REKAPITULASI PENULANGAN BALOK

Proyek

No balok No. Btg Mt kgm


Dimensi ETABS

Ml kgm

N kg

Tump.Tul Atas
Tump.Tul Torsi
Tump.Tul Bawah
Tul Begel

Lap.Tul Atas
Lap.Tul Torsi
Lap.Tul Bawah
Tul Begel

Tump.Tul Atas
Tump.Tul Torsi
Tump.Tul Bawah
Tul Begel

No balok
Dimensi

No. Btg
ETABS

Mt kgm

Ml kgm

N kg

Tump.Tul Atas
Tump.Tul Torsi
Tump.Tul Bawah
Tul Begel

Lap.Tul Atas
Lap.Tul Torsi
Lap.Tul Bawah
Tul Begel

Tump.Tul Atas
Tump.Tul Torsi
Tump.Tul Bawah
Tul Begel

KONTROL LUAS TULANGAN


Proyek : Rumah Tinggal Bapak Ronald Manyar Surabaya
Kode
b (mm)
h (mm)
Ag (mm2)
jml (bh)
d (mm)
A (mm2)

KP

1.86%

Kode

b (mm)
h (mm)
Ag (mm2)
jml (bh)
d (mm)
A (mm2)
%

K1d

1.18%

SLOOF

130
300
400
70714.29
52000
6
6
13
13
796.7143 796.7143
1.13%

Kode

K1b

K1c

K1d

K2a

K2b

130
600
650
300 D
150
150
130
150
150
300
300
300
650
16900
90000
97500
90000 70714.29
45000
97500
4
8
8
12
6
4
8
10
13
13
16
13
13
13
314.2857 1062.286 1062.286 2413.714 796.7143 531.1429 1062.286

b (mm)
h (mm)
Ag (mm2)
jml (bh)
d (mm)
A (mm2)

K1a

B1f

1.53%

B1g

1.09%

B1a

2.68%

B1b

1.13%

B1c

1.11%

B1d

1.09%

B1e

150
550
82500
7
16
1408

150
150
200
200
500
500
400
350
75000
75000
80000
70000
7
6
8
6
13
13
13
13
929.5 796.7143 1062.286 796.7143

1.71%

1.24%

B2a

B2b

1.06%

B1c

150
150
150
150
130
250
400
400
300
130
37500
60000
60000
45000
16900
5
5
5
4
4
13
13
12
12
10
663.9286 663.9286 565.7143 452.5714 314.2857
1.77%

1.18%

0.94%

1.01%

1.86%

1.33%

1.14%

Perhitungan Kolom Dengan Daktilitas Terbatas


Data :
* Nama Kolom
* Dimensi Kolom
*
*
*
*
*

Selimut Beton
Kualitas beton
fy
f'c ( 0.083*K Beton )
Diameter :

*
*
*
*
*
*
*

d'
d
d'/h
Nu :
Mu
Vu
Ag

Perhitungan tulangan kolom


* .Ag.0.85.fc
* .Ag.0.5.fc.h
*
Nu
.Ag.0.85.fc
*
Nu
.Ag.0.85.fc
*
Mu
.Ag.0.5.fc.h
* r :
( Iterasi Kolom CUR IV )
*
( Iterasi Kolom CUR IV )
*
r*
* As
*b*d
* Atul
1/4*22/7*D2
* n Tul
* n Pakai
Perhitungan tulangan geser
* Diameter sengkang :
* fy sengkang
* Vc
1/6*fc*b*d
* Vn
Vu/0.6

C4
h:
b:
:

Tulangan
Sengkang

800
240
0
1500

:
:
:
:
:
:
:
kN
kNm
kN
cm2

300 mm
500 mm
65 mm
K
225
Mpa
400
Mpa
25
Mpa
22
mm
10
mm
86
mm
214
mm
0.28666667
74535
122623380
150000 mm2

untuk
untuk
untuk
untuk

0.65
0.8
0.85
0.65

0.31372549 untuk

0.8

20718.75
25500
478125
0.38612368

0.501960784
0.0175 %
1
0.000175
26.25 mm2
380.2857143 mm2
0.069027047
2

D
D

10 mm
240 Mpa
89.16666667 kN
0 kN

22
25

Vn
0
Memakai tulangan geser min
S min :
d/2
S pasang

Kesimpulan
Dimensi kolom

*
*
*

Selimut beton
Tulangan
Sengkang
Tumpuan
Lapangan

<
<

Vc
240
107
100 mm

h:
b:

300 mm
500 mm
65 mm
D
25

2
10
10

100
150

mm
mm

1/4 l
1/2 l

3.3 REKAPITULASI PENULANGAN BALOK


No balok

No. Btg

B1

52-55

Mt kgm Ml kgm

3200

2305

N kg

6403

(15/40)

B2
(15/50)

B3

50

8810

74

3775

6600

3218

8904

5316

(15/25)

B4
(10/25)

B5
(15/30)

B6

88

2657

56

2458

63

16642

148

1720

15138

2930

4674

18505

(20/50)

B7
(20/50)

B8
(20/50)

B9
(20/40)

64,65

14887

76

2188

68

1677

9000

1543

6708

7512

3715

5458

BAB 3 HAL. 8

Tump.Tul Atas
Tump.Tul Torsi
Tump.Tul Bawah
Tul Begel

Lap.Tul Atas
Lap.Tul Torsi
Lap.Tul Bawah
Tul Begel

2 D13

2 D13

2 D13

2 D13

d8-100

d8-200

4 D13
2d8

2 D13
2d8

2 D13
d8-100

3 D13
d8-200

2 D13

2 D13

2 D13
d8-75

2 D13
d8-150

2 D13
-

2 D13
-

2 D13
d8-150

2 D13
d8-200

2 D13
2 D13

2 D13
2 D13

d8-200

d8-200

7 D13

3 D13

2d8
3 D13

2d8
6 D13

d8-75

d8-100

6 D13
-

3 D13
-

3 D13
d8-150

4 D13
d8-200

2 D13

2 D13

2 D13
d8-200

2 D13
d8-200

2 D13

2 D13

BAB 3 HAL. 9

2 D13

3 D13

d8-200

d8-200

Tump.Tul Atas
Tump.Tul Torsi
Tump.Tul Bawah
Tul Begel
2 D13
2 D13
d8-100
4 D13
2d8
2 D13
d8-100
2 D13
2 D13
d8-75
2 D13
2 D13
d8-150
2 D13
2 D13
d8-200
7 D13
2d8
3 D13
d8-75
6 D13
3 D13
d8-150
2 D13
2 D13
d8-200
2 D13

BAB 3 HAL. 10

2 D13
d8-200

BAB 3 HAL. 11

PERHITUNGAN STRUKTUR
RUMAH TINGGAL - MANYAR SURABAYA

DAFTAR ISI :
I.

DATA-DATA BANGUNAN

II. PROSEDUR PERHITUNGAN


III. PERHITUNGAN PELAT
IV. PERHITUNGAN BALOK
V. PERHITUNGAN KOLOM
VI. PERHITUNGAN PONDASI
VII. LAMPIRAN

II. PROSEDUR PERHITUNGAN


Umum :
Kombinasi beban berfaktor : U = 1.2D + 1.6L
Reduksi kekuatan bahan :
- Lentur ,
- Axial bersengkang (Kolom),
- Geser ,

= 0.8
= 0.65
= 0.6

Pembebanan :
Sesuai Peraturan Pembebanan 1983
Beban pada plat lantai :
I. Beban Mati
a) 1. Plat beton
2. Spesi
3. keramik
4. Rangka plafon
5. Penutup plafon
b) 4. Dinding bata
II. Beban Hidup
1. Lantai rumah = 200

=
=
=
=
=

0.12 m X
2 cm X

4.27 m X

Kombinasi pembebanan U = 1.2D + 1.6L


II.A. Perhitungan Pelat :
II.A.1 Data - data :
Tebal plat
=t
Panjang arah x
= lx
Panjang arah y
= ly
Tebal selimut beton = 20 cm
d = t - selimut - 1.2 tulangan
b= 1 m
II.A.2 Gaya dalam :
Beban-beban yang bekerja :
1. Beban mati
2. Beban hidup
Wu = 1.2 * qD + 1.6 * qL
lihat tabel PBI 71 :
X untuk Mlx
X untuk Mly
X untuk Mtx
X untuk Mty
Didapat Momen :
Mlx = 0.001 * Wu * lx2 * X
Mly = 0.001 * Wu * lx2 * X
Mtx = - 0.001 * Wu * lx2 * X
Mty = - 0.001 * Wu * lx2 * X

kg/m2

2400
21
24
7
11

kg/m3
=
kg/m2/cm =
kg/m2
=
kg/m2
=
kg/m2
=

250 kg/m2

288
42
24
7
11
372

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2 +
kg/m2

1067.5 kg/m'

= 0.8

II.A.3 Desain penulangan :


Penulangan Lapangan / Tumpuan : (Momen sesuaikan dengan hasil hitungan PBI 71)
Rn perlu = Mn perlu / ( b . d^2 )
balance = 0.85 . fc'/fy x 600/(600+fy)
max = 0.75 . balance
min u/ plat dg.Tul.fy240Mpa (altf SKSNI dan CUR) 0.0025
m = fy/0.85 . fc'
min < perlu < max
As perlu = perlu . b . d
Coba diameter tulangan, didapat As1
Jarak tulangan (s cm) = 1000 cm / (Asperlu/As1)
II.B. Perhitungan Balok :
II.B.1 Data - data :
Lebar balok
=b
Tinggi balok
=h
Tebal selimut beton = 30 cm
d = h - selimut - 1.2 tulangan
II.B.2 Gaya dalam :
Beban-beban yang bekerja :
1. Beban mati (merata/m2 plat dan berat dinding bata/m'balok)
a. merata/m2 plat
b. dinding bata /m' balok
2. Beban hidup
Wu = 1.2 * qD + 1.6 * qL
Dengan bantuan program SAP 2000 didapat :
1. Gaya dalam : Momen lapangan/tumpuan, Gaya geser tumpuan, Torsi balok, dan axial kolom
2. Desain beton bertulang
Untuk desain balok, ambil output : Momen dan geser balok.
Mutu beton
= fc' (Mpa)
Mutu baja
= fy (Mpa)

= 0.8
II.B.3 Desain penulangan :
Lentur Balok :
Mu = momen max. di tumpuan/lapangan (sesuai SAP 2000)
Mn perlu = Mu/ = Mu / 0.8
dimensi balok = b (lebar), h (tinggi) dan d ( h-0.5tul-cover)
E (modulus elastisitas baja tul) = 200 000 Mpa
xb (garis netral kondisi seimbang) = ( cu / ( cu + y ) ) x d
x max = 0.75 . xb
C max = 0.85 . fc' . b . 1 . xmax
utk fc' < 27.5 Mpa 1 = 0.85 (C.K.Wang hal 46)

Mn max = Cmax ( d - 1 . x/2) -----> jika Mn max > Mn perlu, tdk perlu tul tekan
Penulangan Lapangan / Tumpuan :
Rn perlu = Mn perlu / ( b . d^2 )
balance = 0.85 . fc'/fy x 600/(600+fy)
max = 0.75 . balance
min = 1.4 / fy.
m = fy/0.85 . fc'
min < perlu < max
As perlu = perlu . b . d
Coba diameter tulangan, didapat As1
Jumlah tulangan = As / As1
Geser Balok :

Kuat geser balok beton Vc = 1/6


fc' bw . d)
Reduksi kekuatan terhadap geser = 0.6
jika : Vu < 0.5 Vc ----> tidak perlu tul geser
jika : 0.5 Vc < Vu < Vc ----> pakai tul geser minimal
Vs min = 1/3 (Mpa) . bw . d
vs = vu < vc
vu = Vu / bd

vc = 1/6
fc'
vs = (vu - vc)
A sengk = (vu - vc) b y / (fy)
A sengk min = b.y / (3 fy)
II.C. Perhitungan Kolom :

Menggunakan program desain beton bertulang dengan SAP 2000


berdasarkan desain penulangan ACI dengan modifikasi ke SKSNI
(Faktor beban dan reduksi kekuatan disesuaikan dengan SKSNI)

II.D. Perhitungan Pondasi :

Data :
Allowable soil strength
Kuat tekan beton
Kuat leleh baja tulangan
Concrete mass/vol.

=
=
=
=
=
=
=
=

Axial load
Moment
Try width of found.
Try width of column

(kg/cm2)
(kg/cm2)
(kg/cm2)

fc'
fy
2.4

(ton/m3)

(kg)

(kg.m)

(cm)

(cm)

buah
cm

Hitung pondasi strous :


Coba jumlah pondasi :
diameter strous

=
=

Pmax. = Axial / n + M.X1 / 2.(X1^2+X2^2)


Kekuatan geser cleaf(lekatan tanah) di kedalaman 5 m diambil 100 kg/cm
Maka kekuatan ijin strous
= Keliling x geser cleaf
> P max

Hitung pile cap :


Thicknes of found.
Weight of foundation

=
=

t
w

cm
kg/cm2

Vu

kg

=
=

1
t - selimut

2 way shear Chek


d
bo = 4 x (d + b )
Vc

=
Vc > Vu ..? If yes, ok tebal pilecap cukup

1/6 (1+2/fc'. bo . D ]

1 way shear Chek


Vc
0,6 [1/6 fc'. B . D ]
=
Vc > Vu ..? If yes, ok tebal pilecap cukup
Reinforcement for bending moment
Mu

kg.m
Q pile cap

L1

L
tebal pile cap = t (m)
Lebar pile cap = B (m)
L1 = Jarak strous ke titik pusat (m)
L = jarak kantilever total (m)
Q (b.s. pile cap) = t.L.B (t/m)
P (daya dukung strous)
Mu = 1.2 x ( P.L1 - 1/2.Q.L^2)
min. = 1.4/fy
Rn = Mu / B.d^2
m = fy / 0.85 fc'
1/m [ 1-(1-2.m.Rn)/fy ]^0.5

>

( min.)

