BQ Tender
BQ Tender
BQ Tender
HARGA ITEM
NO. URAIAN PEKERJAA TOTAL BIAYA (Rp.)
PEKERJAAN (Rp.)
I PEKERJAAN PERSIAPAN
II PEKERJAAN PEBONGKARAN
III PEKERJAAN STRUKTUR LANTAI DASAR
1 Pondasi Batua Kali Camp. 1 : 3
2 Pondasi poer
3 Sloof
4 Kolom & Pilar
5 Balok
6 Plat Lantai Satu
7 Overstek beton di atas Jendela Lantai
8 Tangga
9 Dinding
10 Lantai Dasar
11 Pekerjaan Jendela
12 Pekerjaan Pintu
13 Pekerjaan Plafond
14 Pekerjaan Finishing
15 Menikal dan Elektrikal
16 Fixture, Equipment
V PEKERJAAN STRUKTUR LANTAI SATU
1 Kolom & Pilar
2 Ring Balok
3 Overstek beton dibawah Atap
4 Dinding
5 Pekerjaan Jendela
6 Pekerjaan Pintu
7 Pekerjaan Kuda-Kuda
8 Pekerjaan Atap
9 Pekerjaan Plafond
10 PEKERJAAN FINISHING
11 MEKANIKAL DAN ELEKTRIKAL
12 FIXTURE, EQUIPMENT
13 LANDSCAPE
A REAL COST -
B PPN 10% X A
C TOTAL BIAYA (A + B)
D DIBULATKAN -
Terbilang
:
Enrekang, 2005
Dibuat Oleh,
PT/CV. ……………………………...
(………………………………)
Direktur
-
-
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
PEKERJAAN PEMBESIAN
9.0000 org/hr Tukang @ Rp. = Rp. -
3.0000 org/hr Kepala Tukang @ Rp. = Rp. -
9.0000 org/hr Pekerja @ Rp. = Rp. -
110.0000 Kg Besi Tulangan @ Rp. = Rp. -
2.0000 Kg Kawat @ Rp. = Rp. -
= Rp. -
PEKERJAAN CETAKAN
1.5000 org/hr Tukang @ Rp. = Rp. -
0.0150 org/hr Kepala Tukang @ Rp. = Rp. -
4.0000 org/hr Pekerja @ Rp. = Rp. -
0.0200 org/hr Mandor @ Rp. = Rp. -
0.4000 Kg Kayu Cetakan @ Rp. = Rp. -
1.0000 Kg Paku @ Rp. = Rp. -
-
Jumlah 1 m3 Beton Bertulang Campuran 1 : 2 : 3 = Rp. -
PEKERJAAN PEMBESIAN
44.0000 Kg Besi Tulangan @ Rp. - = Rp. -
0.8000 Kg Kawat @ Rp. - = Rp. -
= Rp. -
PEKERJAAN CETAKAN
1.5000 org/hr Tukang @ Rp. - = Rp. -
0.0273 org/hr Kepala Tukang @ Rp. - = Rp. -
4.0000 org/hr Pekerja @ Rp. - = Rp. -
0.0200 org/hr Mandor @ Rp. - = Rp. -
0.4000 Kg Kayu Cetakan @ Rp. - = Rp. -
1.0000 Kg Paku @ Rp. - = Rp. -
-
Jumlah 1 m3 Lantai Beton Bertulang = Rp. -
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
= Rp. -
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
An.F.30
1 M2 Pintu Panil / Jendela
0.0350 m3 Kayu Klas I @ Rp. = Rp. -
4.0000 org/hr Tukang Kayu @ Rp. = Rp. -
0.4000 org/hr Kepala Tukang @ Rp. = Rp. -
1.3000 org/hr Pekerja @ Rp. - = Rp. -
0.0650 org/hr Mandor @ Rp. - = Rp. -
= Rp. -
An.F.34
1 M2 Pekerjaan Pintu / Jendela Jalusi
0.0400 m3 Kayu Klas I @ Rp. - = Rp. -
9.0000 org/hr Tukang Kayu @ Rp. - = Rp. -
0.9000 org/hr Kepala Tukang @ Rp. - = Rp. -
3.0000 org/hr Pekerja @ Rp. - = Rp. -
0.1500 org/hr Mandor @ Rp. = Rp. -
= Rp. -
An. 1
1 bh Pasang Kunci Tanam Biasa
1.0000 bh Kunci Tanam @ Rp. = Rp. -
0.5000 org/hr Tukang Kayu @ Rp. = Rp. -
0.0500 org/hr Kepala Tukang @ Rp. = Rp. -
0.0100 org/hr Pekerja @ Rp. = Rp. -
0.0050 org/hr Mandor @ Rp. = Rp. -
= Rp. -
An. 2
1 bh Pasang Engsel Pintu
1.0000 bh Engsel @ Rp. = Rp. -
0.1500 org/hr Tukang Kayu @ Rp. = Rp. -
0.0150 org/hr Kepala Tukang @ Rp. = Rp. -
0.0150 org/hr Pekerja @ Rp. = Rp. -
0.0008 org/hr Mandor @ Rp. = Rp. -
= Rp. -
An. 3
1 bh Pasang Grendel
1.0000 bh Grendel @ Rp. = Rp. -
0.2000 org/hr Tukang Kayu @ Rp. = Rp. -
0.0200 org/hr Kepala Tukang @ Rp. - = Rp. -
0.0200 org/hr Pekerja @ Rp. - = Rp. -
0.0010 org/hr Mandor @ Rp. = Rp. -
= Rp. -
-
Untuk 1 m2 = Rp -
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
K. 18
1 m2 Mengecet Menie
1.2000 Kg Cat menei @ Rp. = Rp. -
0.7500 org/hr Tukang Cat @ Rp. = Rp. -
0.0750 org/hr Kepala Tukang @ Rp. = Rp. -
0.5000 org/hr Pekerja @ Rp. = Rp. -
0.0250 org/hr Mandor @ Rp. = Rp. -
= Rp. -
Supl List
1 Titik UPAH MEMASANG INSTALASI LISTRIK
1.5000 org/hr Tukang Listrik @ Rp. = Rp. -
0.5000 org/hr Kepala Tukang @ Rp. = Rp. -
1.5000 org/hr Pekerja @ Rp. = Rp. -
0.5000 org/hr Mandor @ Rp. = Rp. -
= Rp. -
An.F
Pasangan Naco
0.5000 org/hr Tukang Kayu @ Rp. = Rp. -
0.0250 org/hr Kepala Tukang @ Rp. = Rp. -
1.0000 org/hr Naco 6 Mata @ Rp. = Rp. -
1.0000 org/hr Naco7 Mata @ Rp. = Rp. -
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
An. SPL.VII
1 m2 Plafond Triples 3 mm
0.3500 lbr Tripleks @ Rp. 30,800.00 = Rp. 10,780.00
0.0200 kg Paku @ Rp. - = Rp. -
0.5000 org/hr Pekerja @ Rp. - = Rp. -
0.0250 org/hr Mandor @ Rp. - = Rp. -
= Rp. 10,780.00
An. SPL.VII
1 m2 Plafond Kalsiboard
0.3500 lbr Kalsiboard @ Rp. = Rp. -
0.0200 kg Paku @ Rp. = Rp. -
0.2500 org/hr Pekerja @ Rp. = Rp. -
0.0250 org/hr Mandor @ Rp. = Rp. -
= Rp. -
An.F.1
1 M3 Rangka Plafond
1.0000 m3 Kayu Kelas II @ Rp. = Rp. -
15.0000 org/hr Tukang Kayu @ Rp. = Rp. -
1.5000 org/hr Kepala Tukang @ Rp. = Rp. -
5.0000 org/hr Pekerja @ Rp. = Rp. -
0.2500 org/hr Mandor @ Rp. = Rp. -
= Rp. -
An.F,1a
1 M' List Frofil Plafond ( t = 4 x 4 cm )
1.0000 m3 List Profil @ Rp. = Rp. -
0.0150 org/hr Paku @ Rp. = Rp. -
0.0500 org/hr Pekerja @ Rp. = Rp. -
0.0200 org/hr Mandor @ Rp. = Rp. -
= Rp. -
An.F36
1 M2 Pasangan Kaca Mati 3 mm
1.0000 m2 Kaca Ryben 3 mm @ Rp. = Rp. -
0.0040 org/hr Papan (kayu bayam) @ Rp. = Rp. -
0.4000 org/hr Tukang @ Rp. = Rp. -
0.0360 org/hr Kepala Tukang @ Rp. = Rp. -
0.1200 org/hr Pekerja @ Rp. = Rp. -
0.0060 org/hr Mandor @ Rp. = Rp. -
= Rp. -
An.F36
