Disusun Oleh :
ADI CANDRA
NPM. 18031010022
JAWA TIMUR
SURABAYA
2022
LAPORAN PRAKTEK KERJA LAPANGAN
PT. SEMEN INDONESIA (PERSERO) Tbk
SECTION OF RKC 4 OPERATION
LEMBAR PENGESAHAN
LAPORAN KERJA PRAKTEK
DI PT SEMEN INDONESIA (PERSERO) Tbk.
Unit Kerja : Section of RKC 4 Operation
Periode : 03 Januari 2022 s.d 31 Januari 2022
Oleh :
ADI CANDRA
NPM. 18031010022
Mengetahui, Menyetujui,
Ka. Unit of L&D Ops. And Certification Pembimbing Lapangan
FAKULTAS TEKNIK
Jl. Raya Rungkut Madya Gunung Anyar Surabaya 60295 Telp. (031) 872179 Fax. (031)872257
____________________________________________________________________________
KETERANGAN REVISI
Telah mengerjakan revisi/tidak ada revisi*) Proposal/ Skripsi/ Kerja Praktek, dengan
Judul:
Laporan Kerja Praktek di PT. Semen Indonesia (Persero) Tbk. Unit Tuban Jawa Timur
Mengetahui,
Dosen Pembimbing
KATA PENGANTAR
Puji syukur senantiasa penulis panjatkan kepada Tuhan Yang Maha Esa,
yang telah melimpahkan segala rahmat dan hidayah-Nya. sehingga penulis dapat
menyelesaikan penulisan laporan ini. Laporan ini disusun untuk memenuhi salah
satu persyaratan kelulusan Jurusan Teknik Kimia Fakultas Teknik Universitas
2. Ibu Dr. Ir. Sintha Soraya Santi, MT selaku Koordinator Jurusan Teknik
Kimia Fakultas Teknik Universitas Pembangunan
Timur sekaligus sebagai Dosen Pembimbing.
3. Direktur Utama PT. Semen Indonesia (Persero) Tbk.
4.
Certification PT. Semen Indonesia (Persero) Tbk, Pabrik Tuban.
5. Bapak Beni Dwi Putranto selaku Pembimbing Praktek Kerja Lapangan.
6. Seluruh Karyawan PT. Semen Indonesia (Persero) Tbk, Pabrik Tuban.
7.
mendukung kelancaran proses Praktek Kerja Lapangan dan Penyusunan
laporan.
8. Semua pihak yang telah membantu dalam penyelesaian laporan ini.
Penulis
DAFTAR ISI
DAFTAR GAMBAR
Gambar 1 Lay Out Pabrik Semen PT. Semen Indonesia (Persero) Tbk, Tuban .... 3
Gambar 2 Struktur Organisasi PT. Semen Indonesia (Persero) Tbk ................... 11
Gambar 3 Struktur Organisasi Departement Produski dan Litbang PT. Semen
Indonesia (Persero) Tbk ..................................................................... 11
Gambar 4 Struktur Orgnasisasi Unit Produksi Tuban IV .................................... 12
Gambar 5 Bagan Alir Proses Pabrikasi Semen di PT Semen Indonesia (Persero)
Tbk Pabrik Tuban ............................................................................... 21
Gambar 6 Proses Crushing ................................................................................... 49
Gambar 7 Raw Mill Feed ..................................................................................... 51
Gambar 8 Raw Mill .............................................................................................. 52
Gambar 9 Raw Mill Transport ............................................................................. 52
Gambar 10 Proses Coal Mill ................................................................................ 54
Gambar 11 Killn Feed .......................................................................................... 55
Gambar 12 Kiln .................................................................................................... 57
Gambar 13 Cooler ................................................................................................ 59
Gambar 14 Finish mill ......................................................................................... 60
Gambar 15 Vertical MIll ...................................................................................... 62
Gambar 16 Ball Mill ............................................................................................ 64
Gambar 17 Hammer Crusher ............................................................................... 67
Gambar 18 Two Roller Cutter.............................................................................. 68
Gambar 19 Suspension Pre-Heater ...................................................................... 69
Gambar 20 Rotary Kiln ........................................................................................ 70
Gambar 21 Grate Cooler ...................................................................................... 71
Gambar 22 Belnding Silo ..................................................................................... 72
Gambar 23 Ball Mill ............................................................................................ 73
Gambar 24 Vertical Roller Mill ........................................................................... 74
Gambar 25 Proses Pengolahan Sanitasi PT. Semen Indonesia Tbk, Pabrik Tuban
............................................................................................................................... 80
Gambar 26 Flowsheet Compresor ........................................................................ 82
DAFTAR TABEL
INTISARI