PROJECT :
PEKERJAAN CIVIL & MECHANIKAL
PABRIK PENGOLAHAN KERNEL KAPASITAS 300 TON/HARI,
DAN
CPKO STORAGE TANK 5000 TON & 3000 TON
LAPORAN MINGGUAN
TANGGAL 14-08-2023 S/D 19-08-2023
KONTRAKTOR :
PT. HARIAKSA ANDALAN NUSANTARA
MEDAN
DAFTAR ISI
1. Struktur Organisasi
11. Kemajuan Kerja Site Storage Tank 5000 Ton & 3000 Ton
CONTROLL PROJECT
Abdul Halim
SITE FABRIKASI
Waskito
Priswanto
4 Proyek Fabrikasi WS : Pekerjaan Fabrikasi Conveyor Diameter Ø 600 Total Panjang 33.2 Meter
- Fabrikasi Conveyor Dia 600 x 8.5 meter = 1 Unit
- Fabrikasi Conveyor Dia 600 x 24.7 meter = 1 Unit
Pekerjaan Fabrikasi Conveyor Diameter Ø 400 Total Panjang 98.8Meter
- Fabrikasi Conveyor Dia 400 x 24.7 meter = Unit
- Fabrikasi Conveyor Dia 400 x 12 meter = 1 Unit
- Fabrikasi Conveyor Dia 400 x 6.8 meter = 1 Unit
- Fabrikasi Conveyor Dia 400 x 10.9 meter = 1 Unit
- Fabrikasi Conveyor Dia 400 x 11.4 meter = 1 Unit
- Fabrikasi Conveyor Dia 400 x 33 meter = 1 Unit
Pekerjaan Fabrikasi Conveyor Diameter Ø 300 Total Panjang 306.4 Meter
- Fabrikasi Conveyor Dia 300 x 28.8 meter = 1 Unit
- Fabrikasi Conveyor Dia 300 x 28.8 meter = 1 Unit
- Fabrikasi Conveyor Dia 300 x 5.5 meter = 1 Unit
- Fabrikasi Conveyor Dia 300 x 26.8 meter = 1 Unit
- Fabrikasi Conveyor Dia 300 x 7 meter = 1 Unit
- Fabrikasi Conveyor Dia 300 x 33.8 meter = 1 Unit
- Fabrikasi Conveyor Dia 300 x 5.9 meter = 1 Unit
- Fabrikasi Conveyor Dia 300 x 3.5 meter = 1 Unit
- Fabrikasi Conveyor Dia 300 x 9.8 meter = 1 Unit
- Fabrikasi Conveyor Dia 300 x 5 meter = 1 Unit
- Fabrikasi Conveyor Dia 300 x 43.8 meter = 1 Unit
- Fabrikasi Conveyor Dia 300 x 15.5 meter = 1 Unit
- Fabrikasi Conveyor Dia 300 x 46.1 meter = 1 Unit
- Fabrikasi Conveyor Dia 300 x 46.1 meter = 1 Unit
Pekerjaan Fabrikasi Conveyor Diameter Ø 200 Total Panjang 92.9 Meter
- Fabrikasi Conveyor Dia 200 x 30.2 meter = 1 Unit
- Fabrikasi Conveyor Dia 200 x 8.2 meter = 1 Unit
- Fabrikasi Conveyor Dia 200 x 27 meter = 1 Unit
- Fabrikasi Conveyor Dia 200 x 20.5 meter = 1 Unit
- Fabrikasi Conveyor Dia 200 x 7 meter = 1 Unit
5 Pekerjaan Elevator dan screaper
1 FABRIKASI
A Pekerjaan Fabrikasi Conveyor Diameter Ø 600 Total Panjang 33.2 Meter, FINISH
Material sudah sampai ke site, tanggal 02/02/2023.