As = B.d.
try didapat As1
number = As / As1
jarak tulangan (s)

Sloof :
Beban axial sloof

=
= b
= h

Coba penampang sloof


Cek tekan beton

10% ax.kolom
cm
cm
Beban axial sloof / < 75 kg/cm2 ?

As min. 1% beton
ambil n besi
=
4
besi sloof
> min 1,2 cm ?
besi begel sloof minimum = 8 mm

buah

PERHITUNGAN STRUKTUR
RUMAH TINGGAL - MANYAR SURABAYA

I. DATA-DATA BANGUNAN
Data Bangunan :
Nama :
Alamat :
Jumlah Lantai :
Tinggi struktur :
Luas Bangunan :
Perhitungan Struktur :
Sistem struktur :
Metoda analisa :
Metoda desain :
Standard/Ref. :

Data teknis :
Tinggi kolom h1 :
Tinggi kolom h2 :
Perletakan kolom :
Mutu bahan beton fc' :
Mutu baja deform fy :
Mutu baja polos fy :

Rumah Tinggal Manyar


Kertajaya Indah Timur IX / 06 blok O-361
2 (dua)
8.77 m
500 m2

Rangka beton bertulang


- Analisa statis by SAP 2000
- Gaya dalam pelat by PBI 71
Kekuatan Batas
- PBI 71
- PBI 83
- SKSNI 90

4.27
4.5
jepit
20
400
240

m
m
Mpa
Mpa
Mpa

PERHITUNGAN PLAT
PROYEK - RUMAH MANYAR

PERHITUNGAN TANDON AIR BAWAH


1. Plat dinding tandon :
Pa (tekanan tanah aktif) = ca .w .h^2/2
ca (coefisien tekanan aktif) =
w (berat jenis tanah)
=
h (kedalaman bangunan) =

0.3
1800 kg/m3
2 m

Pa =
1080 kg/m
Mu = 1,2 x Pa x 1/3h
864 kg.m
2. Plat lantai tandon :
Tebal plat
=
Panjang arah x (lx) =
Panjang arah y (ly) =
ly / lx
=

0.15
2
2
1.00

Berat volume beton =


2400
Tebal selimut beton
=
d = t*1000 - 20 - 5 =
b=
1
m

8.4672 kN.m

m
m
m

kg/m3
20
125

mm
mm

Beban-beban yang bekerja :


1. Beban mati
Plat
=
0.15 * 2400
Finishing lantai (keramik)
Plafond + instalasi
Total

=
=
=
=

360
0
0
369

kg/m2
kg/m2
kg/m2
kg/m2

2. Beban hidup
Beban hidup yang bekerja

2000

kg/m2

Wu = 1.2 * qd + 1.6 * ql =
lihat tabel PBI 71 :
X untuk Mlx
=
44
X untuk Mly
=
44
X untuk Mtx
=
0
X untuk Mty
=
0
Mlx = 0.001 * Wu * lx2 * X
Mly = 0.001 * Wu * lx2 * X
Mtx = - 0.001 * Wu * lx2 * X
Mty = - 0.001 * Wu * lx2 * X

=
=
=
=

kg/m2

3642.8

641.1328
641.1328
0
0

kgm
kgm
kgm
kgm

=
=
=
=

6.28
6.28
0.00
0.00

kNm
kNm
kNm
kNm

Mutu beton
Mutu baja

=
=
=

20
240
0.8

MPa
MPa

Rn perlu = Mn perlu / ( b . d^2 )


balance = 0.85 . fc'/fy x 600/(600+fy) =
0.0505952381
max = 0.75 . balance
=
0.0379464286
min u/ plat dg.Tul.fy240Mpa (altf SKSNI dan CUR)
0.0025
m = fy/0.85 . fc' =
14.11765
min < perlu < max
As perlu = perlu . b . d
Arah
1. Plat vertikal
2. Plat lantai

x ( lap )
y ( lap )

Mu
kNm
8.47
6.28

Mn
kNm
10.584
7.8538768

Rn=Mn/bd2
N/mm2
0.847
0.503

perlu

cek
> min
0.00353 0.003528
0.00209
0.0025

As perlu tul.pakai
mm2
(mm) s (mm)
441
8
100
313
8
100

As ada

As ada>Asperlu

502
502

ok
ok

PERHITUNGAN PLAT
PROYEK - RUMAH MANYAR
6. TYPE PLAT KANOPI ATAS ( tebal 10 cm )
Tebal plat
=
Panjang arah x (lx) =
Panjang arah y (ly) =
ly / lx
=

0.12
3.3
4
1.21

m
m
m

Berat volume beton =


2400
Tebal selimut beton
=
d = 0.12*1000 - 20 - 5 =
b=
1
m
Beban-beban yang bekerja :
1. Beban mati
Plat
=
0.12 * 2400
Finishing lantai (keramik)
Plafond + instalasi

kg/m3
20
95

=
=
Total

2. Beban hidup
Beban hidup yang bekerja
Wu = 1.2 * qd + 1.6 * ql =
lihat tabel PBI 71 :
X untuk Mlx
=
X untuk Mly
=
X untuk Mtx
=
X untuk Mty
=
Mlx = 0.001 * Wu * lx2 * X
Mly = 0.001 * Wu * lx2 * X
Mtx = - 0.001 * Wu * lx2 * X
Mty = - 0.001 * Wu * lx2 * X
Mutu beton
Mutu baja

=
=
=

mm
mm

=
=

=
642.8

288
0
15
369

kg/m2
kg/m2
kg/m2
kg/m2

125

kg/m2

kg/m2

25
21
59
54

=
=
=
=

175.0023
147.001932
-413.005428
-378.004968
20
240
0.8

=
=
=
=

MPa
MPa

Rn perlu = Mn perlu / ( b . d^2 )


balance = 0.85 . fc'/fy x 600/(600+fy) =
max = 0.75 . balance
=
min u/ plat dg.Tul.fy240Mpa (altf SKSNI dan CUR)
m = fy/0.85 . fc' =
14.117647059
min < perlu < max

kgm
kgm
kgm
kgm

0.050595
0.037946
0.0025

1.72
1.44
-4.05
-3.70

kNm
kNm
kNm
kNm

As perlu = perlu . b . d
Arah
Mu
Mn
kNm
kNm
x ( lap )
1.72 2.143778175
y ( lap )
1.44 1.800773667
x ( tump )
4.05 5.059316493
y ( tump )
3.70 4.630560858
ket. :
s max < 1.5 tebal plat (CUR)
s max < 250 mm
(CUR)
s min > 40 mm (PBI)

Rn=Mn/bd2
N/mm2
0.297
0.200
0.561
0.513

perlu
0.00124
0.00083
0.00234
0.00214

cek
As perlu
tul.pakai
> min
mm2
(mm)
0.0025
238
8
0.0025
238
8
0.0025
238
8
0.0025
238
8

tul.pakai
s (mm)
175
175
175
175

As ada

As ada>Asperlu

287
287
287
287

ok
ok
ok
ok

ATAP U672 - tinggi gel. 4.1 cm


Debit hujan Q =
Debit hujan Q =

lbr. Eff X pjg.atap X Intensitas hujan


10.08 m3/jam

Tinggi basah H (cm)


4.1
3.5
3
2.5
1.4
1

Area basah A (m2)


0.02463075
0.02087685
0.017802
0.014775
0.00815684
0.00577736

A
0.02463075
0.02087685
0.017802
0.014775
0.00815684
0.00577736
sudut i (derajat)
3
Tinggi basah H (cm)
4.1
3.5
3
2.5
1.4
1

S
0.83769
0.79983
0.7683
0.73675
0.6562194
0.6303

Keliling bsh S (m')


0.83769
0.79983
0.7683
0.73675
0.6562194
0.6303

Data :
- Panjang atap 30m
- Sudut kemiringan atap 3 derajat
- Air hujan maks. = 500 mm/jam
Rumus :
Rumus Kutter
V = C (R.i)
C =
23 + 1/n + 0.0015/i
1 + ( 23 + 0.0015/I ) n/( R)

R (A/S)
0.0294031802
0.0261016091
0.0231706365
0.0200542925
0.0124300501
0.0091660479

kemiringan tgn i
0.0524077793
n Kutter
0.02
0.02
0.02
0.02
0.02
0.02

i
0.0524077793
0.0524077793
0.0524077793
0.0524077793
0.0524077793
0.0524077793

R
0.02940318
0.02610161
0.02317064
0.02005429
0.01243005
0.00916605

C-atas
73.02862171
73.02862171
73.02862171
73.02862171
73.02862171
73.02862171

C-bwh
C
V (m/dt)
Q (m3/jam)
3.685968 19.8126 0.77774389 68.963095165
3.850784 18.96461 0.701415686 52.716060197
4.025722 18.1405 0.632144307 40.512358653
4.252327 17.1738 0.556759905 29.61405936
5.13106 14.23266 0.363262301 10.667060874
5.810685 12.56799 0.275457591 5.7291036091

KESIMPULAN :
Ketinggian air di atap U672 akibat hujan 500mm/jam adalah = sekitar 1.35 cm < tinggi gelombang (4.1 cm)

tinggi basah

KAPASITAS DEBIT AIR


4.5
4.1

4
3.5

3.5

2.5

2.5

2
1.5

1.4

0.5
0
0

10

20
30
40
50
kapasitas debit air

60

70

80

ATAP U500 - tinggi gel. 16 cm


Tinggi air hujan H (cm)
3.5
3.4

A
0.0078
0.0076

S
0.285
0.282

sudut (derajat)

Area basah A (m2)


0.0078
0.0076

Keliling bsh S (m')


0.285
0.282

R (A/S)
0.0273684211
0.0269503546

kemiringan tgn i
0.05

Tinggi air hujan H (cm)


3.5
3.4

n Kutter
0.02
0.02

i
0.05
0.05

R
0.027368
0.02695

C-atas
C-bwh
C
V (m/dt)
73.03 3.784191 19.29871 0.713901
73.03 3.805703 19.18962 0.704423

Q hujan = IA V hujan = Q/A


0.0034375 0.4407051282
0.0034375 0.4523026316

PERHITUNGAN STRUKTUR BAJA KMR SONI


BERHUBUNG SEMUA ANALISA DAN DESIGN RANGKA SUDAH DIHITUNG DENGAN SAP2000,
JADI KITA HANYA TINGGAL MENGHITUNG BAUT DAN PONDASI SAJA.

I. DATA-DATA PERENCANAAN
I.1. DATA UMUM BANGUNAN
NAMA =
LUAS LANTAI = 24 m X 41 m
JARAK PORTAL =
TINGGI KOLOM =
SUDUT ATAP =

m
m
degree =

III.2.4. Design of Bolt Connection :


Beam to beam connect. :
a. Loading :
Geser vertical (Pv)
Moment (Mu)
fy
Force due to Mu/l
Resultante geser
b. shear check :
Resultan of shear
Allow. Shear = 0,6 (fy/1.5) =
Allow. Shear Load 1 =
n

=
=
=
=
=

5184.00
8530.00
240.00
426.50
5201.51

kg
kgm
Mpa =
kg
kg

5201.51
950.40
1074.33
4.84

kg
kg/cm2
kg
pcs.

2400.00

kg/cm2

PERHITUNGAN STRUKTUR BAJA GUDANG


I. DATA-DATA PERENCANAAN
I.1. DATA UMUM BANGUNAN
NAMA =
LUAS LANTAI = 24 m X 41 m
JARAK PORTAL =
TINGGI KOLOM =
SUDUT ATAP =

6.00
10.00
25.00

m
m
degree =

0.44 radian

II. DESIGN STRUKTUR SKUNDER :


2.1. DESIGN GORDING
COBA
Wx
Wy
JARAK GORDING (Jg)
a. BEBAN TETAP
TEKANAN HUJAN =
t ATAP =
BERAT ATAP =
BERAT GORDING =
BERAT HUJAN =
TOTAL BEBAN TETAP =

=
=
=
=

MtetapX =1/8 Q.cos25 L^2 =


MtetapY =1/8 Q.sin25 Ly^2 =
b. BEBAN HIDUP =
MhidupX =1/4 P.cos25 Lx =
MhidupY =1/4 P.sin25 Ly =

C 125x50x20x4,5
38.00
10.10
125.00

cm3
cm3
cm

20.00
0.40
3.93
8.32
25.00
37.25

kg/m2
mm =
kg/m'
kg/m'
kg/m' +
kg/m'

151.90
17.71

kg.m
kg.m

100.00
135.95
31.70

kg
kg.m
kg.m

c. BEBAN ANGIN , SUDUT ATAP = 25 derajat


TEKANAN ANGIN
=
25.00
KOF. TEKAN ANGIN ATAP = 0,02(SUDUT ATAP) - 0,4 =
KOF. TEKAN HISAP ATAP = - 0,4
=
KOF. TEKAN ANGIN DINDING = + 0,9
=
KOF. TEKAN HISAP DINDING = - 0,4
=
UNTUK GORDING, AMBIL TEKAN ATAP :
Q angin = [0,02(SUDUT ATAP) - 0,4 ] *P*Jg
M angin= 1/8 * Q*L^2
=
14.06
d. TOTAL TEGANGAN :
Mx =
MtetapX + MhidupX + Mangin
My =
MtetapY + MhidupY
TEGANGAN = Mx/Wx + My/Wy =
GORDING BISA DIPAKAI !

