Anda di halaman 1dari 4

P LA

300 0.5

28

8,078.30

19.23

38.47

42

7,200,000.00 22.44

161,566,038.00 7.5
90

48
PERKIRAAN PEKERJAAN RABAT

gaji 1 paket 162,000,000.00 162,000,000.00


arco 12 600,000.00 7,200,000.00
sekopp 18 100,000.00 1,800,000.00
drum 30 150,000.00 4,500,000.00
papan 6 m3 2,800,000.00 16,800,000.00
balok 2 m3 2,800,000.00 5,600,000.00

197,900,000.00

35,900,000.00
T LUAS
0.15 0.075 22.5

1524

1501.5

22.8

67.73

5 67.73333
338.6667

4.5

338.6667
PEKERJAAN BETON FC 15 MPA
PEKERJA PAPAN YG DIBUTUHKAN PANJANG TARGET PERHARI

KELOMPOK 1 30 LEMBAR 60 METER


KELOMPOK 2 30 LEMBAR 60 METER
KELOMPOK 3 30 LEMBAR 60 METER
KELOMPOK 4 30 LEMBAR 60 METER
KELOMPOK 5 30 LEMBAR 60 METER
KELOMPOK 6 30 LEMBAR 60 METER
PERKIRAAN TOTAL PANJANG PERHARI = 360 METER