- Bangku Motor Conveyor / 100%
B Pekerjaan Fabrikasi Conveyor Diameter Ø 400 Total Panjang 98,8 Meter, Finishing
- Bangku Motor Conveyor / 100%
C Pekerjaan Fabrikasi Conveyor Diameter Ø 300 Total Panjang 306.4 Meter Finish
- Bangku Motor Conveyor / 100%
D Pekerjaan Fabrikasi Hopper 1000 Ton Palm Kernel Storage Silo, FINISHING
1 FABRIKASI
Pekerjaan Fabrikasi Conveyor Diameter Ø 600 Total Panjang 33.2 Meter Finishing / Sudah dikirim
- Pekerjaan Bangku Motor
Pekerjaan Fabrikasi Conveyor Diameter Ø 400 Total Panjang 98.8 Meter Finishing /Sudah dikirim
- Pekerjaan Bangku Motor
Pekerjaan Fabrikasi Conveyor Diameter Ø 300 Total Panjang 306.4 Meter Finish
Material dikirim awal Maret
- Pekerjaan Bangku Motor
Pekerjaan Fabrikasi Hopper 1000 Ton Palm Kernel Storage Silo Finish
- Pekerjaan Pengiriman material Plat Hopper
10 Air Receiver Tank kapasitas 4000 ltr c/w Valve 1 Lot 100.00 100.00% 100.00 100.00% 100.00
II PEKERJAAN MECHANIKAL
1 Structure Tipping Truck 2 Unit 1.686 88.00% 1.484 90.00% 1.517
2 Palm Kernel Reception Hopper (L 12 Mtr x H 1,2 Mtr x W 3 Mtr) 1 Unit 1.154 80.00% 0.923 82.00% 0.947
- Hydraulic System Door
3 Palm Kernel Transfer Incline Chain Conveyor,W/850Meter x H/600mm x L/ 30 Meter 1 unit 1.431 75.00% 1.073 77.00% 1.102
- Gear Motor, Conveyor Chain, Sprocket Chain, & Roller
4 Palm Kernel Elevator ,W/850 Meter x H/32,5 Meter 2 Unit 4.673 75.00% 3.504 77.00% 3.598
- Gear Motor, Conveyor Chain, Sprocket Chain, & Roller
5 PK Cross Transfer Screw Conveyor ,Ø 600mm x 8,5 Meter 1 Unit 0.335 88.00% 0.295 90.00% 0.302
- Gear Motor
6 PK Transfer Screw Conveyor To Silo,Ø 600mm x 24,7 Meter 1 Unit 0.810 87.00% 0.705 89.00% 0.721
- Gear Motor
7 1000 Ton Palm Kernel Storage Silo 3 Unit 32.441 92.00% 29.846 94.00% 30.495
8 PK Transfer Screw Conveyor Below Silo,Ø400mm x 24,7 Meter 1 Unit 0.736 80.00% 0.589 82.00% 0.604
- Gear Motor
9 PK Cross Screw Conveyor,Ø400mmx 8 Meter 1 Unit 0.270 80.00% 0.216 82.00% 0.221
- Gear Motor
10 DCXL Palm Kernel Elevator ,W/700 Meter x H/9 Meter 1 Unit 0.568 80.00% 0.455 82.00% 0.466
- Gear Motor, Conveyor Chain, Sprocket Chain, & Roller
11 PK Transfer Screw Conveyor To KCP,Ø 400 mm x 12 Meter 1 Unit 0.363 80.00% 0.291 82.00% 0.298
- Gear Motor
12 Platform Magnetic Drum & Rotary Strainer Drum 1 Unit 0.452 90.00% 0.407 92.00% 0.416
13 Rotary Strainer Drum (Install) 1 Lot 0.049 - -
14 Magnetic Plat (Install) 2 Unit 0.003 - -
15 PK Transfer Screw Conveyor Below Magnectic Drumm ,Ø400mmx 6,8 Meter 1 Unit 0.231 89.00% 0.206 91.00% 0.211
- Gear Motor
16 DCXL Palm Kernel Elevator, W/700 Meter x H/11 Meter 1 Unit 0.679 89.00% 0.604 91.00% 0.618
