KEGIATAN :
PEKERJAAN :
LOKASI :
SATUAN : Kg
TAHUN ANGGARAN :
Diameter Jarak Psg A B C D E F Pjg Jml Pot Pjg Tot Berat Berat
Posisi Sketsa Gambar
(mm) (cm) (cm) (cm) (cm) (cm) (cm) (cm) (cm) (bh) (m) (kg/m) (kg)
SLOOP 20/40
27 m'
A JARAK KOLOM 4 M' 8 m' 8 m' 8 m' 3 m' 19.0 15.0 392.0 10.0 10.0 - - - 412.00 40 164.80 2.230 367.50
X
Ruang Ruang Ruang 7 m'
Kelas Kelas Kelas
Y 19.0 15.0 392.0 22.0 22.0 10.0 10.0 - 456.00 40 182.40 2.230 406.75
Teras 2 m'
Z
Posisi Sloop 20/40
SLOOP X/Y
12.0 20.0 63.0 42.0 22.0 6.0 6.0 - 139.00 40 55.60 0.888 49.35
a 10.0 20.0 400.0 22.0 22.0 5.0 5.0 454.00 8 36.32 0.617 22.40
Bengkokan 5 cm'
Besi dia12
Beugel
besi dia 8 Bengkokan 4 cm'
Besi dia12
Beugel
n n
Posisi beugel
Diameter Jarak Psg A B C D E F Pjg Jml Pot Pjg Tot Berat Berat
Posisi Sketsa Gambar
(mm) (cm) (cm) (cm) (cm) (cm) (cm) (cm) (cm) (bh) (m) (kg/m) (kg)
E Tulangan bagi atas 16.0 15.0 592.0 8.0 8.0 608.00 26 158.08 1.580 249.77
A B
F Tulangan bagi bawah D 16.0 15.0 8.0 8.0 22.0 22.0 592.0 652.00 26 169.52 1.580 267.84
C
E
C
G Kuda - kuda 12.0 - 30.0 17.0 30.0 17.0 30.0 124.00 30 37.20 0.888 33.02
B
A E
D
Diameter Jarak Psg A B C D E F Pjg Jml Pot Pjg Tot Berat Berat
Posisi Sketsa Gambar
(mm) (cm) (cm) (cm) (cm) (cm) (cm) (cm) (cm) (bh) (m) (kg/m) (kg)
Jumalah 1,396.62
A Penahan plat injak 16.0 15.0 55.0 25.0 8.0 85.0 8.0 - 181.00 80 144.80 1.580 228.78
(2 sisi/dinding)
A B
A
B Plat injak tulangan bagi DC 16.0 15.0 8.0 8.0 22.0 22.0 592.0 - 652.00 26 169.52 1.580 267.84
B
C
E
C Plat injak tulangan bagi 16.0 15.0 8.0 592.0 8.0 - - - 608.00 26 158.08 1.580 249.77
D Plat injak tulangan utama 19.0 15.0 192.0 10.0 10.0 - - - 212.00 80 169.60 2.230 378.21
A B
19.0 15.0 10.0 10.0 22.0 22.0 192.0 - 256.00 80 204.80 2.230 456.70
D
E Plat injak tulangan utama C
E
A A
C
B
F Tulangan utama dinding 19.0 15.0 10.0 492.0 10.0 512.00 160 819.20 2.230 1,826.82
2 sisi B
D
C
E
A
G Tulangan bagi menjadi 16.0 20.0 600.0 200.0 200.0 32.0 32.0 16 1,080.00 80 864.00 1.580 1,365.12
satu sama sayap B C
D F F E
Diameter Jarak Psg A B C D E F Pjg Jml Pot Pjg Tot Berat Berat
Posisi F Sketsa Gambar
F
D E (mm) (cm) (cm) (cm) (cm) (cm) (cm) (cm) (cm) (bh) (m) (kg/m) (kg)
B
H Tulangan bagi sayap A B C 12.0 20.0 6.0 452.0 41.0 12.0 5.0 516.00 80 412.80 0.888 366.36
(4 sayap)
C
A
D
B C
E
I Tulangan pondasi bawah 12.0 20.0 6.0 112.0 6.0 124.00 80 99.20 0.888 88.04
J Tulangan pengaku/sudut 19.0 30.0 40.0 125.0 10.0 40.0 10.0 - 225.00 40 90.00 2.230 200.70
atas (2 sisi) .
