LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN

AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

DAFTAR ISI

KATA PENGANTAR.......................................................................................................i
DAFTAR ISI......................................................................................................................ii
DAFTAR TABEL.............................................................................................................viii
DAFTAR GAMBAR.........................................................................................................xiv

BAB I PENDAHULUAN
1.1 LATAR BELAKANG................................................................................I-1
1.2 MAKSUD...................................................................................................I-4
1.3 TUJUAN.....................................................................................................I-4
1.4 SASARAN..................................................................................................I-5
1.5 LINGKUP KEGIATAN.............................................................................I-5
1.6 SISTEMATIKA PENULISAN...................................................................I-6

BAB II METODE PEKERJAAN DAN KRITERIA DESAIN


2.1 PERIODE PERENCANAAN.....................................................................II-1
2.2 METODOLOGI PEKERJAAN..................................................................II-2
2.3 STANDAR PELAYANAN MINIMAL (SPM).........................................II-6
2.4 KRITERIA DESAIN DRAINASE.............................................................II-7
2.4.1 Kriteria Hidrologi............................................................................II-7
2.4.2 Kriteria Hidrolika............................................................................II-
26
2.4.3 Kriteria Struktur..............................................................................II-
29
2.5 KRITERIA DESAIN PENGELOLAAN SAMPAH..................................II-
33
2.5.1 Pengertian Jenis dan Sumber Sampah............................................II-
33
2.5.2 Sumber dan Timbulan Sampah.......................................................II-
35

CV. IHSAN KONSULTAN ii


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

2.5.3 Komposisi Sampah.........................................................................II-


36
2.5.4 Sistem Pengelolaan Sampah...........................................................II-
38
2.5.5 Kebutuhan Infrastruktur Pengelolaan Sampah...............................II-
50
2.6 KRITERIA DESAIN PENGELOLAAN AIR LIMBAH...........................II-
51
2.6.1 Sistem Pengelolaan Air Limbah.....................................................II-
51
2.6.2 Sistem Pengolahan Air Limbah Kawasan Kepulauan/Pesisir........II-
74
2.6.3 Standar desain penyaluran air limbah domestik.............................II-
75
2.7 PROYEKSI PENDUDUK WILAYAH PELAYANAN............................II-
77
2.8 KONTRIBUSI PENGELOLAAN BIDANG PLP DALAM PERUBAHAN
IKLIM.........................................................................................................II-
80

BAB III DESKRIPSI WILAYAH PERENCANAAN


3.1 KONDISI FISIK KOTA DOBO.................................................................III-1
3.1.1 Geografi..........................................................................................III-1
3.1.2 Topografi.........................................................................................III-1
3.1.3 Hidrologi dan Iklim.........................................................................III-2
3.1.4 Geologi............................................................................................III-4
3.2 KONDISI SOSIAL DAN EKONOMI.......................................................III-6
3.2.1 Sosial Budaya dan Ekonomi...........................................................III-6
3.2.2 Pemerintahan...................................................................................III-7
3.2.3 Sarana dan Prasarana Perkotaan.....................................................III-
10
3.2.3.1 Pendidikan........................................................................III-
10

CV. IHSAN KONSULTAN iii


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

3.2.3.2 Kesehatan.........................................................................III-
11
3.2.3.3 Agama..............................................................................III-
12
3.3 ANGKA KESAKITAN..............................................................................III-
13
3.4 KONDISI KEPENDUDUKAN..................................................................III-
14
3.4.1 Jumlah Penduduk............................................................................III-
14
3.4.2 Kepadatan Penduduk......................................................................III-
15
3.4.3 Distribusi Penduduk........................................................................III-
15
3.4.4 Laju Pertumbuhan Penduduk..........................................................III-
16
3.5 RENCANA PENGEMBANGAN WILAYAH...........................................III-
16
3.5.1 Rencana Tata Guna Lahan..............................................................III-
16
3.5.2 Proyeksi Pengembangan Wilayah...................................................III-
19
3.5.2.1 Pengembangan Kawasan Lindung...................................III-
19
3.5.2.2 Pengembangan Kawasan Budidaya.................................III-
20
3.5.3 Proyeksi Pengembangan Prasarana dan Sarana Perkotaan.............III-
22
3.5.3.1 Transportasi......................................................................III-
22
3.5.3.2 Sistem Jaringan Energi....................................................III-
26
3.5.3.3 Sistem Jaringan Komunikasi............................................III-
27

CV. IHSAN KONSULTAN iv


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

3.5.3.4 Sistem Jaringan Sumber Daya Air...................................III-


28
3.5.3.5 Sistem Prasarana Pengelolaan Lingkungan.....................III-
28
3.6 KONDISI EKSISTING PENGELOLAAN BIDANG PLP KOTA DOBO
.....................................................................................................................III-
31
3.6.1 Kondisi Eksisting Sistem Drainase.................................................III-
31
3.6.1.1 Sistem Drainase Makro....................................................III-
32
3.6.1.2 Sistem Drainase Mikro....................................................III-
33
3.6.1.3 Data Pasang Surut Kota Dobo.........................................III-
36
3.6.2 Kondisi Eksisting Persampahan......................................................III-
37
3.6.2.1 Perilaku Masyarakat.........................................................III-
37
3.6.2.2 Sistem Pengelolaan Sampah............................................III-
39
3.6.2.3 Pola Pengelolaan Sampah................................................III-
48
3.6.2.4 Kelembagaan Pengelolaan Sampah.................................III-
54
3.6.2.5 Pembiayaan......................................................................III-
56
3.6.2.6 Dampak Pengelolaan Sampah Eksisting
Terhadap Lingkungan dan Masyarakat............................III-
56
3.6.3 Kondisi Eksisting Air Limbah........................................................III-
61
3.6.3.1 Infrastruktur Pemanfaatan Air Bersih..............................III-
61