- Gear Motor, Conveyor Chain, Sprocket Chain, & Roller
17 Batch Weigher c/w Hopper SS304, Autosystem (Install) 1 Unit 0.036 89.00% 0.032 91.00% 0.033
18 DCXL Palm Kernel Elevator,W/700 Meter x H/12,6 Meter 1 Unit 0.741 89.00% 0.659 91.00% 0.674
- Gear Motor, Conveyor Chain, Sprocket Chain, & Roller
19 PK Distributing Screw Conveyor To Kernel Dryer ,Ø400mm x 10,9 Meter 1 Unit 0.338 89.00% 0.301 91.00% 0.307
- Gear Motor
19 Kernel Dryer Kaps 22 ton & Ducting 2 Unit 1.772 89.00% 1.577 91.00% 1.612
20 Heater type LFD - 8104 - 4 ,Airflow 34.000 m3/hr, air pressure 250 mm Hg (Install) 4 Unit 0.034 - -
21 Kernel Silo Fan capasity 18000 m3/hr, static Pressure 135mm WG 22 Kw motor 2 Unit 0.303 89.00% 0.270 91.00% 0.276
22 PK Transfer Screw Conveyor Below Kernel Dryer , Ø 400 mm x 11,4 Meter 1 Unit 0.349 89.00% 0.311 91.00% 0.318
- Gear Motor
23 DCXL Palm Kernel Elevator ,W/700 Meter x H/10,9 Meter 1 Unit 0.667 89.00% 0.594 91.00% 0.607
- Gear Motor, Conveyor Chain, Sprocket Chain, & Roller
24 PK Transfer Screw Conveyor Below To Processing Plant , Ø 400 mm x 33 Meter 1 Unit 0.931 89.00% 0.828 91.00% 0.847
- Gear Motor
25 Palm Kernel Hopper ,H/5470mm x W/3040mm x L/21736 1 Unit 1.951 89.00% 1.736 91.00% 1.775
26 1st Pressing Oil Exppeller / YTH 9.35 (Install) 11 Unit 0.348 - -
27 1St Press Cake Transfer Screw Conveyor No.1, Ø 300 mm x 28,8 Meter 1 Unit 0.684 89.00% 0.609 91.00% 0.623
- Gear Motor
28 1St Press Cake Transfer Screw Conveyor No.2, Ø 300 mm x 28,8 Meter 1 Unit 0.684 89.00% 0.609 91.00% 0.623
- Gear Motor
29 1St Press Cake Cross Screw Conveyor To DC 1St Press Cake Elevator, Ø 300 mm x 5,5 Meter 1 Unit 0.186 89.00% 0.165 91.00% 0.169
- Gear Motor
30 DC 1St Press Cake Elevator ,W/700 Meter x H/10,4 Meter 1 Unit 0.590 89.00% 0.525 91.00% 0.536
- Gear Motor, Conveyor Chain, Sprocket Chain, & Roller
31 1St Press Cake Distribution Screw Conveyor To 2 ND Pressing , Ø 300 mm x 26,8 Meter 1 Unit 0.680 89.00% 0.605 91.00% 0.619
- Gear Motor
32 Palm Kernel Hopper ,H/5470mm x W/3040mm x L/2432mm 1 Unit 0.501 89.00% 0.446 91.00% 0.456
33 2ND Pressing PK Cake Exppeller / YTH 9.18 (Install) 13 Unit 0.412 - -
34 1St Press Cake Return Screw Conveyor,Ø 300 mm x 7 Meter 1 Unit 0.226 89.00% 0.202 91.00% 0.206
- Gear Motor
35 Final Cake Transfer Screw Conveyor , Ø 300 mm x 33,8 Meter 1 Unit 0.834 89.00% 0.742 91.00% 0.759
- Gear Motor
36 DC Final Cake Elevator ,W/700 Meter x H/7,6 Meter 1 Unit 0.462 89.00% 0.411 91.00% 0.420
- Gear Motor, Conveyor Chain, Sprocket Chain, & Roller
37 Final Cake Transfer Screw Conveyor To Pulverizer , Ø 300 mm x 5,9 Meter 1 Unit 0.202 89.00% 0.180 91.00% 0.184