JUMLAH 5,428.34
Diameter Jarak Psg A B C D E F Pjg Jml Pot Pjg Tot Berat Berat
Posisi Sketsa Gambar
(mm) (cm) (cm) (cm) (cm) (cm) (cm) (cm) (cm) (bh) (m) (kg/m) (kg)
PLAT BAWAH
A Tulangan bagi 16.0 15.0 1,007.0 8.0 8.0 - - - 1,023.00 27 276.21 1.580 436.41
A B
B Tulangan bagi D 16.0 30.0 8.0 8.0 22.0 22.0 1,007.0 - 1,067.00 13 138.71 1.580 219.16
C
E
C Tulangan bagi C 16.0 30.0 985.0 70.0 70.0 8.0 8.0 - 1,141.00 14 159.74 1.580 252.39
B
D E
A B
D Tulangan utama D 19.0 15.0 10.0 10.0 22.0 22.0 442.0 - 506.00 66 333.96 2.230 744.73
C
E
E Tulangan utama 19.0 15.0 442.0 10.0 10.0 462.00 66 304.92 2.230 679.97
C
F Kuda - kuda B B C 12.0 - 30.0 17.0 30.0 17.0 30.0 124.00 30 37.20 0.888 33.02
A
A E
D
A
C
B
H Tulangan pengaku/sudut
bawah (2 sisi) 19.0 30.0 10.0 30.0 125.0 30.0 10.0 - 205.00 96 196.80 2.230 438.86
E
JUMLAH 2,804.54
A
A
12.0 - 6.0 35.0 65.0 6.0 6.0 - 118.00 40 47.20 0.888 41.89
A Pagar B
B C
Diameter Jarak Psg A B C D E F Pjg Jml Pot Pjg Tot Berat Berat
Posisi Sketsa Gambar
B (mm) (cm) (cm) (cm) (cm) (cm) (cm) (cm) (cm) (bh) (m) (kg/m) (kg)
B C
B Angkur psg batu 12.0 50.0 6.0 80.0 6.0 - - - 92.00 16 14.72 0.888 13.06
D Ring pagar 8.0 - 8.0 4.0 4.0 8.0 8.0 8 40.00 20 8.00 0.395 3.16
B C
E Ring pagar 8.0 - 8.0 4.0 4.0 8.0 8.0 8 40.00 20 8.00 3.850 30.80
F Ring pagar A 8.0 - 9.0 4.0 4.0 9.0 9.0 9 44.00 10 4.40 3.850 16.94
C
G Ring pagar 8.0 - 11.0 4.0 4.0 11.0 11.0 11 52.00 10 5.20 3.850 20.02
D E
JUMLAH 125.87
terbilang : Empat Ratus Tiga Juta Dua Ratus Sembilan Puluh Satu Ribu Rupiah
403,291,000.00
hidden
000000403291000.00
1 0
2 0
4 0 rupiah 0
5 0 1
6 0 2
7 1 satu ribu 3
8 9 sembilan sembilan puluh satu 4
9 2 dua dua ratus 5
10 3 tiga juta 6
11 0 tiga 7
12 4 empat empat ratus 8
13 0 9
14 0 u/ sen
15 0
16 0
17 0
18 0
18
Empat Ratus Tiga Juta Dua Ratus Sembilan Puluh Satu Ribu Rupiah
sen
satu se rupiah
dua belas
tiga puluh
empat ratus
lima ribu
enam juta
tujuh milyard
delapan triliun
sembilan
puluhan ribu pjuta milyard triliun
puluh
rupiah
TABEL BERAT BESI POLOS
mm Kg/m
6.00 0.222 6.00
8.00 0.395 8.00
10.00 0.620 10.00
12.00 0.887 12.00
14.00 1.209 14.00
16.00 1.580 16.00
19.00 2.230 19.00
22.00 2.980 22.00
25.00 3.850 25.00
B BAHAN BANGUNAN
1 Batu Bata Merah Bj 1,400.00
2 Batu Gunung M3
311,000.00
3 Batu Pecah 1 - 2 cm Eks. Krayan M3 450,000.00
4 Batu Pecah 2 - 3 cm Eks. Krayan M3 450,000.00
5 Kerikil Sungai M3 225,000.00
6 Papan nama proyek bh 300,000.00
7 Pasir Sungai Ex. Kandilo M3 477,700.00
8 Pasir pasang putih M3 105,000.00
9 Pasir Urug/Pasir Timbunan M3 100,930.00
10 Semen abu - abu 50 kg Zak 99,000.00
11 Semen putih tiga roda 50 kg Zak 180,000.00
12 Semen warna kg 9,000.00
13 Sirtu M3 471,000.00
14 Tanah Timbunan M3 175,000.00
C BAHAN KAYU
1 Daun Jendela 50x160 cm + Kc 5 mm bh 400,000.00
2 Angin - angin papan ulin bh 40,000.00
3 Kayu Galam D 10-15 cm bh 26,000.00
4 Kayu Galam D 5-9 cm bh 7,280.00
5 Kayu Meranti balok 4m' 5x7 cm M3 2,500,000.00
6 Kayu kelas 2 M3 2,300,000.00
7 Kayu Ulin Balok 4m' 10x10 cm, 8x8 cm M3 4,000,000.00
8 Kayu Ulin Papan 4 m' 2x20 cm M3 4,000,000.00
9 Papan Kayu Meranti 4m' 2x20 cm M3 2,500,000.00
10 Pintu panel ky ulin L 70 cm bh 676,000.00
D BAHAN BESI/LOGAM
1 Besi Holo 2 x 4 M' 10,920.00