CV. IHSAN KONSULTAN v


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

3.6.3.2 Perilaku Masyarakat.........................................................III-


65
3.6.3.3 Sistem dan Teknologi Pengelolaan Air Limbah..............III-
66
3.6.3.4 Akses Sanitasi Total Berbasis Masyarakat......................III-
68
3.6.3.5 Kelembagaan Pengelolaan...............................................III-
70
3.6.3.6 Pembiayaan......................................................................III-
71
3.6.3.7 Dampak Pengelolaan Air Limbah Eksisting
Terhadap Lingkungan dan Masyarakat............................III-
71

BAB IV PERENCANAAN WILAYAH DAN STRATEGI PENGEMBANGAN


BIDANG PLP
4.1 ARAHAN PEMBANGANGUNAN WILAYAH PERENCANAAN (RTRW)
.....................................................................................................................IV-1
4.1.1 Perencanaan Pengembangan Sistem Drainase................................IV-1
4.1.2 Perencanaan Sistem Pengelolaan Persampahan..............................IV-2
4.1.3 Perencanaan Sistem Pengolahan Air Limbah.................................IV-6
4.2 CAKUPAN WILAYAH PELAYANAN PENGELOLAAN BIDANG PLPIV-
13
4.3 PROYEKSI PENDUDUK WILAYAH PERENCANAAN.......................IV-
15
4.4 KAJIAN STRATEGI PERENCANAAN PENGEMBANGAN BIDANG
DRAINASE................................................................................................IV-
19
4.4.1 Kajian Strategi Terdahulu Bidang Drainase...................................IV-
19
4.4.2 Konsep Perencanaan Infrastruktur Bidang Drainase......................IV-
36
4.4.3 Analisa Prioritas Perencanaan Infrastruktur Drainase....................IV-
42

CV. IHSAN KONSULTAN vi


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

4.5 KAJIAN STRATEGI PERENCANAAN PENGEMBANGAN


BIDANG PENGELOLAAN PERSAMPAHAN........................................IV-
48
4.5.1 Kajian Strategi Terdahulu Bidang Persampahan............................IV-
48
4.5.2 Konsep Perencanaan Penanganan Sampah.....................................IV-
53
4.6 KAJIAN STRATEGI PERENCANAAN PENGEMBANGAN
BIDANG PENGOLAHAN AIR LIMBAH................................................IV-
55
4.6.1 Kajian Strategi Terdahulu Bidang Pengolahan Air Limbah...........IV-
55
4.6.2 Konsep Perencanaan Penanganan Air Limbah...............................IV-
58

BAB V USULAN TEKNIS PERENCANAAN INFRASTRUKTUR BIDANG PLP


5.1 USULAN TEKNIS PERENCANAAN INFRASTRUKTUR BIDANG
DRAINASE................................................................................................V-1
5.1.1 Prioritas 1; G.5 Komplek Pelabuhan (Kampung Belanda,
Kampong Dok, Kampung Cina).....................................................V-2
5.1.2 Prioritas 2; G.3 RT.002/RW.02 Kelurahan Siwalama (Lorong Agen)
.........................................................................................................V-3
5.1.3 Prioritas 3; G.1 Kawasan Jalan Raya PEMDA & Jalan
Cendrawasih (depan Bandara)........................................................V-4
5.1.4 Prioritas 4; G.7 Kawasan Pemukiman Belakang Gereja................V-5
5.1.5 Prioritas 5; G.2 Zipur Pantai (lorong Sangrila)...............................V-7
5.1.6 Prioritas 6; G.6 Kawasan Tugu Cendrawasih.................................V-7
5.1.7 Prioritas 7; G.4 Jalan Raja Sam......................................................V-8
5.1.8 Prioritas 8; G.8 Jalan Ali Moertopo................................................V-9
5.1.9 Prioritas 9; G.9 Jalan Dewan Lama-Pemda....................................V-9
5.1.10 Prioritas Penanganan Bidang Drainase Tahun Anggaran 2017......V-20
5.2 USULAN TEKNIS PERENCANAAN INFRASTRUKTUR BIDANG
PERSAMPAHAN.......................................................................................V-
37

CV. IHSAN KONSULTAN vii


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

5.2.1 Proyeksi Timbulan Sampah Kota Dobo.........................................V-37


5.2.2 Usulan Pengelolaan Sampah di Kota Dobo....................................V-41
5.2.3 Analisa Kebutuhan Infrastruktur Persampahan..............................V-45
5.2.4 Analisa Pengolahan Sampah 3r Berbasis Masyarakat....................V-51
5.2.5 Analisa Potensi Ekonomis Sampah................................................V-70
5.2.6 Perencanaan Peningkatan Tpa Kota Dobo Tahun Anggaran 2017.V-71
5.3 USULAN TEKNIS PERENCANAAN INFRASTRUKTUR PENGOLAHAN

