1 2006
2 2007
3 2008
4 2009
5 2010
6 2011
7 2012
8 2013
9 2014
10 2015
2017
2015 2016 2017
455,655 591,036 683,456 GC 521.277
345,286 570,574 658,895 BC 370.121
284,680 202,152 245,827 CC 506.034
24,607 15,627 16,224 CK 21.957
36,510 39,030 49,719 PK 36.565
1,146,738 1,418,419 1,654,121 Jumlah
data r
Curah Peti
Bag Cargo General
No Tahun General Cargo (ton) Curah Cair (ton) Kering Kemas
(ton) Cargo (ton)
(ton) (teus)
6 2011 785,908 524,635 137,877 37,646 38,175 0.35102582
7 2012 1,061,782 601,547 223,893 44,756 35,187 -0.267333596
8 2013 777,932 613,433 P roye ks i a r u s b a ra n g 36,187 -0.177132449
142,150 23,625
9 2014 1,800,000 640,135 490,510 176,352 75,554 40,578 -0.185676459
10 2015 1,600,000 521,277 370,121 506,034 21,957 36,565 0.133823284
11 2016 1,400,000 591,036 570,574 202,152 15,627 39,030 0.156369494
1,200,000
12 2017 683,456 658,895 245,827 16,224 49,719 0.060995508
1,000,000
2018 725,144 597,613 260,821 19,723 55,192 -0.002211466
800,000
2019
ton
untuk kegiatan bongkar sebesar 1.665.923,68 ton dan 807.031,83 ton untuk kegiatan muat
produksi lada putih, karet, CPO dan balok timah
Curah Peti
Bag Cargo Curah Cair Kering Kemas
(ton) (ton) (ton) (teus)
0.14660097 0.6238604 0.1888647 -0.078271
0.019759055 -0.365099 -0.472138 0.0284196
-0.20038537 0.240605 2.1980529 0.1213419
-0.24543638 1.8694543 -0.709387 -0.098896
0.541587751 -0.600517 -0.288291 0.0674142
0.154793243 0.2160503 0.0382031 0.2738663
0.689807343 2.1167335 2.5255452 1.1306592
0.151808008 0.4010028 0.4215588 0.2034601
0.1193845 0.354926 0.21569 0.11007
0 1 2 3 4 5 6 7 8
03 203 203 203 203 203 203 203 203
ra h Ca i r (ton)
Penduduk PDRB No Tahun
General Cargo
Bag
(ton)
Cargo Curah
(ton) CairCurah
(ton) Kering (ton)
Penduduk 1
PDRB 0.99825 1
No 0.997822 0.998457 1
Tahun 0.997822 0.998457 1 1
General Cargo (ton) -0.61677 -0.78604 -0.64837 -0.64837 1
Bag Cargo (ton) 0.573921 0.428575 0.58189 0.58189 -0.25481 1
Curah Cair (ton) 0.278854 0.504393 0.30429 0.30429 -0.5199 -0.23182 1
Curah Kering (ton) -0.18083 -0.24717 -0.19678 -0.19678 0.018188 -0.29086 -0.14483 1
Peti Kemas (teus) 0.925871 0.816996 0.925924 0.925924 -0.58893 0.73711 0.139077 -0.12084
Peti Kemas (teus)
x
penduduk
pdrb
x
1 penduduk
SUMMARY OUTPUT
Regression Statistics
Multiple R 0.573921
R Square 0.329385
Adjusted R Square 0.262324
Standard Error 100373.6
Observations 12
ANOVA
df SS MS F Significance F
Regression 1 4.95E+10 4.95E+10 4.911687 0.051019
Residual 10 1.01E+11 1.01E+10
Total 11 1.5E+11
Coefficients
Standard Error t Stat P-value Lower 95%Upper 95%
Lower 95,0%
Upper 95,0%
Intercept -259951 334446.6 -0.77726 0.455 -1005145 485242.1 -1005145 485242.1
Penduduk 0.909375 0.410325 2.216233 0.051019 -0.00489 1.823635 -0.00489 1.823635
Upper 95,0%
GC BC CC CK PK
Jumlah hari kerja (H) 300 300 300 300 300
BOR 70% 70% 70% 70% 70%
jam kerja per hari (J) 12 12 12 12 12
jumlah gang dalam satu waktu (G) 2 2 2 2 2
Produktivitas (P) 21 21 100 100 8
panjang dermaga
Berth Throughput
Panjang Lebar Konstruksi
No Dermaga Jenis
(m) (m) Lantai Dermaga Jenis Pondasi
1 Dermaga 1 Beton 55 10 Plat Beton Tiang Pancang
2 Dermaga 2 Beton 128 10 Plat Beton Tiang Pancang
4 Dermaga 3 Beton 73 10 Plat Beton Tiang Pancang
5 Dermaga 4 Beton 140 15 Plat Beton Tiang Pancang
5 Dermaga 5 Beton 50 10 Plat Beton Tiang Pancang
446
pangkalbalam
General Bag Curah Curah Peti Tahun
Tahun Cargo Cargo Cair Kering Kemas
(ton) (ton) (ton) (ton) (teus)
2022 891,895 684,709 320,799 33,721 77,082 2022
2023 933,582 706,483 335,793 37,220 82,554 2023
2024 975,270 728,257 350,787 40,720 88,027 2024
2025 1,016,958 750,031 365,782 44,219 93,500 2025
2026 1,058,646 771,806 380,776 47,718 98,972 2026
2027 1,100,333 793,580 395,770 51,218 104,445 2027
2028 1,142,021 815,354 410,765 54,717 109,917 2028
2029 1,183,709 837,128 425,759 58,216 115,390 2029
2030 1,225,397 858,902 440,753 61,716 120,863 2030
2031 1,267,084 880,676 455,748 65,215 126,335 2031
2032 1,308,772 902,450 470,742 68,714 131,808 2032
2033 1,350,460 924,224 485,736 72,214 137,280 2033
2034 1,392,148 945,998 500,731 75,713 142,753 2034
2035 1,433,835 967,772 515,725 79,213 148,225 2035
2036 1,475,523 989,546 530,720 82,712 153,698 2036
2037 1,517,211 1,011,320 545,714 86,211 159,171 2037
2038 1,558,899 1,033,095 560,708 89,711 164,643 2038
2039 1,558,899 1,033,095 560,708 89,711 164,643 2039
2040 1,558,899 1,033,095 560,708 89,711 164,643 2040
2041 1,558,899 1,033,095 560,708 89,711 164,643 2041
2042 1,558,899 1,033,095 560,708 89,711 164,643 2042
Demand dari Kawasan
Demand dari Pangkalbalam Demand Tot
Industri
General Bag Curah Curah Peti Curah Curah Peti General Bag
Cargo Cargo Cair Kering Kemas Cair Kering Kemas Cargo Cargo
(ton) (ton) (ton) (ton) (teus) (ton) (ton) (teus) (ton) (ton)
89,189 68,471 32,080 3,372 7,708 26,077 2,725 21,399 89,189 68,471
93,358 70,648 33,579 3,722 8,255 29,581 3,091 21,803 93,358 70,648
97,527 72,826 35,079 4,072 8,803 33,084 3,457 22,208 97,527 72,826
101,696 75,003 36,578 4,422 9,350 36,588 3,823 22,613 101,696 75,003