2 Besi Holo 4 x 4 M' 12,480.00
3 Besi Tulangan Beton Polos Kg 15,100.00
4 Besi Tulangan Beton Ulir Kg 16,400.00
6 Kawat Bendrat Kg 27,800.00
7 Paku Biasa Kg 28,100.00
8 Paku Genteng Metal Kg 36,700.00
9 Paku plywood Kg 34,800.00
10 Paku Payung (Seng) Kg 36,700.00
11 Paku Ulin Kg 31,500.00
12 Seng Talang 50 cm m' 18,300.00
E ALAT-ALAT LISTRIK
1 Lampu Philips Essential 18 Watt Bh 64,300.00
2 Saklar broco integra tunggal Bh 30,400.00
3 Saklar broco integra seri Bh 87,800.00
4 Stop kontak broco integra Bh 29,200.00
5 MCB Box 4 Group Schneider Bh 75,000.00
6 MCB 6A Merlin Gerin Bh 75,000.00
7 Fitting lampu New Broco Bh 30,000.00
NO URAIAN SATUAN HARGA
F BAHAN LANTAI
1 Keramik halus ukuran 30x30 cm Dos 83,400.00
2 Keramik halus ukuran 30x30 cm Dos 83,400.00
G BAHAN ATAP
1 Suryaroof genteng 2x4 Lbr 72,300.00
2 Suryaroof nok model U (110x5x6 cm) bh 75,800.00
3 Rangka atap baja ringan Taso m2 163,280.00
I BAHAN KACA
1 Kaca Polos standar 5 mm M2 29,690.00
2 Kaca Polos 8 mm M2 205,400.00
K CAT / FINISHING
1 Amplas Kayu/Besi Lbr 3,120.00
2 Cat Besi/kayu Altek 1 kg Kg 35,260.00
3 Cat Besi/kayu Avian 1 kg Kg 42,120.00
4 Cat Tembok Paragon Putih 5 kg Kaleng 65,520.00
5 Cat Tembok Paragon Warna 5 kg Kaleng 70,720.00
6 Cat Tembok Altek 5 kg Kaleng 81,120.00
7 Dempul Kg 20,800.00
8 Meni Kayu yoko 1 kg Kg 20,800.00
9 Meni kayu kembang 1 kg Kg 20,800.00
10 Meni besi altek 1 kg Kg 20,800.00
11 Minyak begesting ltr 10,800.00
12 Plamir RJ London Kg 16,640.00
13 Thinner B special jempol 1 ltr Kaleng 10,400.00
Catatan :
1. Harga diatas adalah harga disumber material ( disungai, dilokasi penggalian) khusus utk bahan lokal
2. Untuk bahan-bahan non lokal harga tersebut adalah harga toko / harga yang berlaku dipasaran
3. Harga sudah terrmasuk keuntungan kontraktor dan ongkos angkut
4. Harga belum termasuk PPn
ANALISA HARGA SATUAN
A. PEKERJAAN PERSIAPAN
A. 6.6.4 1 M' MENGUKUR DAN MEMASANG BOUWPLANK
0.0120 m3 kayu kelas 2 @ 2,300,000.00 27,600.00
0.0200 kg Paku Biasa 2' - 5' @ 28,100.00 562.00
0.0070 m3 kayu papan 2/20 kelas 2 @ 2,300,000.00 16,100.00
0.1000 oh tukang kayu @ 120,750.00 12,075.00
0.1000 oh pekerja @ 92,000.00 9,200.00
0.0100 oh kepala tukang @ 126,500.00 1,265.00
0.0050 oh mandor @ 126,500.00 632.50
JUMLAH 44,262.00 23,172.50 67,434.50
B. PEKERJAAN TANAH
B. 6.6.1 1 M3 GALIAN TANAH BIASA SEDALAM 1 M'
0.4000 oh pekerja @ 92,000.00 36,800.00
0.0400 oh mandor @ 126,500.00 5,060.00
JUMLAH 41,860.00 41,860.00
B. 6.6.9 1 M3 URUGAN KEMBALI
0.1920 oh pekerja @ 92,000.00 17,664.00
0.0190 oh mandor @ 126,500.00 2,403.50
JUMLAH 20,067.50 20,067.50
B. 6.6.11 1 M3 URUGAN TANAH
1.2000 M3 Tanah urug @ 175,000.00 210,000.00
0.2500 oh pekerja @ 92,000.00 23,000.00
0.0250 oh mandor @ 126,500.00 3,162.50
1.0000 oh Ls biaya pemadatan @ - -
JUMLAH 210,000.00 26,162.50 236,162.50
B. 6.6.11.a 1 M3 URUGAN PASIR
1.2000 M3 pasir urug @ 100,930.00 121,116.00
0.3000 oh pekerja @ 92,000.00 27,600.00
0.0100 oh mandor @ 126,500.00 1,265.00
1.0000 oh Ls biaya pemadatan @ -
JUMLAH 121,116.00 28,865.00 149,981.00
C. PEKERJAAN PONDASI
C.6.6.5 1 M3 PASANG PONDASI BATU KALI / GUNUNG / BELAH 1 Pc ; 4 Ps
1.1000 m3 batu belah 15/20 cm @ 311,000.00 342,100.00
