BERITA ACARA
Perihal : BOP Pressure Test (After Setting 20” CSG)

Pada hari, Sabtu Tanggal 21 April 2012, telah dilakukan BOP Pressure Test (After Setting 20” CSG)
Rig PRA#01 adalah sebagai berikut :

 BOP Pressure Test :


 Test Pipe Ram – Test Pressure 500 psi x 5 min & 1400 psi x 10 min – OK
 Test Annular – Test Pressure 500 psi x 5 min & 1400 psi x 10 min – OK
 Test Blind Ram– Test Pressure 500 psi x 5 min & 1400 psi x 10 min – OK
 Test Kill Line – Hydraulic Valve HCR 500 psi x 5 min & 1400 psi x 10 min – OK
– Manual Valve HCR 500 psi x 5 min & 1400 psi x 10 min – OK
 Test Choke Line – Hydraulic Valve HCR 500 psi x 5 min & 1400 psi x 10 min – OK
– Manual Valve HCR 500 psi x 5 min & 1400 psi x 10 min – OK
 Test Check Valve – Test Pressure 500 psi – OK, 1400 psi – Bocor
- Kebocoran diantara sambungan Riser Spol dengan Mud Cross - Perbaikan kencangkan
baut stop bol
- Test ulang ada kebocoran diantara sambungan Mud Cross dengan double Ram
Kencangkan baut stop bol
- Test ulang ada kebocoran diantara DSA 21 1/4 2K x 20 3/4 3K dengan Risser Spool
perbaikan ganti Ring Gasket R. 73
- Test ulang ada kebocoran diantara DSA 20-3/4. 3K
- Test ulang ada kebocoran diantara sambungan Riser Spool dengan Mud Cross perbaikan,
ganti Ring Gasket R. 73
- Test ulang ada kebocoran di Pipe Ram 5” perbaikan, ganti Rubber Ram 5”
- Test ulang Check Valve Pressure 500 psi x 5 min & 1400 psi x 10 min – OK

Demikian berita acara ini dibuat dengan sebenar-benarnya untuk dapat dipergunakan sebagaimana
mestinya.

Dibuat oleh Second Party,


RIG PRA#01 PT. Permata Drilling International

PROKLARIANTO UMAR NA
Rig Superintendent Acknowledged by, IPM Coordinator
Japex (Buton) Ltd.

KUSUMO SULARKO
Company Man