1 M2 Pasangan Kaca Mati 5 mm
1.0000 m2 Kaca Ryben 5 mm @ Rp. = Rp. -
0.0040 org/hr Papan (kayu bayam) @ Rp. = Rp. -
0.4000 org/hr Tukang @ Rp. = Rp. -
0.0360 org/hr Kepala Tukang @ Rp. = Rp. -
0.1200 org/hr Pekerja @ Rp. = Rp. -
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
G.55.b
1 m2 PAS. LAPIS BATU BATA DASAR LANTAI ( Tanpa Plaster )
30.0000 Bh Batu Bata @ Rp. Rp. -
0.0350 M3 Pasir Pasangan @ Rp. Rp. -
0.0600 Org/hr Tukang Batu @ Rp. Rp. -
0.2000 Org/hr Pekerja @ Rp. Rp. -
Rp. -
Sup
10 m2 ACIAN TEMBOK
0.0300 zak Semen ( 40 Kg ) @ Rp. Rp. -
0.0530 m3 Pasir Pasangan @ Rp. Rp. -
0.0500 Org/hr Tukang Batu @ Rp. Rp. -
5.0000 Org/hr Kepala Tukang @ Rp. Rp. -
0.4250 Org/hr Pekerja @ Rp. Rp. -
0.8500 Org/hr Mandor @ Rp. Rp. -
Rp. -
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
1 m2 BAKESTING
0.0400 lbr Triplex @ Rp. Rp. 0
0.4000 Kg Paku @ Rp. Rp. 0
0.5000 Org/hr Tukang Batu @ Rp. Rp. -
0.0500 Org/hr Kepala Tukang @ Rp. Rp. -
0.2000 Org/hr Pekerja @ Rp. Rp. -
0.0100 Org/hr Mandor @ Rp. Rp. -
Rp. -
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
An. J.4
1M2 Pekerjaan Lapisan Atap
1.0500 M2 Karet Lapisan Genteng @ Rp. = Rp. -
0.0100 org/hr Tukang @ Rp. = Rp. -
0.0200 org/hr Mandor @ Rp. = Rp. -
0.0500 org/hr Pekerja @ Rp. = Rp. -
= Rp. -
An. J.4
1M' Memasang Bumbung Atap Genteng Metal
1.0000 M' Bumbungan @ Rp. = Rp. -
6.0000 Kg Paku @ Rp. = Rp. -
0.0250 org/hr Tukang Kayu @ Rp. = Rp. -
0.0030 org/hr Kepala Tukang @ Rp. = Rp. -
0.0250 org/hr Pekerja @ Rp. = Rp. -
0.0100 org/hr Mandor @ Rp. = Rp. -
= Rp. -
An. L4
1 M3 Membongkar Dinding Tembok dengan membersihkan batas-batasnya
2.0000 org/hr Pekerja @ Rp. = Rp. -
0.2000 org/hr Mandor @ Rp. = Rp. -
= Rp. -
An. L5
1 M2 Membongkar Lantai yang lama berikut membersihkan
1.0000 org/hr Pekerja @ Rp. = Rp. -
0.1000 org/hr Mandor @ Rp. = Rp. -
= Rp. -
An. L8
1 M2 Membongkar Atap Seng
1.0000 org/hr Pekerja @ Rp. = Rp. -
0.1000 org/hr Mandor @ Rp. = Rp. -
= Rp. -
An.SPL.III
1 M2 Memasang Tegel Keramik 20/20
1.0000 dos Tegel Keramik Warna 20 x 20 cm @ Rp. = Rp. -
0.0300 m3 Pasir Pasangan @ Rp. = Rp. -
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
An.SPL.III
1 M2 Memasang Tegel Keramik 40/40
1.0000 m2 Tegel Keramik Putih 40 x 40 cm @ Rp. = Rp. -
0.1175 m3 Semen PC @ Rp. = Rp. -
0.8000 Zak Semen Warna @ Rp. = Rp. -
0.0285 org/hr Pasir Pasangan @ Rp. = Rp. -
0.5000 org/hr Tukang Batu @ Rp. = Rp. -
0.0250 org/hr Kepala Tukang @ Rp. = Rp. -
0.7500 org/hr Pekerja @ Rp. = Rp. -
0.0250 org/hr Mandor @ Rp. = Rp. -
= Rp. -
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
DAFTAR HARGA MATERIAL DAN UPAH
NO HARGA WILALYAH
JENIS MATERIAL SAT
KEC. ENREKANG
UPAH KERJA
1 Pekerja org/hr
2 Mandor org/hr
3 Kepala Tukang org/hr
4 Tukang org/hr
5 Mandor Lapangan org/hr
6 Mekanik org/hr
7 Mekanik Pembantu org/hr
8 Operator Terampil org/hr
9 Operator Semi Terampil org/hr
10 Pembantu Operator org/hr
11 Sopir Truk org/hr
12 Sopir Personil org/hr
13 Pembantu Sopir org/hr
14 Buruh Tak terlatih org/hr
15 Buruh Semi Terlatih org/hr
16 Buruh Terlatih org/hr
AGREGAT HALUS :
1 Pasir urug / Pasir Timbun M3
2 Pasir pasang/kali M3
3 Pasir beton M3
4 Sirtu M3
5 Kerikil M3
6 Tanah Timbunan M3
7 Tanah liat M3
AGREGAT KASAR :
8 Batu kali M3
9 Batu Gunung M3
10 Batu Karang Putih/B. Gunung M3
11 Chipping 1-2 M3
12 Batu split 2-3 M3
13 Batu belah M3
14 Batu Bata Bh
15 Kapur Zak
SEMEN:
1 Semen Tonasa @ 50 Kg Zak
Semen Tonasa @ 40 Kg Zak
2 Semen Bosowa @ 50 Kg Zak
3 Semen Putih 40 Kg Zak
4 Semen PC Tong
KAY U :
Kayu kelas I :
1 Kayu Balok M3
2 Kayu Papan M3
Kayu kelas II :
5 Kayu Balok M3
6 Kayu Papan M3
7 Kayu Prancah M3
KAYU LAPIS :
1 Kalsboard Lbr
2 Tripleks 3 mm Lbr
3 Tripleks 4 mm Lbr
4 Tripleks 6 mm Lbr
5 Tripleks 9 mm Lbr
6 Tripleks 12 mm Lbr
1 GYPSUM
1 Gypsum + Ranka Plafond (Terpasang) M2
LIST PROFIL ;
1 Covecornice M'
2 List Profil - K1 A M'
3 List Profil - T-11 M'
4 List Profil - 7 cm M'
5 List Profil - 5 cm M'
6 Plint 10 cm M'
7 Plint 7 cm M'
8 Lambresering 9 cm Meranti M'
9 Lambresering 9 cm Agatis M'
PAK U :
1 Paku Kg
2 Paku Seng Kg
3 Paku Beton 2, 3, 4 cm Dos
4 Paku Beton 5, 7, 10 cm Dos
SENG:
1 Seng BJLS 18 (BWG 34) Lbr/6
2 Seng BJLS 0.2 (BWG 34) Lbr/6
3 Seng BJLS 0.3 (BWG 32) Lbr/6
4 Seng BJLS 0.35 (BWG 28) Lbr/6
PEKERJAAN BAJA :
BAUT :
1 Baut bh
2 Besi Dynabolt 16 x 85 bh
3 Besi Dynabolt 16 x 11 bh
4 Besi Dynabolt 12 x 100 bh
5 Baut Seng 1/2 x 5/8" bh
BOR:
1 GSB 16 RE unit
2 Mata Bor Beton/Masonry Drill bit pcs
3 Masonry Drill dia. 16 pcs
4 Masonry Drill dia. 12 pcs
BESI:
1 Besi beton Kg
2 Besi Plat 4 x 8 x 6 mm M'
11 Besi Plat 4 x 8 x 10 mm Btg
12 Besi Siku 40 x 4 mm Btg
12 Besi Siku 50 x 50 x 5 mm Btg
12 Besi Siku 60 x 6 Btg
KERAMIK :
ASIA TILE :
1 Keramik Dinding 20 x 25 (warna tua) Boks
2 Keramik Dinding 20 x 25 (warna muda) Boks
3 Keramik Lantai 20 x 20 Boks
4 Keramik Lantai 20 x 20 Boks
5 Keramik Lantai 20 x 20 Boks
6 Keramik Lantai 30 x 30 Boks
7 Keramik Lantai 30 x 30 Boks
8 Keramik Lantai 30 x 30 Boks
9 Keramik Lantai 30 x 30 Boks
ROMAN / ROYAL :
1 Keramik Lantai 20 x 20 Boks