163.0000 kg semen porland @ 1,980.00 322,740.00
0.5200 m3 pasir pasang putih @ 105,000.00 54,600.00
9 1.5000 oh pekerja @ 92,000.00 138,000.00
3.6 0.6000 oh tukang batu @ 120,750.00 72,450.00
0.36 0.0600 oh kepala tukang @ 126,500.00 7,590.00
0.45 0.0750 oh mandor @ 126,500.00 9,487.50
JUMLAH 719,440.00 227,527.50 946,967.50
D. PEKERJAAN DINDING
D. 6.6.11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 4 ps
60.0000 bh bata merah 8 x 8 x 15 cm @ 1,400.00 84,000.00
11.5000 kg semen porland @ 1,980.00 22,770.00
0.0430 m3 pasir pasang putih @ 105,000.00 4,515.00
0.3200 oh pekerja @ 92,000.00 29,440.00
0.1000 oh tukang batu @ 120,750.00 12,075.00
0.0100 oh kepala tukang @ 126,500.00 1,265.00
0.0150 oh mandor @ 126,500.00 1,897.50
JUMLAH 111,285.00 44,677.50 155,962.50
HARGA JUMLAH HARGA
KODE HARGA SATUAN
INDEK SATUAN URAIAN BAHAN UPAH (
ANALISA ( Rp )
( Rp ) ( Rp ) Rp )
E. PEKERJAAN PLESTERAN
E. 6.6.4 1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 15 MM
5.2000 kg semen portland @ 1,980.00 10,296.00
0.0200 m3 pasir pasang putih @ 105,000.00 2,100.00
0.2000 oh pekerja @ 92,000.00 18,400.00
0.1500 oh tukang batu @ 120,750.00 18,112.50
0.0150 oh kepala tukang @ 126,500.00 1,897.50
0.0100 oh mandor @ 126,500.00 1,265.00
JUMLAH 12,396.00 39,675.00 52,071.00
F. PEKERJAAN KAYU
F.6.6.3 1 M³ PASANG KUSEN PINTU DAN JENDELA KAYU ULIN
1.2000 m3 kayu ulin, balok @ 4,000,000.00 4,800,000.00
6.0000 oh pekerja @ 92,000.00 552,000.00
18.0000 oh tukang kayu @ 120,750.00 2,173,500.00
2.0000 oh kepala tukang @ 126,500.00 253,000.00
0.3000 oh mandor @ 126,500.00 37,950.00
JUMLAH 4,800,000.00 3,016,450.00 7,816,450.00
F. 6.6.53. 1M' PASANG LISPLANG UKURAN 2/20 ky kelas 1
1.0000 m' Ky kelas 1 uk. 2/20 @ 16,666.67 16,666.67
0.0600 kg paku ulin @ 31,500.00 1,890.00
0.1000 oh pekerja @ 92,000.00 9,200.00
0.1000 oh tukang kayu @ 120,750.00 12,075.00
0.0100 oh kepala tukang @ 126,500.00 1,265.00
0.0500 oh mandor @ 126,500.00 6,325.00
1 m' pasang lisplank uk 2x20 cm JUMLAH 18,556.67 28,865.00 47,421.67
F. 6.6.60 1M' PASANG LIST PLAFOND, KAYU PROFIL
1.0500 m' List kayu meranti @ 20,000.00 21,000.00
0.0100 Kg paku biasa @ 28,100.00 281.00
0.0210 oh pekerja @ 92,000.00 1,932.00
0.0210 oh tukang kayu @ 120,750.00 2,535.75
0.0210 oh kepala tukang @ 126,500.00 2,656.50
0.0010 oh mandor @ 126,500.00 126.50
JUMLAH 21,281.00 7,250.75 28,531.75
A.1.BOW SEBUAH TONGKAT ULIN UK.8x8 cm / KAYU GALAM dia 8-12 cm
TINGGI 4,00 M DILANCIP DAN DITUMBUK
1.0000 BT Balok ulin 8x8 cm @ 4m' @ 100,000.00 100,000.00
1.0000 BT Kayu Galam dia 8-12 cm @ 26,000.00 26,000.00
0.5100 OH tukang kayu @ 120,750.00 61,582.50
0.8750 OH pekerja @ 92,000.00 80,500.00
0.0510 OH kepala tukang @ 126,500.00 6,451.50
0.0440 OH mandor @ 126,500.00 5,566.00
4 m' pancang kayu ulin JUMLAH 100,000.00 154,100.00 254,100.00
4 m' pancang kayu galam 26,000.00 154,100.00 180,100.00
1 m' pancang kayu ulin 63,525.00
1 m' pancang kayu galam 45,025.00
HARGA
KODE HARGA SATUAN JUMLAH HARGA
INDEK SATUAN URAIAN BAHAN UPAH
ANALISA ( Rp ) ( Rp )
( Rp ) ( Rp )
G. PEKERJAAN BETON
G.6.6.1 1 M3 BETON TUMBUK 1 pc ; 3 ps ; 5 kr
218.0000 kg semen portland @ 1,980.00 431,640.00
0.5200 m3 pasir beton @ 477,700.00 248,404.00
