SUDARTO, ST, MT
Direktur
ii
HALAMAN JUDUL.................................................................................. i
KATA PENGANTAR ............................................................................... ii
DAFTAR ISI ............................................................................................ iii
DAFTAR TABEL ..................................................................................... ix
DAFTAR GAMBAR ................................................................................. xvi
DAFTAR LAMPIRAN .............................................................................. xxi
iii
2.2.3 Drainase ................................................................ II-28
2.2.4 Irigasi..................................................................... II-32
2.2.5 Sarana Perekonomian ........................................... II-33
2.2.6 Sarana Sosial dan Kesehatan ............................... II-33
2.2.7 Sarana Peribadatan............................................... II-34
2.2.8 Sarana Transportasi .............................................. II-35
2.2.9 Listrik ..................................................................... II-36
2.2.10 Telepon ................................................................. II-37
2.2.11 Kawasan Strategis................................................. II-37
2.3 Sosial, Ekonomi, dan Budaya ........................................... II-39
2.3.1 Produk Domestik Regional Bruto (PDRB).............. II-39
2.3.2 Mata Pencaharian Penduduk................................. II-40
2.3.3 Adat Istiadat, Tradisi dan Budaya .......................... II-40
2.4 Sarana Kesehatan Lingkungan......................................... II-41
2.4.1 Sarana Kesehatan dan Sanitasi Lingkungan ......... II-41
2.4.2 Statistik Kesehatan................................................ II-44
2.4.3 Insidensi Penyakit.................................................. II-46
2.4.4 Angka Kelahiran dan Angka Kematian .................. II-50
2.4.5 Waterborne Desease............................................. II-54
2.5 Ruang dan Lahan ............................................................. II-55
2.5.1 RTRW Kota Semarang Tahun 2011-2031 ............. II-55
2.5.2 Penggunaan Lahan dan Tata Guna Lahan ........... II-56
2.5.3 Rencana Pengembangan Tata Kota...................... II-59
2.5.4 Rencana Pengembangan Kawasan Prioritas......... II-79
2.5.5 Kawasan Lindung .................................................. II-79
2.5.6 Laju Perubahan Tata Guna dan Fungsi Lahan ...... II-92
2.6 Kependudukan ................................................................. II-96
2.6.1. Jumlah dan Kepadatan Penduduk ........................ II-96
2.6.2. Penyebaran Penduduk.......................................... II-98
2.7 Keuangan Daerah ............................................................ II-99
iv
3.1.1.2 Bukan Jaringan Perpipaan........................ III-34
3.2. Aspek Non Teknis ............................................................ III-76
3.2.1. Kelembagaan...................................................... III-76
3.2.2. Pengaturan ......................................................... III-84
3.2.3 Keuangan ........................................................... III-84
3.3. Permasalahan SPAM ........................................................ III-95
3.3.1 Permasalahan Jaringan Perpipaan...................... III-95
3.3.2 Permasalahan Bukan Jaringan Perpipaan ........... III-98
v
5.4.2. Kebutuhan Non Domestik...................................... V-43
5.4.3. Kebutuhan Rata-Rata............................................ V-44
5.4.4. Kehilangan Air....................................................... V-44
5.4.5. Kebutuhan Maksimum (Qmax).............................. V-46
5.4.6. Kebutuhan Puncak(Qpeak) ................................... V-46
5.4.7. Pendekatan Perhitungan....................................... V-46
vi
BAB VII RENCANA PENGEMBANGAN SPAM.................................... VII-1
7.1 Kebijakan, Struktur, dan Pola Ruang Wilayah
Kota Semarang ......................................................................VII-1
7.1.1. Kebijakan dan Strategi Penataan Ruang......................VII-1
7.1.1.1. Kebijakan dan Strategi Pengembangan
Struktur Ruang................................................VII-1
7.1.1.2. Kebijakan dan Strategi Pengembangan
Pola Ruang .....................................................VII-3
7.1.1.3. Kebijakan dan Strategi Pengembangan
Kawasan Strategis ..........................................VII-4
7.1.2. Rencana Struktur Ruang Kota Semarang ....................VII-5
7.1.2.1. Rencana Pengembangan Sistem Pusat
Pelayanan Kota Semarang .............................VII-5
7.1.2.2. Rencana Pengembangan Sistem Jaringan ...VII-11
7.2 Rencana Sistem Pelayanan.............................................. VII-23
7.2.1 Mata Air dan Sumur Artetis yang dikelola PDAM . VII-23
7.2.2 Sungai Garang dan IPA Sungai Garang .............. VII-23
7.2.3 Saluran Klambu-Kudu dan IPA Kudu................... VII-24
7.2.4 Sungai Garang dan Sungai Kreo dan IPA Jati
Barang................................................................. VII-24
7.2.5 IPA Pucang Gading ............................................. VII-25
7.2.6 IPA Blorong dan IPA Pramuka............................. VII-25
7.2.7 Sistem Pelayanan Non-Perpipaan (Non-PDAM).. VII-30
7.3 Rencana Pengembangan SPAM ..................................... VII-38
7.3.1 Rencana Pengembangan SPAM Perpipaan......... VII-38
7.3.2 Rencana Pengembangan Pelayanan
SPAM Non-Perpipaan .......................................... VII-85
7.3.3 Water Demand Management ............................... VII-88
7.3.4 Program Pengurangan NRW................................ VII-89
7.4 Kapasitas Sistem ............................................................. VII-89
7.5 Perkiraan Kebutuhan Biaya ............................................. VII-115
vii
8.1.2. Sumber dan Pola Pendanaan.............................. VIII-2
8.2 Sumber Penentuan Asumsi Keuangan............................ VIII-12
8.3 Analisa Kelayakan Keuangan.......................................... VIII-26
viii
Tabel II.1 Ketinggian Tempat di Kota Semarang ............................................ II-4
Tabel II.2 Penyebaran Jenis Tanah di Kota Semarang................................. II-10
Tabel II.3 Banyaknya Sarana Pengumpulan Sampah Kota Semarang ......... II-22
Tabel II.4 TPS dan TPST Kota Semarang.................................................... II-23
Tabel II.5 Lokasi Pengolahan Sampah ......................................................... II-24
Tabel II.6 Banyaknya Pasar dan Jenis Pasar Kota Semarang 2008-2012.... II-33
Tabel II.7 Jumlah Fasilitas Kesehatan Kota Semarang Tahun 2010-2012.... II-34
Tabel II.8 Banyaknya Tempat Ibadah Kota Semarang ................................. II-34
Tabel II.9 Panjang Jalan Kota Semarang Tahun 2012 ................................. II-36
Tabel II.10 Produk Domestik Regional Bruto (PDRB) Menurut Lapangan
Usaha atas Dasar Harga Konstan 2000 Tahun 2010-2012
(Jutaan Rupiah) ........................................................................... II-39
Tabel II.11 Mata Pencaharian Kota Semarang Tahun 2012 ........................... II-40
Tabel II.12 Jumlah Sarana dan Prasarana Kesehatan di Kota Semarang
Tahun 2011-2012 ......................................................................... II-41
Tabel II.13 Perkembangan Kelahiran dan Kematian Penduduk Kota
Semarang Periode 2007-2012...................................................... II-51
Tabel II.14 Jumlah Kelahiran Menurut Jenis Kelamin, Kecamatan, dan
Puskesmas Kabupaten/Kota Semarang 2012 .............................. II-52
Tabel II.15 Jumlah Kematian Menurut Jenis Kelamin, Kecamatan, dan
Puskesmas Kabupaten/Kota Semarang 2012 .............................. II-53
Tabel II.16 Kasus Diare yang Ditangani Menurut Jenis Kelamin,
Kecamatan, dan Puskesmas Kabupaten/Kota Semarang
Tahun 2012 .................................................................................. II-54
Tabel II.17 Penggunaan Areal Tanah di Kota Semarang
Pada Akhir Tahun 2012 (Ha) ........................................................ II-57
Tabel II.18 Laju Perubahan Penggunaan Lahan di Kota Semarang
ix
Pada Tahun 2007 dan akhir tahun 2012 (Ha) ............................... II-93
Tabel II.19 Perubahan Penggunaan Sawah Dan Tanah Kering
di Kota Semarang Tahun 2007-2012 (Ha) .................................... II-93
Tabel II.20 Perubahan Penggunaan Lahan Untuk Bangunan dan Tanah
Pekarangan di Kota Semarang Tahun 2007-2012 (Ha) ................ II-95
Tabel II.21 Jumlah Dan Pertumbuhan Penduduk Tahun 2004 – 2012............ II-97
Tabel II.22 Jumlah Penduduk Kota Semarang Tahun 2012 Tiap Kecamatan. II-97
Tabel II.23 Kepadatan Penduduk Kota Semarang Tahun 2012
Tiap kecamatan ............................................................................ II-98
Tabel II.24 Realisasi Penerimaan, Pengeluiaran, dan Belanja Pemerintah
Kota Semarang Tahun Anggaran 2012 ........................................ II-99
Tabel III.1 Sumber Mata Air PDAM Tirta Moedal Kota Semarang .................. III-2
Tabel III.2 Sumber Air Permukaan PDAM Tirta Moedal Kota Semarang ........ III-2
Tabel III.3 Sumber Sumur Pegunungan PDAM Tirta Moedal Kota
Semarang...................................................................................... III-3
Tabel III.4 Sumber Sumur Perkotaan PDAM Tirta Moedal Kota
Semarang...................................................................................... III-4
Tabel III.5 Data Produksi PDAM Kota Semarang Tahun 2012 ..................... III-16
Tabel III.6 Data Masing-Masing Bak Pelepas Tekan (BPT) .......................... III-20
Tabel III.7 Data Masing-Masing Reservoir Produksi ..................................... III-20
Tabel III.8 Data Masing-masing Reservoir Distribusi .................................... III-21
Tabel III.9 Data Panjang Pipa Transmisi dan Distribusi ................................ III-22
Tabel III.10 Data Tapping Pipa Distribusi PDAM Kota Semarang dari
Kabupaten Semarang.................................................................. III-23
Tabel III.11 Rekapitulasi Kondisi Water Meter Setiap Cabang PDAM
Kota Semarang............................................................................ III-24
Tabel III.12 Rekapitulasi Pamsimas Kota Semarang Tahun 2008-2012 ......... III-34
Tabel III.13 Rekapitulasi Data Teknik SPAM Tahun 2008-2012 Pamsimas
Provinsi Jawa Tengah Kota Semarang........................................ III-35
Tabel III.14 Data Teknik Tahun 2012 Program Pamsimas Tahun 2008-2012
Kota Semarang Provinsi Jawa Tengah........................................ III-36
Tabel III.15 Program PNPM Tahun 2007 di Kota Semarang .......................... III-37
Tabel III.16 Program PNPM Tahun 2009 di Kota Semarang .......................... III-38
Tabel III.17 Program PNPM Tahun 2010 di Kota Semarang .......................... III-38
Tabel III.18 Program PNPM Tahun 2011 di Kota Semarang .......................... III-39
x
Tabel III.19 Program PNPM Tahun 2012 di Kota Semarang .......................... III-40
Tabel III.20 Data Sumur DTKP Tahun 2007-2010 di Kota Semarang............. III-41
Tabel III.21 Data Sumur ESDM Provinsi Jawa Tengah Kota Semarang
Tahun 2011 ................................................................................. III-42
Tabel III.22 Data Sumur ESDM Provinsi Jawa Tengah Kota Semarang
Tahun 2012 ................................................................................. III-43
Tabel III.23 Rekap Pelayanan Jaringan Non Perpipaan PDAM Kecamatan
Mijen............................................................................................ III-44
Tabel III.24 Rekap Pelayanan Jaringan Non Perpipaan PDAM Kecamatan
Gunung Pati ................................................................................ III-46
Tabel III.25 Rekap Pelayanan Jaringan Non Perpipaan PDAM Kecamatan
Banyumanik ........................................................................... III-48
Tabel III.26 Rekap Pelayanan Jaringan Non Perpipaan PDAM Kecamatan
Gajah Mungkur .......................................................................... III-50
Tabel III.27 Rekap Pelayanan Jaringan Non Perpipaan PDAM Kecamatan
Semarang Selatan....................................................................... III-52
Tabel III.28 Rekap Pelayanan Jaringan Non Perpipaan PDAM Kecamatan
Candisari ............................................................................... III-54
Tabel III.29 Rekap Pelayanan Jaringan Non Perpipaan PDAM Kecamatan
Tembalang ............................................................................. III-56
Tabel III.30 Rekap Pelayanan Jaringan Non Perpipaan PDAM Kecamatan
Pedurungan ............................................................................ III-58
Tabel III.31 Rekap Pelayanan Jaringan Non Perpipaan PDAM Kecamatan
Genuk ......................................................................................... III-60
Tabel III.32 Rekap Pelayanan Jaringan Non Perpipaan PDAM Kecamatan
Gayamsari ............................................................................. III-62
Tabel III.33 Rekap Pelayanan Jaringan Non Perpipaan PDAM Kecamatan
Semarang Timur.......................................................................... III-64
Tabel III.34 Rekap Pelayanan Jaringan Non Perpipaan PDAM Kecamatan
Semarang Utara .......................................................................... III-66
Tabel III.35 Rekap Pelayanan Jaringan Non Perpipaan PDAM Kecamatan
Semarang Tengah....................................................................... III-68
Tabel III.36 Rekap Pelayanan Jaringan Non Perpipaan PDAM Kecamatan
Semarang Barat .......................................................................... III-70
xi
Tabel III.37 Rekap Pelayanan Jaringan Non Perpipaan PDAM Kecamatan
Tugu ........................................................................................... III-72
Tabel III.38 Rekap Pelayanan Jaringan Non Perpipaan PDAM Kecamatan
Ngaliyan ...................................................................................... III-74
Tabel III.39 Jumlah Pegawai Menurut Jenis Kelamin ..................................... III-78
Tabel III.40 Jumlah Pegawai Menurut Usia .................................................... III-78
Tabel III.41 Jumlah Pegawai Menurut Pendidikan.......................................... III-78
Tabel III.42 Jumlah Pegawai Menurut Jabatan............................................... III-79
Tabel III.43 Jumlah Pegawai Menurut Status ................................................. III-79
Tabel III.44 Cakupan Jumlah SDM PDAM Tirta Moedal Kota Semarang per
Desember Tahun 2008-2012 ....................................................... III-79
Tabel III.45 Laporan Posisi Keuangan PDAM Tirta Moedal Per 31 Desember
2010, 2011, 2012......................................................................... III-84
Tabel III.46 Laporan Laba/Rugi PDAM Tirta Moedal Per 31 Desember 2010,
2011, 2012 .................................................................................. III-85
Tabel III.47 Tarif Rata-rata dan Full Cost Recovery PDAM Tirta Moedal
Tahun 2010, 2011, 2012.............................................................. III-86
Tabel III.48 Struktur Tarif PDAM Tirta Moedal Tahun 2010, 2011, 2012 ........ III-88
Tabel III.49 Realisasi Penggunaan Dana Pamsimas...................................... III-91
Tabel III.50 Rekap Saldo Akhir KAS Seluruh Proyek Pamsimas pada Akhir
Tahun 2012................................................................................. III-93
Tabel III.51 Realisasi Dana Program PNPM Tahun 2007 s/d 2012 ................ III-93
Tabel III.52 Realisasi Dana APBN Penyediaan Air Bersih Program DTKP ..... III-94
Tabel III.53 Permasalahan dan Penyebab Masalah Aspek Teknis di PDAM
Kota Semarang............................................................................ III-95
Tabel III.54 Permasalahan dan Penyebab Masalah Aspek Kelembagaan di
PDAM Kota Semarang ................................................................ III-96
Tabel III.55 Permasalahan dan Penyebab Masalah Aspek Keuangan di
PDAM Kota Semarang ................................................................ III-97
Tabel III.56 Permasalahan dan Penyebab Masalah SPAM Bukan
Jaringan Perpipaan ................................................................... III-98
Tabel IV.1 Materi Survey Air Baku ..................................................................IV-2
Tabel IV.2 Kriteria Teknis Pipa Transmisi .......................................................IV-5
Tabel IV.3 Kriteria Teknis Pipa Distribusi ........................................................IV-9
xii
Tabel IV.4 Tingkat Konsumsi/Pemakaian Air Rumah Tangga Sesuai
Kategori Kota...............................................................................IV-11
Tabel IV.5 Matriks Kriteria Utama Penyususnan RISPAM untuk Berbagai
Klasifikasi Kota ............................................................................IV-13
Tabel V.1 Rencana Pengembangan Kawasan Semarang-Demak ..................V-2
Tabel V.2 Matriks Rencana Pengembangan Kegiatan Kota dan
Tingkat Kebutuhan Pelayanan Jaringan Air Minum ......................V-11
Tabel V.3 Matriks Rencana Pengembangan Kegiatan Kota, Rencana
Penyediaan Air Bersih dan Tingkat Kebutuhan Pelayanan
Jaringan Air Minum.......................................................................V-13
Tabel V.4 Rencana Pengembangan SPAM Jaringan Primer
Kota Semarang.............................................................................V-16
Tabel V.5 Rencana Investasi PDAM Kota Semarang ...................................V-21
Tabel V.6 SPAM Pelayanan Non Perpipaan Kota Semarang .......................V-25
Tabel V.7 Jumlah Penduduk Kota Semarang 8 Tahun Terakhir ...................V-26
Tabel V.8 Perbandingan Standar Deviasi Berbagai Metode Proyeksi
Penduduk Kota Semarang............................................................V-30
Tabel V.9 Pertumbuhan Proyeksi Penduduk Kota Semarang Hasil
Proyeksi Metode Geometri ...........................................................V-31
Tabel V.10 Pertumbuhan Proyeksi Penduduk per Kecamatan .......................V-34
Tabel V.11 Pertumbuhan Proyeksi Penduduk per Cabang .............................V-35
Tabel V.12 Tingkat Konsumsi/Pemakaian Air Rumah Tangga Sesuai
Kategori Kota Semarang ..............................................................V-39
Tabel V.13 Penambahan Luas Area Pelayanan per Cabang ..........................V-41
Tabel V.14 Jumlah Sambungan dan Konsumsi Domestik per Kategori...........V-42
Tabel V.15 Konsumsi Air Bersih per Kapita ....................................................V-43
Tabel VI.1 Deskripsi Sumber Air Permukaan..................................................VI-1
Tabel VI.2 Pembagian Produktivitas Air Tanah di Kota Semarang................VI-22
Tabel VI.3 Produktivitas Air Tanah per Kecamatan di Kota Semarang......... VI-23
Tabel VI.4 Curah Hujan Rerata di CAT Semarang Tahun 2003-2010 .......... VI-33
Tabel VI.5 Imbuhan Air Tanah di Cekungan Air Tanah Kota Semarang....... VI-34
Tabel VI.6 Data Curah Hujan di Pos Gunung Pati Kota Semarang
Tahun 2003-2010 ....................................................................... VI-41
Tabel VI.7 Data Curah Hujan di Pos Kalisari Kota Semarang
Tahun 2003-2010 ....................................................................... VI-42
xiii
Tabel VI.8 Data Curah Hujan di Pos Banyumeneng Semarang
Tahun 2003-2010 ........................................................................VI-43
Tabel VI.9 Lokasi RWH di Kota Semarang Tahun 2011................................VI-45
Tabel VI.10 Lokasi RWH di Kota Semarang Tahun 2012...............................VI-46
Tabel VI.11 Lokasi RWH di Kota Semarang Tahun 2013...............................VI-46
Tabel VI.12 Rekomendasi Air Baku Air Minum ............................................. VI-49
Tabel VI.13 Rencana Pemanfaatan Potensi Air Baku Air Minum Kota
Semarang Tahun 2010-2033 ...................................................... VI-51
Tabel VII.1 Rencana Penambahan SR Pelayanan Perpipaan (PDAM)
Kota Semarang...........................................................................VII-27
Tabel VII.2 Rencana Pengembangan SPAM Non-Perpipaan .......................VII-30
Tabel VII.3 Rencana Pengembangan SR SPAM Non-Perpipaan Cabang
Timur ..........................................................................................VII-31
Tabel VII.4 Pengembangan SR SPAM Non-Perpipaan Cabang Selatan ......VII-32
Tabel VII.5 Pengembangan SR SPAM Non-Perpipaan Cabang Utara..........VII-33
Tabel VII.6 Pengembangan SR SPAM Non-Perpipaan Cabang Tengah ......VII-34
Tabel VII.7 Pengembangan SR SPAM Non-Perpipaan Cabang Barat..........VII-35
Tabel VII.8 Rencana Pengembangan SPAM Perpipaan (PDAM)
Jangka Pendek...........................................................................VII-42
Tabel VII.9 Rencana Pengembangan SPAM Perpipaan (PDAM)
Jangka Menengah ......................................................................VII-44
Tabel VII.10 Rencana Pengembangan SPAM Perpipaan (PDAM)
Jangka Panjang..........................................................................VII-45
Tabel VII.11 Kebutuhan Air Minum Domestik Kota Semarang 2013-2033 ....VII-90
Tabel VII.12 Proyeksi Kebutuhan Air Minum Non-Domestik
Kota Semarang 2013-2033.......................................................VII-91
Tabel VII.13 Proyeksi Kebutuhan Air Domestik per Cabang PDAM ..............VII-92
Tabel VII.14 Proyeksi Kebutuhan Air Total (Domestik dan Non-Domestik)
Kota Semarang.........................................................................VII-93
xiv
Kecamatan Gajah Mungkur ....................................................VII-100
Tabel VII.18 Analisis Kapasitas Sistem Rencana PDAM
Kecamatan Gayamsari ...........................................................VII-101
Tabel VII.19 Analisis Kapasitas Sistem Rencana PDAM
Kecamatan Genuk..................................................................VII-102
Tabel VII.20 Analisis Kapasitas Sistem Rencana PDAM
Kecamatan Gunung Pati.........................................................VII-104
Tabel VII.21 Analisis Kapasitas Sistem Rencana PDAM
Kecamatan Mijen....................................................................VII-105
Tabel VII.22 Analisis Kapasitas Sistem Rencana PDAM
Kecamatan Ngaliyan...............................................................VII-106
Tabel VII.23 Analisis Kapasitas Sistem Rencana PDAM
Kecamatan Pedurungan .........................................................VII-107
Tabel VII.24 Analisis Kapasitas Sistem Rencana PDAM
Kecamatan Semarang Barat...................................................VII-108
Tabel VII.25 Analisis Kapasitas Sistem Rencana PDAM
Kecamatan Semarang Selatan ...............................................VII-109
Tabel VII.26 Analisis Kapasitas Sistem Rencana PDAM
Kecamatan Semarang Timur ..................................................VII-109
Tabel VII.27 Analisis Kapasitas Sistem Rencana PDAM
Kecamatan Semarang Timur ..................................................VII-111
Tabel VII.28 Analisis Kapasitas Sistem Rencana PDAM
Kecamatan Semarang Utara ..................................................VII-112
Tabel VII.29 Analisis Kapasitas Sistem Rencana PDAM
Kecamatan Tembalang...........................................................VII-112
Tabel VII.30 Analisis Kapasitas Sistem Rencana PDAM
Kecamatan Banyumanik.........................................................VII-113
Tabel VII.31 Analisis Kapasitas Sistem Rencana PDAM
Kecamatan Candisari .............................................................VII-114
Tabel VII.32 Rekapitulasi Rencana Anggaran Biaya...................................VII-117
Tabel VIII.1 Rasio Kinerja Keuangan PDAM Kota Semarang.........................VIII-2
Tabel VIII.2 Ringkasan APBD Kota Semarang ..............................................VIII-6
Tabel VIII.3 Alokasi Dana Pengembangan Air Minum dalam RPIJM
2010 s/d 2015..............................................................................VIII-6
Tabel VIII.4 Kebutuhan Investasi dan Pola Pendanaan (Inflasi 6%)...............VIII-8
xv
Tabel VIII.5 Sumber Pendanaan Investasi per Tahun (Inflasi 6%) ...............VIII-10
Tabel VIII.6 Penghitungan Estimasi Biaya Depresiasi per Tahun ................VIII-13
Tabel VIII.7 Penghitungan Biaya Operasi dan Pemeliharaan.......................VIII-15
Tabel VIII.8 Penghitungan Biaya Operasi dan Biaya Administrasi Umum ....VIII-22
Tabel VIII.9 Kapasitas Produksi...................................................................VIII-23
Tabel VIII.10 Penghitungan Tarif .................................................................VIII-24
Tabel VIII.11 Estimasi Pendapatan ..............................................................VIII-25
Tabel VIII.12 Penghitungan NPV untuk Semua Pekerjaan Perpipaan
Dan Non Perpipaan ................................................................VIII-27
Tabel VIII.13 Penghitungan Kelayakan Pekerjaan Perpipaan atas seluruh
Investasi .................................................................................VIII-31
Tabel VIII.14 Penghitungan Kelayakan Pekerjaan Perpipaan atas
Investasi diluar APBN dan APBD Propinsi..............................VIII-34
Tabel IX.1 Usulan Organisasi Kelembagaan PDAM ......................................IX-5
Tabel IX.2 Kebutuhan Sumber Daya Manusia ...............................................IX-6
xvi
Gambar 1.1 Peta Pelayanan Air Minum Kota Semarang ......................... I-6
Gambar 2.1 Peta Administrasi Kota Semarang........................................II-2
Gambar 2.2 Wilayah Administrasi Kota Semarang (Km2)........................ II-3
Gambar 2.3 Peta Topografi Kota Semarang............................................II-5
Gambar 2.4 Peta Geologi Kota Semarang...............................................II-11
Gambar 2.5 Peta Hidrologi Kota Semarang.............................................II-17
Gambar 2.6 Peta Zona dan Sistem Sanitasi Air Limbah .......................... II-21
Gambar 2.7 Zona dan Sistem Sanitasi Persampahan Kota Semarang....II-27
Gambar 2.8 Zona dan Sistem Sanitasi Drainase Kota Semarang............II-31
Gambar 2.9 Grafik Penggunaan Air Bersih Menurut Jenis Sarana .........II-43
Gambar 2.10 Grafik Penggunaan Sumber Air Minum Keluarga.................II-44
Gambar 2.11 Grafik Penderita Diare Tahun 2012 Menurut Kelompok
Umur.................................................................................... II-47
Gambar 2.12 Kasus Diare Kota Semrang Tahun 2012 Menurut Kelompok
Umur.................................................................................... II-47
Gambar 2.13 Peta IR Diare Kota Semarang Tahun 2012 .......................... II-48
Gambar 2.14 Peta IR Diare Per Kecamatan di Kota Semarang Tahun
2012..................................................................................... II-49
Gambar 2.15 Peta Tata Guna Lahan Kota Semarang ............................... II-58
Gambar 2.16 Peta Rencana Struktur Ruang Kota Semarang .................... II-66
Gambar 2.17 Perkembangan Luas Tanah Sawah di Kota Semarang
Th 2007 - 2012.....................................................................II-94
Gambar 2.18 Perkembangan Luas Tanah Kering di Kota Semarang
Th 2007 - 2012.....................................................................II-94
Gambar 2.19 Perkembangan Luas Tanah untuk Bangunan&Pekarangan
Di Kota Semarang Th 2007-2012.........................................II-95
xvii
Gambar 3.1 Data-data Sumber Air Baku PDAM Tirta Moedal Kota
Semarang ............................................................................III-1
Gambar 3.2 Diagram Alir IPA Kaligarang 3..............................................III-8
Gambar 3.3 Diagram Produksi Air IPA Kaligarang I (Per Bulan 2012) .....III-9
Gambar 3.4 Diagram Produksi Air IPA Kaligarang II (Per Bulan 2012) ....III-9
Gambar 3.5 Diagram Produksi Air IPA Kaligarang III (Per Bulan 2012) ...III-10
Gambar 3.6 Diagram Produksi Air IPA Kaligarang IV (Per Bulan 2012)...III-10
Gambar 3.7 Bangunan IPA Kudu ............................................................ III-11
Gambar 3.8 Diagram Produksi Air IPA Kudu (Per Bulan 2012)................III-13
Gambar 3.9 Diagram Produksi Air IPA Pucang Gading (Per Bulan 2012)III-15
Gambar 3.10 Peta Pelayanan Air Minum Cabang Selatan ........................ III-29
Gambar 3.11 Peta Pelayanan Air Minum Cabang Timur ........................... III-30
Gambar 3.12 Peta Pelayanan Air Minum Cabang Utara............................ III-31
Gambar 3.13 Peta Pelayanan Air Minum Cabang Barat ............................ III-32
Gambar 3.14 Peta Pelayanan Air Minum Cabang Tengah ........................ III-33
Gambar 3.15 Peta Informasi Pelayanan Non Perpipaan Kecamatan
Mijen .................................................................................... III-45
Gambar 3.16 Peta Informasi Pelayanan Non Perpipaan Kecamatan
Gunung Pati.........................................................................III-47
Gambar 3.17 Peta Informasi Pelayanan Non Perpipaan Kecamatan
Banyumanik .........................................................................III-49
Gambar 3.18 Peta Informasi Pelayanan Non Perpipaan Kecamatan
Gajah Mungkur ....................................................................III-51
Gambar 3.19 Peta Informasi Pelayanan Non Perpipaan Kecamatan
Semaranag Selatan ............................................................. III-53
Gambar 3.20 Peta Informasi Pelayanan Non Perpipaan Kecamatan
Candisari..............................................................................III-55
Gambar 3.21 Peta Informasi Pelayanan Non Perpipaan Kecamatan
Tembalang...........................................................................III-57
Gambar 3.22 Peta Informasi Pelayanan Non Perpipaan Kecamatan
Pedurungan .........................................................................III-59
Gambar 3.23 Peta Informasi Pelayanan Non Perpipaan Kecamatan
Genuk ..................................................................................III-61
Gambar 3.24 Peta Informasi Pelayanan Non Perpipaan Kecamatan
Gayamsari ...........................................................................III-63
xviii
Gambar 3.25 Peta Informasi Pelayanan Non Perpipaan Kecamatan
Semarang Timur ..................................................................III-65
Gambar 3.26 Peta Informasi Pelayanan Non Perpipaan Kecamatan
Semarang Utara...................................................................III-67
Gambar 3.27 Peta Informasi Pelayanan Non Perpipaan Kecamatan
Semarang Tengah ............................................................... III-69
Gambar 3.28 Peta Informasi Pelayanan Non Perpipaan Kecamatan
Semarang Barat ...................................................................III-71
Gambar 3.29 Peta Informasi Pelayanan Non Perpipaan Kecamatan
Tugu .................................................................................... III-73
Gambar 3.30 Peta Informasi Pelayanan Non Perpipaan Kecamatan
Ngaliyan...............................................................................III-75
Gambar 3.31 Struktur Organisasi PDAM Kota Semarang.......................... III-81
Gambar 3.32 Struktur Organisasi Pamsimas.............................................III-83
Gambar 3.33 Proporsi Realisasi Dana Pamsimas 2008-2012 ...................III-92
Gambar 3.34 Realisasi Dana Program PNPM Tahun 2007 s/d 2012.........III-94
Gambar 3.35 Realisasi Dana APBN Penyediaan Air Bersih Program
DTKP ...................................................................................III-95
Gambar 5.1 Kondisi Eksisting SPAM Kota Semarang ............................. V-4
Gambar 5.2 Pembagian BWK Kota Semarang Tahun 2000-2010 ...........V-7
Gambar 5.3 Kondisi Aktual Pencapaian Ruang Kota Semarang..............V-9
Gambar 5.4 Rencana Pola Ruang Kota Semarang .................................V-12
Gambar 5.5 Rencana Pembagian BWK ..................................................V-13
Gambar 5.6 Eksisting Perpipaan dan Perkembangan Kota ..................... V-15
Gambar 5.7 Rencana Jaringan Air Minum ...............................................V-16
Gambar 5.8 Rencana Pengembangan SPAM Kota Semarang ................V-17
Gambar 5.9 Sinkronisasi RTRW dan Perencanaan SPAM
Kota Semarang Tahun 2013-2033 .......................................V-19
Gambar 5.10 Daerah dengan Penyediaan Air Minum Non-Perpipaan .......V-21
Gambar 5.11 Produktivitas Air Tanah ........................................................ V-23
Gambar 5.12 Laju Pertumbuhan Penduduk Kota Semarang
8 tahun Terakhir...................................................................V-25
Gambar 5.13 Proyeksi Penduduk Kota Semarang dengan Metode
Aritmetika.............................................................................V-31
Gambar 5.14 Proyeksi Jumlah Penduduk Kota Semarang
xix
dan Per cabang Pelayanan PDAM.......................................V-34
Gambar 5.15 Rencana Persebaran Penduduk Kota Semarang.................V-35
Gambar 5.16 Proyeksi Jumlah dan Kepadatan Penduduk Kecamatan
di Kota Semarang ................................................................ V-36
Gambar 5.17 Konsumsi Air perkapita Kota Semarang............................... V-38
Gambar 5.18 Persentase Jenis Konsumsi .................................................V-41
Gambar 5.19 Tingkat Kehilangan Air (NRW) Kota Semarang.................... V-43
Gambar 5.20 Proyeksi Kebutuhan Air Kota Semarang 2013-2033 ............V-54
Gambar 5.21 Proyeksi Suplai Kebutuhan Air Kota Semarang 2013-2033..V-55
Gambar 6.1 DAS Balai PSDA Jragung Tuntang ......................................VI-3
Gambar 6.2 Peta Jaringan Sungai Kota Semarang .................................VI-4
Gambar 6.3 Sungai Garang Saat Akhir Musim Kemarau di Kelurahan
Sampangan .........................................................................VI-5
Gambar 6.4 Debit Harian Rata-Rata Sungai Garang Di Pos Panjangan
Tahun 2010..........................................................................VI-6
Gambar 6.5 Daerah Tangkapan Sungai Blorong dan Bendun
Pengilon...............................................................................VI-7
Gambar 6.6 Debit Harian Rata-Rata Sungai Garang di Pos Panjangan
Tahun 2010..........................................................................VI-8
Gambar 6.7 IPA Pucang Gading dan IPA Meteseh .................................VI-10
Gambar 6.8 Skema Sistem Drainase Semarang Timur dan Distribusi
Debit .................................................................................... VI-10
Gambar 6.9 Distribusi Volume Tampungan dan Elevasi Waduk Kedung
Ombo...................................................................................VI-12
Gambar 6.10 Saluran Air Baku Klambu-Kudu............................................VI-14
Gambar 6.11 Peta Hidrogeologi Kota Semarang dan Sekitarnya ..............VI-19
Gambar 6.12 Peta Produktivitas Air Tanah Kota Semarang ...................... VI-20
Gambar 6.13 Peta Cekungan Air Tanah Kota Semarang .......................... VI-26
Gambar 6.14 Peta Sumber Air Baku PDAM Tirta Moedal Semarang.........VI-28
Gambar 6.15 Skema Neraca Air Waduk Jatibarang ..................................VI-29
Gambar 6.16 Skema Neraca Air Waduk Kedung Ombo ............................ VI-31
Gambar 6.17 Skema Neraca Air Sungai Bloorong.....................................VI-32
Gambar 6.18 Rencana Pembebasan Tanah Proyek Waduk Jatibarang ....VI-37
Gambar 6.19 Sistem Drainase Banjir Kanal barat......................................VI-38
Gambar 6.20 Curah Hujan Rerata Tahunan di Kota Semarang
xx
Tahun 2003-2010.................................................................VI-40
Gambar 6.21 Hujan Bulanan Pos Gunungpati di DAS Garang Hulu ..........VI-41
Gambar 6.22 Hujan Bulanan Pos Kalisari Kota Semarang ........................ VI-42
Gambar 6.23 Hujan Bulanan Pos Banyumeneng Semarang ..................... VI-43
Gambar 6.24 Alternatif Sumber Air Baku ...................................................VI-54
Gambar 7.1 Eksisting Supply Air dan Alokasi Setiap Cabang .................VII-28
Gambar 7.2 Proyeksi Rencana Supply Air dan Alokasi Setiap Cabang ...VII-29
Gambar 7.3 Sistem Pelayanan Non-Perpipaan (Non-PDAM) Eksisting ...VII-37
Gambar 7.4 Sistem Pelayanan Perpipaan (PDAM) Eksisting ..................VII-40
Gambar 7.5 Skema Pelayanan Distribusi Air Minum Perpipaan (PDAM)
Kota Semarang Eksisting..................................................... VII-41
Gambar 7.6 Rekomendasi Rencana Pengembangan SPAM
(Sistem Perpipaan) .............................................................. VII-46
Gambar 7.7 Perijinan, Pembebasan Lahan dan Pembangunan
Reservoir Setuk 5.000 m3.................................................... VII-47
Gambar 7.8 Skema SPAM dari Reservoir Setuk......................................VII-48
Gambar 7.9 Pembebasan Lahan dan Pembangunan Reservoir
Gombel ................................................................................VII-49
Gambar 7.10 Skema SPAM dari Reservoir Gombel ..................................VII-50
Gambar 7.11 Perijinan, Pembebasan dan Pembangunan IPA Pramuka
100 L/Detik...........................................................................VII-51
Gambar 7.12 Skema SPAM dengan IPA Pramuka 100 L/Detik .................VII-52
Gambar 7.13 Perijinan, Pembebasan dan Pembangunan IPA Blorong
200 L/Detik...........................................................................VII-53
Gambar 7.14 Skema SPAM dengan IPA Blorong 200 L/Detik ...................VII-54
Gambar 7.15 Perijinan, Pembebasan dan Pembangunan Reservoir
Mangunharjo 1.000 m3 ........................................................ VII-55
Gambar 7.16 Perijinan, Pembebasan dan Pembangunan Reservoir
Kemijen 2.000 m3 ................................................................ VII-56
Gambar 7.17 Skema SPAM dari Reservoir Kemijen..................................VII-57
Gambar 7.18 Perijinan, Pembebasan dan Pembangunan Reservoir
Tanah Mas 2.000 m3 ........................................................... VII-58
Gambar 7.19 Skema SPAM Reservoir Tanah Mas....................................VII-59
Gambar 7.20 Jaringan Pipa Transmisi IPA Kaligarang-Gajahmungkur
Ø 500 MM ............................................................................VII-60
xxi
Gambar 7.21 Jaringan Pipa Transmisi Input Reservoir Setuk
Ø 500 & 400 MM..................................................................VII-61
Gambar 7.22 Jaringan Pipa Transmisi Plered-Lemah Gempal Ø 500 MM.VII-62
Gambar 7.23 Rehab Jaringan Pipa Wilayah Tanah Mas Tahap 6 dan 7....VII-63
Gambar 7.24 Pemasangan Pipa&Pengamannya-
Sungai Kreo Ø 600 MM........................................................ VII-64
Gambar 7.25 Jaringan Pipa Transmisi Primer Cangkiran_
Ngaliyan Ø 315 MM ............................................................. VII-65
Gambar 7.26 Jaringan Pipa Distribusi Reservoir
Mangunharjo Ø 315 MM ...................................................... VII-66
Gambar 7.27 Skema SPAM dari Reservoir Mangunharjo .......................... VII-67
Gambar 7.28 Reposisi Jaringan Pipa Kolektor Ø 450 MM
Dari Sumur W2-W6 ......................................................... VII-68
Gambar 7.29 Jaringan Pipa Transmisi Sekaran-Gunung Pati.................... VII-69
Gambar 7.30 Jaringan Transmisi 5 Distrik .................................................VII-70
Gambar 7.31 Skema SPAM 5 Zona/Distrik dari IPA Waduk Jatibarang.....VII-71
Gambar 7.32 Switching Jaringan Aliran Gajah Mungkur............................ VII-72
Gambar 7.33 Skema SPAM Switching dari IPA Gajahmungkur
Dan Reservoir Setuk ............................................................ VII-73
Gambar 7.34 Pelayanan Switching/Pengalihan dari IPA Gajah Mungkur
RES. Kepoh .........................................................................VII-74
Gambar 7.35 Switching Jaringan Aliran Gunung Pati ................................ VII-75
Gambar 7.36 Skema SPAM Switching dari Reservoir Gunung Pati ...........VII-76
Gambar 7.37 Pelayanan Switching/Pengalihan dari Gunung Pati..............VII-77
Gambar 7.38 Jaringan Pipa Distribusi untuk Program MBR (3.500) ..........VII-78
Gambar 7.39 Plotting Wilayah Pelayanan Program MBR (3.500) ..............VII-79
Gambar 7.40 Jaringan Pipa Distribusi Reservoir Wonosari-Pelayanan
Zona/Distrik 1.......................................................................VII-80
Gambar 7.41 Jaringan Pipa Distribusi Reservoir Desel-Pelayanan/Distrik
2 (Jar Pipa Distribusi Wilayah Perum Koveri Ø 110 & 63 MM
Jar Pipa Sistribusi Wilayah Sulanji Graha Ø 110 & 63 MM) .VII-81
Gambar 7.42 Jaringan Pipa Distribusi Reservoir Bambankerep-Pelayanan
Zona/Distrik 3 (Jar Pipa Distribusi Wilayah Perum BPI
Ø 110 & 63 MM...................................................................VII-82
Gambar 7.43 Jaringan Pipa Distribusi Reservoir Manyaran 1
xxii
Pelayanan Zona/Distrik 44 ...................................................VII-83
Gambar 7.44 Jaringan Pipa Distribusi Reservoir Manyaran 2 –
Pelayanan Zona/Distrik 5 ..................................................... VII-84
Gambar 7.45 Rekomendasi Rencana Pengembangan SPAM
(Sistem Non-Perpipaan)....................................................... VII-86
Gambar 7.46 Rekomendasi Rencana pengembangan SPAM
(Sistem Perpipaan dan Non-Perpipaan)............................... VII-87
Gambar 7.47 Konsep Water Demand Management Kota Semarang.........VII-89
Gambar 9.1 Tugas dan Fungsi dalam Pengelolaan Sarana SPAM Kota
Semarang ............................................................................IX-4
Gambar 9.2 Usulan Skema Kelembagaan ...............................................IX-5
xxiii
Lampiran-1 Arahan Rencana Pengembangan RTRW Kota Semarang
Lampiran-2 Analisis Rencana Pengembangan RTRW 2011-2031 Kecamatan
Mijen Kota Semarang
Lampiran-3 Analisis Rencana Pengembangan RTRW 2011-2031 Kecamatan
Gunung Pati Kota Semarang
Lampiran-4 Analisis Rencana Pengembangan RTRW 2011-2031 Kecamatan
Banyumanik Kota Semarang
Lampiran-5 Analisis Rencana Pengembangan RTRW 2011-2031 Kecamatan
Gajah Mungkur Kota Semarang
Lampiran-6 Analisis Rencana Pengembangan RTRW 2011-2031 Kecamatan
Semarang Selatan Kota Semarang
Lampiran-7 Analisis Rencana Pengembangan RTRW 2011-2031 Kecamatan
Candisari Kota Semarang
Lampiran-8 Analisis Rencana Pengembangan RTRW 2011-2031 Kecamatan
Tembalang Kota Semarang
Lampiran-9 Analisis Rencana Pengembangan RTRW 2011-2031 Kecamatan
Pedurungan Kota Semarang
Lampiran-10 Analisis Rencana Pengembangan RTRW 2011-2031 Kecamatan
Genuk Kota Semarang
Lampiran-11 Analisis Rencana Pengembangan RTRW 2011-2031 Kecamatan
Gayamsari Kota Semarang
Lampiran-12 Analisis Rencana Pengembangan RTRW 2011-2031 Kecamatan
Semarang Timur Kota Semarang
Lampiran-13 Analisis Rencana Pengembangan RTRW 2011-2031 Kecamatan
Semarang Utara Kota Semarang
Lampiran-14 Analisis Rencana Pengembangan RTRW 2011-2031 Kecamatan
Semarang Tengah Kota Semarang
Lampiran-15 Analisis Rencana Pengembangan RTRW 2011-2031 Kecamatan
Semarang Barat Kota Semarang
Lampiran-16 Analisis Rencana Pengembangan RTRW 2011-2031 Kecamatan
Tugu Kota Semarang
Lampiran-17 Analisis Rencana Pengembangan RTRW 2011-2031 Kecamatan
Ngaliyan Kota Semarang
xxiv
Lampiran-18 Penghitungan Discounted Cash Flow Investasi dengan Faktor
Inflasi 6%, Discount Factor 12% Tahun 2014 s.d 2033
Lampiran-19 Resume Real Demand Survey - RDS
Lampiran-20 Rencana Populasi Pengembangan SPAM Per Cabang PDAM
Lampiran-21 Kandungan Air Sungai Garang
Lampiran-22 RPIJM Kota Semarang 2013-2033
xxv
CV Rekayasa Jati Mandiri Laporan Akhir
b. Tujuan
Tujuan dari Penyusunan Rencana Induk Sistem Penyediaan
Air Minum adalah sebagai berikut :
1. Menyusun rencana induk yang merupakan tahap awal
perencanaan air minum jaringan perpipaan dan bukan jaringan
perpipaan berdasarkan proyeksi kebutuhan air minum yang sesuai
dengan kualitas kesehatan pada satu periode yang dibagi dalam
beberapa tahapan dan memuat komponen utama sistem beserta
dimensi-dimensinya.
