NERACA MASSA
STERILIZER
<1> <5>
<4>
KONDENSAT <4>
Slurry 8.0 2400
Minyak 0.55 13.20
Air 97.2 2331.84
Impurities 2.29 54.96
TBS MASAK<5>
TBS masak 30000
Buah sawit 72.4 21705
Mesocarp 81.9 17784.6
Minyak 84.9 15102.44
Air 5.0 889.23
Serat 10.1 1792.93
Cangkang 12.6 2286.9
Inti 5 1633.5
Minyak Inti 79 1290.47
Air 10 163.35
Daging Inti 11 179.69
Tandan kosong 27.7 8295
Masuk Keluar
No. Komponen Aliran <1> Aliran <2> Aliran <3> Aliran <4> Aliran <5>
x m x m x m x m x m
1 Buah sawit 0.61 18150 0.7 21705
2 Tandan kosong 0.40 11850 0.3 8295
3 Steam 1 4883
4 Exhause steam 1 2483
5 Kondensat 1 2400
1 30000 1 4883 1 2483 1 2400 1 30000
TOTAL
34883 34883
2. THRESSER
<5> <6>
THRESSER
<7>
Masuk Keluar
No. Komponen Aliran <5> Aliran <6> Aliran <7>
x m x m x m
1 Buah sawit 0.72 21705 1 21705
2 Tandan kosong 0.28 8295 1 8295
1 30000 1 8295 1 21705
TOTAL
30000 30000
3. DIGESTER
<8>
<7> <9 >
DIGESTER
Masuk Keluar
No. Komponen Aliran <7> Aliran <8> Aliran <9>
x m x m x m
1 Mesocarp 0.82 17785 0.55 15341
2 Cangkang 0.13 2287 0.08 2287
3 Inti 0.05 1634 0.06 1634
4 Steam 1.00 6430
5 Minyak 0.08 2265
6 Air 0.23 6607
1 21705 1 6429.5 1 28135
TOTAL
28134.51 28134.51
4. SCREW PRESS
< 10 >
Masuk Keluar
No Komponen Aliran <9> Aliran <10> Aliran <11>
x m x m x m
1 Mesocarp 0.55 15341
2 Cangkang 0.08 22870.03 640 0.38 1647
3 Inti 0.06 16340.02 555 0.25 1078
4 Minyak 0.08 22650.63 14910
5 Air 0.23 66070.30 7246
6 Serat 0.02 448 0.37 1610
1 28135 1 23799 1 4335
TOTAL
28135 28135
< 12 >
5. VIBRATING SCREEN I
Masuk Keluar
No. Komponen Aliran <10> Aliran <12> Aliran <13>
x m x m x m
1 Minyak 0.63 14910 0.01 15 0.66 14895
2 Air 0.30 7246 0.32 7173
3 Serat 0.02 448 0.58 802 0.02 358.6
4 Cangkang 0.03 640
5 Inti 0.02 555 0.40 555
1 23799 1 1373 1 22427
TOTAL
23799 23799
<15>
7. SLUDGE TANK
SLUDGE TANK
<15> <16>
<17>
Masuk Keluar
No Komponen Aliran <15> Aliran <16> Aliran <17>
x m x m x m
1 Minyak 0.04 298 0.81 283 0.00 15
2 Air 0.91 6456 0.19 65 0.94 6391
3 Serat 0.05 359 0.05 359
1 7112 1 347.56 1 6765
TOTAL
7112 7112
8. VIBRATING SCREEN II
< 17 > <18 >
VIBRATING SCREEN 2
<19 >
KE DEPERICARPER<18> 422.50
Air 15.13 63.91
Serat 84.87 358.59
Masuk Keluar
No. Komponen Aliran <17> Aliran <18> Aliran <19>
x m x m x m
1 Minyak 0.00 14.9 0.00 14.89
2 Air 0.94 6391 0.15 63.91 1.00 6327
3 Serat 0.05 358.6 0.85 358.59
1 6765 1 422.50 1 6342
TOTAL
6765 6765
<21>
9. DEPERICARPER
<20> <22>
DEPERICARPER
Masuk Keluar
No Komponen Aliran <20> Aliran <21> Aliran <22>
x m x m x m
1 Minyak 0.00 14.91 0.01 14.91
2 Air 0.03 136.37 0.07 136.37
3 Serat 0.43 1828 0.92 1828
4 Cangkang 0.15 640.3 0.28 640
5 Inti 0.38 1633.5 0.72 1634
1 4253 1 1979 1 2274
TOTAL
4253 4253
<21>
<24>
Masuk Keluar
No Komponen Aliran <21> Aliran <23> Aliran <24>
x m x m x m
1 Minyak 0.01 14.91 0.01 14.91
2 Air 0.07 136.37 0.07 136
3 Serat 0.92 1828 1.00 1.98 0.92 1826
1 1979 1 1.98 1 1977
TOTAL
1979 1979
EKSTRAKTOR
<24>
<25>
<27>
Masuk Keluar
No. Komponen Aliran <24> Aliran <25> Aliran <26> Aliran <27>
x m x m x m x m
1 Minyak 0.01 14.91 0.05 127
2 Air 0.07 136.37 0.01 13.64
3 Serat 0.92 1826 0.95 2516 1 1837
4 CO2 1.00 2516
1 1977 1 2516 1 2656 1 1837
TOTAL
4493 4493
12.SEPARATOR <28> ,
PARATOR
CO2 SEPARATOR
<26>
<29>
Masuk Keluar
No Komponen Aliran <26> Aliran <28> Aliran <29>
x m x m x m
1 Minyak 0.05 126.55 0.90 126.5
2 Air 0.01 13.64 0.10 13.64
3 CO2 0.95 2516 1.00 2516
1 2656 1 2516 1 140.2
TOTAL
2656 2656
<32>
Masuk Keluar
No Komponen Aliran <30> Aliran <31> Aliran <32>
x m x m x m
1 Minyak 0.95 15007 0.96 14706 0.56 300
2 Air 0.05 796 0.04 557 0.44 239
1 15802 1 15263 1 538.8
TOTAL
15802 15802
VACUUM DRYER
<31> <34>
Masuk Keluar
No Komponen Aliran <31> Aliran <33> Aliran <34>
x m x m x m
1 Minyak 0.96 14706 0.99 14706
2 Air 0.04 557 1.00 410 0.01 147.1
1 15263 1 410 1 14854
TOTAL
TOTAL
15263 15263
NOTE : Proses fermentasinya butuh steam atau udara panas? (Butuh dari neraca energi)
BIJI <22> 2273.83
Cangkang 28.16 640.33
Inti 71.84 1633.50
Minyak 79.0 1290.47
Air 10.0 163.35
Daging inti 11.0 179.69
Masuk Keluar
No. Komponen Aliran <22> Aliran <36>
x m x m
1 Cangkang 0.28 640.3 0.28 640.33
2 Inti 0.72 1633.5 0.65 1481.7
3 Air 0.06 138.85
4 Minyak 0.01 12.90
1 2274 1 2273.8
TOTAL
2274 2274
<37>
16. NUT CRACKER
<35> <38>
NUT CRACKER
<36>
BIJI MATANG DARI NUT SILO <35> 2273.83
Air 6.11 138.85
Minyak 0.57 12.90
Cangkang 28.16 640.33
Inti 65.17 1481.75
Minyak Inti 86.2 1277.56
Air 1.7 24.50
Daging Inti 12.1 179.69
Masuk Keluar
No. Komponen Aliran <35> Aliran <36> Aliran <37> Aliran <38>
x m x m x m x m
1 Air 0.06 138.85 0.91 138.85
2 Minyak 0.01 12.90 0.09 12.90
3 Cangkang 0.28 640.33 0.95 627.53 0.009 12.81
4 Inti 0.65 1481.7 0.05 29.63 0.991 1452.11
1 2274 151.75 1 657.16 1 1464.92
TOTAL
2274 2274
<37>
HYDROCYCLONE <40>
<37>
HYDROCYCLONE <40>
<38>
<41>
Masuk Keluar
No. Komponen Aliran <37> Aliran <38> Aliran <39> Aliran <41> Aliran <40>
x m x m x m x m x m
1 Cangkang 0.01 627.5 0.01 12.81 0.4 670.0
2 Inti 0.99 29.63 0.99 1452 0.6 1050 1.0 1452
3 Air 1.00 1061 0.0 10.61
1 657.2 1 1465 1 1061 1 1720 1 1463
TOTAL
3183 3183
Masuk Keluar
No. Komponen Aliran <40> Aliran <42> Aliran <43>
x m x m x m
1 Inti 0.99 1452.1 1.00 1452
2 Air 0.01 10.61 1.00 10.61
1 1462.7 1 10.61 1 1452
TOTAL
1462.72 1462.72
< 44 >
Masuk Keluar
No. Komponen Aliran <43> Aliran <44> Aliran <45>
x m x m x m
1 Minyak 0.86 1255.3 0.96 1192.6 0.31 62.77
2 Air 0.01 21.54 0.02 20.46 0.01 1.08
3 Daging 0.12 175.24 0.03 35.05 0.69 140.2
1 1452.1 1 1248.1 1 204.0
TOTAL
1452.11 1452.11
<47 >
21. VIBRATING SCREEN III
Masuk Keluar
No. Komponen Aliran <44> Aliran <47> Aliran <46>
x m x m x m
1 Minyak 0.96 1192.6 0.98 1192.6
2 Air 0.02 20.46 0.02 20.46
3 Daging 0.03 35.05 1.00 35.05
1 1248.1 1 35.05 1 1213.0
TOTAL
1248 1248
<46>
22. OIL PURIFIER <49>
OIL PURIFIER
<48>
Masuk Keluar
No. Komponen Aliran <49> Aliran <50> Aliran <51>
x m x m x m
1 Minyak 0.98 1192.6 0.70 23.85 0.99 1169
2 Air 0.02 20.46 0.30 10.23 0.01 10.23
1 1213.0 1 34.08 1 1179
TOTAL
1213 1213
Berat molekul :
C = 12 kg/kgmol
H = 1 kg/kgmol
O = 16 kg/kgmol
B-19
Cp Asam miristat (C14H28O2) = 1(CH3) + 12(CH2) + COOH
BM = 228 = 36.82 + 364.56 + 79.91
= 481.29 J/molK
= 2.111 kJ/kgK
Tabel B-3. Komponen penyusun tandan kosong, cangkang, serat, inti (Johari, 2013)
Komponen Hemiselulosa Selulosa Lignin
Tandan kosong 35.3 38.3 22.1
Cangkang 22.7 20.8 50.7
Serat 31.8 34.5 25.7
Inti 20.5 50.77 22
B-20
= 1.284 kJ/kgK
Cp Air
T Cp (kJ/kgK)
0 4.22
10 4.195
20 4.185
25 4.182
30 4.181
40 4.181
50 4.183
60 4.187
70 4.192
80 4.199
90 4.208
100 4.219
T (kJ/kg)
133.48 2164.028
1. STERILIZER
<2> <3>
STERILIZER
<1> <5>
<4>
B-21
Tandan Buah Segar <1>
Peak I
P = 1.5 bar ,
T = 111.3
Bahan masuk
T = 30 C
o
T ref = 25 oC
Komponen m Cp (kJ/kgK) mCp
Buah sawit 18150.00 2.064 37461.013
Tandan kosong 11850.00 1.123 13309.820
TOTAL 30000 50770.833
Cp campuran = 50770.833 kJ/K
30000 kg
= 1.692 kJ/kgK
Bahan keluar
T = 50 C
o
T ref = 25 C
o
Konduksi Alat
B-22
Panjang alat = 12.85 m
Cp steam T=111,3 = 1.89 kJ/kgK
ro = 0.76 m
ri = 0.75 m
k = 21.6 W/mK
S = 2L
Ln (r0/r1)
= 80.682
0.013
= 6091.384
Q = k x S x T
= 2631477.791 kJ
Peak II
P = 2.6 bar
T = 126.87 oC
Bahan masuk
T = 50 C
o
T ref = 25 C
o
Bahan keluar
T = 70 C
o
T ref = 25 C
o
B-23
Tandan kosong 11850.00 1.227 14534.728
TOTAL 30000 50782.591
Konduksi Alat
Panjang alat = 12.85 m
Cp steam T=126,87 oC = 1.9 kJ/kgK
ro = 0.76 m
ri = 0.75 m
k = 21.6 W/mK
S = 2L
Ln (r0/r1)
= 80.682
0.013
= 6091.384
Q = k x S x T
= 2631477.7911 kJ
Peak III
P = 3 bar
T = 133.48 oC
Bahan masuk
T = 70 C
o
T ref = 25 C
o
B-24
TOTAL 30000 50782.591
Bahan keluar
T = 90 C
o
T ref = 25 C
o
Konduksi Alat
Panjang alat = 12.85 m
Cp steam T=133,48 C =
o
1.9 kJ/kgK
ro = 0.76 m
ri = 0.75 m
k = 21.6 W/mK
S = 2L
Ln (r0/r1)
= 80.682
0.013
= 6091.384
Q = k x S x T
B-25
= 2631477.7911 kJ
Q = k x S x T
= 7335.612 kJ
KONDENSAT <4>
Q = m kondensat x
= 3900.00 X 2164.028
= 8439709.2 kj
Masuk Keluar
Aliran kJ Aliran kJ
<1> 3808420.911 <3> 1660151.373
<2> 13307507.730 <4> 8439709.200
<5> 6856336.669
Kond. Alat 7335.612
Q loss 152395.788
TOTAL 17115928.641 TOTAL 17115928.641