0.8700 m3 Batu pecah 1-2, 2-3 cm @ 450,000.00 391,500.00
1.6500 oh pekerja @ 92,000.00 151,800.00
0.2500 oh tukang batu @ 120,750.00 30,187.50
0.0250 oh kepala tukang @ 126,500.00 3,162.50
0.0800 oh mandor @ 126,500.00 10,120.00
1,071,544.00 195,270.00 1,266,814.00
G.6.6.5. 1 M3 MEMBUAT BETON BERTULANG Camp. (1 pc ; 2 ps ; 3 kr)
336.00 kg Semen Portland @ 1,980.00 665,280.00
0.54 m3 Pasir beton @ 477,700.00 257,958.00
0.81 m3 Batu pecah 1-2, 2-3 cm @ 450,000.00 364,500.00
2.00 oh Pekerja @ 92,000.00 184,000.00
0.35 oh Tukang batu @ 120,750.00 42,262.50
0.04 oh Kepala Tukang @ 126,500.00 4,427.50
1.00 oh Mandor @ 126,500.00 126,500.00
1,287,738.00 357,190.00 1,644,928.00
G.6.6.25 1 KG PEMBESIAN DG BESI POLOS
1.0500 Kg Besi beton polos @ 15,100.00 15,855.00
0.0150 Kg Kawat bendrat @ 27,800.00 417.00
0.0070 OH pekerja @ 92,000.00 644.00
0.0070 OH tukang besi @ 120,750.00 845.25
0.0007 OH kepala tukang @ 126,500.00 88.55
0.0003 OH mandor @ 126,500.00 37.95
@ JUMLAH 16,272.00 1,615.75 17,887.75
G. 6.6.29 1 M2 PASANG BEKISTING UNTUK SLOOF
0.0450 m3 papan kayu kelas 2 @ 2,300,000.00 103,500.00
0.3000 kg paku biasa 2' - 5' @ 28,100.00 8,430.00
0.1000 lt minyak bekisting @ 10,800.00 1,080.00
0.3000 OH pekerja @ 92,000.00 27,600.00
0.2600 OH tukang kayu @ 120,750.00 31,395.00
0.0260 OH kepala tukang @ 126,500.00 3,289.00
0.0050 OH mandor @ 126,500.00 632.50
1 m2 pasang bekisting sloop 113,010.00 62,916.50 175,926.50
1 m2 pasang bekisting sloop 3 x pakai 58,642.17
A PEKERJAAN PERSIAPAN
1 Memasang bowplank 1.00 ls 350,000.00 350,000.00
Jumlah 350,000.00
B PEKERJAAN TANAH
1 Galian tanah pondasi 71.63 m3 41,860.00 2,998,431.80
2 Urugan Pasir bawah lantai 30.00 m3 149,981.00 4,499,430.00
3 Urugan kembali 17.91 m3 20,067.50 359,408.93
4 Urugan tanah bawah lantai 105.00 m3 236,162.50 24,797,062.50
Jumlah 32,654,333.23
C PEKERJAAN PASANGAN PONDASI
1 Pancang cerucuk Kayu Ulin uk 8X8 cm 92.00 m' 63,525.00 5,844,300.00
2 Pasg. Pondasi batu gunung camp 1:4 51.68 m3 946,967.50 48,939,280.40
Jumlah 54,783,580.40
D PEKERJAAN BETON
1 Sloop 15/20 cm
- Beton Camp. 1pc:2ps:3kr 3.38 m3 1,644,928.00 5,559,856.64
- Pembesian dengan besi polos 404.47 kg 17,887.75 7,235,058.24
- Begesting 38.00 m2 58,642.17 2,228,402.33
Jumlah 15,023,317.22
2 Kolom 15/20 cm
- Beton Camp. 1pc:2ps:3kr 2.52 m3 1,644,928.00 4,145,218.56
- Pembesian dengan besi polos 383.18 kg 17,887.75 6,854,228.05
- Begesting 34.02 m2 100,013.67 3,402,464.94
Jumlah 14,401,911.55
3 Kolom 12/12 cm
- Beton Camp. 1pc:2ps:3kr 0.32 m3 1,644,928.00 518,152.32
- Pembesian dengan besi polos 56.77 kg 17,887.75 1,015,487.57
- Begesting 5.60 m2 100,013.67 560,076.53
Jumlah 2,093,716.42
4 Ringbalk 12/20
- Beton Camp. 1pc:2ps:3kr 2.28 m3 1,644,928.00 3,750,435.84
- Pembesian dengan besi polos 282.72 kg 17,887.75 5,057,224.68
- Begesting 32.40 m2 92,127.00 2,984,914.80
Jumlah 11,792,575.32
JUMLAH D 43,311,520.50
E PEKERJAAN DINDING
1 Pasg. Dinding batu bata camp 1pc : 4ps tebal 1/2 bata 161.60 m2 155,962.50 25,203,540.00
2 Plesteran dinding dan beton camp 1pc : 4ps 348.20 m2 52,071.00 18,131,122.20
Jumlah 43,334,662.20
HRG. SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT.
