RECORD OF REVISION
PEMBANGUNAN CO2 REMOVAL & DHU
SP JATIASRI
Rev.
Page Date Revision
No.
This document is the property of PT. Pertamina EP and it shall not be disclosed to third or reproduced without PEP’s prior written
permission.
Electronic File name: 709241293.docx
PEMBANGUNAN CO2 REMOVAL & DHU
SP JATIASRI
DAFTAR ISI
1 PENDAHULUAN................................................................................................................
2 RUANG LINGKUP.............................................................................................................
3 ISTILAH.............................................................................................................................
4 REFERENSI......................................................................................................................
5 SINGKATAN......................................................................................................................
6 TUJUAN.............................................................................................................................
7 MEDIA TEST.....................................................................................................................
8 PERALATAN TEST...........................................................................................................
9 TAHAPAN HYDROSTATIC TEST.....................................................................................
10 KRITERIA PENERIMAAN (ACCEPTANCE CRITERIA)....................................................
11 LAPORAN..........................................................................................................................
12 LAMPIRAN.........................................................................................................................
This document is the property of PT. Pertamina EP and it shall not be disclosed to third or reproduced without PEP’s prior written
permission.
Electronic File name: 709241293.docx
PEMBANGUNAN CO2 REMOVAL & DHU
SP JATIASRI
1. PENDAHULUAN
SP Jatiasri merupakan salah satu fasilitas produksi Pertamina EP Regional 2 Zona 7
yang terletak di daerah Pamanukan, sekitar 110 kilometer dari Kota Cirebon. Fasilitas ini
digunakan sebagai fasilitas pengumpul dan pemisahan awal dari produksi sumur
minyak dan gas di area Jatiasri (yang berasal dari lapisan reservoir BRF, TAF 2, TAF
2.1, TAF 3.1 dan TAF 3.2). Lokasi dari SP Jatiasri dapat dilihat pada Gambar 1.1:
This document is the property of PT. Pertamina EP and it shall not be disclosed to third or reproduced without PEP’s prior written
permission.
Electronic File name: 709241293.docx
PEMBANGUNAN CO2 REMOVAL & DHU
SP JATIASRI
spesifikasi sales gas yang sesuai dengan ketentuan Perjanjian Pengangkutan Gas
(PPG).
2. RUANG LINGKUP
Dokumen ini berlaku untuk Pembangunan CO2 Removal & DHU SP Jatiasri pada
pekerjaan Uji Jalan (FAT) untuk Air Compressor.
3. ISTILAH
PERUSAHAAN : PT. PERTAMINA EP REGIONAL 2 ZONA 7
KONTRAKTOR : Pihak yang ditunjuk oleh PERUSAHAAN yang
bertanggung
jawab untuk melakukan pekerjaan perancangan,
pengadaan dan instalasi berdasarkan kontrak, lingkup
kerja
atau perintah kerja. (Konsorsium PT. PTG- PT. CBA).
PROYEK : Pembangunan CO2 Removal & DHU di SP Jatiasri
SUB-KONTRAKTOR : Perusahaan atau pihak lain yang ditentukan oleh
KONTRAKTOR untuk membantu melaksanakan
sebagian
pekerjaan PROYEK Pembangunan CO2 Removal &
DHU di
SP Jatiasri
DITJEN MIGAS : Perwakilan dari Pemerintah Indonesia yang
bertanggungjawab untuk memberikan ijin dan sertifikat
kelayakan operasi untuk fasilitas Minyak dan Gas Bumi.
VENDOR : Pihak yang menyediakan/ membuat material atau
peralatan
sesuai dengan spesifikasi yang ditentukan oleh
KONTRAKTOR dan terdaftar dalam dokumen Preffered
Manufacture List (PML) milik PT. Pertamina EP.
PERUSAHAAN INSPEKSI : Badan usaha yang melaksanakan kegiatan Inspeksi
untuk
keselamatan peralatan dan/ atau Instalasi pada
Kegiatan
Usaha Minyak dan Gas Bumi sesuai dengan Standar
dan/
This document is the property of PT. Pertamina EP and it shall not be disclosed to third or reproduced without PEP’s prior written
permission.
Electronic File name: 709241293.docx
PEMBANGUNAN CO2 REMOVAL & DHU
SP JATIASRI
4. REFERENSI
4.1. CODE & STANDART
- API 619: Rotary Compressor
- ISO 5389:2005, Turbo-compressors - Performance test code
- ISO 7183:2007, Compressed air dryers - Specifications and testing
- ISO 12500:2007-Part 1 to 3, Filters for Compressed Air – Test Methods
5. SINGKATAN
CBA : Cahaya Bumi Abadi
EPC : Engineering, Procurement, and Construction
GA : General Arrangement
ITP : Inspection & Test Plan
MAWP : Maximum Allowable Working Pressure
NDE : Non Destructive Examination
P&ID : Piping & Instrumentation Diagram
PEP : Pertamina EP
PI : Perusahaan Inspeksi
PTG : Promatcon Tepat Guna
QC : Quality Control
SS : Stainles steel
This document is the property of PT. Pertamina EP and it shall not be disclosed to third or reproduced without PEP’s prior written
permission.
Electronic File name: 709241293.docx
PEMBANGUNAN CO2 REMOVAL & DHU
SP JATIASRI
6. TUJUAN
Tujuan dari dokumen ini adalah untuk menjadi pedoman dalam melakukan tahapan Uji
Jalan pada equipment Air Compressor sesuai dengan persyaratan Standard & Code
dan spesifikasi perusahaan.
7. MEDIA TEST
Media test yang digunakan untuk running test air compressor dengan kriteria:
Udara lingkungan di sekitar pengetesan.
8. PERALATAN TEST
Peralatan yang digunakan yaitu:
8.1 Air Compressor Package c/w Air Dryer
8.2 Temporary Air Reciever
8.3 Pressure Gauge
8.4 Thermo Temperature
8.5 Tachometer
8.6 Power Logger (Fluke)
8.7 Clamp Ampere
8.8 Lighting
8.9 Camera Digital
8.10 Vibration meter
8.11 Sound meter
8.12 Skid lengkap dengan piping inlet/ outlet
8.13 Ambient temperature thermometer
This document is the property of PT. Pertamina EP and it shall not be disclosed to third or reproduced without PEP’s prior written
permission.
Electronic File name: 709241293.docx
PEMBANGUNAN CO2 REMOVAL & DHU
SP JATIASRI
1. Buka penuh discharge valve dan line discharge yang menuju by pass-outlet.
2. Hidupkan MCB dan jalankan air compressor dengan udara diaalirkan ke outlet
sampai 5 menit untuk flashing.
3. Check putaran motor, vibrasi, discharge pressure dari air compressor.
4. Setelah 5 menit buka aliran ke arah dryer, tutup aliran by pass-outlet air
compressor dan buka line by pass-outlet dari air dryer. Air compressor tetap jalan
sampai 5 menit.
5. Catat semua hasil parameter ukur, seperti: discharge-pressure, power, Ampere,
RPM dan temperature electro motor.
6. Catat juga hasil pengukuran vibrasi, noise.
7. Setelah 5 menit proses flushing air dryer selesai, buka line menuju air receiver
dan tutup line by pass-outlet air dryer.
8. Ambil data uji yang diperlukan: discharge pressure, power, ampere, pressure
gage di air receiver, time untuk load-unload air dryer.
9. Setelah selesai, maka air compressor package dimatikan.
LAMPIRAN
Lampiran 1.
Lampiran 2.
Lampiran 3.
Lampiran 4.