105,865 77,181 38,078 4,772 9,897 40,092 4,189 23,018 105,865 77,181
220,067 158,716 79,154 10,244 20,889 43,595 4,555 23,422 220,067 158,716
228,404 163,071 82,153 10,943 21,983 47,099 4,922 23,827 228,404 163,071
236,742 167,426 85,152 11,643 23,078 50,602 5,288 24,232 236,742 167,426
245,079 171,780 88,151 12,343 24,173 54,106 5,654 24,636 245,079 171,780
253,417 176,135 91,150 13,043 25,267 57,610 6,020 25,041 253,417 176,135
392,632 270,735 141,223 20,614 39,542 61,113 6,386 25,446 392,632 270,735
405,138 277,267 145,721 21,664 41,184 64,617 6,752 25,851 405,138 277,267
417,644 283,799 150,219 22,714 42,826 68,121 7,118 26,255 417,644 283,799
430,151 290,332 154,718 23,764 44,468 71,624 7,484 26,660 430,151 290,332
442,657 296,864 159,216 24,814 46,109 75,128 7,850 27,065 442,657 296,864
455,163 303,396 163,714 25,863 47,751 78,631 8,217 27,470 455,163 303,396
467,670 309,928 168,212 26,913 49,393 82,135 8,583 27,874 467,670 309,928
467,670 309,928 168,212 26,913 49,393 85,639 8,949 28,279 467,670 309,928
467,670 309,928 168,212 26,913 49,393 89,142 9,315 28,684 467,670 309,928
467,670 309,928 168,212 26,913 49,393 92,646 9,681 29,088 467,670 309,928
467,670 309,928 168,212 26,913 49,393 96,149 10,047 29,493 467,670 309,928
Demand Total Demand Jumlah
Curah Curah Peti Demand Total dari Barang Peti
Cair Kering Kemas (dalam ton) Kawasan Umum kemas
(ton) (ton) (teus) Industri (ton) (TEUs)
58,157 6,097 29,107 512,982 0 193,112 7,708 10%
63,160 6,813 30,059 534,567 0 201,308 8,255 10%
68,163 7,529 31,011 556,152 0 209,503 8,803 10%
73,166 8,245 31,963 577,738 0 217,699 9,350 10%
78,169 8,961 32,915 599,323 0 225,895 9,897 10%
122,749 14,799 44,311 959,443 22,590 468,180 43,479 20%
129,252 15,865 45,810 994,696 23,720 484,571 45,703 20%
135,754 16,931 47,310 1,029,949 24,905 500,962 47,983 20%
142,257 17,997 48,809 1,065,203 26,151 517,354 50,323 20%
148,759 19,063 50,308 1,100,456 27,458 533,745 52,725 20%
202,336 27,000 64,988 1,542,585 28,831 825,204 68,374 30%
210,338 28,416 67,035 1,591,506 30,273 849,790 71,457 30%
218,340 29,832 69,081 1,640,428 31,786 874,377 74,612 30%
226,342 31,248 71,128 1,689,349 33,376 898,964 77,843 30%
234,344 32,664 73,174 1,738,271 35,045 923,550 81,154 30%
242,346 34,080 75,221 1,787,192 36,797 948,137 84,548 30%
250,347 35,496 77,267 1,836,114 38,637 972,724 88,030 30%
253,851 35,862 77,672 1,844,031 40,568 972,724 89,961 30%
257,355 36,228 78,077 1,851,948 42,597 972,724 91,990 30%
260,858 36,594 78,481 1,859,865 44,727 972,724 94,120 30%
264,362 36,960 78,886 1,867,782 46,963 972,724 96,356 30%
Perencanaan ini berdasarkan jumlah lahan yang dimiliki oleh pabrik. Dalam pemenuhan kapasitas tahuna
Melalui BUMD Pemprov Babel akan membangun pabrik sawit yang dapat mengolah sawit dengan kapasi
https://babel.antaranews.com/berita/79448/pemprov-kepulauan-babel-akan-bangun-pabrik-sawit
industri pengolahan hasil perikanan sebagai prioritas pertama, Berikutnya, industri pengolahan lada dan
https://republika.co.id/berita/pendidikan/eduaction/17/12/26/p1kf0f414-susun-rencana-pembangunan-indu
hasil
hasil
panen
Tahun CPO Kernel Tahun panen
kelapa
karet
sawit
2017 69,441 26,077 2,725 2017 41,946
2018 78,771 29,581 3,091 2018 42,864
2019 88,101 33,084 3,457 2019 43,782
2020 97,431 36,588 3,823 2020 44,699
2021 106,761 40,092 4,189 2021 45,617
2022 116,091 43,595 4,555 2022 46,534
2023 125,420 47,099 4,922 2023 47,452
2024 134,750 50,602 5,288 2024 48,369
2025 144,080 54,106 5,654 2025 49,287
2026 153,410 57,610 6,020 2026 50,205
2027 162,740 61,113 6,386 2027 51,122
2028 172,070 64,617 6,752 2028 52,040
2029 181,400 68,121 7,118 2029 52,957
2030 190,729 71,624 7,484 2030 53,875
2031 200,059 75,128 7,850 2031 54,793
2032 209,389 78,631 8,217 2032 55,710
2033 218,719 82,135 8,583 2033 56,628
2034 228,049 85,639 8,949 2034 57,545
2035 237,379 89,142 9,315 2035 58,463
2036 246,709 92,646 9,681 2036 59,381
2037 256,038 96,149 10,047 2037 60,298
2038 265,368 99,653 10,413 2038 61,216
2039 274,698 103,157 10,779 2039 62,133
2040 284,028 106,660 11,145 2040 63,051
2041 293,358 110,164 11,512 2041 63,968
2042 302,688 113,668 11,878 2042 64,886
hasil
Tahun CPO Kernel olahan
karet
2017 26,077 2,725 20,973
2018 29,581 3,091 21,432
2019 33,084 3,457 21,891
2020 36,588 3,823 22,350
2021 40,092 4,189 22,808
2022 43,595 4,555 23,267
2023 47,099 4,922 23,726
2024 50,602 5,288 24,185
2025 54,106 5,654 24,644
2026 57,610 6,020 25,102
2027 61,113 6,386 25,561
2028 64,617 6,752 26,020
2029 68,121 7,118 26,479
2030 71,624 7,484 26,937
2031 75,128 7,850 27,396
2032 78,631 8,217 27,855
2033 82,135 8,583 28,314
2034 85,639 8,949 28,773
2035 89,142 9,315 29,231
2036 92,646 9,681 29,690
2037 96,149 10,047 30,149
2038 99,653 10,413 30,608
2039 103,157 10,779 31,067
2040 106,660 11,145 31,525
2041 110,164 11,512 31,984
2042 113,668 11,878 32,443
nuhan kapasitas tahunan, pabrik akan beroperasi kontinyu 24 jam per hari selama 330 hari Untuk memproduksi CPO sebesar
ah sawit dengan kapasitas 15 hingga 30 ton per jam. Dengan begitu para petani sawit terlindungi dan sejahtera.