2. Merencanakan sistem jaringan perpipaan dan non perpipaan,
program dan kegiatan pengembangan, kriteria dan standar
pelayanan, rencana sumber alokasi air baku, rencana
keterpaduan dengan PS Sanitasi, rencana pembiayaan dan pola
investasi, serta rencana pengembangan kelembagaan dalam
sistem penyediaan air minum yang sesuai dengan kualitas
kesehatan.
1.1.3. Otorisasi
Nama dan Satuan Kerja Pembuat Komitmen: Bappeda Kota Semarang,
Pemerintah Kota Semarang.
7. Rencana pembiayaan dan pola investasi, berupa indikasi besar biaya tingkat
awal, sumber dan pola pembiayaan meliputi perencanaan sistem transmisi air
minum dan distribusi.
8. Rencana pengembangan kelembagaan, kelembagaan penyelenggara meliputi
struktur organisasi dan penempatan tenaga ahli.
GAMBAR 1.1
PETA PELAYANAN AIR MINUM KOTA SEMARANG
Sumber : Survey Sambungan Baru MBR PDAM Tirta Moedal Kota Semarang, 2012
GAMBAR 2.1
PETA ADMINISTRASI KOTA SEMARANG
GAMBAR 2.2
WILAYAH ADMINISTRASI KOTA SEMARANG (KM2)
Sumber : Semarang dalam Angka, 2012
Kota Semarang memiliki posisi geostrategis karena berada pada jalur lalu
lintas ekonomi pulau Jawa dan merupakan koridor pembangunan Jawa Tengah
yang terdiri dari empat simpul pintu gerbang yakni koridor pantai Utara; koridor
Selatan kearah kota-kota dinamis seperti Kabupaten Magelang, Surakarta yang
dikenal dengan koridor Merapi-Merbabu, koridor Timur kearah Kabupaten
Demak/Grobogan; dan Barat menuju Kota Semarang. Perkembangan dan
pertumbuhan Jawa Tengah, Semarang sangat berperan terutama dengan
adanya pelabuhan, jaringan transport darat (jalur kereta api dan jalan) serta
transport udara yang merupakan potensi bagi simpul transportasi Regional Jawa
Tengah dan Kota Transit Regional Jawa Tengah. Posisi lain yang tak kalah
pentingnya adalah kekuatan hubungan dengan luar Jawa, secara langsung
sebagai pusat wilayah nasional bagian tengah.
TABEL II.1
KETINGGIAN TEMPAT DI KOTA SEMARANG
KETINGGIAN
NO BAGIAN WILAYAH
(MDPL)
1. Daerah Pantai 0,75
2. Daerah Dataran Rendah
- Pusat Kota (Depan Hotel Dibya Puri Semarang) 2,45
- Simpang Lima 3,49
3. Daerah Perbukitan
- Candi Baru 90,56
- Jatingaleh 136,00
- Gombel 270,00
- Mijen (Bagian Atas) 253,00
- Gunungpati Barat 259,00
- Gunungpati Timur Laut 348,00
Sumber : Kota Semarang dalam angka BPS, 2012
GAMBAR 2.3
PETA TOPOGRAFI KOTA SEMARANG
2.1.3. Geologi
Kondisi Geologi, Kota Semarang berdasarkan Peta Geologi Lembar
Magelang - Semarang (RE. Thaden, dkk; 1996), tatanan stratigrafi daerah
Ungaran dan sekitarnya dapat diklompokan menjadi beberapa formasi yang
secara umum berupa kelompok batuan sedimen dan kelompok batuan vulkanik.
Susunan stratigrafinya adalah sebagai berikut Aluvium (Qa), Batuan Gunungapi
Gajahmungkur (Qhg), Batuan Gunungapi Kaligesik (Qpk), Formasi Jongkong
(Qpj), Formasi Damar (QTd), Formasi Kaligetas (Qpkg), Formasi Kalibeng
(Tmkl), Formasi Kerek (Tmk). Pada dataran rendah berupa endapan aluvial
sungai, endapan fasies dataran delta dan endapan fasies pasang-surut.
Endapan tersebut terdiri dari selang-seling antara lapisan pasir, pasir lanauan
dan lempung lunak, dengan sisipan lensa-lensa kerikil dan pasir vulkanik.
Semarang memiliki geologi jenis tanah asosiasi kelabu dan aluvial coklat kelabu
dengan luas keseluruhan kurang lebih 22 % dari seluruh luas Kota Semarang.
Sisanya alluvial hidromorf dan grumosol kelabu tua.
Menurut Nugroho dan Dwiyanto (1998), secara geomorfologi Kota
Semarang dan sekitarnya dapat dikelompokan menjadi beberapa satuan, yang
secara garis besar dapat diuraikan sebagai berikut :
1. Satuan Daratan Pantai
Satuan ini menyebar secara lateral mulai dari bagian timur sampai barat
sepanjang pantai dengan lebar berkisar 500 m hingga 1000 m. Sebagian
besar satuan ini digunakan sebagai areal budidaya tambak,tanaman bakau
dan jika tidak difungsikan areal ini akan berubah menjadi rawa yang
dipengaruhi proses pasang surut. Elevasi satuan ini berkisar dari 0,50 m -
1,50 m dengan kelerengan kurang dari 3%.
2. Satuan Daratan Aluvial
Satuan ini mempunyai penyebaran dari bagian timur Trimulya, Bangetayu,
Tengah kemudian ke arah barat tengah kota di Mluyu Barat, Widoharjo,
Karangturi dan Wonodri. Dibagian barat melampar dari Panggung,
Tambakharjo, Tugurejo dan Mangkang. Satuan ini mempunyai elevasi 1,00 m
-5,00 m dengan kelerengan 3-4%.
3. Satuan Daratan Limpas Banjir
Satuan geomorfologi ini menyisip pada satuan daratan pantai dan daratan
alluvial, yaitu sepanjang aliran sungai di wilayah Semarang Timur, Semarang
utara dan sebagian wilayah Semarang Barat. Dibagian tenggara dijumpai
disekitar Kali Pengkol. Satuan ini berelevasi 0,5-1,5 m.
4. Satuan Perbukitan Lereng Curam
Satuan ini disebut juga sebagai satuan perbukitan sedimen vulkanik
Karanganyar Gunung-Karang Kumpul dengan kelerengan 3-10% dan elevasi
25 m-150 m di atas permukaan laut.
5. Satuan Perbukitan Bergelombang
Satuan perbukitan lereng sedang ini melampar disekitar Gunung Pasepan
Gunung Bubak dan Tinjomoyo dengan kelerengan 15 - 30% serta elevasi
100 m – 150 m.
TABEL II.2
PENYEBARAN JENIS TANAH DI KOTA SEMARANG
%
NO JENIS TANAH LOKASI TERHADAP POTENSI
WILAYAH
1. Mediteran Kec. Tugu 30 tanaman
Coklat Tua Kec. Semarang tahunan/ keras
Selatan tanaman
Kec. Gunung Pati holtikultura
Kec. Semarang tanaman
Timur palawija
2. Latosol Coklat Kec. Mijen 26 tanaman
Tua Kec. Gunungpati tahunan/ keras
Kemerahan tanaman
holtikultura
tanaman padi
3. Asosiasi Aluvial Kec. Genuk 22 Tanaman tahunan
Kelabu dan Kec. Semarang tidak produktif
Coklat Tengah
kekelabuhan
4 Alluvial Kec. Tugu 22 tanaman
Hidromorf Kec. Semarang tahunan
Grumosol Utara tanaman
kelabu tua Kec. Genuk holtikultura
Kec. Mijen tanaman padi
Sumber : Kota Semarang dalam angka BPS , 2012
GAMBAR 2.4
PETA GEOLOGI KOTA SEMARANG
a. Hidrologi
Kondisi Hidrologi potensi air di Kota Semarang bersumber pada sungai -
sungai yang mengalir di Kota Semarang antara lain Kali Garang, Kali Pengkol,
Kali Kreo, Kali Banjirkanal Timur, Kali Babon, Kali Sringin, Kali Kripik, Kali
Dungadem dan lain sebagainya. Kali Garang yang bermata air di gunung
Ungaran, alur sungainya memanjang ke arah utara hingga mencapai Pegandan
tepatnya di Tugu Soeharto, bertemu dengan aliran Kali Kreo dan Kali Kripik.
Kali Garang sebagai sungai utama pembentuk kota bawah yang mengalir
membelah lembah-lembah Gunung Ungaran mengikuti alur yang berbelok-belok
dengan aliran yang cukup deras. Setelah diadakan pengukuran debit Kali Garang
mempunyai debit 53,0 % dari debit total dan kali Kreo 34,7 % selanjutnya Kali
Kripik 12,3 %. Oleh karena Kali Garang memberikan airnya yang cukup dominan
bagi Kota Semarang, maka langkah-langkah untuk menjaga kelestariannya juga
terus dilakukan. Karena Kali Garang digunakan untuk memenuhi kebutuhan air
minum warga Kota Semarang.
Air Tanah Bebas ini merupakan air tanah yang terdapat pada lapisan
pembawa air (aquifer) dan tidak tertutup oleh lapisan kedap air. Permukaan air
tanah bebas ini sangat dipengaruhi oleh musim dan keadaan lingkungan
sekitarnya. Penduduk Kota Semarang yang berada di dataran rendah, banyak
memanfaatkan air tanah inidengan membuat sumur-sumur gali (dangkal) dengan
kedalaman rata-rata 3 - 18 m.
Peduduk di dataran tinggi hanya dapat memanfaatkan sumur gali pada
musim penghujan dengan kedalaman berkisar antara 20 - 40 m. Air Tanah
Tertekan adalah air yang terkandung di dalam suatu lapisan pembawa air yang
berada diantara 2 lapisan batuan kedap air sehingga hampir tetap debitnya
disamping kualitasnya juga memenuhi syarat sebagai air bersih. Debit air ini
sedikit sekali dipengaruhi oleh musim dan keadaan disekelilingnya.
Daerah Semarang bawah lapisan aquifer didapat dari endapan alluvial
dan delta Kali Garang. Kedalaman lapisan aquifer ini berkisar antara 50 - 90
meter, terletak di ujung Timur laut Kota dan pada mulut Kali Garang lama yang
terletak di pertemuan antara lembah Kali Garang dengan dataran pantai.
Kelompok aquifer delta Garang ini disebut pula kelompok aquifer utama karena
merupakan sumber air tanah yang potensial dan bersifat tawar.
b. Klimatologi
Secara Klimatologi, Kota Semarang seperti kondisi umum di Indonesia,
mempunyai iklim tropik basah yang dipengaruhi oleh angin muson barat dan
muson timur. Bulan November hingga Mei, angin bertiup dari arah utara barat
laut (NW) menciptakan musim hujan dengan membawa banyak uap air dan
hujan. Sifat periode ini adalah curah hujan sering dan berat, kelembaban relatif
tinggi dan mendung. Lebih dari 80% dari curah hujan tahunan turun diperiode ini.
Bulan Juni hingga Oktober angin bertiup dari selatan tenggara (SE) menciptakan
musim kemarau, karena membawa sedikit uap air. Sifat periode ini adalah sedikit
jumlah curah hujan, kelembaban lebih rendah, dan jarang mendung.
Berdasarkan data yang ada, curah hujan di Kota Semarang mempunyai
sebaran yang tidak merata sepanjang tahun, dengan total curah hujan rata-rata
9.891 mm per tahun. Hal ini menunjukkan curah hujan khas pola di Indonesia,
khususnya di Jawa, yang mengikuti pola angin muson SENW yang umum. Suhu
minimum rata-rata yang diukur di Stasiun Klimatologi Semarang berubah-ubah
dari 21,1°C pada September ke 24,6°C pada bulan Mei, dan suhu maksimum
rata-rata berubah-ubah dari 29,9°C ke 32,9°C. Kelembaban relatif bulanan rata-
rata berubah-ubah dari minimum 61% pada bulan September ke maksimum 83%
pada bulan Januari.
Kecepatan angin bulanan rata-rata di Stasiun Klimatologi Semarang
berubah-ubah dari 215 km/hari pada bulan Agustus sampai 286 km/hari pada
bulan Januari. Lamanya sinar matahari yang menunjukkan rasio sebenarnya
sampai lamanya sinar matahari maksimum hari, bervariasi dari 46% pada bulan
Desember sampai 98% pada bulan Agustus.
Mengingat wilayah Kota Semarang yang terbagi menjadi 2 (dua) daerah
dataran, maka kondisi tersebut mempengaruhi kondisi iklim wilayah Kota
Semarang. Wilayah Kota Semarang bagian utara yang didominasi oleh daerah
dataran rendah dan berdekatan dengan Laut Jawa, maka kondisi iklim di daerah
tersebut cenderung lebih panas dengan suhu rata-rata 27°C. Wilayah Kota
Semarang bagian selatan yang merupakan daerah pegunungan dan dataran
tinggi, kondisi iklim di daerah tersebut cenderung lebih sejuk dengan suhu rata-
rata 25°C. Kelembaban udara rata-rata bervariasi dari 62 % hingga 84 %,
dengan arah mata angin sebagian besar bergerak dari arah tenggara menuju
barat laut dengan kecepatan rata-rata berkisar antara 5,7 km/jam.
c. Hidrogeologi
Secara hidrogeologi Kota Semarang dapat dibagi menjadi empat
kelompok akuifer (Peta Konservasi ABT Daerah Semarang dan Sekitarnya),
yakni:
- Kelompok Akuifer Endapan Kuarter
- Kelompok Akuifer Formasi Damar
- Kelompok Akuifer Breksi Volkanik
- Kelompok Akuifer Produk Gunung Api Muda
GAMBAR 2.5
PETA HIDROLOGI KOTA SEMARANG
lumpur tinja dari hasil penyedotan DKP dari masyarakat maupun dari swasta (CV
Doremon Djaya, CV Lala, CV Santoso, dll) dengan pengenaan retribusi.
Pengolahan limbah tinja di Instalasi Pengolahan Lumpur Tinja (IPLT) Kota
Semarang masih dilakukan secara konvensional. Cara yang digunakan yakni
dengan lahan buang tinja yang kemudian disalurkan ke beberapa bak
penampungan, kemudian diangkat ke permukaan untuk dijadikan bahan
campuran pupuk organik. Jumlah limbah cair dan tinja yang dibuang ke IPLT
perhari rata-rata 82 meter kubik. Limbah cair itu dibuang sekitar 10 truk perhari.
Jumlah lumpur tinja yang diolah rata-rata 82 meter kubik perhari. Sedangkan
yang didaur ulang dan digunakan kembali berjumlah 20 meter kubik perhari.
Di samping dilayani oleh perusahan penyedot tinja swasta, Dinas
Kebersihan dan Pertamanan juga melakukan hal yang sama. Dinas Kebersihan
dan Pertamanan hingga saat ini hanya memiliki 2 buah truk penyedot tinja
dengan rata-rata penyedotan tinja perhari 8-12 meter kubik. Tarif yang dikenakan
antara pemerintah dan swasta berbeda. Pemerintah menerapkan biaya Rp
100.000 per 4 sampai 6 meter kubik. Sedangkan perusahaan swasta bertarif Rp
125.000 sampai Rp 150.000 untuk volume tinja yang sama.
Pengelolaan air limbah di bawah koordinasi DTKP dilakukan dengan
pembuatan MCK pada lingkungan lingkup Rukun Warga (RW) sehingga warga
mudah untuk mengakses. Secara teknis MCK dilengkapi Instalasi Pengolahan
Air Limbah (IPAL) Komunal dengan pengolah air limbah secara sederhana yaitu
dengan septik tank bersusun di mana diharapkan air limbah yang keluar sudah
memiliki kualitas yang dapat didegradasi oleh lingkungan.
Pemilihan teknologi ini diharapkan mampu untuk meminimalisir biaya
operasional serta pemeliharaan oleh masyarakat sehingga diharapkan dengan
kemudahan operasional masyarakat mampu mengelola dengan baik.
Sejumlah permasalahan dalam pengelolaan limbah cair di Kota
Semarang, di antaranya adalah :
1. Belum terbangunnya fasilitas pengolahan air buangan kota (sewerage
system).
2. Belum terbangunnya sarana pengelolaan limbah cair domestik secara
terpusat.
3. Kurang memadainya sistem pengelolaan limbah cair domestik/ rumah
tangga individual (on site treatment) atau semi komunal;
GAMBAR 2.6
ZONA DAN SISTEM SANITASI AIR LIMBAH KOTA SEMARANG
2.2.2. Persampahan
Sampah di Kota Semarang berasal dari rumah tangga, kantor pemerintah
dan swasta, pasar dan sebagainya. Untuk sampah rumah tangga sebagian
sudah diolah di sumber sampah. Berdasarkan data, sebanyak 45.000 rumah
tangga sudah melakukan pemilahan sampah sejak dari rumah. Sementara yang
melakukan pengolahan sampah sebanyak 52.500 rumah tangga dengan volume
sampah yang diolah sebanyak 56 meter kubik. Sarana tempat sampah berupa
tong sampah sudah dimiliki 929.500 rumah tangga. Sedangkan sebanyak 25.400
rumah tangga membuang sampahnya ke tempat sampah umum.
Pengelolaan sampah di Kota Semarang dilakukan oleh Dinas Kebersihan
dan Pertamanan didukung oleh masing-masing kecamatan. Penanganan
sampah yang berada di jalan-jalan protokol dan pasar-pasar dikerjasamakan
dengan pihak ketiga (swasta). Sedangkan pengelolaan sampah di wilayah
kelurahan, dilakukan oleh kecamatan setempat. Dengan pola penanganan
sampah seperti ini, baru dapat terlayani pengambilan sampahnya sebanyak 72%
dari volume sampah yang ada. Volume sampah rata-rata per hari di Kota
Semarang tahun 2011-2012, tahun 2011 volume sampah produksi sejumlah
4.110,37 m3 dan volume sampah terangkut sejumlah 3.082,78 m3 dan pada
tahun 2012 volume sampah produksi sejumlah 4.209,01 m3 dan volume sampah
terangkut sejumlah 3.056,68 m3
Banyaknya sarana pengumpulan sampah yang dimiliki Dinas Kebersihan
dan Pertamanan Kota Semarang terlihat dari tabel di bawah ini:
TABEL II.3
BANYAKNYA SARANA PENGUMPULAN SAMPAH KOTA SEMARANG
SARANA PENGUMPULAN
NO JUMLAH
SAMPAH
1 Truck hidrolik 85
2 Dump truck sampah 21
3 Road Sweeper 2
4 Gerobak sampah 0
5 Truk tinja 2
6 Crane 4
7 Wheel loader 0
8 Swamp dozer 1
9 Shoevel loader 0
10 Excavator / Back Hoe 0
SARANA PENGUMPULAN
NO JUMLAH
SAMPAH
11 Trailler urinoir 2
12 Becak sampah 0
13 Tong sampah 0
14 Kontainer sampah 0
15 TPS / Depo sampah 1
16 TPA Jatibarang 1
17 IPLT 4
Jumlah 123
Sumber: Dinas Kebersihan dan Pertamanan
Kota Semarang dalam Angka, 2012
TABEL II.4
TPS DAN TPST KOTA SEMARANG
VOLUME
TEMPAT
NO LOKASI JUMLAH (m3/unit)/LUAS
PENANGANAN
TPST
1 TPS
a. Terbuka Semarang 178 buah @ 12 m3/unit/hari
b. Tertutup Semarang 12 buah @ 4 m3/unit/hari
c. Dengan pemisahan
sesuai jenis sampah
2 Fasilitas pengolahan Semarang 12 TPST @ 4 m3/unit/hari
sampah 6 takakura @ 2 m3/unit/hari
3 TPST Ngudi Kel. Sampangan 5 x 12 m2
Kamulyan
4 TPST Bondho Sepolo Kel. Bulu Lor 5 x 12 m2
5 TPST Pleburan Kel. Pleburan 5 x 12 m2
6 TPST Gemah Kel. Gemah 5 x 12 m2
TPST Pedurungan Kel. Pedurungan 5 x 12 m2
7
Kidul Kidul
8 TPST Penggaron Lor Kel. Penggaron Lor 5 x 12 m2
9 TPST Pudak Payung Kel. Pudak Payung 5 x 12 m2
10 TPST Padangsari Kel. Padangsari 5 x 12 m2
11 TPST Ngaliyan Kel. Ngaliyan 5 x 12 m2
12 TPST Gondoriyo Kel. Gondoriyo 5 x 12 m2
13 TPST Bonbin Kel. Wonosari 5 x 12 m2
Mangkang
14 TPST Dinas Kel. Telogosari 5 x 12 m2
Kebersihan
Sumber: Dinas Kebersihan dan Pertamanan Kota Semarang, 2012
TABEL II.5
LOKASI PENGOLAHAN SAMPAH
VOLUME
SAMPAH
JENIS
NO LOKASI ALAMAT PEMANFAATAN YANG
KEGIATAN
DIOLAH
(m3/bulan)
1 Perumnas Jl. Akasia 3R Organik jadi 60 m3/bln
Sampangan Sampangan kompos 25 m3/bln
Non organik
jadi tas dll
2 Kelurahan Kel. Bulu Lor 3R Organik jadi 50 m3/bln
Bulu Lor kompos 10 m3/bln
Non organik
jadi tas dll
3 Kelurahan Kelurahan 3R Organik jadi 15 m3/bln
Jomblang Jomblang kompos 20 m3/bln
Non organik
jadi tas dll
4 Kelurahan Kelurahan 3R Organik jadi 10 m3/bln
Petompon Petompon kompos
Non organik
jadi tas dll
5 Kelurahan Kelurahan 3R Organik jadi 10 m3/bln
Bendan Bendan kompos 5 m3/bln
Duwur Duwur Non organik
jadi tas dll
VOLUME
SAMPAH
JENIS
NO LOKASI ALAMAT PEMANFAATAN YANG
KEGIATAN
DIOLAH
(m3/bulan)
6 Kelurahan Kelurahan 3R Organik jadi 5 m3/bln
Muktiharjo Muktiharjo kompos
Non organik 3 m3/bln
jadi tas dll
7 TPST Kelurahan 3R Pengomposan 10 m3/bln
Pleburan Pleburan
8 TPST Kelurahan 3R Pengomposan 10 m3/bln
Gemah Gemah
9 TPST Kelurahan 3R Pengomposan 35 m3/bln
Pedurungan Pedurungan
Lor Lor
10 TPST Kelurahan 3R Pengomposan 20 m3/bln
Pedurungan Pedurungan
Kidul Kidul
11 TPST Kelurahan 3R Pengomposan 52 m3/bln
Padangsari Padangsari
12 TPST Kelurahan 3R Pengomposan 32 m3/bln
Ngaliyan Ngaliyan
13 TPST Kelurahan 3R Pengomposan 40 m3/bln
Gondoriyo Gondoriyo
14 TPST Bonbin 3R Pengomposan 15 m3/bln
Mangkang Mangkang
15 TPST DKP Jl. Supriyadi 3R Pengomposan 10 m3/bln
30
16 TPST Kelurahan 3R Pengomposan 36 m3/bln
Pudak Pudak
Payung Payung
Sumber: Dinas Kebersihan dan Pertamanan Kota Semarang, 2012
GAMBAR 2.7
ZONA DAN SISTEM SANITASI PERSAMPAHAN KOTA SEMARANG
2.2.3. Drainase
Pengelolaan drainase kota di Kota Semarang kewenangannya berada di
Dinas Pengelolaan Sumber Daya Air & Energi Sumber Daya Mineral (PSDA &
ESDM) sesuai dengan Peraturan Walikota Semarang No. 32 tahun 2008 tentang
penjabaran tugas dan fungsi dinas pengelolaan sumber daya air dan energi
sumber daya mineral Kota Semarang. Selain itu penanganan drainase
didasarkan pada Keputusan Walikota Nomor: 614.05/061 tentang Pembentukan
Tim Teknis Penanganan Banjir dan Rob Kota Semarang.
Untuk pengelolaan drainase pada skala permukiman dilakukan oleh
Dinas Tata Kota dan Perumahan (DTKP) Kota Semarang sebagai dinas teknis
yang tugas pokok dan fungsinya sebagai pelayanan penataan pembangunan
dan lingkungan Perumahan dan Permukiman yang aman, tertib, asri dan sehat.
Dalam kegiatan yang dilaksanakan Dinas Tata Kota dan Perumahan Kota
Semarang, salah satunya bidang Perumahan dan Permukiman.
Prasarana lingkungan permukiman merupakan kelengkapan dasar fisik
lingkungan yang memungkinkan lingkungan permukiman dapat berfungsi
sebagaimana mestinya. Prasarana utama meliputi jaringan jalan, jaringan
pembuangan air limbah dan sampah, jaringan drainase, jaringan pengadaan air
bersih, jaringan listrik, telepon, gas, dan sebagainya.
Drainase lingkungan yang dikerjakan oleh Dinas Tata Kota dan
Perumahan Kota Semarang adalah drainase di lingkungan perumahan/
permukiman di wilayah Kota Semarang. Prosentase pekerjaan drainase
lingkungan yang dikerjakan pada tahun 2009 sebesar 25% dari total pekerjaan
Perbaikan Lingkungan Permukiman.
Pekerjaan perbaikan lingkungan permukiman berdasarkan ajuan proposal
dari masyarakat, hasil musrenbang, dan hasil studi inventarisasi yang dilakukan
sebelumnya. Prosentase pekerjaan drainase lingkungan jika dibandingkan
dengan pekerjaan fisik lainnya jauh masih sedikit, sebab prioritas kebutuhan
penanganan masyarakat lebih dominan kepada permohonan perbaikan jalan
lingkungan.
Sedangkan pengelolaan drainase skala kota di Kota Semarang terdiri dari
3 sistem yaitu Sistem Barat, Sistem Semarang Tengah dan Sistem Semarang
Timur.
a. Sistem Semarang Barat terdiri dari beberapa Sub Sistem yaitu :
1) Sub Sistem Mangkang
GAMBAR 2.8
ZONA DAN SISTEM SANITASI DRAINASE KOTA SEMARANG
2.2.4. Irigasi
Kota Semarang terbagai atas 79 Daerah Irigasi, sesuai Lampiran II Perda
Kota Semarang No. 14 Tahun 2011 tentang RTRW Kota Semarang Tahun 2011-
2031 sebagai berikut:
TABEL II.6
BANYAKNYA PASAR DAN JENIS PASAR
KOTA SEMARANG 2008-2012
kesehatan masyarakat serta pelayanan kesehatan ibu dan anak serta pemulihan
kesehatan.
Pencegahan penyakit dan cara hidup sehat lebih diutamakan daripada
pengobatan. Untuk itu, Pemerintah Daerah, dalam hal ini Dinas Kesehatan telah
melaksanakan berbagai macam imunisasi pada masyarakat. Selama tahun 2011,
kegiatan imunisasi yang telah dilaksanakan adalah BCG, Polio, DPT dan
Campak.
TABEL II.7
JUMLAH FASILITAS KESEHATAN
KOTA SEMARANG TAHUN 2010-2012
BANYAKNYA
KECAMATAN MASJID MUSHALLA GEREJA/ VIHARA/KUIL/P
KAPEL URA
Mijen 69 140 15 1
Gunungpati 94 223 4 2
Banyumanik 115 121 33 1
Gajahmungkur 57 61 17 1
Smg. Selatan 59 53 21 2
Candisari 50 44 12 1
Tembalang 110 196 20 0
Pedurungan 123 203 17 3
Genuk 54 240 6 0
Gayamsari 53 62 8 0
Semarang Timur 39 87 22 6
BANYAKNYA
KECAMATAN MASJID MUSHALLA GEREJA/ VIHARA/KUIL/P
KAPEL URA
Semarang Utara 54 106 29 0
Semarang Tengah 28 71 18 17
Semarang Barat 111 87 51 4
Tugu 17 86 1 0
Ngaliyan 96 151 14 0
Jumlah/Total
2012 1.129 1.931 288 38
2011 1.129 1.930 288 38
2010 1.126 1.933 287 38
2009 1.067 1.681 279 26
2008 1.067 1.681 279 26
Sumber: Semarang dalam Angka, 2012
Prasarana Jalan
Jalan merupakan prasarana pengangkutan yang penting untuk
memperlancar kegiatan perekonomian. Makin meningkatnya usaha
pembangunan jalan makin memudahkan mobilitas penduduk dan memperlancar
lalu lintas barang dari satu daerah ke daerah lain.
Panjang jalan di seluruh wilayah kota Semarang mencapai 2.786,28 Km,
dimana bila dilihat dari jenis permukaannya 433,28 km sudah diaspal, sedangkan
dari kondisinya 45,05 % dalam keadaan baik; 32,48 % dalam keadaan sedang;
dan sisanya dalam keadaan rusak.
TABEL II.9
PANJANG JALAN KOTA SEMARANG TAHUN 2012
2.2.9. Listrik
Kebutuhan energi listrik akan terus meningkat sejalan dengan
peningkatan roda perekonomian di kota Semarang. Dalam pada itu, PLN sebagai
Perusahaan Negara yang menangani listrik terus meningkatkan kinerjanya
sebagai antisipasi dari peningkatan kebutuhan tenaga listrik.
Salah satu indikator dari kinerja PLN adalah banyaknya laporan
gangguan listrik sebagai bagian dari pelayanan masyarakat. Selama tahun 2012,
2.2.10. Telepon
Perkembangan jaringan telekomunikasi beberapa tahun terakhir cukup
menggembirakan, terlihat dengan banyaknya satuan sambungan yang
dipasarkan kepada masyarakat. Jika dilihat dari sebaran tiap kecamatan yang
ada, maka jaringan telepon telah menjangkaunya seluruh kelurahan yang ada di
tiap kecamatan.
TABEL II.11
MATA PENCAHARIAN PENDUDUK KOTA SEMARANG TAHUN 2012
a. Sarana Kesehatan
Untuk mewujudkan pelayanan kesehatan yang optimal bagi masyarakat
perlu didukung oleh adanya sarana kesehatan yang memadai dan memiliki
kualitas pelayanan yang baik.
TABEL II.12
JUMLAH SARANA DAN PRASARANA KESEHATAN
DI KOTA SEMARANG TAHUN 2011-2012
b. Sanitasi Lingkungan
Kualitas kesehatan lingkungan tidak bisa lepas dari terbukanya akses
terhadap sanitasi. Lingkungan sehat akan tercipta jika persoalan air limbah,
sampah dan drainase tertangani dengan baik.
Pemerintah Kota Semarang telah melakukan upaya untuk menjaga dan
meningkatkan kesehatan lingkungan di wilayahnya. Upaya yang dilakukan
secara langsung oleh pemerintah maupun bersama masyarakat dan pihak
swasta. Kegiatan yang dilakukan bersama dengan pihak swasta seperti kegiatan
membersihkan lingkungan sekitar yang terprogram dalam bentuk Resik-Resik
Kutho yang bekerjasama dengan Harian Umum Suara Merdeka. Demikian
halnya dengan program Semarang Hijau dengan Harian Umum Jawa Pos-Radar
Semarang.
Aktifitas Resik-Resik Kutho merupakan kegiatan kerja bakti semua
lapisan masyarakat, swasta dan pemerintah dengan fokus kebersihan lingkungan
seperti aliran drainase lingkungan dan sekitarnya. Sementara kegiatan
Semarang Hijau berfokus pada lomba kebersihan lingkungan di tingkat RW dan
kelurahan.
Pada level nasional, Kota Semarang berpartisipasi aktif pada peningkatan
kualitas kesehatan lingkungan dalam bentuk lomba Adipura. Dalam kurun 5
tahun terakhir, Kota Semarang berhasil meraih penghargaan untuk lomba tingkat
nasional tersebut.
Lingkungan merupakan salah satu variabel yang perlu mendapat
perhatian khusus dalam menilai kondisi kesehatan masyarakat. Bersama dengan
faktor perilaku, pelayanan kesehatan dan genetik, lingkungan mempengaruhi
derajat kesehatan masyarakat. Untuk menggambarkan keadaan lingkungan,
akan disajikan indikator -indikator seperti : akses terhadap air bersih dan air
minum berkualitas dan akses terhadap sanitasi layak.
GAMBAR 2.9
GRAFIK PENGGUNAAN AIR BERSIH MENURUT JENIS SARANA
Sumber: Seksi PAL Bidang PKPKL dalam Profil Kesehatan Kota Semarang Tahun 2012
Dari data yang ada, suplai air bersih rumah tangga terbesar di Kota
Semarang berasal dari Ledeng 63,2%, diikuti oleh sumur Gali 19%.
Upaya peningkatan kualitas air bersih akan meningkat apabila diikuti
upaya perbaikan sanitasi (sarana pembuangan kotoran manusia,
sampah, air limbah). Selain itu adanya peran serta dan kesadaran sektor
swasta penyedia air bersih yang meningkat berkenaan dengan kualitas air
bersih.
GAMBAR 2.10
GRAFIK PENGGUNAAN SUMBER AIR MINUM KELUARGA
Sumber: Seksi PAL Bidang PKPKL dalam Profil Kesehatan Kota Semarang Tahun 2012
Dari grafik diatas dapat disimpulkan bahwa sumber air minum keluarga
yang digunakan paling banyak berasal dari ledeng meteran dengan
203.701 KK (64,5%).
kematian bayi adalah jumlah penduduk yang meninggal sebelum mencapai usia
1 tahun yang dinyatakan dalam 1.000 kelahiran hidup pada tahun yang sama.
Usia bayi merupakan kondisi yang rentan baik terhadap kesakitan maupun
kematian.
Angka Kematian Balita (AKBa) adalah jumlah anak yang meninggal
sebelum mencapai usia 5 tahun yang dinyatakan sebagai angka per 1.000
kelahiran hidup. AKBa merepresentasikan risiko terjadinya kematian pada fase
antara kelahiran dan sebelum umur 5 tahun. Berdasarkan data kasus kematian
Anak Balita di Kota Semarang Tahun 2012 sebanyak 44 anak dari 27.448
kelahiran hidup (laporan Puskesmas), sehingga diperoleh Angka Kematian Balita
(AKBa) Kota Semarang sebesar 1,6 per 1.000 KH. Jika dibandingkan dengan
tahun 2011 terjadi penurunan.yakni 3,5 per 1.000 KH. Jika dibandingkan dengan
target MDGs yang menetapkan bahwa AKBa tahun 2015 sebesar 32 per 1.000
KH, maka AKBa Kota Semarang telah dibawah target.
Berbagai faktor dapat menyebabkan adanya penurunan AKB & AKBa,
diantaranya pemerataan pelayanan kesehatan berikut fasilitasnya. Hal itu
disebabkan AKB & AKBa sangat sensitive terhadap perbaikan pelayanan
kesehatan. Selain itu, perbaikan kondisi ekonomi yang tercermin dengan
pendapatan masyarakat yang meningkat juga dapat berkontribusi melalui
perbaikan gizi yang berdampak positif pada daya tahan bayi terhadap infeksi
penyakit.
GAMBAR 2.11
GRAFIK PENDERITA DIARE TAHUN 2012
MENURUT KELOMPOK UMUR
Sumber: Seksi P2ML Bidang P2P dalam Profil Kesehatan Kota Semarang Tahun 2012
GAMBAR 2.12
KASUS DIARE KOTA SEMARANG TAHUN 2012
MENURUT KELOMPOK UMUR
Sumber: Seksi P2ML Bidang P2P dalam Profil Kesehatan Kota Semarang Tahun 2012
berarti penderita diare yang berobat ke Puskesmas dan yang ditolong kader tidak
ada yang meninggal. Untuk lebih jelasnya berikut ini peta IR diare per
Puskesmas di Kota Semarang tahun 2012.