DIGESTER
<8>
<7> <9>
DIGESTER
B-26
DIGESTER
P = 3 bar ,
T = 133.48 oC
Bahan masuk
T = 40 C
o
T ref = 25 C
o
Bahan keluar
T = 90 C
o
T ref = 25 C
o
Konduksi Alat
Panjang alat = 18.27 m
B-27
Cp steam T=133,48 oC = 1.9 kJ/kgK
ro = 0.76 m
ri = 0.75 m
k = 21.6 W/mK
S = 2L
Ln (r0/r1)
= 114.736
0.013
= 8662.411
Q = k x S x T
= 9355404.0515 kJ
Masuk Keluar
Aliran kJ Aliran kJ
<7> 650048.489449 <9> 5208281.7779
<8> 13913637.3399 Kond. Alat 9355404.0515
Q loss 227911.66442
TOTAL 14563685.8294 TOTAL 14563685.829
CST
13> <14>
< <15>
Bahan masuk
T = 85 oC
T ref = 25 oC
Komponen m Cp (kJ/kgK) mCp
Serat 358.58592 1.1792837318 422.87454189
Minyak 14894.974401 2.0916777117 31155.48597
Air 7173.0960204 4.2035 30152.109122
TOTAL 22426.656341 61730.469633
B-28
Q = massa TBS x Cp campuran x (T-Tref)
= 22426.656341 x 2.752548962 x 60
= 3703828.178 kJ
Bahan keluar
Aliran 14
T = 90 oC
Tref = 25 oC
Komponen m Cp (kJ/kgK) mCp
Air 717.30960204 4.208 3018.4388054
Minyak 14597.074913 2.0916777117 30532.37625
TOTAL 15314.384515 33550.815056
Aliran 15
T = 90 oC
Tref = 25 oC
Komponen m Cp (kJ/kgK) mCp
Serat 358.58592 1.1792837318 422.87454189
Minyak 297.89948801 2.0916777117 623.1097194
Air 6455.7864184 4.208 27165.949248
TOTAL 7112.2718264 28211.93351
Konduksi Alat
B-29
Panjang alat = 3.5 m
ro = 1.143 m
ri = 1.13 m
k = 21.6 W/mK
S = 2L
Ln (r0/r1)
= 21.98
0.0114407521
= 1921.20237
Q = k x S x T
= 207489.85567 kJ
SLUDGE TANK
SLUDGE TANK
<15> <16>
<17>
Bahan masuk
T = 85
T ref = 25 C
Komponen m Cp (kJ/kgK) mCp
Serat 358.58592 1.1792837318 422.87454189
Minyak 297.89948801 2.0916777117 623.1097194
Air 6455.7864184 4.2035 27136.89821
TOTAL 7112.2718264 28182.882471
B-30
Cp campuran = 28182.88247 kJ/K
7112.271826 kg
= 3.962571054 kJ/kgK
Bahan keluar
Aliran 16
T = 90 C
Tref = 25 C
Komponen m Cp (kJ/kgK) mCp
Air 64.557864184 4.208 271.65949248
Minyak 283.00451361 2.0916777117 591.95423343
TOTAL 347.5623778 863.61372591
Aliran 17
T = 90 C
Tref = 25 C
Komponen m Cp (kJ/kgK) mCp
Serat 358.58592 1.1792837318 422.87454189
Minyak 14.894974401 2.0916777117 31.15548597
Air 6391.2285542 4.208 26894.289756
TOTAL 6764.7094486 27348.319784
B-31
Q = 149942.866375571 kJ
Konduksi Alat
Panjang alat = 2 m
ro = 0.9906 m
ri = 0.68 m
k = 21.6 W/mK
S = 2L
Ln (r0/r1)
= 12.56
0.376220022
= 33.3847198
Q = k x S x T
= 3605.54973348 kJ
Masuk Keluar
Aliran kJ Aliran kJ
< 15 > 1690972.94825 <16 > 56134.892184
Steam 153548.416109 < 17 > 1777640.7859
Kond. Alat 3605.5497335
Q loss 7140.1364941
TOTAL 1844521.36436 TOTAL 1844521.3644
OIL PURIFIER
<30>
<31>
OIL PURIFIER
<32>
Bahan masuk
T = 85 C
Tref = 25 C
Komponen m Cp (kJ/kgK) mCp
Air 795.50424631 4.2035 3343.9020994
Minyak 15006.625229 2.0916777117 31389.023519
B-32
TOTAL 15802.129475 34732.925618
Bahan keluar
Aliran 31
T = 90 C
Tref = 25 C
Komponen m Cp (kJ/kgK) mCp
Air 556.85297242 4.208 2343.2373079
Minyak 14706.492724 2.0916777117 30761.243048
TOTAL 15263.345697 33104.480356
Aliran 32
T = 90 C
Tref = 25 C
Komponen m Cp (kJ/kgK) mCp
Air 238.65127389 4.208 1004.2445605
Minyak 300.13250458 2.0916777117 627.78047038
TOTAL 538.78377847 1632.0250309
B-33
Q loss = 5%
Q = 182592.178736802 kJ
Konduksi Alat
Panjang alat = 0.762 m
ro = 0.62 m
ri = 0.61 m
k = 21.6 W/mK
S = 2L
Ln (r0/r1)
= 4.7853695707
0.0162605209
= 294.293744
Q = k x S x T
= 31783.7243785 kJ
Masuk Keluar
Aliran kJ Aliran kJ
< 30 > 2083975.53709 < 31 > 2151791.2232
Steam 214375.903115 < 32 > 106081.62701
Kond. Alat 31783.724379
Q loss 8694.8656541
TOTAL 2298351.4402 TOTAL 2298351.4402
NUT SILO
<35>
<22> <36>
NUT SILO
P= 1.5 bar ,
T= 111.3 o
C
Bahan masuk
T = 30 C
B-34
T ref = 25 C
Komponen m Cp (kJ/kgK) mCp
Biji 2273.832 1.6517635667 3755.8328545
TOTAL 2273.832 3755.8328545
Bahan keluar
T = 90 C
T ref = 25 C
Komponen m Cp (kJ/kgK) mCp
Biji matang 2273.832 1.6518524556 3756.0349729
TOTAL 2273.832 3756.0349729
Konduksi Alat
Panjang alat = 1.508 m Cp udara T=111,3 = 1.011 kJ/kgK
ro = 0.84 m
ri = 0.83 m
k = 21.6 W/mK
S = 2L
Ln (r0/r1)
= 9.4718468094
0.011976191
= 790.889756
Q = k x S x T
B-35
= 1024993.1232 kJ
Q total yang dibutuhkan = 236631.26441 + 1024993.1232
= 1261624.3876112 kJ
Masuk Keluar
Aliran kJ Aliran kJ
< 22 > 18779.1642725 < 36 > 244142.27324
< 35 > 1261624.38761 Kond. Alat 1024993.1232
Q loss 11268.155448
TOTAL 1280403.55188 TOTAL 1280403.5519
SLURRY STORAGE
Bahan masuk
T = 80
T ref = 25 C
Komponen m Cp (kJ/kgK) mCp
Serat 358.58592 1.1792837318 422.87454189
Minyak 14894.974401 2.0916777117 31155.48597
Air 7173.0960204 4.199 30119.83019
TOTAL 22426.656341 61698.190701
Bahan keluar
T = 90
T ref = 25 C
Komponen m Cp (kJ/kgK) mCp
Serat 358.58592 1.1792837318 422.87454189
Minyak 14894.974401 2.0916777117 31155.48597
Air 7173.0960204 4.2035 30152.109122
TOTAL 22426.656341 61730.469633
B-36
Q = massa TBS x Cp campuran x (T-Tref)
= 22426.656341 x 2.752548962 x 65
= 4012480.5262 kJ
Konduksi Alat
Panjang alat = 3.5 m
ro = 1.4478 m
ri = 1.13 m
k = 21.6 W/mK
S = 2L
Ln (r0/r1)
= 21.98
0.2478295302
= 88.6899958
Q = k x S x T
= 124520.754168 kJ
Masuk Keluar
Aliran kJ Aliran kJ
< 13 a > 3393400.48857 < 13 b > 4012480.5262
Steam 774554.793647 Kond. Alat 124520.75417
Q loss 30954.00188
TOTAL 4167955.28222 TOTAL 4167955.2822
CST STORAGE
Bahan masuk
T = 80
T ref = 25 C
Komponen m Cp (kJ/kgK) mCp
Air 717.30960204 4.199 3011.983019
Minyak 14597.074913 2.0916777117 30532.37625
TOTAL 15314.384515 33544.359269
Cp campuran = 33544.35927 kJ/K
B-37
15314.38451 kg
= 2.190382463 kJ/kgK
Bahan keluar
T = 90
T ref = 25 C
Konduksi Alat
Panjang alat = 3.22 m
ro = 1.2954 m
ri = 1.05 m
k = 21.6 W/mK
S = 2L
Ln (r0/r1)
= 20.2214771328
0.2100313636
= 96.278369
Q = k x S x T
= 51990.3192771 kJ
B-38
= 404426.39531689 kJ
Cp steam = 1.9 kJ/kgK
m steam = 180.01389 kg
Masuk Keluar
Aliran kJ Aliran kJ
< 14 a > 1844939.75981 < 14 b > 2180593.1656
Steam 404426.395317 Kond. Alat 51990.319277
Q loss 16782.670288
TOTAL 2249366.15513 TOTAL 2249366.1551
Bahan keluar
T = 90
T ref = 25 C
B-39
Q yang dibutuhkan = 8649.2102265991 kJ
Q loss = 5%
Q = 9081.6707379291 kJ
Konduksi Alat
Panjang alat = 0.884 m
ro = 0.7112 m
ri = 0.6 m
k = 21.6 W/mK
S = 2L
Ln (r0/r1)
= 5.550642782
0.170026029
= 32.6458414
Q = k x S x T
= 17628.7543746 kJ
Masuk Keluar
Aliran kJ Aliran kJ
< 14 a > 47466.7987823 < 14 b > 56116.009009
Steam 26710.4251125 Kond. Alat 17628.754375
Q loss 432.46051133
TOTAL 74177.2238948 TOTAL 74177.223895
SILO DRYER
Material masuk
Rate solid masuk (Ls) = 1462.7233 kg
B-40
Suhu solid masuk (Ts1) = 90 C
Suhu solid keluar (Ts2) = 100 C
Suhu udara masuk (TG2) = 130 C
Suhu udara keluar (TG1) = 60 C
Kapasitas panas solid (Cps) = 1.6518 kJ/kgK
Kapasitas panas air = 4.208 kJ/kgK
T ref = 25 C
Panas laten pada T=25C = 2442.3 kJ/kg
Rumus :
NT = ( Tg2 - Tg1 ) / LMTD
NT = ( Tg2 - Tg1 ) / ( ( t1 -t2 ) / ln (t1 / t2 ) )
NT = ( Tg2 -Tg1 ) / ( ( Tg2 - ts1 ) - ( ts2 - Tg 1 ) / ln (( Tg2 - ts1 ) / ( ts2 - 1 )) )
NT = ln (( Tg2 - Tw ) / ( Tg1 - Tw ))
Nilai NT berkisar antara 1.5 - 2.5 ( Mc.Cabe, 4th edition, hal 734 )
Nilai NT : 2,25 (ditetapkan terlebih dahulu)
Trial Tw = 51.753 C
NT= ln (( Tg2 - Tw ) / ( Tg1 - Tw ))
NT= 2.25
sehingga :
udara panas masuk pada temperatur 130oC , Tw 40, diperoleh :
humidity 0.015 kg uap air/ kg udara kering
maka,
GH1 = 0.015 G + 10.6104
Komponen Masuk
Enthalpi udara panas masuk (130 C)
H'g2 = Cs ( Tg2- Tref ) + H2 0
(Pers. 9.10-24 Geankoplis 3rd edition,hal 562)
H'g2 = ( 1.005 + 1.88 H2 )(TG2- 25 ) + ( H2 x 0 )
Hg'2 = 145.12 kJ/kg udara kering
Komponen Keluar
Enthalpi udara panas keluar
B-41
H'g1 = Cs ( Tg1- Tref ) + H1 0
H'g1 = ( 1.005 + 1.88 H1 )(TG1- 25 ) + ( H1 x 0 )
H'g1 = 34.875 + 65.8 H1 + 2442.3 H1
H'g1 = 34.875 + 2508.11 H1
Neraca Panas
G H'g2 + Ls H's1 = G H'g1 + Ls H's2 (Pers. 9.10-26 Geankoplis 3rd ed, p. 562)
145.1 G + 165838.25 = 34.88 G + 2508.11 GH1 + 188052.9
145.1 G + 165838.25 = 34.88 G + 37.62165 G + 214664.9
48826.653762 = 72.624 G
G = 672.32119
Kebutuhan steam untuk memanaskan udara pengering
m udara = 672.32119
Cp udara masuk= 1.0048 kJ/kgK
Cp udara keluar= 1.0165 kJ/kgK
T udara masuk = 25 C
T udara keluar = 130 C
T steam masuk = 133.48 C
T steam keluar = 50 C