AIR LIMBAH.............................................................................................V-
90
5.3.1 Proyeksi Timbulan dan Karakteristik Air Limbah..........................V-90
5.3.2 Cakupan Pelayanan Pengelolaan Air Limbah di Kota Dobo..........V-93
5.3.3 Perencanaan Sistem dan Teknologi Pengolahan Air Limbah.........V-94
5.3.4 Kebutuhan Infrastruktur Pengolahan Air Limbah Kota Dobo........V-96

BAB VI USULAN PROGRAM INFRASTRUKTUR BIDANG PLP WILAYAH


PERENCANAAN
6.1 USULAN MANAJEMEN INFRASTRUKTUR BIDANG DRAINASE. .VI-1
6.1.1 Infrastruktur....................................................................................VI-1
6.1.1.1 Rencana Pembangunan Saluran Drainase
Menurt SSK Th. 2014 dan MPS Th.2015,
Kabupaten Kepulauan Aru...............................................VI-1
6.1.1.2 Tahapan Rencana Pembangunan Drainase Kota
Dobo Menurut Masterplan Kota Dobo Th. 2013.............VI-6
6.1.2 Kelembagaan...................................................................................VI-8
6.1.2.1 Pembagian Kewenangan Sistem Drainase Kota
Dobo, Menurut Master Plan dan DED Drainase
Tahun 2014......................................................................VI-8
6.1.2.2 Kajian Strategi Terdahulu dan Perencanaan Pengembangan
Bidang Drainase Wilayah Perencanaan...........................VI-9
6.2 USULAN MANAJEMEN INFRASTRUKTUR BIDANG PENGELOLAAN
SAMPAH....................................................................................................VI-
11

CV. IHSAN KONSULTAN viii


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

6.2.1 Infrastruktur....................................................................................VI-
11
6.2.2 Kelembagaan...................................................................................VI-
13
6.2.2.1 Arahan Pembentukan KSM.............................................VI-
13
6.2.3 Pembiayaan Pengelolaan Sampah...................................................VI-
17
6.2.4 Regulasi Pengelolaan Sampah........................................................VI-
18
6.2.5 Potensi Kerjasama...........................................................................VI-
19
6.3 USULAN MANAJEMEN INFRASTRUKTUR BIDANG PENGOLAHAN
AIR LIMBAH.............................................................................................VI-
19
6.3.1 Infrastruktur....................................................................................VI-
19
6.3.2 Kelembagaan...................................................................................VI-
20
6.3.3 Monitoring dan Evaluasi.................................................................VI-
22
6.3.4 Pendanaan.......................................................................................VI-
22
6.4 ANALISA RANCANGAN ANGGARAN BIAYA BIDANG PLP..........VI-
23
6.4.1 Analisa Harga Satuan Pekerjaan Kota Dobo..................................VI-
23
6.4.1.1 Bidang Drainase..................................................................VI-
24
6.4.1.2 Bidang Persampahan...........................................................VI-
28
6.4.1.3 Bidang Air Limbah.............................................................VI-
32

CV. IHSAN KONSULTAN ix


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

6.4.2 Rancangan Anggaran Biaya Infrastruktur Drainase.......................VI-


36
6.4.3 Rancangan Anggaran Biaya Infrastruktur Persampahan................VI-
43
6.4.4 Rancangan Anggaran Biaya Infrastruktur Pengolahan Air Limbah VI-
47

BAB VII
..............................................................................................................................
PENUTUP
7.1 KESIMPULAN...........................................................................................VII-
1
7.2 SARAN DAN MASUKAN........................................................................VII-
1

CV. IHSAN KONSULTAN x


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

DAFTAR TABEL

Tabel 2.1 Nilai Q/n0,5 dan R/n0,5.................................................................................II-9


Tabel 2.2 Kala Ulang Berdasarkan Tipologi Kota & Luas Daerah Pengaliran.............II-
11
Tabel 2.3 Harga Kt untuk Sebarab Distribusi Normal...................................................II-
12
Tabel 2.4 Harga Yn dan Sn untuk Sebaran Distribusi Gumbel.....................................II-
14
Tabel 2.5 Harga Cs untuk Sebaran Distribusi Log Person III......................................II-
15
Tabel 2.6 Parameter Chi Quadrat Kritis.........................................................................II-
18
Tabel 2.7 Parameter Harga Dcr......................................................................................II-
19
Tabel 2.8 Berat Jenis Bahan...........................................................................................II-
29
Tabel 2.9 Tebal Pelindung Beton Pada Bangunan.........................................................II-
31
Tabel 2.10 Timbulan sampah berdasarkan sumbernya....................................................II-
36
Tabel 2.11 Komposisi sampah domestik.........................................................................II-
37
Tabel 2.12 Tipikal komposisi sampah pemukiman (% berat basah)...............................II-
38
Tabel 2.13 Persyaratan Sarana Pewadahan......................................................................II-
41
Tabel 2.14 Kriteria Jenis Wadah......................................................................................II-
42

CV. IHSAN KONSULTAN xi


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

Tabel 2.15 Perhitungan Kebutuhan Infrastruktur Pengelolaan Sampah..........................II-


