Anda di halaman 1dari 8

QA/ QC

Contract No. Document No. Total Pages:


4650017089 2122A795OO-16-CN-05-IC-007 10 Pages

PEMBANGUNAN CO2 REMOVAL & DHU SP JATIASRI

FAT PROCEDURE FOR AIR COMPRESSOR

A 07/07/2023 Issued for Review AGS MN RTN

Prepared Checked Approved Initial Approved


Rev Date Description
KONSORSIUM PTG - CBA PT. PERTAMINA EP

RECORD OF REVISION
PEMBANGUNAN CO2 REMOVAL & DHU
SP JATIASRI

FAT AIR COMPRESSORE Date: 07/07/2023


2122A795OO-16-CN-05-IC-007 Rev. A
PROCEDURE Hal 2 of 8

Rev.
Page Date Revision
No.

This document is the property of PT. Pertamina EP and it shall not be disclosed to third or reproduced without PEP’s prior written
permission.
Electronic File name: 709241293.docx
PEMBANGUNAN CO2 REMOVAL & DHU
SP JATIASRI

FAT AIR COMPRESSORE Date: 07/07/2023


2122A795OO-16-CN-05-IC-007 Rev. A
PROCEDURE Hal 3 of 8

DAFTAR ISI

1 PENDAHULUAN................................................................................................................
2 RUANG LINGKUP.............................................................................................................
3 ISTILAH.............................................................................................................................
4 REFERENSI......................................................................................................................
5 SINGKATAN......................................................................................................................
6 TUJUAN.............................................................................................................................
7 MEDIA TEST.....................................................................................................................
8 PERALATAN TEST...........................................................................................................
9 TAHAPAN HYDROSTATIC TEST.....................................................................................
10 KRITERIA PENERIMAAN (ACCEPTANCE CRITERIA)....................................................
11 LAPORAN..........................................................................................................................
12 LAMPIRAN.........................................................................................................................

This document is the property of PT. Pertamina EP and it shall not be disclosed to third or reproduced without PEP’s prior written
permission.
Electronic File name: 709241293.docx
PEMBANGUNAN CO2 REMOVAL & DHU
SP JATIASRI

FAT AIR COMPRESSORE Date: 07/07/2023


2122A795OO-16-CN-05-IC-007 Rev. A
PROCEDURE Hal 4 of 8

1. PENDAHULUAN
SP Jatiasri merupakan salah satu fasilitas produksi Pertamina EP Regional 2 Zona 7
yang terletak di daerah Pamanukan, sekitar 110 kilometer dari Kota Cirebon. Fasilitas ini
digunakan sebagai fasilitas pengumpul dan pemisahan awal dari produksi sumur
minyak dan gas di area Jatiasri (yang berasal dari lapisan reservoir BRF, TAF 2, TAF
2.1, TAF 3.1 dan TAF 3.2). Lokasi dari SP Jatiasri dapat dilihat pada Gambar 1.1:

Gambar 1.1 Lokasi Fasilitas SP Jatiasri


[Specification DHU Package & CO2 Removal Package SP Jatiasri – PEP]

Mengacu pada Perjanjian Pengangkutan Gas atau Gas Transportation Agreement


(GTA) No.1253/EP0000/2017-SO tanggal 21 November 2017 antara PT. Pertamina EP
dengan PT. Pertamina Gas, berdasarkan perjanjian pengangkutan gas tersebut,
spesifikasi komposisi natural gas yang diperbolehkan untuk masuk jaringan pipa
Pertagas adalah:
 CO2 maksimum 8% mol
 H2S maksimum 8 ppm
 H2O maksimum lb/MMscf
SP Jatiasri merupakan salah satu titik serah sales gas PT. Pertamina EP Regional 2
Zona 7 ke jaringan pipa Pertagas yang memiliki kandungan gas CO 2 diatas 8 %mol,
kandungan H2O diatas 10 Ib/MMscf dan kandungan gas H 2S diatas 8 ppm, maka SP
Jatiasri akan merencanakan pengembangan fasilitas baru berupa CO2 Removal
Package dan Dehydration Unit untuk memperbaiki kualitas gas agar bisa memenuhi

This document is the property of PT. Pertamina EP and it shall not be disclosed to third or reproduced without PEP’s prior written
permission.
Electronic File name: 709241293.docx
PEMBANGUNAN CO2 REMOVAL & DHU
SP JATIASRI

FAT AIR COMPRESSORE Date: 07/07/2023


2122A795OO-16-CN-05-IC-007 Rev. A
PROCEDURE Hal 5 of 8

spesifikasi sales gas yang sesuai dengan ketentuan Perjanjian Pengangkutan Gas
(PPG).
2. RUANG LINGKUP
Dokumen ini berlaku untuk Pembangunan CO2 Removal & DHU SP Jatiasri pada
pekerjaan Uji Jalan (FAT) untuk Air Compressor.