(RP) (RP)
1 2 3 4 5 6
F PEKERJAAN PENUTUP LANTAI / KERAMIK
1 Cor rabat lantai camp 1pc : 3ps : 5kr 22.50 m3 1,266,814.00 28,503,315.00
2 Pasg. Keramik dlm kelas uk 30x30 tipe halus 120.00 m2 232,209.74 27,865,168.80
3 Pasg. Keramik teras uk 30x30 tipe halus 30.00 m2 232,209.74 6,966,292.20
Jumlah 63,334,776.00
G PEKERJAAN RANGKA ATAP DAN ATAP
1 Rangka atap baja ringan 227.80 m2 163,280.00 37,195,184.00
2 Penutup atap metal colour setara sakura 227.80 m2 141,872.50 32,318,555.50
3 Bubungan atap metal colour setara sakura 17.00 m' 129,869.50 2,207,781.50
4 Pasang listplank ky ulin 2 x 20 60.80 m' 47,421.67 2,883,237.33
Jumlah 74,604,758.33
H PEKERJAAN PLAFOND
1 Pek. Rangka ky meranti + plafond calciboard 218.16 m2 134,993.75 29,450,236.50
2 List plafond profil kayu meranti 150.40 m' 28,531.75 4,291,175.20
Jumlah 33,741,411.70
I PEKERJAAN KUSEN, PINTU, JENDELA DAN PENGGANTUNG
1 Pekerjaan kusen, pintu, jendela kayu klas 1 0.95 m3 7,816,450.00 7,451,030.96
2 Angin-angin papan 40.00 bh 40,000.00 1,600,000.00
3 Daun pintu panil kayu kelas 1 5.00 bh 676,000.00 3,380,000.00
4 Daun jendela + kaca 5mm rangka kayu klas 1 16.00 bh 400,000.00 6,400,000.00
5 Kaca mati bening 5mm 8.00 m2 54,143.88 433,151.00
6 Pasg. Kunci pintu 5.00 bh 259,099.50 1,295,497.50
7 Pasang engsel pintu 5" 3 bh/daun 15.00 psg 51,644.88 774,673.13
8 Pasang Engsel Jendela 3" 2 bh/daun 32.00 psg 35,123.25 1,123,944.00
9 Pasang grendel pintu (atas & bawah) 20.00 bh 46,444.88 928,897.50
10 Pasg. Grendel daun jendela 15.00 bh 37,084.88 556,273.13
11 Pasg. Hak angin daun jendela 32.00 bh 44,785.00 1,433,120.00
12 Pasg. Handel daun jendela 16.00 bh 29,804.88 476,878.00
Jumlah 25,853,465.21
J PEKERJAAN CAT - CATAN
1 Cat dinding & bidang beton yang nampak 348.20 m2 16,941.89 5,899,166.10
2 Cat plafond 218.16 m2 29,375.88 6,408,641.98
3 Cat minyak/kayu 53.72 m2 27,462.40 1,475,280.13
Jumlah 13,783,088.21
K PEKERJAAN INSTALASI LISTRIK
1 Instalasi titik lampu 16.00 Ttk 25,000.00 400,000.00
3 Lampu hemat energi Philips Essential 18 Watt / setara 16.00 Bh 64,300.00 1,028,800.00
4 Fitting lampu segi New Broco/setara (tipe duduk) 16.00 Bh 30,000.00 480,000.00
5 Kabel 2 x 2.5 mm2 2.00 ls 200,000.00 400,000.00
6 Pipa kabel + aksesoris, paku klem (Terpasang) 6.00 Ls 100,000.00 600,000.00
7 Stop kontak broco integra / setara 4.00 Bh 29,200.00 116,800.00
8 Saklar dobel / broco integra / setara 2.00 Bh 30,400.00 60,800.00
9 Saklar tunggal / broco integra / setara 4.00 Bh 87,800.00 351,200.00
Jumlah 3,437,600.00
REKAPITULASI
PEKERJAAN : PEMBANGUNAN 1 RUANG PERPUSTAKAAN SDN ANTABRANTA
LOKASI : KEC. DUMAY, KAB. GALAU
Menyetujui,
Kepala SMKN 4 Penajam Paser Utara
NIP.
TIME SCHEDULE
PEKERJAAN : PEMBANGUNAN 1 RUANG PERPUSTAKAAN SDN ANTABRANTA
LOKASI : KEC. DUMAY, KAB. GALAU
100%
A PEKERJAAN PERSIAPAN 350,000.00 0.09 0.09
B PEKERJAAN TANAH 32,654,333.23 8.39 2.80 2.80 2.80
C PEKERJAAN PASANGAN PONDASI 54,783,580.40 14.08 3.52 3.52 3.52 3.52
D PEKERJAAN BETON 43,311,520.50 11.13 2.23 2.23 2.23 2.23 2.23
E PEKERJAAN DINDING 43,334,662.20 11.13 2.23 2.23 2.23 2.23 2.23
50%
F PEKERJAAN PENUTUP LANTAI / KERAMIK 63,334,776.00 16.27 3.25 3.25 3.25 3.25 3.25
G PEKERJAAN RANGKA ATAP DAN ATAP 74,604,758.33 19.17 4.79 4.79 4.79 4.79
H PEKERJAAN PLAFOND 33,741,411.70 8.67 2.17 2.17 2.17 2.17
I PEKERJAAN KUSEN, PINTU, JENDELA DAN PEN 25,853,465.21 6.64 1.33 1.33 1.33 1.33 1.33
J PEKERJAAN CAT - CATAN 13,783,088.21 3.54 1.18 1.18 1.18
K PEKERJAAN INSTALASI LISTRIK 3,437,600.00 0.88 0.44 0.44 0%
Keterangan
Minggu ke 1 s/d minggu ke 12 : 1 minggu 7 (tujuh) hari kalender
Minggu ke 13 : 1 minggu 6 (enam) hari kalender -
BACK UP DATA VOLUME PEKERJAAN
3 Urugan tanah bawah lantai 129.6 Urugan tanah bawah lantai dalam ruang
Tebal urugan rata - rata = 0.35 m'
Lebar = 7.00 m'
Panjang 8+8+8 = 24.00 m'
Volume = 58.80 m3
4 Urugan pasir bawah lantai 60.19 Urugan pasir bawah lantai dalam ruang
Tebal urugan = 0.10 m'
Lebar = 7.00 m'
Panjang 8+8+8 = 24.00 m'
Volume = 16.80 m3
1 Pasg. Batu kosong Anstamping T=20 cm 38.88 Panjang pondasi 24+24+24+7+7+7+7+2+2+2+2 = 108.00 m'
Tebal = 0.20 m'
Lebar = 0.90 m'
Volume = 19.44 m3
Volume Anstamping 2 Gedung = 19.44*2 = 38.88 m3
2 Pasg. Pondasi batu gunung 1 : 4 86.4 Panjang pondasi 24+24+24+7+7+7+7+2+2+2+2 = 108.00 m'
Lebar atas = 0.30 m'
Lebar bawah = 0.70 m'
Lebar rata - rata = 0.50 m'
Tinggi = 0.80 m'
Volume = 43.20 m3
Volume Pas. Pondasi 2 Gedung = 3.20*2 = 86.40 m3
IV PEKERJAAN PASANGAN
1 Pasangan dinding batu bata 1 : 4 Luas dinding kotor :
* Panjang dinding 24+24+7+7+7+7 = 76.00 m'
* Tinggi pasangan = 3.70 m'
* Luas = 281.02 m2
V PEKERJAAN BETON
1 Cor Lantai t = 5 cm camp 1 : 3 : 5 21.6 Luas lantai dalam 24*7 = 168 m2
Luas lantai luar 24*2 = 48 m2
Luas lantai dalam + luar = 216 m2
Tebal cor = 0.05 m'
Volume 1 RKB = 10.8 m3
Volume cor lantai 2 Gedung = 2*10.8 = 21.60 m2
=
2 Cor rabat beton t = 5 cm camp 1 : 3 : 5 8.5 Volume rabat belakang bangunan :
* Panjang (24+1.2+1.2) = 26.40 m'
* Lebar = 1.20 m'
* Tebal = 0.05 m'
* Volume Panjang*lebar*tinggi = 1.58 m3
Volume depan bangunan
* Panjang (24+1.2+1.2) = 26.40 m'
* Lebar = 1.20 m'
* Tebal = 0.05 m'
* Volume Panjang*lebar*tinggi = 1.58 m3
Rolag samping kiri dan kanan/saluran samping bangunan
* Panjang (7+2)*2 = 18.00 m'
* Lebar = 1.20 m'
* Tebal = 0.05 m'
* Volume Panjang*lebar*tinggi = 1.08 m3
Luas rabat 1 RKB 1.58+1.58+1.08 = 4.25 m2
Volume cor rabat 2 Gedung = 4.25*2 = 8.50 m2
6 Kolom 12/12
- Cor beton camp 1 : 2 : 3 0.4 Tinggi kolom = 3.50 m'
Panjang = 0.12 m'
Lebar = 0.12 m'
Jumlah kolom 10+10+10 = 4.00 bh
Volume kolom 1 RKB = 0.20 m3
Volume cor kolom 12/12 2 Gedung = 43.2*2 = 0.40 m3
8 Konsol beton
- Cor beton camp 1 : 2 : 3 0.32 Panjang konsol 2.6*9 = 23.40 m'
Tebal = 0.10 m'
Lebar = 0.25 m'
Volume sloop 1 RKB 108*0.2*0.15 = 0.59 m3
Volume beton konsol 2 Gedung = 3.24*2 = 1.17 m3
VI PEKERJAAN KERAMIK
1 Pasg. Keramik halus uk 30 x 30 336 Jumlah ruang = 3.00 bh
Luas / ruang 7*8 = 56.00 m2
Luas keramik 3 ruang kelas 56*3 = 168.00 m2
Volume keramik halus 2 Gedung = 168*2 = 336.00 m2
3 Plint keramik 10 x 30 216 Panjang plint tiap ruang 8+7+7+7 = 29.00 m'
Jumlah kelas = 3.00 bh
Jumlah plint 3 kelas = 87.00 m'
Panjang plint teras 7+7+7 = 21.00 m'
Panjang plint 1 RKB = 108.00 m'
Volume plint keramik 2 Gedung = 108*2 = 216.00 m'
2 Daun pintu panel kayu ulin tunggal 6 Jumlah pintu 1 gedung = 3.00 bh
Volume pintu 2 gedung = 3*2 = 6.00 bh
3 Daun jendela kayu ulin besar + kaca 5 mm 36 Daun jendela besar 1 gedung 2*9 = 18.00 bh
Daun jendela besar 2 gedung = 2*18 = 36.00 bh
4 Daun jendela kayu ulin kecil + kaca 5 mm 30 Daun jendela besar 1 gedung 2*6+1*3 = 15.00 bh
Daun jendela kecil 2 gedung = 2*15 = 30.00 bh
Jalusi jendela J1
* Jumlah J1 1 gedung = 6.00 bh
* Panjang jalusi 0.72+0.72+0.72 = 2.16 m'
* Lebar jalusi = 0.15 m'
* Luas = 0.32 m2
* Luas jalusi pintu 1 gedung = 1.94 m2
Jalusi jendela J2
* Jumlah J2 1 gedung = 9.00 bh
* Panjang jalusi 0.72+0.72+0.72 = 2.16 m'
* Lebar jalusi = 0.15 m'
* Luas = 0.32 m2
* Luas jalusi pintu 1 gedung = 2.92 m2
2 Pasangan atap genteng metal 718.5 Luas atap = luas rangka atap = 718.50 m2
3 Bubungan atap genteng metal 74.2 Bubungan atas 2+3.4+2.67+2.67+2.67+ = 18.81 m'
Bubungan samping kiri 4.58*2 = 9.15 m'
Bubungan samping kanan 4.58*2 = 9.15 m'
Panjang bubungan 1 gedung = 37.10 m'
Panjang bubungan 2 gedung 37.1*2 = 74.20 m'
4 Listplank kayu ulin (2 x 2/20) 167.68 Lisplank keliling bangunan (26.4+11.4)*2 = 75.6 m'
Lisplank atas 2.06*4 = 8.24 m'
Listplank 1 gedung 75.6+8.24 = 83.84 m'
Listplank 2 gedung 83.84*2 = 167.68 m'
IX PEKERJAAN PLAFOND
1 Pek. Rangka plafond kayu meranti 601.92 Ruang kelas
* Panjang = 8.00 m'
* Lebar = 7.00 m'
* Jumlah kelas = 3.00 bh
* Luas 3 ruang = 168.00 m2
Teras depan
* Panjang = 24.00 m'
* Lebar = 3.20 m'
* Jumlah = 76.80 m2
Teras samping kiri
* Panjang = 11.40 m'
* Lebar = 1.20 m'
* Jumlah = 13.68 m2
Teras samping kanan
* Panjang = 11.40 m'
* Lebar = 1.20 m'
* Jumlah = 13.68 m2
Teras belakang
* Panjang = 24.00 m'
* Lebar = 1.20 m'
* Jumlah = 28.80 m2
Luas rangka plafond 1 gedung = 300.96 m2
Luas rangka plafond 2 gedung 300.96*2 = 601.92 m2
2 Pas. Plafond kalsiboard 4 mm 601.92 Luas plafond = luas rangka plafond = 601.92 m2
XI PEKERJAAN ELEKTRIKAL
1 Instalasi listrik 58 Instalasi listrik :
* Titik mata lampu = 20.00 bh
* Titik stop kontak = 3.00 bh
* Titik saklar = 5.00 bh
* Titik sekring kas = 1.00 bh
Instalasi listrik 1 gedung = 29.00 bh
Volume instalasi listrik 2 gedung 29*2 = 58.00 bh
2 Cat plafond plywood 601.92 Luas cat plafond = Luas plafond = 601.92 m2
Cat jalusi
* Luas jalusi = 11.75 m'
* Tebal = 0.02 m'
* Luas permukaan jalusi = luas cat = 23.97 m2
Cat lisplank
* Lebar listplank = 0.20 m'
* Panjang lisplang 2 gedung = 167.68 m'
* Luas cat listplank = 33.54 m2