presented by :
Tim Penyusunan Standar dan Acuan Dokumen Tender TraGi
29 Juli 2022
1
OVERVIEW PERUBAHAN DESAIN SAS
www.pln.co.id | 2
PERUBAHAN PADA DESAIN SAS GI
Perubahan supply power SAS equipment
Perubahan dilatarbelakangi masukan dari operasional terkait keandalan SAS saat terjadi
blackout, sehingga power supply SAS equipment yang sebelumnya disupply inverter
dari sistem 110 VDC GI dirubah menjadi supply power tersendiri dari UPS khusus untuk
SAS equipment.
Adapun desain batere untuk UPS dipilih material Li-Ion
www.pln.co.id |
Peralatan Proteksi, Monitoring, Metering dan Kontrol
(SAS) – Sebelum Perubahan
TO IRCC TO RCC
LOCAL HMI COLOR LASER
IEC 60870‐5‐104 SERVER GPS IEC 60870‐5‐104
WORKSTATION PRINTER
LOCAL HMI COLOR LASER
TO IRCC TO RCC WORKSTATION PRINTER
IEC 60870‐5‐101 IEC 60870‐5‐101
ROUTER ROUTER
MODEM MODEM
GATEWAY GATEWAY
STATION LEVEL
STATION LEVEL
Switch Switch Switch Switch Switch Switch Switch Switch Switch Switch Switch Switch Switch Switch Switch Switch Switch Switch
OHL OHL DIAMETER CBF TRAFO TRAFO TRAFO BUSBAR BUSBAR LINE DIAMETER TERTIARY COMMON BCU
BCU BCU MPU BUSPRO
REACTOR REACTOR REACTOR
MPU 1 MPU 2 BCU A CBF/SZP BCU MPU 1 MPU 2 BUSPRO BUSPRO IED I/O
A 150KV BUS A BUS A MPU MPU MPU MPU AVR BPU 1 BPU
BPU 1 BPU 2 Main 1 Main 2 TEST
CCP 1 CCP 2 BCU AB CBF/SZP AVR RST BPU BPU BPU BPU BCM BPU 2 TEST
AB CCP 1 BPU 3 BUSPRO BUSPRO
BCU B BCM BCM BCM BCM BCM
CBF/SZP BUS B BUS B TEST TEST
CCP 2 Main 1 Main 2
BCM B TEST
OHL BAY DIAMETER TRAFO BAY BUSBAR REACTOR COMMON OHL BAY TRAFO BAY COUPLER BUSBAR
2 CCT GI BARU BBB 2 NEW TRAFO 2 CCT GI BARU BBB 2 NEW TRAFO
2 CCT GI BARU CCC 1 FUTURE 2 CCT GI BARU CCC 1 FUTURE
CONTROL & PROTECTION PANEL FOR 275KV OR 500KV CONTROL & PROTECTION PANEL FOR 150 KV
www.pln.co.id |
Peralatan Proteksi, Monitoring, Metering dan Kontrol
(SAS)
www.pln.co.id |
Power Supply SAS Equipment
Sebelum Perubahan – Supply dari 110 VDC Sesudah – Power Supply dari UPS
SAS Equipment
SAS Equipment & CCTV
www.pln.co.id |
BoQ AIS & GIS 500 KV (SAS Equipment) - 1
NO URAIAN PEKERJAAN SATUAN VOLUME
SUBSTATION AUTOMATION EQUIPMENT (According to TPG 9.A) ‐ (refer to SAS Network Drawing)
UPDATE BOQ AIS 66- 12.1 HMI‐Operator Work Station (include with operating system, Software application, HMI Software and Licences for 500 kV and 150 kV) Set 4
500kV & GIS 150-500kV consist of :
‐ CPU
(SAS) ‐ Keyboard, Video & Mouse (KVM extender)
a. 2 Set HMI 500KV
a) Penambahan opsi b. 2 Set HMI 150KV
12.2 Server (include with operating system, IED software SAS software and other related software application) consist of: Sets 2
battere 48 VDC jenis ‐ CPU
Lithium dan sistem ‐ Keyboard, Mouse, VDU Unit
redundansi 48 VDC 12.3 Colour Laser Printer Set 2
a. 1 Set Operator 500KV
b. 1 Set Operator 150KV
b) Penggunaan UPS for 12.4 GPS Time reference clock complete with Antenna Set 1
SAS di semua 12.5 Gate Way (independence gateway for communication to interregional control center, completed with communication Protocol with Sets 2
Control Center Consist of IEC 60870 ‐ 5 ‐ 101, IEC 60870 ‐ 5 ‐ 104 and existing proprietary protocol (if any))
tegangan dan Diesel a. 1 Set Independence Gateway direction IRCC
di 275-500 kV 12 b. 1 Set Independence Gateway direction RCC
12.6 Communication to control center
a. Router (manageble) Set 1
c) SAS Software b. Ethernet Switch for communication data (managebel) Set 1
dipindahkan ke SAS 12.7 Ethernet Switch for station level (manageable) Sets 6
hardware a. 2 Set Ethetnet Switch for SAS 500KV Substation Level
b. 2 Set Ethetnet Switch for SAS 150KV Substation Level
c. 2 Set Ethetnet Switch for HMI Operator Work Station 275KV and HMI Operator waork station 150KV
d) Inverter sudah tidak 12.8 Rack/Cubicle for Work Station, Gate Way, GPS, Modem, Router, Ethernet Switch, etc Lot 1
diperlukan 12.9
12.10
Furniture for HMI Operator 500KV and Operator 150KV Set 2
Engineering Tools and Test Equipment (Laptop) for configurating, testing software and operation maintenance (for relay, Set 1
telecommunication and SAS equipment).