3. ISTILAH
PERUSAHAAN : PT. PERTAMINA EP REGIONAL 2 ZONA 7
KONTRAKTOR : Pihak yang ditunjuk oleh PERUSAHAAN yang
bertanggung
jawab untuk melakukan pekerjaan perancangan,
pengadaan dan instalasi berdasarkan kontrak, lingkup
kerja
atau perintah kerja. (Konsorsium PT. PTG- PT. CBA).
PROYEK : Pembangunan CO2 Removal & DHU di SP Jatiasri
SUB-KONTRAKTOR : Perusahaan atau pihak lain yang ditentukan oleh
KONTRAKTOR untuk membantu melaksanakan
sebagian
pekerjaan PROYEK Pembangunan CO2 Removal &
DHU di
SP Jatiasri
DITJEN MIGAS : Perwakilan dari Pemerintah Indonesia yang
bertanggungjawab untuk memberikan ijin dan sertifikat
kelayakan operasi untuk fasilitas Minyak dan Gas Bumi.
VENDOR : Pihak yang menyediakan/ membuat material atau
peralatan
sesuai dengan spesifikasi yang ditentukan oleh
KONTRAKTOR dan terdaftar dalam dokumen Preffered
Manufacture List (PML) milik PT. Pertamina EP.
PERUSAHAAN INSPEKSI : Badan usaha yang melaksanakan kegiatan Inspeksi
untuk
keselamatan peralatan dan/ atau Instalasi pada
Kegiatan
Usaha Minyak dan Gas Bumi sesuai dengan Standar
dan/

This document is the property of PT. Pertamina EP and it shall not be disclosed to third or reproduced without PEP’s prior written
permission.
Electronic File name: 709241293.docx
PEMBANGUNAN CO2 REMOVAL & DHU
SP JATIASRI

FAT AIR COMPRESSORE Date: 07/07/2023


2122A795OO-16-CN-05-IC-007 Rev. A
PROCEDURE Hal 6 of 8

atau peraturan perundang-undangan. (PT. Sertco


Quality)

4. REFERENSI
4.1. CODE & STANDART
- API 619: Rotary Compressor
- ISO 5389:2005, Turbo-compressors - Performance test code
- ISO 7183:2007, Compressed air dryers - Specifications and testing
- ISO 12500:2007-Part 1 to 3, Filters for Compressed Air – Test Methods

4.2. DOKUMEN PROYEK


- No.: 4650017089 Kontrak/PO “Pembangunan CO2 Removal & DHU di SP
Jatiasri dan SP Karang Baru untuk Perbaikan Sales
Gas
Sub Paket I: Jatiasri”.

5. SINGKATAN
CBA : Cahaya Bumi Abadi
EPC : Engineering, Procurement, and Construction
GA : General Arrangement
ITP : Inspection & Test Plan
MAWP : Maximum Allowable Working Pressure
NDE : Non Destructive Examination
P&ID : Piping & Instrumentation Diagram
PEP : Pertamina EP
PI : Perusahaan Inspeksi
PTG : Promatcon Tepat Guna
QC : Quality Control
SS : Stainles steel

This document is the property of PT. Pertamina EP and it shall not be disclosed to third or reproduced without PEP’s prior written
permission.
Electronic File name: 709241293.docx
PEMBANGUNAN CO2 REMOVAL & DHU
SP JATIASRI

FAT AIR COMPRESSORE Date: 07/07/2023


2122A795OO-16-CN-05-IC-007 Rev. A
PROCEDURE Hal 7 of 8

6. TUJUAN
Tujuan dari dokumen ini adalah untuk menjadi pedoman dalam melakukan tahapan Uji
Jalan pada equipment Air Compressor sesuai dengan persyaratan Standard & Code
dan spesifikasi perusahaan.

