MC1A MC2
MC2 MC2 MC2 MC3 MC2 MC2 MC3 MC2 MC2 MC2
MC2 MC1A
7.00 7.00
℄ ℄
SPX1
SPX1
SPX1
SPX1
SPX1
SPX1
SPX1
SPX1
SPX1
SPX1
SPX1
SPX1
SPX1
SPX1
MC1A MC2
MC2 MC2 MC2 MC3 MC2 MC2 MC3 MC2 MC2 MC2
MC2 MC1A
3.00 3.00
5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
60,00 M
O 10.00
O
Pas. Reataining Wall
28.10
0.60 0.60
Pas. batu penahan tanah
Box Culvert 3 x 3 t = 30 cm
4.00
MAB MAB
3.00 3.00
3.00
60,00
60,00MM
TAMPAK JEMBATAN (RENCANA)
Skala 1 : 400
℄
5.00 0.80 0.50
3.50 0.30
1.75
1.20
5.00 0.20
1.50 1.25 ℄
0.00 0.40 ℄ 0.300.20 1.25 3.50
0.50 1.75 ℄
0.50
0.25
0.65 5.00
0.30 0.30 1.60
0.20 1.45
1.20 0.70 1.20 0.90 1.20 0.50
Construction Joint Construction Joint
Var. Mengikuti
25
Var. Mengikuti
Kemiringan Jalan
Kemiringan Jalan
10 0.70
0.25 0.25
0.50 0.50 0.70 0.50 0.70
0.50
0.50 0.50 0.50
2.10
4.42
4.00 6.57
0.85 0.80
Beton kedap Air 0.50 0.50 Beton kedap Air 0.50 Beton kedap Air
150 250
2.50 2.50
4.00 3.50
A
C 1.75 1.75 C
2.50 2.50
0.50
D D
0.30 0.30
0.70 0.70
1.60 1.60
0.90 0.90 Catatan
C C
5.00
1.50 1.60 0.32
0.50
A10 A9
40 30
0.30 A5
0.20
A8
1.20 1.20 A8 A8 A9
25 D A8 D A4 1.66 D D A4
a
Var. Mengikuti
Var. Mengikuti
10 1.45 b
Kemiringan Jalan
Kemiringan Jalan
A3 A3 A10 a d
0.50 0.50 b e
0.50 0.50 0.50 c
e
0.50 A2 A2
0.50 0.50 E E 0.50 E E
A7 A7 a
b A3 b c
b c
b
4.00 4.00 A1 4.00 A1 a c
A1 A1
A8 A8
a A2 A1 a
A6 A6
B
B
c
A5 a
0.40 0.50 0.50
d b
℄ A5
2.50
A8
A5 A9 0.50
0.20
0.30 0.50
0.40 Catatan
1.60 A1
A1 1.80 - Semua dimemsi dalam meter
- Selimut beton minimun 5 Cm
- Mutu beton Struktur Abutment K 250
A3 A3 - Lantai Jembatan K 350
A2
A'0.40
0.85
- Mutu baja Tulangan 1. U 32 ( 3200 Kg/Cm2)
3.45 0.80 2. U 24 ( 2400 Kg/Cm2)
1.75
7.00
7.00
A
Potongan D - D Potongan E - E Potongan B - B
Skala 1 : 100 Skala 1 : 100
Potongan C - C
Skala 1 : 100 Skala 1 : 100
1
S1
0.50 a
D 12 - 20
b c c b
D 12 - 20
1.25 1.25
c
1.25 b
D 16 - 20 S4
a T1
a c
S3 D 16 - 20 b
3.50 c S2
S5 S6
S5 S6
a
a a
D 13 - 15
D 13 - 15
S3 , T2
T2 T1
D 12 - 20 0.50
D 12 - 20
500 500 c
a b
1 S4 c
500
0.70
50 350 50
T1 S5
℄
T2
2% 2%
S6 S1 S2 S3 S4
1.00
0.10
Catatan
0.50 0.50 - Semua dimemsi dalam Melimeter
- Selimut beton minimun 4 Cm
- Mutu beton Struktur Abutment K 350
- Lantai Jembatan K 350
- Mutu baja Tulangan 1. U 32 ( 3200 Kg/Cm2)
3.50 3.50
2. U 24 ( 2400 Kg/Cm2)
Potongan 1 - 1
Skala 1 : 100
F1 A
F6
F3
C C
F2
A
700
Potongan B - B
Skala 1 : 100
b A8 b