2 Keramik Lantai 20 x 20 Boks
3 Keramik Lantai Roman 30 x 30 (warna muda) Boks
4 Keramik Lantai Royal 30 x 30 (warna muda) Boks
5 Keramik Lantai Royal 30 x 30 (warna tua) Boks
6 Keramik Lantai Royal 40 x 40 (warna muda) Boks
7 Keramik Lantai Royal 40 x 40 (warna tua) Boks
KACA:
1 3 mm Panasap (Bening) M2
2 5 mm Panasap (Bening) M2
3 3 mm Polos Asahi Mas (Ryben) M2
4 5 mm Polos Asahi Mas (Ryben) M2
5 3 mm Polos Utama (Buram) M2
6 5 mm Polos Utama (Buram) M2
7 Kaca nako 6 Mata Set
8 Kaca nako 7 Mata Set
GENTENG :
1 Genteng Metal Zincalume Kasar Multi Roof M2
2 Genteng Metal Zincalume Polos Multi Roof M2
3 Genteng Metal Zincalume Kasar Surya Roof M2
4 Genteng Metal Zincalume Polos Surya Roof M2
5 Bumbungan Metal Roof M'
6 Genteng Metal Zincalume Polos Mega Roof M2
7 Paku Asbes Kg
8 Karet Pelapis Genteng M2
LANDSCAPE :
PAVING :
1 Paving Block 6 cm (50 bj/M2) M2
2 Paving Block 8 cm (50 bj/M2) bh
PLUMBING :
PIPA :
1 Pipa PVC 1" M
2 Pipa PVC 11/2" M
3 Pipa PVC 2" M
4 Pipa PVC 3" M
5 Pipa PVC 1/2" M'
6 Pipa PVC 5/8" Btg
7 Pipa GIP 3" Btg
8 Pipa GIP 2" Btg
9 Pipa GIP 1 1/2" Btg
10 Pipa GIP 1" Btg
11 Pipa GIP 1/2" Btg
TANGKI AIR :
1 TA. Stainless Kap. 1 m3 (Maspion) Bh
2 TA. Stainless Kap. 1/2 m3 (Maspion) Bh
3 TA. Fiberglass Kap. 1 m3 (Grand) Bh
4 TA. Fiberglass Kap. 1/2 m3 (Excel) Bh
KUNCI PINTU :
1 Kunci Tanam 2x Putar Bh
2 Vanessa Type SES 4683 set
3 Sess Type 7936 set
4 Sess Type 20801 set
5 JS Type Js 8816 set
ENGSEL PINTU :
1 Merk SESS 4 x 3 set
2 Merk Cavel 4 x PR set
3 Merk UNO 4 x 3 set
ENGSEL JENDELA :
1 Merk Borsalino 3 x 3 set
2 Merk Cavel 3 x 3 set
3 Merk SS 3 x 2,5 set
4 Merk Hinges 3 x 2,5 set
5 Hak Angin bh
7 Slot Jendela bh
GRENDEL :
2 Ses (Stainless) Pintu set
4 Grendel Biasa Jendela Bh
SANITARY :
KLOSET :
1 Kloset duduk standard (Toto) Bh
2 Kloset duduk Premium (Toto) Bh
3 Kloset duduk Kharisma (KIA) Bh
4 Kloset jongkok standard (TOTO) Bh
5 Kloset jongkok Premium (Toto) Bh
6 Kloset Granada Putih Bh
7 Urinoir standar Bh
8 Jet shower PVC Exel Bh
9 Kaca Cermin Bh
WASHTAFEL :
Wastafel standard (Toto) Bh
Wastafel Studio 50/Wh. Grey Bh
Countertop Randalupe (KIA) Bh
Countertop Aqualupe (KIA) Bh
KRAN :
1 Kran Wall Shower Itap Putar Bh
2 Kran Wastafel F. 10 Bh
3 Kran Tembok CNN Bh
4 Kran Kodok Wastafel ( San-Ei ) Bh
5 Kran Leher Angsa ( San-Ei ) Bh
6 Kran Kamar Mandi ( San-Ei ) Bh
7 Kran Double/Jet Washer ( San-Ei ) Bh
8 Kran Taman ( San-Ei ) Bh
14 Stop Valve 1,5" (Kitz) Bh
SARINGAN :
1 Floor Strainer Heins Bh
2 Floor Drain ( Toto) Bh
SIFON :
1 Sifon ATR Viega Bh
KLEP :
1 Klep Berdiri 1/2 kitz Bh
CAT TEMBOK :
1 Aries Putih (5 ltr) klg
2 Cat Dasar/Undercoat Mowilex Ltr
3 Cat Weather Coat Mowilex Ltr
4 Cat Tembok Dalam Mowilex Ltr
5 Cat Tembok Metrolite Kg
6 Cat Tembok Metrolite Kg
7 Cat warna hitam Kg
8 Cat Vinotex Hitam 5 kg klg
CAT GENTENG :
1 Aga No. 019 galon
2 Aga Cat Genteng Orange 4 kg klg
3 Aga No. 119 4 kg klg
4 SIIP Cat Genteng No. 15 5 kg klg
THINNER :
1 Thinner A Ltr
2 Thinner Super Ltr
KAPUR, SEMEN :
1 Kapur zak
2 Semen Putih zak
DEMPUL :
1 Dempul Kayu Kg
2 Dempul Isamu 1 kg klg
WATERPROOF
1 Waterproof Superflex Lantai M2
2 Waterproof Superflex Dinding M2
3 Waterproof Multiguard M2
4 Waterproof Aquaseal Kg
5 Waterproof Ultraproof Kg
6 Waterproof Seal On Kg
KABEL :
4 Kabel Telepon mtr
5 Kabel NYFGBY (4 50 ) mm2 mtr
6 Kabel NYM 2 x 2.5 mtr
7 Kabel NYM 2 x 2,5 Eterna mtr
8 Kabel NYM 3 x 2.5 Eterna mtr
9 Kabel NYM 3 x 4 Eterna mtr
10 Kabel NYY 4 x 16 mtr
11 Kabel NYY 4 x 10 mm mtr
PIPA :
1 Pipa PVC 20 mm btg
2 Pipa 3/4 btg
3 Fleksibel mtr
4 Pipa Clipsal 20 mm btg
5 L Bow 3/4 bh
6 Klem Kabel Clipsal 20 mm bh
7 Sok/Sambungan Clipsal bh
8 Tedos Clipsal bh
9 Inbow Dos Decker bh
10 Tedos 3/4 bh
11 Dos Inbow Asli bh
LAMPU :
1 Neon Lilin 18 Watt Philips bh
2 Down Light Besar bh
3 Down Light Sedang bh
4 Lampu TL 5 Watt bh
5 Lampu TL 18 Watt bh
6 Fitting Merkuri 250 watt bh
7 Lampu Merkuri Philips 250 watt (utk jalan) set
8 Lampu Taman Bulat Philips set
9 Lampu Baret 32 Watt bh
18 Lampu Dinding Setengah Lingkaran bh
19 Lampu Baret 20 Watt
Sambungan bh
Fitting bh
Kayu Roset bh
PANEL :
1 MCB 16 grup MG asli bh
2 MCB 10 grup MG asli bh
3 Sisir MCB Legrand bh
4 Boks MCB 4 grup IB bh
5 Boks MCB Plastik Grup MCB Asli set
6 MCB 63 Amp MG bh
7 Panel Distribusi Utama 1.00
PENANGKAL PETIR :
1 Elektroda Penangkap 1.00
2 Elektroda Pertanahan 1.00
3 BC 16 mm M'
SAKLAR :
1 Engkel IB bh
2 Stop Kontak 16 AMP bh
3 Saklar Seri bh
4 Saklar Tunggal bh
5 Stop Arde + Tedos OB bh
6 Steker Arde bh
7 Engkel IB Makel bh
8 Kabel Arde mtr
9 Saklar Engkel + Tedos set
10 Dora Dos bh
MUR & BAUT :
1 Fischer dgn mor 58 biji
2 Fischer 6 dos
3 Fischer 12 dos
5 Baut Seng 1/4 gros
6 Mata Bor bh
7 Klem BC bh
8 Alat Bantu Set
FASILITAS KANTOR
1 Meja Kerja 1/2 Biro (Adinda) bh
2 Meja Kerja 1 Biro (Adinda) bh
3 Kursi Hadap (ISABEL) bh
4 Kursi Susun (ISABEL) bh
5 Kursi Lipat (CITOSE) bh
6 Kursi Tamu (HOCK) set
0
-
REKAPITULASI
PEKERJAAN : REHAB. GEDUNG DPRD KAB. ENGREKANG
LOKASI : KAB. ENREKANG
HARGA ITEM
NO. URAIAN PEKERJAA TOTAL BIAYA (Rp.)