- Gear Motor
38 Structure Pulverizer & Platform ,Tangga,Hand rail 1 Unit 0.608 89.00% 0.542 91.00% 0.554
39 YKHLM - 800 Rotary Pulverizer (Install) 1 Unit 0.031 - -
40 Final Cake Transfer Screw Conveyor Below Pulverizer , Ø 300 mm x 3,5 Meter 1 Unit 0.149 89.00% 0.133 91.00% 0.136
- Gear Motor
41 DC Final Cake Elevator ,W/700 Meter x H/14,2 Meter 1 Unit 0.560 89.00% 0.499 91.00% 0.510
- Gear Motor, Conveyor Chain, Sprocket Chain, & Roller
42 Final Cake Transfer Screw Conveyor To Cake Cooler , Ø 300 mm x 9,8 Meter 1 Unit 0.288 89.00% 0.256 91.00% 0.262
- Gear Motor
43 Structure Cake Cooler & Platform ,Tangga,Hand rail 1 Unit 0.519 89.00% 0.462 91.00% 0.472
44 Cake Cooler (Cyclone,Ducting,Fans) (Install) 1 Unit 0.076 - -
45 Final Cake Transfer Screw Conveyor,Ø 300 mm x 5 Meter 1 Unit 0.110 89.00% 0.098 91.00% 0.100
- Gear Motor
46 DC Final Cake Elevator ,W/700 Meter x H/ 10 Meter 1 Unit 0.487 89.00% 0.434 91.00% 0.443
- Gear Motor, Conveyor Chain, Sprocket Chain, & Roller
47 Final Cake Transfer Screw Conveyor, Ø 300 mm x 43,8 Meter 1 Unit 0.965 89.00% 0.859 91.00% 0.878
- Gear Motor
48 Final Cake Transfer Screw Conveyor, Ø 300 mm x 15,5 Meter 1 Unit 0.424 89.00% 0.377 91.00% 0.386
- Gear Motor
49 Structure Magnetic Drum & Platform ,Tangga,Hand rail 1 Unit 0.340 89.00% 0.303 91.00% 0.309
50 Magnetic Drum (Install) 1 Unit 0.022 - -
51 DC Final Cake Elevator ,W/700 Meter x H/ 14,2 Meter 1 Unit 0.787 89.00% 0.700 91.00% 0.716
- Gear Motor, Conveyor Chain, Sprocket Chain, & Roller
52 Final Cake Distributing Screw Conveyor No 1 To Wirehouse , Ø 300 mm x 46,1 Meter 1 Unit 1.112 89.00% 0.989 91.00% 1.012
- Gear Motor
53 Final Cake Distributing Screw Conveyor No 2 To Wirehouse , Ø 300 mm x 46,1 Meter 1 Unit 1.112 80.00% 0.889 91.00% 1.012
- Gear Motor
54 Oil Screw Conveyor Below 2 ND Press , Ø 200 mm x 30,2 Meter 1 Unit 0.778 90.00% 0.701 92.00% 0.716
- Gear Motor -
55 Oil Screw Conveyor Below 1ST Press , Ø 200 mm x 27 Meter 1 Unit 0.666 98.00% 0.652 98.00% 0.652
- Gear Motor -
56 1ST Press Oil Cross Screw Conveyor , Ø 200 mm x 8,2 Meter 1 Unit 0.234 88.00% 0.206 90.00% 0.211
- Gear Motor
57 Underground Buffer Crude OilTank Plat MS , Pit Suply Civil (1,9M x 1,5 M) 1 Unit 0.161 89.00% 0.143 91.00% 0.147
58 Transfer Pump to Vibrating Screen , 10 M3, Head 20 m , 2 Unit 0.159 - -
59 Vibrating Screen, Mesh 30 , motor 2,5 Hp (Owner) 2 Unit 0.008 - -
60 Leaf Filter Buffer Oil Tank Plat MS , Pit Suply Civil 1 Unit 0.429 89.00% 0.382 91.00% 0.391
61 Transfer Pump to Vertical Pressure Leaf Filter , 20 M3, Head 25 m , 2 Unit 0.206 - -
62 Sludge Transfer Screw Conveyor , Ø 200 mm x 20,5 Meter 1 Unit 0.520 89.00% 0.463 91.00% 0.473