steam = 2164.028 kJ/kgK
Cp steam = 1.9 kJ/kgK
EKSTRAKTOR
Bahan masuk
T = 35 C
Tref = 25 C
Komponen m Cp (kJ/kgK) mCp
Serat 1977.28 1.1792837318 2331.771975
CO2 2515.82 2.202 5539.8381204
TOTAL 4493.099293 7871.6100954
B-42
Q = massa TBS x Cp campuran x (T-Tref)
= 4493.099293 x 1.7519332608 x 10
= 78716.100954 kJ
Bahan keluar
Aliran 24b
T = 40 C
Tref = 25 C
Komponen m Cp (kJ/kgK) mCp
Serat 1977.2781666 1.1792837318 2331.771975
CO2 2515.8211264 2.251 5663.1133556
TOTAL 4493.099293 7994.8853306
Aliran 26
T = 40 C
Tref = 25 C
Komponen m Cp (kJ/kgK) mCp
CO2 2515.82 2.251 5663.1133556
Minyak 126.55 1.1792837318 149.2334064
Air 13.64 4.181 57.015377556
TOTAL 2656.0037092 5869.3621396
B-43
Panjang alat = 2.968 m
ro = 1.0414 m
ri = 0.7112 m
k = 21.6 W/mK
S = 2L
Ln (r0/r1)
= 18.6416848193
0.3813675565
= 48.8811502
Q = k x S x T
= 5279.16422364 kJ
Q = k x S x T
= Err:509 kJ
Masuk Keluar
Aliran kJ Aliran kJ
< 24 a > 78716.1009541 < 24 b > 119923.27996
Steam Err:509 < 26 > 88040.432093
Kond. Alat Err:509
Q loss 6462.3805549
TOTAL Err:509 TOTAL Err:509
BAROMETRIK KONDENSOR
Air
B-44
Air
H sensibel = m x Cp x T
= 163.35 x 4.185 x 30 kJ
= 4,900 kcal
B-45
tv - t 2 = (0,1 + 0,02a) x (tv - t1)
55-t2 = 0.1 + 0.00012 x (55-30)
55-t2 = 0.10012 x 25
- t2 = -52.50
t2 = 52.50 o
C
Hair pendingin = m x Cp x DT
= 3,939 x 4.185 x 5
= 82,418 kJ
= 19,698 kcal
H sensible = m x Cp x DT
= 8.168 x 4.19 x 30
B-46
= 1,025 kJ
= 245 kcal
H vapor keluar barometrik kondensor
H total ke jet ejector = H Laten + H sensibel
= 4,628 + 245
= 4,873 kcal
Hkondensat = m x Cp x DT
= 4,094 x 4.185 x (T-25)
= 4,093 (T-25)
JET EJECTOR
Steam
Jet Ejector
B-47
Jet Ejector
Dari Barometrik
Ke Hotwell
B-48
= 274,727 (T - 25) kJ
= 65,660 (T - 25) kcal
Q loss = 10% x H masuk
= 10% x 38,829,570
= 3,882,957 kcal
Neraca Energi :
Energi masuk = Energi keluar
38,829,570 = Q loss + H kondensat
38,829,570 = 3,882,957 + 65659.71 (T - 25)
(T - 25) = 30 o
C
T = 55 oC
H kondensat = M x Cp x DT
= 65,646 x 4.19 x (T - 25)
= 26,099,048 kJ
= 13,922,673 kcal
CPO STORAGE
Bahan masuk
T = 50 C
Tref = 25 C
Komponen m Cp (kJ/kgK) mCp
Air 147.06 4.185 615.46672051
Minyak 14706.49 2.092 30761.243048
TOTAL 14853.557652 31376.709769
B-49
Komponen m Cp (kJ/kgK) mCp
Air 147.06 4.19 615.47
Minyak 14706.49 2.09 30761.24
TOTAL 14853.557652 31376.709769
Konduksi Alat
Panjang alat = 4.486 m
ro = 2.6416 m
ri = 2.6226 m
k = 21.6 W/mK
S = 2L
Ln (r0/r1)
= 28.1699467967
0.0072376673
= 3892.13066
Q = k x S x T
= 2101750.5557 kJ
Masuk Keluar
Aliran kJ Aliran kJ
< 14 a > 14853.5576515 < 14 b > 941301.29307
Steam 2266478.28198 Kond. Alat 2101750.5557
Q loss 46322.386771
TOTAL 2281331.83963 TOTAL 3089374.2355
PKO STORAGE
B-50
Bahan masuk
T = 50 C
Tref = 25 C
Komponen m Cp (kJ/kgK) mCp
Air 10.23 4.208 43.052161795
Minyak 1168.72 2.0916777117 2444.5773698
TOTAL 1178.9471042 2487.6295316
Bahan keluar
T = 55
T ref = 25 C
Konduksi Alat
Panjang alat = 2.35 m
ro = 1.2192 m
ri = 1.2097 m
k = 21.6 W/mK
S = 2L
Ln (r0/r1)
B-51
= 14.757563683
0.0078431775
= 1881.57972
Q = k x S x T
= 1016053.051 kJ
Masuk Keluar
Aliran kJ Aliran kJ
< 14 a > 62190.7382899 < 14 b > 74628.885948
Steam 1029113.10604 Kond. Alat 1016053.051
Q loss 621.9073829
TOTAL 1091303.84433 TOTAL 1091303.8443
B-52
APPENDIKS C
SPESIFIKASI ALAT
Densitas air
T (kg/m3)
0 999.87
10 999.73
20 998.23
25 997.08
30 995.68
40 992.25
50 988.07
60 983.24
70 977.81
80 971.83
90 965.34
100 958.38
2. LORI (F-112)
Fungsi = Sebagai penampung TBS dari loading ramp ke sterilizer
C-53
Bahan konstruksi = Stainless steel
Jumlah isian per lori = 3750 kg
Banyak lori = 8
Komponen % (kg/m3)
Buah sawit 60.50 1112.5
Tandan kosong 39.50 1690
C-54
Faktor keamanan = 20%
Tekanan desain = 52.906 psia
P x ID
ts = + C
2 x (FE - 0.6Pi)
= 2862.6378 + 0.0625
29936.513
= 0.158 in
OD = ID + 2ts
= 54.108 + 0.375
= 54.483 in
ID koreksi = OD - 2ts
= 60 - 0.375
= 59.625 in
Ls = 1.5 x ID
= 89.4375 in
tha = 0,885 x r x Pi
+ C
2 (FE - 0,1 Pi)
tha = 2809.287 0.0625
+
29989.419
= 0.156 in
Dari tabel 5.8 (Brownell) didapatkan tha standar = 0.1875 in
C-55
Dari Tabel 5.7 dan 5.8 (Brownell), untuk tebal tutup = 3/16 Standard dished head
r = 60 in
icr = 3.625 in
sf = 1.5 - 2,25 in (diambil sf = 2.25 in)
Panjang lori = Ls + 2 OA
= 89.438 + 25.028
= 114.47 in
= 2.9074 m
3. STERILIZER (D-110)
Fungsi = Untuk merebus TBS agar buah sawit mudah terlepas dari tandannya
Bahan konstruksi = Stainless steel
Kapasitas olah = 30000 kg
Jumlah isian per lori = 3750 kg
Banyak lori = 8
Banyak lori per sterilizer = 4
Banyak sterilizer = 2
Kapasitas 1 sterilizer = 15000 kg
Komponen % (kg/m3)
Buah sawit 60.5 1112.5
Tandan kosong 39.5 1690
C-56
50%
= 790.228 ft3
Volume sterilizer = 100% x 790.228 ft3
95%
= 831.819 ft3
Pi x ID
ts = + C
2 x (fE - 0.6Pi)
= 3341.4063 + 0.0625
29936.513
= 0.1741 in
OD = ID + 2ts
= 63.16 + 0.375
= 63.53 in
ID = OD - 2ts
= 66 - 0.375
C-57
= 65.625 in
tha = Pi x r x W
+ C
2 (fE - 0,1 Pi)
W = 0,25 x (3 + (r/icr)1/2)
icr = 4 in
W = 1.7655
C-58
Bahan konstruksi = Stainless steel
Kapasitas = 5 ton
Panjang rantai = 6 m
Jumlah = 1 unit
5. THRESSER (H-120)
Kapasitas olah thresser = 30000 kg TBS masak
Jumlah thresser = 1
Interval waktu pengisian thresser = 3750
x 60 menit
30000
= 7.500 menit
= 9 menit
Komponen % (kg/m3)
Buah sawit 72.35 1060 (Naibaho,1998)
Tandan kosong 27.65 1690
C-59
= 21.71 ton/jam
Density = 1060 kg/m3
= 66.17 lb/ft
Panjang = 10 m
= 32.8 ft (Perry, table 21-7 page21-11)
7. DIGESTER ( M-130)
Fungsi = Melumatkan buah sawit agar mudah dipress
Kapasitas olah 1 digester = 10000 kg (Naibaho,1998)
Banyak digester = 2.1705 = 3 buah
Bahan konstruksi = Stainless Steel 304
kelapa sawit = 1060 kg/m3
= 66.173 lb/ft3
C-60
1060 kg/m3
= 9.434 m3
= 333.142 ft3
Pi x ID
ts = + C
2 x (fE - 0.6Pi)
= 4763.8867 + 0.0625
29931.223
= 0.222 in
C-61
Dari tabel 5.7 (Brownell) didapatkan ts standar = 0.2500 in
OD = ID + 2ts
= 83.118 + 0.5
= 83.618 in
tha = Pi x r x W
+ C
2 (FE - 0,1 Pi)
W = 0,25 x (3 + (r/icr)1/2)
icr = 5.125 in
W = 1.7621
C-62
sf = 1.5 - 3 in (diambil sf = 3 in)
Panjang digester = Ls + OA + hb
= 125.3 + 17.519 + 24.278
= 142.8 in
= 3.626 m
Dt = 83.5 in = 2.12 m
Da = 25.05 in = 0.64 m
W = 5.01 in = 0.13 m
Dd = 16.7 in = 0.42 m
H = 83.5 in = 2.12 m
L = 6.2625 in = 0.16 m
C = 27.833333 in = 0.71 m
C-63
= 0.43 rev/s
= 0.81 cP
= 0.00081 Pa.s
Nre = Da2 x N x
= 185.957
0.00081
= 229576.58
b. LMTD
t LMTD = (t1 - t2)
ln (t1 - t2)
C-64
= 168.26 - 18
ln 168.3 / 18
= 67.23 F
Uc = hi x hoi
hi + hoi
Uc = 1361.51 Btu/ft2.hr.F
Rd = 0.005
hd = 1 = 200
0.005
UD = Uc x hd
Uc + hd
= 272301.67
1561.508
= 174.38 Btu/ft2.hr.F
C-65
Dengan adanya Ud maka harga A dan tinggi jaket dapat ditentukan
A = Q
Ud x t LMTD
= 350.44
Panjang pipa yang dibutuhkan = A/a''
= 1785.24 ft
C-66
Persamaan Matthews:
A = 0,4 Ct/ (Cu.Foa.Fs)
A = screen area, ft2
Ct = troughflow rate, Ton.hr
Cu = unit capacity, Ton/(hr.ft2) Figure 19-21
C-67
Foa = open-area factor; Fig. 19-22
Fs = slotted-area factor, Table 19-7
Dengan perencanaan
Laju alir = 23799 kg/jam = 23.79939 ton/jam
Ukuran bahan = 30 mesh
Dimensi buka (a) = 1.5 in = 0.125 ft
Ukuran tebal = 0.2 in = 0.0167 ft
Kapasitas unit (Cu) = 4
Kapasitas = 0.4 x F
Cu x Foa x Fs
= 0.4 x 23.799
4 x 77.855 x 1
= 0.0306 ton/jam
Komponen % (kg/m3)
Minyak 66.42 856.1
Air 1.5989 965.34
Serat 31.98 730
C-68
80%
= 1210.9159 ft3
Pi x ID
ts = + C
2 x (fE - 0,6 Pi)
= 2753.9042 + 0.0625
29971.467
= 0.154 in
Dari tabel 5.7 (Brownell) didapatkan ts standar = 0.1875 in
OD = ID + 2ts
= 115.81866 + 0.375
= 116.19366
ID koreksi = OD - 2ts
C-69
= 114 - 0.375
= 113.625 in
tha = 0.885 x P x r
+ C
2(fE - 0,1Pi)
= 2398.9347 + 0.0625
29995.244
= 0.142 in
Steam
C-70
Kondisi Temperatur pada Coil pemanas adalah:
Temperature steam masuk (T1) = 133.48 C = 272.26 F
Temperature steam keluar (T2) = 100 C = 212 F
Temperatur minyak masuk (t1) = 80 C = 176 F
Temperatur minyak keluar (t2) = 90 C = 194 F
Berdasarkan neraca energi didapatkan m steam = 344.8 kg/jam
= 2758 kg/hari
a. Neraca Panas
Neraca Panas = 650034 Kkal/jam x (1 Btu / 0,25216 Kkal)
= 2577863.4 Btu/jam
b. LMTD
t LMTD = (t1 - t2)
ln (t1 - t2)