7. MEDIA TEST
Media test yang digunakan untuk running test air compressor dengan kriteria:
 Udara lingkungan di sekitar pengetesan.
8. PERALATAN TEST
Peralatan yang digunakan yaitu:
8.1 Air Compressor Package c/w Air Dryer
8.2 Temporary Air Reciever
8.3 Pressure Gauge
8.4 Thermo Temperature
8.5 Tachometer
8.6 Power Logger (Fluke)
8.7 Clamp Ampere
8.8 Lighting
8.9 Camera Digital
8.10 Vibration meter
8.11 Sound meter
8.12 Skid lengkap dengan piping inlet/ outlet
8.13 Ambient temperature thermometer

9. TAHAPAN RUNNING TEST AIR COMPRESSOR PACKAGE


9.1 Persiapan:
a. Check model/type air compressor package yang akan di FAT berikut dengan
orientasinya. Verifikasi name plate dengan data sheet dan spesikasi yang telah di
approved.
b. Check penunjukan alat ukur dan instrument control yang terpasang dalam kondisi
unload/ normal. Pastikan semua alat ukur terkalibrasi dan valid. Pastikan alat
ukur yang akan dipakai dalam kondisi baik.
c. Check arrangement instalasi test untuk air compressor package sudah sesuai
dengan plan-drawing test. Air compressor-air dyer-air receiver vessel.
d. Check tightening baut pengikat baseplate/ baseframe, baut flange, sudah sesuai.
e. Check instalasi listrik yang menuju air compressor package: voltage dan ampere
sudah sesuai.
f. Check instalasi pipa dan aksesoris, pastikan telah terpasang sebagaimana
mestinya/ sesuai gambar rangkaian pengujian.
g. Check putaran air compressor secara manual (diputar dengan tangan) untuk
memastikan tidak ada beban abnormal.
h. Pastikan arah putaran electro motor sesuai dengan arah putaran air compressor.
9.2 Langkah Uji Jalan/ Running Test

This document is the property of PT. Pertamina EP and it shall not be disclosed to third or reproduced without PEP’s prior written
permission.
Electronic File name: 709241293.docx
PEMBANGUNAN CO2 REMOVAL & DHU
SP JATIASRI

FAT AIR COMPRESSORE Date: 07/07/2023


2122A795OO-16-CN-05-IC-007 Rev. A
PROCEDURE Hal 8 of 8

1. Buka penuh discharge valve dan line discharge yang menuju by pass-outlet.
2. Hidupkan MCB dan jalankan air compressor dengan udara diaalirkan ke outlet
sampai 5 menit untuk flashing.
3. Check putaran motor, vibrasi, discharge pressure dari air compressor.
4. Setelah 5 menit buka aliran ke arah dryer, tutup aliran by pass-outlet air
compressor dan buka line by pass-outlet dari air dryer. Air compressor tetap jalan
sampai 5 menit.
5. Catat semua hasil parameter ukur, seperti: discharge-pressure, power, Ampere,
RPM dan temperature electro motor.
6. Catat juga hasil pengukuran vibrasi, noise.
7. Setelah 5 menit proses flushing air dryer selesai, buka line menuju air receiver
dan tutup line by pass-outlet air dryer.
8. Ambil data uji yang diperlukan: discharge pressure, power, ampere, pressure
gage di air receiver, time untuk load-unload air dryer.
9. Setelah selesai, maka air compressor package dimatikan.

10. KRITERIA PENERIMAAN (ACCEPTANCE CRITERIA)


Pengujian dinyatakan diterima apabila selama pengujian:
1. Air compressor package berjalan normal dan noise tidak melebihi batas ijin
(85dB pada jarak 1M dari object), vibrasi, temperature yang melebihi toleransi
yang diijinkan.
2. Discharge pressure, air capacity masih masuk toleransi yang diijinkan dalam
data sheet.
3. Data air compressor package sesuai dengan data sheet yang telah disetujui.
4. Tidak terjadi kerusakan pada bagian air compressor package baik sebelum,
selama maupun setelah pengujian.
11. LAPORAN
Setelah selesai pengujian (running test) air compressor package, inspector yang
berwenang harus membuat Berita Acara Pengujian dan Laporan Hasil Pengujian yang
ditanda tangani oleh pihak yang hadir (witness) di pengujian tersebut.

LAMPIRAN
Lampiran 1.
Lampiran 2.
Lampiran 3.
Lampiran 4.

This document is the property of PT. Pertamina EP and it shall not be disclosed to third or reproduced without PEP’s prior written
permission.
Electronic File name: 709241293.docx