GAMBAR 2.13
PETA IR DIARE KOTA SEMARANG TAHUN 2012
Sumber: Seksi P2ML Bidang P2P dalam Profil Kesehatan Kota Semarang Tahun 2012
Dari Gambar 2.13 dapat kita ketahui bahwa dari 37 Puskesmas di Kota
Semarang yang IR nya sesuai dan melebihi target (target IR 22/1000 penduduk)
ada 13 puskesmas yaitu puskesmas Mangkang(35), Ngemplaksimongan ( 33),
Gunungpati (30), Genuk (28), Karang anyar (28), Bandarharjo (27), Lamper
tengah (27),Karang malang (26), Ngesrep (25), Bugangan (23), Bangetayu (23),
Manyaran(22) dan Halmahera(21). Puskesmas yang IR diarenya < 21 per 1.000
penduduk ( kurang dari target ) ada 24 Puskesmas yaitu puskesmas Padangsari,
Mijen, Miroto, Kedungmundu, Karangayu, Pudakpayung, Rowosari, Krobokan,
Purwoyoso, Kagok, Sekaran, Pegandan, Pandanaran,Tlogosari wetan, Srondol,
Gayamsari, Karangdoro, Poncol, Tambak Aji, Candi Lama, Bulu Lor, Tlogosari
Kulon, Ngalian dan Lebdosari. Rangking IR Per Puskesmas dapat dilihat
dibawah ini
GAMBAR 2.14
PETA IR DIARE PER KECAMATAN DI KOTA SEMARANG TAHUN 2012
Sumber: Seksi P2ML Bidang P2P dalam Profil Kesehatan Kota Semarang Tahun 2012
TABEL II.13
PERKEMBANGAN KELAHIRAN DAN KEMATIAN PENDUDUK
KOTA SEMARANG PERIODE 2007 – 2012
JUMLAH
TAHUN CBR CDR
PENDUDUK KELAHIRAN KEMATIAN
2007 1.453.549 22.838 10.018 16,06 7,04
2008 1.480.630 24.472 10.018 16,60 6,79
2009 1.505.909 25.262 10.373 17,01 6,98
2010 1.526.398 22.724 10.275 14,98 6,77
2011 1.543.557 24.910 10.454 16,09 6,76
2012 1.559.198 23.634 10.012 15,23 6,45
Sumber : Profil Kependudukan Kota Seamrang, 2012
TABEL II.14
JUMLAH KELAHIRAN MENURUT JENIS KELAMIN, KECAMATAN DAN
PUSKESMAS KABUPATEN/KOTA SEMARANG 2012
JUMLAH KELAHIRAN
NO KECAMATAN NAMA PUSKESMAS LAKI-LAKI PEREMPUAN LAKI-LAKI + PEREMPUAN
HIDUP MATI HIDUP + MATI HIDUP MATI HIDUP + MATI HIDUP MATI HIDUP + MATI
1 2 3 4 5 6 7 8 9 10 11 12
1 Smg Tengah 1. Poncol 300 0 300 342 2 344 642 2 644
2. Miroto 254 1 255 335 3 338 589 4 593
2 Smg Utara 3. Bandarharjo 477 0 477 513 3 516 990 3 993
4. Bulu Lor 425 3 428 456 1 457 881 4 885
3 Smg Timur 5. Halmahera 324 2 326 390 1 391 714 3 717
6. Bugangan 157 0 157 151 0 151 308 0 308
7. Karangdoro 456 0 456 463 0 463 919 0 919
4 Smg Selatan 8. Pandanaran 583 3 586 644 2 646 1.227 5 1.232
9. Lamper Tgh 202 2 204 195 2 197 397 4 401
5 Smg Barat 10. Karangayu 179 1 180 193 1 194 372 2 374
11. Lebdosari 320 2 322 349 2 351 669 4 673
12. Manyaran 282 2 284 332 1 333 614 3 617
13. Krobokan 166 1 167 202 0 202 368 1 369
14. Ngemplak S 215 1 216 211 1 212 426 2 428
6 Gayamsari 15. Gayamsari 536 1 537 682 0 682 1.218 1 1.219
7 Candisari 16. Candi Lama 278 1 279 278 1 279 556 2 558
17. Kagok 326 2 328 403 1 404 729 3 732
8 Gajahmungkur 18. Pegandan 638 4 642 847 2 849 1.485 6 1.491
9 Genuk 19. Genuk 824 1 825 728 1 729 1.552 2 1.554
20. Bangetayu 410 3 413 344 2 346 754 5 759
10 Pedurungan 21. Tlogosari Wtn 675 3 678 813 2 815 1.488 5 1.493
22. Tlogosari Kln 832 2 834 794 2 796 1.626 4 1.630
11 Tembalang 23. Kedungmundu 920 1 921 1.020 1 1.021 1.940 2 1.942
24. Rowosari 222 3 225 267 2 269 489 5 494
12 Banyumanik 25. Ngesrep 224 4 228 418 2 420 642 6 648
26. Padangsari 284 0 284 284 0 284 568 0 568
27. Srondol 362 1 363 397 1 398 759 2 761
28. Pudak Payung 119 1 120 151 1 152 270 2 272
13 Gunungpati 29. Gunungpati 330 5 335 348 3 351 678 8 686
30. Sekaran 189 0 189 179 0 179 368 0 368
14 Mijen 31. Mijen 313 2 315 322 2 324 635 4 639
32. Karang Malang 71 0 71 80 0 80 151 0 151
15 Ngalian 33. Tambakaji 249 2 251 265 1 266 514 3 517
34. Purwoyoso 373 1 374 342 1 343 715 2 717
35. Ngalian 335 2 337 368 2 370 703 4 707
16 Tugu 36. Mangkang 152 2 154 146 2 148 298 4 302
37. Karang Anyar 91 0 91 103 0 103 194 0 194
TABEL II.15
JUMLAH KEMATIAN MENURUT JENIS KELAMIN, KECAMATAN DAN
PUSKESMAS KABUPATEN/KOTA SEMARANG 2012
JUMLAH KEMATIAN
DIARE
JUMLAH PENDUDUK DIARE DITANGANI Kematia
NO KECAMATAN PUSKESMAS JUMLAH PERKIRAAAN KASUS
L P L+P n Diare
L P L+P * L P L+P JUMLAH % JUMLAH % JUMLAH %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Smg Tengah 1. Poncol 49.367 20.290 216 272 488 2,4 0
2. Miroto 36.299 14.919 278 326 604 4,0 0
2 Smg Utara 3. Bandarharjo 112.693 46.317 827 1.174 2.001 4,3 0
4. Bulu Lor 51.889 21.326 323 402 725 3,4 0
3 Smg Timur 5. Halmahera 34.548 14.199 653 697 1.350 9,5 0
6. Bugangan 19.322 7.941 373 507 880 11,1 0
7. Karangdoro 27.054 11.119 407 142 549 4,9 0
4 Smg Selatan 8. Pandanaran 52.645 21.637 420 516 936 4,3 0
9. Lamper Tgh 32.940 13.538 413 490 903 6,7 0
5 Smg Barat 10. Karangayu 50.061 20.575 278 357 635 3,1 0
11. Lebdosari 49.422 20.312 287 336 623 3,1 0
12. Manyaran 65.757 27.026 377 455 832 3,1 0
13. Krobokan 50.506 20.758 188 281 469 2,3 0
14. Ngemplak S 43.107 17.717 544 627 1.171 6,6 0
6 Gayamsari 15. Gayamsari 73.878 30.364 398 568 966 3,2 0
7 Candisari 16. Candi Lama 41.502 17.057 191 191 382 2,2 0
17. Kagok 38.724 15.916 248 299 547 3,4 0
8 Gajahmungkur 18. Pegandan 65.384 26.873 587 815 1.402 5,2 0
9 Genuk 19. Genuk 38.922 15.997 623 632 1.255 7,8 0
20. Bangetayu 48.650 19.995 561 550 1.111 5,6 0
10 Pedurungan 21. Tlogosari Wtn 150.789 61.974 627 720 1.347 2,2 0
22. Tlogosari Kln 145.141 59.653 570 618 1.188 2,0 0
11 Tembalang 23. Kedungmundu 123.897 50.922 1.277 1.290 2.567 5,0 0
24. Rowosari 38.060 15.643 260 317 577 3,7 0
12 Banyumanik 25. Ngesrep 41.115 16.898 547 660 1.207 7,1 0
26. Padangsari 31.896 13.109 268 334 602 4,6 0
27. Srondol 48.755 20.038 294 382 676 3,4 0
28. Pudak Payung 38.834 15.961 110 229 339 2,1 0
13 Gunungpati 29. Gunungpati 48.120 19.777 589 696 1.285 6,5 0
30. Sekaran 26.524 10.901 170 194 364 3,3 0
14 Mijen 31. Mijen 43.193 17.752 510 413 923 5,2 0
32. Karang Malang 10.235 4.207 125 125 250 5,9 0
15 Ngalian 33. Tambakaji 38.891 15.984 226 217 443 2,8 0
34. Purwoyoso 33.619 13.817 300 384 684 5,0 0
35. Ngalian 46.383 19.063 301 319 620 3,3 0
16 Tugu 36. Mangkang 15.464 6.356 370 432 802 12,6 0
37. Karang Anyar 14.157 5.819 191 192 383 6,6 0
Total Puskesmas 1.877.743 771.752 14.927 17159 32.086 4,2 0
Rumah Sakit 6.122 4141 10.263 5
JUMLAH (KAB/KOTA) 1.877.743 771.752 21.049 21300 42.349 5,5 5
Sumber: Profil Kesehatan Kota Semarang, 2012
TABEL II.17
PENGGUNAAN AREAL TANAH DI KOTA SEMARANG PADA AKHIR TAHUN 2012 (Ha)
PENGGEM
RAWA- KOLAM/
TEGAL/ BANGUNAN & BALAAN, SEMENTARA
TANAH HUTAN PERKE- HUTAN RAWA TEBAT/
KECAMATAN KEBUN/ TANAH PADANG TAMBAK TDK LAINNYA JUMLAH
SAWAH RAKYAT BUNAN NEGARA TDK EMPANG
LADANG PEKARANGAN RUMPUT, DIUSAHAKAN
DITANAMI DLL
DLL
Mijen 886,50 2.387,16 0,00 0,00 1.046,37 771,65 0,00 0,00 759,46 0,00 4,22 585,77 6.441,13
Gunungpati 1.385,47 2.574,21 0,00 0,00 0,00 1.230,80 0,00 0,00 0,00 0,00 0,00 119,00 5.309,48
Banyumanik 96,00 653,12 0,00 0,00 172,90 412,55 0,00 0,00 0,00 0,00 0,00 1.153,34 2.487,91
Gajah Mungkur 0,00 2,78 0,00 0,00 0,00 648,48 0,00 0,00 0,00 0,00 0,00 65,98 717,24
Smg. Selatan 0,00 0,00 0,00 0,00 0,00 773,38 0,00 0,00 0,00 0,00 0,00 21,76 795,14
Candisari 0,00 18,73 0,00 0,00 0,00 463,55 0,00 0,00 0,00 0,00 13,01 25,57 520,86
Tembalang 432,00 886,30 0,00 0,00 56,26 2.160,64 45,94 0,00 0,00 0,00 0,00 691,35 4.272,49
Pedurungan 64,00 367,54 0,00 0,00 0,00 1.412,98 0,00 0,00 0,00 0,00 0,00 102,20 1.946,72
Genuk 94,00 630,95 0,00 0,00 0,00 1.599,26 0,00 0,00 37,50 0,00 0,00 221,12 2.582,83
Gayamsari 5,00 0,00 4,69 0,00 0,00 394,63 8,20 4,69 7,59 2,81 3,28 84,61 515,50
Smg. Timur 0,00 0,00 0,00 0,00 0,00 722,34 0,00 0,00 0,00 0,00 0,00 0,00 722,34
Smg. Selatan 0,00 0,00 0,00 0,00 0,00 869,63 0,00 0,00 43,22 3,38 0,00 146,34 1.062,57
Smg. Tengah 0,00 5,14 0,00 0,00 0,00 192,21 0,00 0,00 0,00 0,00 5,10 364,80 567,25
Smg. Barat 32,00 55,60 0,00 0,00 0,00 1.739,14 0,00 0,00 0,00 49,37 0,00 396,51 2.272,62
Tugu 454,00 78,95 0,00 0,00 0,00 476,05 454,14 0,00 1.292,52 0,00 0,00 243,33 2.998,99
Ngaliyan 378,00 1.753,31 961,05 0,00 663,83 391,92 9,38 0,00 0,00 0,00 0,00 0,00 4.157,49
Jumlah 3.826,97 9.413,79 965,74 0,00 1.939,36 14.259,21 517,66 4,69 2.140,29 55,56 25,61 4.221,68 37.370,56
Prosentase(%) 10,24 25,19 2,58 0,00 5,19 38,16 1,39 0,01 5,73 0,15 0,07 11,30 100,00
Sumber : Dinas Pertanian Kota Semarang dalam Angka, 2012
GAMBAR 2.15
PETA TATA GUNA LAHAN KOTA SEMARANG
GAMBAR 2.16
PETA RENCANA STRUKTUR RUANG KOTA SEMARANG
– Sub Sistem Sungai Banjir Kanal Barat dengan luas kurang lebih 2.005
(dua ribu lima) hektar meliputi Sungai Kripik, Sungai Kreo dan Sungai
Garang terletak di Kota Semarang dan Kabupaten Semarang;
– Sub Sistem Sungai Bulu dengan luas kurang lebih 94 (sembilan puluh
empat) hektar meliputi Saluran Jl. Hasanudin, Saluran Jl. Brotojoyo,
Saluran Panggung Kidul dan Saluran Bulu Lor;
– Sub Sistem Sungai Semarang dengan luas kurang lebih 1.352 (seribu
tiga ratus lima puluh dua) hektar;
– Sub Sistem Sungai Simpang Lima dengan luas kurang lebih 340 (tiga
ratus empat puluh) hektar;
– Sub Sistem Sungai Banger dengan luas kurang lebih 524 (lima ratus
dua puluh empat) hektar.
– Sub Sistem Sungai Bandarharjo dengan luas kurang lebih 302 (tiga
ratus dua) hektar;
– Sub Sistem Sungai Asin dengan luas kurang lebih 282 (dua ratus
delapan puluh dua) hektar; dan
– Sub Sistem Sungai Baru dengan luas kurang lebih 186 (seratus
delapan puluh enam) hektar.
4) Sistem drainase Semarang Timur.
Sistem Drainase Semarang Timur memiliki luas daerah aliran sungai
kurang lebih 31.043 (tiga puluh satu ribu empat puluh tiga) hektar yang
terdiri dari 5 (lima) sub sistem meliputi :
– Sub Sistem Banjir Kanal Timur dengan luas kurang lebih 3.705 (tiga
ribu tujuh ratus lima) hektar meliputi Sungai Candi, Sungai Bajak,
Sungai Kedungmundu dan Saluran Bulu Lor;
– Sub Sistem Sungai Tenggang dengan luas kurang lebih 1.138 (seribu
seratus tiga puluh delapan) hektar;
– Sub Sistem Sungai Sringin dengan luas kurang lebih 1.527 (seribu
lima ratus dua puluh tujuh) hektar;
– Sub Sistem Sungai Babon dengan luas kurang lebih 12.715 (dua
belas ribu tujuh ratus lima belas) hektar meliputi Sungai Gede, Sungai
Meteseh, Sungai Jetak dan Sungai Sedoro; dan
– Sub Sistem Sungai Pedurungan dengan luas kurang lebih 1.077
(seribu tujuh puluh tujuh) hektar.
Sempadan pantai ditetapkan dengan luas kurang lebih 175 (seratus tujuh puluh
lima) hektar meliputi:
a. Kelurahan Mangkang Kulon;
b. Kelurahan Mangunharjo;
c. Kelurahan Mangkang Wetan;
d. Kelurahan Randugarut; dan
e. Kelurahan Tugurejo.
Sempadan pantai meliputi:
a. Kelurahan Jerakah;
b. Kelurahan Tambakharjo;
c. Kelurahan Tawangsari;
d. Kelurahan Tawangmas;
e. Kelurahan Panggung Lor;
f. Kelurahan Bandarharjo;
g. Kelurahan Tanjung Mas; dan
h. Kelurahan Terboyo Kulon.
Rencana sempadan pantai meliputi:
a. Perlindungan garis pantai;
b. Penghijauan sempadan pantai; dan
c. Pengaturan pemanfaatan sempadan pantai hasil reklamasi diatur lebih
lanjut dengan Peraturan Daerah.
Sempadan sungai meliputi:
a. Sungai Garang berserta anak sungainya;
b. Sungai Kripik berserta anak sungainya;
c. Sungai Kreo berserta anak sungainya;
d. Sungai Beringin berserta anak sungainya;
e. Sungai Pengkol berserta anak sungainya;
f. Sungai Banjirkanal Timur berserta anak sungainya;
g. Sungai Babon berserta anak sungainya;
h. Sungai Sringin berserta anak sungainya; dan
i. Sungai-sungai yang lainnya.
Rencana sempadan sungai meliputi:
a. Perlindungan dan penguatan dinding pembatas sungai;
b. Penghijauan sempadan sungai; dan
c. Pengembangan jalan inspeksi.
b. Ruang terbuka hijau kawasan rawan gerakan tanah dan longsor dengan
luas kurang lebih 727 (tujuh ratus dua puluh tujuh) hektar;
c. Ruang terbuka hijau kawasan patahan (sesar) aktif dengan luas kurang
lebih 146 (seratus empat puluh enam) hektar;
d. Ruang terbuka hijau sempadan pantai dengan luas kurang lebih 250 (dua
ratus lima puluh) hektar;
e. Ruang terbuka hijau kawasan sempadan sungai dengan luas kurang lebih
641 (enam ratus empat puluh satu) hektar;
f. Ruang terbuka hijau kawasan sempadan waduk dengan luas kurang lebih
122 (seratus dua puluh dua) hektar;
g. Ruang terbuka hijau jalur sempadan rel kereta api dengan luas kurang
lebih 38 (tiga puluh delapan) hektar;
h. Ruang terbuka hijau jalur SUTT dan SUTET dengan luas kurang lebih 60
(enam puluh) hektar; dan
i. Ruang terbuka hijau pemakaman umum dengan luas kurang lebih 89
(delapan puluh sembilan) hektar tersebar di setiap BWK.
Rencana ruang terbuka hijau meliputi :
a. Peningkatan kualitas ruang terbuka hijau yang sudah ada di seluruh
wilayah Kota;
b. Pengembangan ruang terbuka hijau baru di kawasan pusat kota;
c. Pengembangan teknologi baru dalam penyediaan ruang terbuka hijau di
kawasan pusat kota; dan
d. Pengembangan kawasan hutan ekowisata.
2) Kelurahan Jatibarang;
3) Kelurahan Kedungpane; dan
4) Kelurahan Purwosari.
b. Kecamatan Gunungpati meliputi :
1) Kelurahan Sadeng;
2) Kelurahan Kandri;
3) Kelurahan Pongangan;
4) Kelurahan Nongkosawit;
5) Kelurahan Kalisegoro;
6) Kelurahan Sukorejo;
7) Kelurahan Patemon; dan
8) Kelurahan Pakintelan.
c. Kecamatan Banyumanik meliputi :
1) Kelurahan Gedawang;
2) Kelurahan Tinjomoyo;
3) Kelurahan Srondol Kulon;
4) Kelurahan Banyumanik;
5) Kelurahan Pudakpayung; dan
6) Kelurahan Jabungan.
d. Kecamatan Tembalang meliputi :
1) Kelurahan Meteseh;
2) Kelurahan Bulusan;
3) Kelurahan Kramas; dan
4) Kelurahan Rowosari.
5) Kecamatan Semarang Barat terdapat di Kelurahan Manyaran.
Kawasan sesar aktif meliputi:
a. Kecamatan Tembalang terdapat di :
1) Kelurahan Jangli;
2) Kelurahan Tembalang;
3) Kelurahan Bulusan; dan
4) Kelurahan Kramas.
b. Kecamatan Banyumanik meliputi :
1) Kelurahan Srondol Kulon;
2) Kelurahan Tinjomoyo;
3) Kelurahan Pedalangan;
4) Kelurahan Jabungan;
5) Kelurahan Padangsari;
6) Kelurahan Sumurboto; dan
7) Kelurahan Tinjomoyo.
c. Kecamatan Gunungpati meliputi :
1) Kelurahan Sumurejo;
2) Kelurahan Mangunsari;
3) Kelurahan Pakintelan;
4) Kelurahan Plalangan;
5) Kelurahan Patemon;
6) Kelurahan Sekaran;
7) Kelurahan Kalisegoro;
8) Kelurahan Sadeng;
9) Kelurahan Pongangan;
10) Kelurahan Ngijo;
11) Kelurahan Cepoko;
12) Kelurahan Kandri;
13) Kelurahan Gunungpati;
14) Kelurahan Sukorejo;
d. Kecamatan Ngaliyan meliputi :
1) Kelurahan Ngaliyan;
2) Kelurahan Kalipancur; dan
3) Kelurahan Bambankerep.
e. Kecamatan Mijen meliputi :
1) Kelurahan Tambangan;
2) Kelurahan Jatirejo;
3) Kelurahan Jatibarang;
4) Kelurahan Wonoplumbon;
5) Kelurahan Ngadirgo;
6) Kelurahan Purwosari; dan
7) Kelurahan Cangkiran.
f. Kecamatan Gajahmungkur meliputi :
1) Kelurahan Bendan Duwur;
2) Kelurahan Bendan Ngisor;
3) Kelurahan Sampangan;
2) Kelurahan Nongkosawit;
3) Kelurahan Kalisegoro;
4) Kelurahan Sukorejo;
5) Kelurahan Patemon; dan
6) Kelurahan Pakintelan.
f. Kecamatan Mijen meliputi :
1) Kelurahan Wonolopo;
2) Kelurahan Jatisari; dan
3) Kelurahan Kedungpane.
Rencana pengelolaan kawasan rawan gerakan tanah dan longsor meliputi :
a. Penetapan tingkat bahaya gerakan tanah dan longsor per masing-masing
kawasan;
b. Pemindahan bangunan dan atau rumah yang ada di kawasan rawan
gerakan tanah dan longsor; dan
c. Penetapan kawasan kawasan rawan gerakan tanah dan longsor sebagai
RTH pengaman lingkungan.
Kawasan rawan bencana angin topan e meliputi :
a. Kecamatan Tembalang;
b. Kecamatan Banyumanik;
c. Kecamatan Gunungpati; dan
d. Kecamatan Mijen.
Rencana pengelolaan kawasan rawan bencana angin topan meliputi :
a. Pelaksanaan sosialisasi kepada masyarakat tentang kawasan rawan
bencana angin topan; dan
b. Pengembangan ruang terbuka hijau sebagai penahan angin topan.
TABEL II.18
LAJU PERUBAHAN PENGGUNAAN LAHAN DI KOTA SEMARANG PADA
TAHUN 2007 DAN AKHIR TAHUN 2012 (Ha)
RATA-RATA
JENIS TAHUN TAHUN PERUBAHAN
PERUBAHAN
PENGGUNAAN 2007 2011 PERTAHUN
(Ha)
Tanah Sawah 3.980,00 3.826,97 -153,03 -38,26
Tegal/ Kebun/ ladang 10.288,29 9.413,79 -874,50 -218,63
Hutan Rakyat 1.025,00 965,74 -59,26 -14,82
Perkebunan 1.181,00 0,00 -1.181,00 -295,25
Hutan Negara 1.716,00 1.939,36 223,36 55,84
Bangunan & tanah
14.005,38 14.259,21 253,83 63,46
pekarangan
Penggem balaan,
37,62 517,66 480,04 120,01
padang rumput, dll
rawa-rawa tdk
0,00 4,69 4,69 1,17
ditanami
Tambak 247,36 2.140,29 1.892,93 473,23
Kolam/ Tebat/
65,38 55,56 -9,82 -2,46
Empang dll
Sementara tdk
800,26 25,61 -774,65 -193,66
diusahakan
lainnya 4.024,56 4.221,68 197,12 49,28
Jumlah 37.370,85 37.370,56 -0,29 -0,07
Sumber: Kota Semarang Dalam Angka 2012, Diolah.
TANAH
TAHUN TANAH SAWAH JUMLAH
KERING
2012 3.826,97 33.543,60 37.370,57
2011 3.826,97 33.543,60 37.370,57
2010 3.746,97 33.623,60 37.370,57
TANAH
TAHUN TANAH SAWAH JUMLAH
KERING
2009 3.746,97 33.623,60 37.370,57
2008 3.980,00 33.534,22 37.514,22
2007 3.980,00 33.390,85 37.370,85
Sumber: Kota Semarang Dalam Angka 2012, Diolah
GAMBAR 2.17
PERKEMBANGAN LUAS TANAH SAWAH
DI KOTA SEMARANG TAHUN 2007 - 2012
Sumber : BPS Kota Semarang, 2012
33.623,60
33.650,00
33.623,60
33.600,00
33.550,00 33.534,22 33.543,60
33.500,00 33.543,60
33.450,00
33.400,00 33.390,85
33.350,00
33.300,00
33.250,00
2007 2008 2009 2010 2011 2012
Tanah Kering
GAMBAR 2.18
PERKEMBANGAN LUAS TANAH KERING
DI KOTA SEMARANG TAHUN 2007 - 2012
Sumber : BPS Kota Semarang, 2012
TABEL II.20
PERUBAHAN PENGGUNAAN LAHAN UNTUK BANGUNAN DAN TANAH
PEKARANGAN DI KOTA SEMARANG
TAHUN 2007-2012 (HA)
14.265,58
14.300,00 14.248,03
14.250,00
14.200,00 14.259,21 14.259,21
14.150,00 Bangunan &
14.100,00 tanah
14.050,00 pekarangan
14.005,38
14.000,00
13.950,00
13.900,00
13.850,00
2007 2008 2009 2010 2011 2012
GAMBAR 2.19
PERKEMBANGAN LUAS TANAH UNTUK BANGUNAN & PEKARANGAN
DI KOTA SEMARANG TAHUN 2007 - 2012
Sumber : BPS Kota Semarang, 2012
2.6. Kependudukan
2.6.1. Jumlah dan Kepadatan Penduduk
Berdasarkan hasil registrasi penduduk tahun 2012, jumlah penduduk Kota
Semarang tercatat sebesar 1.559.198 jiwa dengan pertumbuhan penduduk
selama tahun 2012 sebesar 0,96 %. Kondisi tersebut memberi arti bahwa
pembangunan kependudukan, khususnya usaha untuk menurunkan jumlah
kelahiran, memberikan hasil yang nyata.
Sekitar 71,61 % penduduk Kota Semarang berumur produktif (15-64) th,
sehingga angka beban tanggungan, yaitu perbandingan antara penduduk usia
produktif dengan penduduk usia tidak produktif (0-14 dan 65 th keatas) pada
tahun 2012 sebesar 39,65 yang berarti 100 orang penduduk usia produktif
menanggung 40 orang penduduk usia tidak produktif. Dengan jumlah sebesar itu
Kota Semarang masih termasuk dalam 5 besar Kabupaten/Kota yang
mempunyai jumlah penduduk terbesar di Jawa Tengah.
Perkembangan dan pertumbuhan penduduk selama 7 tahun terakhir
menunjukkan hasil yang bervariasi dengan tren semakin meningkat.
Sebagai salah satu kota metropolitan, Semarang boleh dikatakan belum
terlalu padat. Pada tahun 2012 kepadatan penduduknya sebesar 4.358 jiwa per
km2. Bila dilihat menurut Kecamatan yang mempunyai kepadatan penduduk
paling kecil adalah Kecamatan Ngaliyan sebesar 806 jiwa per km2, diikut dengan
Kecamatan Mijen 1.056 jiwa per km2 dan Kecamatan Gunungpati 1.776 jiwa per
km2. Ketiga Kecamatan tersebut merupakan daerah pertanian dan perkebunan,
sehingga sebagian wilayahnya masih banyak terdapat areal persawahan dan
perkebunan, namun sebaliknya untuk Kecamatan-Kecamatan yang terletak di
pusat kota, dimana luas wilayahnya tidak terlalu besar tetapi jumlah
penduduknya sangat banyak, kepadatan penduduknya sangat tinggi. Kepadatan
pendudukn yang paling tinggi adalah Kecamatan Gayamsari 12.144 jiwa/km2,
kemudian Kecamatan Semarang Selatan 11.883 jiwa/km2 , dan Kecamatan
Candisari 11.724 jiwa/km2.
Bila dikaitkan dengan banyaknya keluarga atau rumah tangga, maka
dapat dilihat bahwa rata-rata setiap keluarga di Kota Semarang memiliki 4
(empat) anggota keluarga, dan kondisi ini terjadi pada hampir seluruh Kecamatan
yang ada
TABEL II.21
JUMLAH DAN PERTUMBUHAN PENDUDUK TAHUN 2004-2012
TINGKAT PERTUMBUHAN
TAHUN JUMLAH PENDUDUK
SETAHUN (%)
TABEL II.22
JUMLAH PENDUDUK KOTA SEMARANG
TAHUN 2012 TIAP KECAMATAN
BANYAKNYA PENDUDUK
No. KECAMATAN
LAKI-LAKI PEREMPUAN JUMLAH
1. Mijen 28.479 28.091 56.570
2. Gunungpati 37.534 37.493 75.027
3. Banyumanik 63.671 64.554 128.225
4. Gajah Mungkur 31.760 31.670 63.430
5. Semarang Selatan 41.357 41.574 82.931
6. Candisari 39.649 40.253 79.902
7. Tembalang 72.234 70.707 142.941
8. Pedurungan 86.884 88.886 175.770
9. Genuk 45.928 45.599 91.527
10. Gayamsari 37.099 36.485 73.584
11. Semarang Timur 38.842 40.047 78.889
12. Semarang Utara 62.339 65.582 127.921
13. Semarang Tengah 35.023 36.651 71.674
14. Semarang Barat 79.214 79.767 158.981
15. Tugu 15.393 15.511 30.904
16. Ngaliyan 60.387 60.535 120.922
JUMLAH
2012 775.793 783.405 1.559.198
2011 767.884 776.474 1.544.358
2010 758.267 769.166 1.527.433
BANYAKNYA PENDUDUK
No. KECAMATAN
LAKI-LAKI PEREMPUAN JUMLAH
2009 748.515 758.409 1.506.924
2008 735.457 746.183 1.481.640
Sumber : Semarang dalam Angka 2012
TABEL II.23
KEPADATAN PENDUDUK KOTA SEMARANG
TAHUN 2012 TIAP KECAMATAN
KEPADATAN
JUMLAH LUAS AREA
NO KECAMATAN PENDUDUK
(jiwa) (Km2)
(Jiwa/ Km2)
1. Mijen 56.570 57,55 983
2. Gunungpati 75.027 54,11 1.387
3. Banyumanik 128.225 25,69 4.991
4. Gajah Mungkur 63.430 9,07 6.993
5. Semarang Selatan 82.931 5,93 13.990
6. Candisari 79.902 6,54 12.217
7. Tembalang 142.941 44,20 3.234
8. Pedurungan 175.770 20,72 8.483
9. Genuk 91.527 27,39 3.342
10. Gayamsari 73.584 6,18 11.913
11. Semarang Timur 78.889 7,70 10.245
12. Semarang Utara 127.921 10,97 11.661
13. Semarang Tengah 71.674 6,14 11.673
14. Semarang Barat 158.981 21,74 7.313
15. Tugu 30.904 31,78 972
16. Ngaliyan 120.922 37,99 3.183
JUMLAH 1.559.198 373,700 4.172
Sumber : Profil Kependudukan Kota Semarang 2012
Sedangkan ciri masyarakat Kota Semarang terbagi dua yaitu masyarakat dengan
karakteristik perkotaan dan masyarakat dengan karakteristik pedesaan.
TABEL II.24
REALISASI PENERIMAAN, PENGELUARAN, DAN BELANJA
PEMERINTAH KOTA SEMARANG TAHUN ANGGARAN 2010, 2011, 2012
JUMLAH
JENIS PENERIMAAN
2010 2011 2012
A. PENDAPATAN
1. Pendapatan Asli 328.571.317.000 518.084.921.141 786.563.411.659
Daerah
2. Pendapatan 1.666.469.938.991
Transfer
- Transfer 670.478.472.000 969.374.571.789 1.165.886.786.903
Pemerintah Pusat
– Dana
Perimbangan
- Transfer 719.040.047.000 239.992.018.350 191.552.502.000
Pemerintah Pusat
dan Lainnya
- Transfer 295.955.495.000 234.691.238.426 309.030.650.088
Pemerintah
Propinsi
B. BELANJA
1. Belanja Operasi 1.517.658.147.000 1.732.252.557.023 1.707.019.250.559
JUMLAH
JENIS PENERIMAAN
2010 2011 2012
Terduga
1.734.099.513.000 2.038.547.706.400 2.058.962.173.768
JUMLAH BELANJA
C. TRANSFER
1. Transfer/Bagi Hasil 0 0 2.058.962.173.768
ke Desa
D. PEMBIAYAAN
1. Penerimaan 313.114.936.000 195.198.550.840 207.718.808.732
Pembiayaan
TABEL II.27
REALISASI PENDAPATAN ASLI DAERAH KOTA SEMARANG
TAHUN ANGGARAN 2011
GAMBAR 3.1
DATA-DATA SUMBER AIR BAKU PDAM TIRTA MOEDAL KOTA SEMARANG
Sumber : PDAM Tirta Moedal Kota Semarang, 2012
1. Mata Air
PDAM Kota Semarang memiliki 8 mata air yang terdapat di Kalidoh,
Seleses, Ancar, Mudal Besar, Mudal Kecil, Lawang I, Lawang II dan Abimanyu.
Untuk lebih jelasnya dapat dilihat pada tabel berikut :
TABEL III.1
SUMBER MATA AIR PDAM TIRTA MOEDAL KOTA SEMARANG
KAPASITAS
TAHUN
NO MATA AIR ELEVASI (M) PRODUKSI
PEMBUATAN
(L/DETIK)
1. Kalidoh Besar 1923 418 26,37
2. Seleses 1977 425 17,73
3. Ancar 1932 431 16,76
4. Mudal Besar 1911 337 114,32
5. Mudal Kecil 1911 329 39,91
6. Lawang I 1912 329 41,03
7. Abimanyu 1977 349 4,26
8. Lawang II 1998 329 32,54
Jumlah 292,92
Sumber : PDAM Tirta Moedal Kota Semarang, 2012
2. Air Permukaan/Sungai
Air Permukaan diambil dari Kali Garang, Kali Babon, Saluran air baku
Klambu-Kudu. Jumlah pemakaiannya belum maksimal di gunakan dikarenakan
beberapa kendala.
TABEL III.2
SUMBER AIR PERMUKAAN PDAM TIRTA MOEDAL KOTA SEMARANG
KAPASITAS
NO LOKASI SUMBER (LITER/DETIK)
TERPASANG PRODUKSI
1 IPA Sungai Garang I Sungai Garang 500 460,78
2 IPA Sungai Garang II Sungai Garang 80 53,82
3 IPA Sungai Garang III Sungai Garang 250 283,92
4 IPA Sungai Garang IV Sungai Garang 300 265,78
5 IPA Kudu Klambu 1.250 772.56
6 IPA Pucanggading Kali Babon 60 47,35
7 IPA Meteseh Tidak Berfungsi
Sumber : PDAM Kota Semarang, 2012
3. Sumur Pegunungan
PDAM Kota Semarang memiliki 30 Sumur Artetis yang terdapat di
Kabupaten Semarang, Kabupaten Kendal dan Kota Semarang Sistem
pengambilan sumber air baku di Kota Semarang melalui pemompaan untuk
pelayanan ke atas dan secara gravitasi untuk pelayanan yang terdapat di bawah.
Untuk lebih jelasnya dapat dilihat pada table berikut :
TABEL III.3
SUMBER SUMUR PEGUNUNGAN PDAM TIRTA MOEDAL KOTA SEMARANG
4. Sumur Kota
Air Tanah dalam perkotaan sebagian besar tidak beroperasi lagi. Hal ini
dikarenakan produksi air dari sumur semakin berkurang dan dibutuhkan pompa
dengan tekanan yang lebih tinggi lagi. Hal ini membuat pengambilan air baku dari
sumber air tanah dalam tidak effisien di Kota. Air tanah dalam perkotaan dapat
dilihat pada tabel dibawah ini :
TABEL III.4
SUMBER SUMUR PERKOTAAN PDAM TIRTA MOEDAL KOTA SEMARANG
KAPASITAS KOORDINAT
TAHUN
SUMBER PRODUKSI ELEVASI
PEMBUATAN S E
(LT/DTK)
Jl. Ngasrep 1985 1,25 07o03.169’ 110o25.375’ 238
Jl. Erawati 1984 - - - -
Jl. Tombro 1984 - - - -
Jl. Arjuno 1952 - - - -
Jl. Ronggowarsito 1973 - - - -
Jl. Raden Patah 1977 - - - -
Jl. Citandui 1984 - - - -
Jl. Belimbing 1984 - - - -
Jl. Pemali 1987 - - - -
Jl. Senjoyo 1977 - - - -
Jl. Kinibalu 1975 - - - -
Jl. Wotgandul 1976 - - - -
Jl. Brumbungan 1975 - - - -
Jl. Manyaran 1975 - - - -
o o
Jl. Jangli 1977 1,26 07 01.371’ 110 25.701’ 133
KAPASITAS KOORDINAT
TAHUN
SUMBER PRODUKSI ELEVASI
PEMBUATAN S E
(LT/DTK)
Jl. Mijen 1975 - - - -
Sadeng
Jl. 1989 - - - -
(Siwarak)
Jl. Cendrawasih 1975 1,06 06o58.198’ 110o25.734’ 48
Jl. Rejosari 1997 - - - -
Sandang
Jl. 1997 2,44 07o02.805’ 110o28.540’ 95
Mulyo
Jl. Beringin 1 (E1) 1997 4,26 06o59.639’ 110o19.566’ 109
Jl. Beringin 2 (E2) 1997 2,55 06o59.748’ 110o19.536’ 105
Jl. Beringin 3 (E3) 1997 2,85 06o59.693’ 110o19.555’ 113
Beringin 4
Jl. (Beringin 1997 2,47 06o59.245’ 110o19.509’ 94
Utara D)
Sumber : PDAM Kota Semarang, 2012
b. Unit Produksi
Sumber daya air yang digunakan oleh PDAM Semarang berasal dari
berbagai macam sumber, seperti: air permukaan, mata air dan air tanah dalam.
Sumber – sumber air baku tersebut ada yang langsung digunakan sebagai air
bersih yang langsung dialirkan ke konsumen tanpa melalui pengolahan, tetapi
ada juga yang harus melalui tahapan pengolahan air pada Instalasi Pengolahan
Air Bersih (IPA).
IPA KALIGARANG
Untuk IPA Kaligarang, sumber air bakunya berasal dari Sungai Garang.
Pengolahan air bersih di IPA Kaligarang, salah satu contoh adalah IPA III
adalah cabang Semarang Tengah, sebagian wilayah Cabang Barat,
sebagian wilayah Cabang Selatan dan sebagian wilayah Cabang Utara.
1) Intake
Lokasi intake pada sumber air yaitu
Sungai Garang, dengan kapasitas
produksi sebesar 300 lt/dtk.
2) Koagulasi
Pada proses koagulasi, koagulan
dicampur dengan air baku selama
beberapa saat hingga merata. Setelah
pencampuran ini, akan terjadi
destabilisasi koloid yang ada pada air
baku. Koloid yang sudah kehilangan
muatannya atau terdestabilisasi
mengalami saling tarik menarik
sehingga cenderung untuk membentuk
gumpalan yang lebih besar.
3) Flokulasi
Flok-flok kecil yang sudah terbentuk di
koagulator diperbesar disini. Faktor-
faktor yang mempengaruhi bentuk flok
yaitu kekeruhan pada air baku, tipe dari
suspended solids, pH, alkalinitas, bahan
koagulan yang dipakai, dan lamanya
pengadukan. Beberapa tipe flokulator
adalah channel floculator (buffle channel
horizontal, buffle channel vertikal, buffle
channel vertikal dengan diputar, melalui
plat berlubang, dalam Cone, dan
dengan pulsator), pengadukan secara
mekanik, pengadukan melalui media
pengadukan secara pneumatik (dengan
udara).
4) Sedimentasi
Sedimentasi adalah pemisahan partikel
secara gravitasi. Pengendapan
kandungan zat padat di dalam air dapat
digolongkan menjadi pengendapan
diskrit (kelas 1), pengendapan flokulen
(kelas 2), pengendapan zone,
pengendapan kompresi/tertekan. Jenis
bak pengendap adalah bak pengendap aliran batch dan bak pengendap
dengan aliran kontinu.
5) Filtrasi
Proses filtrasi adalah mengalirkan air
hasil sedimentasi atau air baku melalui
media pasir. Proses yang terjadi selama
penyaringan adalah pengayakan
(straining), flokulasi antar butir,
sedimentasi antar butir, dan proses
biologis. Dilihat dari segi desain
kecepatan, filtrasi dapat digolongkan
menjadi saringan pasir cepat (filter
bertekanan dan filter terbuka) dan
saringan pasir lambat.
Setelah filter digunakan beberapa saat,
filter akan mengalami penyumbatan.
Untuk itu perlu pembersihan, yang
dapat dilakukan dengan pencucian dengan udara dan pencucian dengan air
(pencucian permukaan filter dengan penyemprotan dan pencucian dengan
backwash).
Sedangkan tenaga untuk pencucian dapat dilakukan dengan cara pompa
(memompa air yang ada di reservoir penampung ke dasar filter),
menggelontor air yang ada di reservoir atas (elevated tank) secara gravitasi
ke dasar filter, dan menggelontor air yang ada di filter sebelahnya ke filter
yang sudah jenuh (interfilter).