50
Tabel 2.16 Ukuran tangki septik sesuai dengan jumlah pemakai dan masa pemakaian..II-54
Tabel 2.17 Kelebihan dan Kekurangan Tangki Interseptor.............................................II-60
Tabel 2.18 Kelebihan dan Kekurangan WC Sentor Jongkok..........................................II-63
Tabel 2.19 Kelebihan dan Kekurangan WC Sentor Duduk.............................................II-65
Tabel 2.20 Kelebihan dan Kekurangan Tangki Septik......................................................II-69
Tabel 2.21 Kelebihan dan Kekurangan Kolam Stabilisasi..............................................II-71
Tabel 2.22 Kelebihan dan Kekurangan Biofilter.............................................................II-73
Tabel 2.23 Standar Perencanaan Tangki Septik...............................................................II-76

Tabel 3.1 Daerah Aliran Sungai di Kabupaten Kepulauan Aru.....................................III-2


Tabel 3.2 Jenis Tanah dan Jenis Batuanpada Kepulauan...............................................III-4
Tabel 3.3 Jumlah Anak Desa, Rukun Warga dan Rukun Tetangga...............................III-9
Tabel 3.4 Luas Wilayah dan Jarak dari Ibukota Kecamatan dan
Ibukota Kabupaten di Kecamatan Pulau-Pulau Aru......................................III-9
Tabel 3.5 Jumlah Fasilitas Pendidikan menurut Desa...................................................III-
10
Tabel 3.6 Jumlah Sekolah, Gedung Sekolah, Kelas dan Ruang Kelas..........................III-
11
Tabel 3.7 Jumlah Tenaga Pengajar, Murid dan Penerimaan Baru.................................III-
11
Tabel 3.8 Jumlah Rumah Sakit, Puskesmas, Puskesmas Pembantu,
Posyandu, Polindes, dan Poskesdes di Kecamatan Pulau-Pulau Aru............III-
12
Tabel 3.9 Jumlah Tenaga Dokter Umum, Perawat, Bidan, Sanitasi dan
lainnya di Kecamatan Pulau-Pulau Aru.........................................................III-
12
Tabel 3.10 Jumlah Fasilitas Peribadatan Agama.............................................................III-
13
Tabel 3.11 Jumlah Kasus Penyakit Terbanyak di Kabupaten Kepulauam Aru...............III-
13
Tabel 3.12 Jumlah Kasus Penyakit Terbanyak di Kabupaten Kepulauam Aru...............III-
14

CV. IHSAN KONSULTAN xii


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

Tabel 3.13 Jumlah Penduduk menurut Desa di Kecamatan Pulau-Pulau Aru.................III-


14
Tabel 3.14 Luas Desa, Jumlah Penduduk dan Kepadatan Penduduk menurut
Desa di Kecamatan Pulau-Pulau Aru.............................................................III-
15
Tabel 3.15 Jumlah Penduduk dan Persebaran Penduduk menurut Desa.........................III-
15
Tabel 3.16 Inventarisasi Drainase Primer, Kawasan Kota Dobo.....................................III-
33
Tabel 3.17 Inventarisasi Drainase Mikro, Kawasan Kota Dobo......................................III-
33
Tabel 3.18 Infrastruktur Persampahan di Kota Dobo......................................................III-
49
Tabel 3.19 Kelompok Kerja Penyapu Jalan di Kota Dobo..............................................III-
51
Tabel 3.20 Retribusi Realisasi Persampahan Kepulauan Aru..........................................III-
56
Tabel 3.21 Area Beresiko Sanitasi Komponen Persampahan..........................................III-
57
Tabel 3.22 Sistem Penyediaan dan Pengelolan Air Minum Cabang PDAM Dobo.........III-
62
Tabel 3.23 Pengelolaan Air Limbah dengan Jamban Pribadi..........................................III-
67

Tabel 4.1 Program/Kegiatan Pengelolaan Drainase di Kabupaten Kepulauan


Aru Tahun 2011/2012....................................................................................IV-1
Tabel 4.2 Rencana Program/Kegiatan Pengelolaan Drainase di
Kabupaten Kepulauan Aru Tahun 2015........................................................IV-1
Tabel 4.3 Rencana Program Jangka Menengah Komponen
Persampahan Kabupaten Kepulauan Aru Tahun 2016/2020.........................IV-2
Tabel 4.4 Rencana Program Jangka Menengah Komponen Persampahan
Kota Dobo Tahun 2016/2020.........................................................................IV-4
Tabel 4.5 Rencana Kegiatan Persampahan Kota Dobo Tahun 2016/2020....................IV-5
Tabel 4.6 Prioritas Implementasi Program dan Kegiatan Persampahan........................IV-5