3.14 m2

kg/m2
0.10
-0.40
0.90
-0.40

3.13 kg/m
kg.m

=
=

301.91
49.40
1283.65 < 1600 ?

OK !

III. DESIGN STRUKTUR UTAMA :


III.1. PEMBEBANAN KUDA-KUDA
a. PEMBEBANAN GRAVITASI
BERAT ATAP =
BERAT GORDING =

18.84
41.60
60.44
100.00

b. BEBAN HIDUP TERPUSAT =


c. BEBAN ANGIN , SUDUT ATAP = 25 derajat
TEKANAN ANGIN
=
25.00
KOF. TEKAN ANGIN ATAP = 0,02(SUDUT ATAP) - 0,4 =
KOF. TEKAN HISAP ATAP = - 0,4
=
KOF. TEKAN ANGIN DINDING = + 0,9
=
KOF. TEKAN HISAP DINDING = - 0,4
=

kg/m
kg/m +
kg/m
kg
kg/m2
0.10
-0.40
0.90
-0.40

BEBAN AKIBAT ANGIN :


Q tekan atap = [0,02(SUDUT ATAP) - 0,4 ] *P*Jk
=
15.00 kg/m
Q hisap atap = - 0,4 *P*Jk
=
-60.00 kg/m
Q tekan dinding = 0,9 *P*Jk
=
135.00 kg/m
Q hisap dinding = - 0,4 *P*Jk
=
-60.00 kg/m
BEBAN DI RAK :
Q = BETON + HIDUP = 2400 kg/m3 * 12cm*Jk + 400kg/m2
=
4128.00
kg/m
sehingga :
Q di batang kuda2 = GRAV. + ANGIN
=
75.44 kg/m
Q di kolom kiri
= ANGIN tekan
=
135.00 kg/m
Q di kolom kanan = ANGIN hisap
=
-60.00 kg/m
Q di balok rak
=
4128.00 kg/m
c. ANALISA STRUKTUR
Dengan bantuan program komputer SAP90 didapat :
Elemen kuda2
=
Moment
=
2539.00 kg.m
Axial
=
1634.00 kg
Elemen balok
=
Moment
=
6985.00 kg.m
Axial
=
458.00 kg
Pondasi utama
=
Fx
=
2136.00 kg
Fy
=
11690.00 kg
Mz
=
3016.00 kg.m
Pondasi rak
=
Fx
=
1574.00 kg
Fy
=
8094.00 kg
Mz
=
1257.00 kg.m
d. DESIGN ELEMEN
Elemen kuda2
=
WF 300x150x9x6.5
Elemen kolom
=
WF 300x150x9x6.5
Elemen balok rak
=
WF 300x150x9x6.5
Elemen kokok & cantilever =
WF 150x75

+ P 100 kg.

III.2. Design Struktur


1. Standart and Reference :
- Peraturan Pembebanan Indonesia utk. Gedung 1983
- AISC
2. Material
- Steel fy
=
- Concrete fc'
=
3. Design metode
- Elastic design :
- Ultimate design :
4. Structure analysis
- Manual
:
- SAP 90
:
- COSMIC
:

2400.00 kg/cm2
240.00 kg/cm2
for steel structure
for concrete structure
for structure
for structure
for roof

III.2.1. Design balok rak :


Try :
Beam
fy
Weight
Ix
flens width (bf)
flens thickness (tf)
web deepth (d)
web thickness (tw)
radius of giration ('r)
Sect. Area (A)
Span (L)
a. Loading :
Roof panel 0.3x0.001x30 m3
Roof weight / panel
number of panels
Roof length
Total roof weight
Total Beam weight
Live load
Total Weight
Max. moment

=
=
=
=
=
=
=
=
=
=
=

WF 300x150x6.5x9
240.00 Mpa
36.70 kg/m
7210.00 cm4
150.00 mm
9.00 mm
300.00 mm
6.50 mm
12.40 cm
46.78 cm2
600.00 cm

=
=
=
=
=
=

141.30
20.00
30.00
2826.00
220.20
25.00

=
=

647.20
1/8.Q.L^2

kg
panels
m
kg
kg
kg/m2
kg/m

=
b. Lateral support check :
L

<

>
Use Fb = [ 2/3 - ( fy(L/r)^2 )/(1530e3.Cb) ] fy
Fb
=
=
c. Compact check :
- Flens bf / 2.tf
<
8.33 <
- Web
d / tw
<
46.15 <
d. Stress check
fb = Mu c / I
fb / Fb

6985.00 kg.cm

76. Bf / fy^0.5
76.08 (in.)
193.25 cm

(in.)

0.61 fy
145.62 Mpa
65 / fy^0,5
11.02
640 / fy^0,5
108.49

OK
OK

=
=

14.53 kg/cm2
0.01
OK

=
=
=
=
=
=
=
=
=
=
=

WF 300x150x6.5x9
240.00 Mpa
36.70 kg/m
7210.00 cm4
150.00 mm
9.00 mm
300.00 mm
6.50 mm
12.40 cm
46.78 cm2
900.00 cm

III.2.2. Design of Column :


Try :
Column
fy
Weight
I
flens width (bf)
flens thickness (tf)
web deepth (d)
web thickness (tw)
radius of giration ('r)
Sect. Area (A)
Length (L)
a. Loading :
Axial (Pu)
Moment (Mu)
b. Beam - column check :
b.1. Lateral support check :
L

=
=
=

<

2009.00
3864.00

kg
kg.m

76. Bf / fy^0.5
76.08 (in.)

(in.)

>
Use Fb = [ 2/3 - ( fy(L/r)^2 )/(1530e3.Cb) ] fy
Fb =
=
b.2. Compact check :
- Flens bf / 2.tf
- Web

d / tw

<
8.33 <
<
46.15 <

193.25 cm

0.54 fy
129.64 Mpa
65 / fy^0,5
11.02
640 / fy^0,5
108.49

OK
OK

c. Stress check
fb = Mu c / I
fb / Fb

=
=

803.88 kg/cm2
0.62
OK

fa = Pu / A
k factor
k l /r
From tab. AISC , Fa

=
=
=
=

fa / Fa

42.95 kg/cm2
0.80
58.06
17.62 (ksi)
1214.90 kg/cm2
0.04
<
OK

Total stress ratio :


fa/Fa + fb/Fb

=
=

0.04
0.66

+
OK

=
=
=
=
=
=
=
=
=
=
=

WF 300x150x6.5x9
240.00 Mpa
36.70 kg/m
7210.00 cm4
150.00 mm
9.00 mm
300.00 mm
6.50 mm
12.40 cm
46.78 cm2
900.00 cm

III.2.3. Design kuda-kuda :


Try :
Column
fy
Weight
I
flens width (bf)
flens thickness (tf)
web deepth (d)
web thickness (tw)
radius of giration ('r)
Sect. Area (A)
Length (L)
a. Loading :
Axial (Pu)

1634.00

kg

0.15

0.62

Moment (Mu)

b. Beam - column check :


b.1. Lateral support check :
L

=
=

<

>
Use Fb = [ 2/3 - ( fy(L/r)^2 )/(1530e3.Cb) ] fy
Fb
=
=
b.2. Compact check :
- Flens bf / 2.tf
<
8.33 <
- Web
d / tw
<
46.15 <

2539.00

kg.m

76. Bf / fy^0.5
76.08 (in.)
193.25 cm
0.54 fy
129.64 Mpa
65 / fy^0,5
11.02
640 / fy^0,5
108.49

OK
OK

c. Stress check
fb = Mu c / I
fb / Fb

=
=

528.22 kg/cm2
0.41
OK

fa = Pu / A
k factor
k l /r
From tab. AISC , Fa

=
=
=
=

fa / Fa

34.93 kg/cm2
0.80
58.06
17.62 (ksi)
1214.90 kg/cm2
0.03
<
OK

Total stress ratio :


fa/Fa + fb/Fb

=
=

0.03
0.44

+
OK

III.2.4. Design of Bolt Connection :


Beam to beam connect. :
a. Loading :
Geser vertical (Pv)
Moment (Mu)
Force due to Mu/l
Resultante geser

=
=
=
=

(in.)

1634.00
2539.00
126.95
1638.92

kg
kgm
kg
kg

0.15

0.41

b. shear check :
Resultan of shear
Allow. Shear = 0,6 (fy/1.5) =
Allow. Shear Load 1 =
n

1638.92
950.40
1074.33
1.53

kg
kg/cm2
kg
pcs.

(IMB)

PERHITUNGAN STRUKTUR
RUMAH
PONDOK WISATA
JL. BRATANG BINANGUN VI / 49, SURABAYA

A. PERHITUNGAN STRUKTUR BAJA

I. DATA-DATA PERENCANAAN
I.1. DATA UMUM BANGUNAN
NAMA
LUAS LANTAI
JARAK PORTAL
JUMLAH LANTAI
TINGGI KOLOM TOTAL
SUDUT ATAP

Rumah & Pondok Wisata ,Jl. Bratang Binangun VI/49, Sby.


=
=
=
=
=

3.00
3
10.05
30.00

m
m
degree =

0.52 radian

II. DESIGN STRUKTUR UTAMA :


II.1. Referensi Analisa & Design Struktur
1. Standart and Reference :
- Peraturan Pembebanan Indonesia utk. Gedung 1983
- AISC
- Peraturan Baja Indonesia
- Pedoman Perencanaan Ketahanan Gempa untuk Rumah dan Gedung
2. Material
- Steel
fy
- Concrete fc'
3. Design metode
- Elastic design :
- Ultimate design :
4. Structure analysis
- SAP 2000
:

=
=

2400.00 kg/cm2
240.00 kg/cm2

for steel structure


for concrete structure
for structure

II.2. PEMBEBANAN
II. 2. 1. GEMPA
Fi (geser tingkat) =

Wi hi V
S Wi hi

dimana :
V (geser dasar akibat gempa) = Cd. Wt
= ( C . I . K ) Wt
T (waktu getar alami) = 0.085 H ^ 3/4
(Baja)
H
=
10.05
T
=
0.48
Surabaya : zona 4
kondisi tanah di lokasi : lunak
C =
0.05
I (keutamaan struktur) =
1.00
K (jenis struktur)
=
1.00

m
detik

(lihat grafik)

Lti. Atap :
kolom WF 300
balok WF 250
atap
kuda2 WF 250

n
15.00
-

panjang (m)
3.35
100.00
11.70
50.00

lebar (m)
11.00

berat (kg/m)
36.70
29.60
65.00
29.60

total (kg)
1,844.18
2,960.00
8,365.50
1,480.00
14,649.68

Lti. III :
kolom WF 300
balok WF 300

n
15.00
-

panjang (m)
3.35
100.00

lebar (m)
-

berat (kg/m)
36.70
36.70

total (kg)
1,844.18
3,670.00

pelat t=0.12 m
dinding

11.70
200.00

8.00
3.20

2400.00
250.00

Lti. II :
kolom WF 400
balok WF 300
pelat t=0.12 m
dinding

n
15.00
-

panjang (m)
3.35
100.00
11.70
140.00

lebar (m)
8.00
3.20

berat (kg/m)
66.00
36.70
2400.00
250.00

so : V (gaya geser dasar) =


Gaya geser tingkat (Fi) :
Fi = Wi hi V
S Wi hi

17,653.20

Wi (kg)
atap
lti. III
lti. II

total (kg)
3,316.50
3,670.00
26,956.80
112,000.00
145,943.30
TOTAL =

353,063.95

kg

hi (m)
14,649.68
192,470.98
145,943.30

26,956.80
160,000.00
192,470.98

10.05
6.70
3.35
S Wi hi =

Wi hi
147,229.23
1,289,555.53
488,910.06
1,925,694.82

Fi (kg)
1,349.68
11,821.59
4,481.93
17,653.20

II. 2. 2. BEBAN GRAVITASI LANTAI


BEBAN MATI
Q ekv. Trap = 1/2. Qu. Ly. (1 - 1/3. (Ly/Lx)^2 )
Qu mati lti

: plat beton t=12cm =


plafon
=
tegel
=
adukan semen 2cm =

Qu dinding bata
h = 3.1 m, Q dinding

288.00
18.00
24.00
42.00
372.00
250.00
775.00

=
=

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m
9.55
3.18

Qu hidup lti

(tangga )

Ly
3.40
3.75
4.20
3.20
2.00

Q mati total balok tengah =


Q mati total balok pinggir =
Q mati total balok tangga =

250.00

Lx
1.10
3.40
3.00
2.45
1.50

Qmati
372.00
372.00
372.00
372.00
372.00

1,604.9
1,190.0
151.8

kg/m
kg/m
kg/m

557.7
278.9

kg/m
kg/m

Q hidup total balok tengah =


Q hidup total balok pinggir =

kg/m2
Qhidup
Q ekv. Mati (kg/ Q ekv. Hidup (kg/m)
250.00
-1,379.51
-927.09
250.00
414.95
278.87
250.00
271.33
182.34
250.00
257.08
172.77
250.00
151.78
102.00

II.2.3. BEBAN GRAVITASI PADA ATAP


Beban - beban mati pada atap :
1. Genteng, reng, usuk
jarak kuda2 = 6.3 m, maka
2. Gording 7 bh. X 11 kg/m
Q mati total

Beban hidup pada atap :


Beban hidup (hujan)
jarak kuda2 = 3 m, maka

=
=

50.00 kg/m2
315.00 kg/m'

=
=

77.00 kg/m'
392.00 kg/m'

=
=

25.00 kg/m2
157.50 kg/m'

II.3. ANALISA DAN DESAIN STRUKTUR UTAMA


Struktur Baja ini dianalisa dengan bantuan program SAP 2000.
Dengan memasukan input data geometry struktur, beban-beban yang terjadi,
termasuk kombinasi beban, akan didapat hasil analisa struktur berupa :
gaya-gaya dalam, defleksi dan reaksi pada pondasi.
Sekaligus bisa diketahui desain penampang elemen-elemen struktur utama :
Balok dan kolom.