6) Reservoir
Reservoir digunakan pada sistem
distribusi untuk meratakan aliran, untuk
mengatur tekanan, dan untuk keadaan
darurat.
INTAKE
KOAGULASI
FLOKULASI
2 UNIT
BAK SEDIMENTASI
5 UNIT
BAK FILTRASI
KLORINASI
RESERVOIR
Pelanggan:
GAMBAR 3.3
DIAGRAM PRODUKSI AIR IPA KALIGARANG I (PER BULAN 2012)
Sumber: PDAM Tirta Moedal Kota Semarang
GAMBAR 3.4
DIAGRAM PRODUKSI AIR IPA KALIGARANG II (PER BULAN 2012)
Sumber: PDAM Tirta Moedal Kota Semarang
GAMBAR 3.5
DIAGRAM PRODUKSI AIR IPA KALIGARANG III (PER BULAN 2012)
Sumber: PDAM Tirta Moedal Kota Semarang
GAMBAR 3.6
DIAGRAM PRODUKSI AIR IPA KALIGARANG IV (PER BULAN 2012)
Sumber: PDAM Tirta Moedal Kota Semarang
IPA KUDU
Sumber air baku berasal dari Bendungan Klambu, dengan debit intake IPA
Kudu sebesar 1400 lt/dtk. Kapasitas air bersih yang dihasilkan 1250 lt/dtk.
Kapasitas Reservoir Kudu 2 x 5000 m3. Kapasitas air bersih yang
dipompakan ke Reservoir Kedung Mundu 500 lt/dtk dengan pipa Ø 800 mm
sepanjang 11,3 km. Kapasitas air bersih yang dipompakan ke zona timur 1
sebesar 520 lt/dtk dengan pipa Ø 200-800 mm. Kapasistas air bersih yang
dialirkan gravitasi ke zona timur 2 sebesar 230 lt/dtk dengan pipa Ø 200-800
mm.
GAMBAR 3.7
BANGUNAN IPA KUDU
Sumber: PDAM Tirta Moedal Kota Semarang
1) Intake
Tempat pengambilan air baku dari saluran
Klambu – Kudu yang dilengkapi dengan
Bar screen / penyaring yang bertujuan
untuk menyaring benda-benda terapung
(sampah) agar tidak sampai masuk ruang
intake karena bisa mengganggu kinerja
pompa.
2) Koagulasi
Proses koagulasi adalah proses
pemberian koagulan (contoh :
tawas/CMA) dengan maksud mengurangi
gaya tolak menolak antar partikel koloid
sehingga partikel tersebut bisa
bergabung menjadi flok-flok kecil
3) Flokulasi
Flokulasi yaitu proses pembentukan
flokulan dengan maksud menggabungkan
flok-flok kecil yang telah terbentuk pada
proses sebelumnya (koagulasi) sehingga
menjadi besar dan mudah untuk
diendapkan dalam proses flokulasi
mengalami pengadukan lambat untuk
memberikan kesempatan flok-flok kecil
menjadi semakin besar dan mencegah
pecahnya kembali flok-flok yang sudah
terbentuk.
4) Sedimentasi
Didalam proses sedimentasi partikel-
partikel / flok-flok yang terbentuk dari
flokulasi akan mengendap pada bak
sedimentasi. Pada bak sedimentasi
dilengkapi tube settler yang bertujuan
untuk mempercepat proses pengendapan.
5) Filtrasi
Proses filtrasi bertujuan untuk melakukan
penyaringan flok-flok halus yang belum
terendapkan pada bak sedimentasi.
Proses filtrasi dilakukan dengan cara
melalui media porous yaitu : pasir
silica/kwarsa.
6) Reservoir
Air hasil olahan dari filtrasi akan
ditampung di bak reservoir air bersih
dengan kapasitas 2 x 5.000 m3
sebelumnya diinjeksi gas chlor setelah itu
baru didistribusikan ke pelanggan baik
melalui pipa transmisi maupun pipa
distribusi.
GAMBAR 3.8
DIAGRAM PRODUKSI AIR IPA KUDU (PER BULAN 2012)
Sumber: PDAM Tirta Moedal Kota Semarang
2) Koagulasi
Merupakan proses pembubuhan bahan
kimia berupa aluminium sulfat (tawas)
ataupun CMA sehingga kotoran-
kotorannya terpisah dengan air
3) Flokulasi
Merupakan proses pengadukan lambat
yang menghasilkan flok-flok halus.
4) Sedimentasi
Proses di mana terjadi pengendapan flok-
flok lumpur yang terbentuk pada saat
koagulasi
5) Filtrasi
Proses filtrasi bertujuan untuk melakukan
penyaringan flok-flok halus yang belum
terendapkan pada bak sedimentasi.
Proses filtrasi dilakukan dengan cara
melalui media poros yaitu : pasir silica.
GAMBAR 3.9
DIAGRAM PRODUKSI AIR IPA PUCANG GADING (PER BULAN 2012)
Sumber: PDAM Tirta Moedal Kota Semarang
TABEL III.5
DATA PRODUKSI PDAM KOTA SEMARANG TAHUN 2012
c. Unit Distribusi
Pipa transmisi dan distribusi PDAM Kota Semarang terbagi dalam dua
sistem pengaliran yaitu cara gravitasi dan menggunakan pompa/booster pump.
Unit terdiri dari:
Pipa Transmisi
Bak Pelepas Tekan (BPT)
Reservoir Distribusi
Pipa Distribusi
Meter Induk Distribusi
Air bersih dari unit produksi didistribusikan ke konsumen dengan sistem
gravitasi kecuali pada daerah – daerah yang lebih tinggi dan ujung – ujung pipa
distribusi menggunakan booster pump.
TABEL III.6
DATA MASING – MASING BAK PELEPAS TEKAN (BPT)
TABEL III.7
DATA MASING – MASING RESERVOIR PRODUKSI
KOORDINAT VOLUME
SUMBER ELEVASI
S E (m3)
KOORDINAT VOLUME
SUMBER ELEVASI
S E (m3)
TABEL III.8
DATA MASING – MASING RESERVOIR DISTRIBUSI
Pipa distribusi adalah pipa yang dimulai dari reservoir distribusi, tower
distribusi atau pipa distribusi yang mensupplay air minum di daerah pelayanan.
Pipa distribusi terdiri atas distribusi jaringan pipa utama dan distribusi cabang
dari pipa utama dan menghubungkannya dengan pipa pelayanan.
Jaringan distribusi adalah rangkaian pipa yang berhubungan dan
digunakan untuk mengalirkan air ke konsumen. Tata letak distribusi ditentukan
oleh kondisi topografi daerah layanan dan lokasi instalasi pengolahan.
TABEL III.9
DATA PANJANG PIPA TRANSMISI DAN DISTRIBUSI
TABEL III.10
DATA TAPPING PIPA DISTRIBUSI PDAM KOTA SEMARANG
DARI KABUPATEN SEMARANG
PERKIRAAN
UNTUK
NO LOKASI MULAI JUMLAH KETERANGAN
DAERAH
PEL (SR)
Pipa dinas RM Pelanggan
1 Ayam Bakar depan 2005 Komplek 20 Pipa Ø 1/2"
Polsek Ungaran Tugusari
Sebantengan 50 Pipa Ø 3"
Depan Nisin/Depan
2 2003 Jl. Arwana Ke
SMP I Politek Pipa Ø 3/4"
Kelatan
RD Bupati 260 Pipa Ø 1"
Jl. Let Jen Kantor BKD
3 Soeprapto Makam 1989 Komplek
Ibu Munadi Kantor
Bawasda
Bank Mandiri 35 Pipa Ø 1 1/2"
Apotek
4 Utara Bank Mandiri 1987
Jl. Terbayan
Selatan
Beteng 200 Pipa Ø 2"
Komplek Pasar
155
Bandarjo
Depan Polsek
5 1996 Bandaran
Ungaran
Barat
Kuncen Baru 200
Legoksari
Genuk Gang Jl. Gang
6 2000 30 Pipa Ø 1/2"
Mawar III Mawar III
Komplek
4 Pipa Ø 3/4"
DPRD
Gedung PKK
7 DPRD 1998
Gedung
Pertemuan
Komplek SMP I
SD Induk 71 Pipa Ø 1 1/2"
8 Setenan 1996 Komplek
Pipa Ø 3"
Setennan
Komplek
Perumahan 40 Pipa Ø 1"
PLN
Komplek kantor
9 1994 Komplek
BAPPEDA
Kantor
BAPPEDA
Kab. Semarang
Komplek
Komplek perum
10 Perum 600 Pipa Ø 2"
mapagan
Mapagan
Sumber : PDAM Kota Semarang, 2012
TABEL III.11
REKAPITULASI KONDISI WATER METER SETIAP CABANG
PDAM KOTA SEMARANG
JUMLAH PELANGGAN
KONDISI JUMLAH
SELATAN TIMUR UTARA BARAT TENGAH
Baik 20.588 32.171 20.547 25.185 17.749 116.240
Ketanem 190 267 3.683 15 142 4.297
Bureng 434 511 450 134 64 1.593
Mati 208 - 1.272 50 106 1.636
Kebalik 4 - - - - 4
Mundur 13 - - 21 49 83
Lain – lain 0
- Gembok 617 517 55 24 116 1.329
- Lepas/DOP 32 0 18 6 34 90
- Rumah
1.588 387 1.498 2.158 185
Kosong 5.816
- Belum
- - - - 31
Ketemu 31
- Sumur - - 150 - 339 489
- Ganti
- - 457 - 97
Meter 554
- Laporan
367 405 218 - 70
Pelanggan 1.060
- Terhalang 36 130 34 - 35 235
Sumber: Laporan Produksi Per Desember 2012, PDAM Kota Semarang
d. Unit Pelayanan
Berdasarkan faktor lokasi, maka pihak PDAM Kota Semarang menentukan
daerah yang akan dilayani. Sedangkan berdasarkan karakteristik hidroliknya,
daerah distribusi Kota Semarang dibagi menjadi 5 (lima) wilayah pelayanan yang
meliputi Semarang Barat, Semarang Timur, Semarang Selatan, Semarang Utara
dan Semarang Tengah.
Berdasarkan kategori pelanggan, pelanggan PDAM Semarang dibagi
menjadi 10 kategori pelanggan yang meliputi :
1. Sosial
2. Warung Air
3. Rumah Tangga
4. Instansi Pemerintah
5. Lembaga Pendidikan
6. Niaga
7. Industri
8. Pelabuhan
9. Terminal Air
10. KU Khusus
GAMBAR 3.10
PETA PELAYANAN AIR MINUM CABANG SELATAN
Sumber : PDAM Tirta Moedal Kota Semarang
GAMBAR 3.11
PETA PELAYANAN AIR MINUM CABANG TIMUR
Sumber : PDAM Tirta Moedal Kota Semarang
GAMBAR 3.12
PETA PELAYANAN AIR MINUM CABANG UTARA
Sumber : PDAM Tirta Moedal Kota Semarang
GAMBAR 3.13
PETA PELAYANAN AIR MINUM CABANG BARAT
Sumber : PDAM Tirta Moedal Kota Semarang
GAMBAR 3.14
PETA PELAYANAN AIR MINUM CABANG TENGAH
Sumber : PDAM Tirta Moedal Kota Semarang
PAMSIMAS merupakan salah satu program dan aksi nyata pemerintah pusat dan daerah
dengan didukung Bank Dunia untuk meningkatkan penyediaan air minum, sanitasi dan
meningkatkan derajat kesehatan masyarakat terutama dalam menurunkan angka
penyakit lainnya yang ditularkan melalui air dan lingkungan. Program penyediaan air
minum, sanitasi dan kesehatan ini berbasis pada masyarakat melalui pelibatan seluruh
masyarakat dan dilakukan melalui pendekatan yang tanggap terhadap kebutuhan
masyarakat (demand responsive approach).
TABEL III.12
REKAPITULASI PAMSIMAS KOTA SEMARANG TAHUN 2008 – 2012
TABEL III.13
REKAPITULASI DATA TEKNIK SPAM TAHUN 2008-2012 PAMSIMAS PROVINSI JAWA TENGAH KOTA SEMARANG
PENGOLAHAN SEDERHANA
JUMLAH PENDUDUK DESA
KUANTITAS L/DET
JUMLAH DUSUN
RUMAH POMPA
MENARA AIR
RENCANA SR
REALISASI SR
SUMUR BOR
RESERVOIR
TRANSMISI
DISTRIBUSI
MATA AIR
LAINNYA
HU/KU
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
(dusun) (jiwa) (jiwa) (jiwa) (l/detik) (unit) (unit) (l/detik) (unit) (unit) (unit) (unit) 0 (unit) (unit) (unit) (unit) (unit)
1 2008 4 66 68.989 16 18.130 13,95 9 15,18 3.027 1.531 16 9 9 22.032
2 2009 7 94 101.810 19 18.135 18,9 15 22,1 3.567 3.113 38 15 15 34.810
3 2010 6 79 110.800 16 12.964 24 13 23,64 2.231 2.727 8 13 13 24.180
4 2011 7 98 108.700 28 17.031 14 17 24,8 12.151 2.348 11 17 17 34.810
5 2012 9 136 147.190 21 18.443 20,85 16 1 29,7 3.051 1.212 15 0 0 17 17 0 - 29.097
Jumlah 473 537.489 100 84.703 91,7 70 1 115,42 24.027 10.931 88 0 0 71 71 0 - 144.929
Sumber: PSDA & ESDM Kota Semarang, 2013
TABEL III.14
DATA TEKNIK TAHUN 2012
PROGRAM PAMSIMAS TAHUN 2008 – 2012 KOTA SEMARANG PROVINSI JAWA TENGAH
TABEL III.15
PROGRAM PNPM PERKOTAAN TAHUN 2007
DI KOTA SEMARANG
DANA AKTIF / SUMBER
NO KECAMATAN KELURAHAN TOTAL
BLM SWADAYA TIDAK DANA
T AHUN 2007
1 NGALIYAN BAMBAN KEREP 18.000.000 6.500.000 24.500.000 AKTIF APBN
2 TUGU RANDU GARUT 2.000.000 2.000.000 AKTIF APBN
3 MIJEN BUBAKAN 24.300.000 5.000.000 29.300.000 AKTIF APBN
4 MIJEN POLAMAN 3.500.000 1.120.000 4.620.000 AKTIF APBN
5 MIJEN PURWOSARI 20.475.000 6.552.000 27.027.000 AKTIF APBN
6 GUNUNGPATI NONGKO SAWIT 20.000.000 6.250.000 26.250.000 AKTIF APBN
7 GUNUNGPATI NONGKO SAWIT 20.000.000 6.250.000 26.250.000 AKTIF APBN
8 GUNUNGPATI CEPOKO 12.600.000 4.000.000 16.600.000 AKTIF APBN
9 GUNUNGPATI JATIREJO 24.300.000 7.100.000 31.400.000 AKTIF APBN
10 GUNUNGPATI KANDRI 18.000.000 5.400.000 23.400.000 AKTIF APBN
11 GUNUNGPATI KANDRI 29.250.000 9.000.000 38.250.000 AKTIF APBN
12 GUNUNGPATI PLALANGAN 7.500.000 2.500.000 10.000.000 AKTIF APBN
13 GUNUNGPATI PLALANGAN 7.500.000 2.000.000 9.500.000 AKTIF APBN
14 GUNUNGPATI PLALANGAN 18.950.000 7.150.000 26.100.000 AKTIF APBN
15 GUNUNGPATI PLALANGAN 7.000.000 2.200.000 9.200.000 AKTIF APBN
16 BANYUMANIK GEDAWANG 12.000.000 5.000.000 17.000.000 AKTIF APBN
17 TEMBALANG KRAMAS 20.000.000 6.000.000 26.000.000 AKTIF APBN
18 TEMBALANG SENDANG MULYO 4.000.000 3.276.600 7.276.600 AKTIF APBN
19 SEMARANG TIMUR KARANGTURI 6.000.000 1.800.000 7.800.000 AKTIF APBN
20 GENUK TRIMULYO 9.000.000 6.000.000 15.000.000 AKTIF APBN
21 MIJEN KEDUNGPANE 16.337.500 4.901.250 21.238.750 TIDAK AKTIF APBD
22 MIJEN KEDUNGPANE 16.337.500 4.901.250 21.238.750 AKTIF APBD
23 MIJEN KEDUNGPANE 4.500.000 2.500.000 7.000.000 AKTIF APBD
24 MIJEN KEDUNGPANE 12.200.000 3.660.000 15.860.000 AKTIF APBD
25 MIJEN PESANTREN 3.000.000 900.000 3.900.000 AKTIF APBN
26 MIJEN PESANTREN 30.000.000 9.000.000 39.000.000 AKTIF APBN
27 MIJEN NGADIRGO 11.000.000 3.300.000 14.300.000 AKTIF APBN
28 MIJEN CANGKRINGAN 20.000.000 4.000.000 24.000.000 AKTIF APBN
29 GUNUNGPATI NONGKOSAWIT 22.500.000 6.750.000 29.250.000 AKTIF APBN
30 GUNUNGPATI NONGKOSAWIT 25.000.000 7.500.000 32.500.000 AKTIF APBN
31 GUNUNGPATI CEPOKO 15.000.000 4.500.000 19.500.000 AKTIF APBN
32 GUNUNGPATI CEPOKO 15.000.000 4.500.000 19.500.000 AKTIF APBN
33 GUNUNGPATI JATIREJO 25.700.000 4.000.000 29.700.000 AKTIF APBN
34 GUNUNGPATI PLALANGAN 20.523.750 6.250.000 26.773.750 AKTIF APBN
35 GUNUNGPATI MANGUNSARI 15.400.000 7.000.000 22.400.000 AKTIF APBN
36 GUNUNGPATI PATEMON 10.000.000 3.000.000 13.000.000 AKTIF APBN
37 TEMBALANG KRAMAS 13.700.000 4.110.000 17.810.000 AKTIF APBD
38 SEMARANG TIMUR KARANGTURI 3.375.000 1.012.500 4.387.500 AKTIF APBN
39 SEMARANG TENGAH PANDANSARI 6.000.000 1.800.000 7.800.000 AKTIF APBN
40 GENUK PENGGARON LOR 10.000.000 3.000.000 13.000.000 AKTIF APBN
Sumber : PNPM Perkotaan Kota Semarang, 2013
TABEL III.16
PROGRAM PNPM PERKOTAAN TAHUN 2009
DI KOTA SEMARANG
DANA AKTIF / SUMBER
NO KECAMATAN KELURAHAN TOTAL
BLM SWADAYA TIDAK DANA
T AHUN 2009
1 GUNUNGPATI PLALANGAN 42.750.000 7.000.000 49.750.000 AKTIF APBN
2 TEMBALANG KRAMAS 6.000.000 2.000.000 8.000.000 AKTIF APBN
3 CANDISARI JATINGALEH 12.500.000 3.750.000 16.250.000 AKTIF APBN
4 CANDISARI KALIWIRU 20.000.000 6.000.000 26.000.000 AKTIF APBN
5 SEMARANG TENGAH PURWODINATAN 16.750.000 5.025.000 21.775.000 AKTIF APBN
6 TUGU MANGKANG WETAN 12.000.000 4.000.000 16.000.000 AKTIF APBN
7 TUGU MANGKANG WETAN 12.000.000 4.000.000 16.000.000 AKTIF APBN
8 TUGU MANGKANG WETAN 12.000.000 4.000.000 16.000.000 TIDAK AKTIF APBN
9 SEMARANG SELATAN PETERONGAN 15.000.000 4.500.000 19.500.000 AKTIF APBN
10 SEMARANG SELATAN WONODRI 7.000.000 2.100.000 9.100.000 AKTIF APBN
11 SEMARANG TENGAH KEMBANGSARI 17.000.000 6.600.000 23.600.000 AKTIF APBN
12 GENUK MUKTIHARJO LOR 24.000.000 7.500.000 31.500.000 AKTIF APBN
13 NGALIYAN PURWOYOSO 15.000.000 2.721.500 17.721.500 AKTIF APBN
14 MIJEN KEDUNGPANI 28.875.000 8.700.000 37.575.000 AKTIF APBN
15 TEMBALANG KRAMAS 21.750.000 6.755.000 28.505.000 AKTIF APBN
16 SEMARANG TIMUR KARANGTURI 3.875.000 1.100.000 4.975.000 AKTIF APBN
17 TEMBALANG SAMBIROTO 9.875.000 2.965.000 12.840.000 AKTIF APBN
18 SEMARANG SELATAN LAMPER LOR 14.437.500 4.300.000 18.737.500 AKTIF APBN
19 SEMARANG SELATAN WONODRI 10.000.000 3.000.000 13.000.000 AKTIF APBN
Sumber : PNPM Perkotaan Kota Semarang, 2013
TABEL III.17
PROGRAM PNPM PERKOTAAN TAHUN 2010
DI KOTA SEMARANG
DANA AKTIF /
NO KECAMATAN KELURAHAN TOTAL SUMBER DANA
BLM SWADAYA TIDAK
T AHUN 2010
1 NGALIYAN PURWOYOSO 30.000.000 5.000.000 35.000.000 AKTIF APBN
2 NGALIYAN TAMBAK AJI 45.000.000 13.500.000 58.500.000 AKTIF APBN
3 NGALIYAN TAMBAK AJI 45.000.000 13.500.000 58.500.000 AKTIF APBN
4 NGALIYAN TAMBAK AJI 12.000.000 3.600.000 15.600.000 AKTIF APBN
5 SEMARANG BARAT TAWANGMAS 6.500.000 8.400.000 14.900.000 AKTIF APBD
6 CANDISARI KALIWIRU 5.300.000 1.590.000 6.890.000 AKTIF APBD
7 TEMBALANG MANGUNHARJO 7.540.000 2.300.000 9.840.000 AKTIF APBD
8 SEMARANG TIMUR KARANGTURI 10.000.000 3.500.000 13.500.000 AKTIF APBD
9 SEMARANG TENGAH PENDRIKAN KIDUL 10.000.000 3.000.000 13.000.000 AKTIF APBD
10 SEMARANG TENGAH PENDRIKAN KIDUL 6.000.000 1.500.000 7.500.000 AKTIF APBD
11 MIJEN KEDUNGPANI 26.000.000 9.170.400 35.170.400 AKTIF APBD
12 MIJEN NGADIRGO 42.350.000 7.250.000 49.600.000 AKTIF APBD
13 MIJEN PESANTREN 10.000.000 3.000.000 13.000.000 AKTIF APBD
14 GUNUNGPATI PONGANGAN 27.125.000 8.137.500 35.262.500 AKTIF APBD
15 GENUK TERBOYO WETAN 31.900.000 4.200.000 36.100.000 AKTIF APBD
16 BANYUMANIK JABUNGAN 4.150.000 1.200.000 5.350.000 AKTIF APBD
17 NGALIYAN WONOSARI 45.000.000 7.500.000 52.500.000 AKTIF APBN
18 GUNUNGPATI NONGKOSAWIT 7.500.000 3.000.000 10.500.000 AKTIF APBN
19 BANYUMANIK TINJOMOYO 15.000.000 3.652.000 18.652.000 AKTIF APBN
20 GENUK TERBOYO WETAN 29.000.000 8.700.000 37.700.000 AKTIF APBN
21 BANYUMANIK PUDAKPAYUNG 13.000.000 3.000.000 16.000.000 AKTIF APBN
22 MIJEN PURWOSARI 25.250.000 7.500.000 32.750.000 AKTIF APBN
23 GUNUNGPATI GUNUNGPATI 50.000.000 19.400.000 69.400.000 AKTIF APBN
24 GUNUNGPATI GUNUNGPATI 7.750.000 1.413.000 9.163.000 AKTIF APBN
25 GENUK TRIMULYO 16.350.000 2.000.000 18.350.000 AKTIF APBN
26 GENUK TERBOYO WETAN 28.500.000 3.804.000 32.304.000 AKTIF APBN
27 MIJEN KEDUNGPANI 29.000.000 11.565.000 40.565.000 AKTIF APBD Perubahan
28 GAJAHMUNGKUR BENDAN DUWUR 48.000.000 4.893.000 52.893.000 AKTIF APBD Perubahan
29 MIJEN PURWOSARI 9.500.000 3.000.000 12.500.000 AKTIF APBD Perubahan
30 MIJEN TAMBANGAN 7.725.000 2.200.000 9.925.000 AKTIF APBD Perubahan
31 GENUK TERBOYO WETAN 18.850.000 3.879.000 22.729.000 AKTIF APBD Perubahan
32 MIJEN WONOPLUMBON 21.000.000 7.000.000 28.000.000 AKTIF APBD Perubahan
33 Gunungpati PLALANGAN 10.000.000 1.779.500 11.779.500 AKTIF APBD Perubahan
34 GENUK TERBOYO WETAN 9.000.000 2.020.000 11.020.000 AKTIF APBD Perubahan
35 BANYUMANIK PUDAKPAYUNG 18.500.000 1.500.000 20.000.000 AKTIF APBD Perubahan
Sumber : PNPM Perkotaan Kota Semarang, 2013
TABEL III.18
PROGRAM PNPM PERKOTAAN TAHUN 2011
DI KOTA SEMARANG
DANA AKTIF / SUMBER
NO KECAMATAN KELURAHAN TOTAL
BLM SWADAYA TIDAK DANA
T AHUN 2011
1 TEMBALANG SAMBIROTO 45.000.000 4.750.000 49.750.000 AKTIF APBN
2 TEMBALANG SAMBIROTO 17.000.000 2.600.000 19.600.000 AKTIF APBN
3 TEMBALANG KEDUNGMUNDU 42.000.000 3.065.000 45.065.000 AKTIF APBN
4 TEMBALANG KEDUNGMUNDU 15.000.000 1.675.000 16.675.000 AKTIF APBN
5 TUGU MANGKANG WETAN 28.500.000 5.000.000 33.500.000 AKTIF APBN
6 TEMBALANG TEMBALANG 18.500.000 5.116.000 23.616.000 AKTIF APBN
7 MIJEN KEDUNGPANI 9.550.000 3.325.000 12.875.000 AKTIF APBN
8 GUNUNGPATI KALISEGORO 19.000.000 5.000.000 24.000.000 AKTIF APBN
9 GUNUNGPATI NGIJO 9.000.000 2.672.000 11.672.000 AKTIF APBN
10 MIJEN WONOPLUMBON 13.500.000 4.500.000 18.000.000 AKTIF APBN
11 GUNUNGPATI Sukorejo 15.900.000 2.000.000 17.900.000 AKTIF APBN
12 GUNUNGPATI Sukorejo 18.000.000 5.100.000 23.100.000 AKTIF APBN
13 GUNUNGPATI Sukorejo 6.900.000 1.800.000 8.700.000 AKTIF APBN
14 NGALIYAN PURWOYOSO 31.000.000 4.000.000 35.000.000 AKTIF APBN
15 NGALIYAN TAMBAK AJI 12.500.000 3.750.000 16.250.000 AKTIF APBN
16 SEMARANG SELATAN LAMPER TENGAH 5.000.000 1.000.000 6.000.000 AKTIF APBN
17 SEMARANG SELATAN RANDUSARI 9.500.000 2.000.000 11.500.000 AKTIF APBN
18 GUNUNGPATI Sukorejo 8.500.000 2.050.000 10.550.000 AKTIF APBN
19 NGALIYAN Purwoyoso 27.750.000 8.325.000 36.075.000 AKTIF APBN
20 MIJEN Purwosari 42.750.000 13.100.000 55.850.000 AKTIF APBN
21 TUGU Randu Garut 28.500.000 1.450.000 29.950.000 AKTIF APBN
22 TUGU Mangunharjo 19.500.000 3.218.000 22.718.000 AKTIF APBN
23 GUNUNGPATI Cepoko 9.000.000 3.079.000 12.079.000 AKTIF APBN
24 CANDISARI CANDI 2008 25.000.000 7.570.000 32.570.000 AKTIF APBD
25 GUNUNGPATI PAKINTELAN 20.000.000 6.000.000 26.000.000 AKTIF APBN
26 TUGU Karanganyar 6.500.000 770.000 7.270.000 AKTIF APBN
27 TEMBALANG Kramas 28.500.000 18.957.000 47.457.000 AKTIF APBN
28 SEMARANG SELATAN PLEBURAN 15.000.000 2.000.000 17.000.000 AKTIF APBN
29 MIJEN WONOPLUMBON 14.500.000 14.500.000 29.000.000 AKTIF APBN
30 MIJEN BUBAKAN 9.900.000 3.000.000 12.900.000 AKTIF APBN
31 GUNUNGPATI MANGUNSARI 40.000.000 12.000.000 52.000.000 AKTIF APBN
32 GUNUNGPATI MANGUNSARI 40.000.000 12.000.000 52.000.000 AKTIF APBN
33 GUNUNGPATI MANGUNSARI 22.000.000 6.500.000 28.500.000 AKTIF APBN
34 SEMARANG TENGAH Miroto 5.000.000 1.500.000 6.500.000 AKTIF APBN
35 TEMBALANG BULUSAN 50.000.000 6.611.000 56.611.000 AKTIF APBN
36 TEMBALANG BULUSAN 47.000.000 8.233.000 55.233.000 AKTIF APBN
37 SEMARANG TENGAH KAUMAN 7.500.000 1.500.000 9.000.000 AKTIF APBN
Sumber : PNPM Perkotaan Kota Semarang, 2013
TABEL III.19
PROGRAM PNPM PERKOTAAN TAHUN 2012
DI KOTA SEMARANG
DANA AKTIF / SUMBER
NO KECAMATAN KELURAHAN TOTAL
BLM SWADAYA TIDAK DANA
T AHUN 2012
1 TEMBALANG KEDUNGMUNDU 10.000.000 2.500.000 12.500.000 AKTIF APBN
2 TEMBALANG TEMBALANG 28.000.000 1.135.000 29.135.000 AKTIF APBN
3 MIJEN TAMBANGAN 45.000.000 13.500.000 58.500.000 AKTIF APBN
4 MIJEN TAMBANGAN 45.000.000 13.500.000 58.500.000 AKTIF APBN
5 GUNUNGPATI NGIJO 50.000.000 18.800.000 68.800.000 AKTIF APBN
6 GUNUNGPATI CEPOKO 16.500.000 4.048.000 20.548.000 AKTIF APBN
7 TUGU KARANGANYAR 14.000.000 2.500.000 16.500.000 AKTIF APBN
8 TUGU KARANGANYAR 7.200.000 2.500.000 9.700.000 AKTIF APBN
9 SEMARANG TENGAH KAUMAN 6.000.000 1.000.000 7.000.000 AKTIF APBN
10 SEMARANG TENGAH KRANGGAN 8.000.000 1.700.000 9.700.000 AKTIF APBN
11 TEMBALANG TANDANG 19.750.000 7.720.000 27.470.000 AKTIF APBN
12 TEMBALANG TANDANG 18.000.000 8.700.000 26.700.000 AKTIF APBN
13 TEMBALANG SENDANGGUWO 48.000.000 9.000.000 57.000.000 AKTIF APBN
14 CANDISARI KALIWIRU 25.500.000 3.514.000 29.014.000 AKTIF APBN
15 NGALIYAN PURWOYOSO 31.500.000 10.000.000 41.500.000 AKTIF APBN
16 NGALIYAN NGALIYAN 30.000.000 14.000.000 44.000.000 AKTIF APBN
17 NGALIYAN TAMBAK AJI 40.000.000 5.000.000 45.000.000 AKTIF APBN
18 TEMBALANG BULUSAN 50.000.000 2.455.000 52.455.000 AKTIF APBN
19 TEMBALANG BULUSAN 35.500.000 3.125.000 38.625.000 AKTIF APBN
20 GUNUNGPATI MANGUNSARI 22.000.000 6.500.000 28.500.000 AKTIF APBN
21 GUNUNGPATI PATEMON 20.000.000 5.532.000 25.532.000 AKTIF APBN
22 SEMARANG UTARA DADAPSARI 5.000.000 1.825.000 6.825.000 AKTIF APBN
23 SEMARANG UTARA DADAPSARI 6.000.000 1.750.000 7.750.000 AKTIF APBN
24 SEMARANG SELATAN PETERONGAN 15.000.000 3.000.000 18.000.000 AKTIF APBN
25 MIJEN BUBAKAN 50.000.000 3.000.000 53.000.000 AKTIF APBN
26 GUNUNGPATI SADENG 20.000.000 5.170.000 25.170.000 AKTIF APBN
27 GUNUNGPATI KANDRI 27.000.000 8.000.000 35.000.000 AKTIF APBN
28 TUGU JERAKAH 15.500.000 2.000.000 17.500.000 AKTIF APBN
29 TEMBALANG TEMBALANG 30.000.000 22.052.000 52.052.000 AKTIF APBN
30 TUGU KARANGANYAR 25.000.000 7.000.000 32.000.000 AKTIF APBN
31 NGALIYAN PURWOYOSO 29.500.000 7.000.000 36.500.000 AKTIF APBN
32 NGALIYAN PODOREJO 39.500.000 11.850.000 51.350.000 AKTIF APBN
33 GUNUNGPATI SEKARAN 49.500.000 14.200.000 63.700.000 AKTIF APBN
34 SEMARANG UTARA PURWOSARI 5.000.000 1.500.000 6.500.000 AKTIF APBN
35 SEMARANG UTARA PURWOSARI 4.500.000 1.400.000 5.900.000 AKTIF APBN
36 NGALIYAN BERINGIN 32.000.000 9.750.000 41.750.000 AKTIF APBN
37 TUGU TUGUREJO 50.000.000 15.000.000 65.000.000 AKTIF APBN
38 TUGU TUGUREJO 35.500.000 12.500.000 48.000.000 AKTIF APBN
39 TUGU MANGKANG WETAN 12.000.000 2.000.000 14.000.000 AKTIF APBN
Sumber : PNPM Perkotaan Kota Semarang, 2013
TABEL III.20
DATA SUMUR ARTESIS DTKP Tahun 2007 – 2010 KOTA SEMARANG
TAHUN 2007
1 Candisari Jatingaleh
2 Gunungpati Kalisegoro
3 Semarang Barat Manyaran
4 Gunungpati Pakintelan
5 Banyumanik Pudakpayung
TAHUN 2008
6 Ngaliyan Wonosari
7 Gunungpati Pongangan
8 Gunungpati Pakintelan
9 Tembalang Rowosari
10 Mijen Polaman
11 Ngaliyan Wates
12 Gunungpati Nongkosawit
TAHUN 2009
13 Ngaliyan Ngaliyan
14 Candisari Candi
15 Gunungpati Mangunsari
16 Tugu Mangunharjo
17 Semarang Barat Manyaran
18 Candisari Jomblang
19 Tugu Karanganyar
TAHUN 2010
20 Gunungpati Nongkosawit
21 Tembalang Tandang
22 Ngaliyan Wonosari
23 Ngaliyan Tambakaji
24 Ngaliyan Purwoyoso
25 Mijen Polaman
26 Mijen Wonoplumbon
27 Candisari Karanganyar Gunung
Sumber : Dinas Tata Kota dan Perumahan, 2013
TABEL III.21
DATA SUMUR ESDM PROVINSI JAWA TENGAH
KOTA SEMARANG TAHUN 2011
PROGRAM SUMUR ESDM KOTA SEMARANG 2011
SARAN
NO. KECAMATAN KELURAHAN PEMOHON SUMUR KE
DEBIT
Universitas Negeri 1 100
Karanganyar
Semarang 2 100
PT. Little Giant Steel 1 50
Purwoyoso
PT. Serasi Autoraya 1 5
1 72
PT. Bandeng Juwana
2 72
Bambankerep
PT. Buana Interglobal 2 10
CV. Primatex Lestari 1 10
Bringin PT. Indo Sigma Surya Corps 1 10
CV. Darat 1 20
1 Ngaliyan
PT. San-yu Frame Moulding
1 40
Industries
Tambakaji
PT. Indofood Fritolay
4 200
Makmur
PT. Aneka Gas Industri 1 50
PT. Arna Makmur Industri 1 30
Ngaliyan 1 25
Kolam Renang Ngaliyan
Tirta Indah 1 25
2 25
TABEL III.22
DATA SUMUR ESDM PROVINSI JAWA TENGAH
KOTA SEMARANG TAHUN 2012
PROGRAM SUMUR ESDM KOTA SEMARANG 2012
SARAN
NO. KECAMATAN KELURAHAN PEMOHON SUMUR KE
DEBIT
PT. Alimdo Ampuh Abadi
1 100
J.O
Mangunharjo
Dinas PSDA &ESDM Kota
1 100
Semarang
1 Tembalang Dinas PSDA &ESDM Kota
Sendangmulyo 1 100
Semarang
Sambiroto PT. Ciputra Inti Pratama 1 100
Tembalang Fakultas Hukum UNDIP 1 20
1 50
Pekunden Rumah Sakit Telogorejo 2 90
5 Semarang Tengah 3 50
Hotel Novotel Semarang 1 100
Sekayu
PT. Merdeka Sandi 1 75
TABEL III.23
REKAP PELAYANAN JARINGAN NON PERPIPAAN
KECAMATAN MIJEN
1) KECAMATAN MIJEN
GAMBAR 3.15
PETA INFORMASI PELAYANAN NON PERPIPAAN KECAMATAN MIJEN
Sumber : Analisis Konsultan, 2013
TABEL III.24
REKAP PELAYANAN JARINGAN NON PERPIPAAN
KECAMATAN GUNUNG PATI
2) KECAMATAN GUNUNG PATI
GAMBAR 3.16
PETA INFORMASI PELAYANAN NON PERPIPAAN KECAMATAN GUNUNG PATI
Sumber : Analisis Konsultan, 2013
TABEL III.25
REKAP PELAYANAN JARINGAN NON PERPIPAAN
KECAMATAN BANYUMANIK
3) KECAMATAN BANYUMANIK
GAMBAR 3.17
PETA INFORMASI PELAYANAN NON PERPIPAAN KECAMATAN BANYUMANIK
Sumber : Analisis Konsultan, 2013
TABEL III.26
REKAP PELAYANAN JARINGAN NON PERPIPAAN
KECAMATAN GAJAH MUNGKUR
PETOMPON ESDM Prov. Jateng 2011 Sumur Bor RSB. Gunung Sawo
GAMBAR 3.18
PETA INFORMASI PELAYANAN NON PERPIPAAN KECAMATAN GAJAH MUNGKUR
Sumber : Analisis Konsultan, 2013
TABEL III.27
REKAP PELAYANAN JARINGAN NON PERPIPAAN
KECAMATAN SEMARANG SELATAN
GAMBAR 3.19
PETA INFORMASI PELAYANAN NON PERPIPAAN KECAMATAN SEMARANG SELATAN
Sumber : Analisis Konsultan, 2013
TABEL III.28
REKAP PELAYANAN JARINGAN NON PERPIPAAN
KECAMATAN CANDISARI
6) KECAMATAN CANDISARI
GAMBAR 3.20
PETA INFORMASI PELAYANAN NON PERPIPAAN KECAMATAN CANDISARI
Sumber: Analisis Konsultan, 2013
TABEL III.29
REKAP PELAYANAN JARINGAN NON PERPIPAAN
KECAMATAN TEMBALANG
7) KECAMATAN TEMBALANG
GAMBAR 3.21
PETA INFORMASI PELAYANAN NON PERPIPAAN KECAMATAN TEMBALANG
Sumber : Analisis Konsultan, 2013
TABEL III.30
REKAP PELAYANAN JARINGAN NON PERPIPAAN
KECAMATAN PEDURUNGAN
8) KECAMATAN PEDURUNGAN
GAMBAR 3.22
PETA INFORMASI PELAYANAN NON PERPIPAAN KECAMATAN PEDURUNGAN
Sumber : Analisis Konsultan, 2013
TABEL III.31
REKAP PELAYANAN JARINGAN NON PERPIPAAN
KECAMATAN GENUK
9) KECAMATAN GENUK
GAMBAR 3.23
PETA INFORMASI PELAYANAN NON PERPIPAAN KECAMATAN GENUK
Sumber : Analisis Konsultan, 2013
TABEL III.32
REKAP PELAYANAN JARINGAN NON PERPIPAAN
KECAMATAN GAYAMSARI
10) KECAMATAN GAYAMSARI
GAMBAR 3.24
PETA INFORMASI PELAYANAN NON PERPIPAAN KECAMATAN GAYAMSARI
Sumber : Analisis Konsultan, 2013
TABEL III.33
REKAP PELAYANAN JARINGAN NON PERPIPAAN PDAM
KECAMATAN SEMARANG TIMUR
GAMBAR 3.25
PETA INFORMASI PELAYANAN NON PERPIPAAN KECAMATAN SEMARANG TIMUR
Sumber : Analisis Konsultan, 2013
TABEL III.34
REKAP PELAYANAN JARINGAN NON PERPIPAAN
KECAMATAN SEMARANG UTARA
12) KECAMATAN SEMARANG UTARA
GAMBAR 3.26
PETA INFORMASI PELAYANAN NON PERPIPAAN KECAMATAN SEMARANG UTARA
Sumber : Analisis Konsultan, 2013
TABEL III.35
REKAP PELAYANAN JARINGAN NON PERPIPAAN
KECAMATAN SEMARANG TENGAH
13) KECAMATAN SEMARANG TENGAH
BANGUNHARJO ESDM Prov. Jateng 2011 Sumur Bor Gereja Bethel T. Kristus Alfa Omega
PEKUNDEN ESDM Prov. Jateng 2012 Sumur Bor Rumah Sakit Telogorejo
Sumur Bor Hotel Novotel Semarang
SEKAYU ESDM Prov. Jateng 2012
Sumur Bor PT. Merdeka Sandi
KEMBANG SARI Swadaya 2006 Sumur Dalam RT 05 RW IV 0
Penampungan Air Bersih RT 4/ III
PANDRIKAN KIDUL PNPM 2010
Penampungan Air Bersih RT 4/ V
Sumber : Analisis Konsultan, 2013
GAMBAR 3.27
PETA INFORMASI PELAYANAN NON PERPIPAAN KECAMATAN SEMARANG TENGAH
Sumber : Analisis Konsultan, 2013
TABEL III.36
REKAP PELAYANAN JARINGAN NON PERPIPAAN
KECAMATAN SEMARANG BARAT
14) KECAMATAN SEMARANG BARAT
TAWANGSARI ESDM Prov. Jateng 2012 Sumur Bor Gereja JKI Injil Kerajaan
GAMBAR 3.28
PETA INFORMASI PELAYANAN NON PERPIPAAN KECAMATAN SEMARANG BARAT
Sumber : Analisis Konsultan, 2013
TABEL III.37
REKAP PELAYANAN JARINGAN NON PERPIPAAN
KECAMATAN TUGU
15) KECAMATAN TUGU
GAMBAR 3.29
PETA INFORMASI PELAYANAN NON PERPIPAAN KECAMATAN TUGU
Sumber : Analisis Konsultan, 2013
TABEL III.38
REKAP PELAYANAN JARINGAN NON PERPIPAAN
KECAMATAN NGALIYAN
16) KECAMATAN NGALIYAN
GAMBAR 3.30
PETA INFORMASI PELAYANAN NON PERPIPAAN KECAMATAN NGALIYAN
Sumber : Analisis Konsultan, 2013
TABEL III.39
JUMLAH PEGAWAI MENURUT JENIS KELAMIN
TABEL III.40
JUMLAH PEGAWAI MENURUT USIA
TABEL III.41
JUMLAH PEGAWAI MENURUT PENDIDIKAN
TABEL III.42
JUMLAH PEGAWAI MENURUT JABATAN
TABEL III.43
JUMLAH PEGAWAI MENURUT STATUS
TABEL III.44
CAKUPAN JUMLAH SDM PDAM TIRTA MOEDAL KOTA SEMARANG
PER DESEMBER TAHUN 2008-2012
GAMBAR 3.31
STRUKTUR ORGANISASI PDAM KOTA SEMARANG
Sumber : PDAM Tirta Moedal Kota Semarang, 2013
PUSAT
TIM PENGARAH
Dpti BSP, DJCK : Dpti BSK, DJA, DJBAKD, DJBPD, DJPMD,
DJP2&PL, DJIKM, Dpti BPPL, Bapekki
EXECUTING AGENCY IMPLEMENTING AGENCY
DJCK DJCK. DJP2&PL. DJ PMD.