CV. IHSAN KONSULTAN xiii


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

Tabel 4.7 Rencana Program Jangka Menengah Komponen Air Limbah


Kabupaten Kepulauan Aru Tahun 2016/2020...............................................IV-7
Tabel 4.8 Rencana Program Jangka Menengah Komponen Air Limbah Kota
Dobo Tahun 2016/2020.................................................................................IV-
10
Tabel 4.9 Rencana Cakupan Pelayanan Air Limbah Kabupaten Kepulauan
Aru Tahun 2016/2020....................................................................................IV-
11
Tabel 4.10 Prioritas Implementasi Program dan Kegiatan Pengelolaan Air Limbah......IV-
12
Tabel 4.11 Jumlah Penduduk per Desa di Kota Dobo.....................................................IV-
16
Tabel 4.12 Proyeksi Pertumbuhan Penduduk Kota Dobo................................................IV-
16
Tabel 4.13 Proyeksi Kepadatan Penduduk Kota Dobo....................................................IV-
19
Tabel 4.14 Permasalahan MendesakKabupaten Kepulauan Aru.....................................IV-
21
Tabel 4.15 Luas Wilayah Genangan Kepulauan Aru, Tahun 2014.................................IV-
21
Tabel 4.16 Inventarisasi Lokasi Genangan dan Penyebabnya, di Kota Dobo.................IV-
23
Tabel 4.17 Perolehan Data Curah Hujan, Kota Dobo......................................................IV-
36
Tabel 4.18 Data Hujan Maksimum di Stasiun Tual Tahun 1953 - 1981.........................IV-
37
Tabel 4.19 Data Hujan Maksimum Stasiun Tual Tahun 2003-2013...............................IV-
37
Tabel 4.20 Analisa Hujan Bulanan St. St. Tual Th. 2003-2013 (mm/bln)......................IV-
38
Tabel 4.21 Analisa Hujan Uji Konsistensi Data St. Tual (Studi Terdahulu)...................IV-
39
Tabel 4.22 Resume Hasil Analisa Hujan Rencana Rata-rata St. Tual (Metode Terbaik)IV-
39

CV. IHSAN KONSULTAN xiv


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

Tabel 4.23 Resume Hasil Analisa Hujan Rencana St. Tual Th.2003-2013.....................IV-
40
Tabel 4.24 Perbandingan Hasil Analisa Hujan Rencana St. Tual....................................IV-
41
Tabel 4.25 Data Informasi Kondisi Besaran Genangan...................................................IV-
42
Tabel 4.26 Analisa Tinggi Genangan..............................................................................IV-
43
Tabel 4.27 Analisa Luas Genangan.................................................................................IV-44
Tabel4.28 Analisa Lama Genangan................................................................................IV-44
Tabel 4.29 Analisa Frekuensi Genangan.........................................................................IV-
45
Tabel 4.30 Analisa Prioritas Pemecahan Masalah Genangan..........................................IV-
47
Tabel 4.31 Urutan Prioritas Penanganan Daerah Genangan Kota Dobo.........................IV-
48
Tabel 4.32 Tujuan, Sasaran, dan Strategi Persampahan Kabupaten Kepulauan Aru......IV-
49
Tabel 4.33 Tahapan Pengembangan Persampahan Kabupaten Kepulauan Aru..............IV-
50
Tabel 4.34 Permasalahan Mendesak................................................................................IV-
58

Tabel 5.1 Inventarisasi Lokasi, Permasalahan dan Pemecahan Genangan....................V-1


Tabel 5.2 Prioritas 1; G.5 Komplek Pelabuhan (Kampung Belanda,............................V-2
Tabel 5.3 Prioritas 2; G.3 RT.002/RW.02 Kelurahan Siwalama (Lorong Agen)..........V-3
Tabel 5.4 Prioritas 3; G.1 Kawasan Jalan Raya PEMDA & Jalan Cendrawasih
(depan Bandara).............................................................................................V-5
Tabel 5.5 Prioritas 4; G.7 Kawasan Pemukiman Belakang Gereja...............................V-5
Tabel 5.6 Prioritas 6; G.6 Kawasan Tugu Cendrawasih................................................V-7
Tabel 5.7 Prioritas 7; G.4 Jalan Raja Sam.....................................................................V-8
Tabel 5.8 Prioritas 8; G.8 Jalan Ali Moertopo...............................................................V-9
Tabel 5.9 Prioritas 9; G.9 Jalan Dewan Lama-Pemda...................................................V-9

CV. IHSAN KONSULTAN xv


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

Tabel 5.10 Analisa Debit Rencana Drainase Kawasan Tugu Cendrawasih....................V-


20
Tabel 5.11 Analisa Dimensi Rencana Drainase Kawasan Tugu Cendrawasih................V-
22
Tabel 5.12 Analisa Elevasi Rencana Rencana Drainase Kawasan Tugu Cendrawasih...V-
22
Tabel 5.13 Komposisi Timbulan Sampah di Kota Dobo Tahun 2013.............................V-
38
Tabel 5.14 Komposisi Timbulan Sampah di Kota Dobo Tahun 2015.............................V-
38
Tabel 5.15 Proyeksi Total Timbulan dan Komposisi Sampah Kota Dobo......................V-40
Tabel 5.16 Proyeksi Kebutuhan Infrastruktur Pengelolaan Sampah Desa Galay Dubu..V-46
Tabel 5.17 Proyeksi Kebutuhan Infrastruktur Pengelolaan Sampah Kelurahan Siwalima V-
47
Tabel 5.18 Rekapitulasi Proyeksi Kebutuhan Infrastruktur Pengelolaan Sampah di
Kelurahan Galaydubu dan Kelurahan SiwalimaKota Dobo..........................V-48
Tabel 5.19 Persentase Pelayanan Infrastruktur Eksisting dari Kebutuhan Infrastruktur
Persampahan Kota Dobo................................................................................V-48
Tabel 5.20 Penambahan Pengadaan Infrastruktur Pengelolaan Sampah Kota Dobo......V-49
Tabel 5.21 Perencanaan Kebutuhan TPS3R Kota Dobo..................................................V-52
Tabel 5.22 Timbulan Sampah Dikelola di TPS 3R..........................................................V-53
Tabel 5.23 Spesifikasi Mesin Pencacah Sampah Organik...............................................V-55
Tabel 5.24 Kelebihan dan Kekurangan Metoda Pengomposan.......................................V-57
Tabel 5.25 Kelebihan dan Kekurangan Metoda Pengomposan.......................................V-71
Tabel 5.26 Sistem Penyediaan dan Pengelolaan Air Minum Cabang PDAM Kota Dobo V-
90
Tabel 5.27 Kriteria Perencananaan Air Bersih................................................................V-91
Tabel 5.28 Timbulan Air Limbah Kota Dobo..................................................................V-92
Tabel 5.29 Karakteristik Limbah Cair.............................................................................V-93
Tabel 5.30 Rangkuman Desain IPAL Komunal Sanimas................................................V-96
Tabel 5.31 Kebutuhan Infrastruktur Sanimas Desa Galay Dubu.....................................V-97
Tabel 5.32 Kebutuhan Infrastruktur Sanimas Kelurahan Siwalima................................V-97

