS BAWAH
1 B1 500.800 5 D 16 3 D 16 3 D 16 5 D 16 D13 D 13 - 150 D 13 - 200
2 B1 450.700 5 D 16 3 D 16 3 D 16 5 D 16 D13 D 13 - 150 D 13 - 200
3 B1 400.800 5 D 16 3 D 16 3 D 16 5 D 16 D13 D 13 - 150 D 13 - 200
4 B1 450.800 5 D 16 3 D 16 3 D 16 5 D 16 D13 D 13 - 150 D 13 - 200
5 B1 500.700 5 D 16 3 D 16 3 D 16 5 D 16 D13 D 13 - 150 D 13 - 200
6 B2 300.450 4 D 16 3 D 16 2 D 16 3 D 16 𝜙10 𝜙 10 - 150 𝜙 10 - 200
7 B2 350.450 4 D 16 3 D 16 2 D 16 3 D 16 𝜙10 𝜙 10 - 150 𝜙 10 - 200
8 B2 300.500 4 D 16 3 D 16 2 D 16 3 D 16 𝜙10 𝜙 10 - 150 𝜙 10 - 200
9 B3 300.450 5 D 16 3 D 16 2 D 16 4 D 16 𝜙10 𝜙 10 - 150 𝜙 10 - 200
10 B3 300.500 5 D 16 3 D 16 2 D 16 4 D 16 𝜙10 𝜙 10 - 150 𝜙 10 - 200
11 B4 200.350 3 D 16 2 D 16 2 D 16 2 D 16 𝜙8 𝜙 8 - 150 𝜙 8 - 200
12 B4 250.350 3 D 16 2 D 16 2 D 16 2 D 16 𝜙8 𝜙 8 - 150 𝜙 8 - 200
13 PLAT LANTAI 𝜙10 - 150 𝜙10 - 150
14 PLAT ATAP 𝜙10 - 150 𝜙10 - 150
13 K1 500.500 16 D19 𝜙 10 - 150 𝜙 10 - 200
14 K2 400.400 12 D19 𝜙 10 - 150 𝜙 10 - 200
15 S1 300.450 5 D 16 5 D 16 5 D 16 5 D 16 𝜙10 𝜙 10 - 150 𝜙 10 - 200
16 S2 250.400 5 D 16 5 D 16 5 D 16 5 D 16 𝜙10 𝜙 10 - 150 𝜙 10 - 200

8. Tebal selimut beton (t) pada balok, kolom dan sloof sebesar 40mm, sedangkan pada
plat sebesar 30mm.
9. Syarat pembebanan sesuai dengan SNI 1727 – 2019. Pada area yang diarsir akan
dialih- fungsikan menjadi Ruang Arsip dan Komputer (server). Untuk peraturan lain
digunakan SNI 1726 – 2019 dan SNI 2847 – 2019.
10. Beban Outdoor AC (Chiller dan Cooling Tower) pada plat lantai 3 sebesar 1,5 ton/m2
11. Beban tandon air pada plat atap sebesar 1,2 ton/m2
12. Alternatif metode perbaikan menggunakan CFRP / Baja komposit

25
Mahasiswa diminta
1. Mengevaluasi kapasitas elemen struktur eksisting
2. Menghitung gaya dalam ultimate kondisi eksisting dan akibat alih fungsi bangunan
3. Merencanakan perkuatan elemen eksisting
4. Menentukan material dan metode perkuatan
5. Membuat detail gambar kerja
6. Menggambarkan metode pelaksanaan
7. Mengestimasikan biaya (RAB) perkuatan

Ketentuan Pelaksanaan Tugas


1. Dikerjakan dan diselesaikan dengan bimbingan dosen asisten di kelas yang sudah
terjadwal (minimal dalam 12 minggu)
2. Laporan tugas dikerjakan secara mandiri dan dilarang melakukan penjiplakan
(plagiarisme)
3. Tidak boleh mencontoh (terbukti mencontoh dinyatakan TIDAK LULUS) serta pada
laporan perhitungan mahasiswa diminta membuat pernyataan sbb: Dengan ini saya,
(Nama) menyatakan dengan sesungguhnya bahwa tugas ini adalah hasil
pekerjaan saya sendiri.
4. Apabila tugas tidak selesai secara keseluruhan, maka untuk mata kuliah Proyek
Evaluasi dan Rehabilitasi Struktur Bangunan Sipil dinyatakan TIDAK LULUS

25
Jadwal Asistensi dan Target Minimal Penyelesaian Tugas Besar

Minggu Target Minimal Penyelesaian


ke Tugas
1 Latar Belakang Evaluasi dan Rehabilitasi Struktur Bangunan Sipil
2 Pembagian dan Penjelasan Tugas dari Dosen Pengampu
3 Menghitung Kapasitas Elemen Struktur dari Data Lembar Tugas
4-5 Identifikasi Beban, Analisa dan Pemodelan Struktur Bangunan
Eksisting
6 Verifikasi Gaya Dalam pada Struktur Eksisting
7 Identifikasi Beban, Analisa dan Pemodelan Struktur Bangunan Alih
Fungsi
8 Evaluasi I
9 Verifikasi Gaya Dalam pada Struktur dengan Beban Alih Fungsi
10-11 Merencanakan Perkuatan Struktur yang dibutuhkan
12-13 Penggambaran Rencana Perkuatan Struktur
14 Merencanakan Metode Pelaksanaan
15 Menghitung Volume dan Estimasi Biaya Perkuatan
16 Evaluasi II

Sistem Penilaian Tugas ditentukan sbb:


 Kehadiran (jumlah asistensi) : minimal 8 kali (Kurang dari 8 kali max. nilai 60)
 Pemahaman (kemampuan menjawab pertanyaan, kebenaran hitungan dll): 40%
 Penggambaran : 20%
 Metode Pelaksanaan : 10%
 Perhitungan Volume dan Estimasi Biaya : 10%
 Laporan : 20%

25
Data Tanah

25
LAMPIRAN 2
SPESIFIKASI MATERIAL
PERKUATAN

25
25
26
26
26
26
26
26
26
26
26
26
27
LAMPIRAN 3
GAMBAR RENCANA
PERKUATAN

27

Anda mungkin juga menyukai