III. DESIGN STRUKTUR SKUNDER :


III..1. DESIGN GORDING
COBA
Wx
Wy
JARAK GORDING (Jg)
a. BEBAN TETAP
TEKANAN HUJAN =
t ATAP =
BERAT ATAP =
BERAT GORDING =
BERAT HUJAN =
TOTAL BEBAN TETAP =

=
=
=

C 150x75x20x4,5
65.20
19.80
=
125.00

MtetapX =1/8 Q.cos25 L^2 =


MtetapY =1/8 Q.sin25 Ly^2 =
b. BEBAN HIDUP =
MhidupX =1/4 P.cos25 Lx =
MhidupY =1/4 P.sin25 Ly =

cm3
cm3
cm

20.00
0.40
3.93
8.32
25.00
37.25

kg/m2
mm =
kg/m'
kg/m'
kg/m' +
kg/m'

36.29
5.24

kg.m
kg.m

100.00
64.95
18.75

kg
kg.m
kg.m

3.14 m2

c. BEBAN ANGIN
TEKANAN ANGIN
=
25.00
kg/m2
KOF. TEKAN ANGIN ATAP = 0,02(SUDUT ATAP) - 0,
0.20
KOF. TEKAN HISAP ATAP = - 0,4
=
-0.40
KOF. TEKAN ANGIN DINDING = + 0,9
0.90
KOF. TEKAN HISAP DINDING = - 0,4
-0.40
UNTUK GORDING, AMBIL TEKAN ATAP :
Q angin = [0,02(SUDUT ATAP) - 0,4 ] *P*Jg
M angin= 1/8 * Q*L^2
=
7.03
d. TOTAL TEGANGAN :
Mx =
MtetapX + MhidupX + Mangin
My =
MtetapY + MhidupY

6.25 kg/m
kg.m

108.27
23.99

TEGANGAN = Mx/Wx + My/Wy =

287.21 < 1600 ?

OK !

GORDING BISA DIPAKAI !

III. 2. PERHITUNGAN BAUT SAMBUNGAN BALOK-KOLOM

SAMBUNGAN - I

(WF400X200) alternatif 1

V =
M=

10960.00 kg
11850.00 kg.m
no

spasi
(cm)
8.00
8.00
8.00
12.00
9.00
9.00
9.00

1.00
2.00
3.00
4.00
5.00
6.00
7.00

hi
(cm)
6.00
14.00
22.00
34.00
43.00
52.00
61.00
sigma =

gaya tarik max. akibat M (1 baut atas) =


coba baut
=
so, luas 1 baut
=
Tegangan akibat M
=

3562.24
2.00
3.14
1134.47

kg
cm
cm2
kg/cm2

Jumlah baut total


gaya akibat V ( I baut )
Tegangan akibat V

16.00
685.00
218.15

buah
kg
kg/cm2

1195.74

kg/cm2

TEGANGAN KOMB.

SAMBUNGAN - I

=
=
=
=

(WF 400X200) alternatif 2

hi^2
(cm2)
36.00
196.00
484.00
1156.00
1849.00
2704.00
3721.00
10146.00

< OK !

h1 h2 h3 h4 h5 h6

1600.00 kg/cm2

h7

V =
M=

10960.00 kg
11850.00 kg.m
no

spasi
(cm)
10.00
10.00
15.00
10.00
10.00

1.00
2.00
3.00
4.00
5.00

hi
(cm)
6.00
16.00
31.00
41.00
51.00
sigma =

gaya tarik max. akibat M (1 baut atas) =


coba baut
=
so, luas 1 baut
=
Tegangan akibat M
=

5459.35
2.40
4.52
1207.39

kg
cm
cm2
kg/cm2

Jumlah baut total


gaya akibat V ( I baut )
Tegangan akibat V

12.00
913.33
201.99

buah
kg
kg/cm2

1257.06

kg/cm2

TEGANGAN KOMB.

=
=
=
=

hi^2
(cm2)
36.00
256.00
961.00
1681.00
2601.00
5535.00

< OK !

1600.00 kg/cm2

SAMBUNGAN - II (WF TANGGA)


V =
M=

1500.00 kg
800.00 kg.m
no

spasi
(cm)

hi
(cm)

hi^2
(cm2)

1.00
2.00
3.00
4.00

5.00
10.00
5.00
5.00

5.00
15.00
20.00
25.00
sigma =

25.00
225.00
400.00
625.00
1275.00

gaya tarik max. akibat M (1 baut atas) =


coba baut
=
so, luas 1 baut
=
Tegangan akibat M
=

784.31
1.20
1.13
693.84

kg
cm
cm2
kg/cm2

Jumlah baut total


gaya akibat V ( I baut )
Tegangan akibat V

10.00
150.00
132.70

buah
kg
kg/cm2

730.91

kg/cm2

TEGANGAN KOMB.

SAMBUNGAN - III

=
=
=
=

< OK !

1600.00 kg/cm2

(WF 300X150)

V =
M=

7500.00 kg
7300.00 kg.m
no

spasi
(cm)
7.00
7.00
15.00
7.00
7.00

1.00
2.00
3.00
4.00
5.00

hi
(cm)
6.00
13.00
28.00
35.00
42.00
sigma =

gaya tarik max. akibat M (1 baut atas) =


coba baut
=
so, luas 1 baut
=
Tegangan akibat M
=

3853.70
2.00
3.14
1227.29

kg
cm
cm2
kg/cm2

Jumlah baut total


gaya akibat V ( I baut )
Tegangan akibat V

12.00
625.00
199.04

buah
kg
kg/cm2

1274.79

kg/cm2

TEGANGAN KOMB.

=
=
=
=

hi^2
(cm2)
36.00
169.00
784.00
1225.00
1764.00
3978.00

< OK !

1600.00 kg/cm2

C. LAMPIRAN

B . PONDASI
1. Design of Main Foundation I P-1 :
Data :
Allowable soil strength
fc'
fy
Concrete mass/vol.
Axial load (P)
Moment (M)
Try width of found. (B)
Try width of column (b)
Try deepth of WF (l)

=
=
=
=
=
=
=
=
=

1.00 kg/cm2
250.00 kg/cm2
4000.00 kg/cm2
2.40 ton/m3
17500.00 kg
1531.00 kg.m
170.00 cm
50.00 cm
40.00 cm

a. Foundation Plan
Thicknes of found.
Weight of foundation
Allowable soil strength net.

=
=
=

Extrem soil stress

=
=
=

50.00 cm
0.12 kg/cm2
0.88 kg/cm2
P/A

Extrem soil stress < Allw. Soil strength nett. ?


=

+
0.61
+
0.79 kg/cm2

0.79

M / (1/6 B^3)

<

0.19

0.88

17500.00

..?

17500.00

..?

...YES
b. 2 way shear Chek
Vu

17500.00 kg

=
=

1.00
44.00 cm

d
bo = 4 x (d + b )
Vc

=
=
=
=

Vc > Vu ..?

376.00 cm

1/6 (1+2/fc'. bo . D ]
2481600.00
248160.00

N.
kg.

248160.00

>

YES
c. 1 way shear Chek
Vc
Vc > Vu ..?

=
=

0,6 [1/6 fc'. B . D ]


374000.00
N.
37400.00
kg.

37400.00

>

YES
d. Reinforcement for bending moment
Mu
min. = 1.4/fy
Rn = Mu / B.d^2
m = fy / 0.85 fc'
1/m
(1-2.m.Rn/fy)^0,5
1/m [ 1-(1-2.m.Rn)/fy ]^0.5
Use

1531.00 kg.m

=
=
=
=
=

0.0035
0.05
18.82
0.05
1.00

=
=

0.0001
0.0035

<

As = B.d.

2618.00 mm2

try
number

=
=

16.00 mm
20.00

0.0035

(min.)

As

4019.20

>

2618.00

OK
Use :

B
b
t

=
=
=

170.00
50.00
50.00

cm
cm
cm

=
=

16.00
20.00

mm
pcs

g. Sloof :
Beban axial sloof
Coba penampang sloof

=
= b
= h

Cek tekan beton


=
As min. 1% beton
=
ambil n besi
=
besi sloof
=
besi begel sloof minimum = 8 mm

1750.00
20.00
30.00
2.92
6.00
6.00
1.13

kg
cm
cm
kg/cm2
cm2
buah
cm

= 10% ax.kolom ? Ok !

< 75 kg/cm2 ?

Ok !

> min 1,2 cm ?

No !

h. Strous :
Coba

n
4.00 buah
strous
=
50.00 cm
Pmax. = Axial / n + M.X1 / 2.(X1^2+X2^2) =
4375.00
+
900.59
=
5275.59 kg
Kekuatan geser cleaf(lekatan tanah) di kedalaman 6 m diambil 100 kg/cm
Maka kekuatan ijin strous
=
Keliling x geser cleaf
=
15700.00 kg
> P max ?

Ok !

2. Design of Main Foundation II P-2 :


Data :
Allowable soil strength
fc'
fy
Concrete mass/vol.
Axial load (P)
Moment (M)
Try width of found. (B)
Try width of column (b)
Try deepth of WF (l)

=
=
=
=
=
=
=
=
=

1.00 kg/cm2
300.00 kg/cm2
2400.00 kg/cm2
2.40 ton/m3
26899.00 kg
1961.00 kg.m
200.00 cm
50.00 cm
40.00 cm

a. Foundation Plan
Thicknes of found.
Weight of foundation
Allowable soil strength net.

=
=
=

Extrem soil stress

=
=
=

35.00 cm
0.08 kg/cm2
0.92 kg/cm2
P/A

Extrem soil stress < Allw. Soil strength nett. ?


=

+
0.67
+
0.82 kg/cm2

0.82

M / (1/6 B^3)

<

...YES
b. 2 way shear Chek
Vu

26899.00 kg

=
=

1.00
29.00 cm

d
bo = 4 x (d + b )
Vc

=
=
=
=

316.00 cm

1/6 (1+2/fc'. bo . D ]
1505798.86
150579.89

N.
kg.

0.15

0.92

Vc > Vu ..?

150579.89

>

26899.00

..?

26899.00

..?

YES
c. 1 way shear Chek
Vc

=
=

Vc > Vu ..?

0,6 [1/6 fc'. B . D ]


317679.08
N.
31767.91
kg.

31767.91

>

YES
d. Reinforcement for bending moment
Mu
min. = 1.4/fy
Rn = Mu / B.d^2
m = fy / 0.85 fc'
1/m
(1-2.m.Rn/fy)^0,5
1/m [ 1-(1-2.m.Rn)/fy ]^0.5
Use

1961.00 kg.m

=
=
=
=
=

0.01
0.12
9.41
0.11
1.00

=
=

0.0005
0.0058

<

As = B.d.

3383.33 mm2

try
number
As

=
=
=

18.00 mm
16.00
4069.44
>

0.0058

(min.)

3383.33

OK
Use :

B
b
t

=
=
=

200.00
50.00
35.00

cm
cm
cm

=
=

18.00
16.00

mm
pcs

e. Design of Base Plat :


Width of base plat (w)
Critical cantilv.length (m)
Conc. Bearing stress (fp)
Thickness of base plat (t)

=
=
=
=
=

f. Anker Bolt (6 bolt) :


Geser ijin beton K300
Jarak baut terjauh dari as
jumlah baut angker (n)
Gaya akibat Momen (P1)
1 baut memikul (P1 / 2) (tarik)
Gaya akibat Normal (tekan)

=
=
=
=
=
=

A 1 baut

=
=

g. Sloof :
Beban axial sloof
Coba penampang sloof

=
= b
= h

Cek tekan beton


=
As min. 1% beton
=
ambil n besi
=
besi sloof
=
besi begel sloof minimum = 8 mm

h. Strous :

50.00 cm
5.00 cm
105.00 kg/cm2
2.m (fp / fy)^0.5
2.09 cm

6.50
20.00
6.00
4902.50
2451.25
4483.17

kg/cm2
cm
kg
kg
kg

4.33 cm2
2.35 cm
144.60 cm

3000.00
20.00
30.00
5.00
6.00
6.00
1.13

kg
cm
cm
kg/cm2
cm2
buah
cm

> 10% ax.kolom ? Ok !

< 75 kg/cm2 ?

Ok !

> min 1,2 cm ?

No !

Coba

n
2.00 buah
strous
=
50.00 cm
Pmax. = Axial / n + M.X1 / 2.(X1^2+X2^2) =
13449.50
+
980.50
=
14430.00 kg
Kekuatan geser cleaf(lekatan tanah) di kedalaman 6 m diambil 100 kg/cm
Maka kekuatan ijin strous
=
Keliling x geser cleaf
=
15700.00 kg
> P max ?