Tabel 6.1 Area Berisiko Sanitasi (tingkat 3 dan 4) Komponen Sistem

CV. IHSAN KONSULTAN xvi


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

Drainase Kepulauan Aru................................................................................VI-1


Tabel 6. 2 Rencana Kegiatan Drainase, MPS Th. 2015..................................................VI-2
Tabel 6.3 Tahapan Pengembangan Drainase Perkotaan................................................VI-2
Tabel 6.4 Ringkasan Indikasi Kebutuhan Biaya dan Sumber Pendanaan
dan/atau Pembiayaan Pengembangan Sanitasi untuk 5 Tahun......................VI-5
Tabel 6.5 Rencana Pengembangan Jangka Menengah Drainase, MPS Th. 2015..........VI-5
Tabel 6. 6 Rekapitulasi Anggaran per Sumber Anggaran Sanitasi
Kabupaten Kepulauan Aru, MPS Th. 2015...................................................VI-5
Tabel 6.7 Rekapitulasi Anggaran Drainase per Sumber Anggaran
Sanitasi Kabupaten Kepulauan Aru, MPS Th. 2015......................................VI-6
Tabel 6.8 Pemangku Kepentingan dalam Pembangunan dan
Pengelolaan Drainase Perkotaan,Kepulauan Aru..........................................VI-8
Tabel 6.9 Kelembagaan Penanganan Drainase, Kota Dobo..........................................VI-9
Tabel 6.10 Perencanaan Permasalahan Genangan di Kota Dobo....................................VI-
10
Tabel 6.11 Program Pengelolaan Infrastruktur Persampahan..........................................VI-
12
Tabel 6.12 Program Pengadaan Infrastruktur Persampahan............................................VI-
12
Tabel 6.13 Rencana Program Pengelolaan Persampahan................................................VI-
16
Tabel 6.14 Program Pengelolaan Infrastruktur Persampahan..........................................VI-
19
Tabel 6.15 Daftar Harga Satuan Dasar Pekerjaan Drainase Kota Dobo Tahun 2016.....VI-
24
Tabel 6.16 Daftar Harga Satuan Pekerjaan Drainase Kota Dobo Tahun 2016................VI-
26
Tabel 6.17 Daftar Harga Satuan Dasar Pekerjaan Persampahan Kota Dobo Tahun 2016 VI-
28
Tabel 6.18 Daftar Harga Satuan Pekerjaan Persampahan Kota Dobo Tahun 2016.........VI-
30
Tabel 6.19 Daftar Harga Satuan Dasar Pekerjaan Air Limbah Kota Dobo Tahun 2016.VI-
32

CV. IHSAN KONSULTAN xvii


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

Tabel 6.20 Daftar Harga Satuan Pekerjaan Air Limbah Kota Dobo Tahun 2016...........VI-
35
Tabel 6.21 Rencana Anggaran Biaya Drainase Kota Dobo TA 2017.............................VI-
37
Tabel 6.22 Rencana Anggaran Biaya Pembangunan Bidang Persampahan Kota Dobo
TA 2017.........................................................................................................VI-44
Tabel 6.23 Rencana Anggaran Biaya Pembangunan Bidang Pengolahan Air Limbah Kota
Dobo TA 2017...............................................................................................VI-
48

CV. IHSAN KONSULTAN xviii


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

DAFTAR GAMBAR

Gambar 2.1 Skematik Unit Hidrograph.....................................................................II-


23
Gambar 2.2 Skematik Unit Hidrograph Yang Sudah Di Modifikasi.........................II-
23
Gambar 2.3 Saluran Bentuk Trapesium.....................................................................II-
26
Gambar 2. 4 Saluran Bentuk Segiempat.....................................................................II-
26
Gambar 2.5 Kemiringan Tanah..................................................................................II-
28
Gambar 2.6 Parameter Bilangan Froude....................................................................II-
29
Gambar 2.7 Dump Truck...........................................................................................II-
45
Gambar 2.8 Arm roll Truck........................................................................................II-
46
Gambar 2. 9 Sistem pembuangan air limbah terpusat.................................................II-
51
Gambar 2.10 Tangki septik..........................................................................................II-
53
Gambar 2.11 Sistem pembuangan air limbah terpusat.................................................II-
55
Gambar 2.12 Anaerobik Bafel Reaktor (ABR)............................................................II-
57
Gambar 2. 13 Manhole dan Drop Manhole...................................................................II-
59
Gambar 2.14 Gambar Potongan Tangki Interseptor....................................................II-
60

CV. IHSAN KONSULTAN xix


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

Gambar 2.15 WC Sentor Jongkok................................................................................II-