= 96.26 - 18
ln 96.264 / 18
= 46.677 F
c. perhitungan temperatur caloric
Tc = 176 + 194 = 185 F
2
tc = 272.3 + 212 = 242.132 F
2
d. Trial ukuran pipa coil
Ukuran pipa coil = 0.75 in OD BWG 16
(Kern, Tabel 10 hal.843)
ID = 0.62 in = 0.052 ft = 0.016 m
a'' = 0.3925 ft2/1in ft
C-71
Bagian Bejana Bagian Coil
1. Nre = (Da)2 x N x
= 48477.061
2. JH = 750 (Fig. 20.2)
3. ho = JH x (k/di) x (Cp x /k) x (/w)
1/3 0,14
3'. hoi = 1500 btu/ft2.hr.oF
dengan:
Tc = 185 F
cp = 3.9 btu/lbF
k = 0.398 btu/hr ft2 (F/ft)
= 0.81 cp = 1.96 lb/ft.h
ho = 1623 btu/ft2.hr.oF
Uc = hi x hoi
hi + hoi
Uc = 779.58 Btu/ft2.hr.F
Rd = 0.005
hd = 1 = 200.00
0.005
UD = Uc x hd
Uc + hd
= 155916.84
979.584
= 159.166 Btu/ft2.hr.F
C-72
Bahan = Stainless Steel 304
Skema =
Data :
1. larutan CPO = 817.51 kg/m = 51.012872 lb/ft3
2. larutan CPO, 30C = 0.81 cp = 0.00081 kg/m.s
3. Laju alir massa yang akan dialirkan= 22426.66 kg/jam
= 493386.44 kg/hari
4. Persamaan kesetimbangan energi mekanis :
Langkah-langkah perhitungan :
1. Menghitung rate massa
2. Menghitung diameter optimum pipa
3. Menghitung Reynold Number
4. Menghitung total energi yang hilang dalam sistem pemompaan
5. Menghitung daya pompa
Perhitungan :
C-73
1. Menghitung rate massa :
Waktu kerja = 18 jam/hari
Diketahui
CPO = 0.8175 gr/cm = 817.51 kg/m
CPO = 0.00081 kg/m.s = 51.037 lb/ft
v = Q
A
3.05 = 0.0076 m3/s
A
A = 0.002 m2
C-74
3. Menghitung Reynold Number (NRe)
NRe = ( x D x v)
b. Menghitung total energi hilang dalam sistem pemompaan Energi yang hilang
dalam sistem pemompaan, berupa :
1 Kontraksi masukan pipa dari Tangki bak penampung
2 Friksi pada pipa lurus
3 Friksi pada elbow
4 Friksi pada valve
5 Ekspansi pada keluaran pipa menuju Tangki CST
C-75
Didapatkan fanning friction factor (f) = 0.0085
Dari Semua perhitungan friction loss pada pipa lurus, dapat diperoleh P2
dengan perhitungan sebagai berikut:
P2 = F x
= 240.9 N.m/kg x 817.5 kg/m3
= 196,961 N/m2
= 1477.33 mmHg
C-76
= 1.94 atm
= 2.01 kg/cm2g
1/2 (V - V) = 0
(1/2)x(v22av - v12av)+( gx(z2 - z1)) + ((p2 - p1 )/) + F + Ws = 0
0 + 58.8 + 0.00082 + 241 + Ws = 0
299.727 + Ws = 0
-299.73 = Ws
Menghitung Ws
Berdasarkan pump manufactur,
pompa sentrifugal kapasitas 14,2 m3/jam memiliki efisiensi sebesar 60%
Ws = -xWp
-299.73 = -1 xWp
Wp = 428.18 J/Kg
C-77
= 2.67 kW
C-78
= 112.88 in
Pi x ID
ts = + C
2 x (fE - 0.6Pi)
= 2830.6668 + 0.0625
29969.908
= 0.157 in
Dari tabel 5.7 (Brownell) didapatkan ts standar = 0.1875 in
OD = ID + 2ts
= 112.881 + 0.375
= 113.256 in
Dari tabel 5.7 (Brownell) didapatkan OD standar = 114 in
ID koreksi = OD - 2ts
= 114 - 0.375
= 113.625 in
Ls koreksi = 1.5 x ID koreksi
= 170.438 in
tha = 0.885 x P x r
+ C
2(fE - 0,1Pi)
= 2529.97578624 + 0.0625
C-79
29994.9846847334
= 0.147 in
Perhitungan Agitator
C-80
Dt = 113.625 in = 2.89 m
Da = 34.0875 in = 0.87 ft
W = 6.8175 in = 0.17 m
Dd = 22.725 in = 0.58 m
H = 113.625 in = 2.89 m
L = 8.521875 in = 0.22 m
C = 37.875 in = 0.96 m
= 0.81 cP
= 0.00081 Pa.s
Nre = Da2 x N x
= 33.323
0.00081
= 41139.391
Steam
C-81
Kondisi Temperatur pada Coil pemanas adalah:
Temperature steam masuk (T1) = 133.48 C = 272.26 F
Temperature steam keluar (T2) = 100 C = 212 F
Temperatur minyak masuk (t1) = 85 C = 185 F
Temperatur minyak keluar (t2) = 90 C = 194 F
Berdasarkan neraca energi didapatkan m steam = 237.6 kg/jam
= 1901 kg/hari
a. Neraca Panas = 78059.331 Kkal/h x ( 1 Btu / 0.252 Kkal)
Neraca Panas = 309562.7 Btu/jam
b. LMTD
t LMTD = (t1 - t2)
ln (t1 - t2)
= 87.264 - 18
ln 87.26 / 18
= 43.88 F
C-82
Tc = 189.5 F
cp = 3.9 btu/lbF
k = 0.398 btu/hr ft2 (F/ft)
= 0.8 cp = 1.96 lb/ft.h
ho = 735.8 btu/ft2.hr.oF
Uc = hi x hoi
hi + hoi
Uc = 493.67 Btu/ft2.hr.F
Rd = 0.005
hd = 1 = 200.00
0.005
UD = Uc x hd
Uc + hd
= 98734.174
693.671
= 142.34 Btu/ft2.hr.F
Komponen % (kg/m3)
Minyak 95.316 856.1
Air 4.6839 965.34
C-83
volume isian = 15314.385 kg
861.21669 kg/m3
= 17.782 m3
= 627.94517 ft3
OD = ID + 2ts
C-84
= 100.23463 + 0.375
= 100.60963
Steam
C-85
Kondisi Temperatur pada Coil pemanas adalah:
Temperature steam masuk (T1) = 133.48 C = 272.26 F
Temperature steam keluar (T2) = 100 C = 212 F
Temperatur minyak masuk (t1) = 80 C = 176 F
Temperatur minyak keluar (t2) = 90 C = 194 F
a. Neraca Panas
Neraca Panas = 96752.726 Kkal/jam x ( 1 Btu / 0.252 Kkal)
= 383695.773 Btu/jam
b. LMTD
t LMTD = (t1 - t2)
ln (t1 - t2)
= 96.26 - 18
ln 96.264 / 18
= 46.676771 F
c. perhitungan temperatur caloric
Tc = 176 + 194 = 185 F
2
C-86
0.00081
= 51068.55
ho = 1775 btu/ft2.hr.oF
Uc = hi x hoi
hi + hoi
Uc = 812.91 Btu/ft2.hr.F
Rd = 0.005
hd = 1 = 200.00
0.005
UD = Uc x hd
Uc + hd
= 162582.61
1012.913
= 160.510 Btu/ft2.hr.F
Diambil dc =
8 ft
nc = L
xdc
= 541.788
= 467 lilitan
14. CYLINDRICAL SETTLING PUMP (L-124)
Fungsi = Untuk mengalirkan CPO dari CST menuju Oil Purifier
C-87
Dasar perencanaan
Tipe = Centrifugal Pump
Bahan = Stainless Steel 304
Skema =
Data :
1. larutan CPO = 889 kg/m = 55.475 lb/ft3
2. larutan CPO, 30C = 0.81 cp = 0.00081 kg/m.s
3. Laju alir massa yang akan dialirkan= 15314.38 kg/jam
= 245030.15 kg/hari
4. Persamaan kesetimbangan energi mekanis :
Keterangan :
g = Percepatan gravitasi, ft/s atau m/s.
gc = Faktor proposionalitas (kesebandingan)
Newton, 32.2 ft-lb/lbf-s.
p = Tekanan, Pa
F = Gaya gesek total dalam sistem, J/kg
v = Kecepatan aliran dalam pipa, m/s
z = Tinggi fluida, m
Ws = Kerja pompa, j/kg atau ft.lbf/lbm
= Faktor koreksi, 1 untuk aliran turbulen dan 1/2 untuk aliran laminer
= Densitas fluida, kg/m
Langkah-langkah perhitungan :
1. Menghitung rate massa
2. Menghitung diameter optimum pipa
3. Menghitung Reynold Number
C-88
4. Menghitung total energi yang hilang dalam sistem pemompaan
5. Menghitung daya pompa
Perhitungan
1. Menghitung rate massa
Kapasitas bahan baku = 15314 kg/jam
Diketahui :
CPO = 0.889 gr/cm = 889 kg/m
CPO = 0.00081 kg/m.s = 55.502 lb/ft
C-89
Schedule Number = 40
(Sumber: http://www.engineersedge.com/fluid_flow/steel-pipe-schedule-40.htm)
3. Menghitung Reynold Number (NRe)
NRe = ( x D x v)
= 889 kg/m3 x 0.010 m x 3.05 m/s
0.00081 kg/m.s
= 31889.74
4. Menghitung Dishcarge Pressure Pompa
a. Tekanan suction (P1)
P1 = g h + P atm
= 889.0 kg/m x 9.8067 m/s2 x 3.6352 m + 1 atm
= 31693.123 N/m2 + 1 atm
= 237.72 mmHg + 1 atm
= 1.3128 atm
= 1.3564 kg/cm2g
b. Menghitung total energi hilang dalam sistem pemompaan
dalam sistem pemompaan, berupa :
1 Kontraksi masukan pipa dari Tangki bak penampung
2 Friksi pada pipa lurus
3 Friksi pada elbow
4 Friksi pada valve
5 Ekspansi pada keluaran pipa menuju Tangki Oil Purifier
C-90
~ dari Tangki penampung ke elbow I = 1.5 m
~ dari elbow I ke pompa = 1 m
~ dari pompa ke elbow II = 1 m
~ dari elbow II ke elbow III = 9.5 m
~ dari elbow III ke elbow IV = 3 m
~ dari elbow IV ke Oil Purifier = 1 m
Total = 17 m
Maka friksi total pada pipa lurus adalah :
F = 4f x (L/D) x (v/2)
= (4 x 0,0075) x (17/0,009) x (3,05/2)
= 249.010 N.m/kg
Semua perhitungan friction loss pada pipa lurus, maka dapat diperoleh P2
dengan perhitungan sebagai berikut:
P2 = F x
= 271.0 N.m/kg x 889 kg/m3
= 240893.52 N/m2
= 1806.85 mmHg
= 2.38 atm
= 2.46 kg/cm2g
C-91
Tekanan pada terminal point diketahui = 2 kg/cm2g
Maka, PDischarge Pump = P2+P3-P1
= 2.38 + 2 - 1.31
= 3.06 atm
= 3.1665 kg/cm2g
1/2 (V - V) = 0
(1/2)x(v22av - v12av)+( gx(z2 - z1)) + ((p2 - p1 )/) + F + Ws = 0
0 + 78.4 + 0.0012 + 271 + Ws = 0
349.4 + Ws = 0
-349.37 = Ws
Menghitung Ws
Berdasarkan pump manufactur,
Pompa sentrifugal dengan kapasitas 14,9 m3/jam memiliki efisiensi 70%
Ws = -xWp
-349.4 = -1 xWp
Wp = 499.09 J/Kg
C-92
= 2.123
0.97
= 2.19 kW
Komponen % (kg/m3)
Minyak 4.1885 856.1
Air 90.77 965.34
Serat 5.0418 730
C-93
264.6811 = 30.929 Lls + 18.697
Lls = 7.953 ft
Pi x ID
ts = + C
2 x (fE - 0.6Pi)
= 1759.4211 + 0.0625
29971.97
= 0.1212022 in
OD = ID + 2ts
= 75.324 + 0.375
= 75.699 in
ID koreksi = OD - 2ts
= 78 - 0.375
= 77.625 in
tha = 0.885 x P x r
+ C
2(fE - 0,1Pi)
= 1612.4073 + 0.0625
C-94
29995.328
= 0.116 in
Perhitungan Agitator
C-95
Dt = 77.625 in = 1.97 m
Da = 23.2875 in = 0.59 m
W = 4.6575 in = 0.12 m
Dd = 15.525 in = 0.39 m
H = 77.625 in = 1.97 m
L = 5.821875 in = 0.15 m
C = 25.875 in = 0.66 m
= 0.81 cP
= 0.00081 Pa.s
Nre = Da2 x N x
= 61.812
0.00081
= 76310.536
Steam
C-96
Kondisi Temperatur pada Coil pemanas adalah:
Temperature steam masuk (T1) = 133.48 C = 272.26 F
Temperature steam keluar (T2) = 100 C = 212 F
Temperatur minyak masuk (t1) = 85 C = 185 F
Temperatur minyak keluar (t2) = 90 C = 194 F
Berdasarkan neraca energi didapatkan m steam = 68.345804 kg/jam
= 546.766 kg/hari
a. Neraca Panas = 35871.499 Kkal/h x ( 1 Btu / 0.252 Kkal)
Neraca Panas = 142256.9 Btu/jam
b. LMTD
t LMTD = (t1 - t2)
ln (t1 - t2)
= 87.264 - 18
ln 87.26 / 18
= 43.88 F
C-97
k = 0.398 btu/hr ft2 (F/ft)
= 0.81 cp = 1.960 lb/ft.h
ho = 1407 btu/ft2.hr.oF
Uc = hi x hoi
hi + hoi
Uc = 725.94 Btu/ft2.hr.F
Rd = 0.005
hd = 1 = 200.00
0.005
UD = Uc x hd
Uc + hd
= 145189
925.945
= 156.801 Btu/ft2.hr.F
C-98
Foa = open-area factor; Fig. 19-22
Fs = slotted-area factor, Table 19-7
Dengan perencanaan
Laju alir = 6765 kg/jam = 6.7647 ton/jam
Ukuran bahan = 30 mesh
Dimensi buka (a) = 1.5 in = 0.125 ft
Ukuran tebal = 0.2 in = 0.0167 ft
Kapasitas unit (Cu) = 4
Kapasitas = 0.4 x F
Cu x Foa x Fs
= 0.4 x 6.7647
4 x 77.855 x 1
= 0.0087 ton/jam
C-99
Perhitungan dimensi storage
Asumsi Ls/D = 1.5
Bentuk tutup atas dan bawah = Standar dished head
Volume tutup = 0.0847 ID3
Pi x ID
ts = + C
2 x (fE - 0,6Pi)
= 546.2851 + 0.0625
29976.174
= 0.080724 in
Dari tabel 5.7 (Brownell) didapatkan ts standar = 0.1875 in
OD = ID + 2ts
= 27.514 + 0.375
= 27.889 in
Dari tabel 5.7 (Brownell) didapatkan OD standar = 28 in
ID koreksi = OD - 2ts
= 28 - 0.375
= 27.625 in
Ls koreksi = 1.5 x ID koreksi
= 41.4375 in
C-100
Perhitungan tebal tutup
OD = 28 in
ts = 0.1875 in
r = 28 in
tha = 0.885 x P x r
+ C
2(fE - 0,1Pi)
= 492.0083 + 0.0625
29996.0290
= 0.0789 in
Dari tabel 5.6 diambil tha standar = 0.1875 in
Steam
C-101
Temperatur minyak masuk (t1) = 80 C = 176 F
Temperatur minyak keluar (t2) = 90 C = 194 F
C-102
dengan:
Tc = 185 F
cp = 3.9 btu/lbF
k = 0.398 btu/hr ft2 (F/ft)
= 0.81 cp = 1.96 lb/ft.h
ho = 1840 btu/ft2.hr.oF
Uc = hi x hoi
hi + hoi
Uc = 826.27 Btu/ft2.hr.F
Rd = 0.005
hd = 1 = 200.00
0.005
UD = Uc x hd
Uc + hd
= 165254.23
1026.271
= 161.024 Btu/ft2.hr.F
C-103
kg/m
cp
Data :
1. larutan CPO = 945.04925 = 58.971 lb/ft3
2. larutan CPO, 30C = 0.81 = 0.00081 kg/m.s
3. Laju alir massa yang akan dialirkan = 15802.13 kg/jam
= 252834.07 kg/hari
4. Persamaan kesetimbangan energi mekanis :
Langkah-langkah perhitungan :
1. Menghitung rate massa
2. Menghitung diameter optimum pipa
3. Menghitung Reynold Number kg/jam
4. Menghitung total energi yang hilang jam/hari
5. Menghitung daya pompa
Perhitungan :
1. Menghitung rate massa :
Kapasitas bahan baku = 15802
Waktu kerja = 18
Diketahui :
CPO = 0.9450493 gr/cm = 945 kg/m
CPO = 0.00081 kg/m.s = 59 lb/ft
Rate = 15802.13 kg/jam / 945.05 kg/m
Volumetrik (Q) = 16.7210 m/jam
= 0.0046 m/s
= 0.0017 ft/s
C-104
Rate massa = Qx
= 0.005 m/s x 945.05 kg/m
= 4.389 kg/s
C-105
= 22481.147 N/m2 + 1 atm
= 168.63 mmHg + 1 atm
= 1.2219 atm
= 1.2625 kg/cm2g
C-106
= (4 x 0,008 ) x (11/0,009) x (3,05/2)
= 172.805 N.m/kg
(GeanKoplis,C.J,"Transport Process and Units Operations" 3rd Ed,eq.2.10-6)
Dari Semua perhitungan friction loss pada pipa lurus, dapat diperoleh P2
dengan perhitungan sebagai berikut:
P2 = F x
= 194.8 N.m/kg x 945 kg/m3
= 184056.45 N/m2
= 1380.5 mmHg
= 1.82 atm
= 1.88 kg/cm2g
C-107
(GeanKoplis,C.J,"Transport Process and Units Operations",eq.2.7-28,p.108)
(untuk aliran turbulen) = 1.00
Dimana:
v1 = kecepatan alir fluida yang masuk ke pompa (suction)
v2 = kecepatan alir fluida yang keluar ke pompa (discharge)
karena diameter pipa yang digunakan sebagai aliran masuk pompa
dan yang keluar pompa sama, maka v1 dan v2 konstan
sehingga v22-v12 = 0
1/2 (V - V) = 0
(1/2)x(v22av - v12av)+( gx(z2 - z1)) + ((p2 - p1 )/) + F + Ws = 0
0 + 29.4 + 0.00065 + 195 + Ws = 0
224.159 + Ws = 0
-224.2 = Ws
Menghitung Ws
Berdasarkan pump manufactur,
pompa sentrifugal kapasitas 14,2 m3/jam memiliki efisiensi sebesar 60%
Ws = -xWp
-224 = -0.6 xWp
Wp = 373.6 J/Kg
C-108
Air
l
Minyak
campuran
Kapasitas olah
Volume isian
Tebal basket
=
=
Tipe saringan
94.966 856.1
5.0342 965.34
Kapasitas basket
= 18.340
lb/ft3
= 15802.129 kg
= 15802.129 kg
861.599
= 647.657
340 x D2 x H
385.111 ft3
Steam
=
=
=
=
=
=
=
=
kg/m3
m3
ft3
C-109
= 11.91 = 12 buah
Kondisi Temperatur pada Coil pemanas adalah:
Temperature steam masuk (T1) = 133.5 C = 272.3 F
Temperature steam keluar (T2) = 100 C = 212 F
Temperatur minyak masuk (t1) = 85 C = 185 F
Temperatur minyak keluar (t2) = 90 C = 194 F
b. LMTD
t LMTD = (t1 - t2)
ln (t1 - t2)
= 87.3 - 18
ln 87.3 / 18
= 43.889 F
C-110
ho = 3246 btu/ft2.hr.oF
Uc = hi x hoi
hi + hoi
Uc = 1025.96 Btu/ft2.hr.F
Rd = 0.005
hd = 1 = 200.00
0.005
UD = Uc x hd
Uc + hd
= 205191.16
1225.956
= 167.372 Btu/ft2.hr.F
Direncanakan
Vacuum dryer tipe counter current Perry Figure 12-101 hal.12-86
Suhu minyak masuk (t1) = 70 C = 158 F
Suhu minyak keluar (t2) = 75 C = 167 F
Suhu umpan masuk (T1) == 80 C = 176 F
Suhu umpan keluar (T2) = 80 C = 176 F
C-111
ln (t1 - t2)
= 12.984 F
C-112
Bahan Konstruksi = Stainless steel
Kondisi operasi =
P = 1 atm
T = 90 C
Tinggi silinder :
Ls = 0.12 ft
= 1.45 in
Tekanan Desain :
Bahan konstruksi = Stainless Steel
Allowable pressure (F) = 18750 psia
Efisiensi sambungan (E) = 0.8
Corrosion allowance (C) = 0.0625
Tekanan hidrostatis = 0.6 psia
Tekanan operasi = 15.2854 psia
Faktor keamanan = 25%
Tekanan desain = 19.1068 psia
= 0.314 lb/in
Tebal silinder :
Pi x ID
ts = + C
2 x (fE - 0.6Pi)
= 18.5335 + 0.0625
29977.072
= 0.063 in
Dari tabel 5.7 (Brownell) didapatkan ts standar = 0.1875 in
OD = ID + 2ts
= 0.970 + 0.375
C-113
= 1.345 in
Dari tabel 5.7 (Brownell) didapatkan OD standar = 24 in
ID koreksi = OD - 2ts
= 24 - 0.375
= 23.625 in
Ls koreksi = 1.5 x ID koreksi
= 35.438 in
tha = Pi x r x W
+ C
2 (FE - 0,1 Pi)
W = 0,25 x (3 + (r/icr)1/2)
icr = 1.5 in
W = 1.75
Berat tutup :
m tutup = 2 x ( x ( ID) x tha x material)
= 52 lb
= 23 kg
Perhitungan tinggi tangki
a. Tinggi tutup atas
Dari Tabel 5.7 dan 5.8 (Brownell), untuk tebal tutup = 3/16 torispherical dishead
r = 24 in
icr = 1.5 in
sf = 1.5 - 2,25 in (diambil sf = 2.25 in)
C-114
AB = ( x ID) - icr = 10.3125 in
BC = r - icr = 22.5 in
b = r - (BC2 - AB2) = 4.0024 in
OA = t + b + sf = 6.4399 in
C-115
Perhitungan Pipa Uap
Laju alir masa uap = 155.2 kg/jam = 342.1 lb/jam
= 0.095 lb/detik
Dari tabel 40.4 diperoleh kecepatan normal uap dalam vak = 28 in
Densitas uap = 0.004 lb/ft3
Kecepatan normal uap (v) = 210 ft/s
Rate uap (V) = m /r
= 0.0950
0.0035
= 27 ft3/detik
Cross section pipa, S = V
v
= 27
210
= 0.13 ft2
Diameter pipa uap, d = (4s/p)0,5
= 0.405 ft
= 5 in
= 0.1234 m
= ( 4 QL /p v)
0,5
D
dimana D = Diameter pipa air pendingin (ft)
QL = Laju alir air (ft3/detik)
QL = m /r
= 3938.73
62.43
= 63.09 ft3/jam
= 0.02 ft3/detik
C-116
D = ( 4 x 0.018 / p . 8.020 )0,5
= 0.053 ft
= 0.633 in
h = Ho + x + s
Ho = 34 x 28 x 1.004 x 30.7
30 30
= 32.508 ft
V2
x = (1+a)
2g
Asumsi : V = 3 ft / s
a = 1 (Tabel 41.13, Hugot)
x = 0.2795 ft
s = 1.5 ft (Hal 833, Hugot)
h = 34.287 ft
= 10.451 m
C-117
(Ludwig, Fig. 6-20A, hal364)
Sehingga, Wv' = 10 lb uap air/ lb udara
Maksimum uap air masuk = 8193.19 lb/jam
Recommended udara kering = 56.2 lb/jam
(Ludwig, Tab 6-6, hal 366)
Total uap air = Wa x Wv'
= 56.2 x 10
= 562 lb/jam
Total campuran uap = 562 + 56
= 618.2 lb/jam
Tekanan = 29.8psia
= 15.1psig
Pada Ps. = 15.1psig,
F = 1.4 (Steam Pressure Factor)
(Ludwig, Fig. 6.26B, hal 373)
Kebutuhan steam sebenarnya (Ws) = 65646 x 1.4
= 91904 lb/jam
= 41687 kg/jam
C-118
23. PUMP CPO STORAGE (L-130)
Fungsi = Mengalirkan CPO dari Vacuum Dryer menuju CPO Storage
Dasar perencanaan
Tipe = Centrifugal Pump
Bahan = Stainless Steel
Skema :
Data :
1. larutan CPO = 857.18 kg/m = 53.4881 lb/ft3
2. larutan CPO, 30C = 0.81 cp = 0.00081 kg/m.s
3. Laju alir massa = 14853.56 kg/jam
= 326778.27 kg/hari
4. Persamaan kesetimbangan energi mekanis :
(1/2)x(v22av - v12av)+( gx(z2 - z1)) + ((p2 - p1 )/) + F + Ws = 0
Keterangan :
g = Percepatan gravitasi, ft/s atau m/s.
gc = Faktor proposionalitas (kesebandingan)
Newton, 32.2 ft-lb/lbf-s.
p = Tekanan, Pa
F = Gaya gesek total dalam sistem, J/kg
v = Kecepatan aliran dalam pipa, m/s
z = Tinggi fluida, m
Ws = Kerja pompa, j/kg atau ft.lbf/lbm
= Faktor koreksi, 1 untuk aliran turbulen dan 1/2 untuk aliran laminer
= Densitas fluida, kg/m
(GeanKoplis,C.J,"Transport Process and Units Operations" 3rd Ed,eq.2.7-28,p.64)
Langkah-langkah perhitungan :
C-119
1. Menghitung rate massa
2. Menghitung diameter optimum pipa
3. Menghitung Reynold Number
4. Menghitung total energi yang hilang dalam sistem pemompaan
5. Menghitung daya pompa
Perhitungan :
1. Menghitung rate massa
Waktu kerja = 18 jam/hari
Diketahui :
CPO = 0.8572 gr/cm = 857.18 kg/m
CPO = 0.00081 kg/m.s = 54 lb/ft
C-120
Inside Diamater (ID) 0.374 0.011
Outside Diameter (OD) 0.54 0.014
Ditetapkan design ID 0.364 0.010920
Material yang digunakan = Commercial steel
Schedule Number = 40
(Sumber: http://www.engineersedge.com/fluid_flow/steel-pipe-schedule-40.htm)
b. Menghitung total energi hilang dalam sistem pemompaan Energi yang hilang
dalam sistem pemompaan, berupa :
1 Kontraksi masukan pipa dari Tangki bak penampung
2 Friksi pada pipa lurus
3 Friksi pada elbow
4 Friksi pada valve
5 Ekspansi pada keluaran pipa menuju CPO Storage
C-121
2 Friksi pada pipa lurus
Untuk material Commercial steel () = 4,6 x 10 m
Maka nilai /D = 4,6 x 10 m/ 0.8763 m
= 0.00421
Pada NRe = 36240.567
Didapatkan fanning friction factor (f) = 0.0085
C-122
Semua perhitungan friction loss pada pipa lurus, maka dapat diperoleh P2
dengan perhitungan sebagai berikut:
P2 = F x
= 289.6 N.m/kg x 857.2 kg/m3
= 248,205 N/m2
= 1861.69 mmHg
= 2.45 atm
= 2.53 kg/cm2g
1/2 (V - V) = 0
(1/2)x(v22av - v12av)+( gx(z2 - z1)) + ((p2 - p1 )/) + F + Ws = 0
0 + 58.8 + 0.0014 + 290 + Ws = 0
348.4 + Ws = 0
-348.36 = Ws
Menghitung Ws
Berdasarkan pump manufactur, pompa sentrifugal kapasitas 18,57 m3/jam
memiliki efisiensi sebesar 65%
Ws = -xWp
-348.36 = -0.65 xWp
Wp = 535.94 J/Kg
Daya pompa = mxWp
C-123
Power motor
Fungsi
Bahan konstruksi
Kapasitas
Komponen
Minyak
Air
campuran
volume isian
Vt
= 4.126 kg/s x
= 2,211.28 J/s
= 2,211.28
=
1000
= 2.21 kW
= 3
BHP
h
= 2.9484
0.97
hp
= 3.04 hp
= 53.512 lb/ft3
= 14853.558 kg
857.18158 kg/m3
= 17.3284 m3
= 611.91665 ft3
535.94 J/Kg
Berdasarkan pump vendor, power pompa yang diingankan adalah 97%. Maka:
= volume silinder
= 1/4LsID2
764.9 = 1.1775 ID3
ID = 8.2811 ft
+
+
0.1694
0.1694
C-124
= 1.5
= Standar dished head
= 0.0847
+ ( 2 x volume tutup)
ID3
ID3
ID3
l= 2.5241 m
= 99.374 in
Tekanan operasi
Faktor keamanan
Tekanan desain
ts =
=
Pi x ID
48.1006
2 x (fE - 0.6Pi)
9569.8556
29884.4388
= 0.3827 in
+ C
+
Plate steels SA-240 grade S type 304
18750
0.8
0.0625
62.3448
77.0408
25%
96.3010
0.0625
OD
ID koreksi
Ls koreksi
ts
r
tha
=
= 104
ID
= 100.12443
= 0.375
= 104
=
=
=
+
= 99.374426 +
in
in
in
2ts
0.75
1.5 x ID koreksi
154.875 in
0.885 x P x r
2(fE - 0,1Pi)
+ C
C-125
psia
psia
psia
psia
=
0.375
104
in
in
r = 96
b
=
icr = 5.875 in
in
8863.5430592055
29980.7398021312
0.3581 in
= r - (BC - AB )
OA = t + b + sf
2 2
Panjang storage = Ls + (2 x OA )
= 176.6004 in
= 4.4857
Steam
m
a. Neraca Panas
=
+ 0.0625
= 133.5 C = 272.3 F
= 100 C = 212 F
=
50 C = 122 F
55 C = 131 F
C-126
=
0.375 in
Dari Tabel 5.7 dan 5.8 (Brownell), untuk tebal tutup = 3/8 Standar dished head
979.83 kg/jam
7838.62 kg/hari
Neraca Panas = 2266478 Kkal/jam x( 1 Btu / 0.2522 Kkal)
= 8988255 Btu/jam
b. LMTD
t LMTD = (t1 - t2)
ln (t1 - t2)
= 150.3 - 81
ln 150.3 / 81
= 112.10252 F
c. perhitungan temperatur caloric
Tc = 122 + 131 = 126.5 F
2
C-127
ho = 1731 btu/ft2.hr.oF
Uc = hi x hoi
hi + hoi
Uc = 803.71 Btu/ft2.hr.F
Rd = 0.005
hd = 1 = 200.00
0.005
UD = Uc x hd
Uc + hd
= 160741.88
1003.709
= 160.148 Btu/ft2.hr.F
C-128
l
Data yang diperoleh
Diameter of flight
Diameter of pipe
Diameter of shafts
Size of lumps (max.)
Speed
Feed section diameter
hp motor/ 30ft length
Biji
campuran
Asumsi
Ls/D
= 4253.087 kg
Komponen
Serat
volume isian
% (kg/m3)
42.66
= 4.564
= 161.152
57.02 1088.31
9
2.5
2
0.75
40
6
0.85
= 4253.087
931.972
lb/ft3
kg
kg/m3
m3
ft3
100%
80%
in
in
in
rpm
in
HP
x 161.2 ft3
= 201.44012 ft3
C-129
= 0.2286 m
= 0.0635 m
= 0.0508 m
= 0.1524 m
Pi x ID
ts = + C
2 x (fE - 0.6Pi)
= 1334.5097 + 0.125
16534.916
= 0.206 in
Dari tabel 5.7 (Brownell) didapatkan ts standar = 0.25 in
OD = ID + 2ts
= 63.842 + 0.5
= 64.342
ID koreksi = OD - 2ts
= 66 - 0.5
= 65.5 in
Ls koreksi = 1.5 x ID koreksi
= 98.25 in
C-130
Perhitungan tebal tutup
a. Tebal tutup atas (standar dished)
OD = 66 in
ts = 0.25 in
r = 66 in
tha = 0.885 x P x r + C
2(fE - 0,1Pi)
= 1220.9701 + 0.125
16555.819
= 0.1987487 in
tha standar = 0.25 in
C-131
Tipe
l
27. BLOWER DEPERICARPER (G-132 A/B)
Fungsi
Bahan Konstruksi
Kondisi operasi
P = 1 atm
T = 30C
ID Depericarper
Luas penampang
v udara
Volumetrik rate
Operasi 1 jam
Massa udara
Dasar Perencanaan
Volumetrik rate
T Udara
P1
P2
Densitas Udara
BM Udara
Kondisi Isothermal
Brake kW
= Memisahkan serabut-serabut ringan dan fiber ringan
= 14.69 psia
=
= 1.664 m
= 2.173 m2
=
1
6 m/s
= 13.04 m3/s
3600 s
Densitas udara (40 o C) =
30
1.16 kg/m3
= 54441.887 kg
54442
15.12
12.95
303.2
= 101.3
= 1.5
= 152.0
= 1.168
= 29.68
M
36.4 J/kg
= - Ws x m
x 1000
= 0.734
Power untuk 2 blower = 0.734
kW
kW
C
K
atm
kPa
atm
kPa
Kg/m3
kg/mol
(Naibaho, 1998)
kg/jam
kg/s
m3/s
46627.862 m3/jam
C-132
P2
P1 )^0.285 - 1 ]
l
Power untuk 1 blower = 0.367
Komponen
Serat
Air
Minyak
campuran
92.36
6.89
0.75
% (kg/m3)
= 1979.255 kg/jam
=
749.546 kg/m3
2.641 m3/jam
A
0.088
Dc
(De)
(Lb)
(Lc)
(Dd)
(W)/(Bc)
(H)
(De)
(Lb)
(Lc)
(Dd)
(W)/(Bc)
(H)
C-133
= 6
= 30 m/s = 98 ft/s
=
=
=
Laju alir volumetrik
Kecepatan gas masuk cyclone
0.088
0.1
= 0.1 Dc2
= 0.9382 m
= 0.5 Dc
= 1.5 Dc
= 2.5 Dc
= 0.375 Dc
= 0.2 Dc
= 0.5 Dc
=
=
=
=
=
=
0.469
1.407
2.345
0.352
0.188
0.469
Dc2
m
m
m
m
m
m
m2
=
=
=
=
=
=
1.539
4.617
7.695
1.154
0.616
1.539
ft
ft
ft
ft
ft
ft
viskositas udara = 0.0184 cp
= 0.0000123 lb/fts
densitas partikel = 45.5723 lb/ft3
perhitungan efsiensi :
rumus :
= 1
1+(dpc/dp)2
dpc = [9 Bc / 2 nt Vi (p-)]^0.5
nt = Lb + Lc
2H
= 4
dpc = 0.00002464 ft
= 7.905 m
dp = 250 m
= 99.90 %
C-134
Fungsi = Melumatkan biji sawit agar mudah dipress
Kapasitas olah nut silo = 2273.832 kg
Bahan konstruksi = Stainless steel 304
biji sawit = 1088.31 kg/m3
= 67.941 lb/ft3
C-135
OD
ts
r
tha
tha
l
ts =
= 50.663
= 54
= 0.1875
= 54
Pi x ID
2 x (fE - 0.6Pi)
= 2771.3963
=
30044.088
0.155 in
= Pi x r x W
29988.978
= 0.228
in
in
in
= 1.6686
4 in
= 4965.530
+
+ C
+ C
+
= 0,25 x (3 + (r/icr)1/2)
icr =
0.0625
0.0625
ID koreksi
Ls koreksi
=
=
=
=
=
OD -
54 -
53.625 in
2ts
0.375
1.5 x ID koreksi
80.4375 in
0.0625
thb standar
C-136
=
=
0.1875
54
0.25
0.1875 in
in
in
in
Perhitungan tinggi tangki
Dari Tabel 5.7 dan 5.8 (Brownell), untuk tebal tutup =4/16 torispherical dishead
r = 54 in
icr = 3.125 in
sf = 1.5 - 2,25 in (diambil sf = 2.25 in)
Dasar Perencanaan
Massa udara masuk = 1297 kg/jam
= 0.360 kg/s
Volumetrik rate = 0.31 m3/s = 1111 m3/jam
T Udara = 30 C = 303.2 K
P1 = 1 atm = 101.3 kPa
P2 = 1.5 atm = 152.0 kPa
Densitas Udara = 1.168 Kg/m3
BM Udara = 29.68 kg/mol
C-137
(-Ws) = 2.3026 RT1 log P2
M P1
= 28972.1 J/kg
Brake kW = - Ws x m = 13.917
x 1000
Power untuk 2 blower = 13.917 kW
Power untuk 1 blower = 6.9587 kW
m udara = 1297 kg
= 588.30623 lb
T1 = 30 C T2 = 60 C
= 86 F = 140 F
t2 = 107.1 C
= 224.78 F
Cp udara masuk = 1.013 kJ/kgC = 0.242 Btu/ lb F
Cp udara keluar = 1.019 kJ/kgC = 0.243 Btu/ lb F
(http://www.peacesoftware.de/einigewerte/co2_e.html)
Cp steam masuk = 1.916 kJ/kgC = 0.458 Btu/ lb F
Cp steam keluar = 4.416 kJ/kgC = 1.055 Btu/ lb F
T ref = 25 C
R = 0.0722 FT = 0.75
C-138
S = 0.6088
t = 83.915 F
Suhu kalorik
Tc = 226.75 F
tc = 113 F
Asumsi : Ud = 15
Ao = 37366.78
1258.7261
= 29.686 ft2
Ud = Q / (A x t)
Ud = 37366.776 / ( 39.260 x 83.92 )
Ud = 11.342 Btu/J ft2 oF
C-139
Bagian Tube
di = 0.652 in (diameter dalam tube) (Appendiks tabel 10, Kern)
do = 0.75 in (diameter luar tube)
L = 10 ft (panjang tube)
n = 4 (jumlah passes pada tube) (Appendiks tabel 9, Kern)
Nt = 20 (jumlah tube) (Appendiks tabel 9, Kern)
Pt = 1 in (jarak antar sumbu tube)
C' = 0.25 in (jarak antar diameter luar tube) (C' = Pt - do)
a"t = 0.1963 ft (luas permukaan panjang)
2
(Appendiks tabel 10, Kern)
a't = 0.334 in2 (luas penampang aliran) (Appendiks tabel 10, Kern)
Perpindahan panas
Shell Tube
5) Menghitung Nre 5') Menghitung Nre pipa
as = (IDs x B x c')/(n' x Pt x 144) at = (Nt x a't)/144n
= 8 x 8 x 0.25 = 20 x 0.334
2 x 1 x 144 144 x 4
= 0.0556 ft2 = 0.0116 ft2
6) Gs = M / as 6') Gt = m / at
= 588 / 0.0556 = 111837.1 lb/hr.ft2
= 10590 lb/hr.ft2
C-140
Rd = (Uc - Ud)/(Uc x Ud)
= 0.01 > 0.005 Rd ditetapkan (memenuhi)
Evaluasi P
Shell Tube
1) NRes = 1163.85 1) Nret = 139496.9
f = 0.0034 (fig. 29, Kern) f = 0.00045 (fig 26, Kern)
sg = 0.05
IDs = 8 in 3) Pn = 4 x n x v2 x 62.5
= 0.667 ft sg x 2gc x 144
v2x62.5 = 0.001 (fig, 27, Kern)
s.g = 0.073 2gc x 144
Pn = 4 x 4 x 0.001
Ps f Gs2 IDs (N+1) 0.05
5.22 x 10 x de x Sg x s
10
= 0.384
Data :
Laju bahan masuk = 2273.83 kg/jam
Faktor kelonggaran = 20%
Kapasitas olah = 2728.5984 kg/jam
C-141
Kecepatan (maks) = 1200 rpm
Daya = 100 hp
Komponen % (kg/m3)
Air 37.7 965.34
Cangkang 29 833.29
Inti 33.3 1400
C-142
Jumlah putaran efektif gas dalam cyclone (Ne) = 6 (Naibaho)
Kecepatan gas masuk cyclone (Vc) = 30 m/s
= 98 ft/s
(De) = 0.5 Dc
(Lb) = 1.5 Dc
(Lc) = 2.5 Dc
(Dd) = 0.375 Dc
(W)/(Bc) = 0.2 Dc
(H) = 0.5 Dc
= 1
1+(dpc/dp)2
dpc = [9 Bc / 2 nt Vi (p-)]^0.5
nt = Lb + Lc
2H
= 4
dpc = 0.00001441 ft
= 4.622 m
dp = 250 m (diameter partikel)
C-143
= 99.965835 %
Data :
1. air = 1071.7873 kg/m = 66.88
2. air, 30C = 0.81 cp = 0.00081 lb/ft3
3. Laju alir massa yang akan dialirkan =1591.56 kg/jam kg/m.s
= 25464.958 kg/hari
4. Persamaan kesetimbangan energi mekanis :
C-144
Langkah-langkah perhitungan :
1. Menghitung rate massa
2. Menghitung diameter optimum pipa
3. Menghitung Reynold Number
4. Menghitung total energi yang hilang dalam sistem pemompaan
5. Menghitung daya pompa
Perhitungan
1. Menghitung rate massa
Kapasitas bahan baku = 1591.56 kg/jam
Diketahui :
air = 1.0717873 gr/cm = 1072 kg/m
air = 0.00081 kg/m.s = 66.912 lb/ft
C-145
Inside Diamater (ID)
Outside Diameter (OD)
Ditetapkan design ID
=
=
=
24652.462 N/m2 +
184.91 mmHg
1.2433 atm
1.2846 kg/cm2g
= 13073.421
0.00081 kg/m.s
(Sumber: http://www.engineersedge.com/fluid_flow/steel-pipe-schedule-40.htm)
3.05 m/s
x 2.3455 m + 1 atm
b. Menghitung total energi hilang dalam sistem pemompaan Energi yang hilang
dalam sistem pemompaan, berupa :
1 Kontraksi masukan pipa dari Tangki bak penampung
2 Friksi pada pipa lurus
C-146
2 Friksi pada pipa lurus
Untuk material Commercial steel = 4,6 x 10 m
Maka nilai /D = 4,6 x 10 m/ 0.02 m
= 0.0022
Pada NRe = 13073.421
Didapatkan fanning friction factor = 0.0085
C-147
Dari Semua perhitungan friction loss pada pipa lurus, maka dapat diperoleh P2
dengan perhitungan sebagai berikut:
P2 = F x
= 676.9 N.m/kg x 1,072 kg/m3
= 725,504 N/m2
= 5441.72 mmHg
= 7.16 atm
= 7.40 kg/cm2g
Dimana:
v1 = kecepatan alir fluida yang masuk ke pompa (suction)
v2 = kecepatan alir fluida yang keluar ke pompa (discharge)
karena diameter pipa yang digunakan sebagai aliran masuk pompa dan yang
keluar pompa sama, maka v1 dan v2 konstan, sehingga v22-v12 = 0
1/2 (V - V) = 0
(1/2)x(v22av - v12av)+( gx(z2 - z1)) + ((p2 - p1 )/) + F + Ws = 0
0 + 58.80 + 0.0055 + 677 + Ws = 0
735.72 + Ws = 0
-735.72 = Ws
Menghitung Ws
Berdasarkan pump manufactur, pompa sentrifugal dengan kapasitas 14,9
m3/jam memilik efisiensi sebesar 70%
Ws = -xWp
C-148
-736 = -1 xWp
Wp = 1051 J/Kg
Berdasarkan pump vendor, diketahui power pompa yang diingankan adalah 97%
Power motor BHP
=
h
= 0.4647
0.97
= 0.48 kW
C-149
= 1/4LsID2 + 0.000049 ID3 + 0.0756 ID3
46.12 = 1.1775 ID3 + 0.000049 ID3 + 0.0756 ID3
ID = 3.3263 ft
= 1.0139 m
= 39.916 in
Pi x ID
ts = + C
2 x (fE - 0.6Pi)
= 703.92232 + 0.125
30014.108
= 0.1485 in
Dari tabel 5.7 (Brownell) didapatkan ts standar = 0.1875 in
OD = ID + 2ts
= 39.915755 + 0.375
= 40.290755
ID koreksi = OD - 2ts
= 42 - 0.375
= 41.625 in
C-150
OD = 42 in
ts = 0.1875 in
r = 42 in
tha = Pi x r x W
+ C
2 (fE - 0,1 Pi)
W = 0,25 x (3 + (r/icr)1/2)
icr = 2.625 in
W = 1.75
C-151
Fungsi
Tipe
Bahan Konstruksi
Kondisi operasi
P2
P = 1 atm
T = 30C
Dasar Perencanaan
Volumetrik rate
T Udara
P1
Densitas Udara
BM Udara
Kondisi Isothermal
Brake kW
=
=
=
=
=
=
1
71.95 in
1.828 m
= 1.5
atm
= 101.3 kPa
atm
= 152.0 kPa
C
= 1.168 Kg/m3
= 29.68 kg/mol
= - Ws x m
x 1000
= 0.009 kW
Dengan perencanaan:
Kapasitas = 15 ton
C-152
- 1 ]
Panjang = 974 cm
Lebar = 294 cm
Diameter ulir = 536 mm
Panjang ulir = 1940 mm
Putaran ulir = 20 rpm
Spesifikasi
Merk = Manseman Atos Rexhorth
Tekanan kerja = 120 bar
Elektro motor
Tipe = TEFC
Daya = 30 Hp
Voltase = 38 Volt
Dengan perencanaan
Laju alir = 1248 kg/jam = 1.2481 ton/jam
Ukuran bahan = 30 mesh
Dimensi buka (a) = 1.5 in = 0.125 ft
Ukuran tebal = 0.2 in = 0.0167 ft
Kapasitas unit (Cu) = 4
Kapasitas = 0.4 x F
C-153
Cu x Foa x Fs
= 0.4 x 1.2481
4 x 77.855 x 1
= 0.0016 ton/jam
Komponen % (kg/m3)
Minyak 98.313 831
Air 1.6869 965.34
Kapasitas basket = Vp x N
= 1540.4457 L
C-154
Banyak basket yang dibutuhkan = 1455.752788
1540.4456973
= 0.945 1 buah
C-155
Perhitungan tinggi isian :
V isian
OD
ID koreksi
Ls koreksi
ts
r
tha
= 1/4LlsID2 +
48.5762 = 9.9434 Lls +
Lls = 4.5013 ft
Tekanan operasi
Faktor keamanan
Tekanan desain
ts =
=
= 48
Pi x ID
ID
= OD -
= 48 -
= 0.1875
= 48
=
+
= 42.708909 +
= 43.0839 in
= 47.625 in
=
=
=
2 x (fE - 0.6Pi)
2214.7891
29937.7707
= 0.1365 in
+ C
+
2ts
0.375
0.0847
3.8184
41.4862
25%
51.8578
0.0625
71.4375 in
0.885 x P x r
2(fE - 0,1Pi)
2202.9184
29989.6284
0.1360 in
2ts
0.375
1.5 x ID koreksi
+
+
C
0.0625
C-156
ID3
psia
psia
psia
=
0.1875
48
in
in
Dari tabel 5.6 diambil tha standar = 0.1875 in
Steam
C-157
ln (t1 - t2)
= 150.3 - 81
ln 150.3 / 81
= 112.10252 F
c. perhitungan temperatur caloric
Tc = 122 + 131 = 126.5 F
2
ho = 1731 btu/ft2.hr.oF
Uc = hi x hoi
hi + hoi
C-158
Uc = 803.71 Btu/ft2.hr.F
Rd = 0.005
hd = 1 = 200.00
0.005
UD = Uc x hd
Uc + hd
= 160741.88
1003.709
= 160.148 Btu/ft2.hr.F
Dasar Perancangan:
Tekanan = 60 bar
= 870 psi
Suhu = 5 C
= 278.15 K
Rate CO2 = 2515.82 kg/jam
Lama penyimpanan = 12 jam
Kapasitas CO2 storage = 2515.82 kg/jam x 12 jam
= 30189.854 kg
Perhitungan:
Densitas CO2 = 500 kg/m3 = 31.2 lb/ft3
(Aspen Hysys)
Menghitung volume storage
Volume storage = Kapasitas 30189.854 kg
=
500 kg/m3
C-159
= 60.38 m3 = 2132 ft3
Bahan akan mengisi tangki sebesar 80% dari volume total, maka:
Volume total tangki = 100 x 20.13
80
= 25.16 m3
Menentukan diameter tangki
Asumsi Ls/D = 1.5
Bentuk tutup atas dan bawah = Elliptical dished head
Volume tutup = 0.000076 ID3
Pi x ID
ts = + C
2 x (fE - 0.6Pi)
= 641.6909 + 0.0625
29976.8740
= 0.0839 in
C-160
OD
Dari tabel 5.7 (Brownell) didapatkan ts standar
ID koreksi
Ls koreksi
OD
ts
r
tha
icr = 3
=
= 48
BC = r - icr
b
ID
in
in
+
= 33.297114 +
= 33.6721 in
= OD -
= 48 -
= 47.625 in
=
=
= 0.1875
= 48
=
2ts
0.375
71.4375 in
Pi x ID x V
1627.2770
29996.1457
= 0.1167 in
2ts
0.375
1.5 x ID koreksi
2(fE - 0,1Pi)
= r - (BC - AB )
OA = t + b + sf
Panjang storage
2
= Ls + 2OA
= 92.5168
= 2.3499
2.25 in)
in
m
C-161
in
in
in
in
in
=
=
=
0.1875
48
0.1875 in
in
in
Dari Tabel 5.7 dan 5.8 (Brownell), untuk tebal tutup = 3/16 torispherical dishead
r = 48
Tekanan hidrostatik (Ph) = 31.2
x 1.0
144
= 0.22 psi
Tekanan design = P + Ph
= 870 + 0.22
= 870 psi
= 856 psig
Spesifikasi
1 Bentuk bejana = Elliptical tank
2 Tipe = Vertical
3 ID = 47.625 in
4 OD = 48 in
5 Tebal bejana = 0.1875 in
6 Tebal tutup = 0.1875 in
7 Panjang bejana = 92.5168 in
8 Volume bejana = 25.16 m3/tangki
9 Jumlah = 1 buah
m CO2 = 2515.82 kg
= 1141.1513 lb T2 = 5
T1 = 10 C = 41 C
= 50 F t2 = -2 C F
= 28.4 F
Q = 35880 Btu/hr
massa propane = 3390.6748 lb
TLMTD = -23.4
-0.734
= 31.881 F
R = 0.154 FT = 0.98
C-162
S = 0.6
t = 32.53 F
Suhu kalorik
Tc = 50 + 41 = 45.5 F
2
tc = -4 + 28.4 = 12.2 F
2
Asumsi : Ud = 40
Ao = 35880
2312.1325
= 15.52 ft2
c). Koreksi Ud
A = Nt x a''t x L
A = 20 x 0.1963 x 8
A = 31.408 ft 2
Ud = Q / (A x t)
Ud = 35880 / ( 31.408 x 32.5 )
Ud = 35.116 Btu/h ft2 oF
C-163
IDs = 8 in
n' = 4 (jumlah passes pada shell)
B = 8 in (baffle spacing)
de = 0.73 in (diameter ekivalen) (Appendiks fig. 28, Kern)
Bagian Tube
di = 0.62 in (diameter dalam tube) (Appendiks tabel 10, Kern)
do = 0.75 in (diameter luar tube)
L = 8 ft (panjang tube)
n = 4 (jumlah passes pada tube) (Appendiks tabel 9, Kern)
Nt = 20 (jumlah tube) (Appendiks tabel 9, Kern)
Pt = 1 in (jarak antar sumbu tube)
C' = 0.25 in (jarak antar diameter luar tube) (C' = Pt - do)
a"t = 0.1963 ft2 (luas permukaan panjang) (Appendiks tabel 10, Kern)