GUBERNUR PROVINSI
BUPATI/WALIKOT KAB/KOTA
DMAC :
TIM KOORD. KAB/KOTA DPMU
8. HH Spec
Bappeda, DPU, DinKes Ast Bid. Perencanaan 9. WSS Spec
10. CD Spec
POKJA AMPL KAB/KOTA
Ast. Bid. Monev & Evisi 11. PMA
Bappeda, DPU, DinKes, BPMD, Bapedalda,
DikNAs, dll DPIU 3,4,5/ DPIU 2/ DPIU 1B/ DPIU 1A/
Ast. Bid. Keuangan Satker Satker Satker Satker
KADES/LURAH DESA/KEL.
M A S Y A R A K A T W A R G A
GAMBAR 3.32
STRUKTUR ORGANISASI PAMSIMAS
Sumber: Kemenpu Ditjen Satker PAM Jateng, 2008-2012
3.2.2. Pengaturan
Perusahaan Daerah Air Minum (PDAM) Kota Semarang berdasarkan
SK DPRD nomor : 48/KEP/DPRD/64 tanggal 22 Desember 1964 statusnya
berubah menjadi Perusahaan Daerah Air Minum Kotapraja Semarang. Susunan
organisasi dan tata Kerja Perusahaan Daerah Air Minum Kota Semarang
ditetapkan berdasarkan Keputusan Walikota Semarang No. 061.1/15 tanggal 29
Januari 2004. Berdasarkan Peraturan Walikota Semarang No 690/0248 tahun
2009 tarif PDAM Tirta Moedal mengalami penyesuaian setiap 6 bulan sekali.
PDAM Tirta Moedal selama 3 tahun pengamatan mengalami perbaikan baik
dalam kinerja sesuai PERMENDAGRI 49/1999 maupun dalam kategori tingkat
kesehatan sesuai kriteria BPPSPAM.
3.2.3. Keuangan
A. Jaringan Perpipaan
1. Laporan Posisi Keuangan
Laporan posisi keuangan atau neraca PDAM Tirta Moedal per 31
Desember 2010, 2011, 2012 adalah sebagai berikut :
TABEL III.45
LAPORAN POSISI KEUANGAN PDAM TIRTA MOEDAL
PER 31 DESEMBER 2010, 2011, 2012
NERACA
Rekening
31/12/2010 31/12/2011 31/12/2012
Aset Lancar 42,234,621,738 83,817,800,990 114,599,037,495
Aset Tetap 227,590,155,417 203,651,093,839 205,602,083,531
Jumlah Asset 269,824,777,155 287,468,894,829 320,201,121,026
Kewajiban jangka
312,930,106,563 343,206,859,096 372,875,673,048
pendek
Kewajiban jangka
89,027,323,299 69,260,627,221 49,493,931,145
panjang
Kewajiban lain-lain 44,878,503,660 400,476,516 435,192,821
Jumlah Kewajiban 446,835,933,522 412,867,962,833 422,804,797,014
Ekuitas (177,011,156,367) (125,399,068,005) (102,603,675,988)
Jumlah Kewajiban
269,824,777,155 287,468,894,828 320,201,121,026
& ekuitas
Sumber : Laporan keuangan auditan 2010, 2011, 2012
2. Laporan Laba/Rugi
Kinerja keuangan PDAM dalam menghasilkan laba selama tahun 2010,
2011, dan 2012 ditunjukkan dalam laporan laba/rugi berikut ini :
TABEL III.46
LAPORAN LABA/RUGI PDAM TIRTA MOEDAL
PER 31 DESEMBER 2010, 2011, 2012
LAPORAN LABA/RUGI
REKENING
2010 2011 2012
Pendapatan air 128,006,803,290 149,717,961,669 159,285,371,020
Pendapatan non
14,578,049,771 13,443,579,089 12,206,150,261
air
Total Pendapatan 142,584,853,061 163,161,540,758 171,491,521,281
Beban usaha 137,342,828,530 159,012,645,942 171,131,688,244
Laba usaha 5,242,024,531 4,148,894,816 359,833,037
Pendapatan &
(11,159,776,228) 2,835,739,398 2,922,780,246
beban lain-lain
Laba usaha
(5,917,751,697) 6,984,634,214 3,282,613,283
sebelum pajak
Sumber : Laporan keuangan auditan 2010, 2011, 2012
beberapa item biaya seperti biaya beban pegawai, beban air baku, dan
beban pemeliharaan.
TABEL III.47
TARIF RATA-RATA DAN FULL COST RECOVERY
PDAM TIRTA MOEDAL TAHUN 2010, 2011, 2012
Tarif rata-rata yang diberlakukan masih bisa menutup full cost recovery
selama tiga tahun pengamatan, namun masih belum bisa menutup HPP air
per m3. Kondisi ini tidak menguntungkan bagi tingkat kesehatan PDAM
karena seharusnya tariff rata-rata yang diterapkan bisa selalu menutup baik
tariff HPP air maupun tarif full cost recovery. Sehingga PDAM Tirta Moedal
dalam hal ini pada tahun-tahun selanjutnya harus dapat menekan biaya jika
kenaikan tariff secara signifikan adalah langkah yang sebisa mungkin
dihindari.
4. Struktur Tarif
Berdasarkan Peraturan walikota Semarang no 690/0248 tahun 2009 tarif
PDAM Tirta Moedal mengalami penyesuaian setiap 6 bulan sekali. Berikut ini
adalah struktur tarif yang berlaku melalui periode akhir tahun selama tiga
tahun berturut-turut.
TABEL III.48
STRUKTUR TARIF PDAM TIRTA MOEDAL TAHUN 2010, 2011, 2012
sosial khusus 790 840 1,675 870 925 1,850 960 1,020 2,035
sosial umum 1,675 1,675 1,675 1,850 1,850 1,850 2,035 2,035 2,035
Kelompok II Kelompok II Kelompok II Kelompok II
Niaga 1 5,345 5,345 5,345 5,895 5,895 5,895 6,500 6,500 6,500
Niaga 2 6,415 6,415 6,415 7,075 7,075 7,075 7,800 7,800 7,800
Niaga 3 6,685 6,685 6,685 7,370 7,370 7,370 8,125 8,125 8,125
Niaga 4 7,750 7,750 7,750 8,585 8,585 8,585 9,420 9,420 9,420
Niaga 5 9,890 9,890 9,890 10,905 10,905 10,905 12,020 12,020 12,020
Niaga 6 10,690 10,690 10,690 11,785 11,785 11,785 12,995 12,995 12,995
Industri 1 8,020 8,020 8,020 8,840 8,840 8,840 9,745 9,745 9,745
Industri 2 10,690 10,690 10,690 11,785 11,785 11,785 12,995 12,995 12,995
Industri 3 14,430 141,430 141,430 15,910 15,910 15,910 17,540 17,540 17,540
Kelompok
Kesepakatan Kesepakatan Kesepakatan
khusus
Sumber : lampiran IX, XI, XIII Peraturan walikota Smg 690/0248 tahun 2009
TABEL III.49
REALISASI PENGGUNAAN DANA PAMSIMAS
SUMBER DANA
NO TAHUN DANA
APBD APBN IN-CASH IN-KIND TOTAL
LAIN
1 2008 247,500,000 1,732,500,000 99,000,000 396,000,000 2,475,000,000
2 2009 412,500,000 2,887,500,000 165,000,000 748,000,000 4,213,000,000
3 2010 770,000,000 2,310,000,000 132,000,000 616,000,000 3,828,000,000
4 2011 852,500,000 3,287,500,000 165,000,000 748,000,000 5,053,000,000
5 2012 852,500,000 4,687,500,000 165,000,000 748,000,000 6,453,000,000
TOTAL 3,135,000,000 14,905,000,000 726,000,000 3,256,000,000 - 22,022,000,000
Sumber : Kemenpu Ditjen Satker PAM Jateng, 2008-2012
GAMBAR 3.33
PROPORSI REALISASI DANA PAMSIMAS 2008-2012
Sumber : Kemenpu Ditjen Satker PAM Jateng, 2008-2012
TABEL III.50
REKAP SALDO AKHIR KAS SELURUH PROYEK PAMSIMAS
PADA AKHIR TAHUN 2012
TABEL III.51
REALISASI DANA PROGAM PNPM TAHUN 2007 S/D 2012
GAMBAR 3.34
REALISASI DANA PROGAM PNPM TAHUN 2007 S/D 2012
Sumber : Kemenpu Ditjen Satker PAM Jateng, 2008-2012
TABEL III.52
REALISASI DANA APBN PENYEDIAAN AIR BERSIH PROGRAM DTKP
TAHUN TOTAL REALISASI DANA
2007 456,050,000
2008 688,761,000
2009 693,776,000
2010 n/a
Total 1,838,587,000
Sumber : DTKP Kota Semarang, 2007-2010
GAMBAR 3.35
REALISASI DANA APBN PENYEDIAAN AIR BERSIH PROGRAM DTKP
Sumber : DTKP Kota Semarang, 2007-2010
TABEL III.53
PERMASALAHAN DAN PENYEBAB MASALAH ASPEK TEKNIS
DI PDAM KOTA SEMARANG
TABEL III.54
PERMASALAHAN DAN PENYEBAB MASALAH ASPEK KELEMBAGAAN
DI PDAM KOTA SEMARANG
2. Aspek Keuangan
TABEL III.55
PERMASALAHAN DAN PENYEBAB MASALAH ASPEK KEUANGAN
DI PDAM KOTA SEMARANG
TABEL III.56
PERMASALAHAN DAN PENYEBAB MASALAH SPAM
BUKAN JARINGAN PERPIPAAN
Materi survey air baku seperti pada Tabel IV.1 berikut ini.
TABEL IV.1
MATERI SURVEY AIR BAKU
SUMBER
NO DATA YANG DIPERLUKAN KETERANGAN
AIR BAKU
1. Mata Air Lokasi dan ketinggian Sumber layak dipilih
Kualitas air (visual dan bila tidak ada konflik
laboratorium) kepentingan dengan
Kuantitas dan kontinuitas masyarakat
Peruntukkan saat ini Kualitas dan kuantitas
Kepemilikan lahan di sekitar memenuhi ketentuan
mata air yang berlaku
Jarak ke daerah pelayanan
Hal-hal yang mempengaruhi
kualitas
Jalan masuk ke mata air
2. Air Tanah Lokasi
Kualitas, kuantitas dan
kontinuitas
Peruntukan saat ini
Kepemilikan
Jarak ke daerah pelayanan
Jalan masuk ke mata air
3. Air Lokasi dan ketinggian Sumber dipilih jika
Permukaan Kualitas air (visual dan alternatif satu dan dua
laboratorium) tidak ada
Kuantitas dan kontinuitas
Peruntukkan saat ini
Jarak ke unit pengolahan dan
ke daerah pelayanan
4. Air Hujan Curah hujan Sumber dipilih jika
Kualitas dan kuantitas air 1,2,3 tidak ada
hujan
Sumber : BAPPEDA Kota Semarang, 2011
dimana :
Q = debit aliran (m³/detik)
H = tinggi muka air dari ambang (m)
1,417 = konstanta konversi waktu (perdetik)
dengan mengukur perubahan tinggi muka air (H) dalam penampungan yang
memiliki luas tertentu (A) dalam jangka waktu tertentu, maka dapat dihitung :
b) Perkiraan potensi sumur tanah dalam dapat diperoleh informasi data dari
instansi terkait, meliputi : kedalaman sumur, kualitas air dan kuantitas serta
knstruksinya.
Perhitungan debit air permukaan Perhitungan debit air sungai dilakukan
dengan mengukur luas potongan melintang penampang basah sungai dan
kecepatan rata-rata alirannya dengan rumus :
Q=A.v
v = C.√R. S
TABEL IV.2
KRITERIA TEKNIS PIPA TRANSMISI
TABEL IV.3
KRITERIA TEKNIS PIPA DISTRIBUSI
Air yang dihasilkan dari produksi air dapat ditampung dalam reservoir air
yang akan berfungsi untuk menjaga kesetimbangan antara produksi dan
kebutuhan, sebagai penyimpan kebutuhan air dalam kondisi darurat, dan
sebagai penyediaan kebutuhan air untuk keperluan instalansi. Reservoir air
dibangun dalam bentuk reservoir tanah yang umumnya untuk menampung
produksi air atau dalam bentuk menara air yang umumnya untuk mengantisipasi
kebutuhan puncak didaerah distribusi. Reservoir dibangun baik dengan
konstruksi baja maupun dengan konstruksi beton bertulang. Pada perencanaan
reservoir hal utama yang perlu diperhatikan adalah :
a. Lokasi dan tinggi reservoir
Lokasi dan tinggi reservoir ditentukan berdasarkan pertimbangan sebagai
berikut :
Reservoir pelayanan ditempat sedekat mungkin dengan pusat daerah
pelayanan, kecuali kalau keadaan tidak memungkinkan.
b. Voume reservoir
Reservoir pelayanan
Volume reservoir pelayanan (service reservoir) ditentukan berdasarkan :
jumlah volume air maksimum yang harus ditampung pada saat pemakaian air
minimum ditambah dengan volume air yang harus disediakan pada saat
pengaliran jam puncak karena danya fluktuasi pemakaian air di wilayah
pelayanan dan periode pengisian reservoir. Serta cadangan air untuk
pemadam kebakaran kota sesuai dengan peraturan daerah yang berlaku
disamping juga untuk kebutuhan air khusus, seperti pengurasan reservoir,
taman dan peristiwa khusus.
Reservoir penyeimbang
Volume efektif reservoir penyeimbang (balance reservoir) ditentukan
berdasarkan keseimbangan aliran keluar dan aliran masuk reservoir selama
pemakaian air didaerah pelayanan. Sistem pengisian reservoir dapat dilakuka
dengan pompa maupun grafitasi.
yang aman melalui SPAM jaringan perpipaan dan bukan jaringan perpipaan,
terhadap total masyarakat di seluruh Kota Semarang.
SPM cakupan pelayanan = Masyarakat terlayani
Proyeksi total masyarakat
TABEL IV.4
TINGKAT KONSUMSI/PEMAKAIAN AIR RUMAH TANGGA
SESUAI KATEGORI KOTA
TINGKAT
JUMLAH
NO KATEGORI KOTA SISTEM PEMAKAIAN
PENDUDUK
AIR
1. Non
Kota Metropolitan >1.000.000 190
Standar
2. 500.000 – Non
Kota Besar 170
1.000.000 Standar
3. Non
Kota Sedang 100.000 – 500.000 150
Standar
4. Standar
Kota Kecil 20.000 – 100.000 130
BNA
5. Kota kecamatan <20.000 Standar IKK 100
6. Kota Pusat Standar
<3.000 60
Pertumbuhan DPP
Sumber: SK-SNI Air Minum
Dimana :
a = jumlah pemakaian air (liter/ orang/ hari)
b = jumlah penduduk daerah pelayanan (jiwa)
TABEL IV.5
MATRIKS KRITERIA UTAMA PENYUSUNAN RIPSPAM
UNTUK BERBAGAI KLASIFIKASI KOTA
Kategori Kota
No. Kriteria Teknis Besar (500rb -1juta) Sedang (100-500rb)
Metro (> 1 juta) jiwa Kecil (20-100rb) jiwa
jiwa jiwa
1 Jenis Pekerjaan Rencana Induk Rencana Induk Rencana Induk -
2 Horison Perencanaan 20 Tahun (15 - 20) Tahun (15 - 20) Tahun (15 - 20) Tahun
3 Sumber Air Baku Investigasi Investigasi Identifikasi Identifikasi
4 Pelaksana Penyedia Jasa/ Penyedia Jasa/ Penyedia Jasa/ Penyedia Jasa/
Penyelenggara/ Penyelenggara/ Penyelenggara/ Penyelenggara/
Pemda Pemda Pemda Pemda
5 Peninjauan Ulang Per 5 tahun Per 5 tahun Per 5 tahun Per 5 tahun
6 Penanggungjawab Penyelenggara/ Penyelenggara/ Penyelenggara/ Penyelenggara/
Pemda Pemda Pemda Pemda
7 Sumber Pendanaan - Hibah LN - Hibah LN - Hibah LN - Pinjaman LN
- Pinjaman LN - Pinjaman LN - Pinjaman LN - APBD
- Pinjaman DN - Pinjaman DN - Pinjaman DN
- APBD - APBD - APBD
- PDAM - PDAM - PDAM
- Swasta - Swasta - Swasta
5.1.1. Peran dan Fungsi Penting Kota Semarang dalam Konstelasi Sistem
Perkotaan Nasional (RTRWN)
Kota Semarang sebagai Ibu Kota Provinsi Jawa Tengah mempunyai 3
(tiga) peran dan fungsi penting dalan Konstelasi Sistem Perkotaan Nasional,
yaitu bersama dengan Metropolitan Kedungsepur berperan dan berfungsi
sebagai PKN, Kawasan Andalan dan Kawasan Strategis Nasional (KSN).
Kota Semarang (bersama dengan Kendal, Demak, Ungaran, dan
Purwodadi: Metropolitan Kedungsepur) dalam Sistem Perkotaan Nasional
berfungsi sebagai PKN. Pusat Kegiatan Nasional yang selanjutnya disebut PKN
adalah kawasan perkotaan yang berfungsi untuk melayani kegiatan skala
internasional, nasional, atau beberapa provinsi.
Sebagai PKN bersama Perkotaan Kedungsepur, Kota Semarang
mempunyai kriteria:
a. Kawasan perkotaan yang berfungsi atau berpotensi sebagai simpul
utama kegiatan ekspor-impor atau pintu gerbang menuju kawasan
internasional;
KAWASAN
KAWASAN LAUT DALAM FUNGSI KOTA
KAWASAN DARAT
YANG TERKAIT KAWASAN NASIONAL
DARAT
Kawasan Kawasan laut Semarang PKN
Semarang-Demak Karimunjawa dan Kendal PKL
Sektor Unggulan: sekitarnya Demak PKL
Industri Sektor Unggulan: Ungaran PKW
Pariwisata Perikanan Salatiga PKW
Tanaman Pertambangan Purwodadi PKL
Pangan Pariwisata
Perdagangan Kota Orientasi:
Semarang
Sumber: PP Nomor 26 Tahun 2008
c. Kawasan Kota Lama, Masjid Agung Semarang, Masjid Agung Jawa Tengah
dan Gedong Batu Semarang, sebagai KSP dari sudut kepentingan sosial dan
budaya.
GAMBAR 5.1
PETA PEMBAGIAN BWK KOTA SEMARANG (RTRW KOTA SEMARANG TAHUN 2011 – 2031)
GAMBAR 5.2
PETA RENCANA STRUKTUR RUANG KOTA SEMARANG (RTRW KOTA SEMARANG TAHUN 2011 – 2031)
Kota Semarang saat ini terdiri dari 16 kecamatan dengan luas 37,375,4
km2 dengan kecamatan paling luas adalah Kecamatan Mijen yaitu sebesar
6,218,24 km2, kecamatan yang memiliki luas lahan sawah paling besar yaitu
Kecamatan Gunungpati sebesar 1,386 Km2 atau sebesar 34,72 % dari total
lahan sawah di Kota Semarang dan kecamatan dengan pemanfaatan lahannya
hanya berupa lahan non-sawah adalah Kecamatan Gajahmungkur, Semarang
Selatan, Candisari, Semarang Timur, Semarang Utara dan Semarang Tengah.
Informasi tata guna lahan selengkapnya dapat dilihat pada Gambar 2.15.
Secara topografi, Kota Semarang berada pada ketinggian antara 0,75 m
sampai sekitar 350 m diatas permukaan laut. Ketinggian Kota Semarang yang
bervariasi ini menjadikan pemanfaatan bagian atas Kota Semarang harus
berhati-hati dengan lebih difungsikan sebagai daerah konservasi untuk
melindungi Kota Semarang bagian bawah, sedangkan kota bawah perlu kehati-
hatian pula karena kawasan ini merupakan kawasan pesisir yang rawan banjir
dan rob.
Secara hidrologis, Kota Semarang terdiri atas hidrologi permukaan dan
bawah tanah. Hidrologi permukaan Kota Semarang terbentuk oleh alur sungai
dan saluran drainase yang ada. Permasalahan dalam sungai/ saluran di Kota
Semarang adalah debit saluran dan sungai yang tidak sebanding dengan volume
air. Semakin banyak daerah terbangun mempengaruhi besar dan kecepatan
aliran air (run off) sehingga debit air pada sungai-sungai tersebut juga semakin
besar. Adanya sungai yang mengalami penyempitan dan sedimentasi serta
kurangnya drainase dibandingkan dengan lahan terbangun merupakan faktor
penyebab terjadinya banjir ataupun genangan di Kota Semarang bagian bawah
dimusim penghujan.
Penyediaan dan pengelolaan air bersih di Kota Semarang pada saat ini
terbagi ke dalam 2 (dua) sistem, yaitu sistem jaringan perpipaan yang dikelola
oleh PDAM dan sistem non perpipaan yang dikelola secara mandiri oleh
penduduk. Untuk pelayanan dengan sistem perpipaan meliputi hampir seluruh
kecamatan-kecamatan di Kota Semarang seperti ditunjukkan pada Gambar 5.3,
kecuali Kecamatan Mijen dan Kecamatan Gunungpati, Pemanfaatan air tanah
(non perpipaan), khususnya di Kota Semarang bagian bawah, seharusnya
dihindarkan untuk menghindarkan dampak lingkungan yang terjadi. Sistem
jaringan perpipaan di Kota Semarang ini pelayanan dan pengelolaannya
dilakukan oleh PDAM dengan cakupan pelayanan 15 kecamatan dari 16
kecamatan yang ada di Kota Semarang, walaupun tidak semua wilayah dalam
satu kecamatan tersebut terlayani semua (seperti Kecamatan Tugu, Ngaliyan,
Genuk, dan Gunungpati).
Beberapa permasalahan pengelolaan air perpipaan oleh PDAM saat ini
misalnya tingkat kebocoran air yang relatif tinggi, kurangnya tekanan pada lokasi
tertentu, manajemen pengukuran dan pemantauan yang tidak optimal, peta GIS
jaringan tidak update dan kondisi hidrolika perpipaan yang tidak mendukung
pengembangan.
TABEL V.2
MATRIKS RENCANA PENGEMBANGAN KEGIATAN KOTA DAN TINGKAT
KEBUTUHAN PELAYANAN JARINGAN AIR MINUM
TABEL V.3
MATRIKS RENCANA PENGEMBANGAN KEGIATAN KOTA, RENCANA PENYEDIAAN AIR BERSIH
DAN TINGKAT KEBUTUHAN PELAYANAN JARINGAN AIR MINUM
Rencana
Rencana Penyediaan Prasarana Air Bersih, pengembangan
Penggunaan Air Tanah, dan Pemanfaatan Air sistem jaringan
Hujan air minum
(perpipaan)
Rencana Kebutuhan
Rencana peningkatan
Luas Pengembangan Pelayanan
No BWK Fungsi BWK Kecamatan Pengembangan dan
(Ha) kawasan Jaringan
Industri pengembangan
perumahan pembatasan pengembangan Jaringan Air Air Minum
sistem
pengambilan pemanfaatan Minum
prasarana air
air tanah air hujan (rencana)
permukaan
melalui sistem
perpipaan
1 BWK I 2.233 Pusat Pelayanan Semarang Berkepadatan primer, Tinggi,
- √ √ √
Kota: Tengah tinggi sekunder Mendesak
perkantoran, Semarang Berkepadatan primer, Tinggi,
- √ √ √
perdagangan dan Timur tinggi sekunder Mendesak
jasa Semarang Berkepadatan primer, Tinggi,
- √ √ √
Selatan tinggi sekunder Mendesak
2 BWK II 1.320 Pusat Pelayanan Candisari Berkepadatan √ √ primer,
Kota:perkantoran, tinggi sekunder
- Tinggi
perdagangan dan
jasa
pendidikan Gajahmungkur Berkepadatan √ √ primer,
kepolisian dan tinggi - sekunder Tinggi
olah raga
3 BWK 3.522 Pusat Pelayanan Semarang Berkepadatan √ √ √ primer,
III Kota:perkantoran, Barat tinggi sekunder Tinggi,
-
perdagangan dan Mendesak
jasa
transportasi Semarang Berkepadatan Kawasan √ √ √ sekunder
udara dan Utara tinggi Industri Berikat;
Tinggi,
transportasi laut Kawasan
Mendesak
Industri
Pergudangan
Rencana
Rencana Penyediaan Prasarana Air Bersih, pengembangan
Penggunaan Air Tanah, dan Pemanfaatan Air sistem jaringan
Hujan air minum
(perpipaan)
Rencana Kebutuhan
Rencana peningkatan
Luas Pengembangan Pelayanan
No BWK Fungsi BWK Kecamatan Pengembangan dan
(Ha) kawasan Jaringan
Industri pengembangan
perumahan pembatasan pengembangan Jaringan Air Air Minum
sistem
pengambilan pemanfaatan Minum
prasarana air
air tanah air hujan (rencana)
permukaan
melalui sistem
perpipaan
BWK Berkepadatan Industri dan √ √ √ primer, Tinggi,
4 2.738 Industri Genuk
IV sedang Pergudangan sekunder Mendesak
6 BWK 2.622 Berkepadatan √ √ √ primer, Tinggi,
Gayamsari -
V tinggi sekunder Mendesak
Berkepadatan Kawasan √ √ √ primer,
Tinggi,
Pedurungan tinggi Peruntukan sekunder
Mendesak
Industri
BWK Berkepadatan √ √ primer,
8 4.420 Pendidikan Tembalang - Sedang
VI sedang sekunder
BWK Perkantoran Berkepadatan √ √ primer,
10 2.509 Banyumanik - Sedang
VII militer sedang sekunder
BWK Berkepadatan √ √ primer,
12 5.399 Pendidikan Gunungpati - Sedang
VIII rendah sekunder
BWK Kantor pelayanan Berkepadatan Kawasan √ √ primer
14 6.213 Mijen Tinggi
IX publik rendah Industri
16 BWK 6.393 Berkepadatan Kawasan √ √ √ primer,
X sedang Industri Berikat; sekunder
Industri Tinggi
Kawasan
Tugu Industrial Estate
Berkepadatan √ √ primer
Ngaliyan - Sedang
rendah
Sumber: Hasil analisis tim, 2013.
GAMBAR 5.3
RENCANA POLA RUANG KOTA SEMARANG (RTRW KOTA SEMARANG TAHUN 2011 – 2031)
TABEL V.4
RENCANA PENGEMBANGAN SPAM JARINGAN PRIMER
KOTA SEMARANG
CABANG
LOKASI
PDAM
Jalan Banjardowo – Pertigaan Jalan Brigjend. Sudiarto
Timur
– Sendangmulyo
Timur Jalan di Kelurahan Karangroto
Timur Jalan Tentara Pelajar – Jalan Raya Kedungmundu
Jalan S. Parman – Jalan Sultan Agung – Jalan Teuku
Selatan
Umar – Jalan Setiabudi – Jalan Perintis Kemerdekaan
Tengah Jalan Diponegoro
Selatan Jalan Raya Ungaran – Gunungpati
Barat Jalan Kedungpane – Boja
GAMBAR 5.4
EKSISTING PERPIPAAN DAN PERKEMBANGAN KOTA
GAMBAR 5.5
RENCANA JARINGAN AIR MINUM
GAMBAR 5.6
RENCANA PENGEMBANGAN SPAM KOTA SEMARANG
GAMBAR 5.7
RENCANA DAERAH PELAYANAN SPAM SISTEM PERPIPAAN DAN NON-PERPIPAAN KOTA SEMARANG
TABEL V.5
RENCANA INVESTASI PDAM KOTA SEMARANG
NO URAIAN PEKERJAAN
1 Pengembangan dan pemasangan pipa di Ngaliyan – Cangkringan
2 Pengembangan dan pemasangan Pipa Di Wilayah Mangunharjo
3 Pengembangan dan pemasangan Pipa Di Sekaran - Gunungpati
4 Pengembangan dan pemasangan Pipa Jaringan Distribusi Pramuka
Pengembangan dan pemasangan Pipa Jaringan Distribusi
5
Jatibarang
Pengembangan dan pemasangan Pipa Jaringan Transmisi Dari Ipa
6
Kaligarang Ke Gajah Mungkur
Pengembangan dan pemasangan Pipa Jaringan Pipa Distribusi
7
Wilayah Tanah Mas
Pemasangan Pipa Jaringan Pipa Transmisi Kalidoh - Pudakpayung
8
(Tahap 1 Dan 2)
9 Pembangunan Ipa Blorong 200 Lt/Dt
10 Instalasi sistem Scada
GAMBAR 5.8
SINKRONISASI RTRW DAN PERENCANAAN SPAM
KOTA SEMARANG TAHUN 2013 – 2033
Cakupan pelayanan air minum perpipaan PDAM saat ini (2012) baru
memenuhi 59% dari total jumlah penduduk Kota Semarang. Sebagian besar
wilayah yang tingkat pelayanan air minum perpipaannya masih rendah antara
lain Kecamatan Mijen, Kecamatan Gunungpati, dan Kecamatan Tugu. Gambar
5.9 menunjukkan lokasi-lokasi dengan penyediaan air minum non-perpipaan.
Sistem non perpipaan pada wilayah yang tidak terlayani jaringan
perpipaan seperti ditunjukkan Gambar 5.9 meliputi cara penggalian atau
pengeboran air tanah permukaan; pengeboran air tanah dalam secara terbatas
dengan mempertimbangkan kelestarian lingkungan; pengembangan
pemanfaatan air hujan; pengolahan air payau dan air laut; dan penyediaan
terminal air untuk kawasan-kawasan yang belum terlayani jaringan perpipaan.
Tabel di bawah ini menunjukkan beberapa program yang telah dilaksanakan
untuk memenuhi kebutuhan daerah yang belum bisa terlayani oleh PDAM.
GAMBAR 5.9
DAERAH DENGAN PENYEDIAAN AIR MINUM NON-PERPIPAAN
TABEL V.6
SPAM PELAYANAN NON PERPIPAAN KOTA SEMARANG
Sumber: PSDA Kota Semarang 2013 ,PNPM Perkotaan Kota Semarang 2013,ESDM Prov. Jateng 2013, DTKP 2013 (Data Tahun 2001-2012)
TABEL V.7
JUMLAH PENDUDUK KOTA SEMARANG 8 TAHUN TERAKHIR
PERTAMBAHAN
TAHUN JUMLAH PENDUDUK PENDUDUK
JIWA PERSEN
2005 1.419.478
2006 1.434.025 14.547 1,02%
2007 1.454.594 20.569 1,43%
2008 1.481.640 27.046 1,86%
2009 1.506.924 25.284 1,71%
2010 1.527.433 20.509 1,36%
2011 1.544.358 16.925 1,11%
2012 1.559.198 14.840 0, 96%
Rata-rata 19.960 1,35%
Sumber : Semarang dalam Angka, 2012
2,0%
1,86%
1,71%
1,5%
1,43%
1,36%
Persentase
1,11%
1,0% 1,02%
0,96%
0,5%
0,0%
2006 2007 2008 2009 2010 2011 2012
Tahun
Laju pertumbuhan penduduk
GAMBAR 5.10
LAJU PERTUMBUHAN PENDUDUK KOTA SEMARANG 8 TAHUN TERAKHIR
1. Metoda Aritmatika
Metoda ini didasarkan pada angka kenaikan penduduk rata-rata setiap tahun.
Metoda ini digunakan jika data berkala menunjukkan jumlah penambahan
yang relatif sama setiap tahunnya. Metode ini juga merupakan metoda
proyeksi dengan regresi sederhana. Persamaan umumnya adalah :
Y = a + bx
Keterangan:
Y = nilai variabel berdasarkan garis regresi, populasi ke - n
x = Bilangan independen, bilangan yang dihitung dari tahun awal
a = Yi Xi 2 Xi XiYi
nXi 2 Xi
2
a = konstanta
b = koefesien arah garis (gradien) regresi linier
nXiYi Xi Yi
b=
n Xi 2 Xi
2
2. Metode Logaritma
Persamaan umumnya adalah :
Y a x bX
Persamaan di atas dapat dikembalikan kepada model linier dengan
mengambil logaritma napirnya (Ln), dimana :
Y = a + b . Ln X
Apabila diambil X' = Ln X, maka diperoleh bentuk linear Y = a + b . X',
dengan mengganti nilai X = Ln X
a
Yi b ( Ln(Xi))
n
keterangan:
Y = Nilai variabel Y berdasarkan garis regresi, populasi ke - n
X = Bilangan independen, bilangan yang dihitung dari tahun awal
a= konstanta
b= koefesien arah garis (gradien) regresi linier
3. Metode Eksponensial
Persamaan umumnya adalah :
Y a eb X
Dengan mengambil logaritma napirnya (Ln), persamaan di atas dapat dirubah
menjadi persamaan berikut :
Ln Y = Ln a + b . X
Dimana persamaan tersebut linier dalam X dan Ln Y.
a
Ln(Yi) b Ln( Xi )
n
Keterangan:
Y = Nilai variabel Y berdasarkan garis regresi, populasi ke - n
X= Bilangan independen, bilangan yang dihitung dari tahun awal
a= konstanta
b= koefesien arah garis (gradien) regresi linier
4. Metode Geometri
Metoda ini didasarkan pada rasio pertambahan penduduk rata-rata tahunan.
Sering digunakan untuk memperkirakan data yang perkembangannya melaju
sangat cepat. Persamaan umumnya adalah:
Y a. X b
Persamaan diatas dapat dikembalikan kepada model linier dengan
mengambil logaritma napirnya (Ln), dimana :
Ln Y = Ln a + b x Ln X
Persamaan tersebut linier dalam Ln X dan Ln Y.
a
Ln(Yi) b Ln(Xi)
n
n (Ln(Xi) Ln(Yi)) Ln(Xi) Ln(Yi)
b
n Ln(Xi2 ) ln(X)2
Keterangan:
Y = Nilai variabel Y berdasarkan garis regresi, populasi ke - n
X= Bilangan independen, bilangan yang dihitung dari tahun awal
a= konstanta
b= koefesien arah garis (gradien) regresi linier
S
n ( n 1)
( yi y ') 2
r 1
( yi y )2
dimana :
xI = P – P’
yI = P = Jumlah penduduk awal
y = Pr = Jumlah penduduk rata-rata
y’ = P’ = Jumlah penduduk yang akan dicari
Pemilihan metoda proyeksi yang paling tepat jika :
Memiliki standar deviasi yang paling kecil yang berarti menunjukkan kecilnya
penyimpangan data dari nilai rata – rata
Harga R yang paling mendekati 1 atau –1.
Proyeksi ditentukan dari beberapa metode perhitungan; yaitu metoda
aritmatik, geometrik dan least square dengan menggunakan data jumlah
penduduk tahun terakhir. Pemilihan metode proyeksi berdasarkan metode
proyeksi yang memilik nilai standar deviasi terkecil dari tiga perhitungan.
TABEL V.8
PERBANDINGAN STANDAR DEVIASI BERBAGAI METODE PROYEKSI
PENDUDUK KOTA SEMARANG
Eksisting Proyeksi
2.500.000
2.000.000
Jumlah Penduduk
1.500.000
1.000.000
500.000
0
2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030 2032
Tahun
PROYEKSI PENDUDUK KOTA SEMARANG Cabang Timur
Cabang Selatan Cabang Utara
GAMBAR 5.11
PROYEKSI PENDUDUK KOTA SEMARANG DENGAN METODE GEOMETRI
Sumber: Hasil Analisis Konsultan, 2013
TABEL V.10
PERTUMBUHAN PROYEKSI PENDUDUK PER KECAMATAN (PERIODE 5 TAHUNAN)
TABEL V.11
PERTUMBUHAN PROYEKSI PENDUDUK PER CABANG
(PERIODE 5 TAHUNAN)
GAMBAR 5.12
RENCANA PERSEBARAN PENDUDUK KOTA SEMARANG
GAMBAR 5.13
PROYEKSI JUMLAH DAN KEPADATAN PENDUDUK KECAMATAN DI KOTA SEMARANG
TABEL V.12
TINGKAT KONSUMSI/PEMAKAIAN AIR RUMAH TANGGA SESUAI
KATEGORI KOTA SEMARANG
125
konsumsi (liter/orang/hari)
120
115
110
Konsumsi Perkapita
105
100
95
2008 2009 2010 2011 2012
Tahun
GAMBAR 5.14
KONSUMSI AIR PERKAPITA KOTA SEMARANG
Sumber : Audit BPKP, 2012
Area Pelayanan
Rencana penambahan area pelayanan di masa depan mengikuti
beberapa kriteria; antara lain sebagai berikut:
Area dengan kepadatan lebih dari 50 orang per hektar
Area dengan keterbatasan air bawah tanah yang terbatas
Area yang sudah terlayani PDAM
Berdasarkan dengan kriteria di atas, ringkasan dari perluasan area
pelayanan dapat dilihat pada tabel berikut ini :
TABEL V.13
PENAMBAHAN LUAS AREA PELAYANAN PER CABANG
Populasi Terlayani
Konsumsi Domestik per Kapita
Berdasarkan data konsumsi PDAM selama tahun 2012, rata-rata
konsumsi perbulan setiap sambungan rumah adalah 22 m3. Konsumen domestik
dikategorikan menjadi 6 kelompok tergantung dari jumlah penghuni, struktur
rumah dan lain sebagainya. Dari 6 kelompok domestik, satu kelompok untuk
kategori konsumen rumah tangga yang memiliki usaha kecil. Data jumlah
sambungan dan konsumsi domestik (rumah tangga) diringkaskan pada tabel
berikut ini.