- Gear Motor
63 Structure Vertical Pressure Leaf Filter 1 Unit 0.483 89.00% 0.430 91.00% 0.440
64 Vertical Pressure Leaf Filter (Install) 2 Unit 0.083 - -
65 Sludge Transfer Screw Conveyor , Ø 200 mm x 7 Meter 1 Unit 0.222 87.00% 0.193 89.00% 0.197
- Gear Motor
66 Clean Oil Tank Dia 3M x H/3M, Ms Plat 6 mm 1 Unit 0.429 90.00% 0.387 92.00% 0.395
67 Transfer Pump to Bulk Storage Oil Tank , 50 M3, Head 25 m , 2 Unit 0.509 87.00% 0.443 91.00% 0.463
68 Air Compressor - 11 Hp 1 Unit 0.750 98.00% 0.735 98.00% 0.735
69 Air Receiver Tank Kapasitas 4000 ltr c/w Valve 1 Lot 0.750 98.00% 0.735 98.00% 0.735
70 Structure Chain Block & Roller Block 1 Lot 0.150 87.00% 0.131 89.00% 0.134
71 Piping Process (Pipa, Fitting, & Valve) 1 Lot 1.304 89.00% 1.161 91.00% 1.187
72 Piping Transfer Oil (Pipa, Fitting, & Valve) 1 Lot 1.683 87.00% 1.464 89.00% 1.498
73 Piping Fire Hydrant (Pipa, Fitting, & Valve) 1 Lot 0.650 87.00% 0.566 89.00% 0.579
74 Piping & Valve 1 Lot 0.573 87.00% 0.499 89.00% 0.510
75 Walkway/Staircase, Hand Rail 1 Lot 0.877 97.00% 0.851 97.00% 0.851
76 Overhead Conveyor & Elevator Support 1 Lot 0.702 89.00% 0.625 89.00% 0.625
77 Hydraulic System 2 Unit 2.753 87.00% 2.395 87.00% 2.395
78 Pompa Hydrant & Piping Hydrant 1 Unit 0.228 89.00% 0.203 89.00% 0.203
3 Lokasi : Sipil & Erection di Lapangan / Site PT. Aman Jaya Perdana
II. PERENCANA KERJA MINGGU DEPAN : - Pengelasan Bottom Plat Tangki Timbun 5000 Ton
- Diagonal Dan Pengerolan Ms Plat 12mm Shel Ke 4 Dan Ke 5 Tangki Timbun 5000 Ton
- Menaikkan Shel Ke 4, 5 Dan 6 Ms Plat 8mm Tangki Timbun 3000 Ton
- Pengelasan Vertikal Dan Horizon Tangki Timbun 3000 Ton
- Menaikkan Shel Ke 3, 4 Dan 5 Ms Plat 14mm, 12mm Tangki Timbun 5000 Ton
- Pengelasan Shel Pertama & Kedua Vertikal Dan Horizon Tangki Timbun 5000 Ton
- Pengelasan Luar Dalam Shel Ke 4, 5, 6 Tangki Timbun 3000 Ton
- Pengelasan Luar Dalam Shel Ke 4, 5, 6 Tangki Timbun 5000 Ton
- Pengelasan Bottom Plat Tangki Timbun 3000 Ton
- Pengelasan Vertikal Dan Horizon Shel Ke 5,6,7 Tangki Timbun 5000 Ton
- Pengelasan Vertikal Dan Horizon Shel Ke 4,5,6 Tangki Timbun 3000 Ton
- Pemasangan Shel 9 & 10 Tangki 5000 Ton
- Pengelasan Vertikal Dan Horizon Shel Ke 7 & 8 Tangki 3000 Ton
- Menaikkan Shel 7 & 8 Tangki 3000 Ton
- Pengelasan Vertikal Dan Horizon Shel 5 & 6 Tangki 3000 Ton
- Pabrikasi Laba-Laba/Rangka Roof Tangki Timbun 5000 Ton
- Pabrikasi Laba-Laba/Rangka Roof Tangki Timbun 3000 Ton
- Pengelasan Laba-Laba Tangki 5000 Ton
- Pengelasan Ms Plat 8 & 6mm Shel Ke 9 Dan 10 Tangki 5000 Ton
- Penyetalan Ms Plat 6mm Shel Ke 7 & 8 Tangki 3000 Ton