un-pabrik-sawit
0.4087487
0.53014
Perikanan Lada
Produk Bahan Baku Produk Bahan Baku
produk olah 50% ikan produk olah 120%
masuk pabri 80% masuk pabr 80%
Perikanan Lada
dan sejahtera.
hasil hasil
panen olahan
lada lada
18,568 9,284
20,545 10,273
22,523 11,261
24,500 12,250
26,478 13,239
28,455 14,228
30,433 15,216
32,410 16,205
34,388 17,194
36,365 18,183
38,343 19,171
40,321 20,160
42,298 21,149
44,276 22,138
46,253 23,127
48,231 24,115
50,208 25,104
52,186 26,093
54,163 27,082
56,141 28,070
58,118 29,059
60,096 30,048
62,073 31,037
64,051 32,026
66,029 33,014
68,006 34,003
1 teus = 10 ton
9 ton/tahun dan propan 9 ton/tahun. Selain CPO, pabrik ini juga menghasilkan produk berupa Palm Kernel Oil (PKO) yang diha
nel Oil (PKO) yang dihasilkan sebanyak 9.338 ton/tahun.
Kelapa Sawit 2010 2011 2012 2013 2014 2015 2016
provinsi 52,321 72,532 91,111 94,796 100,593 107,084 120,223 0.94683
Pulau bangka 46,127 70,746 89,029 92,138 95,170 101,004 113,831
Hinterland 24,923 26,713 28,396 39,751 41,419 46,721 49,141 0.40875
Bagged Cargo
No Keterangan 2022-2027 2022-2032
1 Jumlah bongkar muat (ton/tahun) 158,716 270,735
2 Rata-rata volume muatan kapal (ton) 4,000 4,000
3 Jumlah kunjungan kapal (kapal/tahun) 40 68
4 handling rate (ton/jam) 60 60
5 service time (jam/kapal) 80 80
6 waktu efektif (jam/tahun) 6,930 6,930
7 berth occupancy rate (BOR) 70% 70%
8 kebutuhan jumlah tambatan 0.65 1.12
9 kebutuhan jumlah tambatan (pembulatan) 1 1
10 panjang kapal (LOA) (meter) 104 104
11 kebutuhan panjang dermaga (meter) 125 125
Curah Cair
No Keterangan 2022-2027 2022-2032
1 Jumlah bongkar muat (ton/tahun) 122,749 202,336
2 Rata-rata volume muatan kapal (ton) 4,000 4,000
3 Jumlah kunjungan kapal (kapal/tahun) 31 51
4 handling rate (ton/jam) 100 100
5 service time (jam/kapal) 48 48
6 waktu efektif (jam/tahun) 6,930 6,930
7 berth occupancy rate (BOR) 70% 70%
8 kebutuhan jumlah tambatan 0.30 0.50
9 kebutuhan jumlah tambatan (pembulatan) 1 1
10 panjang kapal (LOA) (meter) 97 97
11 kebutuhan panjang dermaga (meter) 116 116
Curah Kering
No Keterangan 2022-2027 2022-2032
1 Jumlah bongkar muat (ton/tahun) 14,799 27,000
2 Rata-rata volume muatan kapal (ton) 2,100 2,100
3 Jumlah kunjungan kapal (kapal/tahun) 7 13
4 handling rate (ton/jam) 100 100
5 service time (jam/kapal) 25 25
6 waktu efektif (jam/tahun) 6,930 6,930
7 berth occupancy rate (BOR) 70% 70%
8 kebutuhan jumlah tambatan 0.04 0.07
9 kebutuhan jumlah tambatan (pembulatan) 1 1
10 panjang kapal (LOA) (meter) 140 140
11 kebutuhan panjang dermaga (meter) 168 168
Petikemas
rekapitulasi
No Keterangan 2022-2027 2022-2032
1 General Cargo
Kebutuhan jumlah tambatan (unit) 1 2
Kebutuhan panjang dermaga (m) 125 239
2 Bagged Cargo
Kebutuhan jumlah tambatan (unit) 1 1
Kebutuhan panjang dermaga (m) 125 125
3 Curah Cair
Kebutuhan jumlah tambatan (unit) 1 1
Kebutuhan panjang dermaga (m) 116 116
4 Curah Kering
Kebutuhan jumlah tambatan (unit) 1 1
Kebutuhan panjang dermaga (m) 168 168
5 Petikemas
Kebutuhan jumlah tambatan (unit) 1 1
Kebutuhan panjang dermaga (m) 122 122
5 Total
Kebutuhan jumlah tambatan (unit) 4 5
Kebutuhan panjang dermaga (m) 540 771
372
all
No Keterangan 2022-2027 2022-2032
1 Jumlah bongkar muat (ton/tahun) 959,443 1,542,585
2 Rata-rata volume muatan kapal (ton) 3,000 3,000
3 Jumlah kunjungan kapal (kapal/tahun) 320 514
4 handling rate (ton/jam) 80 80
5 service time (jam/kapal) 45 45
6 waktu efektif (jam/tahun) 6,930 6,930
7 berth occupancy rate (BOR) 70% 70%
8 kebutuhan jumlah tambatan 2.97 4.77
9 kebutuhan jumlah tambatan (pembulatan) 3 5
10 panjang kapal (LOA) (meter) 97 97
11 kebutuhan panjang dermaga (meter) 310 514
2022-2042
467,670
4,000 2000
117 - Terminal Pelra/ Lokal
60 Jenis Kapal
80 - TUKS GC
6,930 Bagged Cargo
70% Curah Cair
1.93 860 Curah Kering
2 1485 Petikemas
104 100
239 640
2022-2042
309,928 30000
4,000
77
60
80
6,930
70%
1.28
1
104
125
2022-2042
264,362
4,000 5000 dwt
66
100
48
6,930
70%
0.65
1
97
116
2022-2042
36,960
2,100 10000 DWT
18
100
25
6,930
70%
0.09
1
140
168
2022-2042
78,886
240 30.000 DWT
329
15
19
6,930
70%
1.30
1
102
122
rencana pembangunan
2022-2042 No Keterangan #REF!