TABEL V.14
JUMLAH SAMBUNGAN DAN KONSUMSI DOMESTIK PER KATEGORI
UNIT KONSUMSI
JENIS JUMLAH KONSUMSI KONSUMSI
DESKRIPSI
TARIF PELANGGAN DESEMBER PERBULAN PERKAPITA
(l/o/h)
2012 (m3) (m3)
D. RT I 0 0
E. RT II 1.804 40.446 22 145
F. RT III 102.733 2.120.759 21 133
G. RT IV 20.039 447.662 22 144
H. RT V 6.052 165.156 27 176
I. RT Niaga 22 384 17 113
Total 130.650 2.774.407
Rata-rata 22 142
Sumber: Hasil Perhitungan Analisis Konsultan, 2013
TABEL V.15
KONSUMSI AIR BERSIH PER KAPITA (2012)
CABANG RATA-
BARAT TENGAH TIMUR UTARA SELATAN RATA
Jumlah Pelanggan 30.367 19.254 39.028 28.846 24.077
Konsumsi perkapita (l/o/h) 136 172 108 144 152 142
Sumber : Hasil Perhitungan Analisis Konsultan, 2013
82,6%
GAMBAR 5.15
PERSENTASE JENIS KONSUMSI
Sumber: Audit BPKP, 2012
70%
30% NRW
20%
10%
0%
2004 2005 2006 2007 2008 2009 2010 2011 2012
Tahun
GAMBAR 5.16
TINGKAT KEHILANGAN AIR (NRW) KOTA SEMARANG
Sumber: Audit BPKP, 2012
6. Kebutuhan air non domestik dihitung 20% dari kebutuhan domestik sesuai
dengan Permen PU no. 18/ 2007 atau sesuai RSNI T-01-2003 tentang Tata
Cara Perencanaan Plambing
7. Faktor hari maksimum : 1,2
8. Faktor jam puncak : 1,7
TABEL VI.1
DESKRIPSI SUMBER AIR PERMUKAAN
GAMBAR 6.1
DAS BALAI PSDA JRAGUNG TUNTANG
GAMBAR 6.2
PETA JARINGAN SUNGAI KOTA SEMARANG
GAMBAR 6.3
SUNGAI GARANG SAAT AKHIR MUSIM KEMARAU DI KEL. SAMPANGAN
GAMBAR 6.4
DEBIT HARIAN RATA-RATA SUNGAI GARANG DI POS PANJANGAN
TAHUN 2010
irigasi. Daerah genangan Sungai Blorong meliputi daerah seluas 590 ha dengan
kedalaman rata-rata 0,5 m yang merupakan daerah pertanian dan sebagian
daerah pemukiman.
GAMBAR 6.5
DAERAH TANGKAPAN SUNGAI BLORONG DAN BENDUNG PENGILON
GAMBAR 6.6
DEBIT HARIAN RATA-RATA SUNGAI GARANG DI POS PANJANGAN
TAHUN 2010
Penggaron ke Banjir Kanal Timur. Bagian hilir Sungai Babon dari Pucang Gading
merupakan dataran rendah dan merupakan kawasan padat penduduk dan
kawasan irigasi. Kerusakan banjir sering terjadi di kawasan ini karena
ketidakmampuan Sungai Babon menampung debit banjir. Di lain pihak, di hulu
Pucang Gading adalah kawasan perbukitan dan kerusakan banjir serius belum
pernah terjadi.
Sungai Babon dimanfaatkan untuk sumber air baku Instalasi Pengolahan
Air Pucang Gading dan Meteseh. Debit air Sungai Babon relatif kecil pada musim
kemarau, pengoperasian IPA Pucang Gading tidak optimal berkisar antara Q= 40
– 50 l/det sedangkan kapasitas terpasang sebesar Q=60 l/det. Sistem
penyadapan pada IPA Pucanggading menggunakan saluran pipa langsung dari
sungai. Pada saat muka air terendah di musim kemarau posisi pipa penyadap
berada lebih tinggi dari muka air. Jika posisi pipa penyadap diturunkan maka
akan terjadi permasalahan pada musim penghujan dimana pipa tertutup oleh
sampah dan lumpur. Data kualitas air menunjukkan bahwa kandungan nitrogen
pada air baku di atas standar peraturan air menunjukkan bahwa air tersebut telah
dimanfaatkan sebagai kegiatan pertaniaan hulu. Untuk pasokan sumber air
dibuat pipa suplesi dari air baku dari SAB Kudu (Masterplan Air Baku Semarang,
2011)
Kapasitas terpasang IPA Meteseh sebesar 12 l/det tidak dapat
dioperasikan karena bendung peninggi air telah rusak. Muka air eksisting tidak
cukup tinggi untuk disadap. Bangunan tanggul yang rusak disebabkan
konstruksinya rusak karena diterjang banjir. Awalnya, Instalasi Meteseh melayani
kebutuhan perumahan di daerah sekitar seperti Dinar Mas. Kini kebutuhan air
baku perumahan di suplai dari IPA Pucang Gading ke reservoir Meteseh yang
kemudian di pompa lagi ke masyarakat.
GAMBAR 6.7
IPA PUCANG GADING DAN IPA METESEH
GAMBAR 6.8
SKEMA SISTEM DRAINASE SEMARANG TIMUR DAN DISTRIBUSI DEBIT
Sumber : BAPPEDA, 2007
GAMBAR 6.9
DISTRIBUSI VOLUME TAMPUNGAN DAN ELEVASI
WADUK KEDUNG OMBO
Sumber : Suharyanto, 2006
Keterangan :
Kapasitas tampungan total (Gross Storage Capacity) = 723 X 106 m³
Kapasitas tampungan mati (dead storage) = 88,4 X 106 m³
Kapasitas tampungan efektif = 634,6 X 106 m³
Alokasi tampungan sedimen = 72 X 106 m³
Alokasi tampungan untuk pengendalian banjir = 263 X 106 m³
Maximum Flood Level (MFL), merupakan elevasi muka air waduk yang
dicapai pada kondisi debit inflow Probable Maximum Flood (PMF) pada
elevasi + 95,00 m. Batas muka air waduk untuk penampungan banjir
terjadi pada elevasi 93,70 m dan batas pelepasan debit pendahuluan
melalui pelimpah pada elevasi 90,00 m
Full Supply Level (FSL), merupakan elevasi muka air waduk operasi
penuh (pada elevasi +90,00 m) dan merupakan elevasi yang diharapkan
tercapai pada awal sampai dengan pertengahan musim tanam sehingga
tidak mengganggu pertumbuhan tanaman pada waktu musim kemarau.
Pelepasan air diperkenankan melalui outlet turbin dan outlet irigasi.
Minimum Operation Level (MOL), merupakan batas minimum irigasi (pada
elevasi + 67,50 m) untuk pengoperasian katup irigasi). Jika muka air
waduk sudah berada di bawah elevasi tersebut maka katup irigasi ditutup
dan pelepasan air waduk hanya diperhitungkan untuk pembangkit energi
listrik dan air baku, namun kelebihannya dapat dimanfaatkan untuk
suplesi kebutuhan irigasi.
Tail Water Level (TWL), merupakan elevasi muka air di hilir stasiun
pembangkit tenaga listrik yang mengalir melalui fasilitas outlet (intake
irigasi dan PLTA). TWL ini berpengaruh terhadap tinggi jatuh efektif dari
sistem pembangkit tenaga listrik, sedangkan TWL max dan TWL min
merupakan batasan dari TWL tersebut (Suharyanto, 2006).
a. Bendung Klambu
Sistem penyaluran air baku dari Waduk Kedung Ombo berupa saluran
berbuka diantaranya adalah suplesi pada sistem Klambu Kudu yang terbagi
menjadi tiga titik yaitu suplesi Gubug berada di Desa Mranten Kecamatan Gubug
berasal dari saluran irigasi sekunder Gubug, Suplesi Waru merupakan saluran
bypass dari Bendung Pucang Gading ke instalasi IPA Kudu yang menggunakan
pipa berdiameter 2 x 300 mm dan suplesi pada Bangunan Air baku (BAB) 15 di
mana air sungai di pompa ke saluran Klambu Kudu ketika ada perbaikan di hulu.
Alokasi debit air yang diberikan dari Bendung Klambu ialah sebesar 1,3 m3/det
dan sesampainya di Kudu hanya sebesar 900 l/det. Hal ini mengindikasikan
bahwa sekitar 400 l/det hilang selama perjalanan. Kualitas air pada Bendung
Klambu secara setelah disalurkan hingga Kudu, kualitas air telah mengandung
Total Suspended Solid yang tinggi. Hal ini mengakibatkan pengendapan partikel
di intake pompa Kudu yang tentunya akan mempengaruhi kinerja pompa dan
proses Pengolahan Air.
b. IPA Kudu
Instalasi Pengolahan Air Kudu memilki kapasitas terpasang Q=1250 l/det.
Hingga kini pemanfaatannya belum optimal pada tahun 2011 berkisar antara 900
l/det. Hal ini dikarenakan penyerapan air dari konsumen yang masih belum
maksimal. Selain itu, di beberapa lokasi saluran transmisi klambu kudu nampak
muka air telah berada di ujung atas saluran perkerasan. Jika kapasitas
ditingkatkan maka air yang melimpah akan semakin besar sehingga faktor
kehilangannya semakin besar. Kemungkinan pada desain awal memang saluran
di desain untuk mengalirkan air sebanyak 1250 l/det namun nilai ini belum
memperhitungkan faktor kehilangan air salama perjalanan sehingga desain
terlalu kecil di kenyataannya.
GAMBAR 6.10.
SALURAN AIR BAKU KLAMBU – KUDU
Sumber : Dinas PSDA Jawa Tengah, 2012
dikembangkan sebagai sumber air tanah, baik berupa air tanah bebas (tak
tertekan), air tanah tertekan, maupun mata air. Oleh karena itu perlu investigasi
mendalam melalui penyelidikan dan analisis hidrogeologi.
GAMBAR 6.11
PETA HIDROGEOLOGI KOTA SEMARANG DAN SEKITARNYA
GAMBAR 6.12
PETA PRODUKTIVITAS AIR TANAH KOTA SEMARANG
TABEL VI.2
PEMBAGIAN PRODUKTIVITAS AIR TANAH DI KOTA SEMARANG
Dilihat dari tabel di atas, secara umum lebih dari 50% wilayah Semarang
mempunyai potensi air tanah sedang. Daerah dengan potensi air tanah tinggi
mencakup 11,7% atau sekitar 43,97 km2. Daerah air tanah potensi kecil dan
langka mencapai 16%.
TABEL VI.3.
PRODUKTIVITAS AIR TANAH PER KECAMATAN DI KOTA SEMARANG
GAMBAR 6.13
PETA CEKUNGAN AIR TANAH KOTA SEMARANG
GAMBAR 6.14
PETA SUMBER AIR BAKU PDAM TIRTA MOEDAL SEMARANG
GAMBAR 6.15
SKEMA NERACA AIR WADUK JATIBARANG
GAMBAR 6.16
SKEMA NERACA AIR WADUK KEDUNG OMBO
GAMBAR 6.17
SKEMA NERACA AIR SUNGAI BLORONG
TABEL VI.4
CURAH HUJAN RERATA TAHUNAN DI CAT SEMARANG
TAHUN 2003 – 2010
TABEL VI.5
IMBUHAN AIR TANAH DI CEKUNGAN AIR TANAH KOTA SEMARANG
tangga maupun untuk melakukan pengisian air tanah pada lokasi yang mampu
menyerap air.
Pemanfaatan air waduk, situ dan sungai sebagai sumber air bersih akan
berdampak positif pada penataan pengairan. Optimalisasi waduk dapat
dilakukan, karena waduk berfungsi menjaga ketahanan air di suatu wilayah. Saat
musim hujan, waduk akan menampung air sebanyak-banyaknya. Saat musim
kemarau, air bisa dimanfaatkan sebagai sumber air baku.
Air laut merupakan sumberdaya air minum yang tidak terbatas khususnya
Indonesia memiliki air laut sebesar 70 persen dari luas wilayahnya. Dengan
demikian untuk mengatasi krisis air minum sekarang dan di masa mendatang,
pemanfaatan air laut menjadi air minum merupakan potensi yang harus dieksplor
dan dieksploitasi.
Berikut ini akan disampaikan uraian mengenai potensi sumber air baku
yang dapat dimanfaatkan dalam pengembangan pasokan air baku air minum di
Kota Semarang.
A. Lokasi
Pembangunan Waduk Jatibarang meliputi lokasi tempat dimana waduk
dibangun (dam axis), areal genangan, sabuk hijau (green belt) dan jalan
penghubung (access road) yang terletak di 4 (empat) kelurahan dalam 2 (dua)
kecamatan sebagai berikut:
1. Kelurahan Kedungpane dan Jatibarang : Kecamatan Mijen
2. Kelurahan Kandri dan Jatirejo : Kecamatan Gunungpati
Dalam areal waduk khususnya di Kelurahan Kandri terdapat kawasan
wisata “Goa Kreo”. Berdasarkan perhitungan para staff ahli genangan tertinggi
tidak akan menggenangi objek utama kawasan wisata ini (Dahlan, 2007).
Sungai utama yang dibendung untuk keperluan Waduk Jatibarang adalah
Sungai Kreo. Waduk membendung Sungai Kreo di Dusun Talun Kacang,
Kelurahan Kandri Kecamatan Gunungpati atau tepatnya disebelah utara lokasi
wisata Goa Kreo. Peta lokasi rencana Waduk Jatibarang adalah sebagaimana
terlihat pada Gambar 6.18. dibawah ini:
GAMBAR 6.18
RENCANA PEMBEBASAN TANAH PROYEK WADUK JATIBARANG
Sumber : Dahlan, 2007
A. Manfaat
1. Rencana Pengendalian Banjir
Pengendalian banjir Kota Semarang bagian barat periode ulang 50 tahun
merupakan kombinasi dari (a) Normalisasi Kali Garang/Banjir Kanal Barat
dan (b) Pembangunan Waduk Jatibarang. Pengendalian banjir melalui
Waduk Jatibarang dengan mengurangi debit banjir oleh Waduk Jatibarang
sebesar 170 m³/detik dengan menyediakan tampungan sebesar 2.7 juta m³
GAMBAR 6.19
SISTEM DRAINASE BANJIR KANAL BARAT
Sumber: JICA, 2010
B. Desain Teknis
Tinggi dan kapasitas Waduk Jatibarang dibatasi topografi lereng pada
daerah genangan dan konservasi monumen bersejarah, Goa Kreo.Kapasitas
efektif sebesar 20.400.000 m³ dialokasikan untuk pemanfaatan air dan
pengendalian banjir dari sudut pandang ekonomi. Dari hasil studi, perbandingan
tampungan waduk adalah sebagai berikut:
1. Kapasitas Sedimen : 6,800,000 m³
2. Kapasitas Pengendalian Banjir : 2,700,000 m³
3. Kapasitas Air Baku : 10.900,000 m³
4. Kapasitas Total : 20,400,000 m3
Selain manfaat diatas, Waduk Jatibarang akan mengembangkan
Pembangkit Listrik Tenaga Air dengan kapasitas sebesar 1.500 kW (JICA, 2010).
km/hari pada bulan Agustus sampai 286 km/hari pada bulan Januari. Lamanya
sinar matahari, yang menunjukkan rasio sebenarnya sampai lamanya sinar
matahari maksimum hari, bervariasi dari 46% pada bulan Desember sampai 98%
pada bulan Agustus.
Pemanfaatan air hujan juga perlu dipertimbangkan mengingat curah
hujan yang ada per tahun pada wilayah ini cukup besar, sebagai gambaran
umum curah hujan rata-rata di Kota Semarang di tunjukkan pada Gambar 6.29,
dan Tabel VI.11 – Tabel VI.13 serta Gambar 6.30 – Gambar 6.32 adalah
gambaran curah hujan yang terukur di 3 stasiun yaitu Gunung Pati, Kalisari dan
Banyumeneng, yaitu antara 1442-2614 mm.
Berdasarkan data curah hujan rerata di pos Gunung Pati Di DAS Garang
Hulu (tahun 2003-2010), hujan rata-rata di pos terukur tersebut sebesar 2.614
mm/tahun. Dari data terukur tersebut musim hujan (November – April )
sedangkan musim kemarau ( Mei –Oktober). Curah Hujan rata-rata maksimum
bulan Januari sebesar 577 mm/bulan dan hujan minimal bulan April sebesar 25
mm/bulan.
3000
2500
2000
1500
1000
500
0
1 2 3 4 5 6 7 8 9 10 11 12
Bulan
GAMBAR 6.20
CURAH HUJAN RERATA TAHUNAN DI KOTA SEMARANG
TAHUN 2003 – 2010
Curah hujan bulanan tertinggi terjadi pada bulan Januari yang berkisar
dari 202,1 mm hingga 436,9 mm. Curah hujan bulanan terendah terjadi pada
bulan Juli dengan kisaran hujan antara 14,9 mm hingga 31,6 m. Curah hujan
600
500
400
300
200
100
0
Jan Peb Mar Apr Mei Jun Jul Ags Sep Okt Nop Des
Bulan
Hujan rata - rata
Hujan maksimum
Hujan minimum
GAMBAR 6.21
HUJAN BULANAN POS GUNUNGPATI DI DAS GARANG HULU
(2003-2010)
Sumber: Tabel IV.8
TABEL VI.7
DATA CURAH HUJAN DI POS KALISARI KOTA SEMARANG
TAHUN 2003-2010
300
250
200
150
100
50
0
Jan Peb Mar Apr Mei Jun Jul Ags Sep Okt Nop Des
Rerata Max
GAMBAR 6.22
HUJAN BULANAN POS KALISARI KOTA SEMARANG
(TAHUN 2003-2010)
Sumber : Tabel VI.7
TABEL VI.8
DATA CURAH HUJAN DI POS BANYUMENENG SEMARANG
TAHUN 2003-2010
600
500
Curah Hujan (mm )
400
300
200
100
0
Jan Peb Mar Apr Mei Jun Jul Ags Sep Okt Nop Des
Bulan
GAMBAR 6.23
HUJAN BULANAN POS BANYUMENENG SEMARANG
(TAHUN 2003-2010)
Sumber : Tabel VI.8
salah satu peran utama RWH adalah air komplementer pasokan atau sumber air
alternatif.
Pra studi kelayakan pemanenan air hujan telah dilakukan di Semarang
(2011) dengan pilot project yaitu di Kelurahan Wonosari dan Kelurahan Tandang.
Kegiatan pembangunan sistem pemanenan individu di Kelurahan Wonosari
dilakukan di 5 rumah yang tidak memiliki sumber air bersih sendiri. Kegiatan ini
termasuk persiapan masyarakat dan manajemen, membangun sumur serapan
dan air keran, selokan perawatan, dan pemasangan pipa. Bersamaan dengan
itu, kegiatan komunal sistem panen hujan di Kelurahan Tandang (terletak di SDN
03 Tandang) terdiri dari persiapan masyarakat dan manajemen, menginstal
tangki air, filter, dan tangki penyaring air, selokan, instalasi pipa, dan
penyadapan air.
Berdasarkan studi pra-kelayakan pemanenan hujan (RWH), yang
mencakup pengumpulan dan meninjau data, kelayakan sosial ekonomi,
rekomendasi, desain dan uji coba dalam dua kelurahan, disimpulkan ada
kebutuhan yang kuat untuk mekanisme saling kerjasama antara pemerintah
daerah, masyarakat dan sektor swasta dalam mengembangkan dan menerapkan
Sistem RWH.
Kemudian berdasarkan data dari Badan Lingkungan Hidup Kota
Semarang, kegiatan RWH dari mulai tahun 2011 hingga 2013 disajikan pada
tabel berikut ini.
TABEL VI.9
LOKASI RWH DI KOTA SEMARANG TAHUN 2011
TABEL VI.10
LOKASI RWH DI KOTA SEMARANG TAHUN 2012
TABEL VI.11
LOKASI RWH DI KOTA SEMARANG TAHUN 2013
Dalam hal pemanfaatan guna penyediaan air bersih/ air minum yang
merupakan tujuan dari RISPAM Kota Semarang ini, maka izin dapat diberikan.
Hal tersebut dikarenakan pemanfaatan air baku dalam hal untuk penyediaan air
bersih merupakan salah satu syarat yang harus dipenuhi sehingga dapat
diizinkan.
TABEL VI.12
REKOMENDASI AIR BAKU AIR MINUM
TABEL VI.13
RENCANA PEMANFAATAN POTENSI AIR BAKU AIR MINUM KOTA
SEMARANG TAHUN 2010 – 2033
Tahap I
Tahun 2014 terdapat penambahan produksi
dari IPA TGM sebesar 150 l/det dan
pemanfaatan air hujan (RWH) sebesar 3 l/det
dan peningkatan produksi IPA Kudu menjadi
1100 l/det
2014 - 2018 4.356 – 5.340 Tahun 2015 terdapat pengurangan produksi
sumur dalam perkotaan, karena sudah tidak
direkomendasikan lagi.
Tahun 2015 terdapat penambahan supply
dengan beroprasinya IPA Garang Hulu
sebesar 100 l/det dan IPA Blorong sebesar 100
l/det.
Tahap II
Tahun 2019 terdapat peningkatan pemanfaatan
air hujan (RWH) menjadi 5 l/det.
Tahun 2020 terdapat penambahan supply
dengan beroperasinya secara penuh IPA
2019 - 2023 5.353 – 5.911 Jatibarang sebesar 1000 l/det.
Tahun 2021 terdapat peningkatan pemanfaatan
air hujan (RWH) menjadi 10 l/det.
Adanya peningkatan pelayanan non PDAM tiap
tahun
Tahap III
Tahun 2024 terdapat peningkatan pemanfaatan
air hujan (RWH) menjadi 11 l/det.
Tahun 2026 terdapat peningkatan pemanfaatan
air hujan (RWH) menjadi 12 l/det.
2024 - 2033 5.925 – 6.030 Tahun 2026 terdapat peningkatan pemanfaatan
air hujan (RWH) oleh penduduk menjadi 30
l/det (dari 1% menjadi 5% total penduduk).
Adanya peningkatan pelayanan non PDAM tiap
tahun.
Air Laut
Tak hingga
Hujan
123 l/det
570 l/det
250 l/det
1.000 l/det
10 l/det
15 l/det
200 l/det
100 l/det
GAMBAR 6.24
ALTERNATIF SUMBER AIR BAKU
d. BWK IV meliputi Kecamatan Genuk dengan luas kurang lebih 2.738 (dua ribu
tujuh ratus tiga puluh delapan) hektar;
e. BWK V meliputi Kecamatan Gayamsari dan Kecamatan Pedurungan dengan
luas kurang lebih 2.622 (dua ribu enam ratus dua puluh dua) hektar;
f. BWK VI meliputi Kecamatan Tembalang dengan luas kurang lebih 4.420 (empat
ribu empat ratus dua puluh) hektar;
g. BWK VII meliputi Kecamatan Banyumanik dengan luas kurang lebih 2.509 (dua
ribu lima ratus sembilan) hektar;
h. BWK VIII meliputi Kecamatan Gunungpati dengan luas kurang lebih 5.399 (lima
ribu tiga ratus Sembilan puluh sembilan) hektar;
i. BWK IX meliputi Kecamatan Mijen dengan luas kurang lebih 6.213 (enam ribu
dua ratus tiga belas) hektar; dan
j. BWK X meliputi Kecamatan Ngaliyan dan Kecamatan Tugu dengan luas kurang
lebih 6.393 (enam ribu tiga ratus Sembilan puluh tiga) hektar.
Masing-masing BWK dikembangkan dengan fungsi sebagai berikut :
a. Perkantoran, perdagangan dan jasa di BWK I, BWK II, BWK III;
b. Pendidikan kepolisian dan olah raga di BWK II;
c. Transportasi udara dan transportasi laut di BWK III;
d. Industri di BWK IV dan BWK X;
e. Pendidikan di BWK VI dan BWK VIII;
f. Perkantoran militer di BWK VII; dan
g. Kantor pelayanan publik di BWK IX.
Rencana Penetapan Pusat Pelayanan Kota Semarang meliputi :
a. Pusat pelayanan kota, ditetapkan untuk BWK I, BWK II, dan BWK III. Pusat
pelayanan skala kota berfungsi sebagai pusat pelayanan pemerintahan Kota
dan pusat kegiatan perdagangan dan jasa.
Pusat kegiatan pemerintahan berupa pusat pelayanan kegiatan pemerintahan yang
dilengkapi dengan pengembangan fasilitas, meliputi :
– Kantor Walikota; dan
– Fasilitas kantor pemerintahan pendukung dan pelayanan publik.
Pusat pelayanan perdagangan dan jasa skala kota dilengkapi dengan :
– Pusat perbelanjaan skala kota;
– Perkantoran swasta; dan
b. Sub pusat pelayanan kota. Sub pusat pelayanan kota merupakan pusat BWK
yang dilengkapi dengan sarana lingkungan perkotaan skala pelayanan BWK
yang meliputi :
– Sarana perdagangan dan jasa;
– Sarana pendidikan;
– Sarana kesehatan;
– Sarana peribadatan; dan
– Sarana pelayanan umum.
Rencana lokasi pengembangan sub pusat pelayanan kota dimasing-masing BWK
meliputi :
– Sub pusat pelayanan kota di BWK II meliputi Kelurahan Sampangan dan
Kelurahan Bendan Ngisor;
– Sub pusat pelayanan kota di BWK III meliputi Kelurahan Cabean, Kelurahan
Salaman Mloyo, dan Kelurahan Karangayu.
– Sub pusat pelayanan kota di BWK IV meliputi Kelurahan Genuksari dan
Kelurahan Banjardowo;
– Sub pusat pelayanan kota di BWK V meliputi Kelurahan Palebon, Kelurahan
Gemah, Kelurahan Pedurungan Kidul, Kelurahan Pedurungan Tengah, dan
Kelurahan Pedurungan Lor;
– Sub pusat pelayanan kota di BWK VI meliputi Kelurahan Meteseh dan
Kelurahan Sendangmulyo;
– Sub pusat pelayanan kota di BWK VII meliputi Kelurahan Srondol Kulon,
Kelurahan Srondol Wetan, Kelurahan Banyumanik;
– Sub pusat pelayanan kota di BWK VIII meliputi Kelurahan Gunungpati,
Kelurahan Plalangan, Kelurahan Cepoko, dan Kelurahan Nongkosawit;
– Sub pusat pelayanan kota di BWK IX meliputi Kelurahan Mijen, Kelurahan
Jatibarang, Kelurahan Wonolopo; dan
– Sub pusat pelayanan kota di BWK X meliputi Kelurahan Mangkang Kulon,
Kelurahan Mangkang Wetan, dan Kelurahan Wonosari.
Untuk mengurangi timbulan sampah dari TPST yang dibawa ke TPA, setiap TPST
dilengkapi dengan fasilitas pengolahan sampah.
Rencana sistem pembuangan air limbah bahan berbahaya dan beracun akan
ditetapkan lebih lanjut berdasarkan peraturan perundang-undangan.
b. Sistem pembuangan air limbah industri dan kegiatan komersial, meliputi:
– Pengembangan sistem instalasi pengolahan air limbah (IPAL) industri di
kawasan industri di Kecamatan Tugu, Kecamatan Ngaliyan, Kecamatan Genuk
dan Kecamatan Pedurungan; dan
– Pengembangan sistem instalasi pengolahan air limbah (IPAL) kegiatan
perdagangan dan jasa di pusat pelayanan kota dan sub pusat pelayanan kota.
c. Sistem pembuangan air limbah rumah tangga baik individual maupun komunal,
meliputi:
– Sistem pembuangan air limbah rumah tangga individual diarahkan pada
kawasan perumahan kepadatan rendah di kecamatan tembalang, kecamatan
banyumanik, kecamatan gunungpati, kecamatan mijen dan kecamatan ngaliyan;
dan
– Sistem pembuangan air limbah rumah tangga komunal diarahkan pada
kawasan perumahan kepadatan tinggi di seluruh kecamatan.
– Sub Sistem Sungai Tugurejo dengan luas kurang lebih 733 (tujuh ratus tiga
puluh tiga) hektar meliputi Sungai Jumbleng, Sungai Buntu, Sungai Tambak
Harjo dan Sungai Tugurejo;
– Sub Sistem Sungai Silandak dengan luas kurang lebih 926 (sembilan ratus dua
puluh enam) hektar;
– Sub Sistem Sungai Siangker dengan luas kurang lebih 1.022 (seribu dua puluh
dua) hektar meliputi saluran Madukoro, Sungai Tawang, Sungai Karangayu,
Sungai Ronggolawe dan Sungai Siangker; dan
– Sub Sistem Bandar Udara Ahmad Yani dengan luas kurang lebih 424 (empat
ratus dua puluh empat) hektar adalah Saluran Lingkar Selatan Barat yang
meliputi Sungai Selinga, Sungai Simangu, Sungai Tawang dan Sungai Banteng
yang merupakan kawasan drainase semi tertutup.
c. Sistem drainase Semarang Tengah
Sistem Drainase Semarang Tengah memiliki luas daerah aliran sungai kurang
lebih 22.307 (dua puluh dua ribu tiga ratus tujuh) hektar yang terdiri dari 8 (delapan)
sub sistem meliputi :
– Sub Sistem Sungai Banjir Kanal Barat dengan luas kurang lebih 2.005 (dua ribu
lima) hektar meliputi Sungai Kripik, Sungai Kreo dan Sungai Garang terletak di
Kota Semarang dan Kabupaten Semarang;
– Sub Sistem Sungai Bulu dengan luas kurang lebih 94 (sembilan puluh empat)
hektar meliputi Saluran Jl. Hasanudin, Saluran Jl. Brotojoyo, Saluran Panggung
Kidul dan Saluran Bulu Lor;
– Sub Sistem Sungai Semarang dengan luas kurang lebih 1.352 (seribu tiga ratus
lima puluh dua) hektar;
– Sub Sistem Sungai Simpang Lima dengan luas kurang lebih 340 (tiga ratus
empat puluh) hektar;
– Sub Sistem Sungai Banger dengan luas kurang lebih 524 (lima ratus dua puluh
empat) hektar.
– Sub Sistem Sungai Bandarharjo dengan luas kurang lebih 302 (tiga ratus dua)
hektar;
– Sub Sistem Sungai Asin dengan luas kurang lebih 282 (dua ratus delapan puluh
dua) hektar; dan
– Sub Sistem Sungai Baru dengan luas kurang lebih 186 (seratus delapan puluh
enam) hektar.
d. Sistem drainase Semarang Timur.
Sistem Drainase Semarang Timur memiliki luas daerah aliran sungai kurang
lebih 31.043 (tiga puluh satu ribu empat puluh tiga) hektar yang terdiri dari 5 (lima)
sub sistem meliputi :
– Sub Sistem Banjir Kanal Timur dengan luas kurang lebih 3.705 (tiga ribu tujuh
ratus lima) hektar meliputi Sungai Candi, Sungai Bajak, Sungai Kedungmundu
dan Saluran Bulu Lor;
– Sub Sistem Sungai Tenggang dengan luas kurang lebih 1.138 (seribu seratus
tiga puluh delapan) hektar;
– Sub Sistem Sungai Sringin dengan luas kurang lebih 1.527 (seribu lima ratus
dua puluh tujuh) hektar;
– Sub Sistem Sungai Babon dengan luas kurang lebih 12.715 (dua belas ribu
tujuh ratus lima belas) hektar meliputi Sungai Gede, Sungai Meteseh, Sungai
Jetak dan Sungai Sedoro; dan
– Sub Sistem Sungai Pedurungan dengan luas kurang lebih 1.077 (seribu tujuh
puluh tujuh) hektar.
GAMBAR 7.1
RENCANA TATA RUANG WILAYAH KOTA SEMARANG TAHUN 2011-2031
sebelumnya. IPA Sungai Garang terdiri dari 4 IPA dengan nama IPA Sungai Garang
I sampai IV.
Proyek pembuatan dam serbaguna di Jatibarang akan menjamin
kestabilan suplai air baku kepada IPA Sungai Garang pada kondisi 1.130 l/detik.
Tidak ada rencana ekstensi dan pengembangan lebih jauh dari IPA Sungai Garang.
Oleh karena itu, kapasitas saat ini sebesar 1.130 l/detik digunakan sebagai dasar
perhitungan proyeksi sampai tahun 2033. Walaupun demikian, adalah sangat
penting untuk tetap melalukan perawatan, rehabilitasi dan peningkatan unutk
menjaga kapasitas IPA agar selalu dalam kondisi maksimal.
Semarang, JBIC Loan IP-534. Salah satu tujuan dari proyek ini adalah untuk
membuat sumber air baku yang baru untuk Kota Semarang untuk melayani
kebutuhan air masa depan. Kapasitas air baku direncanakan sebesar 2,400 l/detik;
termasuk juga untuk menyuplai IPA Kaligarang eksisting. Pengoperasian IPA
Jatibarang direncanakan akan dimulai pada tahun 2017 dengan kapasitas awal
sebesar 500 l/detik.
