PT PERTAMINA EP
PEMBANGUNAN FASILITAS WATER TREATMENT
INJECTION PLANT LAPANGAN TANJUNG
KSO NINDYA -ARTHA
LEMBAR REVISI
DAFTAR ISI
1. Lembar Judul.................................................................................................................................................. 1
2. Lembar Revisi ................................................................................................................................................ 2
3. Daftar Isi ......................................................................................................................................................... 3
4. Detail Inspection Test Plan............................................................................................................................. 4
A. Document .................................................................................................................................................. 4
B. Fabrication & Testing (FAT) ....................................................................................................................... 4
C. SAT (Site Acceptance Test) ...................................................................................................................... 6
D. Packing & Shipment .................................................................................................................................. 6
5. Form VFD Load Testing .................................................................................................................................. 7
6. Form Functional Testing.................................................................................................................................. 8
7. Form Physical Inspection .............................................................................................................................. 10
8. Form SAT Check List Physical/ Visual Inspection ......................................................................................... 11
PT PERTAMINA EP
PEMBANGUNAN FASILITAS WATER
TREATMENT INJECTION PLANT
KSO NINDYA ‐ARTHA
LAPANGAN TANJUNG
No. Dokumen Rev B1
INSPECTION AND TEST PLAN (ITP) VFD PANEL
TOP-TJGP-WTIP-VDR-EL-ITP-001 Halaman 4 dari 11
Inspection Level
Methode Of
No. Inspection/ Test Item Verifying Document Acceptance Criteria KSO NINDYA Remarks
Inspection VENDOR PERTAMINA EP PI/ MIGAS
- ARTHA
A DOCUMENT
1 Engineering Drawing Review 1. General Arrangement Drawing Drawing Approved P R R/A
2. Schematic Drawing
3. Single line Diagram
Inspection Level
Methode Of
No. Inspection/ Test Item Verifying Document Acceptance Criteria KSO NINDYA Remarks
Inspection VENDOR PERTAMINA EP PI/ MIGAS
- ARTHA
3 Testing Visual 1. Schematic Drawing P I/W W
1. "HI-POT" dielectric withstand test Test 2. Single line Diagram 1. 13.5 k Vac 1 minute (2501-
3. FAT Procedure 5000V)
2. Function test/ run test 2.
a. Control Power Failure Test a. Test DC Fail Circuit
b. Test mode b. Check Rectifier Gating
Check Inverter Gating
c. Line Converter Tests c. With Rated Voltage applied
check phase rotation and phase
relationship
d. Machine Converter Tests d. Connected to Motor Load:
> open loop stability
> output waveforms at minimum
speed
> output phase relationship
> adjust speed to 60 Hz,
checking for normal noise &
vibration
> check machine converter
voltage & current relationship
e. Load Tests e. Connected to fully rated
dynamometer load
> 1 hour rated load test
> 1/2 hour torque step test
Inspection Level
Methode Of
No. Inspection/ Test Item Verifying Document Acceptance Criteria KSO NINDYA Remarks
Inspection VENDOR PERTAMINA EP PI/ MIGAS
- ARTHA
C SAT (Site Acceptance Test)
1 SAT Procedure & check list Review Procedure Document Appoved P R R/A
2 1. Function test/ run test Test 1. Schematic Drawing 1. P I/W W
a. Start/Stop 2. SAT Procedure a. Test local start/stop button,
remote start/stop
b. Backup time b. UPS can hold control power for
30 minutes
c. Load Tests c. Connected to fully motor load
The first phase of the FAT will be the VFD Load Test. This will be conducted on a test setup on the VFD. The
load for this test will be provided by the test bay’s motor.
The load testing will be conducted while the VFD is running on medium voltage power.
The following is check list to be used for the Load Testing.
Load Testing
Ramp Down to ➢ Using the door mounted speed potentiometer the motor is
minimum speed ramped down to 6Hz. Motor operated sable at 6HZ
( A, V)
Ramp Up to Using the door mounted speed potentiometer the motor is
maximum speed ramped up from 6Hz to 50Hz. Motor operated stable as 50HZ
( A, V).
Stop Motor ➢ Motor is stopped utilizing the local STOP pushbutton on
the low voltage door.
Notes:
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
The second phase of the FAT will be the Functional Testing of the purchased equipment.
The functional testing will be conducted while the equipment is connected to low voltage power. All
medium voltage has been removed.
The following is check list to be used during the functional testing.
Functional Tests
Notes:
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
The third phase of the FAT will involve physical inspection of the purchased equipment. All medium and low
voltage has been removed. All equipment doors have been opened.
A visual inspection of the equipment shall be carried out against the General Arrangement Drawings.
Inspection and operation of the cubicles can be checked for satisfactory performance and mechanical security.
The following is a check list of the items to be checked during the visual inspection
Visual Inspection
Notes:
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
The phase of the SAT will involve physical/visual inspection of the purchased equipment. All medium and low
voltage has been removed. All equipment doors have been opened.
A visual inspection of the equipment shall be carried out against the General Arrangement Drawings.
Inspection and operation of the cubicles can be checked for satisfactory performance and mechanical security.
The following is a check list of the items to be checked during the visual inspection
Visual Inspection
Notes:
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________