PELAT
BALOK
KOLOM
DINDING
PONDASI
START
BEBAN
BEBAN
TIDAK
LATERAL
YA
TIDAK
b. Gempa Bumi
REVISI
DIMENSI CHECK
& DIMENSI
SISTIM BEBAN
YA
GAMBAR
PELAKSANAAN
PELAKSANAAN
BEBAN
MENGATASI KERUSAKAN STRUKTUR
Sistim
Struktur
Pemikul
Gaya
Lateral
1. Angin
2. Gempa
ELEMENT STRUKTUR BETON
(1)
ELEMENT STRUKTUR BETON
(2)
PELAT SATU ARAH
ALUR BEBAN
TEBAL PELAT MINIMUM PELAT SATU ARAH
2 tumpuan / 20
3 tumpuan / 24
Cantilever / 10
Bentang untuk one-way slab
n
c
c
n t
BEKISTING PABRIK MODUL
KECIL
l
JOIST FLOOR + BALOK
DISTRIBUSI (DIAPHRAGMA)
2 tumpuan / 16
3 tumpuan /18.5
lebih dari 3 tumpuan / 21
Cantilever
/8
300 ln / 33 ln / 36 ln / 36 ln / 36 ln / 40 ln / 40
420 ln / 30 ln / 33 ln / 33 ln / 33 ln / 36 ln / 36
520 ln / 28 ln / 31 ln / 31 ln / 31 ln / 34 ln / 34
sisi panjang
sisi pendek
UKURAN KOLOM
Pu
Ag
'
0 .4 f c t f y
luas tulangan
t
luas penampang beton
Di ambil 0.01 (1 %)
MATERIAL BETON
BERTULANG
MUTU BETON : KUAT TEKAN SILINDER 28 hari
'
f : 15 50 MPa
c
bikonus
Mesin Bor
tanah
1. Pasang Casing
baja
2. Pengeboran &
Cleaning
3. Masukan
Keranjang baja
tulangan
4. Pasang pipa
tremi
5. Pengecoran
beton
bertahap
bersamaan
dengan
penarikan
pipa tremi
Diaphragm Wall & Ground AQnchors, Dewatering
4 LANTAI BASEMENT
DEWATERING
GROUND ANCHOR
D-WALL
SISTIM STRUKTUR
PERIMETER FRAME & CORE
WALL INTERACTION
D-wall & ground anchor
Bored pile
Double cross
coupling beam
ST REGIS
Hotel Bali
Pengeboran
& cleaning
Pasang Tulangan
Pengecoran
EXISTING CONDITION
Hasil studi dari Portland Cement Association
Indonesia:
Beda Temperatur
Rata2 10o C
L max = 180 m
North tower : hotel 33
changes 37 story
Podium changes 4
to 8 story
EARLIER STAGES DESIGN CONCEPT (SIMPLIFED
THE STRUCTURAL ANALYSIS AND COMPEXITY)
MANUAL
EXCAVATIONS
CHEMICAL
ANCHORS
ADDITIONAL
REBARS &
NON-SHRINK
CONCRETE
PLACEMENT
REQUIRE EXTRA CARES AND WELL PLAN COORDINATION FOR UPPER
–HEAVY QUIPMENT MOBILIZATION AND LOWER FLOORS
CONSTRUCTION ACTIVITIES !!!
SPACE LIMITATION AT EXISTING LOWER & BASEMENT
FLOORS REQUIRE MANUAL DEMOLITION !!!
CUTTING & DEMOLISHED THE 800 MM THICK OF CONCRETE WALL WITH
GRADE OF 50 MPa !! (EARLIER STAGE, PREPARE SERIES OF CORES
AND MANUAL HAMMERING CONCRETE – VERY SLOW PROGRESS &
EXPENSIVE COSTS (PROJECT DELAY) CHANGES METHOD
PREPARE 2 CORES AT CERTAIN DISTANCE, INSERT THE WIRES,
ROTATE WITH PRESSURE, WORKS AS “JIG-SAW”
Study Time
C
D 7.Pencabutan casing. 8.Pekerjaan Bored Pile selesai
S
Y
S
T
E
M
9
R 1. Menentukan titik koordinat Bored Pile dengan
theodolit (survey); lalu di buat lubang tiap-tiap
lantai, diameternya lebih besar dari diameter
bored pile, pada Basement 4 di buat sampai
tembus ke tanah.
2. Casing dimasukkan ke dalam lubang
C
D 3.Pengeboran dimulai dengan alat bor RCD, selama
pengeboran lumpur dan tanah akan disedot melalui
4.Memasukkan pembesian yang telah dirakit,
oleh alat Rafter Crane sampai batas kedalaman
pipa dan dimasukkan ke dalam tangki yang telah yang ditentukan.
disediakan dimana pengeboran sampai batas
kedalaman yang ditentukan.
Mat Foundation
Pondasi Tiang
Pancang
Flat slabs
Kesalahan umum dalam pelaksanaan