Sawah Besar, Sambirejo, Siwalan, Trimulyo, Terboyo Wetan, Terboyo Kulon, Banjar
Dowo dan lain sebagainya akan mendapatkan alternatif sebagai berikut:
Mendapatkan bantuan tangki air dan kios air dari PDAM
Dapat mengembangkan SPAM non perpipaan dengan syarat daerah
tersebut memiliki cadangan air yang memadai dan dikelola secara lestari
TABEL VII.1
RENCANA PENAMBAHAN SR PELAYANAN PERPIPAAN (PDAM) KOTA SEMARANG
GAMBAR 7.1
EKSISTING SUPPLY AIR DAN ALOKASI SETIAP CABANG
Sumber : Analisis Konsultan, 2013
GAMBAR 7.2
PROYEKSI RENCANA SUPPLY AIR DAN ALOKASI SETIAP CABANG
Sumber : Analisis Konsultan, 2013
TABEL VII.2
RENCANA PENGEMBANGAN SPAM NON-PERPIPAAN (L/S)
Eksisting (lps) Tahap I (lps) Tahap 2 (lps) Tahap 3 (lps)
Lokasi
2013 2014 2016 2018 2019 2021 2023 2025 2029 2033
Cabang Timur 136 136 137 132 129 125 121 117 111 105
Cabang Selatan 174 179 182 190 194 202 210 218 236 253
Cabang Utara 39 39 39 37 36 34 32 30 27 25
Cabang Tengah 29 29 29 29 30 30 30 31 31 32
Cabang Barat 471 490 513 536 548 572 597 621 672 723
Total 849 874 901 924 937 962 989 1.018 1.077 1.139
Sumber: Analisis Konsultan (2014)
TABEL VII.3
RENCANA PENGEMBANGAN SRSPAM NON-PERPIPAAN CABANG TIMUR
TAHAP I TAHAP II TAHAP III
KECAMATAN KELURAHAN 2014 2016 2018 2019 2021 2023 2025 2027 2029 2033
PROYEKSI JUMLAH SR
Genuk MUKTIHARJO LOR 280 290 310 291 282 266 251 238 216 198
GENUKSARI 320 331 354 332 322 304 287 272 247 226
BANGETAYU KULON 410 425 454 426 413 389 368 349 316 289
BANGETAYU WETAN 150 155 166 156 151 142 135 128 116 106
SAMBUNGHARJO 565 585 626 587 569 536 507 481 436 399
PENGGARON LOR 200 207 222 208 201 190 179 170 154 141
KUDU 150 155 166 156 151 142 135 128 116 106
BANJAR DOWO 590 590 590 553 536 505 478 453 411 376
TRIMULYO 190 190 190 178 173 163 154 146 132 121
TERBOYO WETAN 920 920 920 862 836 788 745 707 641 586
TERBOYO KULON 10 10 10 9 9 9 8 8 7 6
Gayamsari PANDEAN LAMPER 20 20 20 19 18 17 16 15 14 13
GAYAMSARI 10 10 10 9 9 9 8 8 7 6
SIWALAN 370 370 370 347 336 317 300 284 258 236
SAWAH BESAR 240 240 240 225 218 206 194 184 167 153
KALIGAWE 130 130 130 122 118 111 105 100 91 83
Pedurungan PEDURUNGAN KIDUL 400 400 400 375 363 343 324 307 279 255
PLAMONGANSARI 400 400 400 375 363 343 324 307 279 255
PENGGARON KIDUL 140 140 140 131 127 120 113 108 98 89
PEDURUNGAN LOR 290 290 290 272 264 248 235 223 202 185
TLOGOMULYO 200 200 200 187 182 171 162 154 139 127
PEDURUNGAN
20 20 20 19 18 17 16 15 14 13
TENGAH
KALICARI 140 140 140 131 127 120 113 108 98 89
TLOGOSARI KULON 400 400 400 375 363 343 324 307 279 255
TLOGOSARI WETAN 590 590 590 553 536 505 478 453 411 376
MUKTIHARJO KIDUL 130 130 130 122 118 111 105 100 91 83
Tembalang ROWOSARI 769 769 717 672 652 615 581 551 500 457
BULUSAN 1330 1330 1330 1330 1330 1330 1330 1330 1330 1330
MANGUNHARJO 640 640 640 640 640 640 640 640 640 640
SENDANG MULYO 550 550 513 481 466 440 416 394 357 327
SAMBIROTO 660 660 660 660 660 660 660 660 660 660
TANDANG 1260 1260 1260 1260 1260 1260 1260 1260 1260 1260
KEDUNG MUNDU 430 430 430 430 430 430 430 430 430 430
SENDANGGUWO 670 670 670 670 670 670 670 670 670 670
TOTAL 13.574 13.648 13.709 13.162 12.913 12.458 12.053 11.689 11.064 10.546
TABEL VII.4
RENCANA PENGEMBANGAN SRSPAM NON-PERPIPAAN CABANG SELATAN
TABEL VII.5
RENCANA PENGEMBANGAN SRSPAM NON-PERPIPAAN CABANG UTARA
TABEL VII.6
RENCANA PENGEMBANGAN SRSPAM NON-PERPIPAAN CABANG TENGAH
TABEL VII.7
RENCANA PENGEMBANGAN SRSPAM NON-PERPIPAAN CABANG BARAT
GAMBAR 7.3
SISTEM PELAYANAN NON-PERPIPAAN (NON-PDAM) EKSISTING
Sumber : Analisis Konsultan, 2013
GAMBAR 7.4
SISTEM PELAYANAN PERPIPAAN (PDAM) EKSISTING
Sumber : Analisis Konsultan, 2013
GAMBAR 7.5
SKEMA PELAYANAN DISTRIBUSI AIR MINUM PERPIPAAN (PDAM) KOTA SEMARANG EKSISTING
Sumber : Analisis Konsultan, 2013
TABEL VII.8
RENCANA PENGEMBANGAN SPAM PERPIPAAN (PDAM) JANGKA PENDEK
Tahun
No Program Kegiatan
2013-2014 2015 2016 2017 2018
SISTEM PERPIPAAN
A PROGRAM FISIK
Res (Mangunharjo),
Reservoir (Setuk, IPA Blorong 200 lps, Res (Kemijen), IPA
1 UNIT PRODUKSI IPA Blorong 100 lps,
Gombel, IPA Pramuka 100 lps JTB 500 lps
IPA Pramuka 100 lps
IPA Kaligarang -
Gajahmungkur Ø 500 transmisi utk
transmisi utk
2 JARINGAN TRANSMISI DAN PIPA DISTRIBUSI mm, transmisi utk reservoir, Cangkiran-
reservoir, Plered- reservoir
Ngaliyan
L.Gempal
Permata Puri,
Jomblang, Karangroto- Wilayah Sulanji
Kudu, Greenwood-
Graha, Perum Koveri, Wilayah
3 JARINGAN DISTRIBUSI DAN PIPA DINAS Kalialang, jaringan
MBR, Kaligawe, Perum BPI, Cangkiran- Banyumanik
Bugangan Baru, Ngaliyan
Simongan
PENGALIHAN (SWITCHING) PERPIPAAN
4
DISTRIBUSI SEMARANG BARAT
SISTEM JARINGAN DISTRIBUSI PERPIPAAN AIR
5
MINUM WILAYAH SEMARANG BARAT
6 PENAMBAHAN SAMBUNGAN BARU
7 PENGEMBANGAN ZONING
8 KEGIATAN PENUNJANG
9 KEGIATAN OPERATION & MAINTENANCE IPA
B PROGRAM NON-FISIK
C PROGRAM PENGURANGAN NRW
SISTEM NON-PERPIPAAN
A PROGRAM FISIK
B PROGRAM NON-FISIK
C PERLINDUNGAN SUMBER DAYA AIR
TABEL VII.9
RENCANA PENGEMBANGAN SPAM PERPIPAAN (PDAM) JANGKA MENENGAH
Tahun
No Program Kegiatan
2019 2020 2021 2022 2023
SISTEM PERPIPAAN
A PROGRAM FISIK
1 UNIT PRODUKSI IPA JTB 1000 lps Persiapan Ekspansi IPA Kudu
2 JARINGAN TRANSMISI DAN PIPA DISTRIBUSI
3 JARINGAN DISTRIBUSI DAN PIPA DINAS
4 PENAMBAHAN SAMBUNGAN BARU
5 PENGEMBANGAN ZONING
6 KEGIATAN PENUNJANG
7 KEGIATAN OPERATION & MAINTENANCE IPA
B PROGRAM NON-FISIK
C PROGRAM PENGURANGAN NRW
SISTEM NON-PERPIPAAN
A PROGRAM FISIK
B PROGRAM NON-FISIK
C PERLINDUNGAN SUMBER DAYA AIR
TABEL VII.10
RENCANA PENGEMBANGAN SPAM PERPIPAAN (PDAM) JANGKA PANJANG
Tahun
No Program Kegiatan
2024 2025 2027 2029 2033
SISTEM PERPIPAAN
A PROGRAM FISIK
Ekspansi IPA Ekspansi IPA
1 UNIT PRODUKSI
Kudu 200 lps Kudu 570 lps
2 JARINGAN TRANSMISI DAN PIPA DISTRIBUSI
3 JARINGAN DISTRIBUSI DAN PIPA DINAS
4 PENAMBAHAN SAMBUNGAN BARU
5 PENGEMBANGAN ZONING
6 KEGIATAN PENUNJANG
7 KEGIATAN OPERATION & MAINTENANCE IPA
B PROGRAM NON-FISIK
C PROGRAM PENGURANGAN NRW
SISTEM NON-PERPIPAAN
A PROGRAM FISIK
B PROGRAM NON-FISIK
C PERLINDUNGAN SUMBER DAYA AIR
GAMBAR 7.6
REKOMENDASI RENCANA PENGEMBANGAN SPAM (SISTEM PERPIPAAN)
Sumber : Analisis Konsultan, 2013
1. Reservoir Setuk
GAMBAR 7.7
PERIJINAN, PEMBEBASAN LAHAN DAN PEMBANGUNAN RESERVOIR SETUK 5.000 M 3
Sumber : Analisis Konsultan, 2013
GAMBAR 7.8
SKEMA SPAM DARI RESERVOIR SETUK
Sumber : Analisis Konsultan, 2013
2. Reservoir Gombel
GAMBAR 7.9
PERIJINAN, PEMBEBASAN LAHAN DAN PEMBANGUNAN RESERVOIR GOMBEL 2.500 M3
Sumber : Analisis Konsultan, 2013
GAMBAR 7.10
SKEMA SPAM DARI RESERVOIR GOMBEL
Sumber : Analisis Konsultan, 2013
GAMBAR 7.11
PERIJINAN, PEMBEBASAN DAN PEMBANGUNAN IPA PRAMUKA 100 L/DETIK
Sumber : Analisis Konsultan, 2013
GAMBAR 7.12
SKEMA SPAM DENGAN IPA PRAMUKA 100 L/DETIK
Sumber : Analisis Konsultan, 2013
GAMBAR 7.13
PERIJINAN, PEMBEBASAN DAN PEMBANGUNAN IPA BLORONG 200 L/DETIK
Sumber : Analisis Konsultan, 2013
GAMBAR 7.14
SKEMA SPAM DENGAN IPA BLORONG 200 L/DETIK
Sumber : Analisis Konsultan, 2013
5. Reservoir Mangunharjo
GAMBAR 7.15
PERIJINAN, PEMBEBASAN DAN PEMBANGUNAN RESERVOIR MANGUNHARJO 1.000 M3
Sumber : Analisis Konsultan, 2013
6. Reservoir Kemijen
GAMBAR 7.16
PERIJINAN, PEMBEBASAN DAN PEMBANGUNAN RESERVOIR KEMIJEN 2.000 M3
Sumber : Analisis Konsultan, 2013
GAMBAR 7.17
SKEMA SPAM DARI RESERVOIR KEMIJEN
Sumber : Analisis Konsultan, 2013
GAMBAR 7.18
PERIJINAN, PEMBEBASAN DAN PEMBANGUNAN RESERVOIR TANAH MAS 2.000 M3
Sumber : Analisis Konsultan, 2013
GAMBAR 7.19
SKEMA SPAM DARI RESERVOIR TANAH MAS
Sumber : Analisis Konsultan, 2013
GAMBAR 7.20
JARINGAN PIPA TRANSMISI IPA KALIGARANG - GAJAHMUNGKUR Ø 500 MM
Sumber : Analisis Konsultan, 2013
GAMBAR 7.21
JARINGAN PIPA TRANSMISI INPUT RESERVOIR SETUK Ø 500 & 400 MM
Sumber : Analisis Konsultan, 2013
GAMBAR 7.22
JARINGAN PIPA TRANSMISI PLERED - LEMAH GEMPAL Ø 500 MM
Sumber : Analisis Konsultan, 2013
GAMBAR 7.23
REHAB JARINGAN PIPA WILAYAH TANAH MAS TAHAP 6 DAN 7
Sumber : Analisis Konsultan, 2013
GAMBAR 7.24
PEMASANGAN PIPA & PENGAMANANNYA - SUNGAI KREO Ø 600 MM
Sumber : Analisis Konsultan, 2013
GAMBAR 7.25
JARINGAN PIPA DISTRIBUSI PRIMER CANGKIRAN - NGALIYAN Ø 315 MM
Sumber : Analisis Konsultan, 2013
GAMBAR 7.26
JARINGAN PIPA DISTRIBUSI RESERVOIR MANGUNHARJO Ø 315 MM
Sumber : Analisis Konsultan, 2013
GAMBAR 7.27
SKEMA SPAM DARI RESERVOIR MANGUNHARJO
Sumber : Analisis Konsultan, 2013
GAMBAR 7.28
REPOSISI JARINGAN PIPA KOLEKTOR Ø 450 MM DARI SUMUR W2-W6
Sumber : Analisis Konsultan, 2013
GAMBAR 7.29
JARINGAN PIPA TRANSMISI SEKARAN - GUNUNG PATI
Sumber : Analisis Konsultan, 2013
GAMBAR 7.30
JARINGAN TRANSMISI 5 DISTRIK
Sumber : Analisis Konsultan, 2013
GAMBAR 7.31
SKEMA SPAM 5 ZONA/DISTRIK DARI IPA WADUK JATIBARANG
Sumber : Analisis Konsultan, 2013
70 lps ke Tanah
Putih
IPA KG 1
363 lps
30 lps ke Jangli
70 lps ke Akpol,
dan Harmoni
Karangrejo,
Semeru
GAMBAR 7.32
SWITCHING JARINGAN ALIRAN GAJAH MUNGKUR
Sumber : Analisis Konsultan, 2013
GAMBAR 7.33
SKEMA SPAM SWITCHING DARI IPA GAJAHMUNGKUR DAN RESERVOIR SETUK
Sumber : Analisis Konsultan, 2013
GAMBAR 7.34
PELAYANAN SWITCHING/PENGALIHAN DARI IPA GAJAH MUNGKUR – RES. KEPOH
Sumber : Analisis Konsultan, 2013
45 lps ke Sekaran
70 lps ke Wungkal
80 lps ke Sadeng & Kasab
Green Wood
40 eksisting
40 rencana
GAMBAR 7.35
SWITCHING JARINGAN ALIRAN GUNUNG PATI
Sumber : Analisis Konsultan, 2013
GAMBAR 7.36
SKEMA SPAM SWITCHING DARI RESERVOIR GUNUNG PATI
Sumber : Analisis Konsultan, 2013
GAMBAR 7.37
PELAYANAN SWITCHING/PENGALIHAN DARI GUNUNG PATI
Sumber : Analisis Konsultan, 2013
GAMBAR 7.38
JARINGAN PIPA DISTRIBUSI UNTUK PROGRAM MBR (3.500 UNIT)
Sumber : Analisis Konsultan, 2013
GAMBAR 7.39
PLOTTING WILAYAH PELAYANAN PROGRAM MBR (3.500 UNIT)
Sumber : Analisis Konsultan, 2013
GAMBAR 7.40
JARINGAN PIPA DISTRIBUSI RESERVOIR WONOSARI – PELAYANAN ZONA/DISTRIK 1
Sumber : Analisis Konsultan, 2013
GAMBAR 7.41
JARINGAN PIPA DISTRIBUSI RESERVOIR DESEL – PELAYANAN ZONA/DISTRIK 2 (JAR PIPA DISTRIBUSI WILAYAH
PERUM KOVERI Ø 110 & 63 MM; JAR PIPA DISTRIBUSI WILAYAH SULANJI GRAHA Ø 110 & 63 MM)
Sumber : Analisis Konsultan, 2013
GAMBAR 7.42
JARINGAN PIPA DISTRIBUSI RESERVOIR BAMBANKEREP – PELAYANAN ZONA/DISTRIK 3
(JAR PIPA DISTRIBUSI WILAYAH PERUM BPI Ø 110 & 63 MM)
Sumber : Analisis Konsultan, 2013
GAMBAR 7.43
JARINGAN PIPA DISTRIBUSI RESERVOIR MANYARAN 1 - PELAYANAN ZONA/DISTRIK 4
Sumber : Analisis Konsultan, 2013
GAMBAR 7.44
JARINGAN PIPA DISTRIBUSI RESERVOIR MANYARAN 2 – PELAYANAN ZONA/DISTRIK 5
Sumber : Analisis Konsultan, 2013
GAMBAR 7.45
REKOMENDASI RENCANA PENGEMBANGAN SPAM (SISTEM NON-PERPIPAAN)
Sumber : Analisis Konsultan, 2013
GAMBAR 7.46
REKOMENDASI RENCANA PENGEMBANGAN SPAM (SISTEM PERPIPAAN DAN NON-PERPIPAAN)
Strategi Manajemen
Demand Air Bersih
GAMBAR 7.47
KONSEP WATER DEMAND MANAGEMENT KOTA SEMARANG
TABEL VII.11
PROYEKSI KEBUTUHAN AIR MINUM DOMESTIK KOTA SEMARANG 2013 – 2033
B KEBUTUHAN DOMESTIK
1 Penduduk jiwa 1.526.398 1.580.258 1.601.603 1.645.161 1.689.904 1.712.730 1.759.310 1.807.158 1.856.306 1.958.650 2.066.636
2 Cakupan pelayanan % 58% 59% 61% 70% 92% 95% 97% 99% 100% 100% 100%
3 Penduduk terlayani
a. Total jiwa 772.494 885.378 921.378 1.080.378 1.442.298 1.475.298 1.560.498 1.624.098 1.762.098 1.921.239 2.004.866
b. Sambungan Rumah(SR) jiwa 128.749 147.563 156.063 185.063 243.563 259.563 273.763 284.363 307.363 333.899 347.918
c. Hidran Umum (HU) jiwa 386 354 369 324 288 295 75 25 25 25 25
4 Kebutuhan Air Domestik
a. SR l/dt 1.251,7 1.455,1 1.625,7 1.927,7 2.621,7 2.884,0 3.041,8 3.159,6 3.308,4 3.594,0 3.744,9
b. HU l/dt 0,3 0,2 0,3 0,2 0,2 0,2 0,1 0,0 0,0 0,0 0,0
TOTAL KEBUTUHAN DOMESTIK l/dt 1.252 1.455 1.626 1.928 2.622 2.884 3.042 3.160 3.308 3.594 3.745
Sumber : Analisis Konsultan, 2013
TABEL VII.12
PROYEKSI KEBUTUHAN AIR MINUM NON-DOMESTIK KOTA SEMARANG 2013 – 2033
TABEL VII.13
PROYEKSI KEBUTUHAN AIR DOMESTIK PER CABANG PDAM KOTA SEMARANG
TABEL VII.14
PROYEKSI KEBUTUHAN AIR TOTAL (DOMESTIK DAN NON-DOMESTIK) KOTA SEMARANG
TABEL VII.15
PROYEKSI SUPLAI AIR TOTAL (PDAM, NON PDAM, DAN SUMBER TERBARUKAN) KOTA SEMARANG
Eksisting Proyeksi
9.000
8.000
7.000 6632,76
6502,50
6371,91
6251,58
6137,40
6020,82
Kebutuhan air (liter/detik)
5862,985929,09
6.000 5536,685557,655578,725638,38
5402,375465,77
5279,65
4886,90
5.000 4709,87
3771,39
4.000
3377,83
3212,73
2916,86
2780,76
3.000 2600,472553,89
2.000
1.000
0
2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030 2032
Tahun
Suplai Kebutuhan rata-rata (l/dtk) Kebutuhan harian maksimum Kebutuhan jam puncak NRW
GAMBAR 7.48
PROYEKSI KEBUTUHAN AIR KOTA SEMARANG 2013 – 2033
Sumber: Analisis Konsultan, 2013
GAMBAR 7.49
PROYEKSI SUPLAI DAN KEBUTUHAN AIR KOTA SEMARANG 2013 – 2033
Sumber: Analisis Konsultan, 2013
GAMBAR 7.50
ANALISIS HIDROLIKA SPAM KOTA SEMARANG (JARINGAN PIPA PRIMER)
Sumber : Analisis Konsultan, 2013
TABEL VII.16
ANALISIS KAPASITAS SISTEM RENCANA (PDAM) KECAMATAN TUGU
TABEL VII.17
ANALISIS KAPASITAS SISTEM RENCANA (PDAM) KECAMATAN GAJAH MUNGKUR
TABEL VII.18
ANALISIS KAPASITAS SISTEM RENCANA (PDAM) KECAMATAN GAYAMSARI
TABEL VII.20
ANALISIS KAPASITAS SISTEM RENCANA (PDAM) KECAMATAN GUNUNGPATI
KONDISI DAERAH (2012) PDAM
TABEL VII.21
ANALISIS KAPASITAS SISTEM RENCANA (PDAM) KECAMATAN MIJEN
TABEL VII.22
ANALISIS KAPASITAS SISTEM RENCANA (PDAM) KECAMATAN NGALIYAN
TABEL VII.23
ANALISIS KAPASITAS SISTEM RENCANA (PDAM) KECAMATAN PEDURUNGAN
TABEL VII.24
ANALISIS KAPASITAS SISTEM RENCANA (PDAM) KECAMATAN SEMARANG BARAT
TABEL VII.25
ANALISIS KAPASITAS SISTEM RENCANA (PDAM) KECAMATAN SEMARANG SELATAN
TABEL VII.26
ANALISIS KAPASITAS SISTEM RENCANA (PDAM) KECAMATAN SEMARANG TIMUR
TABEL VII.27
ANALISIS KAPASITAS SISTEM RENCANA (PDAM) KECAMATAN SEMARANG TIMUR
TABEL VII.28
ANALISIS KAPASITAS SISTEM RENCANA (PDAM) KECAMATAN SEMARANG UTARA
TABEL VII.29
ANALISIS KAPASITAS SISTEM RENCANA (PDAM) KECAMATAN TEMBALANG
TABEL VII.30
ANALISIS KAPASITAS SISTEM RENCANA (PDAM) KECAMATAN BANYUMANIK
TABEL VII.31
ANALISIS KAPASITAS SISTEM RENCANA (PDAM) KECAMATAN CANDISARI
TABEL VII.32
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN PENGETESAN,
4.1.5 PENGGELONTORAN DAN DISINFEKSI
PIPA
1 Pengetesan Pipa :
- Pipa HDPE Ø 560 mm 4,266 m 18,800,620.34
- Pipa HDPE Ø 450 mm 2,034 m 7,368,440.00
- Pipa HDPE Ø 355 mm 3,204 m 9,609,120.24
- Pipa HDPE Ø 280 mm 4,176 m 10,357,929.91
- Pipa HDPE Ø 225 mm 4,614 m 10,882,884.92
2 Penggelontoran dan Disinfeksi Pipa : -
- Pipa HDPE Ø 560 mm 4,266 m 25,307,123.54
PEKERJAAN PENGETESAN,
4.2.5 PENGGELONTORAN DAN DISINFEKSI
PIPA
Pengetesan Pipa :
Pipa HDPE Ø 355 mm 7,302 m 21,899,391.69
Penggelontoran dan Disinfeksi Pipa :
Pipa HDPE Ø 355 mm 7,302 m 26,426,631.69
4.2.6 Kontingensi 2,063,872,802.34
Pengetesan Pipa : -
- Pipa HDPE Ø 560 mm 300 M 1,299,247.20
- Pipa HDPE Ø 500 mm 300 M 1,137,427.20
- Pipa HDPE Ø 450 mm 240 M 860,093.76
- Pipa HDPE Ø 400 mm 2,520 M 7,725,677.40
- Pipa HDPE Ø 355 mm 1,500 M 4,452,142.50
- Pipa HDPE Ø 280 mm 2,172 M 5,328,385.15
- Pipa HDPE Ø 225 mm 1,470 M 3,433,061.52
- Pipa HDPE Ø 180 mm 6,024 M 12,770,675.18
- Pipa HDPE Ø 110 mm 1,794 M 2,324,275.90
Penggelontoran dan Disinfeksi Pipa : -
- Pipa HDPE Ø 560 mm 300 M 1,756,807.20
- Pipa HDPE Ø 500 mm 300 M 1,433,167.20
- Pipa HDPE Ø 450 mm 240 M 1,046,837.76
- Pipa HDPE Ø 400 mm 2,520 M 9,483,377.40
- Pipa HDPE Ø 355 mm 1,500 M 5,382,142.50
- Pipa HDPE Ø 280 mm 2,172 M 6,506,695.15
- Pipa HDPE Ø 225 mm 1,470 M 4,116,611.52
- Pipa HDPE Ø 180 mm 6,024 M 14,638,115.18
- Pipa HDPE Ø 110 mm 1,794 M 2,741,380.90
-
KONTINGENSI 10 % 1,687,583,378.79
-
PENGADAAN DAN PEMASANGAN
5.1.5 PIPA JARINGAN DISTRIBUSI UTAMA -
DISTRIK 5
PEKERJAAN PERSIAPAN -
KONTINGENSI 10 % 5,516,392,341.31
7 PENGEMBANGAN ZONING
7.1 Penggantian Meter Mati, Bureng & Ngembun 233,767 unit 88,150,807,070.26
7.2 Penggantian Meter Reguler 100,471 unit 37,941,603,030.11
7.3 Pengadaan Water Meter Induk Eksisting
Cabang Semarang Barat 5 unit 1,500,000,000.00
Cabang Semarang Timur 7 unit 2,100,000,000.00
Cabang Semarang Utara 6 unit 1,800,000,000.00
Cabang Semarang Selatan 8 unit 2,400,000,000.00
Cabang Semarang Tengah 10 unit 3,000,000,000.00
7.4 Pengadaan Water Meter Induk Rencana
Cabang Semarang Barat 15 unit 1,500,000,000.00
Cabang Semarang Timur 3 unit 900,000,000.00
Cabang Semarang Utara 2 unit 600,000,000.00
8 KEGIATAN PENUNJANG
8.1 Mekanikal & Elektrikal 20 LS 170,336,794,594.21
8.2 Alat-alat laboratorium 20 LS 11,972,594,345.53
8.3 Alat-alat bengkel 20 LS 18,132,561,392.19
8.4 Kendaraan 20 LS 123,625,870,893.11
8.5 Meubeler kantor 20 LS 9,677,964,792.83
8.6 Mesin-mesin kantor 20 LS 49,317,274,588.65
8.7 Bangunan Kantor 20 LS 41,214,062,956.12
8.8 Bangunan & perbaikannya 20 LS 49,498,760,637.85
8.9 Rupa-rupa peralatan kantor 20 LS 394,236,797.64
8.10 Pengurusan sertifikat tanah 20 LS 10,284,438,105.87
8.11 Bangunan dan Perbaikan IPA 20 LS 1,641,796,000.00
8.12 Lain-lain -
SISTEM NON-PERPIPAAN
A PROGRAM FISIK
1 Unit Produksi (program 20 tahun) 178 unit 58,680,000,000.00
PAMSIMAS
PNPM
2 Jaringan Distribusi (program 20 tahun) 35,673 SR 23,591,609,770.50
3 Penambahan SR (program 20 tahun) 35,673 SR 94,366,439,082.00
4 Penggantian pipa distribusi yang rusak dan pemeriksaan kualitas air 1,000 LS 16,300,000,000.00
B PROGRAM NON-FISIK
1 Pengembangan kapasitas organisasi SPAM Komunal 10 sesi 54,500,000.00
2 Pembinaan, pendampingan, pemanfaatan AM 350,000,000.00
3 Studi manajemen aset SPAM non PDAM 413,000,000.00
4 Penguatan Kelembagaan PAMSIMAS 700 unit 1,058,400,000,000.00
C PERLINDUNGAN SUMBER DAYA AIR
1 Program penghijauan SAB dan daerah hulu 100 LS 1,330,000,000.00
2 Rainwater harvesting (Panen air hujan) 100 LS 105,350,000.00
3 Sumur resapan 100 LS 105,350,000.00
TOTAL INVESTASI 12,052,623,850,473.60
PPN 10% 1,205,262,385,047.36
TOTAL INVESTASI + PPN 13,257,886,235,520.90
a. Sistem Perpipaan
i. Program fisik: unit produksi, jaringan transmisi dan pipa distribusi, jaringan distribusi dan
pipa dinas, pengalihan (switching) perpipaan disribusi Semarang Barat (Gajah Mungkur,
Gunung Pati, Wungkal Kasap), system jaringan distribusi perpipaan air minum wilayah
Semarang Barat, penambahan sambungan baru, pengembangan zoning, kegiatan
penunjang, kegiatan operation and maintenance.
ii. Program non fisik: dibagi menjadi kegiatan di bidang pelayanan pelanggan, bidang
teknik, organisasi dan masyarakat, personalia dan SDM, hukum, kemitraan, dan
keuangan.
iii. Program pengurangan NRW: awareness, metering, monitoring dan control, district meter
area.
Kinerja keuangan PDAM kota Semarang, meski terjadi perbaikan dari tahun ke tahun,
namun belum mampu memberikan kinerja yang baik. Dari nilai maksimal 60 untuk indikator
keuangan, PDAM kota Semarang baru berhasil mengumpulkan poin 16,5 pada tahun 2010,
20,25 pada yagun 2011, dan dan 18 tahun 2012. Berdasarkan empat indikator keuangan
yang digunakan BPKP dalam menilai kierja keuangan, PDAM Kota Semarang masih
mempunyai raport merah terkait kemampuannya menghasilkan laba dari ekuitas yang
dimiliki (ROE atau Return on Equity), kemampuannya menekan biaya operasi dari
pendapatan yang dihasilkan (rasio operasi), dan kemampuannya manjamin keterbayaran
hutang jangka panjangnya dengan aset yang dimiliki (rasio solvabilitas). Sepanjang tiga
tahun pengamatan, hanya rasio efektifitas penagihan yang mempunyai nilai yang bagus.
Besarnya rugi usaha yang dialami sampai dengan tahun 2010 membawa dampak yang
buruk bagi penilaian kinerja keuangan, karena menyebabkan total ekuitas menjadi bernilai
negatif. Tahun 2010 juga terjadi pengeluaran kas yang cukup besar baik untuk aktivitas
operasi maupun investasi, hal ini menyebabkan jumlah kas menjadi sangat terbatas
bahkan untuk menjamin keterbayaran utang jangka pendek yang harus dilunasi dalam
jangka waktu kurang dari 1 periode. Terbatasnya jumlah kas dan setara kas yang dimiliki
terjadi hingga akhir tahun 2012. Kondisi ini didukung dengan hasil penghitungan atas rasio
operasi PDAM yang mengalami penurunan namun tidak signifikan. Menurunnya rasio
operasi ini mengindikasikan besarnya biaya operasional yang dapat ditanggung dari total
pendapatan air yang dicapai.
Rata-rata kemampuan internal cash dari PDAM kota Semarang tidak mencukupi untuk
mendanai investasi. Bahkan untuk membayar utang jangka pendeknya pun masih sangat
terbatas. Kas yang dimiliki baru bisa digunakan untuk menutup biaya operasional dengan
demikian tidak tersedia idle cash yang bisa digunakan untuk pembiayaan jangka panjang/
investasi. Mempertimbangkan kondisi ini maka secara finansial PDAM Kota Semarang
sebaiknya tidak melakukan aktivitas investasi dulu, apalagi dalam jumlah yang besar.
Jumlah kas yang ada sebaiknya diprioritaskan untuk menutup beban operasional dan
pembayaran kewajiban.
2. Kerjasama Kredit
Dengan cara ini penyelenggara mendapatkan fasilitas/instalasi yang dibangun dan didanai
oleh pihak ketiga/pihak swasta dan dianggap sebagai hutang penyelenggara. Kesepakatan
dilakukan antara penyelenggara dengan pihak swasta (B to B). Selanjutnya pengembalian
dilakukan dengan cara mencicil selama jangka waktu yang disepakati. Fasilitas yang
dibangun dengan cara ini biasanya di wilayah dimana pelanggan memiliki kemampuan
membayar yang tinggi (captive market) atau yang potensial.
Pinjaman mengasumsikan bahwa kebutuhan investasi akan dibiayai oleh pinjaman bank
hingga kondisi keuangan internal cukup untuk membiayai kebutuhan investasi tersebut.
Pada simulasi pinjaman ini, pinjaman diambil untuk 5 (lima) tahun pertama, kemudian
kebutuhan investasi selanjutnya dipenuhi oleh keuangan internal, dengan asumsi kinerja
teknis dan keuangan dapat terpenuhi maka diharapkan kas hasil operasional mampu untuk
menutup biaya-biaya tersebut. Persyaratan pinjaman tergantung dari :
1). Tingkat suku bunga per tahun
2). Jangka waktu pembayaran, termasuk masa tenggang.
Untuk pinjaman dari luar negeri dapat dilakukan dengan mengusahaan pinjaman lunak
dengan jangka waktu pengembalian minimal 15 tahun termasuk masa tenggang 5 tahun
dari lembaga keuangan internasional melalui pinjaman SLA atau Rekening Pembangunan
Daerah (RPD).
Alternative pinjaman mengandung konsekuensi timbulnya biaya bunga disamping juga
menuntut kemampuan PDAM untuk mengembalikan pokok pinjaman. Sampai dengan 31
Desember 2012 total kewajiban yang dimiliki PDAM sebesar Rp 422.804.797.014 yang
terdiri dari kewajiban jangka pendek Rp 372.875.673.048; kewajiban jangka panjang Rp
49.493.931.145; dan kewajiban lain-lain sebesar Rp 435.192.821. Sedangkan jumlah
kewajiban yang masuk dalam program restrukturisasi terdiri dari utang pokok Rp
125.168.483.504 dan utang non pokok Rp 285.596.275.848 sehingga total menjadi Rp
410.764.759.352. Dari proyeksi sementara dengan asumsi kondisi normal, pekerjaan ini
justru dalam 20 tahun ke depan belum bisa menghasilkan cash flow yang positif meski
sudah bisa menghasilkan laba operasi. Maka opsi melakukan pinjaman menjadi sangat
berisiko.
b) Tingkat bunga (kupon) per tahun (lebih tinggi dari tingkat bunga acuan).
7. APBD, Dana APBD dapat digunakan untuk pengembangan sistem distribusi sampai
pelayanan.
Kinerja keuangan daerah dapat dilihat dari struktur APBD yang dimilikinya. Berdasarkan
tabel berikut Pemerintah kota Semarang berhasil memperbaiki kinerja keuangannya tahun
2011 dibanding tahun 2010. Tahun 2011 sudah bisa mencapai surplus dalam menutup total
belanja dari pendapatan yang mampu diusahakannya sebesar Rp 11,918,718,306.
Besarnya surplus ini masih ditambah dengan aktivitas pembiayaan yang mampu
menghasilkan kas masuk yang lebih besar dari kas pembiayaan yang keluar sehingga
pada tahun 2011 pemerintah kota Semarang bisa memperoleh SILPA sebesar Rp
202,300,603,746. Kondisi ini lebih baik dari pada pencapaiannya tahun 2010 dimana total
belanja masih lebih besar dari total pendapatan sehingga terjadi deficit Rp 110.520.412.000
yang dapat ditutup dari aktivitas pembiayaan penerimaan yang lebih besar dari
pengeluaran, sehingga SILPA tahun 2010 masih positif sebesar Rp 193.773.035.000.
Kemampuan kas pemerintah kota semarang dalam melakukan penyertaan modal dapat
dilihat dari besarnya pengeluaran pembiayaan dibanding surplus yang dicapainya. Tahun
2012 kondisi keuangan pemkot Semarang membaik, kondisi surplus juga ditambah dengan
penerimaan pembiayaan yang lebih besar dari pada pengeluaran pembiayaan. Sehingga
dapat disimpulkan Pemeritah kota Semarang mampu melakukan penyertaan modal.
TABEL VIII.2
RINGKASAN APBD KOTA SEMARANG
Jika melihat dari RPIJMD tahun 2010 s/d 2015 yang ditetapkan, Pemkot pun sudah
mengalokasikan anggarannya untuk penyertaan modal di bidang air minum total senilai Rp
36,520,424,000.
TABEL VIII.3
ALOKASI DANA PENGEMBANGAN AIR MINUM DALAM RPJMD 2010 S/D 2015
RPJMD 2010-
2015 Kota
Semarang 2010 2011 2012 2013 2014 2015 Total
Program
penyediaan
dan
pengolahan air
baku n/a 1,278,521,000 4,852,000,000 4,910,224,000 4,969,148,000 5,028,776,000 21,038,669,000
Program
pengembangan
kinerja
pengelolaan air
minum dan air
limbah n/a 1,494,255,000 3,085,000,000 3,278,500,000 3,631,000,000 3,993,000,000 15,481,755,000
8. APBN, Dana APBN dapat digunakan untuk mengembangkan sistem air baku dan
pengembangan jaringan distribusi untuk MBR.
Secara umum berbagai alternatif pendanaan yang tepat untuk pekerjaan investasi ini
dikelompokkan menjadi 5 kelompok, yaitu APBN, APBD Propinsi, APBD Kota, PDAM, dan
Hibah/KPS/pengembang/B2B. Berikut ini tabel rincian pekerjaan berikut alokasi dana yang
dibutuhkan pada masing-masing tahapan berikut sumber pendanaan dengan
mempertimbangkan faktor inflasi sebesar 6% dengan menggunakan tahun dasar 2013.
TABEL VIII.4
KEBUTUHAN INVESTASI DAN POLA PENDANAAN (INFLASI 6%)
JANGKA
JK MENENGAH JK PANJANG
NO KEGIATAN TOTAL PENDEK
2 METERING 1,749,000,000.0
1,749,000,000.00 - -
0
SISTEM NON-PERPIPAAN
1 EKSPANSI IPA KUDU (1250 lps -> 1820 lps) 48,952,000,000.0 48,952,000,000.
- -
0 00
Skenario 1 +
13,310,783,035,5 2,057,998,004,2 2,983,483,574,5 8,269,301,456,7
PPN
21 74 27 20
Skenario 2 +
13,272,325,935,5 2,057,998,004,2 2,945,026,474,5 8,269,301,456,7
PPN
21 74 27 20
Skenario 3 +
13,609,444,035,5 2,057,998,004,2 3,282,144,574,5 8,269,301,456,7
PPN
21 74 27 20
TABEL VIII.5
SUMBER PENDANAAN INVESTASI PER TAHUN (INFLASI 6%)
21,700,735,0
2013 275,000,000 78,705,000 26 41,468,254,090 72,875,000 63,595,569,116
26,235,000,0 12,126,400,0
2014 66,648,616,402 00 00 53,198,376,626 53,736,622,556 211,945,015,584
11,661,100,0 113,679,490,32
2016 63,422,379,609 - 00 7 61,323,923,266 250,086,893,202
16,368,000,0 237,988,484,56
2017 11,226,134,422 00 - 6 483,004,941,050 748,587,560,037
349,602,054,76
2018 56,558,358,559 - 572,000,000 6 96,879,766,479 503,612,179,803
321,780,945,50
2019 60,634,477,859 - - 4 102,692,552,468 485,107,975,831
337,999,013,97
2020 61,858,166,274 - 234,300,000 9 170,048,631,631 570,140,111,884
348,723,345,99
2021 64,625,383,568 - - 8 180,251,549,529 593,600,279,095
368,701,035,79
2022 67,390,462,472 - 677,600,000 8 191,066,642,500 627,835,740,770
381,896,137,27
2023 70,153,488,619 - - 8 202,530,641,050 654,580,266,947
387,824,997,86
2024 72,731,949,735 - 273,900,000 8 214,682,479,513 675,513,327,116
422,891,699,63
2025 75,484,533,682 - - 0 227,563,428,284 725,939,661,596
435,055,108,40
2026 78,235,327,095 - 783,200,000 7 241,217,233,981 755,290,869,483
435,181,464,88
2027 80,984,414,447 - - 2 255,690,268,020 771,856,147,349
440,994,711,00
2028 83,731,877,426 - 313,500,000 1 271,031,684,101 796,071,772,528
461,845,368,24
2029 86,477,794,543 - - 9 287,293,585,147 835,616,747,939
474,533,262,83
2030 89,222,240,908 - 888,800,000 7 304,531,200,256 869,175,504,001
491,804,744,87
2031 91,965,288,122 - - 6 322,803,072,272 906,573,105,270
511,319,756,65
2032 94,707,004,260 - 353,100,000 2 342,171,256,608 948,551,117,521
526,720,218,00
2033 97,447,453,913 - - 0 362,701,532,004 986,869,203,917
TABEL VIII.6
PENGHITUNGAN ESTIMASI BIAYA DEPRESIASI PER TAHUN
b. Biaya operation dan maintenance, dihitung dengan merinci kebutuhan biaya operasional
dan pemeliharaan per IPA, yaitu biaya listrik, biaya bahan kimia, penggantian pasar,
tenaga kerja, retribusi, laboratorium, dan maintenance rutin. IPA yang diperhitungkan
adalah Biaya OM IPA Jatibarang Tahap 1 dan 2, Blorong, Kaligarang Hulu, TGM, dan
idle capacity.
TABEL VIII.7
PENGHITUNGAN BIAYA OPERASI DAN PEMELIHARAAN
Bia 18,24 456, 483, 512, 543, 576, 610, 647, 686, 727, 770, 817, 866, 918, 973, 1,03 1,09 1,15 1,22 1,30 1,38 1,46
ya 8,141 286, 663, 683, 444, 051, 614, 251, 086, 251, 886, 139, 168, 138, 226, 1,61 3,51 9,12 8,67 2,39 0,54 3,37
List ,280. 500. 690. 511. 522. 193. 265. 120. 188. 359. 441. 627. 005. 085. 370. 9,95 7,14 8,17 5,86 6,42 0,20 2,61
a rik 34 00 00 40 08 41 01 91 17 46 03 49 14 45 57 2.81 9.98 8.97 9.71 1.90 7.21 9.64
Bia
ya
Ba
ha 16,2 17,2 18,2 19,3 20,5 21,7 23,0 24,4 25,9 27,4 29,1 30,8 32,7 34,6 36,7 38,9 41,3 43,7 46,4 49,1 52,1
n 650,1 57,5 33,0 67,0 63,0 24,8 56,3 61,7 45,4 12,1 66,8 14,8 61,7 13,4 76,2 56,8 62,2 00,0 78,0 04,6 88,9 40,3
Ki 85,60 96,4 52,1 35,3 57,4 40,8 31,3 11,2 13,8 38,7 67,0 79,0 71,8 78,1 86,8 64,0 75,8 12,4 13,1 93,9 75,5 14,1
mi 9,230 00.0 84.0 15.0 33.9 79.9 32.7 12.7 85.5 18.6 41.7 64.2 08.1 16.6 03.6 11.8 52.5 03.6 47.9 36.7 72.9 07.3
b a .02 0 0 4 4 8 8 4 1 4 6 6 2 1 0 2 3 8 0 7 8 6
Pe
ng
ga
nti 29,99 750, 795, 842, 893, 946, 1,00 1,06 1,12 1,19 1,26 1,34 1,42 1,50 1,59 1,69 1,79 1,90 2,01 2,14 2,26 2,40
an 4,545 000, 000, 700, 262, 857, 3,66 3,88 7,72 5,38 7,10 3,13 3,72 9,14 9,69 5,67 7,41 5,26 9,57 0,75 9,19 5,35
Pas ,006. 000. 000. 000. 000. 720. 9,18 9,33 2,69 6,05 9,21 5,77 3,91 7,35 6,19 7,96 8,64 3,76 9,58 4,36 9,62 1,60
c ir 82 00 00 00 00 00 3.20 4.19 4.24 5.90 9.25 2.41 8.75 3.88 5.11 6.82 4.82 3.51 9.33 4.68 6.57 4.16
Te
na 18,00 450, 477, 505, 536, 568, 602, 638, 676, 717, 760, 806, 854, 905, 960, 1,01 1,07 1,14 1,21 1,28 1,36 1,44
ga 3,392 166, 176, 807, 155, 325, 424, 570, 884, 497, 547, 179, 550, 823, 173, 7,78 8,85 3,58 2,19 4,92 2,02 3,74
Ker ,458. 666. 666. 266. 702. 044. 547. 020. 221. 274. 111. 938. 734. 778. 205. 3,59 0,61 1,65 6,54 8,34 4,04 5,48
d ja 54 67 67 67 67 83 52 37 59 88 38 06 34 40 11 7.42 3.26 0.06 9.06 2.00 2.52 5.07
34,68 867, 919, 974, 1,03 1,09 1,16 1,23 1,30 1,38 1,46 1,55 1,64 1,74 1,84 1,96 2,07 2,20 2,33 2,47 2,62 2,78
Ret 3,292 240, 274, 430, 2,89 4,87 0,56 0,19 4,00 2,24 5,18 3,09 6,28 5,05 9,76 0,74 8,39 3,09 5,28 5,39 3,92 1,35
rib ,282. 000. 400. 864. 6,71 0,51 2,74 6,51 8,30 8,80 3,73 4,75 0,44 7,26 0,70 6,34 1,12 4,59 0,27 7,08 0,91 6,16
e usi 29 00 00 00 5.84 8.79 9.92 4.91 5.81 4.16 2.41 6.35 1.73 8.23 4.33 6.59 7.38 5.03 0.73 6.97 2.19 6.92
Lab 19,2 20,4 21,6 22,9 24,3 25,7 27,3 28,9 30,7 32,5 34,4 36,5 38,7 41,0 43,5 46,1 48,9 51,8 54,9 58,2 61,7
ora 770,4 63,8 19,7 44,9 43,5 20,2 79,4 26,1 65,7 03,7 45,9 98,6 68,6 62,7 88,4 53,8 67,0 37,0 73,2 85,6 84,8 81,9
tori 15,44 88.8 22.2 05.5 99.8 15.8 28.8 94.5 66.2 12.2 34.9 91.0 12.5 29.2 93.0 02.5 30.7 52.5 75.7 72.2 12.6 01.3
f um 3.05 9 2 6 9 8 4 7 4 1 5 4 1 6 1 9 5 9 5 9 3 9
Ma
int 8,174 204, 216, 229, 243, 258, 273, 289, 307, 325, 345, 366, 388, 411, 435, 462, 489, 519, 550, 583, 618, 655,
g en ,513, 400, 664, 663, 443, 050, 533, 945, 342, 782, 329, 049, 012, 292, 970, 128, 856, 247, 402, 426, 432, 538,
anc 332.5 000. 000. 840. 670. 290. 308. 306. 024. 546. 499. 269. 225. 958. 536. 768. 494. 884. 757. 922. 538. 490.