General Cargo
2 Kebutuhan jumlah tambatan (unit) #REF!
239 Kebutuhan panjang dermaga (m)
Bagged Cargo
1 Kebutuhan jumlah tambatan (unit)
125 #REF! Kebutuhan panjang dermaga (m)
Curah Cair
1 Kebutuhan jumlah tambatan (unit)
116 Kebutuhan panjang dermaga (m)
Curah Kering
1 Kebutuhan jumlah tambatan (unit)
168 Kebutuhan panjang dermaga (m)
Petikemas
1 Kebutuhan jumlah tambatan (unit)
122 Kebutuhan panjang dermaga (m)
5
771
2022-2042
1,867,782
3,000
623
80
45
6,930
70%
5.78
6
97
616
DWT LOA Lebar Draft Kapasitas (ton)
5000 104 16 6.1 4000 80%
5000 104 16 6.1 4000 80%
5000 97 16 6.1 4000 80%
7000 140 16.5 4.7 2100 30%
5000 102 18 6.4 300 80%
GT 2877
dwt 3560.644
#REF! 2022-20272022-20322022-2042 #REF! 0
General Cargo
No Keterangan 2022-2027 2022-2032
1 Jumlah bongkar muat (ton/tahun) 220,067 392,632
2 Lama penumpukan (hari) 7 7
3 Stowage factor / Kebutuhan ruang (m3/ton) 1 1
4 Stacking Height / tinggi tumpukan (m) 3 3
5 Broken stowage 30% 30%
6 kebutuhan total area penumpukan (m2) 2,223 3,966
7 - lapangan penumpukan (m2) 1,778 3,173
8 - gudang (m2) 445 793
Bagged Cargo
No Keterangan 2022-2027 2022-2032
1 Jumlah bongkar muat (ton/tahun) 158,716 270,735
2 Lama penumpukan (hari) 7 7
3 Stowage factor / Kebutuhan ruang (m3/ton) 1 1
4 Stacking Height / tinggi tumpukan (m) 3 3
5 Broken stowage / sirkulasi 30% 30%
6 kebutuhan total area penumpukan (m2) 1,603 2,735
7 - lapangan penumpukan (m2) 1,283 2,188
8 - gudang (m2) 321 547
Curah Cair
No Keterangan 2022-2027 2022-2032
1 Jumlah bongkar muat (ton/tahun) 122,749 202,336
2 lama penumpukan (hari) 7 7
3 Stowage factor (m3/ton) 1.25 1.25
4 tinggi tumpukan (m) 9 9
5 broken stowage (BS) 30% 30%
6 kebutuhan lapangan penumpukan (m2) 517 852
Rumah Pompa (m2) 100 100
Curah Kering
No Keterangan 2022-2027 2022-2032
1 Jumlah bongkar muat (ton/tahun) 14,799 27,000
2 lama penumpukan (hari) 7 7
3 Stowage factor (m3/ton) 1.25 1.25
4 tinggi tumpukan (m) 3 3
5 broken stowage (BS) 30% 30%
6 kebutuhan lapangan penumpukan (m2) 187 341
Petikemas
No Keterangan 2022-2027 2022-2032
1 Jumlah bongkar muat (teus/tahun) 44,311 64,988
2 lama penumpukan (hari) 7 7
3 Stowage factor (m3/teu) 12.00 12.00
4 tinggi tumpukan (teu) 3 3
5 broken stowage (BS) 30% 30%
6 kebutuhan lapangan penumpukan (m2) 5,371 7,877
7 Gudang CFS 3,739 5,484
Fasilitas Pendukung
No Keterangan 2022-2027 2022-2032
Bunker BBM 1,375 1,375
Pemadam Kebakaran
Ruang Terbuka Hijau 0 0
Kantor KSOP 100 100
Kantor Operator 150 150
Pos Jaga 30 30
Parkir
- mobil kantor 150 150
- truk kargo 315 315
- truk CPO 315 315
- truk Petikemas 1,178 1,727
Ruang Genset 24 24
General Cargo
No Keterangan 2022-2027 2022-2032
1 Jumlah bongkar muat (ton/tahun) 378,783 663,367
2 Lama penumpukan (hari) 7 7
3 Stowage factor / Kebutuhan ruang (m3/ton) 0.6 0.6
4 Stacking Height / tinggi tumpukan (m) 3 3
5 Broken stowage 20% 20%
6 kebutuhan total area penumpukan (m2) 1,406 2,462
7 - lapangan penumpukan (m2) 703 1,231
8 - gudang (m2) 703 1,231
2022-2042
467,670
7
1
3
30%
4,724
3,779 0.8 0.8 0.8
945 0.2 0.2 0.2
2022-2042
309,928
7
1
3
30%
3,131 25
2,504 0.8 0.8 0.8
626 0.2 0.2 0.2
2022-2042
264,362
7
1.25 2 3 4
9 8167.14
30% 22
1,113
100
2022-2042
36,960
7
1.25
3
30%
467
2022-2042
78,886
7
12.00
3
30%
9,562
6,657 42
2022-2042
1,375
0
100
150
30
150
315
315
2,097 6.656696
24
2022-2042
777,598
7
0.6
3
20%
2,887
1,443 0.5 0.5 0.5
1,443 0.5 0.5 0.5
Pekerjaan Satuan Harga Satuan ALT. LOKASI 1 RAMBAK
(Rp) Vol.
1 Dermaga
- Dermaga Multipurpose m2 24,035,799 13,500
- Dermaga Curah Cair
platform (20x15 m) m2 24,035,799 300
breasting dolphin (7x5 m) bh 4,157,275,057 2
mooring dolphin (5x5 m) bh 1,411,165,262 2
2 Trestle
- Dermaga Multipurpose m2 21,965,847 16,800
- Dermaga Curah Cair m2 21,965,847 5,600
3 Causeway m2 8,030,165 -
4 Reklamasi m3 397,153 -
5 Pengerukan m3 90,916 -
6 Breakwater m2 - -
7 Zona General Cargo
- Gudang Lini 1 m2 3,000,000 750
- Gudang Cold Storage m2 3,500,000 750
- Gudang Lini 2 m2 3,000,000 1,600
- Lapangan Penumpukan m2 2,304,006 1,600
- Areal Parkir m2 2,304,006 540
8 Zona Petikemas
- Lapangan Penumpukan m2 2,304,006 16,000
- Areal Parkir m2 2,304,006 3,200
- Gudang CFS m2 5,000,000 6,720
9 Zona Curah Cair
- Lapangan Penumpukan m2 2,304,006 3,600
- Tangki Penyimpanan CPO bh 1,500,000,000 4
- Rumah Pompa m2 4,000,000 100
- Areal Parkir m2 2,304,006 540
10 Zona Curah Kering
- Lapangan Penumpukan m2 2,304,006 400
- Areal Parkir m2 2,304,006 180
11 Zona Perkantoran
Kantor KSOP m2 4,000,000 150
Kantor Operator Pelabuhan m2 4,000,000 150
Kantor CIQ m2 4,000,000 150
Kantor Agen Pelayaran m2 4,000,000 150
12 Fasilitas Pendukung
Jalan Pelabuhan m2 2,489,679 14,400
Pemadam Kebakaran ls 1,500,000,000 1
Bunker BBM m2 10,000,000 200
Gudang B3 m2 3,500,000 100
Pengolahan Limbah ls 3,500,000 200
Ruang Genset ls 100,000,000 1
Menara Air ls 5,000,000 1
Bengkel SBNP m2 3,000,000 100
Gate, Pagar, Pos Keamanan ls 50,000,000 1
Ruang Terbuka Hijau m2 1,500,000 820
Jumlah
PPN 10%
Total
biaya personil
No. Posisi Jml Gaji / bulan ALT. LOKASI 1 RAMBAK
( Org ) (Rp) Vol.