62
Gambar 2.16 WC Sentor Duduk..................................................................................II-
64
Gambar 2.17 Grease Trap............................................................................................II-
66
Gambar 2.18 Septic Tank.............................................................................................II-
68
Gambar 2.19 Kolam Stabilisasi....................................................................................II-
70
Gambar 2.20 Gambar Potongan Biofilter....................................................................II-
72
Gambar 2.21 Gambar Detail Bagian Dalam Biofilter..................................................II-
73
Gambar 2.22 Sistem Pengolahan Air Limbah Pulau Pramuka....................................II-
75

Gambar 3.1 Orientasi Wilayah Kota Dobo, Kabupaten Kepulauan Aru...................III-1


Gambar 3.2 Peta Topografi Kota Dobo.....................................................................III-5
Gambar 3.3 Kondisi Eksisting Sistem Drainase Jalan di Kota Dobo........................III-
32
Gambar 3. 4 Peta Jaringan Drainase Primer, Kawasan Kota Dobo............................III-
34
Gambar 3. 5 Peta Jaringan Drainase Mikro, Kawasan Kota Dobo.............................III-
35
Gambar 3. 6 Perilaku Membuang Sampah di Pantai dan Sungai................................III-
38
Gambar 3. 7 Kondisi Pengelolaan Sampah di Kota Dobo..........................................III-
39
Gambar 3.8 TPS 3R di dekat TPA.............................................................................III-
44
Gambar 3.9 TPA BLH di Kota Dobo.........................................................................III-
45

CV. IHSAN KONSULTAN xx


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

Gambar 3.10 Penumpukan sampah di jalan menuju TPA BLH di Kota Dobo............III-
45
Gambar 3.11 Lokasi TPA dan TPS di Kota Dobo.......................................................III-
47
Gambar 3.12 Sampah yang Tercampur di dalam Kontainer........................................III-
48
Gambar 3.13 Petugas Penyapu Jalan Kota Dobo.........................................................III-
51
Gambar 3.14 Peta Cakupan Pelayanan Persampahan di Kepulauan Aru....................III-
52
Gambar 3.15 Peta Area Beresiko Sanitasi Persampahan.............................................III-
58
Gambar 3.16 Peta Jaringan PDAM Kabupaten Kepulauan Aru..................................III-
64
Gambar 3.17 Perilaku BABs yang dilakukan Masyarakat...........................................III-
65
Gambar 3.18 Sarana MCK di Kota Dobo....................................................................III-
66
Gambar 3.19 Akses Sanitasi STBM Kecamatan Pulau-pulau Aru..............................III-
69
Gambar 3.20 Pemetaan Akses Sanitasi STBM Kecamatan Pulau-pulau Aru..............III-
70

Gambar 4.1 Peta Pembagian Kawasan (Batas Desa) Kota Dobo..............................IV-


14
Gambar 4.2 Peta Lokasi Genangan, Kota Dobo........................................................IV-
26
Gambar 4.3 Peta Permasalahan Genangan G1; Kawasan Jalan Raya
Pemda dan Jalan Cendrawasih (Depan Bandara)...................................IV-
27
Gambar 4.4 Peta Permasalahan Genangan G2; Zipur Pantai (Lorong Sangrila).......IV-
28

CV. IHSAN KONSULTAN xxi


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

Gambar 4.5 Peta Permasalahan Genangan G3; RT.002/RW.02 Kelurahan Siwalima


(Lorong Agen)........................................................................................IV-
29
Gambar 4.6 Peta Permasalahan Genangan G4; Jalan Raja Sam................................IV-
30
Gambar 4.7 Peta Permasalahan Genangan G5; Komplek Pelabuhan
(Kampung Belanda, Kampung Dok, Kampung Cina)...........................IV-
31
Gambar 4.8 Peta Permasalahan Genangan G6; Kawasan Tugu Cendrawasih...........IV-
32
Gambar 4.9 Peta Permasalahan Genangan G7; Kawasan Permukiman Belakang
Gereja.....................................................................................................IV-
33
Gambar 4.10 Peta Permasalahan Genangan G8; Jalan Ali Moertopo..........................IV-
34
Gambar 4. 11 Peta Permasalahan Genangan G9; Jalan Dewan Lama – Pemda...........IV-
35
Gambar 4.12 Peta Tahapan Pengembangan Persampahan Kabupaten Kepulauan Aru IV-
52
Gambar 4.13 Skenario Perencanaan Pengelolaan Persampahan Kota Dobo...............IV-
54
Gambar 4.14 Peta Kelompok Pola Pemukiman Berdasarakan Rencana Pengelolaan Air
Limbah....................................................................................................IV-
60

Gambar 5.1 Prioritas 1; G.5 Komplek Pelabuhan (Kampung Belanda, Kampong Dok,
Kampung Cina)......................................................................................V-11
Gambar 5.2 Prioritas 2; G.3 RT.002/RW.02 Kelurahan Siwalama (Lorong Agen). .V-12
Gambar 5.3 Prioritas 3; G.1 Kawasan Jalan Raya PEMDA & Jalan Cendrawasih
(depan Bandara).....................................................................................V-13
Gambar 5.4 Prioritas 4; G.7 Kawasan Pemukiman Belakang Gereja........................V-14
Gambar 5.5 Prioritas 5; G.2 Zipur Pantai (lorong Sangrila)......................................V-15
Gambar 5.6 Prioritas 6; G.6 Kawasan Tugu Cendrawasih........................................V-16
Gambar 5.7 Prioritas 7; G.4 Jalan Raja Sam..............................................................V-17