e 3 00 00 00 40 62 06 55 94 43 22 17 32 84 37 56 67 35 41 86 23 52
ruti
n
19,0 20,1 21,3 22,6 23,9 25,4 26,9 28,5 30,2 32,1 34,0 36,0 38,2 40,5 42,9 45,5 48,2 51,1 54,2 57,5 60,9
04,9 45,2 53,9 35,2 93,3 32,9 58,8 76,4 91,0 08,4 34,9 77,0 41,7 36,2 68,3 46,4 79,2 76,0 46,5 01,3 51,4
53,4 50,6 65,7 03,6 15,8 14,8 89,7 23,0 08,4 68,9 77,1 75,7 00,2 02,3 74,4 76,9 65,5 21,4 82,7 77,7 60,3
Sub total 55.5 62.8 02.6 44.8 63.5 15.3 04.2 86.5 71.6 79.9 18.7 45.9 90.6 08.1 46.5 13.3 28.1 59.8 47.4 12.3 75.0
6 9 6 2 1 2 4 0 9 9 9 1 7 1 9 9 9 8 8 3 7
Bia 22,97 574, 609, 645, 684, 725, 768, 815, 863, 915, 970, 1,02 1,09 1,15 1,22 1,29 1,37 1,45 1,54 1,63 1,73 1,84
ya 7,681 546, 019, 560, 294, 351, 872, 005, 905, 739, 684, 8,92 0,66 6,10 5,46 8,99 6,93 9,55 7,12 9,95 8,34 2,64
List ,137. 500. 290. 447. 074. 718. 821. 191. 502. 832. 222. 5,27 0,79 0,44 6,46 4,45 4,12 0,16 3,17 0,57 7,60 8,46
a rik 01 00 00 40 24 70 82 13 60 75 72 6.08 2.65 0.21 6.62 4.61 1.89 9.21 9.36 0.12 4.33 0.59
Bia
ya
Ba
ha 32,5 34,4 36,5 38,7 41,0 43,5 46,1 48,8 51,8 54,9 58,2 61,7 65,4 69,3 73,5 77,9 82,6 87,5 92,8 98,3 104,
n 1,300 15,1 66,1 34,0 26,1 49,6 12,6 23,4 90,8 24,2 33,7 29,7 23,5 26,9 52,5 13,7 24,5 00,0 56,0 09,3 77,9 280,
Ki ,371, 92,8 04,3 70,6 14,8 81,7 62,6 22,4 27,7 77,4 34,0 58,1 43,6 56,2 73,6 28,0 51,7 24,8 26,2 87,8 51,1 628,
mi 218,4 00.0 68.0 30.0 67.8 59.9 65.5 25.4 71.0 37.2 83.5 28.5 16.2 33.2 07.2 23.6 05.0 07.3 95.8 73.5 45.9 214.
b a 60.05 0 0 8 8 6 6 9 2 8 2 3 4 1 1 4 6 6 0 5 6 72
Pe
ng
ga
nti 59,98 1,50 1,59 1,68 1,78 1,89 2,00 2,12 2,25 2,39 2,53 2,68 2,84 3,01 3,19 3,39 3,59 3,81 4,03 4,28 4,53 4,81
an 9,090 0,00 0,00 5,40 6,52 3,71 7,33 7,77 5,44 0,77 4,21 6,27 7,44 8,29 9,39 1,35 4,83 0,52 9,15 1,50 8,39 0,70
Pas ,013. 0,00 0,00 0,00 4,00 5,44 8,36 8,66 5,38 2,11 8,43 1,54 7,83 4,70 2,39 5,93 7,28 7,52 9,17 8,72 9,25 3,20
c ir 64 0.00 0.00 0.00 0.00 0.00 6.40 8.38 8.49 1.80 8.50 4.81 7.50 7.75 0.22 3.63 9.65 7.03 8.65 9.37 3.13 8.32
Te
na 18,00 450, 477, 505, 536, 568, 602, 638, 676, 717, 760, 806, 854, 905, 960, 1,01 1,07 1,14 1,21 1,28 1,36 1,44
ga 3,392 166, 176, 807, 155, 325, 424, 570, 884, 497, 547, 179, 550, 823, 173, 7,78 8,85 3,58 2,19 4,92 2,02 3,74
Ker ,458. 666. 666. 266. 702. 044. 547. 020. 221. 274. 111. 938. 734. 778. 205. 3,59 0,61 1,65 6,54 8,34 4,04 5,48
d ja 54 67 67 67 67 83 52 37 59 88 38 06 34 40 11 7.42 3.26 0.06 9.06 2.00 2.52 5.07
69,36 1,73 1,83 1,94 2,06 2,18 2,32 2,46 2,60 2,76 2,93 3,10 3,29 3,49 3,69 3,92 4,15 4,40 4,67 4,95 5,24 5,56
Ret 6,584 4,48 8,54 8,86 5,79 9,74 1,12 0,39 8,01 4,49 0,36 6,18 2,56 0,11 9,52 1,49 6,78 6,18 0,56 0,79 7,84 2,71
rib ,564. 0,00 8,80 1,72 3,43 1,03 5,49 3,02 6,61 7,60 7,46 9,51 0,88 4,53 1,40 2,69 2,25 9,19 0,54 4,17 1,82 2,33
e usi 57 0.00 0.00 8.00 1.68 7.58 9.84 9.83 1.62 8.31 4.81 2.70 3.46 6.47 8.66 3.18 4.77 0.05 1.46 3.94 4.38 3.84
Lab
ora 770,4 19,2 20,4 21,6 22,9 24,3 25,7 27,3 28,9 30,7 32,5 34,4 36,5 38,7 41,0 43,5 46,1 48,9 51,8 54,9 58,2 61,7
tori 15,44 63,8 19,7 44,9 43,5 20,2 79,4 26,1 65,7 03,7 45,9 98,6 68,6 62,7 88,4 53,8 67,0 37,0 73,2 85,6 84,8 81,9
f um 3.05 88.8 22.2 05.5 99.8 15.8 28.8 94.5 66.2 12.2 34.9 91.0 12.5 29.2 93.0 02.5 30.7 52.5 75.7 72.2 12.6 01.3
9 2 6 9 8 4 7 4 1 5 4 1 6 1 9 5 9 5 9 3 9
Ma
int
en
anc 8,174 204, 216, 229, 243, 258, 273, 289, 307, 325, 345, 366, 388, 411, 435, 462, 489, 519, 550, 583, 618, 655,
e ,513, 400, 664, 663, 443, 050, 533, 945, 342, 782, 329, 049, 012, 292, 970, 128, 856, 247, 402, 426, 432, 538,
ruti 332.5 000. 000. 840. 670. 290. 308. 306. 024. 546. 499. 269. 225. 958. 536. 768. 494. 884. 757. 922. 538. 490.
g n 3 00 00 00 40 62 06 55 94 43 22 17 32 84 37 56 67 35 41 86 23 52
36,9 39,2 41,5 44,0 46,7 49,5 52,4 55,6 58,9 62,5 66,2 70,2 74,4 78,9 83,6 88,6 93,9 99,6 105, 111, 118,
98,0 17,9 71,0 65,2 09,1 11,7 82,4 31,3 69,2 07,4 57,8 33,3 47,3 14,1 49,0 67,9 88,0 27,3 604, 941, 657,
49,8 32,8 08,8 69,3 85,5 36,6 40,8 87,2 70,5 26,7 72,3 44,7 45,3 86,1 37,2 79,5 58,2 41,7 982, 281, 758,
55.5 46.8 17.7 46.7 07.5 38.0 36.3 86.4 23.6 55.0 60.4 02.0 84.1 07.1 73.6 10.0 80.6 77.4 284. 221. 094.
6 9 0 6 7 2 1 8 7 9 0 2 4 9 3 4 5 8 13 18 45
Bia 22,97 574, 609, 645, 684, 725, 768, 815, 863, 915, 970, 1,02 1,09 1,15 1,22 1,29 1,37 1,45 1,54 1,63 1,73 1,84
ya 7,681 546, 019, 560, 294, 351, 872, 005, 905, 739, 684, 8,92 0,66 6,10 5,46 8,99 6,93 9,55 7,12 9,95 8,34 2,64
List ,137. 500. 290. 447. 074. 718. 821. 191. 502. 832. 222. 5,27 0,79 0,44 6,46 4,45 4,12 0,16 3,17 0,57 7,60 8,46
a rik 01 00 00 40 24 70 82 13 60 75 72 6.08 2.65 0.21 6.62 4.61 1.89 9.21 9.36 0.12 4.33 0.59
Bia
ya
Ba
ha 10,3 10,9 11,6 12,3 13,0 13,8 14,7 15,5 16,5 17,5 18,5 19,6 20,8
n 260,0 6,50 6,89 7,30 7,74 8,20 8,70 9,22 9,77 64,8 86,7 45,9 44,7 85,3 70,5 02,7 84,9 20,0 11,2 61,8 75,5 56,1
Ki 74,24 3,03 3,22 6,81 5,22 9,93 2,53 4,68 8,16 55,4 46,8 51,6 08,7 91,2 14,7 45,6 10,3 04,9 05,2 77,5 90,2 25,6
mi 3,692 8,56 0,87 4,12 2,97 6,35 2,53 4,48 5,55 87.4 16.7 25.7 23.2 46.6 21.4 04.7 41.0 61.4 59.1 74.7 29.1 42.9
b a .01 0.00 3.60 6.02 3.58 1.99 3.11 5.10 4.20 6 0 1 5 4 4 3 1 7 6 1 9 4
Pe
ng
ga
nti 11,99 300, 318, 337, 357, 378, 401, 425, 451, 478, 506, 537, 569, 603, 639, 678, 718, 762, 807, 856, 907, 962,
an 7,818 000, 000, 080, 304, 743, 467, 555, 089, 154, 843, 254, 489, 658, 878, 271, 967, 105, 831, 301, 679, 140,
Pas ,002. 000. 000. 000. 800. 088. 673. 733. 077. 422. 687. 308. 567. 941. 478. 186. 457. 505. 835. 745. 850. 641.
c ir 73 00 00 00 00 00 28 68 70 36 70 96 50 55 04 73 93 41 73 87 63 66
Te
na 18,00 450, 477, 505, 536, 568, 602, 638, 676, 717, 760, 806, 854, 905, 960, 1,01 1,07 1,14 1,21 1,28 1,36 1,44
ga 3,392 166, 176, 807, 155, 325, 424, 570, 884, 497, 547, 179, 550, 823, 173, 7,78 8,85 3,58 2,19 4,92 2,02 3,74
Ker ,458. 666. 666. 266. 702. 044. 547. 020. 221. 274. 111. 938. 734. 778. 205. 3,59 0,61 1,65 6,54 8,34 4,04 5,48
d ja 54 67 67 67 67 83 52 37 59 88 38 06 34 40 11 7.42 3.26 0.06 9.06 2.00 2.52 5.07
Ret 13,87 346, 367, 389, 413, 437, 464, 492, 521, 552, 586, 621, 658, 698, 739, 784, 831, 881, 934, 990, 1,04 1,11
rib 3,316 896, 709, 772, 158, 948, 225, 078, 603, 899, 073, 237, 512, 022, 904, 298, 356, 237, 112, 158, 9,56 2,54
e usi ,912. 000. 760. 345. 686. 207. 099. 605. 322. 521. 492. 902. 176. 907. 281. 538. 450. 838. 108. 834. 8,36 2,46
91 00 00 60 34 52 97 97 32 66 96 54 69 29 73 64 95 01 29 79 4.88 6.77
Lab 19,2 20,4 21,6 22,9 24,3 25,7 27,3 28,9 30,7 32,5 34,4 36,5 38,7 41,0 43,5 46,1 48,9 51,8 54,9 58,2 61,7
ora 770,4 63,8 19,7 44,9 43,5 20,2 79,4 26,1 65,7 03,7 45,9 98,6 68,6 62,7 88,4 53,8 67,0 37,0 73,2 85,6 84,8 81,9
tori 15,44 88.8 22.2 05.5 99.8 15.8 28.8 94.5 66.2 12.2 34.9 91.0 12.5 29.2 93.0 02.5 30.7 52.5 75.7 72.2 12.6 01.3
f um 3.05 9 2 6 9 8 4 7 4 1 5 4 1 6 1 9 5 9 5 9 3 9
Ma
int
en
anc 8,174 204, 216, 229, 243, 258, 273, 289, 307, 325, 345, 366, 388, 411, 435, 462, 489, 519, 550, 583, 618, 655,
e ,513, 400, 664, 663, 443, 050, 533, 945, 342, 782, 329, 049, 012, 292, 970, 128, 856, 247, 402, 426, 432, 538,
ruti 332.5 000. 000. 840. 670. 290. 308. 306. 024. 546. 499. 269. 225. 958. 536. 768. 494. 884. 757. 922. 538. 490.
g n 3 00 00 00 40 62 06 55 94 43 22 17 32 84 37 56 67 35 41 86 23 52
10,0 10,6 11,2 11,9 12,6 13,3 14,1 15,0 15,9 16,8 17,9 18,9 20,1 21,3 22,6 23,9 25,4 26,9
8,39 8,90 9,43 02,5 02,6 38,8 13,1 27,9 85,6 88,7 40,0 42,5 99,0 12,9 87,7 27,0 34,6 14,7 71,6 09,9 34,5
8,31 2,21 6,34 23,5 74,9 35,4 65,5 55,4 32,7 70,7 97,0 02,8 53,0 96,1 75,9 42,5 65,0 44,9 29,6 27,4 23,0
1,61 0,31 2,93 07.1 17.5 12.5 37.3 69.5 97.7 65.6 11.5 32.2 02.2 82.3 53.2 10.4 61.0 64.7 62.6 42.4 88.9
5.56 2.49 1.24 1 4 9 5 9 6 3 7 6 0 3 7 6 9 6 4 0 5
Bia 22,97 574, 609, 645, 684, 725, 768, 815, 863, 915, 970, 1,02 1,09 1,15 1,22 1,29 1,37 1,45 1,54 1,63 1,73 1,84
ya 7,681 546, 019, 560, 294, 351, 872, 005, 905, 739, 684, 8,92 0,66 6,10 5,46 8,99 6,93 9,55 7,12 9,95 8,34 2,64
List ,137. 500. 290. 447. 074. 718. 821. 191. 502. 832. 222. 5,27 0,79 0,44 6,46 4,45 4,12 0,16 3,17 0,57 7,60 8,46
a rik 01 00 00 40 24 70 82 13 60 75 72 6.08 2.65 0.21 6.62 4.61 1.89 9.21 9.36 0.12 4.33 0.59
Bia
ya
Ba
ha 10,4
n 130,0 3,25 3,44 3,65 3,87 4,10 4,35 4,61 4,88 5,18 5,49 5,82 6,17 6,54 6,93 7,35 7,79 8,26 8,75 9,28 9,83 28,0
Ki 37,12 1,51 6,61 3,40 2,61 4,96 1,26 2,34 9,08 2,42 3,37 2,97 2,35 2,69 5,25 1,37 2,45 0,00 5,60 0,93 7,79 62,8
mi 1,846 9,28 0,43 7,06 1,48 8,17 6,26 2,24 2,77 7,74 3,40 5,81 4,36 5,62 7,36 2,80 5,17 2,48 2,62 8,78 5,11 21.4
b a .01 0.00 6.80 3.01 6.79 6.00 6.56 2.55 7.10 3.73 8.35 2.85 1.62 3.32 0.72 2.36 0.51 0.74 9.58 7.35 4.60 7
Pe
ng
ga
nti 5,998 150, 159, 168, 178, 189, 200, 212, 225, 239, 253, 268, 284, 301, 319, 339, 359, 381, 403, 428, 453, 481,
an ,909, 000, 000, 540, 652, 371, 733, 777, 544, 077, 421, 627, 744, 829, 939, 135, 483, 052, 915, 150, 839, 070,
Pas 001.3 000. 000. 000. 400. 544. 836. 866. 538. 211. 843. 154. 783. 470. 239. 593. 728. 752. 917. 872. 925. 320.
c ir 6 00 00 00 00 00 64 84 85 18 85 48 75 78 02 36 96 70 87 94 31 83
Te
na 18,00 450, 477, 505, 536, 568, 602, 638, 676, 717, 760, 806, 854, 905, 960, 1,01 1,07 1,14 1,21 1,28 1,36 1,44
ga 3,392 166, 176, 807, 155, 325, 424, 570, 884, 497, 547, 179, 550, 823, 173, 7,78 8,85 3,58 2,19 4,92 2,02 3,74
Ker ,458. 666. 666. 266. 702. 044. 547. 020. 221. 274. 111. 938. 734. 778. 205. 3,59 0,61 1,65 6,54 8,34 4,04 5,48
d ja 54 67 67 67 67 83 52 37 59 88 38 06 34 40 11 7.42 3.26 0.06 9.06 2.00 2.52 5.07
6,936 173, 183, 194, 206, 218, 232, 246, 260, 276, 293, 310, 329, 349, 369, 392, 415, 440, 467, 495, 524, 556,
Ret ,658, 448, 854, 886, 579, 974, 112, 039, 801, 449, 036, 618, 256, 011, 952, 149, 678, 618, 056, 079, 784, 271,
rib 456.4 000. 880. 172. 343. 103. 549. 302. 661. 760. 746. 951. 088. 453. 140. 269. 225. 919. 054. 417. 182. 233.
e usi 6 00 00 80 17 76 98 98 16 83 48 27 35 65 87 32 48 01 15 39 44 38
Lab 19,2 20,4 21,6 22,9 24,3 25,7 27,3 28,9 30,7 32,5 34,4 36,5 38,7 41,0 43,5 46,1 48,9 51,8 54,9 58,2 61,7
ora 770,4 63,8 19,7 44,9 43,5 20,2 79,4 26,1 65,7 03,7 45,9 98,6 68,6 62,7 88,4 53,8 67,0 37,0 73,2 85,6 84,8 81,9
tori 15,44 88.8 22.2 05.5 99.8 15.8 28.8 94.5 66.2 12.2 34.9 91.0 12.5 29.2 93.0 02.5 30.7 52.5 75.7 72.2 12.6 01.3
f um 3.05 9 2 6 9 8 4 7 4 1 5 4 1 6 1 9 5 9 5 9 3 9
Ma
int
en
anc 8,174 204, 216, 229, 243, 258, 273, 289, 307, 325, 345, 366, 388, 411, 435, 462, 489, 519, 550, 583, 618, 655,
e ,513, 400, 664, 663, 443, 050, 533, 945, 342, 782, 329, 049, 012, 292, 970, 128, 856, 247, 402, 426, 432, 538,
ruti 332.5 000. 000. 840. 670. 290. 308. 306. 024. 546. 499. 269. 225. 958. 536. 768. 494. 884. 757. 922. 538. 490.
g n 3 00 00 00 40 62 06 55 94 43 22 17 32 84 37 56 67 35 41 86 23 52
ga 4,362 3,33 7,33 5,77 8,91 7,05 0,47 9,50 4,47 5,74 3,69 8,71 1,23 1,70 0,61 8,44 5,75 3,10 1,08 0,35 1,57 5,46
Ker .90 3.33 3.33 3.33 9.73 4.92 8.21 6.91 7.32 5.96 0.72 2.16 4.89 8.98 1.52 8.21 5.10 0.41 6.44 1.62 2.72 7.08
ja
Ret 19,00 475, 503, 533, 565, 599, 635, 674, 714, 757, 802, 851, 902, 956, 1,01 1,07 1,13 1,20 1,27 1,35 1,43 1,52
rib 4,543 200. 712. 934. 970. 929. 924. 080. 525. 396. 840. 010. 071. 195. 3,56 4,38 8,84 7,17 9,60 6,38 7,76 4,03
e usi .72 00 00 72 80 05 79 28 10 61 40 83 47 76 7.51 1.56 4.45 5.12 5.63 1.97 4.88 0.78
Lab
ora 2,110 52,7 55,9 59,3 62,8 66,6 70,6 74,8 79,3 84,1 89,1 94,5 100, 106, 112, 119, 126, 134, 142, 150, 159, 169,
tori ,727. 77.7 44.4 01.1 59.1 30.7 28.5 66.2 58.2 19.7 66.9 16.9 187. 199. 571. 325. 485. 074. 118. 645. 684. 265.
f um 24 8 4 1 8 3 7 9 6 6 5 6 98 26 21 49 02 12 56 68 42 48
Ma
int
en
anc
e 22,39 560, 593, 629, 666, 706, 749, 794, 842, 892, 946, 1,00 1,06 1,12 1,19 1,26 1,34 1,42 1,50 1,59 1,69 1,79
ruti 5,926 000. 600. 216. 968. 987. 406. 370. 032. 554. 108. 2,87 3,04 6,83 4,43 6,10 2,07 2,59 7,95 8,42 4,33 5,99
g n .94 00 00 00 96 10 32 70 95 92 22 4.71 7.19 0.02 9.83 6.22 2.59 6.94 2.76 9.93 5.72 5.86
13,2 14,0 14,8 15,7 16,6 17,6 18,7 19,8 21,0 22,3 23,6 25,0 26,5 28,1 29,8 31,6 33,5 35,5 37,7 39,9 42,3
14,6 07,5 47,9 38,8 83,1 84,1 45,2 69,9 62,1 25,8 65,4 85,3 90,4 85,8 77,0 69,6 69,8 84,0 19,0 82,2 81,1
42.0 20.5 71.7 50.0 81.0 71.9 22.2 35.6 31.7 59.6 11.2 35.8 56.0 83.4 36.4 58.5 38.1 28.3 70.1 14.3 47.1
2 4 7 7 8 4 6 0 3 4 1 9 4 0 1 9 1 9 0 0 6
Bia 22,97 574, 609, 645, 684, 725, 768, 815, 863, 915, 970, 1,02 1,09 1,15 1,22 1,29 1,37 1,45 1,54 1,63 1,73 1,84
ya 7,681 546, 019, 560, 294, 351, 872, 005, 905, 739, 684, 8,92 0,66 6,10 5,46 8,99 6,93 9,55 7,12 9,95 8,34 2,64
List ,137. 500. 290. 447. 074. 718. 821. 191. 502. 832. 222. 5,27 0,79 0,44 6,46 4,45 4,12 0,16 3,17 0,57 7,60 8,46
a rik 01 00 00 40 24 70 82 13 60 75 72 6.08 2.65 0.21 6.62 4.61 1.89 9.21 9.36 0.12 4.33 0.59
Bia
ya
Ba
ha 29,2 31,0 32,8 34,8 36,9 39,1 41,5 44,0 46,6 49,4 52,4 55,5 58,8 62,4 66,1 70,1 74,3 78,8 83,5 88,5 93,8
n 1,170 63,6 19,4 80,6 53,5 44,7 61,3 11,0 01,7 41,8 40,3 06,7 51,1 84,2 17,3 62,3 32,0 40,0 00,4 28,4 40,1 52,5
Ki ,334, 73,5 93,9 63,5 03,3 13,5 96,3 80,1 44,9 49,6 60,6 82,3 89,2 60,6 16,2 55,2 96,5 22,3 23,6 49,0 56,0 65,3
mi 096,6 20.0 31.2 67.0 81.1 83.9 99.0 82.9 93.9 93.5 75.1 15.6 54.6 09.8 46.4 21.2 34.5 26.6 66.2 86.1 31.3 93.2
b a 14.04 0 0 7 0 6 0 4 2 5 6 7 1 9 8 7 5 2 2 9 7 5
Pe
ng
ga
nti 59,98 1,50 1,59 1,68 1,78 1,89 2,00 2,12 2,25 2,39 2,53 2,68 2,84 3,01 3,19 3,39 3,59 3,81 4,03 4,28 4,53 4,81
an 9,090 0,00 0,00 5,40 6,52 3,71 7,33 7,77 5,44 0,77 4,21 6,27 7,44 8,29 9,39 1,35 4,83 0,52 9,15 1,50 8,39 0,70
Pas ,013. 0,00 0,00 0,00 4,00 5,44 8,36 8,66 5,38 2,11 8,43 1,54 7,83 4,70 2,39 5,93 7,28 7,52 9,17 8,72 9,25 3,20
c ir 64 0.00 0.00 0.00 0.00 0.00 6.40 8.38 8.49 1.80 8.50 4.81 7.50 7.75 0.22 3.63 9.65 7.03 8.65 9.37 3.13 8.32
d Te
na 18,00 450, 477, 505, 536, 568, 602, 638, 676, 717, 760, 806, 854, 905, 960, 1,01 1,07 1,14 1,21 1,28 1,36 1,44
ga 3,392 166, 176, 807, 155, 325, 424, 570, 884, 497, 547, 179, 550, 823, 173, 7,78 8,85 3,58 2,19 4,92 2,02 3,74
Ker ,458. 666. 666. 266. 702. 044. 547. 020. 221. 274. 111. 938. 734. 778. 205. 3,59 0,61 1,65 6,54 8,34 4,04 5,48
ja 54 67 67 67 67 83 52 37 59 88 38 06 34 40 11 7.42 3.26 0.06 9.06 2.00 2.52 5.07
62,42 1,56 1,65 1,75 1,85 1,97 2,08 2,21 2,34 2,48 2,63 2,79 2,96 3,14 3,32 3,52 3,74 3,96 4,20 4,45 4,72 5,00
Ret 9,926 1,03 4,69 3,97 9,21 0,76 9,01 4,35 7,21 8,04 7,33 5,57 3,30 1,10 9,56 9,34 1,10 5,57 3,50 5,71 3,05 6,44
rib ,108. 2,00 3,92 5,55 4,08 6,93 2,94 3,72 4,95 7,84 0,71 0,56 4,79 3,08 9,26 3,42 4,02 0,27 4,48 4,75 7,64 1,10
e usi 12 0.00 0.00 5.20 8.51 3.82 9.85 6.84 0.45 7.48 8.33 1.43 5.12 2.82 7.79 3.86 9.29 1.05 7.31 6.55 1.94 0.46
Lab 19,2 20,4 21,6 22,9 24,3 25,7 27,3 28,9 30,7 32,5 34,4 36,5 38,7 41,0 43,5 46,1 48,9 51,8 54,9 58,2 61,7
ora 770,4 63,8 19,7 44,9 43,5 20,2 79,4 26,1 65,7 03,7 45,9 98,6 68,6 62,7 88,4 53,8 67,0 37,0 73,2 85,6 84,8 81,9
tori 15,44 88.8 22.2 05.5 99.8 15.8 28.8 94.5 66.2 12.2 34.9 91.0 12.5 29.2 93.0 02.5 30.7 52.5 75.7 72.2 12.6 01.3
f um 3.05 9 2 6 9 8 4 7 4 1 5 4 1 6 1 9 5 9 5 9 3 9
Ma
int
en
anc 8,174 204, 216, 229, 243, 258, 273, 289, 307, 325, 345, 366, 388, 411, 435, 462, 489, 519, 550, 583, 618, 655,
e ,513, 400, 664, 663, 443, 050, 533, 945, 342, 782, 329, 049, 012, 292, 970, 128, 856, 247, 402, 426, 432, 538,
ruti 332.5 000. 000. 840. 670. 290. 308. 306. 024. 546. 499. 269. 225. 958. 536. 768. 494. 884. 757. 922. 538. 490.
g n 3 00 00 00 40 62 06 55 94 43 22 17 32 84 37 56 67 35 41 86 23 52
33,5 35,5 37,7 39,9 42,3 44,9 47,6 50,4 53,5 56,7 60,1 63,7 67,5 71,6 75,9 80,4 85,2 90,4 95,8 101, 107,
73,0 87,4 22,7 86,0 85,2 28,3 24,0 81,5 10,3 21,0 24,2 31,7 55,6 08,9 05,5 59,8 87,4 04,6 28,9 578, 673,
82,5 67,5 15,5 78,5 43,2 57,8 59,2 02,8 93,0 16,6 77,5 34,2 38,3 76,6 15,2 46,1 36,8 83,0 64,0 701, 424,
75.5 30.0 81.8 16.8 27.8 21.4 90.7 48.2 19.1 00.2 96.2 52.0 07.1 05.6 01.9 14.0 80.9 93.7 79.3 924. 039.
6 9 9 1 2 9 7 2 1 6 8 5 8 1 4 6 0 6 8 15 60
102, 108, 115, 122, 129, 137, 145, 154, 163, 173, 184, 195, 206, 219, 232, 246, 261, 276, 293, 311, 329,
810, 979, 518, 449, 796, 584, 839, 589, 865, 696, 118, 165, 875, 288, 445, 392, 175, 846, 457, 064, 728,
956, 613, 390, 494, 463, 251, 306, 665, 045, 947, 764, 890, 843, 394, 698, 440, 986, 545, 338, 778, 665,
GRAND 479. 868. 700. 142. 791. 618. 715. 118. 025. 727. 591. 466. 894. 528. 200. 092. 497. 687. 428. 734. 458.
TOTAL - 79 58 70 74 30 78 91 86 99 55 21 68 68 36 06 06 59 44 69 41 48
4. Biaya aministrasi dan umum, dihitung dengan mencari rata-rata biaya administrasi dan
umum dengan data historis (3 tahun terahir) dan kemudian estimasi kenaikan per tahun
sebesar 5% .
TABEL VIII.8
PENGHITUNGAN BIAYA OPERASI DAN BIAYA ADMINISTRASI DAN UMUM
5. Menggunakan data teknik kapasitas produksi (perpipaan) untuk menghitung satuan biaya
per m3 sebagai berikut:
TABEL VIII.9
KAPASITAS PRODUKSI
PDAM
Sumur dalam l/de 50 49 50 59 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
1 pegunungan t 4 2 8 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sumur dalam l/de
2 Perkotaan t 26 23 18 22 18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
IPA Sungai l/de 94 98 1,0 1,1 1,1 1,1 1,1 1,1 1,1 1,1 1,1 1,1 1,1 1,1 1,1 1,1 1,1 1,1 1,1 1,1 1,1 1,1 1,1 1,1
3 Garang 1,2,3,4 t 7 3 64 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
IPA Pucang l/de
4 Gading t 41 48 47 48 50 50 50 50 50 50 50 50 50 50 50 50 0 0 0 0 0 0 0 0
l/de 81 77 77 1,0 1,1 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2
5 IPA Kudu t 7 3 3 60 00 00 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50
l/de 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
6 IPA Garang hulu t 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
l/de 50 50 50 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0
7 IPA Jatibarang t 0 0 0 0 0 0 0 0 0 0 00 00 00 00 00 00 00 00 00 00 00 00 00 00
l/de 10 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
8 IPA Blorong t 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
l/de 29 34 29 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39 39
9 Mata Air t 0 6 3 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
1 TGM Gajah l/de 45 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
0 Mungkur t 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 Ekspansi IPA l/de
1 Kudu t 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
l/de 2,6 2,6 2,7 3,7 3,7 4,0 4,2 4,7 4,7 4,7 5,2 5,2 5,2 5,2 5,2 5,2 5,1 5,1 5,1 5,1 5,1 5,1 5,1 5,1
Total PDAM t 25 65 03 05 97 79 29 29 29 29 29 29 29 29 29 29 79 79 79 79 79 79 79 79
6. Besarnya tarif/thn dihitung dengan cara menjumlah total biaya operasi dan pemeliharaan,
biaya administrasi dan umum, dan biaya depresiasi dikalikan dengan porsentase
contribution margin yang diingankan. Hasil penghitungan lebih lanjut menunjukkan bahwa
porsetase CM minimal untuk mendapatkan penghitungan yang layak adalah 55% dari total
biaya.
TABEL VIII.10
PENGHITUNGAN TARIF
7. Estimasi Pendapatan
Estimasi Pendapatan untuk investasi perpipaan dihitung dengan cara menjumlahkan
estimasi pendapatan dari sambungan baru dan dari estimasi penjualan air, sebagaimana
dalam tabel di bawah ini.
TABEL VIII.11
ESTIMASI PENDAPATAN
Tarif
Tarif Air
Total
Air dengan
Total Pendapatan
dengan Penyus
Pendapatan (C) dg
Penyus utan
Tarif (A) dgn penyusutan
Tah Kebutuhan Air Kebutuhan air / tambaha Pendapatan utan (Inv
Pasang penyusutan inv non
un Rata2 tahun n SR Pasang Baru (Inv non
Baru inv total APBN &
dengan APBN
APBD P
APBN) & APBD
P)
Ltr/dt M3/dt
8 92 90 05 4,706 2,555
TABEL VIII.12
PENGHITUNGAN NPV UNTUK SEMUA PEKERJAAN PERPIPAAN DAN
NON PERPIPAAN
Sa
tu
an 2013 TOTAL 2014 2015 2016 2017 2018
TABEL VIII.13
PENGHITUNGAN KELAYAKAN PEKERJAAN PERPIPAAN ATAS SELURUH INVESTASI
BEBAN OPERASI NET CASH FLOW Discounted Cash Flow
PENDAPATAN LABA
(TUNAI) INVESTASI PERPIPAAN (PROCEED) Discount (NPV)
TAHUN
TOTAL rate 8%
Margin Laba 45% PENYUS TOTAL Margin Laba 45% Margin Laba 45% Margin Laba 45%
8% 9%
Th ke Proceed (CM 45%) Payback Period
DF NPV DF NPV
IRR 8.92
Payback Period 17.7 17 tahun 4 bulan
TABEL VIII.14
PENGHITUNGAN KELAYAKAN PEKERJAAN PERPIPAAN ATAS INVESTASI DILUAR APBN DAN APBD PROPINSI
NET CASH FLOW Discounted Cash Flow
PENDAPATAN LABA
BEBAN OPERASI INVESTASI perpipaan non (PROCEED) Discount (NPV)
TAHUN
(TUNAI) apbn & apbdp rate 8%
Margin Laba 45% Margin Laba 45% Margin Laba 45% Margin Laba 45%
8% 9%
Th ke Proceed (CM 45%) Payback Period
DF NPV DF NPV
IRR 9.22
16 tahun 10 bulan
Payback Period 16.8
dan seluruh atau sebagian besar modalnya dimiliki oleh daerah melalui
penyertaan secara langsung yang berasal dari kekayaan daerah yang dipisahkan
yang dibentuk khusus sebagai Penyelenggara.
Dalam Hal Kelembagaan Pengelolaan SPAM tersebut selanjutnya diatur
dalam Peraturan Menteri Pekerjaan Umum Nomor : 18/PRT/M/2007 Tentang
Penyelenggaraan Pengembangan Sistem Penyediaan Air Minum. Pada Bagian
Bagian Kelima, Kelembagaan Pasal 42 menyebutkan bahwa :
1. Pengelolaan SPAM dilaksanakan oleh penyelenggara berupa BUMN, BUMD,
koperasi, badan usaha swasta dan masyarakat, yang khusus bergerak di
bidang air minum.
2. Kelembagaan penyelenggara air minum sekurang-kurangnya memiliki:
a. Organisasi meliputi struktur organisasi kelembagaan dan personil
pengelola unit SPAM
b. Tata laksana meliputi uraian tugas pokok dan fungsi, serta pembinaan
karir pegawai penyelenggara SPAM
3. Kelembagaan penyelenggara SPAM harus dilengkapi dengan sumber daya
manusia yang kompeten di bidang pengelolaan SPAM sesuai dengan
peraturan perundangan yang berlaku
Operasional PDAM diharapkan mampu memaksimalkan pelayanan air
minum kepada masyarakat yang tidak hanya mengutamakan mencari
keuntungan, serta dalam melakukan kegiatannya didasarkan pada prinsip efisien
dan efektif dengan menerapkan praktek-praktek bisnis yang sehat untuk
meningkatkan pelayanan kepada masyarakat dalam rangka memajukan
kesejahteraan umum dan mencerdaskan kehidupan bangsa. PDAM adalah
instansi dilingkungan Pemerintah yang dibentuk untuk memberikan pelayanan
kepada masyarakat berupa Penyediaan Air Minum yang dijual tanpa
mengutamakan mencari keuntungan dan dalam melakukan kegiatannya
didasarkan pada prinsip efisiensi dan produktivitas.
Tantangan yang dihadapi PDAM pada masa kini maupun yang akan
datang adalah menjaga keberlangsungan investasi SPAM secara efektif dan
efisien. Lingkup kegiatan pengelolaan SPAM, meliputi :
1. Pengelolaan teknis dan pengelolaan non teknis, yaitu :
a. Pengelolaan teknis terdiri dari kegiatan operasional, pemeliharaan,
pemantauan dari unit air baku, unit produksi dan unit distribusi.
b. Pengelolaan non teknis terdiri dari administrasi dan pelayanan.
GAMBAR 9.1
TUGAS DAN FUNGSI DALAM PENGELOLAAN SARANA SPAM
KOTA SEMARANG
Manajer Keuangan
Manajer Produksi
Manajer SDM Direktur Keuangan dan Umum Direktur Teknik
Manajer Transmisi dan Distribusi
Manajer Asset
Direktur Utama
Pengawasan Teknik
Pengawasan Internal
Pengawasan Administrasi
GAMBAR 9.2
USULAN SKEMA KELEMBAGAAN
Sumber : Analisis Konsultan, 2013
TABEL IX.1
USULAN ORGANISASI KELEMBAGAAN PDAM
TABEL IX.2
KEBUTUHAN SUMBER DAYA MANUSIA
KEBUTUHAN
JUMLAH
TAHUN JUMLAH RASIO
PELANGGAN
PEGAWAI
2008 126.749 622 4.91%
2009 129.507 614 4.74%
2010 134.617 602 4.47%
2011 138.775 582 4.19%
2012 141.563 558 3.94%
2013 202.563 798 3.94%
2014 215.424 849 3.94%
2015 231.254 855 3.70%
2016 247.418 866 3.50%
2017 255.467 882 3.45%
2018 263.639 896 3.40%
2019 271.933 910 3.35%
2020 280.351 940 3.35%
2021 288.892 954 3.30%
2022 297.556 968 3.25%
2023 306.342 981 3.20%
2024 315.252 994 3.15%
2025 324.285 1005 3.10%
2026 333.440 1017 3.05%
2027 342.719 1035 3.02%
2028 352.121 1055 3.00%
2029 361.645 1084 3.00%
2030 371.293 1115 3.00%
2031 381.063 1142 3.00%
2032 390.957 1173 3.00%
2033 400.973 1204 3.00%
Sumber : Analisis Konsultan, 2013
LINGKUNGAN
KELEMBAGAAN TEKNIS
KEBERLANJUTAN
PROGRAM
GAMBAR 9.3
Faktor-Faktor Kesinambungan Program Pamsimas
Keberlanjutan Program:
Untuk menjaga keberlanjutan program, hal-hal yang harus dilakukan antara lain:
1. Lingkungan :
a Perlunya pemetaan lokasi non-perpipaan (PAMSIMAS, PNPM, dan lain-
lain) berbasis pada teknologi GIS (ArcGIS, ArcView, MapInfo). Pemetaan
lokasi non-perpipaan ini untuk memudahkan identifikasi dan rekomendasi
pengamanan sumber daya air, khususnya air tanah. Selain air tanah,
dimungkinkan terdapatnya pemakaian sumber air permukaan lainnya
yang tidak teridentifikasi oleh instansi berwenang. Dalam hal ini diusulkan
kegiatan management assets pada sistem non-perpipaan untuk
mendukung pemetaan lokasi non-perpipaan.
b Perlunya kajian lingkungan terhadap kegiatan pembangunan SPAM
sistem non-perpipaan, minimal kajian UKL-UPL, sehingga pembangunan
SPAM sistem non-perpipaan lebih berlandaskan sustainable
development.
c Perlunya kajian pencemaran lingkungan pada setiap pembangunan
SPAM sistem non-perpipaan. Dimana terdapat banyak persoalan
pembangunan sarana-prasarana air bersih pada lokasi tercemar atau
berdekatan dengan lokasi tercemar. Hal ini dapat dikaitkan dengan kajian
2. Teknis :
a Pemilihan Jenis Teknologi. Untuk mendukung keberlangsungan program,
maka pemilihan teknologi harus disesuaikan dengan kemampuan dan
sumberdaya yang ada. Pemilihan tekologi yang tidak tepat dan mahal
akan dapat berpengaruh pada ketergantungan dan ketidakmandirian.
b Untuk kemudahan pengelola dalam melakukan operasi dan pemeliharaan
sarana air bersih, sebaiknya dibuatkan pedoman operasi dan
pemeliharaan untuk semua jenis teknologi (non perpipaan, perpipaan
gravitasi dan perpipaan pemompaan). Hal ini penting mengingat tenaga
teknis yang ada bukan berasal dari TKM yang pernah mendapat pelatihan
teknis. Untuk peningkatan kemampuan teknis Badan Pengelola dalam
menjaga keberlanjutan fungsi dan manfaat sarana air bersih yang sudah
dibangun, diperlukan adanya pelatihan untuk para Pengelola PAMSIMAS.
c Pelatihan spesifikasi teknis diperlukan untuk mendukung poin pemilihan
jenis teknologi. Spesifikasi teknis SPAM perlu diketahui oleh masyarakat
pengguna yang sangat terkait dengan kegiatan operasi pemeliharaan.
d Sosialisasi dan keterlibatan masyarakat pada aspek teknis SPAM sistem
non-perpipaan perlu dilakukan untuk mempermudah masyarakat
pengguna dalam mengoperasikan SPAM dimulai dari unit air baku hingga
ke pelayanan.
3. Kelembagaan
a Unit utama di tingkat desa adalah Lembaga Keswadayaan Masyarakat
(LKM) dan Satuan/Unit Pelaksana kegiatannya (Village Implementation
Team) Di kelurahan yang sedang dilaksanakan program pemberdayaan
masyarakat oleh pemerintah seperti P2KP yang telah membentuk BKM
tidak perlu membentuk LKM baru, cukup dengan memanfaatkan BKM
5. Finansial :
a Kontribusi masyarakat dalam pengembangan PAMSIMAS dimaksudkan
sebagai wujud dari komitmen 'sense of belonging' dan 'sense of