1 staf pelabuhan 5 3,000,000 60
maintenance
No Keterangan biaya ALT. LOKASI 1 RAMBAK
nilai aset
1 fasilitas laut 0.10% ###
2 bangunan darat 0.50% ###
TOTAL
trestle
causeway
pengerukan
mooring dolphin
breasting
platform
reklamasi/urugan
jalan
konstruksi
Pekerjaan Satuan Harga Satuan ALT. LOKASI 1
(Rp) Vol.
1 Dermaga
- Dermaga Multipurpose m2 24,035,799 13,500
- Dermaga Curah Cair
platform (20x15 m) m2 24,035,799 300
breasting dolphin (7x5 m) bh 4,157,275,057 2
mooring dolphin (5x5 m) bh 1,411,165,262 2
2 Trestle
- Dermaga Multipurpose m2 21,965,847 16,800
- Dermaga Curah Cair m2 21,965,847 5,600
3 Causeway m2 8,030,165 -
4 Reklamasi m3 397,153 -
5 Pengerukan m3 90,916 -
6 Zona General Cargo m2
- Gudang Lini 1 m2 3,000,000 750
- Gudang Cold Storage m2 3,500,000 750
- Gudang Lini 2 m2 3,000,000 1,600
- Lapangan Penumpukan m2 2,304,006 1,600
- Areal Parkir m2 2,304,006 540
7 Zona Petikemas m2
- Lapangan Penumpukan m2 2,304,006 16,000
- Areal Parkir m2 2,304,006 3,200
- Gudang CFS m2 5,000,000 6,720
8 Zona Curah Cair
- Lapangan Penumpukan m2 2,304,006 3,600
- Tangki Penyimpanan CPO bh 1,500,000,000 4
- Rumah Pompa m2 4,000,000 100
- Areal Parkir m2 2,304,006 540
9 Zona Curah Kering
- Lapangan Penumpukan m2 2,304,006 400
- Areal Parkir m2 2,304,006 180
10 Zona Perkantoran
Kantor KSOP m2 4,000,000 150
Kantor Operator Pelabuhan m2 4,000,000 150
Kantor CIQ m2 4,000,000 150
Kantor Agen Pelayaran m2 4,000,000 150
11 Fasilitas Pendukung
Jalan Pelabuhan m2 2,489,679 14,400
Pemadam Kebakaran ls 1,500,000,000 1
Bunker BBM m2 10,000,000 200
Gudang B3 m2 3,500,000 100
Pengolahan Limbah ls 3,500,000 200
Ruang Genset ls 100,000,000 1
Menara Air ls 5,000,000 1
Bengkel SBNP m2 3,000,000 100
Gate, Pagar, Pos Keamanan ls 50,000,000 1
Ruang Terbuka Hijau m2 1,500,000 820
Jumlah
PPN 10%
Total
biaya personil
No. Posisi Jml Gaji / bulan ALT. LOKASI 1
( Org ) (Rp) Vol.
1 staf pelabuhan 5 3,000,000 60
maintenance
No Keterangan biaya ALT. LOKASI 1
nilai aset
1 fasilitas laut 0.10% 834,865,875,088
2 bangunan darat 0.50% 154,203,768,341
TOTAL
989,069,643,429 1,462,844,666,475
98,906,964,343 146,284,466,648
1,087,976,607,772 1,609,129,133,123
180,000,000 60 180,000,000 60
ALT. LOKASI 3
Total (Rp.)
180,000,000
ALT. LOKASI 3
Total (Rp.)
435,512,394
771,018,842
1,206,531,235
ALT. LOKASI 3
Total (Rp.)
120,000,000
60,000,000
90,000,000
270,000,000
ALT. LOKASI 3
Total (Rp.)
180,000,000
435,512,394
771,018,842
120,000,000
60,000,000
90,000,000
1,656,531,235
2015 2021
17,766,000 24,035,799 1.0407 dermaga
Jumlah
PPN 10%
Total
biaya personil
No. Posisi Jml Gaji / bulan ALT. LOKASI 2
( Org ) (Rp) Vol.
1 staf pelabuhan 5 3,000,000 60
maintenance
No Keterangan biaya ALT. LOKASI 2
Vol.
1 fasilitas laut 0.10% 873,613,363,873
2 bangunan darat 0.50% 154,203,768,341
TOTAL
ALT. LOKASI 2
Total (Rp.)
180,000,000 2017
fs
ALT. LOKASI 2
Total (Rp.)
873,613,364
771,018,842
1,644,632,206
ALT. LOKASI 2
Total (Rp.)
120,000,000
60,000,000
90,000,000
270,000,000
ALT. LOKASI 2
Total (Rp.)
180,000,000
873,613,364
771,018,842
120,000,000
60,000,000
90,000,000
2,094,632,206
2021
24,035,799 1.0407 dermaga
21,965,847 trestle
8,030,165 causeway
2,304,006 lapangan
90,916 pengerukan
4,157,275,057 breasting
43,398,666 platform
397,153 reklamasi/urugan
2,489,679 jalan
2018 2019 2020
Alur Pelayaran W = Lebar alur pelayaran W = 9B + 30 (m) 174 174 179 192
Areal Kolam Putar D = Diameter kolam putar D > 2L (m) 208 194 280 204
15291230
2708770
1 2 3 4 5 6
Uraian
2023 2024 2025 2026 2027 2028
Produksi 1,067,391 1,116,259 1,165,127 1,213,995 2,482,132 2,576,365
General cargo 93,358 97,527 101,696 105,865 220,067 228,404
Bagged Cargo 70,648 72,826 75,003 77,181 158,716 163,071
Curah Cair 63,160 68,163 73,166 78,169 122,749 129,252
Curah Kering 6,813 7,529 8,245 8,961 14,799 15,865
Petikemas 30,059 31,011 31,963 32,915 44,311 45,810
Kapal General Cargo 23 24 25 26 55 57
Kapal Bagged Cargo 18 18 19 19 40 41
Kapal Tanker Curah cair 16 17 18 20 31 32
Kapal curah kering 3 4 4 4 7 8
Kapal Petikemas 100 103 107 110 148 153
Kunjungan Kapal 160 167 173 179 280 290
7 8 9 10
2029 2030 2031 2032
2,670,598 2,764,831 2,859,063 4,399,388
236,742 245,079 253,417 392,632
167,426 171,780 176,135 270,735
135,754 142,257 148,759 202,336
16,931 17,997 19,063 27,000
47,310 48,809 50,308 64,988
59 61 63 98
42 43 44 68
34 36 37 51
8 9 9 13
158 163 168 217
301 311 321 446
TABEL
FINANCIAL ANALYSIS (NPV, FIRR, Payback Period and BCR)
PELABUHAN PENGGANTI (PENGEMBANGAN) PANGKALBALAM
4 Biaya
Pemeliharaan Juta Rp.