12.11 Mapping SAS, mapping gateway IRCC & RCC, commisioning, point to point test beetwen substation and control centre Lot 1
12.12 Integration between SAS 500KV and 150KV Lot 1
12.13 Miscelaneous equipment and material including cables, optical cable, STP cable and cord, clamps, connectors, compression terminal, Lot 1
power surge protection device (Refer to SPLN S3.005‐1:2021), ethernet surge protector, connection to individual items of equipment
….etc, to complete the scope of works.
www.pln.co.id |
BoQ AIS & GIS 500 KV (SAS Equipment) - 2
UPDATE BOQ AIS 66- NO URAIAN PEKERJAAN SATUAN VOLUME
500kV & GIS 150-500kV UNINTERUPTIBLE POWER SUPPLY (UPS) FOR SUBSTATION AUTOMATION
(SAS) 13.1 UPS (for SAS and CCTV) Minimum 10 kVA (capacity subject to calculation result), including metering
voltage and current, standing rack, etc (according to TPG 10.G)
a) Penambahan opsi Note untuk perencana : jika membangun GITET 500 kV dan GI 150 kV dalam 1 lokasi, maka UPS cukup
battere 48 VDC jenis dibeli di sistem 500 kV (untuk supply SAS dan CCTV sistem 500 dan 150 kV)
Lithium dan sistem 13.2 External Battery 48 Volt (NiCad or Lithium Battery) for 10 hours full load capacity (according to TPG.10.B)
redundansi 48 VDC 13 Including Metering voltage and current, standing rack, etc Set 2
AC Distribution Board complete, incl. power surge protection device (Refer to SPLN S3.005-1:2021),
13.3 outgoing MCB's for supplying SAS equipment and CCTV, Automatic Change Over Switch (ACOS), etc.
b) Penggunaan UPS for (according to TPG.11)
SAS di semua 13.4 LV power cable, control cable and accesorries and necessary equipment (cable ladder, clamp, cable lug,
terminal, etc.) to complete the specified scope of work. (According to TPG 15)
tegangan dan Diesel
di 275-500 kV SUBSTATION AUXILIARIES EQUIPMENT
15.4 48 V DC Battery ( according to TPG 10.B1 and TPG 10.B2 ) Set 2
48 V DC Battery suitable for supplying all 48 V DC load for 8 hours discharge. (minimum capacity refer to TPG and
c) SAS Software subject to calculation for SCADATEL equipment). NiCad or Lithium Battery
dipindahkan ke SAS Battery Fuse Box,
hardware 15.5 48 V DC Battery charger ( according to TPG 10.D )
15 Battery charger with required voltage dropper (suitable for charging NiCad or Lithium Battery according to
d) Inverter sudah tidak item 15.4 above), Current rate subject to calculation, for 48V DC Battery complete with Panel Board , Set 2
Battery Fuse Box, metering and indicators.
diperlukan
15.8 'Standby Diesel Generator unit including accessories ( according to TPG.14.C ) Set 1
www.pln.co.id |
Technical Specification – TSS 9 dan TSS 10
• Update TSS 9 yang sebelumnya terdiri dari
• Narasi di dalam TSS 9B tentang numerical relays dijadikan satu dengan narasi dalam TSS 9A bab 3 Protection
Intelligent Electronics Device (IED)
• Update Narasi dalam TSS 9A bab 3 Protection Intelligent Electronics Device (IED) berdasarkan Grid Code dan SPLN
Pola Proteksi terbaru.
www.pln.co.id | 12
UPDATE TPG AIS & GIS (SAS)
UPDATE TPG AIS 66-500 KV (SAS)
Perubahan jumlah dan item dari SAS, Control & Protection Cubicle. SAS menjadi
seragam 15 item di semua tegangan, Control and protection terbagi 2 kelompok di
66-150 kV (15 item) dan 275-500 kV (21 item) mengikuti SPLN terbaru.
Control and Protection Cubicle dan MK penambahan kelengkapan dan perubahan
nilai protection class
Penambahan : Battere 48 VDC untuk jenis Lithium 66 – 500 kV
Penambahan : Uninterruptible Power Supply 66 – 500 kV
Pengurangan : PAX dan ADSS pada telekomunikasi 66 – 500 kV
Pengurangan : Inverter 66 – 500 kV
www.pln.co.id |
Penambahan TPG UPS dan Batere 48 V (LiFePO4)
www.pln.co.id |
UPDATE DRAWING AIS & GIS (SAS)
UPDATE DRAWING AIS 66-500 KV
Perubahan system inverter menjadi UPS dan teknologi Battery tipe litium
Penyesuaian desain gambar ACDC Sistem menyesuiakan SPLN Konstruksi GI dan SPLN
Remote station
Updating Telecommunication System, SAS System, CCTV System menyesuikan
perubahan pada BOQ
www.pln.co.id |