PROYEK

PURI
INDAH
FINANCIAL
TOWER
PKP 1053

DAFTAR ISI

INFORMASI PROYEK
ITEM PARETO
TARGET MUTU
METODE KERJA
PROGRAM KERJA
SCHEDULE HOLD POINT
STRUKTUR ORGANISASI
RAPP

INFORMASI PROYEK

DATA PROYEK PURI INDAH FINANCIAL TOWER


NAMA PROYEK

: PURI INDAH FINANCIAL TOWER

PEMILIK PROYEK

: PT. ANTILOPE MADJU PURI INDAH

KONSULTAN PERENCANA

: ARC PAC

PT. ARGO CALISTA DESAIN


KONSULTAN STRUKTUR

: DAVY SUKAMTA & PARTNERS

KONSULTAN QS

: WILDE & WOLLARD INDONESIA

NILAI KONTRAK

: Rp. 85.859.510,418 Excl. PPN

MASA PELAKSANAAN

330 HARI KALENDER


Mulai tgl 17 September 2013 s/d 13
Agustus 2014 11 Bulan

(STRUKTUR,ARS. DAN PLUMBING)

465 HARI KALENDER


(KOORDINASI NSC) 15 Bulan

LINGKUP PEKERJAAN

1. PEKERJAAN STRUKTUR
2. PEKERJAAN ARSITEK
. PASANGAN BATA
. PEMASANGAN HT
. RAILLING TANGGA
. PEMASANGAN SANITAIR
3. PLUMBING

BANGUNAN

: 4 (EMPAT) BASEMENT
25 (DUA PULUH LIMA) LANTAI DAN ATAP

LUASAN BANGUNAN

: BASEMENT 20.000 M2
TYPICAL FLOOR 1.750 M2

ITEM MAJOR

PEKERJAAN BESI VOL

: 3.643 TON (BESI SUPPLY BY

OWNER)

PEKERJAAN BETON

PEKERJAAN BEKISTING : 136.128 M2

PASANGAN BATA DINDING

: 28.125 M3 (SUPPLY BY OWNER)

: 25.394 M2

PETA PROYEK LOKASI PROYEK

TAMPAK BANGUNAN

DENAH B4

DENAH B3

DENAH B2

DENAH B1

DENAH GF

DENAH L2-L4

DENAH L5

DENAH L6 - L25

DENAH LANTAI MECHANICAL

LAYOUT DIREKSI KEET

LAYOUT PLAN

ITEM PARETO

ITEM PARETO

A. Pek. Persiapan Prasarana & Penunjang

1. Peralatan, Bahan & Tenaga kerja

9%

B. Pek. Struktur

1. Pek. Bekesting 23.127.766.633

27 %

2. Pek. Pembesian 5.373.206.361

6%

3. Pek. Beton

6%

4. Pek. Atap 3.845.389,744

4.785.894,671
3%

C. Pek. Finishing

1. Pek.Dinding 8.983.330.044

10%

2. Pek. Plafond 1.636.292.491

2%

3. Pek. Lantai

6%

4.734.086.524

D. Pek. Plumbing

7.598.081.500

1. Pek. Plumbing 4.410.445.470

5%

E. Nominated Subcontractor, Direct contractor and suppliers

1. Biaya Koordinasi dan management fee

2. Pek. Pintu dan Pengecatan 5.000.000.000

Jumlah

77.025.493.439

90%

7.531.000.000
6%

9%

TARGET MUTU

TARGET MUTU

TARGET MUTU

TARGET MUTU

TARGET MUTU

METODE KERJA

REKAP VOLUME BESI, BEKESTING DAN BETON

RENCANA PENEMPATAN TC

RENCANA TC : 2 BH
TC 1 = 50 M
TC 2 = 55 M

ZONING PENGECORAN PLAT DAN


BALOK
Basement 4~1

55 mtr

ZONA P2

ZONA P1

ZONA P6

ZONA P3
TC2

50 mtr
ZONA T2

ZONA T1
ZONA P5

ZONA P4
TC1

ZONING PENGECORAN PLAT DAN


BALOK
Groundfloor

55 mtr

ZONA P2

ZONA P1

ZONA P6

ZONA P3

TC2

ZONA T2

ZONA T1
ZONA P5

ZONA P4

50 mtr
TC1

ZONING PENGECORAN PLAT DAN


BALOK
Lantai 2~5
55 MTR

ZONA P2

ZONA P1
ZONA P3
ZONA T2

ZONA T1

TC2
50 MTR
TC1

ZONING PENGECORAN PLAT DAN


BALOK
Lantai 6~26

ZONA T2

ZONA T1

Siklus Pengecoran

Potongan Siklus Pengecoran BSM 4 BSM


1

Potongan Siklus Pengecoran LT Dasar LT


4

Potongan Siklus Pengecoran LT 5 LT 9

Potongan Siklus Pengecoran LT 10 LT 14

Potongan Siklus Pengecoran LT 15 LT 19

Potongan Siklus Pengecoran LT 20 LT 25

PengPengecoran terakhir 21 Mei


2014

PROGRAM KERJA

SCHEDULE HOLD POINT


&
WITNESS POINT

SCHEDULE HOLD POINT & WITNESS POINT

STRUKTUR ORGANISASI

STRUKTUR ORGANISASI