PEKERJAAN (Rp.)
I PEKERJAAN PERSIAPAN 22,700,000.00
II PEKERJAAN PEBONGKARAN 15,000,000.00
III PEKERJAAN STRUKTUR LANTAI DASAR 1,589,286,302.40
1 Pondasi Batua Kali Camp. 1 : 3 34,692,982.91
2 Pondasi poer 329,472,888.82
3 Sloof 229,477,257.84
4 Kolom & Pilar 168,285,614.42
5 Balok 123,535,019.75
6 Plat Lantai Satu 141,730,496.45
7 Overstek beton di atas Jendela Lantai 53,227,741.84
8 Tangga 19,897,436.84
9 Dinding 86,169,640.92
10 Lantai Dasar 92,420,292.12
11 Pekerjaan Jendela 65,706,615.00
12 Pekerjaan Pintu 56,402,308.98
13 Pekerjaan Plafond 68,077,935.10
14 Pekerjaan Finishing 8,373,915.91
15 Menikal dan Elektrikal 13,707,950.00
16 Fixture, Equipment 98,108,205.50
V PEKERJAAN STRUKTUR LANTAI SATU 1,210,359,109.89
1 Kolom & Pilar 183,302,345.28
2 Ring Balok 43,760,939.31
3 Overstek beton dibawah Atap 348,111,518.98
4 Dinding 72,003,802.50
5 Pekerjaan Jendela 67,974,075.00
6 Pekerjaan Pintu 54,735,110.72
7 Pekerjaan Kuda-Kuda 99,053,553.02
8 Pekerjaan Atap 80,048,516.48
9 Pekerjaan Plafond 87,206,365.00
10 PEKERJAAN FINISHING 22,826,298.45
11 MEKANIKAL DAN ELEKTRIKAL 16,793,300.00
12 FIXTURE, EQUIPMENT 113,897,550.00
13 LANDSCAPE 20,645,735.15
JUMLAH 2,837,345,412.30
DIBULATKAN 2,837,345,000.00
Terbilang
Dua Milyar Delapan Ratus Tiga Puluh Tujuh Juta Tiga Ratus Empat Puluh Lima Ribu Rupiah
:
Enrekang, 2005
Diperiksa Oleh, Dibuat Oleh,
Kabid. Cipta Karya CV. INTERPOLA CONSULTANT
1,210,359,109.89
RENCANA ANGGARAN BIAYA
Pekerjaan : PEMB. RAHAB. GEDUNG DPRD
Lokasi : KAB. ENREKANG
1 PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi ls 1.000 2,000,000 2,000,000
2 Papan Proyek bh 1.00 250,000 250,000
3 Pekejaan Pengukuran & Bowplank ls 1.00 2,000,000 2,000,000
4 Pembuatan Direksi Keet ls 1.00 2,500,000 2,500,000
4 As Built Drawing ls 1.00 2,500,000 2,500,000
5 Test Material Ls 1.00 2,000,000 2,000,000
6 Laporan dan dokumentasi Bh 1.00 1,500,000 1,500,000
7 P3K ls 1.00 750,000 750,000
8 Izin Memdirikan Bangunan (IMB) ls 1.00 9,200,000 9,200,000
2 PEKERJAAN PEBONGKARAN
2.1 Atap Seng Ls 1.00 7,000,000 7,000,000
2.2 Lantai Lama Ls 1.00 4,500,000 4,500,000
2.3 Dinding Tembok Ls 1.00 3,500,000 3,500,000
3.1.3 Sloof
3.1.3.1 Sloof K. 225 M3 93.45 2,455,721 229,477,258
3.1.5 Balok
3.1.5.1 Cor Beton K.225 M3 50.31 2,455,721 123,535,020
3.1.8 Tangga
3.1.8.1 Cor Beton K. 225 M3 7.39 2,455,721 18,147,774
3.1.8.2 Pas. Tegel M3 20.57 85,059 1,749,662
3.1.9 Dinding
3.1.9.1 Pas. Batu Merah 1/2 bt M3 58.42 357,684 20,896,272
3.1.9.2 Pas. Trasram Batu Merah 1/2 bt M3 6.49 395,064 2,564,397
3.1.9.3 Plesteran Camp. 1 : 2 M2 1,062.20 21,302 22,627,170
3.1.9.4 Plesteran Camp. 1 : 4 M2 118.02 18,543 2,188,445
3.1.9.5 Acian Dinding M2 1,180.22 22,919 27,049,079
3.1.9.6 Pas. Kramik Dinding 20 x 20 M2 129.78 83,559 10,844,279
PEKERJAAN FINISHING
3.2 Pengecetan
3.2.1 Cat Tembok M2 1,180.22 4,876 5,754,753
3.2.2 Cat Kayu M2 62.64 41,813 2,619,163
FIXTURE, EQUIPMENT
4.1 FIXTURE
4.1.1 Armature
4.1.1.1 Lantai Dasar
4.1.1.1.1 Lampu TL 2 x 18 Watt (Philip) Bh 24.00 45,000 1,080,000
4.1.1.1.2 Baret 20 Watt Bh 4.00 75,000 300,000
4.1.1.1.3 Neon Lilin 18 Watt Bh 27.00 34,500 931,500
4.1.1.1.4 Down Light 32 Watt (Philip) Bh 18.00 27,000 486,000
4.1.1.1.5 Down Light 15 Watt (Philip) Bh 21.00 24,000 504,000
4.1.1.1.6 Lampu Taman GL 18 Watt (Phil Bh 4.00 82,500 330,000
4.1.1.1.7 Stop kontak Bh 1.00 14,500 14,500
4.1.1.1.8 Saklar Tunggal Bh 17.00 14,300 243,100
4.1.1.1.9 Saklar Seri Bh 18.00 19,650 353,700
4.1.1.1.10 Baret 32 Watt Bh 12.00 80,000 960,000
4.1.1.1.11 Panel Bh 1.00 25,000 25,000
4.1.2 Sanitary
4.1.2.1 Lantai Dasar
4.1.2. 1.1 Galian Tanah M3 4.62 16,670 77,065
4.1.2. 1.2 Urugan Pasir M3 0.11 54,248 6,130
4.1.2. 1.3 Kerikil M3 0.11 80,900 9,142
4.1.2. 1.4 Beton M3 0.16 2,455,721 388,004
4.1.2. 1. 5 Pas. Batu Transram 1 : 2 M3 2.28 395,064 899,165
4.1.2. 1. 6 Pas. Batu Koral M3 0.47 50,000 23,400
4.1.2. 1. 7 Lapisan Ijuk Kg 25.00 -
4.1.2. 1. 8 Pek. Pipa PVC Dia 3" M' 70.00 17,000 1,190,000
4.1.2.1. 9 Closet duduk lengkap Bh 7.00 1,050,000 7,350,000
4.1.2.1.10 Closet Jongkok Bh 2.00 165,000 330,000
4.1.2.1.11 Wastafel Bh 2.00 170,000 340,000
4.1.2.1.12 Kra Kamar Mandi Bh 10.00 10,000 100,000
4.1.2.1.13 Jet Washer Bh 8.00 35,000 280,000
4.1.2.1.14 Urinoir Bh 7.00 160,500 1,123,500
4.1.2.1.15 Kaca Cermin Bh 2.00 42,500 85,000
1 2 3 4 5 6=5x4
4.1.3 Sound System
4.1.3.1 Lantai Dasar
4.1.3.1.1 Celling Speaker Bh 14.00 137,500 1,925,000
4.1.3.1.2 Wall mount Speaker 25 watt Bh 6.00 548,000 3,288,000
4.1.3.1.3 Toa Speaker 25 Watt Bh 2.00 254,000 508,000
4.1.3.1.4 Potentiope Bh 7.00 125,000 875,000
4.1.4 Telepon
4.1.4.1 Lantai Dasar
4.1.4.1.1 Pesawat Telepon Direct Bh 8.00 100,000 800,000
4.2 EQUIPMENT
4.2.1 Lantai Dasar
4.2.1.1 Pas. AC 1,0 PK Unit 7.00 2,993,000 20,951,000
4.2.1.2 Pas. AC 1,5 PK Unit 6.00 4,122,000 24,732,000
4.2.1.3 Pas. AC 2,0 PK Unit 6.00 4,600,000 27,600,000
4 PEKERJAAN STRUKTUR LANTAI SATU
5 PEKERJAAN FINISHING
5.1 Pengecetan
5.1.1 Cat Tembok M2 4,117.62 4,876 20,077,515
5.1.2 Cat Kayu M2 65.74 41,813 2,748,783
7 FIXTURE, EQUIPMENT
7.1 FIXTURE
7.1.1 Armature
7.1.1.1 Lantai 1
7.1.1.1.1 Lampu TL 2 x 18 Watt (Philip) Bh 26.00 45,000 1,170,000
7.1.1.1.2 Neon Lilin 15 Watt Bh 18.00 34,500 621,000
7.1.1.1.3 Down Light 32 Watt (Philip) Bh 13.00 24,000 312,000
7.1.1.1.4 Down Light 15 Watt (Philip) Bh 17.00 27,000 459,000
7.1.1.1.5 Stop kontak Bh 1.00 14,500 14,500
7.1.1.1.6 Saklar Tunggal Bh 21.00 14,300 300,300
7.1.1.1.7 Saklar Seri Bh 15.00 19,650 294,750
7.1.1.1.8 Baret 32 Watt Bh 14.00 80,000 1,120,000
7.1.1.1.9 Panel Bh 1.00 25,000 25,000.00
7.1.2 Sanitary
7.1.2.1 Lantai 1
7.1.2.1. 1 Pek. Pipa PVC Dia 3" Bh 92.00 17,000 1,564,000
7.1.2.1. 2 Closet duduk lengkap Bh 8.00 1,050,000 8,400,000
7.1.2.1. 3 Wastafel Bh 5.00 170,000 850,000
7.1.2.1. 4 Kran Kamar Mandi Bh 10.00 10,000 100,000
7.1.2.1. 5 Jet Washer Bh 9.00 35,000 315,000
7.1.2.1. 6 Urinoir Bh 5.00 160,500 802,500
7.1.2.1. 7 Kaca Cermin Bh 4.00 42,500
7.1.3 Sound System
7.1.3.1 Lantai 1
7.1.3.1.1 Ceiling Speaker Bh 17.00 137,500 2,337,500
7.1.3.1.2 Wall mount Speaker 25 watt Bh 6.00 548,000 3,288,000
7.1.3.1.3 Toa Speaker 25 watt Bh 2.00 254,000 508,000
7.1.3.1.4 Potentiope Bh 9.00 125,000 1,125,000
7.1.4 Telepon
7.1.4.1 Lantai 1
7.1.4.1.1 Pesawat Telepon Direct Bh 8.00 100,000 800,000
1 2 3 4 5 6=5x4
7.2 EQUIPMENT
7.2.1 Lantai 1
7.2.1.1 Pompa Air (20 Head) Unit 4.00 375,000 1,500,000
7.2.1.2 Pas. AC 1,0 PK Unit 9.00 2,993,000 26,937,000
Pas. AC 1,5 PK Unit 7.00 4,122,000 28,854,000
Pas. AC 2,0 PK Unit 7.00 4,600,000 32,200,000
8 LANDSCAPE
8.1 Drainase dan Lantai depan Teras
8.1.1 Galian tanah M3 29.00 16,670 483,430
8.1.2 Pas. Batu Bata M3 28.15 395,064 11,121,038
8.1.3 Urugan pasir M3 20.40 54,248 1,106,659
8.1.4 Plesteran M2 121.00 21,302 2,577,563
8.1.5 Paving Blok M2 95.00 35,963 3,416,461
8.1.6 Timbunan Tanah M3 38.00 51,068 1,940,584
22,700,000
15,000,000
1,589,286,302
34,692,983
329,472,889
229,477,258
168,285,614
123,535,020
141,730,496
53,227,742
19,897,437
86,169,641
92,420,292 160,498,227
7
65,706,615
56,402,309
68,077,935
8,373,916
8,373,916
13,707,950
4,772,100
7
1,227,450
1,271,050
808,850
2,333,500
777,000
2,518,000
98,108,205
24,825,205
7
39.47
73,283,000
1,210,359,110
183,302,345
43,760,939
348,111,519
72,003,803
78,597,892
67,974,075
54,735,111
7
99,053,553
80,048,516
87,206,365
Gygsum M2
M2
22,826,298 M'
22,826,298
16,793,300
4,829,200
7
784,550
1,139,400
1,502,150
225,000
3,755,000
649,000
3,909,000
113,897,550
24,406,550
7
89,491,000
20,645,735
###
102.200
450.000
552.200
15.00
20.00
300.00
44.4
266.4
566.400
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
= Rp. 357,684.25
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
PEKERJAAN PEMBESIAN
9.0000 org/hr Tukang @ Rp. 31,500.00 = Rp. 283,500.00
3.0000 org/hr Kepala Tukang @ Rp. 36,800.00 = Rp. 110,400.00
9.0000 org/hr Pekerja @ Rp. 21,000.00 = Rp. 189,000.00
110.0000 Kg Besi Tulangan @ Rp. 5,725.00 = Rp. 629,750.00
2.0000 Kg Kawat @ Rp. 4,725.00 = Rp. 9,450.00
= Rp. 1,222,100.00
PEKERJAAN CETAKAN
1.5000 org/hr Tukang @ Rp. 31,500.00 = Rp. 47,250.00
0.0150 org/hr Kepala Tukang @ Rp. 36,800.00 = Rp. 552.00
4.0000 org/hr Pekerja @ Rp. 21,000.00 = Rp. 84,000.00
0.0200 org/hr Mandor @ Rp. 36,800.00 = Rp. 736.00
0.4000 Kg Kayu Cetakan @ Rp. 1,521,800.00 = Rp. 608,720.00
1.0000 Kg Paku @ Rp. 8,500.00 = Rp. 8,500.00
749,758.00
Jumlah 1 m3 Beton Bertulang Campuran 1 : 2 : 3 = Rp. 2,455,720.50
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
PEKERJAAN PEMBESIAN
44.0000 Kg Besi Tulangan @ Rp. 5,725.00 = Rp. 251,900.00
0.8000 Kg Kawat @ Rp. 4,725.00 = Rp. 3,780.00
= Rp. 255,680.00
PEKERJAAN CETAKAN
1.5000 org/hr Tukang @ Rp. 31,500.00 = Rp. 47,250.00
0.0273 org/hr Kepala Tukang @ Rp. 36,800.00 = Rp. 1,003.06
4.0000 org/hr Pekerja @ Rp. 21,000.00 = Rp. 84,000.00
0.0200 org/hr Mandor @ Rp. 36,800.00 = Rp. 736.00
0.4000 Kg Kayu Cetakan @ Rp. 1,521,800.00 = Rp. 608,720.00
1.0000 Kg Paku @ Rp. 8,500.00 = Rp. 8,500.00
750,209.06
Jumlah 1 m3 Lantai Beton Bertulang = Rp. 1,474,689.06
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
= Rp. 162,528.60
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
An.F.30
1 M2 Pintu Panil / Jendela
0.0350 m3 Kayu Klas I @ Rp. 3,521,800.00 = Rp. 123,263.00
4.0000 org/hr Tukang Kayu @ Rp. 31,500.00 = Rp. 126,000.00
0.4000 org/hr Kepala Tukang @ Rp. 36,800.00 = Rp. 14,720.00
1.3000 org/hr Pekerja @ Rp. 21,000.00 = Rp. 27,300.00
0.0650 org/hr Mandor @ Rp. 36,800.00 = Rp. 2,392.00
= Rp. 293,675.00
An.F.34
1 M2 Pekerjaan Pintu / Jendela Jalusi
0.0400 m3 Kayu Klas I @ Rp. 3,521,800.00 = Rp. 140,872.00
9.0000 org/hr Tukang Kayu @ Rp. 31,500.00 = Rp. 283,500.00
0.9000 org/hr Kepala Tukang @ Rp. 36,800.00 = Rp. 33,120.00
3.0000 org/hr Pekerja @ Rp. 21,000.00 = Rp. 63,000.00
0.1500 org/hr Mandor @ Rp. 36,800.00 = Rp. 5,520.00
= Rp. 526,012.00
An. 1
1 bh Pasang Kunci Tanam Biasa
1.0000 bh Kunci Tanam @ Rp. 95,000.00 = Rp. 95,000.00
0.5000 org/hr Tukang Kayu @ Rp. 31,500.00 = Rp. 15,750.00
0.0500 org/hr Kepala Tukang @ Rp. 36,800.00 = Rp. 1,840.00
0.0100 org/hr Pekerja @ Rp. 21,000.00 = Rp. 210.00
0.0050 org/hr Mandor @ Rp. 36,800.00 = Rp. 184.00
= Rp. 112,984.00
An. 2
1 bh Pasang Engsel Pintu
1.0000 bh Engsel @ Rp. 22,000.00 = Rp. 22,000.00
0.1500 org/hr Tukang Kayu @ Rp. 31,500.00 = Rp. 4,725.00
0.0150 org/hr Kepala Tukang @ Rp. 36,800.00 = Rp. 552.00
0.0150 org/hr Pekerja @ Rp. 21,000.00 = Rp. 315.00
0.0008 org/hr Mandor @ Rp. 36,800.00 = Rp. 27.60
= Rp. 27,619.60
An. 3
1 bh Pasang Kunci Slot/Grendel
1.0000 bh Grendel @ Rp. 12,500.00 = Rp. 12,500.00
0.2000 org/hr Tukang Kayu @ Rp. 31,500.00 = Rp. 6,300.00
0.0200 org/hr Kepala Tukang @ Rp. 36,800.00 = Rp. 736.00
0.0200 org/hr Pekerja @ Rp. 21,000.00 = Rp. 420.00
0.0010 org/hr Mandor @ Rp. 36,800.00 = Rp. 36.80
= Rp. 19,992.80
48,760.00
Untuk 1 m2 = Rp 4,876.00
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
K.31
1 m2 Mengecet Besi 2 Kali Olah
0.1750 Kg Cat Avian @ Rp. 26,500.00 = Rp. 4,637.50
0.0500 Ltr Minyak Cat @ Rp. 19,500.00 = Rp. 975.00
0.0500 org/hr Tukang Cat @ Rp. 31,500.00 = Rp. 1,575.00
0.0150 org/hr Kepala Tukang @ Rp. 36,800.00 = Rp. 552.00
0.0500 org/hr Pekerja @ Rp. 21,000.00 = Rp. 1,050.00
0.0150 org/hr Mandor @ Rp. 36,800.00 = Rp. 552.00
= Rp. 9,341.50
K. 9+23
1 m2 Mengecet Kayu 3 Kali Olah
0.4250 Kg Cat Avian @ Rp. 26,500.00 = Rp. 11,262.50
0.0575 Ltr Minyak Cat @ Rp. 19,500.00 = Rp. 1,121.25
0.0800 Kg Dempul @ Rp. 14,850.00 = Rp. 1,188.00
0.3400 org/hr Tukang Cat @ Rp. 31,500.00 = Rp. 10,710.00
0.0340 org/hr Kepala Tukang @ Rp. 36,800.00 = Rp. 1,251.20
0.6000 org/hr Pekerja @ Rp. 21,000.00 = Rp. 12,600.00
0.1000 org/hr Mandor @ Rp. 36,800.00 = Rp. 3,680.00
= Rp. 41,812.95
K. 18
1 m2 Mengecet Menie
1.2000 Kg Cat menei @ Rp. 19,500.00 = Rp. 23,400.00
0.7500 org/hr Tukang Cat @ Rp. 36,800.00 = Rp. 27,600.00
0.0750 org/hr Kepala Tukang @ Rp. 21,000.00 = Rp. 1,575.00
0.5000 org/hr Pekerja @ Rp. 36,800.00 = Rp. 18,400.00
0.0250 org/hr Mandor @ Rp. 36,800.00 = Rp. 920.00
= Rp. 71,895.00
Supl List
1 Titik UPAH MEMASANG INSTALASI LISTRIK
1.5000 org/hr Tukang Listrik @ Rp. 31,500.00 = Rp. 47,250.00
0.5000 org/hr Kepala Tukang @ Rp. 36,800.00 = Rp. 18,400.00
1.5000 org/hr Pekerja @ Rp. 21,000.00 = Rp. 31,500.00
0.5000 org/hr Mandor @ Rp. 36,800.00 = Rp. 18,400.00
= Rp. 115,550.00
An. SPL.VII
1 m2 Plafond Triples 3 mm
0.3500 lbr Tripleks @ Rp. 30,800.00 = Rp. 10,780.00
0.0200 kg Paku @ Rp. 8,500.00 = Rp. 170.00
0.5000 org/hr Pekerja @ Rp. 21,000.00 = Rp. 10,500.00
0.0250 org/hr Mandor @ Rp. 36,800.00 = Rp. 920.00
= Rp. 22,370.00
An.F.1
1 M3 Rangka Plafond
1.0000 m3 Kayu Kelas II @ Rp. 1,421,800.00 = Rp. 1,421,800.00
15.0000 org/hr Tukang Kayu @ Rp. 31,500.00 = Rp. 472,500.00
1.5000 org/hr Kepala Tukang @ Rp. 36,800.00 = Rp. 55,200.00
5.0000 org/hr Pekerja @ Rp. 21,000.00 = Rp. 105,000.00
0.2500 org/hr Mandor @ Rp. 36,800.00 = Rp. 9,200.00
= Rp. 2,063,700.00
An.F,1a
1 M' List Frofil Plafond ( t = 4 x 4 cm )
1.0000 m3 List Profil @ Rp. 5,500.00 = Rp. 5,500.00
0.0150 org/hr Paku @ Rp. 8,500.00 = Rp. 127.50
0.0500 org/hr Pekerja @ Rp. 21,000.00 = Rp. 1,050.00
0.0200 org/hr Mandor @ Rp. 36,800.00 = Rp. 736.00
= Rp. 7,413.50
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
An.F36
1 M2 Pasangan Kaca Mati 3 mm
1.0000 m2 Kaca Ryben 3 mm @ Rp. 100,100.00 = Rp. 100,100.00
0.0040 org/hr Papan (kayu bayam) @ Rp. 3,521,800.00 = Rp. 14,087.20
0.4000 org/hr Tukang @ Rp. 31,500.00 = Rp. 12,600.00
0.0360 org/hr Kepala Tukang @ Rp. 36,800.00 = Rp. 1,324.80
0.1200 org/hr Pekerja @ Rp. 21,000.00 = Rp. 2,520.00
0.0060 org/hr Mandor @ Rp. 36,800.00 = Rp. 220.80
= Rp. 130,852.80
An.F36
1 M2 Pasangan Kaca Mati 5 mm
1.0000 m2 Kaca Ryben 5 mm @ Rp. 122,100.00 = Rp. 122,100.00
0.0040 org/hr Papan (kayu bayam) @ Rp. 3,521,800.00 = Rp. 14,087.20
0.4000 org/hr Tukang @ Rp. 31,500.00 = Rp. 12,600.00
0.0360 org/hr Kepala Tukang @ Rp. 36,800.00 = Rp. 1,324.80
0.1200 org/hr Pekerja @ Rp. 21,000.00 = Rp. 2,520.00
0.0060 org/hr Mandor @ Rp. 36,800.00 = Rp. 220.80
= Rp. 152,852.80
1 m2 BAKESTING
0.0400 lbr Triplex @ Rp. 30,800 Rp. 1232
0.4000 Kg Paku @ Rp. 8,500 Rp. 3400
0.5000 Org/hr Tukang Batu @ Rp. 31,500 Rp. 15,750
0.0500 Org/hr Kepala Tukang @ Rp. 36,800 Rp. 1,840
0.2000 Org/hr Pekerja @ Rp. 21,000 Rp. 4,200
0.0100 Org/hr Mandor @ Rp. 36,800 Rp. 368
Rp. 26,790
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
An. J.4
1M2 Pekerjaan Lapisan Atap
1.0500 M2 Karet Lapisan Genteng @ Rp. 6,000.00 = Rp. 6,300.00
0.0100 org/hr Tukang @ Rp. 31,500.00 = Rp. 315.00
0.0200 org/hr Mandor @ Rp. 36,800.00 = Rp. 736.00
0.0500 org/hr Pekerja @ Rp. 21,000.00 = Rp. 1,050.00
= Rp. 8,401.00
An. J.4
1M' Memasang Bumbung Atap Genteng Metal
1.0000 M' Bumbungan @ Rp. 17,500.00 = Rp. 17,500.00
6.0000 Bh Paku @ Rp. 200.00 = Rp. 1,200.00
0.0250 org/hr Tukang Kayu @ Rp. 31,500.00 = Rp. 787.50
0.0030 org/hr Kepala Tukang @ Rp. 36,800.00 = Rp. 110.40
0.0250 org/hr Pekerja @ Rp. 21,000.00 = Rp. 525.00
0.0100 org/hr Mandor @ Rp. 36,800.00 = Rp. 368.00
= Rp. 20,490.90
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
An.SPL.III
1 M2 Memasang Tegel Keramik 40/40
1.0000 m2 Tegel Keramik Putih 40 x 40 cm @ Rp. 43,000.00 = Rp. 43,000.00
0.1175 m3 Semen PC @ Rp. 25,225.00 = Rp. 2,963.94
0.8000 Zak Semen Warna @ Rp. 21,600.00 = Rp. 17,280.00
0.0285 org/hr Pasir Pasangan @ Rp. 50,000.00 = Rp. 1,425.00
0.5000 org/hr Tukang Batu @ Rp. 31,500.00 = Rp. 15,750.00
0.0250 org/hr Kepala Tukang @ Rp. 36,800.00 = Rp. 920.00
0.7500 org/hr Pekerja @ Rp. 21,000.00 = Rp. 15,750.00
0.0250 org/hr Mandor @ Rp. 36,800.00 = Rp. 920.00
= Rp. 98,008.94
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
7,492.80
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
ANALISA HARGA SATUAN
REHABILITASI GEDUNG DPRD KAB. ENREKANG
TA. 2005
348231982.xls
DAFTAR HARGA MATERIAL DAN UPAH
NO HARGA WILALYAH
JENIS MATERIAL SAT
KEC. ENREKANG
UPAH KERJA
1 Pekerja org/hr 21,000.00
2 Mandor org/hr 36,800.00
3 Kepala Tukang org/hr 36,800.00
4 Tukang org/hr 31,500.00
5 Mandor Lapangan org/hr 36,800.00
6 Mekanik org/hr 42,000.00
7 Mekanik Pembantu org/hr 36,800.00
8 Operator Terampil org/hr 36,800.00
9 Operator Semi Terampil org/hr 31,500.00
10 Pembantu Operator org/hr 26,300.00
11 Sopir Truk org/hr 36,800.00
12 Sopir Personil org/hr 36,800.00
13 Pembantu Sopir org/hr 31,500.00
14 Buruh Tak terlatih org/hr 16,800.00
15 Buruh Semi Terlatih org/hr 18,400.00
16 Buruh Terlatih org/hr 21,000.00
AGREGAT HALUS :
1 Pasir urug / Pasir Timbun M3 39,650.00
2 Pasir pasang/kali M3 50,000.00
3 Pasir beton M3 52,500.00
4 Sirtu M3 39,500.00
5 Kerikil M3 80,900.00
6 Tanah Timbunan M3 37,000.00
7 Tanah liat M3 20,000.00
AGREGAT KASAR :
8 Batu kali M3 68,300.00
9 Batu Gunung M3 73,500.00
10 Batu Karang Putih/B. Gunung M3 50,000.00
11 Chipping 1-2 M3 102,400.00
12 Batu split 2-3 M3 84,000.00
13 Batu belah M3 73,500.00
14 Batu Bata Bh 260.00
15 Kapur Zak 4,950.00
SEMEN:
1 Semen Tonasa @ 50 Kg Zak 31,950.00
Semen Tonasa @ 40 Kg Zak 25,225.00
2 Semen Bosowa @ 50 Kg Zak 29,950.00
3 Semen Putih 40 Kg Zak 21,600.00
4 Semen PC Tong
KAY U :
Kayu kelas I :
1 Kayu Balok M3 2,521,800.00
2 Kayu Papan M3 3,521,800.00
Kayu kelas II :
5 Kayu Balok M3 1,421,800.00
6 Kayu Papan M3 1,521,800.00
7 Kayu Prancah M3 1,021,800.00
KAYU LAPIS :
1 Kalsboard Lbr 27,500.00
2 Tripleks 3 mm Lbr 30,800.00
3 Tripleks 4 mm Lbr 42,500.00
4 Tripleks 6 mm Lbr 61,600.00
5 Tripleks 9 mm Lbr 82,500.00
6 Tripleks 12 mm Lbr 75,000.00
1 GYPSUM
1 Gypsum + Ranka Plafond (Terpasang) M2 101,750.00
LIST PROFIL ;
1 Covecornice M' 7,500.00
2 List Profil - K1 A M' 6,500.00
3 List Profil - T-11 M' 5,000.00
4 List Profil - 7 cm M' 6,500.00
5 List Profil - 5 cm M' 5,500.00
6 Plint 10 cm M' 3,500.00
7 Plint 7 cm M' 3,000.00
8 Lambresering 9 cm Meranti M' 3,500.00
9 Lambresering 9 cm Agatis M' 4,000.00
PAK U :
1 Paku Kg 8,500.00
2 Paku Seng Kg 9,500.00
3 Paku Beton 2, 3, 4 cm Dos 10,000.00
4 Paku Beton 5, 7, 10 cm Dos 10,000.00
Paku Metal Roof Bh 200.00
SENG:
1 Seng BJLS 18 (BWG 34) Lbr/6 30,085.00
2 Seng BJLS 0.2 (BWG 34) Lbr/6 31,625.00
3 Seng BJLS 0.3 (BWG 32) Lbr/6 33,440.00
4 Seng BJLS 0.35 (BWG 28) Lbr/6 41,085.00
PEKERJAAN BAJA :
BAUT :
1 Baut bh 16,000.00
2 Besi Dynabolt 16 x 85 bh 1,750.00
3 Besi Dynabolt 16 x 11 bh 2,600.00
4 Besi Dynabolt 12 x 100 bh 1,500.00
5 Baut Seng 1/2 x 5/8" bh 10,000.00
BOR:
1 GSB 16 RE unit 600,000.00
2 Mata Bor Beton/Masonry Drill bit pcs 9,000.00
3 Masonry Drill dia. 16 pcs 50,000.00
4 Masonry Drill dia. 12 pcs 20,000.00
BESI:
1 Besi beton Kg 5,725.00
2 Besi Plat 4 x 8 x 6 mm M' 65,500.00
11 Besi Plat 4 x 8 x 10 mm Btg 663,000.00
12 Besi Siku 40 x 4 mm Btg 25,000.00
12 Besi Siku 50 x 50 x 5 mm Btg 55,000.00
12 Besi Siku 60 x 6 Btg 90,000.00
KERAMIK :
ASIA TILE :
1 Keramik Dinding 20 x 25 (warna tua) Boks 38,000.00
2 Keramik Dinding 20 x 25 (warna muda) Boks 41,000.00
3 Keramik Lantai 20 x 20 Boks 27,500.00
4 Keramik Lantai 20 x 20 Boks 32,000.00
5 Keramik Lantai 20 x 20 Boks 39,000.00
6 Keramik Lantai 30 x 30 Boks 24,000.00
7 Keramik Lantai 30 x 30 Boks 25,000.00
8 Keramik Lantai 30 x 30 Boks 26,000.00
9 Keramik Lantai 30 x 30 Boks 32,000.00
ROMAN / ROYAL :
1 Keramik Lantai 20 x 20 Boks 27,500.00
2 Keramik Lantai 20 x 20 Boks 29,500.00
3 Keramik Lantai Roman 30 x 30 (warna muda) Boks 28,500.00
4 Keramik Lantai Royal 30 x 30 (warna muda) Boks 31,500.00
5 Keramik Lantai Royal 30 x 30 (warna tua) Boks 37,000.00
6 Keramik Lantai Royal 40 x 40 (warna muda) Boks 40,000.00
7 Keramik Lantai Royal 40 x 40 (warna tua) Boks 43,000.00
KACA:
1 3 mm Panasap (Bening) M2 77,000.00
2 5 mm Panasap (Bening) M2 94,600.00
3 3 mm Polos Asahi Mas (Ryben) M2 100,100.00
4 5 mm Polos Asahi Mas (Ryben) M2 122,100.00
5 3 mm Polos Utama (Buram) M2 101,200.00
6 5 mm Polos Utama (Buram) M2 140,250.00
7 Kaca nako 6 Mata Set 102,971.00
8 Kaca nako 7 Mata Set 111,458.00
GENTENG :
1 Genteng Metal Zincalume Kasar Multi Roof M2 69,000.00
2 Genteng Metal Zincalume Polos Multi Roof M2 59,000.00
3 Genteng Metal Zincalume Kasar Surya Roof M2 58,000.00
4 Genteng Metal Zincalume Polos Surya Roof M2 51,000.00
5 Bumbungan Metal Roof M' 17,500.00
6 Genteng Metal Zincalume Polos Mega Roof M2 33,750.00
7 Paku Asbes Kg 15,000.00
8 Karet Pelapis Genteng M2 6,000.00
LANDSCAPE :
PAVING :
1 Paving Block 6 cm (50 bj/M2) M2 18,000.00
2 Paving Block 8 cm (50 bj/M2) bh 450.00
PLUMBING :
PIPA :
1 Pipa PVC 1" M 5,000.00
2 Pipa PVC 11/2" M 7,000.00
3 Pipa PVC 2" M 9,000.00
4 Pipa PVC 3" M 17,000.00
5 Pipa PVC 1/2" M' 2,500.00
6 Pipa PVC 5/8" Btg 4,600.00
7 Pipa GIP 3" Btg 484,000.00
8 Pipa GIP 2" Btg 226,600.00
9 Pipa GIP 1 1/2" Btg 85,000.00
10 Pipa GIP 1" Btg 125,620.00