Ok !

3. Design of Main Foundation III (tangga) P-3 :


Data :
Allowable soil strength
fc'
fy
Concrete mass/vol.
Axial load (P)
Moment (M)
Try width of found. (B)
Try width of column (b)
Try deepth of WF (l)

=
=
=
=
=
=
=
=
=

1.00 kg/cm2
300.00 kg/cm2
2400.00 kg/cm2
2.40 ton/m3
4832.00 kg
571.00 kg.m
120.00 cm
30.00 cm
20.00 cm

a. Foundation Plan
Thicknes of found.
Weight of foundation
Allowable soil strength net.

=
=
=

Extrem soil stress

=
=
=

25.00 cm
0.06 kg/cm2
0.94 kg/cm2
P/A

Extrem soil stress < Allw. Soil strength nett. ?


=

+
0.34
+
0.53 kg/cm2

0.53

M / (1/6 B^3)

<

0.20

0.94

4832.00

..?

4832.00

..?

...YES
b. 2 way shear Chek
Vu

4832.00 kg

=
=

1.00
19.00 cm

d
bo = 4 x (d + b )
Vc

=
=
=
=

Vc > Vu ..?

196.00 cm

1/6 (1+2/fc'. bo . D ]
611915.64
61191.56

N.
kg.

61191.56

>

YES
c. 1 way shear Chek
Vc
Vc > Vu ..?

=
=

0,6 [1/6 fc'. B . D ]


124880.74
N.
12488.07
kg.

12488.07

>

YES
d. Reinforcement for bending moment
Mu
min. = 1.4/fy
Rn = Mu / B.d^2
m = fy / 0.85 fc'
1/m
(1-2.m.Rn/fy)^0,5

=
=
=
=
=
=

571.00 kg.m
0.01
0.13
9.41
0.11
0.99

1/m [ 1-(1-2.m.Rn)/fy ]^0.5


=
=

Use
As = B.d.
try
number
As

0.0006
0.0058

<

1330.00 mm2

=
=
=

16.00 mm
8.00
1607.68
>

0.0058

(min.)

1330.00

OK
Use :

B
b
t

=
=
=

120.00
30.00
25.00

cm
cm
cm

=
=

16.00
8.00

mm
pcs

e. Design of Base Plat :


Width of base plat (w)
Critical cantilv.length (m)
Conc. Bearing stress (fp)
Thickness of base plat (t)

=
=
=
=
=

f. Anker Bolt (6 bolt) :


Geser ijin beton K300
Jarak baut terjauh dari as
jumlah baut angker (n)
Gaya akibat Momen (P1)
1 baut memikul (P1 / 2) (tarik)
Gaya akibat Normal (tekan)

=
=
=
=
=
=

A 1 baut

=
=

g. Sloof :
Beban axial sloof
Coba penampang sloof

=
= b
= h

Cek tekan beton


=
As min. 1% beton
=
ambil n besi
=
besi sloof
=
besi begel sloof minimum = 8 mm

30.00 cm
5.00 cm
105.00 kg/cm2
2.m (fp / fy)^0.5
2.09 cm

6.50
17.00
6.00
1679.41
839.71
805.33

kg/cm2
cm
kg
kg
kg

1.03 cm2
1.14 cm
70.43 cm

3000.00
15.00
20.00
10.00
3.00
6.00
0.80

kg
cm
cm
kg/cm2
cm2
buah
cm

> 10% ax.kolom ? Ok !

< 75 kg/cm2 ?

Ok !

> min 1,2 cm ?

No !

4. Design of Main Foundation Gabungan P-4 :


Data :
Allowable soil strength
fc'
fy
Concrete mass/vol.
Axial load (P)kiri
Moment (M)kiri
Axial load (P)kanan
Moment (M)kanan
P total
Try width of found. (B)
Try width of column (b)

=
=
=
=
=
=
=
=
=
=
=

1.00 kg/cm2
300.00 kg/cm2
2400.00 kg/cm2
2.40 ton/m3
5476.00 kg
1287.00 kg.m
12348.00 kg
1355.00 kg.m
17824.00 kg
150.00 cm
40.00 cm

Try width of found. (L) =

300.00 cm

30.00 cm

Thicknes of found.
Weight of foundation
Allowable soil strength net.

=
=
=

35.00 cm
0.08 kg/cm2
0.92 kg/cm2

Extrem soil stress

=
=
=

Try deepth of WF (l)

a. Foundation Plan

P total /A
0.40
0.40

Extrem soil stress < Allw. Soil strength nett. ?


=

kg/cm2

0.40

<

0.92

5476.00

..?

5476.00

..?

...YES
b. 2 way shear Chek
Vu

5476.00 kg

=
=

1.00
29.00 cm

d
bo = 4 x (d + b )
Vc

=
=
=
=

Vc > Vu ..?

276.00 cm

1/6 (1+2/fc'. bo . D ]
1315191.41
131519.14

N.
kg.

131519.14

>

YES
c. 1 way shear Chek
Vc
Vc > Vu ..?

=
=

0,6 [1/6 fc'. B . d ]


238259.31
N.
23825.93
kg.

23825.93

>

YES
d. Reinforcement for bending moment
Mu max. (dari SAP2000)
min. = 1.4/fy
Rn = Mu / B.d^2
m = fy / 0.85 fc'
1/m
(1-2.m.Rn/fy)^0,5
1/m [ 1-(1-2.m.Rn)/fy ]^0.5
Use

4000.00 kg.m

=
=
=
=
=

0.01
0.32
9.41
0.11
0.99

=
=

0.0013
0.0058

<

As = B.d.

2537.50 mm2

try
number
As

=
=
=

18.00 mm
10.00
2543.40
>

OK
Use :

B
b
t

=
=
=

150.00
40.00
35.00

cm
cm
cm

=
=

18.00
10.00

mm
pcs

e. Design of Base Plat :


Width of base plat (w)
Critical cantilv.length (m)
Conc. Bearing stress (fp)
Thickness of base plat (t)

f. Anker Bolt (6 bolt) :

=
=
=
=
=

40.00 cm
5.00 cm
105.00 kg/cm2
2.m (fp / fy)^0.5
2.09 cm

0.0058

2537.50

(min.)

Geser ijin beton K300


Jarak baut terjauh dari as
jumlah baut angker (n)
Gaya akibat Momen (P1)
1 baut memikul (P1 / 2) (tarik)
Gaya akibat Normal (tekan)

=
=
=
=
=
=

A 1 baut

=
=

g. Sloof :
Beban axial sloof
Coba penampang sloof

=
= b
= h

Cek tekan beton


=
As min. 1% beton
=
ambil n besi
=
besi sloof
=
besi begel sloof minimum = 8 mm

6.50
12.00
6.00
5362.50
2681.25
912.67

kg/cm2
cm
kg
kg
kg

2.25 cm2
1.69 cm
104.10 cm

1500.00
15.00
30.00
3.33
4.50
6.00
0.98

kg
cm
cm
kg/cm2
cm2
buah
cm

> 10% ax.kolom ? Ok !

< 75 kg/cm2 ?

Ok !

> min 1,2 cm ?

No !

h. Strous :
Coba

n
2.00 buah
strous
=
30.00 cm
Pmax. = Axial / n + M.X1 / 2.(X1^2+X2^2) =
8912.00
+
0.00
=
8912.00 kg
Kekuatan geser cleaf(lekatan tanah) di kedalaman 6 m diambil 100 kg/cm
Maka kekuatan ijin strous
=
Keliling x geser cleaf
=
9420.00 kg
> P max ?

Ok !
14.17

5. Design of Main Foundation Gabungan P-5


Data :
Allowable soil strength
fc'
fy
Concrete mass/vol.
Axial load (P)kiri
Moment (M)kiri
Axial load (P)kanan
Moment (M)kanan
P total
Try width of found. (B)
Try width of column (b)
Try deepth of WF (l)

=
=
=
=
=
=
=
=
=

1.00 kg/cm2
300.00 kg/cm2
2400.00 kg/cm2
2.40 ton/m3
43900.00 kg
1235.00 kg.m
38250.00 kg
1888.00 kg.m
82150.00 kg

=
=
=

200.00 cm

Try width of found. (L) =

50.00 cm
40.00 cm

a. Foundation Plan
Thicknes of found.
Weight of foundation
Allowable soil strength net.

=
=
=

Extrem soil stress

=
=
=

50.00 cm
0.12 kg/cm2
0.88 kg/cm2
P total /A
0.84
0.84

Extrem soil stress < Allw. Soil strength nett. ?


=

kg/cm2

0.84

...YES
b. 2 way shear Chek
Vu

43900.00 kg

<

0.88

490.00 cm

=
=

d
bo = 4 x (d + b )
Vc

1.00
44.00 cm

=
=
=
=

Vc > Vu ..?

376.00 cm

1/6 (1+2/fc'. bo . D ]
2718456.60
271845.66

N.
kg.

271845.66

>

43900.00

..?

43900.00

..?

YES
c. 1 way shear Chek
Vc

=
=

Vc > Vu ..?

0,6 [1/6 fc'. B . d ]


481995.85
N.
48199.59
kg.

48199.59

>

YES
d. Reinforcement for bending moment
Mu max. (dari SAP2000)
min. = 1.4/fy
Rn = Mu / B.d^2
m = fy / 0.85 fc'
1/m
(1-2.m.Rn/fy)^0,5
1/m [ 1-(1-2.m.Rn)/fy ]^0.5
Use

24300.00 kg.m

=
=
=
=
=

0.01
0.63
9.41
0.11
0.98

=
=

0.0026
0.0058

<

As = B.d.

5133.33 mm2

try
number
As

=
=
=

20.00 mm
18.00
5652.00
>

0.0058

(min.)

5133.33

OK
Use :

B
b
t

=
=
=

200.00
50.00
50.00

cm
cm
cm

=
=

20.00
18.00

mm
pcs

e. Design of Base Plat :


Width of base plat (w)
Critical cantilv.length (m)
Conc. Bearing stress (fp)
Thickness of base plat (t)

=
=
=
=
=

f. Anker Bolt (6 bolt) :


Geser ijin beton K300

=
=
=
=
=
=

Jarak baut terjauh dari as


jumlah baut angker (n)
Gaya akibat Momen (P1)
1 baut memikul (P1 / 2) (tarik)
Gaya akibat Normal (tekan)
A 1 baut

=
=

g. Sloof :
Beban axial sloof

=
= b
= h

Coba penampang sloof


Cek tekan beton
As min. 1% beton

=
=

50.00 cm
5.00 cm
105.00 kg/cm2
2.m (fp / fy)^0.5
2.09 cm

6.50
12.00
6.00
5145.83
2572.92
7316.67

kg/cm2
cm
kg
kg
kg

6.18 cm2
2.81 cm
172.68 cm

4500.00
15.00
30.00
10.00
4.50

kg
cm
cm
kg/cm2
cm2

> 10% ax.kolom ? Ok !

< 75 kg/cm2 ?

Ok !

ambil n besi
=
besi sloof
=
besi begel sloof minimum = 8 mm

6.00 buah
0.98 cm

> min 1,2 cm ?

No !

h. Strous :
Coba

n
5.00 buah
strous
=
55.00 cm
Pmax. = Axial / n + M.X1 / 2.(X1^2+X2^2) =
16430.00
+
0.00
=
16430.00 kg
Kekuatan geser cleaf(lekatan tanah) di kedalaman 6 m diambil 100 kg/cm
Maka kekuatan ijin strous
=
Keliling x geser cleaf
=
17270.00 kg
> P max ?

KESIMPULAN :

Ok !

NAMA PONDAS
P(kg)
P-1
17500.00
P-2
26899.00
P-3
4832.00
P-4
P-5

M(kg.m) B(cm)
1531.00
170.00
1961.00
200.00
571.00
120.00
150.00
200.00

t(cm)
50.00
35.00
25.00
35.00
50.00

(mm)
16.00
18.00
16.00
18.00
20.00

n (pcs)
20.00
16.00
8.00
10.00
18.00

t base plat (cmn angker (pcs


#REF!
#REF!
2.09
6.00
2.09
6.00
2.09
6.00
2.09
6.00

(cm)
#REF!
2.35
1.14
1.69
2.81

PERHITUNGAN STRUKTUR BANGUN

HOTEL S O N N Y
JL. BRATANG BINANGUN - SURABAYA

AGUSTUS 2003

C . LAMPIRAN

L (cm)
#REF!
144.60
70.43
104.10
172.68

n strous
4.00
2.00
2.00
5.00

TRUKTUR BANGUNAN

SONNY

INANGUN - SURABAYA

beton(cm)
50.00
50.00
30.00
55.00

STUS 2003

I. Design of skunder Foundation :


Data :
Allowable soil strength
fc'
fy
Concrete mass/vol.
Axial load (P)
Moment (M)
Try width of found. (B)
Try width of column (b)
Try deepth of WF (l)

=
=
=
=
=
=
=
=
=

0.40

kg/cm2

300.00 kg/cm2
2400.00 kg/cm2
2.40 ton/m3
8093.00 kg
1257.00 kg.m
200.00 cm
40.00 cm
30.00 cm

a. Foundation Plan
Thicknes of found.
Weight of foundation
Allowable soil strength net.

=
=
=

Extrem soil stress

=
=
=

25.00 cm
0.06 kg/cm2
0.34 kg/cm2
P/A

+
0.20
+
0.30 kg/cm2

Extrem soil stress < Allw. Soil strength nett. ?