Operasi Juta Rp. 27%
Asuransi Juta Rp. 0.50%
2,641,035 - - -
(2,641,035) 11,289 12,188 13,081
1.000 0.909 0.826 0.751
- 2,641,035 10,262 10,073 9,828
(2,641,035) (2,630,773) (2,620,700) (2,610,872)
- - - - -
15,498 34,802 36,466 40,889 42,626
0.683 0.621 0.564 0.513 0.467
10,585 21,609 20,584 20,982 19,885
(2,600,287) (2,578,677) (2,558,093) (2,537,111) (2,517,226)
- - - - -
44,353 73,628 76,250 78,861 86,464
0.424 0.386 0.350 0.319 0.290
18,810 28,387 26,725 25,128 25,045
(2,498,416) (2,470,029) (2,443,304) (2,418,176) (2,393,131)
- - - - -
89,192 91,907 100,312 100,435 100,543
0.263 0.239 0.218 0.198 0.180
23,487 22,002 21,831 19,871 18,083
(2,369,644) (2,347,642) (2,325,811) (2,305,940) (2,287,857)
- - - - -
106,688 106,784 106,402 112,383 111,962
0.164 0.149 0.135 0.123 0.112
17,444 15,873 14,378 13,806 12,504
(2,270,412) (2,254,540) (2,240,161) (2,226,356) (2,213,852)
- - - - -
111,521 117,757 117,271 116,760 123,258
0.102 0.092 0.084 0.076 0.069
11,322 10,869 9,840 8,906 8,547
(2,202,530) (2,191,661) (2,181,821) (2,172,915) (2,164,368)
- - - - -
122,695 122,103 128,869 128,216 127,532
0.063 0.057 0.052 0.047 0.043
7,735 6,998 6,714 6,073 5,491
(2,156,634) (2,149,636) (2,142,922) (2,136,850) (2,131,358)
- - - - -
134,569 133,814 133,021 140,332 139,458
0.039 0.036 0.032 0.029 0.027
5,267 4,762 4,303 4,127 3,728
(2,126,091) (2,121,329) (2,117,026) (2,112,899) (2,109,171)
- - - - -
138,541 146,128 145,116 144,054 151,917
0.024 0.022 0.020 0.018 0.017
3,367 3,229 2,915 2,630 2,522
(2,105,804) (2,102,575) (2,099,660) (2,097,030) (2,094,508)
- - - - -
150,746 149,516 157,652 156,297 154,873
0.015 0.014 0.012 0.011 0.010
2,275 2,051 1,966 1,772 1,596
(2,092,233) (2,090,182) (2,088,216) (2,086,443) (2,084,847)
- - - - -
163,277 161,708 160,060 168,723 166,906
0.009 0.009 0.008 0.007 0.006
1,530 1,378 1,240 1,188 1,068
(2,083,317) (2,081,940) (2,080,700) (2,079,512) (2,078,444)
- - - - -
164,998 173,909 171,805 169,597 178,737
0.006 0.005 0.005 0.004 0.004
960 920 826 741 710
(2,077,484) (2,076,564) (2,075,738) (2,074,997) (2,074,286)
- - - - -
176,303 173,746 183,094 180,275 177,316
0.004 0.003 0.003 0.003 0.002
637 571 547 489 438
(2,073,649) (2,073,079) (2,072,532) (2,072,043) (2,071,605)
- - - - -
186,842 183,579 180,153 189,821 186,044
0.002 0.002 0.002 0.002 0.002
419 374 334 320 285
(2,071,186) (2,070,812) (2,070,478) (2,070,158) (2,069,873)
- - - - -
182,078 191,843 187,470 182,879 192,683
0.001 0.001 0.001 0.001 0.001
254 243 216 191 183
(2,069,619) (2,069,376) (2,069,161) (2,068,969) (2,068,786)
90.5 90.5
60.0 60.0
51.2 51.2
19.1 19.1
203.5 203.5
113.1 113.1
75.0 75.0
33.3 33.3
23.8 23.8
254.4 254.4
108,408 108,408
71,843 71,843
29,414 29,414
7,493 7,493
171,731 171,731
6,033 6,033
1,000 1,000
5,036 5,036
704 704
15,265 15,265
230,228 235,543
106,293 111,607
110,730 110,730
13,205 13,205
- -
187,622 182,307
0.001 0.001
162 143
(2,068,624) (2,068,480)
230,228 235,543
417,850 417,850
199 185
361 329
TABEL
FINANCIAL ANALYSIS (NPV, FIRR, Payback Period and BCR)
PELABUHAN PENGGANTI (PENGEMBANGAN) PANGKALBALAM
d Jasa Penumpukan
2000 General cargo Rp/ton/m3/hari 2,500
2000 Bagged Cargo Rp/ton/m3/hari 2,500
2250 Curah Cair Rp/ton/m3/hari 2,813
2250 Curah Kering Rp/ton/m3/hari 2,813
20000 Petikemas Rp/Teus/hari 25,000
e Jasa trucking
3500 General cargo Rp/ton
3500 Bagged Cargo Rp/ton
3500 Curah Cair Rp/ton
3500 Curah Kering Rp/ton
35000 Petikemas Rp/teus
4 Biaya 0 20,983
Pemeliharaan Juta Rp. 3,018
Operasi Juta Rp. 27% rev 9,919
Asuransi Juta Rp. 0.50% asset (T) 8,046
60 60 63 63 63 66
60 60 63 63 63 66
60 60 63 63 63 66
60 60 63 63 63 66
60 60 63 63 63 66
75 75 79 79 79 83
75 75 79 79 79 83
39 39 41 41 41 43
75 75 79 79 79 83
75 75 79 79 79 83
- - - - - -
66 66 69 69 69 73
66 66 69 69 69 73
66 66 69 69 69 73
66 66 69 69 69 73
66 66 69 69 69 73
83 83 87 87 87 91
83 83 87 87 87 91
43 43 45 45 45 47
83 83 87 87 87 91
83 83 87 87 87 91
- - - - - -
73 73 77 77 77 80
73 73 77 77 77 80
73 73 77 77 77 80
73 73 77 77 77 80
73 73 77 77 77 80
91 91 96 96 96 101
91 91 96 96 96 101
47 47 50 50 50 52
91 91 96 96 96 101
91 91 96 96 96 101
- - - - - -
80 80 84 84 84 89
80 80 84 84 84 89
80 80 84 84 84 89