CV. IHSAN KONSULTAN xxii


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

Gambar 5.8 Prioritas 8; G.8 Jalan Ali Moertopo.......................................................V-18


Gambar 5.9 Prioritas 9; G.9 Jalan Dewan Lama-Pemda............................................V-19
Gambar 5.10 Analisa Pemecahan Masalah Genangan dan Cathment Area (CA)
Genangan 6, Kawasan Tugu Cendrawasih.............................................V-21
Gambar 5.11 Situasi dan Potongan Memanjang Kawasan Tugu Cendrawasih...........V-24
Gambar 5.12 Potongan Melintang Kawasan Tugu Cendrawasih................................V-28
Gambar 5.13 Tipe Saluran Perencanaan Drainase Kawasan Tugu Cendrawasih........V-34
Gambar 5.14 Peta Kebutuhan Infrastruktur Pengelolaan Sampah Kota Dobo............V-50
Gambar 5.15 Mesin Pencacah Sampah Organik..........................................................V-55
Gambar 5.16 Mesin Pencacah Sampah Organik..........................................................V-58
Gambar 5.17 Detail Tipikal Bangunan TPS 3R Berbasis Masyarakat di Kota Dobo..V-63
Gambar 5.18 Denah Eksisting TPA Kota Dobo..........................................................V-75
Gambar 5.19 Denah Perencanaan Peningkatan TPA Kota Dobo................................V-76
Gambar 5.20 Perencanaan Jembatan Double Box-Culvert TPA Kota Dobo...............V-77
Gambar 5.21 Perencanaan Gapura TPA Kota Dobo....................................................V-79
Gambar 5.22 Detail Rancangan Drainase TPA Kota Dobo.........................................V-80
Gambar 5.23 Perencanaan Jembatan Timbang TPA Kota Dobo.................................V-81
Gambar 5.24 Perencanaan Pos Jaga TPA Kota Dobo..................................................V-83
Gambar 5.25 Perencanaan Pagar Keliling TPA Kota Dobo........................................V-86
Gambar 5.26 Perencanaan Peningkatan Jalan Akses TPA Kota Dobo........................V-88
Gambar 5.27 Skema Tipikal IPAL Komunal Sanimas................................................V-95
Gambar 5.28 Tipikal Tangki Septik Komunal Sanimas..............................................V-99
Gambar 5.29 Peta Kebutuhan Sanimas Kota Dobo.....................................................V-104

Gambar 6.1 Area Beresiko Sanitasi Kabupaten Kepulauan Aru...............................VI-4


Gambar 6.2 Struktur Organisasi KSM.......................................................................VI-
16
Gambar 6.3 Sumber Pendanaan Sanimas...................................................................VI-
23

DAFTAR BAGAN
Bagan 2.1
Metodologi Pelaksanaan Pekerjaan............................................................II-3

CV. IHSAN KONSULTAN xxiii


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

Bagan 2.2 Pola Pengangkutan Sistem Kontiner Tetap.................................................II-


44
Bagan 2.3 Pola Pengangkutan Sistem Kontiner Tak Tetap.........................................II-
45
Bagan 2.4 Skema Pengelolaan Sampah Kawasan Kepulauan.....................................II-
49

Bagan 3.1
Pengelolaan Persampahan Kota Dobo........................................................III-
53

Bagan 4.1 Skema Pengelolaan Air Limbah di Kota Dobo...........................................IV-


59

Bagan 5.1
Diagaram Alir Perhitungan Air Limbah.....................................................V-
91

DAFTAR GRAFIK
Grafik 3.1
Elevasi Pasang Surut Air Laut Type Campuran Condong..........................III-
36
Grafik 3.2 Penanganan Sampah Rumah Tangga di Kepulauan Aru............................III-
39
Grafik 3.3 Periode Pengangkutan Sampah...................................................................III-
50
Grafik 3.4 Persentase Kualitas Sumber Air Bersih Kabupaten Kepulauan Aru..........III-
62
Grafik 3.5 Tempat penyaluran Akhir Tinja..................................................................III-
67

CV. IHSAN KONSULTAN xxiv


LAPORAN FASILITASI PENYUSUNAN OUTLINE PLAN
AKHIR BIDANG PLP KOTA DOBO (KAWASAN PERBATASAN)

Grafik 4.1 Grafik Proyeksi Penduduk Kel. Galay Dubu..............................................IV-


18
Grafik 4.2 Grafik Proyeksi Penduduk Kel. Siwalima..................................................IV-
18
Grafik 4.3 Hujan Bulanan St. Tual Th. 2003-2013 (mm/bln)......................................IV-
38
Grafik 4.4 Analisa Intensitas Hujan Rata-rata St. Tual Tahun 2003-2013..................IV-
42
Grafik 4.5 Persentase Penduduk yang Melakukan BABS...........................................IV-
57
Grafik 4.6 Persentase Rumah Tangga Miskin Menurut Jenis Jamban
yang digunakan,Tahun 2012.......................................................................IV-
57

Grafik 5.1 Proyeksi Akumulasi Timbulan Sampah di Kota Dobo..................................V-41


Grafik 5.2 Grafik Timbulan Air Limbah Tahun 2011 – 2036.........................................V-92

CV. IHSAN KONSULTAN xxv