000 ton/tahun
Muhammad Naufal Ariq, Budhijanto, S.T., M.T., Ph.D.
Universitas Gadjah Mada, 2020 | Diunduh dari http://etd.repository.ugm.ac.id/
Prarancangan Pabrik Amonium Sulfat dari Amonia dan Asam Sulfat
Kapasitas 250.000 ton/tahun
INTISARI
ABSTRACT
This plant will be established in the Gresik area, East Java with
consideration of the availability of raw materials, where the location is not too far
from PT Petrokimia Gresik as the producer of the two main raw materials of this
ammonium sulfate plant.