a't = 0.302 in2 (luas penampang aliran) (Appendiks tabel 10, Kern)
Perpindahan panas
Shell Tube
5) Menghitung Nre 5') Menghitung Nre pipa
as = (IDs x B x c')/(n' x Pt x 144) at = (Nt x a't)/144n
= 8.00 x 8.00 x 0.25 = 20 x 0.302
4 x 1 x 144 144 x 4
= 0.028 ft2 = 0.0105 ft2
6) Gs = M / as 6') Gt = m / at
= 1141.15 / 0.028 = 3390.6748 / 0.0105
= 41081.447 lb/hr.ft2 = 323349.1 lb/hr.ft2
C-164
= 175.91 Btu/hr.ft2.oF = 95.8 Btu/hr.ft2.oF
10') hio = hi x di
do
= 79.195 Btu/hr.ft2.oF
Evaluasi P
Shell Tube
1) NRes = 52688.51 1) Nret = 1006922.28
f = 0.0015 (fig. 29, Kern) f = 0.0024 (fig 26, Kern)
sg = 0.10
Pn = 4 x 4 x 0.0012
= 0.04368 psia 0.0980
= 0.1959
Pt = 8.54 + 0.196
= 8.74
Ps < 10 psia (memenuhi)
DPt < 10 psia (memenuhi)
C-165
43. CO2 PUMP (L-142)
5m
Z
30m
20 m
20 m
Dipakai diameter standard = 1.5 in sch 40 (App. Table 11, Kern hal 844)
ID = 1.610 in
OD = 1.900 in
A = 2.040 in2
v = Q ft2/s (Kecepatan aliran di dalam pipa)
A
= 3.4840 ft/s
NRe = D v r = 219333.851
(Nre > 2100, maka memenuhi aliran turbulen)
C-166
Beda ketinggian, Z = 20 m
= 65.62 ft
Perhitungan friksi
A. Friksi di bagian suction
1) Friksi karena pipa lurus
Panjang pipa lurus bagian suction diperkirakan = 20 m = 65.62 ft
NRe = 219333.85
= 0.000046 m (Commercial Steel, Geankoplis fig. 2.10-3 hal 94)
D = 0.0408941 m
/D = 0.0011249
C-167
= 38.200536 ft lbf/lbm
Ws = 20 ft lbf/lbm
h = 23% (Fig 14.36 peters & timmerhaus)
wp = Ws
h
= 86.957
BHP = Rate Massa x wp
550
= 0.2436
Dari grafik 14.38 timmerhaus didapat eff.motor = 81%
eff.motor = 0.81
C-168
kons.power = BHP = 0.3007 hp
eff.motor
= 0.2242 kW
m CO2 = 2515.82 kg
= 1141.1513 lb T2 = 40 C
T1 = 5 C = 104 F
= 41 F t2 = 90 C
= 194 F
Q = 164900 Btu/hr
massa propane = 161.4 lb
TLMTD = 15.3
0.095
= 58.983 F
R = 1.2429 FT = 0.98
S = 0.2724
t = 57.80 F
Suhu kalorik
Tc = 272.3 + 194 = 233.15 F
2
tc = 41 + 104 = 72.5 F
2
Asumsi : Ud = 100
Ao = 164900
5780.3313
= 28.53 ft2
C-169
Asumsi 1-2 exchanger
Panjang = 8
OD = 0.75 in
BWG = 16
triangular pitch = 1 in
c). Koreksi Ud
A = Nt x a''t x L
A = 20 x 0.1963 x 8
A = 31.408 ft 2
Ud = Q / (A x t)
Ud = 164900 / ( 31.408 x 57.8 )
Ud = 90.83 Btu/J ft2 oF
Kesimpulan sementara hasil perancangan :
Bagian shell
IDs = 8
n' = 6 (jumlah passes pada shell)
B = 8 in (baffle spacing)
de = 0.73 in (diameter ekivalen) (Appendiks fig. 28, Kern)
Bagian Tube
di = 0.62 in (diameter dalam tube) (Appendiks tabel 10, Kern)
do = 0.75 in (diameter luar tube)
L = 8 ft (panjang tube)
n = 6 (jumlah passes pada tube) (Appendiks tabel 9, Kern)
Nt = 20 (jumlah tube) (Appendiks tabel 9, Kern)
Pt = 1.00 in (jarak antar sumbu tube)
C' = 0.25 in (jarak antar diameter luar tube) (C' = Pt - do)
a"t = 0.196 ft2 (luas permukaan panjang) (Appendiks tabel 10, Kern)
a't = 0.302 in (luas penampang aliran)
2
(Appendiks tabel 10, Kern)
C-170
Perpindahan panas
Shell Tube
5) Menghitung Nre 5') Menghitung Nre pipa
as = (IDs x B x c')/(n' x Pt x 144) at = (Nt x a't)/144n
= 8.00 x 8.00 x 0.25 = 20 x 0.302
6 x 1 x 144 144 x 6
= 0.019 ft2 = 0.007 ft2
6) Gs = M / as 6') Gt = m / at
= 1141.15 / 0.019 = 23087.7 lb/hr.ft2
= 61622.17 lb/hr.ft2
Evaluasi P
Shell Tube
1) NRes = 14329.71 1) Nret = 3088.46
f = 0.0034 (fig. 29, Kern) f = 0.00045 (fig 26, Kern)
C-171
sg = 0.05
IDs = 8 in 3) Pn = 4 x n x v2 x 62.5
= 0.667 ft sg x 2gc x 144
v2x62.5 = 0.001 (fig, 27, Kern)
s.g = 0.073 2gc x 144
Pn = 4 x 6 x 0.0012
Ps f Gs IDs (N+1)
2
0.05
5.22 x 1010 x de x Sg x s = 0.576
C-172
= 1/4LsID2 + 0.000152 ID3
119.561 = 1.1775 ID3 + 0.000152 ID3
ID = 4.6651 ft
= 1.4219 m
= 55.981 in
Pi x ID
ts = + C
2 x (fE - 0.6Pi)
= 292298.432 + 0.0625
23734.373
= 12.3779 in
didapatkan ts standar = 13 in
OD = ID + 2ts
= 55.9813 + 26
= 81.981326
Dari tabel 5.7 (Brownell) didapatkan OD standar = 82 in
ID koreksi = OD - 2ts
= 82 - 26
= 56 in
C-173
+ C
2 (fE - 0,1 Pi)
tha = 470261.13644 0.0625
+
28955.7288
= 16.303194
didapatkan tha standar = 17 in
Panjang ekstraktor = Ls + 2 OA
= 84 + 32.867
= 116.9 in
= 2.968 m
m CO2 = 22.23 kg
= 10.08159 lb t2 = 40 C
t1 = 20 C = 104 F
= 68 F T2 = 90 C
= 194 F
C-174
Cp CO2 keluar = 1.7270 kJ/kgC = 0.4110 Btu/ lb F
Cp steam masuk = 1.9460 kJ/kgC = 0.4631 Btu/ lb F
Cp steam keluar = 4.3750 kJ/kgC = 1.0413 Btu/ lb F
Q = 446200 Btu/hr
massa propane = 436.6 lb
TLMTD = 42.3
0.289
= 146.131 F
R = 2.175 FT = 0.98
S = 0.1762
t = 143.21 F
Suhu kalorik
Tc = 272.3 + 194 = 233.15 F
2
tc = 68 + 104 = 86 F
2
Asumsi : Ud = 5
Ao = 446200
623.14766
= 716.04 ft2
c). Koreksi Ud
C-175
A = Nt x a''t x L
A = 370 x 0.1963 x 10
A = 726.310 ft2
Ud = Q / (A x t)
Ud = 446200 / ( 726.310 x 143.2 )
Ud = 4.2898 Btu/J ft F
2 o
Bagian Tube
di = 0.62 in (diameter dalam tube) (Appendiks tabel 10, Kern)
do = 0.75 in (diameter luar tube)
L = 10 ft (panjang tube)
n = 4 (jumlah passes pada tube) (Appendiks tabel 9, Kern)
Nt = 370 (jumlah tube) (Appendiks tabel 9, Kern)
Pt = 1.00 in (jarak antar sumbu tube)
C' = 0.25 in (jarak antar diameter luar tube) (C' = Pt - do)
a"t = 0.196 ft2 (luas permukaan panjang) (Appendiks tabel 10, Kern)
a't = 0.302 in2 (luas penampang aliran) (Appendiks tabel 10, Kern)
Perpindahan panas
Shell Tube
5) Menghitung Nre 5') Menghitung Nre pipa
as = (IDs x B x c')/(n' x Pt x 144) at = (Nt x a't)/144n
= 25.00 x 25.00 x 0.25 = 370 x 0.302
4 x 1 x 144 144 x 4
= 0.271 ft2 = 0.194 ft2
6) Gs = M / as 6') Gt = m / at
= 10.08 / 0.271 = 2250.6 lb/hr.ft2
= 37.165 lb/hr.ft2
C-176
8) JH = 12 (fig. 28, Kern) 8') hio = 1500 Btu/hr.ft2.oF
k 0.3801
= JH x (k/de) x (cp m/k)
1/3
ho
= 5.1424 Btu/hr.ft2.oF
Evaluasi P
Shell Tube
1) NRes = 158.55 1) Nret = 3612.78
f = 0.0034 (fig. 29, Kern) f = 0.00045 (fig 26, Kern)
sg = 0.05
2) Menghitung harga (N+1) 2) .P1 = f x Gt2 x L x n
N+1 = (12 x l x n') / B 5.22x1010 x di x sg x t
= 19 = 0.001
IDs = 25.00 in 3) Pn = 4 x n x v2 x 62.5
= 2.083 ft sg x 2gc x 144
v2x62.5 = 0.001 (fig, 27, Kern)
s.g = 0.073 2gc x 144
C-177
Komponen % (kg/m3)
Minyak 4.7645 856.1
CO2 94.722 1.7845
Air 13.637 965.34
campuran = (%m minyak x minyak)+ (%m CO2 x CO2)+ (%m air x air)
= 174.12066 kg/m3
= 10.869973 lb/ft3
volume isian = 140.18258 kg
174.12066 kg/m3
= 0.805 m3
= 28.430 ft3
volume silinder = 100% x 28.430 ft3
50%
= 56.860 ft3
C-178
Pi x ID
ts = + C
2 x (fE - 0.6Pi)
= 44222.035 + 0.1
28729.982
= 1.6017295 in
OD = ID + 2ts
= 41.783999 + 3.25
= 45.033999
Dari tabel 5.7 (Brownell) didapatkan OD standar = 48 in
ID koreksi = OD - 2ts
= 48 - 3.25
= 44.75 in
tha = 0.885 x P x r
+ C
2(fE - 0,1Pi)
= 44958.6466 + 0.1
29788.3303
= 1.5718 in
C-179
Panjang separator = Ls + 2 OA
= 67.13 + 27
= 94.14 in
= 2.391 m
m CO2 = 2515.82 kg
= 1141.1513 lb T2 = 5 C
T1 = 40 C = 41 F
= 104 F t2 = -2 C
= 28.4 F
Q = 575300 Btu/hr
massa propane = 15730 lb
TLMTD = 30.6
0.519
= 58.983 F
R = 1.944 FT = 0.98
S = 0.3
t = 57.80 F
Suhu kalorik
Tc = 104 + 41 = 72.5 F
2
tc = -4 + 28 = 12.2 F
2
Asumsi : Ud = 40
Ao = 575300
2312.1325
= 248.82 ft2
C-180
Asumsi 1-2 exchanger
Panjang = 10
OD = 0.75 in
BWG = 16
triangular pitch = 1 in
c). Koreksi Ud
A = Nt x a''t x L
A = 158 x 0.1963 x 10
A = 310.154 ft 2
Ud = Q / (A x t)
Ud = 575300 / ( 310.154 x 57.8 )
Ud = 32.09 Btu/h ft2 oF
Bagian Tube
di = 0.62 in (diameter dalam tube) (Appendiks tabel 10, Kern)
do = 0.75 in (diameter luar tube)
L = 10 ft (panjang tube)
n = 4 (jumlah passes pada tube) (Appendiks tabel 9, Kern)
Nt = 158 (jumlah tube) (Appendiks tabel 9, Kern)
Pt = 1 in (jarak antar sumbu tube)
C' = 0.25 in (jarak antar diameter luar tube) (C' = Pt - do)
a"t = 0.1963 ft2 (luas permukaan panjang) (Appendiks tabel 10, Kern)
C-181
a't = 0.302 in2 (luas penampang aliran) (Appendiks tabel 10, Kern)
Perpindahan panas
Shell Tube
5) Menghitung Nre 5') Menghitung Nre pipa
as = (IDs x B x c')/(n' x Pt x 144) at = (Nt x a't)/144n
= 17.25 x 17.25 x 0.25 = 158 x 0.302
4 x 1 x 144 144 x 4
= 0.129 ft2 = 0.0828 ft2
6) Gs = M / as 6') Gt = m / at
= 1141.15 / 0.129 = 15730 / 0.0828
= 8836 lb/hr.ft2 = 189883.5 lb/hr.ft2
10') hio = hi x di
do
= 645.6 Btu/hr.ft2.oF
C-182
Rd = (Uc - Ud)/(Uc x Ud)
= 0.008 > 0.005 Rd ditetapkan (memenuhi)
Evaluasi P
Shell Tube
1) NRes = 11332.29 1) Nret = 26037.16
f = 0.0034 (fig. 29, Kern) f = 0.002 (fig 26, Kern)
sg = 0.10
Pt = 1.13 + 0.202
= 1.33
Ps < 10 psia (memenuhi)
DPt < 10 psia (memenuhi)
C-183
C-184
C-185
C-186
C-187
C-188
C-189
C-190
persamaan berikut
C-191
C-192
C-193
C-194
ft
C-195
C-196
C-197
C-198
+ (%m air x air)
C-199
C-200
C-201