80 80 84 84 84 89
80 80 84 84 84 89
- - - - - -
89 89 93 93 93 98
89 89 93 93 93 98
89 89 93 93 93 98
89 89 93 93 93 98
89 89 93 93 93 98
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
194 194
194 194
194 194
194 194
194 194
242 242
242 242
126 126
242 242
242 242
231,804 231,804
231,804 231,804
111,266 111,266
202,738 202,738
2,176,942 2,176,942
8,063 8,063
8,063 8,063
9,071 9,071
9,071 9,071
80,627 80,627
417,850 417,850
90.5 90.5
60.0 60.0
51.2 51.2
19.1 19.1
203.5 203.5
113.1 113.1
75.0 75.0
33.3 33.3
23.8 23.8
254.4 254.4
108,408 108,408
71,843 71,843
29,414 29,414
7,493 7,493
171,731 171,731
6,033 6,033
1,000 1,000
5,036 5,036
704 704
15,265 15,265
225,068 230,383
106,293 111,607
110,730 110,730
8,046 8,046
- -
192,781 187,467
0.001 0.001
167 147
(985,167) (985,019)
225,068 230,383
417,850 417,850
195 181
361 329
TABEL
FINANCIAL ANALYSIS (NPV, FIRR, Payback Period and BCR)
PELABUHAN PENGGANTI (PENGEMBANGAN) PANGKALBALAM
d Jasa Penumpukan
2000 General cargo Rp/ton/m3/hari
2000 Bagged Cargo Rp/ton/m3/hari
2250 Curah Cair Rp/ton/m3/hari
2250 Curah Kering Rp/ton/m3/hari
20000 Petikemas Rp/Teus/hari
e Jasa trucking
3500 General cargo Rp/ton
3500 Bagged Cargo Rp/ton
3500 Curah Cair Rp/ton
3500 Curah Kering Rp/ton
35000 Petikemas Rp/teus
60 60 60 63 63 63 66
60 60 60 63 63 63 66
60 60 60 63 63 63 66
60 60 60 63 63 63 66
60 60 60 63 63 63 66
75 75 75 79 79 79 83
75 75 75 79 79 79 83
39 39 39 41 41 41 43
75 75 75 79 79 79 83
75 75 75 79 79 79 83
66 66 69 69 69 73 73
66 66 69 69 69 73 73
66 66 69 69 69 73 73
66 66 69 69 69 73 73
66 66 69 69 69 73 73
83 83 87 87 87 91 91
83 83 87 87 87 91 91
43 43 45 45 45 47 47
83 83 87 87 87 91 91
83 83 87 87 87 91 91
73 77 77 77 80 80
73 77 77 77 80 80
73 77 77 77 80 80
73 77 77 77 80 80
73 77 77 77 80 80
91 96 96 96 101 101
91 96 96 96 101 101
47 50 50 50 52 52
91 96 96 96 101 101
91 96 96 96 101 101
80 84 84 84 89 89
80 84 84 84 89 89
80 84 84 84 89 89
80 84 84 84 89 89
80 84 84 84 89 89
89 93 93 93 98 98
89 93 93 93 98 98
89 93 93 93 98 98
89 93 93 93 98 98
89 93 93 93 98 98
194
194
194
194
194
242
242
126
242
242
231,804
231,804
111,266
202,738
2,176,942
8,063
8,063
9,071
9,071
80,627
417,850
90.5
60.0
51.2
19.1
203.5
113.1
75.0
33.3
23.8
254.4
108,408
71,843
29,414
7,493
171,731
6,033
1,000
5,036
704
15,265
227,990
111,607
110,730
5,653
-
189,859
0.001
149
(482,581)
227,990
417,850
179
329
TABEL
FINANCIAL ANALYSIS (NPV, FIRR, Payback Period and BCR)
PELABUHAN PENGGANTI (PENGEMBANGAN) PANGKALBALAM
d Jasa Penumpukan
2000 General cargo Rp/ton/m3/hari 2,500
2000 Bagged Cargo Rp/ton/m3/hari 2,500
2250 Curah Cair Rp/ton/m3/hari 2,813
2250 Curah Kering Rp/ton/m3/hari 2,813
20000 Petikemas Rp/Teus/hari 25,000
e Jasa trucking
3500 General cargo Rp/ton
3500 Bagged Cargo Rp/ton
3500 Curah Cair Rp/ton
3500 Curah Kering Rp/ton
35000 Petikemas Rp/teus
Jasa trucking
General cargo
Bagged Cargo
Curah Cair
Curah Kering
Petikemas
4 Biaya 0 18,377
Pemeliharaan Juta Rp. 3,018
Operasi Juta Rp. 27% rev 9,919
Asuransi Juta Rp. 0.50% asset (T) 5,440
60 60 63 63 63 66 66
60 60 63 63 63 66 66
60 60 63 63 63 66 66
60 60 63 63 63 66 66
60 60 63 63 63 66 66
75 75 79 79 79 83 83
75 75 79 79 79 83 83
39 39 41 41 41 43 43
75 75 79 79 79 83 83
75 75 79 79 79 83 83
- - - - - - -
66 69 69 69 73 73 73
66 69 69 69 73 73 73
66 69 69 69 73 73 73
66 69 69 69 73 73 73
66 69 69 69 73 73 73
83 87 87 87 91 91 91
83 87 87 87 91 91 91
43 45 45 45 47 47 47
83 87 87 87 91 91 91
83 87 87 87 91 91 91
- - - - - - -
77 77 77 80 80 80
77 77 77 80 80 80
77 77 77 80 80 80
77 77 77 80 80 80
77 77 77 80 80 80
- - - - - -
84 84 84 89 89 89
84 84 84 89 89 89
84 84 84 89 89 89
84 84 84 89 89 89
84 84 84 89 89 89
- - - - - -
93 93 93 98 98 98
93 93 93 98 98 98
93 93 93 98 98 98
93 93 93 98 98 98
93 93 93 98 98 98
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
d Jasa Penumpukan
2000 General cargo Rp/ton/m3/hari 2,500
2000 Bagged Cargo Rp/ton/m3/hari 2,500
2250 Curah Cair Rp/ton/m3/hari 2,813
2250 Curah Kering Rp/ton/m3/hari 2,813
20000 Petikemas Rp/Teus/hari 25,000
e Jasa trucking
3500 General cargo Rp/ton
3500 Bagged Cargo Rp/ton
3500 Curah Cair Rp/ton
3500 Curah Kering Rp/ton
35000 Petikemas Rp/teus
