No Uraian Pekerjaan Volume Satuan Harga Satuan (Rp.) Jumlah (Rp)
(1) (2) (3) (4) (5) (6) RUANG KELAS BARU (RKB) I PEK. PERSIAPAN/PEMBERSIHAN LOKASI 1 … Sub Total 12,000,000 II PEK. GALIAN DAN URUGAN 1 … Sub Total 6,500,000 III PEK. PONDASI DAN BETON 1 … Sub Total 8,000,000 IV PEK. DINDING DAN PELESTERAN 1 … Sub Total 25,000,000 V PEK. ATAP DAN PLAPON 1 … Sub Total 35,000,000 VI PEK. KUSEN PINTU & KUNCI 1 … Sub Total 30,000,000 VIII PEK. LANTAI 1 … Sub Total 25,000,000 IX PEK. PENGECATAN 1 … Sub Total 8,500,000 X PEK. FINISHING 1 … Sub Total 10,000,000 XI MEUBELAIR 1 Meja siswa 2 Kursi siswa 3 Meja dan kursi guru 4 Papan Tulis Sub Total 20,000,000 GRAND TOTAL 180,000,000