=
0.30

<

M / (1/6 B^3)
0.09

0.34

...YES
b. 2 way shear Chek
Vu

=
=
=

d
bo = 4 x (d + b )
Vc

Vc > Vu ..?

8093.00 kg
1.00
19.00 cm
236.00 cm
1/6 (1+2/fc'. bo . D ]

=
=

###
73679.64

N.
kg.

73679.64

>

8093.00

..?

8093.00

..?

YES
c. 1 way shear Chek
Vc
Vc > Vu ..?

=
=
=

0,6 [1/6 fc'. B . D ]


###
N.
20813.46
kg.
20813.46

>

YES
d. Reinforcement for bending moment
Mu

1257.00 kg.m

min. = 1.4/fy

=
Rn = Mu / B.d^2
=
m = fy / 0.85 fc'
=
1/m
=
(1-2.m.Rn/fy)^0,5
=
1/m [ 1-(1-2.m.Rn)/fy ]^0.5
=
=

Use
As = B.d.
try
number
As

0.01
0.17
9.41
0.11
0.99
0.0007
0.0058

<

2216.67 mm2

=
=
=

14.00 mm
16.00
2461.76
>

0.0058

(min.)

2216.67

OK
Use :

B
b
t

=
=
=

200.00
40.00
25.00

cm
cm
cm

=
=

14.00
16.00

mm
pcs

II. Design of Base Plat :


Width of base plat (w)
Critical cantilv.length (m)
Conc. Bearing stress (fp)
Thickness of base plat (t)

=
=
=
=
=

40.00 cm
5.00 cm
105.00 kg/cm2
2.m (fp / fy)^0.5
2.09 cm

III. Anker Bolt (6 bolt) :


Geser ijin beton K300
Jarak baut terjauh dari as
jumlah baut angker (n)
Gaya akibat Momen (P1)
1 baut memikul (P1 / 2) (tarik
Gaya akibat Normal (tekan)

=
=
=
=
=
=

A 1 baut

=
=

6.50
15.00
6.00
4190.00
2095.00
1348.83

kg/cm2
cm
kg
kg
kg

2.15 cm2
1.66 cm
101.90 cm

IV. Sloof :
Beban axial sloof
Coba penampang sloof
Cek tekan beton
As min. 1% beton
ambil n besi
besi sloof

==
= b
= h
=
=
=
=

2136.00
25.00
40.00
2.14
10.00
6.00
1.46

kg
cm
cm
kg/cm2
cm2
buah
cm

> 10% ax.kolom ? Ok !

< 75 kg/cm2 ?

Ok !

> min 1,2 cm ?

Ok !

besi begel sloof minimum = 8 mm

V. Strous :
Coba

n
2.00 buah
strous
= 30.00 cm
Pmax. = Axial / n + M.X1 /1.(X1^2+X2^2) 4046.50
+
1257.00
= 5303.50 kg
Kekuatan geser cleaf(lekatan tanah) di kedalaman 6 m diambil 100 kg/cm
Maka kekuatan ijin strous
Keliling x geser cleaf
= 9420.00 kg
> P max ?

Ok !

PERHITUNGAN PLAT
PROYEK - RUMAH MANYAR
1. TYPE PLAT TANGGA UTAMA-a ( tebal 14 cm )
Tebal plat
=
Panjang arah x (lx) =
Panjang datar =

0.14
1
4.3

m
m
m

Berat volume beton =


2400
kg/m3
Tebal selimut beton
=
20
mm
d = 0.14*1000 - 20 - 5 =
115
mm
b=
1
m
L miring =
4.414748011
m
Beban-beban yang bekerja :
1. Beban mati
Plat
=
t * 2400
=
336
Finishing lantai (keramik)
=
66
Anak tgga =
12
=
166.3515
Total
=
568

t bordes =
d bordes =

kg/m2
kg/m2
kg/m2
kg/m2
Wu bordes
kg/m2

2. Beban hidup
Beban hidup yang bekerja
Wu = 1.2 * qd + 1.6 * ql =
Wu = 1.2 * qd + 1.6 * ql =

Dari SAP (dianalisa sebagai balok) didapat :


Mu lap.plat tangga =
Mu tump.plat bordes =

200

1002.02181
802.4

kg/m2
kg/m2

3944 kgm
8656 kgm

kg/m2
(plat tangga)
(plat bordes)

=
=

38.65
84.83

kNm
kNm

170
145

Wu plat
kg/m2

Mutu beton
Mutu baja

=
=

20
400
0.8

MPa
MPa

Rn perlu = Mn perlu / ( b . d^2 )


balance = 0.85 . fc'/fy x 600/(600+fy) =
max = 0.75 . balance
=
min u/ plat dg.Tul.fy240Mpa (altf SKSNI dan CUR)
m = fy/0.85 . fc' =
min < perlu < max

23.52941176

As perlu = perlu . b . d
Arah
Mu
kNm
utama di plat
38.65
utama di bordes
84.83
pembagi
pembagi

Rn=Mn/bd2
Mn
kNm
N/mm2
48.314
4.567
106.036
5.043

tangga pakai t =
bordes pakai t =
tulangan utama :
tulangan bordes :
tulangan pembagi :
PERHITUNGAN GESER PADA PLAT TANGGA
Vc = 1/6
=

0.0255
0.019125
0.0025

(fc' bw . d)
0.6

jika : Vu < 0.5 Vc ----> tidak tul geser


jika : 0.5 Vc < Vu < Vc ----> pakai tul geser minimal
Vs min = 1/3 (Mpa) . bw . d
vs = vu < vc

140
170
16
19
10

perlu

cek
As perlu
> min
mm2
0.01142 0.011416
1313
0.01261 0.012608
1828
263
366

mm
mm
- s=
- s=
- s=

150
150
200

mm
mm
mm

tul.pakai
(mm)
16
19
10
10

vu = Vu / bd

vc = 1/6
fc'
vs = (vu - vc)
A sengk = (vu - vc) b y / (fy)
A sengk min = b.y / (3 fy)
fc' =
fy sengk =

20 Mpa
240 Mpa

PLAT TANGGA
BORDES

Vu
kg
3,369
5,963

b
mm
1,000
1,000

h
mm
140
170

DESAIN BALOK TANGGA


I. LENTUR :
Mu = 1/8 Q . L^2
Mn perlu = Mu/ = Mu / 0.8
qU bordes =
qU plat =

802.4 kg/m2
1002.0 / 2 =

501 kg/m2

Mu =

dimensi balok = b (lebar), h (tinggi) dan d ( h-0.5tul-cover)


E (modulus elastisitas baja tul) = 200 000 Mpa
xb (garis netral kondisi seimbang) = ( cu / ( cu + y ) ) x d

d
105
135

vu
vc
Mpa
Mpa
0.320857 0.447214
0.441704 0.447214

vc > vu ?
ok, tdk perlu tul gsr
ok, tdk perlu tul gsr

x max = 0.75 . xb
C max = 0.85 . fc' . b . 1 . xmax
utk fc' < 27.5 Mpa 1 = 0.85 (C.K.Wang hal 46)
Mn max = Cmax ( d - 1 . x/2) -----> jika Mn max > Mn perlu, tdk perlu tul tekan
Rn perlu = Mn perlu / ( b . d^2 )
balance = 0.85 . fc'/fy x 600/(600+fy)
max = 0.75 . balance
min = 1.4 / fy

perlu = 1/m [ 1- 1- (2.m.Rn perlu)/fy ]


m = fy/0.85 . fc'
min < perlu < max
As perlu = perlu . b . d

Atap

Lantai -1

E baja =
fc' =
fy =

200,000 Mpa
20 Mpa perhitungan ini hanya berlaku utuk fc' < 27.5 Mpa, diatas itu nilai 1 hrs diganti
400 Mpa
Mu
Mu
Mn perlu
b
h
d
xb.
(kg.m)
(N.mm)
(N.mm)
(mm)
(mm)
(mm)
(mm)
11,727.00
1.17E+08
1.47E+08
150
550
485
9,982.00
9.98E+07
1.25E+08
150
550
485

B1a

lt-1 tumpu
lt-1 lap.

#VALUE!
#VALUE!

B1b

lt-1 tumpu
lt-1 lap.

6,590.00
2,842.00

6.59E+07
2.84E+07

8.24E+07
3.55E+07

150
150

500
500

435
435

#VALUE!
#VALUE!

B1c

lt-1 tumpu
lt-1 lap.

5,375.00
3,027.00

5.38E+07
3.03E+07

6.72E+07
3.78E+07

150
150

500
500

435
435

#VALUE!
#VALUE!

B2a

atap tumpu
atap lap

1397
2860

1.40E+07
2.86E+07

1.75E+07
3.58E+07

150
150

400
400

335
335

#VALUE!
#VALUE!

B2b

atap tumpu
atap lap

681
346

6.81E+06
3.46E+06

8.51E+06
4.33E+06

150
150

300
300

235
235

#VALUE!
#VALUE!

Garasi

blk.tangga
blk.tandon
B-utamatepi tumpu
lap

648
1052
2,690.00
5,491.00

6.48E+06
1.05E+07
2.69E+07
5.49E+07

8.10E+06
1.32E+07
3.36E+07
6.86E+07

150
150
150
200

400
350
400
400

335
285
335
335

#VALUE!
#VALUE!
#VALUE!
#VALUE!

B-utama-dlm tumpu
lap

400.00
2,027.00

4.00E+06
2.03E+07

5.00E+06
2.53E+07

200
200

350
350

285
285

#VALUE!
#VALUE!

tumpu
lap

400.00
1,930.00

4.00E+06
1.93E+07

5.00E+06
2.41E+07

150
150

250
250

185
185

#VALUE!
#VALUE!

B-anak

macam tul. :
polos
deform

6,8,10
12,13,16,19,22

mm

Wu plat
kg/m2

Wu bordes
kg/m2

s (mm)
150
150
200
200

As ada

As ada>Asperlu

1340
1889
393
393

ok
ok
ok
ok

20% tul.utama
20% tul.utama

xmax
(mm)

min
perlu
perlu > min
Cmax
Mn max beton
Mn max be Rn perlu balance max
m
(N)
(N.mm)
> Mn perlu
#VALUE! #VALUE!
#VALUE! #VALUE! 4.154533 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE! 3.53633 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE! 2.902189
#VALUE! 1.251596

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE! #VALUE!
#VALUE! #VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE! 2.367111
#VALUE! 1.333069

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE! #VALUE!
#VALUE! #VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE! 1.037351
#VALUE! 2.12371

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE! #VALUE!
#VALUE! #VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE! 1.027614
#VALUE! 0.522107

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE! #VALUE!
#VALUE! #VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

0.481176
1.079306
1.997475
3.058031

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE! 0.307787
#VALUE! 1.559711

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE! #VALUE!
#VALUE! #VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE! 0.973947
#VALUE! 4.699294

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE! #VALUE!
#VALUE! #VALUE!

perlu < max


As perlu
tul pakai
As ada
> As perlu
mm2
jml
(mm) mm2
#VALUE! #VALUE!
5
16
1004.8 #VALUE!
#VALUE! #VALUE!
4
16
803.84 #VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!

4
3

13
13

530.66 #VALUE!
397.995 #VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

4
3

13
13

530.66 #VALUE!
397.995 #VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

2
3

12
12

226.08 #VALUE!
339.12 #VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

2
2

12
12

226.08 #VALUE!
226.08 #VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

2
2
3
4

12
12
13
16

226.08
226.08
397.995
803.84

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

2
3

13
13

265.33 #VALUE!
397.995 #VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

2
3

13
13

265.33 #VALUE!
397.995 #VALUE!