a
a A9
b c b
b A3 b c a
CL d a a
e b
a c
c e c F1 c
a F3
b
A2 d d
b
F2
a A1 a
350
b F2 b
c b
A5 a A10 a
a
b
d b
F4 a
b b b
700 A6 A7 c
a
d A4
F4 , F5 , F6
Potongan C - C
Skala 1 : 100
1600 80 1600
B
F1 F6
40
F5
80
F3
Catatan
F4 F2
- Semua dimemsi dalam Melimeter
- Selimut beton minimun 5 Cm
B - Mutu beton Struktur Abutment K 250
- Lantai Jembatan K 350
- Mutu baja Tulangan 1. U 32 ( 3200 Kg/Cm2)
Detail Tapak Abutment (Potongan A - A) 2. U 24 ( 2400 Kg/Cm2)
Skala 1 : 100
C 0.50
0.30
W1 W2
0.25 0.40
A A
W6 W5
0.10 W5 W6
50
50
W7 W8 576
400
W11
35
40
50 W9
b d
70 W3 W4 c c
W10
350 a
b a
C Potongan C - C
Skala 1 : 100 c
Detail Sayap Potongan B - B W1 W2 W11 W12
a
Skala 1 : 100 W6
W5 a
a
a b b
b a
W10
c
W3 W4
c b
W9
55 147 30 182 c d
40 W12
B 40 W1 W3
B
45 Catatan
202 212 - Semua dimemsi dalam Melimeter
- Selimut beton minimun 4 Cm
- Mutu beton Struktur Abutment K 250
Potongan A - A - Lantai Jembatan K 350
Skala 1 : 100 - Mutu baja Tulangan 1. U 32 ( 3200 Kg/Cm2)
2. U 24 ( 2400 Kg/Cm2)
d
a d a d
a
50
k
b k
0.65
P1 c b b
120
P2 P1
Var. Mengikuti
Kemiringan Jalan
10
50
50
P6 c c
50 P5
Construction Joint 50 k
P5 P6 P3 P4
P4 P2
400 50
620
20
250
50
A Potongan A - A
70
Skala 1 : 100
350
100 Beton kedap Air
B B
250
100
Cyclopen 40% Bt Kali
250
2100
A 1500
P1
P2
P5
P3
Catatan
250
- Semua dimemsi dalam Melimeter
- Selimut beton minimun 4 Cm
- Mutu beton Struktur Abutment K 250
Potongan B - B - Lantai Jembatan K 350
Skala 1 : 100
- Mutu baja Tulangan 1. U 32 ( 3200 Kg/Cm2)
2. U 24 ( 2400 Kg/Cm2)
6.00
0.20
O 16 - 20 O 12 - 20
30
5.00
0.30 0.20
30 O 12 - 20 O 16 - 20
POTONGAN MELINTANG
3.75
594
7.5 7.5
494
14 14
32 7.5
16
7.5 7.5
494
DENAH
DETAIL PLAT INJAK
CL Jembatan Dinding Bahagian Belakang Abutment
Baja Siku 60.60.6
Baja Siku 60.60.6
400 300
30
Expansion Seal Esa
3 3 2 CLBearing Abutment
300 A
500
200
DETAIL BEARING
Skala 1 : 20 Max. 1200
DETAIL A
Construction Joint Block Penahan
Var. Mengikuti
0.50 Skala 1 : 10
Kemiringan Jalan
700
4.77
0.50
D D
0.30
0.70
0.85
B B Denah Abutment
Skala 1 : 100
Dinding Belakang Abutment
0.85 0.50
A
2.50 0.50 0.50 2.50
5.00
CLBearing Abutment
3.50 3.50
DENAH KEPALA ABUTMENT
Skala 1 : 100
700
1 2 1
CL Bearing CL Bearing 450
CL
700
175 500
475
50 175 50 355
2
120 145
25
10 70
50
50
Lobang Baut Angker
100 x 100 x 525
135
50 50 50 135
POTONGAN 1
Skala 1 : 25
POTONGAN KEPALA ABUTMENT
Skala 1 : 100