60 60 63 63 63 66 66
60 60 63 63 63 66 66
60 60 63 63 63 66 66
60 60 63 63 63 66 66
60 60 63 63 63 66 66
75 75 79 79 79 83 83
75 75 79 79 79 83 83
39 39 41 41 41 43 43
75 75 79 79 79 83 83
75 75 79 79 79 83 83
66 69 69 69 73 73 73
66 69 69 69 73 73 73
66 69 69 69 73 73 73
66 69 69 69 73 73 73
66 69 69 69 73 73 73
83 87 87 87 91 91 91
83 87 87 87 91 91 91
43 45 45 45 47 47 47
83 87 87 87 91 91 91
83 87 87 87 91 91 91
77 77 77 80 80 80
77 77 77 80 80 80
77 77 77 80 80 80
77 77 77 80 80 80
77 77 77 80 80 80
84 84 84 89 89 89
84 84 84 89 89 89
84 84 84 89 89 89
84 84 84 89 89 89
84 84 84 89 89 89
93 93 93 98 98 98
93 93 93 98 98 98
93 93 93 98 98 98
93 93 93 98 98 98
93 93 93 98 98 98
15000 DWT
US$1 per satu deadweighttonne(DWT) kapal per hari jika kapal tidak beroperasi karena mengan
DPP INSA
KONDISI IDEAL PENGGUNAAN KAPAL 6000 TEUs MENURUNKAN BIAYA ANGKUT MENJADI 54,5% DARI BIA
2500 6000
100
KUT MENJADI 54,5% DARI BIAYA ANGKUT DENGAN KAPAL 2500 TEUs
6286.026
4109.943
7724.771
TABEL
ANALISIS EKONOMI
PELABUHAN PENGGANTI (PENGEMBANGAN) PANGKALBALAM
2 Cost 0
Pemeliharaan Juta Rp.
Operasi Juta Rp. 27% rev
Asuransi Juta Rp. 0.50% asset (T)
4 NPV, EIRR
Proceed Juta Rp. (1,130,599)
Discount Factor 10.0% 1.000
NPV Proceed Juta Rp. - 1,130,599
5 Cummulative NPV Juta Rp. (1,130,599)
BCR
Cost Juta Rp. 1,130,599
Benefit Juta Rp. -
NPV Cost Juta Rp. 1,847,249 1,027,817
NPV Benefit Juta Rp. 2,658,242 -
1 2 3 4 5 6
2023 2024 2025 2026 2027 2028
1,194,371 67,465 70,099 74,837 115,534 119,835
8,480 8,821 9,162 9,502 14,855 15,407
1,225 1,280 1,335 1,389 2,888 2,998
927 956 984 1,013 2,083 2,140
829 895 960 1,026 1,611 1,696
238 264 289 314 518 555
5,260 5,427 5,593 5,760 7,754 8,017
11,861 12,353 12,845 13,337 21,771 22,577
2,334 2,438 2,542 2,647 5,502 5,710
1,766 1,821 1,875 1,930 3,968 4,077
1,579 1,704 1,829 1,954 3,069 3,231
170 188 206 224 370 397
6,012 6,202 6,393 6,583 8,862 9,162
37,431 38,860 40,290 43,805 70,307 72,820
1,130,599 1,131 1,187 1,246 1,309 1,374
6,000 6,300 6,615 6,946 7,293 7,658
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - -
2 Cost 0
Pemeliharaan Juta Rp.
Operasi Juta Rp. 27% rev
Asuransi Juta Rp. 0.50% asset (T)
4 NPV, EIRR
Proceed Juta Rp. (1,087,977)
Discount Factor 10.0% 1.000
NPV Proceed Juta Rp. - 1,087,977
5 Cummulative NPV Juta Rp. (1,087,977)
NPV Juta Rp. 723,932
EIRR % 18.79%
BCR Ratio 1.458
BCR
Cost Juta Rp. 1,087,977
Benefit Juta Rp. -
NPV Cost Juta Rp. 1,795,905 989,070
NPV Benefit Juta Rp. 2,618,744 -
1 2 3 4 5 6
2023 2024 2025 2026 2027 2028
1,151,749 67,422 70,054 74,790 115,485 119,783
8,480 8,821 9,162 9,502 14,855 15,407
1,225 1,280 1,335 1,389 2,888 2,998
927 956 984 1,013 2,083 2,140
829 895 960 1,026 1,611 1,696
238 264 289 314 518 555
5,260 5,427 5,593 5,760 7,754 8,017
11,861 12,353 12,845 13,337 21,771 22,577
2,334 2,438 2,542 2,647 5,502 5,710
1,766 1,821 1,875 1,930 3,968 4,077
1,579 1,704 1,829 1,954 3,069 3,231
170 188 206 224 370 397
6,012 6,202 6,393 6,583 8,862 9,162
37,431 38,860 40,290 43,805 70,307 72,820
1,087,977 1,088 1,142 1,199 1,259 1,322
6,000 6,300 6,615 6,946 7,293 7,658
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - -
2 Cost 0
Pemeliharaan Juta Rp.
Operasi Juta Rp. 27% rev
Asuransi Juta Rp. 0.50% asset (T)
4 NPV, EIRR
Proceed Juta Rp. (1,028,889)
Discount Factor 10.0% 1.000
NPV Proceed Juta Rp. - 1,028,889
5 Cummulative NPV Juta Rp. (1,028,889)
BCR
Cost Juta Rp. 1,028,889
Benefit Juta Rp. -
NPV Cost Juta Rp. 1,724,726 935,353
NPV Benefit Juta Rp. 2,563,988 -
1 2 3 4 5 6
2023 2024 2025 2026 2027 2028
1,092,661 67,363 69,992 74,725 115,416 119,711
8,480 8,821 9,162 9,502 14,855 15,407
1,225 1,280 1,335 1,389 2,888 2,998
927 956 984 1,013 2,083 2,140
829 895 960 1,026 1,611 1,696
238 264 289 314 518 555
5,260 5,427 5,593 5,760 7,754 8,017
11,861 12,353 12,845 13,337 21,771 22,577
2,334 2,438 2,542 2,647 5,502 5,710
1,766 1,821 1,875 1,930 3,968 4,077
1,579 1,704 1,829 1,954 3,069 3,231
170 188 206 224 370 397
6,012 6,202 6,393 6,583 8,862 9,162
37,431 38,860 40,290 43,805 70,307 72,820
1,028,889 1,029 1,080 1,134 1,191 1,251
6,000 6,300 6,615 6,946 7,293 7,658
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - -