Task IDs
Task ID Description Estimated Duration Actual Duration Remarks
10 PERSIAPAN (IZIN KERJA, TOOLS DAN MATERIAL) 00:20
20 PERIKSA VISUAL SETIAP PANEL (KELAINAN SUARA DAN 00:10
TEMPERATUR HUMIDITY)
30 PERIKSA DISPLAY PADA SISTEM PROTEKSI SETIAP PANEL (ALARM)
00:10
40 PERIKSA LAMPU INDIKATOR SETIAP PANEL BREAKER 00:10
50 PERIKSA SISTEM PENERANGAN, PENDINGIN PADA 00:10
RUANGAN TRANSFORMER (FAN TRANSFORMER) DAN
RUANGAN PANEL
60 PERIKSA PARAMETER OPERASI TRANSFORMER 00:10
(TEGANGAN DAN ARUS)
70 PERIKSA VISUAL TRANSFORMER 00:10
(KELAINAN SUARA DAN TEMPERATUR)
80 PERIKSA DAN BERSIHKAN SEMUA CUBICLE BERSERTA INSTALASINYA
00:25
90 LAPORKAN HASIL PEKERJAAN (KEPADA OPERASI ) DAN 00:15
ISI FEEDBACK DI MAXIMO
Planned Labor
Task ID Craft Description Qty Hours Labor ID Labor Name Remarks
10 SRELEC Senior Electrical 1 02:00
Technician
20 JRELEC Junior Electrical 1 02:00
Technician
Planned Material
Task ID Item Description Storeroom Qty Satuan Remarks
Planned Tool
Task ID Tool Description QTY Hours Remarks
61.001.014.0144.AMC KUAS 3 INCI HITAM 2 2
48.034.017.0044 TANG AMPERE METER ; MODEL FLUKE 376 ; 1 2
MERK FLUKE
67.002.001.0099 TOOLSET KRISBOW TYPE KW0103392 1 2
67.018.005.0021 BLOWER KW07-00591. MERK: KRISBOW 1 2
Planned Services
Task ID Service Item Description QTY Vendor
FAILURE REPORTING
PREDICTION ACTUAL
Problem : Problem :
Cause : Cause :
Remedy : Remedy :
Additional Remarks :
4/18/21 2:08 PM
PANGKALAN SUSU OMU 202114494
*) Untuk pekerjaan yang memerlukan ijin khusus harus dilengkapi ijin tambahan seperti : Hot Work Permit, Fire Detection Isolation Permit, Hazardous Energies
Work Permit, dan Confined Space Work Permit.
4/18/21 2:08 PM