11 Pipa GIP 1/2" Btg 35,000.00
TANGKI AIR :
1 TA. Stainless Kap. 1 m3 (Maspion) Bh 1,250,000.00
2 TA. Stainless Kap. 1/2 m3 (Maspion) Bh 850,000.00
3 TA. Fiberglass Kap. 1 m3 (Grand) Bh 560,000.00
4 TA. Fiberglass Kap. 1/2 m3 (Excel) Bh 600,000.00
KUNCI PINTU :
1 JS Type Js 8816 set 95,000.00
2 Vanessa Type SES 4683 set 375,000.00
3 Sess Type 7936 set 350,000.00
4 Kunci Tanam 2x Putar Bh 35,000.00
5 Sess Type 20801 set 750,000.00
ENGSEL PINTU :
1 Merk SESS 4 x 3 set 85,000.00
2 Merk Cavel 4 x PR set 50,000.00
3 Merk UNO 4 x 3 set 40,000.00
ENGSEL JENDELA :
1 Merk Borsalino 3 x 3 set 30,000.00
2 Merk Cavel 3 x 3 set 40,000.00
3 Merk SS 3 x 2,5 set 10,000.00
4 Merk Hinges 3 x 2,5 set 5,000.00
5 Hak Angin bh 6,600.00
7 Slot Jendela bh
GRENDEL :
2 Ses (Stainless) Pintu set 40,000.00
4 Grendel Biasa Jendela Bh 12,500.00
SANITARY :
KLOSET :
1 Kloset duduk standard (Toto) Bh 1,050,000.00
2 Kloset duduk Premium (Toto) Bh 1,150,000.00
3 Kloset duduk Kharisma (KIA) Bh 1,495,000.00
4 Kloset jongkok standard (TOTO) Bh 165,000.00
5 Kloset jongkok Premium (Toto) Bh 115,000.00
6 Kloset Granada Putih Bh 750,000.00
7 Urinoir standar Bh 160,500.00
8 Jet shower PVC Exel Bh 35,000.00
9 Kaca Cermin Bh 42,500.00
WASHTAFEL :
Wastafel standard (Toto) Bh 170,000.00
Wastafel Studio 50/Wh. Grey Bh 120,000.00
Countertop Randalupe (KIA) Bh 0.00
Countertop Aqualupe (KIA) Bh 0.00
KRAN :
1 Kran Wall Shower Itap Putar Bh 75,000.00
2 Kran Wastafel F. 10 Bh 65,000.00
3 Kran Tembok CNN Bh 10,000.00
4 Kran Kodok Wastafel ( San-Ei ) Bh 120,000.00
5 Kran Leher Angsa ( San-Ei ) Bh 160,000.00
6 Kran Kamar Mandi ( San-Ei ) Bh 10,000.00
7 Kran Double/Jet Washer ( San-Ei ) Bh 160,000.00
8 Kran Taman ( San-Ei ) Bh 65,000.00
14 Stop Valve 1,5" (Kitz) Bh 65,000.00
SARINGAN :
1 Floor Strainer Heins Bh 25,000.00
2 Floor Drain ( Toto) Bh 104,000.00
SIFON :
1 Sifon ATR Viega Bh 32,500.00
KLEP :
1 Klep Berdiri 1/2 kitz Bh 30,000.00
CAT TEMBOK :
1 Aries Putih (5 ltr) klg 12,500.00
2 Cat Dasar/Undercoat Mowilex Ltr 18,400.00
3 Cat Weather Coat Mowilex Ltr 34,800.00
4 Cat Tembok Dalam Mowilex Ltr 21,200.00
5 Cat Tembok Metrolite Kg 8,000.00
6 Cat Tembok Metrolite Kg 9,500.00
7 Cat warna hitam Kg 22,750.00
8 Cat Vinotex Hitam 5 kg klg 20,000.00
CAT GENTENG :
1 Aga No. 019 galon 52,000.00
2 Aga Cat Genteng Orange 4 kg klg 50,000.00
3 Aga No. 119 4 kg klg 50,000.00
4 SIIP Cat Genteng No. 15 5 kg klg 45,000.00
THINNER :
1 Thinner A Ltr 4,500.00
2 Thinner Super Ltr 6,000.00
KAPUR, SEMEN :
1 Kapur zak 4,950.00
2 Semen Putih zak 44,000.00
DEMPUL :
1 Dempul Kayu Kg 14,850.00
2 Dempul Isamu 1 kg klg 15,000.00
WATERPROOF
1 Waterproof Superflex Lantai M2 30,000.00
2 Waterproof Superflex Dinding M2 25,000.00
3 Waterproof Multiguard M2 30,000.00
4 Waterproof Aquaseal Kg 23,000.00
5 Waterproof Ultraproof Kg 0.00
6 Waterproof Seal On Kg 0.00
KABEL :
4 Kabel Telepon mtr 2,500.00
5 Kabel NYFGBY (4 50 ) mm2 mtr 4,750.00
6 Kabel NYM 2 x 2.5 mtr 2,100.00
7 Kabel NYM 2 x 2,5 Eterna mtr 1,860.00
8 Kabel NYM 3 x 2.5 Eterna mtr 2,250.00
9 Kabel NYM 3 x 4 Eterna mtr 3,470.00
10 Kabel NYY 4 x 16 mtr 18,500.00
11 Kabel NYY 4 x 10 mm mtr 4,250.00
PIPA :
1 Pipa PVC 20 mm btg 5,500.00
2 Pipa 3/4 btg 6,500.00
3 Fleksibel mtr 3,500.00
4 Pipa Clipsal 20 mm btg 5,500.00
5 L Bow 3/4 bh 1,500.00
6 Klem Kabel Clipsal 20 mm bh 450.00
7 Sok/Sambungan Clipsal bh 1,500.00
8 Tedos Clipsal bh 4,000.00
9 Inbow Dos Decker bh 1,500.00
10 Tedos 3/4 bh 1,500.00
11 Dos Inbow Asli bh 1,200.00
LAMPU :
1 Neon Lilin 18 Watt Philips bh 34,500.00
2 Down Light Besar bh 27,000.00
3 Down Light Sedang bh 24,000.00
4 Lampu TL 5 Watt bh 30,000.00
5 Lampu TL 18 Watt bh 45,000.00
6 Fitting Merkuri 250 watt bh 22,500.00
7 Lampu Merkuri Philips 250 watt (utk jalan) set 550,000.00
8 Lampu Taman Bulat Philips set 82,500.00
9 Lampu Baret 32 Watt bh 80,000.00
18 Lampu Dinding Setengah Lingkaran bh 75,000.00
19 Lampu Baret 20 Watt 75,000.00
Sambungan bh 1,500.00
Fitting bh 1,500.00
Kayu Roset bh 150.00
PANEL :
1 MCB 16 grup MG asli bh 25,000.00
2 MCB 10 grup MG asli bh 25,000.00
3 Sisir MCB Legrand bh 17,000.00
4 Boks MCB 4 grup IB bh 10,000.00
5 Boks MCB Plastik Grup MCB Asli set 435,000.00
6 MCB 63 Amp MG bh 135,000.00
7 Panel Distribusi Utama 1.00 160,000.00
PENANGKAL PETIR :
1 Elektroda Penangkap 1.00 40,000.00
2 Elektroda Pertanahan 1.00 32,000.00
3 BC 16 mm M' 6,500.00
SAKLAR :
1 Engkel IB bh 6,000.00
2 Stop Kontak 16 AMP bh 14,500.00
3 Saklar Seri bh 19,650.00
4 Saklar Tunggal bh 14,300.00
5 Stop Arde + Tedos OB bh 14,500.00
6 Steker Arde bh 4,500.00
7 Engkel IB Makel bh 6,000.00
8 Kabel Arde mtr 6,250.00
9 Saklar Engkel + Tedos set 19,600.00
10 Dora Dos bh 12,500.00
MUR & BAUT :
1 Fischer dgn mor 58 biji 500.00
2 Fischer 6 dos 3,000.00
3 Fischer 12 dos 4,000.00
5 Baut Seng 1/4 gros 33,000.00
6 Mata Bor bh 12,000.00
7 Klem BC bh 750.00
8 Alat Bantu Set 35,000.00
FASILITAS KANTOR
1 Meja Kerja 1/2 Biro (Adinda) bh 950,000.00
2 Meja Kerja 1 Biro (Adinda) bh 1,400,000.00
3 Kursi Hadap (ISABEL) bh 350,000.00
4 Kursi Susun (ISABEL) bh 210,000.00
5 Kursi Lipat (CITOSE) bh 250,000.00
6 Kursi Tamu (HOCK) set 3,000,000.00
2556
864000