- Pengelasan Bagian Dalam Shel Ke 5 & 6 Tangki 3000 Ton
- Penyetelan Laba-Laba Dan Pengelasan Tangki 3000 Ton
Catatan Pekerjaan :
LAPORAN KEMAJUAN PEKERJAAN LAPANGAN
CLIENT : PT. AMAN JAYA PERDANA
NAMA PEKERJAAN : PEKERJAAN CPKO STORAGE TANK 5000 TON & 3000 TON
LOKASI : BANDAR LAMPUNG
KONTRAKTOR : PT. HARIAKSA ANDALAN NUSANTARA
I DEMOBILIZATION
- Transportasi Personal 1 Lot 17.31 90.00% 15.57 90.00% 15.57
- Trasnportasi Alat & Mechanical 1 Lot 82.69 80.00% 66.16 80.00% 66.16
Total Bobot Demobilization 100.00 81.73 81.73
Total Bobot Mobilization, Civil & Structure Storage Tank 5000 & 3000 Ton (Tgl. 12 Agustus
9,032
2023 S/d 19 Agustus 2023
;
PROJECT CPKO STORAGE TANK 5000TON & 3000 TON
PEKERJAAN SHEL KE 10 CPKO STORAGE TANK 5000 TON & FABRIKASI RAFTER /LABA - LABA CPKO STORAGE
TANK 5000TON & 3000 TON
PT. AMAN JAYA PERDANA - BANDAR LAMPUNG
PROJECT CPKO STORAGE TANK 5000TON & 3000 TON
PEKERJAAN STRUKTUR LABA - LABA CPKO STORAGE TANK 3000T, LABA - LABA & CENTER LABA - LABA, &
PENGEBORAN TAPAK LABA - LABA CPKO STORAGE TANK 5000T & 3000T
PT. AMAN JAYA PERDANA - BANDAR LAMPUNG
PROJECT CPKO STORAGE TANK 5000TON & 3000 TON
PEKERJAAN PENGELASAN SHEL DALAM CPKO STORAGE TANK 5000TON & 3000 TON
PT. AMAN JAYA PERDANA - BANDAR LAMPUNG
PROJECT CPKO STORAGE TANK 5000TON & 3000 TON
PENGIRIMAN MATERIAL & ALAT KERJA TERAKHIR UNTUK PEKERJAAN CPKO STORAGE TANK 5000T & 3000T (TGL.
14 AGUSTUS 2023)
PT. AMAN JAYA PERDANA - BANDAR LAMPUNG
PROJECT CPKO STORAGE TANK 5000TON & 3000 TON
PENGIRIMAN MATERIAL & ALAT KERJA TERAKHIR UNTUK PEKERJAAN CPKO STORAGE TANK 5000T & 3000T (TGL.
14 AGUSTUS 2023)
PT. AMAN JAYA PERDANA - BANDAR LAMPUNG
9
8
7
6
5
4
3
2
1
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
NO
JAM
KETERANGAN :
9:00:00 PM
8:00:00 PM
7:00:00 PM
6:00:00 PM
5:00:00 PM
4:00:00 PM
3:00:00 PM
2:00:00 PM
1:00:00 PM
9:00:00 AM
8:00:00 AM
7:00:00 AM
6:00:00 AM
5:00:00 AM
4:00:00 AM
3:00:00 AM
2:00:00 AM
1:00:00 AM
11:00:00 PM
10:00:00 PM
12:00:00 PM
11:00:00 AM
10:00:00 AM
12:00:00 AM
31-Jul-23 Senin
1-Aug-23 Selasa
CERAH
2-Aug-23 Rabu
HUJAN LEBAT
3-Aug-23 Kamis
HUJAN GERIMIS
4-Aug-23 Jum'at
5-Aug-23 Sabtu
6-Aug-23 Minggu
7-Aug-23 Senin
8-Aug-23 Selasa
9-Aug-23 Rabu
10-Aug-23 Kamis
11-Aug-23 Jum'at
12-Aug-23 Sabtu
13-Aug-23 Minggu
14-Aug-23 Senin
15-Aug-23 Selasa
Hari/Tanggal
16-Aug-23 Rabu
KEADAAN CUACA
17-Aug-23 Kamis
LAPORAN BULANAN
18-Aug-23 Jum'at
19-Aug-23 Sabtu
20-Aug-23 Minggu
PERIODE BULAN : JULI - AGUSTUS 2023
21-Aug-23 Senin
22-Aug-23 Selasa
23-Aug-23 Rabu
24-Aug-23 Kamis
25-Aug-23 Jum'at
26-Aug-23 Sabtu
27-Aug-23 Minggu
28-Aug-23 Senin
29-Aug-23 Selasa
30-Aug-23 Rabu
31-Aug-23 Kamis