Anda di halaman 1dari 2

LAPORAN PELAKSANAAN PEKERJAAN LAPANGAN SURVEY TOPOGRAFI

MENGGUNAKAN PESAWAT UDARA TANPA AWAK (UAV)


PLTA – PEBATUA 02, SUNGAI LARIANG - LUAS AREA 2500 Hektar
Lokasi : Ds. Pili Maku Jawa, Kec. Kulawi Selatan, Kab. Sigi – Prop. Sulteng

PT. CIPTA HARMONI SELARAS


Tanggal : 5 April s/d 19 April 2018

Laporan Pelaksanaan Pekerjaan lapangan – Aerial Mapping PLTA – PABATUA 02


DAFTAR ISI

HALAMAN JUDUL.........................................................................................................i
LAPORAN PELAKSANAAN PEKERJAAN LAPANGAN SURVEY TOPOGRAFI
MENGGUNAKAN PESAWAT UDARA TANPA AWAK (UAV)
PLTA – PEBATUA 2, SUNGAI LARIANG, LUAS AREA 2500 HEKTAR
Lokasi : Ds. Pili Maku Jawa, Kec. Kulawi Selatan, Kab. Sigi – Prop. Sulteng

DAFTAR ISI...............................................................................................................ii

I. PENDAHULUAN....................................................................................1
II. TENAGA AHLI......................................................................................2
III. PERALATAN.........................................................................................2
IV. TAHAPAN PELAKSANAAN KEGIATAN LAPANGAN......................................5
A. Laporan Kegiatan Pemasangan GCP (Ground Control Points).......................6
- 1. Pelaksanaan pekerjaan.......................................................................6
- 2. List koordinat hasil pengukuran koordinat GCP dan Premarks................8
B. Laporan kegiatan Aerial Mapping...............................................................8
-1. Lokasi Base atau GCS (Ground Control Station)....................................9
-2. Desain Jalur Terbang..........................................................................11
C. Kegiatan QC (Quality Control) Dataset Foto udara dan GCP.......................12
- Screen shoot covered area terhadap AOI...............................................11

V. PENUTUP................................................................................................13

LAMPIRAN.
A.1. Dokumentasi kegiatan Pemasangan Premark dan Pengukuran
koordinat GCP
B.1. Foto-foto Dokumentasi kegiatan Aerial Mapping

C.1. Hasil pemetaan area rencana PLTA – PEBATUA 2 (Screen Shoot)

Laporan Pelaksanaan Pekerjaan lapangan – Aerial Mapping PLTA – PABATUA 02

Anda mungkin juga menyukai