PERHITUNGAN PLAT
PROYEK - RUMAH MANYAR
1. TYPE PLAT TANGGA UTAMA-a bagian atas ( tebal 14 cm )
Tebal plat
=
Panjang arah x (lx) =
Panjang datar =

0.14
1
3.88

m
m
m

Berat volume beton =


2400
kg/m3
Tebal selimut beton
=
20
mm
d = 0.14*1000 - 20 - 5 =
115
mm
b=
1
m
L miring =
4.00679423
m
Beban-beban yang bekerja :
1. Beban mati
Plat
=
t * 2400
=
336
Finishing lantai (keramik)
=
66
Anak tgga
12
=
183.2887
Total
=
585

kg/m2
kg/m2
kg/m2
kg/m2

2. Beban hidup
Beban hidup yang bekerja
Wu = 1.2 * qd + 1.6 * ql =

=
1022.3464084

Dari SAP (dianalisa sebagai balok) didapat :


Mu lap.plat tangga =
Mu tump.plat tangga =

Mutu beton
Mutu baja

200

=
=

20
240
0.8

869 kgm
1800 kgm

As perlu = perlu . b . d
Arah
Mu

(plat tangga)

=
=

8.52
17.64

MPa
MPa

Rn perlu = Mn perlu / ( b . d^2 )


balance = 0.85 . fc'/fy x 600/(600+fy) =
max = 0.75 . balance
=
min u/ plat dg.Tul.fy240Mpa (altf SKSNI dan CUR)
m = fy/0.85 . fc' =
min < perlu < max

kg/m2

kg/m2

0.050595
0.037946
0.0025

14.11764706

Mn

Rn=Mn/bd2

perlu

cek

kNm
8.52
17.64

lap di plat
tum di plat
pembagi
pembagi

kNm
10.64525
22.05

tangga pakai t =
bordes pakai t =
tulangan utama :
tulangan bordes :
tulangan pembagi :

N/mm2
1.006
2.084

140
140
10
13
10

> min
0.00419 0.004192
0.00868 0.008684

mm
mm
- s=
- s=
- s=

150
120
200

PERHITUNGAN GESER PADA PLAT TANGGA

Vc = 1/6
fc' bw . d)
=
0.6
jika : Vu < 0.5 Vc ----> tidak tul geser
jika : 0.5 Vc < Vu < Vc ----> pakai tul geser minimal
Vs min = 1/3 (Mpa) . bw . d
vs = vu < vc
vu = Vu / bd

vc = 1/6
fc'
vs = (vu - vc)
A sengk = (vu - vc) b y / (fy)
A sengk min = b.y / (3 fy)
fc' =
fy seng

20 Mpa
240 Mpa

PLAT TANGGA
BORDES

Vu
kg
2,596

b
mm
1,000
1,000

h
mm

d
140
170

105
135

vu
Mpa
0.247238
0

t bordes =
d bordes =

140
0 mm

(plat tangga)

kNm
kNm
Wu kg/m2

As perlu

tul.pakai

As ada

As ada>Asperlu

mm2
482
999
96
200

(mm)
10
13
10
10

mm
mm
mm

vc
Mpa
0.447214
0.447214

vc > vu ?
ok, tdk perlu tul gsr
ok, tdk perlu tul gsr

s (mm)
150
120
200
200

523
1106
393
393

ok
ok
ok
ok

20% tul.utama
20% tul.utama

20% tul.utama
20% tul.utama

PERHITUNGAN PLAT
PROYEK - RUMAH MANYAR
1. TYPE PLAT TANGGA BELAKANG ( tebal 12 cm )
Tebal plat
=
Panjang arah x (lx) =
Panjang datar =

0.12
1
1.875

m
m
m

Berat volume beton =


2400
kg/m3
Tebal selimut beton
=
20
d = t*1000 - 20 - 5 =
95
b=
1
m
L miring =
2.125
m
Beban-beban yang bekerja :
1. Beban mati
Plat
=
t * 2400
=
Finishing lantai (keramik)
=
Anak tgga
5
=
Total
=

mm
mm

288
66
144
498

kg/m2
kg/m2
kg/m2
kg/m2

200

kg/m2

2. Beban hidup
Beban hidup yang bekerja

Wu = 1.2 * qd + 1.6 * ql =
Wu = 1.2 * qd + 1.6 * ql =

917.6
744.8

Dari SAP (dianalisa sebagai balok) didapat :


Mu lap.plat tangga =
Mu tump.plat bordes =

Mutu beton
Mutu baja

=
=

20
400
0.8

658 kgm
1980 kgm

As perlu = perlu . b . d
Arah
Mu

(plat tangga)
(plat bordes)

=
=

6.45
19.40

Wu bordes
kg/m2

MPa
MPa

Rn perlu = Mn perlu / ( b . d^2 )


balance = 0.85 . fc'/fy x 600/(600+fy) =
max = 0.75 . balance
=
min u/ plat dg.Tul.fy240Mpa (altf SKSNI dan CUR)
m = fy/0.85 . fc' =
min < perlu < max

kg/m2
kg/m2

0.0255
0.019125
0.0025

23.52941176

Mn

Rn=Mn/bd2

perlu

cek

kNm
6.45
19.40

utama di plat
utama di bordes
pembagi
pembagi

kNm
8.0605
24.255

tangga pakai t =
bordes pakai t =
tulangan utama :
tulangan bordes :
tulangan pembagi :

N/mm2
1.116
2.688

120
120
10
10
8

> min
0.00279 0.002791
0.00672 0.006719

mm
mm
- s=
- s=
- s=

120
120
200

PERHITUNGAN GESER PADA PLAT TANGGA


Vc = 1/6
=

(fc' bw . d)
0.6

jika : Vu < 0.5 Vc ----> tidak tul geser


jika : 0.5 Vc < Vu < Vc ----> pakai tul geser minimal
Vs min = 1/3 (Mpa) . bw . d
vs = vu < vc
vu = Vu / bd

vc = 1/6
fc'
vs = (vu - vc)
A sengk = (vu - vc) b y / (fy)
A sengk min = b.y / (3 fy)
fc' =
fy sengk =

20 Mpa
240 Mpa

PLAT TANGGA
BORDES

Vu
kg
1,249
3,450

b
mm
1,000
1,000

h
mm

d
120
120

85
85

vu
Mpa
0.146941
0.405882

t bordes =
d bordes =

120
95 mm

(plat tangga)
(plat bordes)

kNm
kNm

Wu bordes
kg/m2

Wu plat
kg/m2

Wu bordes
kg/m2

As perlu

tul.pakai

As ada

As ada>Asperlu

mm2
265
638
53
128

(mm)
10
10
8
8

mm
mm
mm

vc
Mpa
0.4472135955
0.4472135955

vc > vu ?
ok, tdk perlu tul gsr
ok, tdk perlu tul gsr

s (mm)
120
120
200
200

654
654
251
251

ok
ok
ok
ok

20% tul.utama
20% tul.utama

PERHITUNGAN PLAT
PROYEK - RUMAH MANYAR
1. TYPE PLAT TANGGA BELAKANG ( tebal 12 cm )
Tebal plat
=
Panjang arah x (lx) =
Panjang arah y (ly) =
ly / lx
=

0.12
2
2
1.00

m
m
m

Berat volume beton =


2400
Tebal selimut beton
=
d = 0.12*1000 - 20 - 5 =
b=
1
m
L miring =
2.8284271247
Beban-beban yang bekerja :
1. Beban mati
Plat
=
0.12 * 2400
Finishing lantai (keramik)
Anak tgga =
6

kg/m3
20
95
m

=
=
Total

2. Beban hidup
Beban hidup yang bekerja
Wu = 1.2 * qd + 1.6 * ql =
Wu = 1.2 * qd + 1.6 * ql =
Dari SAP didapat :
Mu lap.plat tangga =
Mu tump.plat tangga =
Mu lap. plat bordes =
Mu tump. plat bordes =
Mutu beton
Mutu baja

=
=
=

mm
mm

=
=

288
66
129.8248
484

kg/m2
kg/m2
kg/m2
kg/m2

200

kg/m2

=
900.589766031
744.8

kg/m2
kg/m2

260 kgm
845
456
51 kgm
20
240
0.8

Wu bordes
kg/m2

(pelat)
(bordes)
=

2.55
8.28
4.47
0.50

kNm
kNm
kNm
kNm

MPa
MPa

Rn perlu = Mn perlu / ( b . d^2 )


balance = 0.85 . fc'/fy x 600/(600+fy) =
max = 0.75 . balance
=
min u/ plat dg.Tul.fy240Mpa (altf SKSNI dan CUR)

0.050595
0.037946
0.0025

m = fy/0.85 . fc' =
14.117647059
min < perlu < max
As perlu = perlu . b . d
Arah
Mu
kNm
x ( lap )
2.55

Mn
kNm
3.185

Rn=Mn/bd2
N/mm2
0.441

perlu
0.00184

cek
As perlu tul.pakai
> min
mm2
(mm)
0.0025
238
8

y ( lap )
x ( tump )
y ( tump )

8.28
4.47
0.50

10.35125
5.586
0.62475

1.147
0.619
0.069

tangga pakai t=120mm : 10 - 150 mm

0.00478 0.004779
0.00258 0.002579
0.00029
0.0025

454
245
238

10
8
8

Wu plat
kg/m2

Wu bordes
kg/m2

s (mm)
150

As ada

As ada>Asperlu

335

ok

150
150
150

523
335
335

ok
ok
ok

PERHITUNGAN PLAT
PROYEK - RUMAH MANYAR

PERHITUNGAN TANDON AIR BAWAH


1. Plat dinding tandon :
Pa (tekanan tanah aktif) = ca .w .h^2/2
ca (coefisien tekanan aktif) =
w (berat jenis tanah)
=
h (kedalaman bangunan) =

0.3
1800 kg/m3
2 m

Pa =
1080 kg/m
Mu = 1,2 x Pa x 1/3h
864 kg.m
2. Plat lantai tandon :
Tebal plat
=
Panjang arah x (lx) =
Panjang arah y (ly) =
ly / lx
=

0.15
2
2
1.00

Berat volume beton =


2400
Tebal selimut beton
=
d = t*1000 - 20 - 5 =
b=
1
m

8.4672 kN.m

m
m
m

kg/m3
20
125

mm
mm

Beban-beban yang bekerja :


1. Beban mati
Plat
=
0.15 * 2400
Finishing lantai (keramik)
Plafond + instalasi
Total

=
=
=
=

360
0
0
369

kg/m2
kg/m2
kg/m2
kg/m2

2. Beban hidup
Beban hidup yang bekerja

2000

kg/m2

Wu = 1.2 * qd + 1.6 * ql =
lihat tabel PBI 71 :
X untuk Mlx
=
44
X untuk Mly
=
44
X untuk Mtx
=
0
X untuk Mty
=
0
Mlx = 0.001 * Wu * lx2 * X
Mly = 0.001 * Wu * lx2 * X
Mtx = - 0.001 * Wu * lx2 * X
Mty = - 0.001 * Wu * lx2 * X

=
=
=
=

kg/m2

3642.8

641.1328
641.1328
0
0

kgm
kgm
kgm
kgm

=
=
=
=

6.28
6.28
0.00
0.00

kNm
kNm
kNm
kNm

Mutu beton
Mutu baja

=
=
=

20
240
0.8

MPa
MPa

Rn perlu = Mn perlu / ( b . d^2 )


balance = 0.85 . fc'/fy x 600/(600+fy) =
0.0505952381
max = 0.75 . balance
=
0.0379464286
min u/ plat dg.Tul.fy240Mpa (altf SKSNI dan CUR)
0.0025
m = fy/0.85 . fc' =
14.11765
min < perlu < max
As perlu = perlu . b . d
Arah
1. Plat vertikal
2. Plat lantai

x ( lap )
y ( lap )

Mu
kNm
8.47
6.28

cek
Rn=Mn/bd2 perlu
Mn
As perlu
kNm
N/mm2
> min
mm2
10.584 0.847
0.00353 0.003528
441
7.8538768 0.503
0.00209
0.0025
313

tul.pakai
(mm) s (mm)
8
100
8
100

As ada

As ada>Asperlu

502
502

ok
ok

PONDASI
Proyek Manyar
I. Design of Main Foundation P1 :
Data :
Allowable soil strength
fc'
fy
Concrete mass/vol.
Axial load (P)
Moment (M)
Try width of found. (B)
Try width of column (b)
Try deepth of WF (l)

=
=
=
=
=
=
=
=
=

0.50

kg/cm2

200.00 kg/cm2
3200.00 kg/cm2
2.40 ton/m3
13849.00 kg
534.00 kg.m
100.00 cm
15.00 cm
15.00 cm

V. Strous :
Coba

n
strous
=
Pmax. = Axial / n + M.X1 / 2.(X1^2+X2^2) =

2.00 buah
30.00 cm
6924.50
+
=
7458.50 kg
Kekuatan geser cleaf(lekatan tanah) di kedalaman 6 m diambil 100 kg/cm
Maka kekuatan ijin strous
=
Keliling x geser cleaf
=
9420.00 kg

534.00

> P max ?

Ok !

a. Foundation Plan
Thicknes of found.
Weight of foundation

=
=

40.00 cm
0.10 kg/cm2

b. 2 way shear Chek


Vu

13849.00 kg

=
=

1.00
34.00 cm

D
bo = 4 x (d + b )
Vc

Vc > Vu ..?

196.00 cm

1/6 (1+2/fc'. bo . D ]

=
=

894069.42
89406.94

N.
kg.

89406.94

>

13849.00

..?

13849.00

..?

YES
c. 1 way shear Chek
Vc
Vc > Vu ..?

=
=

0,6 [1/6 fc'. B . D ]


152052.62
N.
15205.26
kg.

15205.26

>

YES
d. Reinforcement for bending moment
Mu

534.00 kg.m
Q pile cap =

L1

0.96

t/m

P strous
L

t=
0.40
B=
1.00
L1 =
0.30
L=
0.60
Q (b.s. pile cap) = t.L.B
P (daya dukung strous)
Mu = 1.2 x ( P.L1 - 1/2.Q.L^2)
min. = 1.4/fy
Rn = Mu / B.d^2
m = fy / 0.85 fc'
1/m
(1-2.m.Rn/fy)^0,5
1/m [ 1-(1-2.m.Rn)/fy ]^0.5
Use
As = B.d.
try
number
As

m
m
m
m
=
=
=

0.96 t/m
9.42 t
3.18 t.m

=
=
=
=
=

0.0044
0.0275
18.82
0.05
1.00

=
=

0.00009
0.0044

1487.50 mm2

=
=
=

16.00 mm
10.00
2009.60
>

<

0.0044

(min.)

1487.50

OK
Use :

B
b
t

=
=
=

100.00
15.00
40.00

cm
cm
cm

=
=
=

16.00
10.00
10.00

mm
pcs
mm

n
s jarak tul

IV. Sloof :
Beban axial sloof

=
= b
= h

Coba penampang sloof


Cek tekan beton
As min. 1% beton
ambil n besi

=
=
=

1384.90
15.00
30.00
3.08
4.50
4.00

kg
cm
cm
kg/cm2
cm2
buah

( 10% ax.kolom)

< 75 kg/cm2 ?

Ok !

besi sloof
=
besi begel sloof minimum = 8 mm

1.20 cm

> min 1,2 cm ?

No !

(min.)

DESAIN BALOK
I. LENTUR :
Mu = momen negatif max. di tumpuan
Mn perlu = Mu/ = Mu / 0.8
dimensi balok = b (lebar), h (tinggi) dan d ( h-0.5tul-cover)
E (modulus elastisitas baja tul) = 200 000 Mpa
xb (garis netral kondisi seimbang) = ( cu / ( cu + y ) ) x d
x max = 0.75 . xb
C max = 0.85 . fc' . b . 1 . xmax
utk fc' < 27.5 Mpa 1 = 0.85 (C.K.Wang hal 46)
Mn max = Cmax ( d - 1 . x/2) -----> jika Mn max > Mn perlu, tdk perlu tul tekan
Rn perlu = Mn perlu / ( b . d^2 )
balance = 0.85 . fc'/fy x 600/(600+fy)
max = 0.75 . balance
min = 1.4 / fy

perlu = 1/m [ 1- 1- (2.m.Rn perlu)/fy ]


m = fy/0.85 . fc'
min < perlu < max
As perlu = perlu . b . d

200,000 Mpa
20 Mpa perhitungan ini hanya berlaku utuk fc' < 27.5 Mpa, diatas itu nilai 1 hrs digan
400 Mpa

lt-1 tumpu
lt-1 lap.

B1b

lt-1 tumpu
lt-1 lap.

6,590.00
2,842.00

6.59E+07 8.24E+07
2.84E+07 3.55E+07

150
150

500
500

435
435

B1c

lt-1 tumpu
lt-1 lap.

5,375.00
3,027.00

5.38E+07 6.72E+07
3.03E+07 3.78E+07

150
150

500
500

435
435

B2a

atap tumpu
atap lap

1397
2860

1.40E+07 1.75E+07
2.86E+07 3.58E+07

150
150

400
400

335
335

B2b

atap tumpu
atap lap

681
346

6.81E+06 8.51E+06
3.46E+06 4.33E+06

150
150

300
300

235
235

6.48E+06
1.05E+07
2.69E+07
5.49E+07

150
150
150
200

400
350
400
400

335
285
335
335

blk.tangga
blk.tandon
tumpu
B-utamatepi
lap
Garasi

Mu
Mu
Mn perlu b
h
d
(kg.m)
(N.mm)
(N.mm)
(mm)
(mm)
(mm)
3,200.00
3.20E+07 4.00E+07
150
400
380
9,982.00
9.98E+07 1.25E+08
150
550
485

B1a

Atap

Lantai -1

E baja =
fc' =
fy =

648
1052
2,690.00
5,491.00

8.10E+06
1.32E+07
3.36E+07
6.86E+07

Garasi

B-utama-dlm

tumpu
lap

400.00
2,027.00

4.00E+06 5.00E+06
2.03E+07 2.53E+07

200
200

350
350

285
285

B-anak

tumpu
lap

400.00
1,930.00

4.00E+06 5.00E+06
1.93E+07 2.41E+07

150
150

250
250

185
185

macam tul. :
polos
deform

6,8,10
12,13,16,19,22

as itu nilai 1 hrs diganti

xb.
(mm)

xmax
(mm)

Cmax
(N)

228
291

171
218.25

Mn max beton
(N.mm)
370,643
113,907,706
473,057
185,553,603

261
261

195.75
195.75

424,288
424,288

261
261

195.75
195.75

201
201

Mn max beton
> Mn perlu
Tdk pelu tul tekan
Tdk pelu tul tekan

Rn perlu

balance

1.846722
3.53633

0.0255
0.0255

149,267,214 Tdk pelu tul tekan


149,267,214 Tdk pelu tul tekan

2.902189
1.251596

0.0255
0.0255

424,288
424,288

149,267,214 Tdk pelu tul tekan


149,267,214 Tdk pelu tul tekan

2.367111
1.333069

0.0255
0.0255

150.75
150.75

326,751
326,751

88,526,955 Tdk pelu tul tekan


88,526,955 Tdk pelu tul tekan

1.037351
2.12371

0.0255
0.0255

141
141

105.75
105.75

229,213
229,213

43,563,387 Tdk pelu tul tekan


43,563,387 Tdk pelu tul tekan

1.027614
0.522107

0.0255
0.0255

201
171
201
201

150.75
128.25
150.75
150.75

326,751
277,982
326,751
435,668

0.481176
1.079306
1.997475
3.058031

0.0255
0.0255
0.0255
0.0255

88,526,955
64,073,085
88,526,955
118,035,940

Tdk pelu tul tekan


Tdk pelu tul tekan
Tdk pelu tul tekan
Tdk pelu tul tekan

171
171

128.25
128.25

370,643
370,643

85,430,780 Tdk pelu tul tekan


85,430,780 Tdk pelu tul tekan

0.307787
1.559711

0.0255
0.0255

111
111

83.25
83.25

180,444
180,444

26,997,862 Tdk pelu tul tekan


26,997,862 Tdk pelu tul tekan

0.973947
4.699294

0.0255
0.0255

max

min

perlu

perlu > min

perlu < max As perlu


tul pakai
mm2
jml (mm)
0.019125 0.0035 23.52941 0.004899 0.0048991814
ok
279.2533
5
16
0.019125 0.0035 23.52941 0.010023 0.0100226267
ok
729.1461
4
16
0.019125 0.0035 23.52941 0.00801 0.0080103655
0.019125 0.0035 23.52941 0.003254
0.0035

ok
ok

522.6763
228.375

4
3

13
13

0.019125 0.0035 23.52941


0.0064 0.0063996009
0.019125 0.0035 23.52941 0.003475
0.0035

ok
ok

417.574
228.375

4
3

13
13

0.019125 0.0035 23.52941 0.002678


0.0035
0.019125 0.0035 23.52941 0.00569 0.0056901961

ok
ok

175.875
285.9324

2
3

12
12

0.019125 0.0035 23.52941 0.002652


0.019125 0.0035 23.52941 0.001326

ok
ok

123.375
123.375

2
2

12
12

ok
ok
ok
ok

175.875
149.625
267.7125
569.0877

2
2
3
4

12
12
13
16

0.019125
0.019125
0.019125
0.019125

0.0035
0.0035
0.0035
0.0035

0.0035
0.0035

23.52941 0.00122
0.0035
23.52941 0.00279
0.0035
23.52941 0.005328 0.0053276111
23.52941 0.008494 0.0084938466

0.019125 0.0035 23.52941 0.000777


0.0035
0.019125 0.0035 23.52941 0.004097 0.0040967257

ok
ok

199.5
233.5134

2
3

13
13

0.019125 0.0035 23.52941 0.002509


0.0035
0.019125 0.0035 23.52941 0.014081 0.0140808155

ok
ok

97.125
390.7426

2
3

13
13

As ada > As perlu


mm2
1004.8
ok
803.84
ok
530.66
398

ok
ok

530.66
398

ok
ok

226.08
339.12

ok
ok

226.08
226.08

ok
ok

226.08
226.08
398
803.84

ok
ok
ok
ok

265.33
398

ok
ok

265.33
398

ok
ok

PERHITUNGAN GESER PADA BALOK

Vc = 1/6
fc' bw . d)
=
0.6
jika : Vu < 0.5 Vc ----> tidak tul geser
jika : 0.5 Vc < Vu < Vc ----> pakai tul geser minimal
Vs min = 1/3 (Mpa) . bw . d
vs = vu < vc
vu = Vu / bd

vc = 1/6
fc'
vs = (vu - vc)
A sengk = (vu - vc) b y / (fy)
A sengk min = b.y / (3 fy)

Garasi

atap

lt-1

fc' =
fy seng

20 Mpa
240 Mpa

B1a
B1b
B1c
B2a
B2b
blk. Tangga
blk tandon
B-utamatepi
B-utama-dlm
B-anak

Vu
kg
12,939
7,274
6,228
2,842
1,337
2000
597
4014
1796
858

b
mm

h
mm
150
150
150
150
150
150
150
200
200
150

d
550
500
500
400
300
400
400
400
350
250

500
450
450
350
250
350
350
350
300
200

``

y (per 1m)
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000

vu
Mpa
1.7252
1.07763
0.922667
0.541333
0.356533
0.380952
0.113714
0.573429
0.299333
0.286

vc
Mpa
0.447214
0.447214
0.447214
0.447214
0.447214
0.447214
0.447214
0.447214
0.447214
0.447214

vs
Mpa
1.277986
0.630416
0.475453
0.09412
-0.09068
-0.066261
-0.333499
0.126215
-0.14788
-0.161214

A sengk
mm2
1,331
657
495
98
(94)
(69)
(347)
131
(154)
(168)

A sengk min
mm2
208
208
208
208
208
208
208
278
278
208

A sengk > Amin


1331
657
495
208
208
208
208
278
278
208

tul pakai
jrk (mm) (mm)
100
10
200
10
200
10
200
8
200
8
200
8
200
8
150
8
150
8
150
8

As ada
1,570
785
785
502
502
502
502
670
670
670

> As perlu
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok

PERHITUNGAN KOLOM
Penulangan dipasang sama rata di semua sisi kolom
Desain menggunakan diagram interaksi P-M terlampir (buku :CUR hal 181)
fc' =
20 Mpa
(diagram berlaku untk. fc' = 15, 20, 25, 30, 35Mpa)
fy =
400 Mpa
(diagram berlaku untk. fy = 400 Mpa)
d'/h =
0.15
(diagram berlaku untk. d'/h = 0.15 )
d' =
50 mm
(selimut beton+sengkang+1/2diamter tul)
h = tinggi penampang kolom
Sumbu vertikal = Pu / ( . Agr. 0.85. fc')
Sumbu horisontal = Pu / ( . Agr. 0.85. fc') . (e/h)
e = Mu / Pu
=
0.65 (reduksi kekuatan kolom)
= r. --->
fc' 15 : =0.6
fc' 20 : =0.8
fc' 25 : =1.0
fc' 30 : =1.2
fc' 35 : =1.33

type
K1a (Lantai-1)
K1b (Lantai-1)
K1c (teras)
K1d (garasi)
K2 (Lantai-2)

b
(mm)
150
150
250
250

h
(mm)
450
450
250
250

150

300

Pu
kg
24,354

Mu
kg.m
932

Pu
N
243,540

Mu
Nmm
9,320,000

Dari hasil SAP2000 didapat As :


type
K1a (Lantai-1)
K1b (Lantai-1)
K1c (teras)
K1d (garasi)
K2 (Lantai-2)

b
h
As perlu
(mm)
(mm)
mm2
150
600
900
150
500
900
250
250
625
250
250
2215
150

300

450

tul pakai
As ada
jml
D (mm) mm2
8
13
1061.32
8
13
1061.32
8
13
1061.32
12
16
2411.52
4

13

530.66

e
mm
38

Sb.ver.
0.326516

Sb.hor.
0.03

d'/h
0.15
0.111

As perlu tul pakai


mm2
jml
900
8
900
8
625
8
2215
12
450

> As perlu
ok
ok
ok
ok
ok

D (mm)
13
13
13
16
13

As ada
> As perlu
mm2
1061.32
ok
1061.32
ok
1061.32
ok
2411.52
ok
530.66

ok

**** D E S I G N M O M E N C A P A C I T Y O F B E A M ****
====> FY [Mpa]
====> F'C [Mpa]
Bar diameter [mm]
Stirrups dia [mm]
Cover [mm]

400
20
12
10
30

BJTD 35
K225
Width(mm)

150

Tens. Compr
300
350
400
450
500
550
600
650
700
750
800
bar
bar Mn(kgm) Mu(kgm) Mn(kgm) Mu(kgm) Mn(kgm) Mu(kgm) Mn(kgm) Mu(kgm) Mn(kgm) Mu(kgm) Mn(kgm) Mu(kgm) Mn(kgm) Mu(kgm) Mn(kgm) Mu(kgm) Mn(kgm) Mu(kgm) Mn(kgm) Mu(kgm) Mn(kgm) Mu(kgm)
2
3
3

2
2
3

1826
2891
2739

1643
2602
2465

2278
3570
3417

2050
3213
3075

2730
4248
4095

2457
3823
3686

3183
4926
4774

2864
4434
4296

3635
5604
5452

3271
5044
4907

4087
6283
6130

3678
5654
5517

4539
6961
6808

4085
6265
6127

4991
7639
7487

4492
6875
6738

5443
8317
8165

4899
7486
7348

5895
8996
8843

5306
8096
7959

6348
9674
9521

5713
8706
8569

PERHITUNGAN GESER BALOK


Beton :
Baja :
jarak
mm
75
100
150
200

20 Mpa
240 Mpa
30
Vn (kg)
9729
7739
5750
4755

Tul utama :
Sengkang :

35
Vn (kg)
11572
9205
6839
5656

40
Vn (kg)
13414
10671
7928
6556

45
Vn (kg)
15257
12137
9017
7457

12 mm
10 mm
50
Vn (kg)
17099
13603
10106
8358

55
Vn (kg)
18942
15069
11195
9258

60
Vn (kg)
20785
16534
12284
10159

Jumlah kaki
B ( cm )
65
Vn (kg)
22627
18000
13373
11059

2
15
70
Vn (kg)
24470
19466
14462
11960

75
Vn (kg)
26312
20932
15551
12861

80
Vn (kg)
28155
22398
16640
13761