Cover Dan Daftar Isi - Plta Lariang
Cover Dan Daftar Isi - Plta Lariang
HALAMAN JUDUL.........................................................................................................i
LAPORAN PELAKSANAAN PEKERJAAN LAPANGAN SURVEY TOPOGRAFI
MENGGUNAKAN PESAWAT UDARA TANPA AWAK (UAV)
PLTA – PEBATUA 2, SUNGAI LARIANG, LUAS AREA 2500 HEKTAR
Lokasi : Ds. Pili Maku Jawa, Kec. Kulawi Selatan, Kab. Sigi – Prop. Sulteng
DAFTAR ISI...............................................................................................................ii
I. PENDAHULUAN....................................................................................1
II. TENAGA AHLI......................................................................................2
III. PERALATAN.........................................................................................2
IV. TAHAPAN PELAKSANAAN KEGIATAN LAPANGAN......................................5
A. Laporan Kegiatan Pemasangan GCP (Ground Control Points).......................6
- 1. Pelaksanaan pekerjaan.......................................................................6
- 2. List koordinat hasil pengukuran koordinat GCP dan Premarks................8
B. Laporan kegiatan Aerial Mapping...............................................................8
-1. Lokasi Base atau GCS (Ground Control Station)....................................9
-2. Desain Jalur Terbang..........................................................................11
C. Kegiatan QC (Quality Control) Dataset Foto udara dan GCP.......................12
- Screen shoot covered area terhadap AOI...............................................11
V. PENUTUP................................................................................................13
LAMPIRAN.
A.1. Dokumentasi kegiatan Pemasangan Premark dan Pengukuran
koordinat GCP
B.1. Foto-foto Dokumentasi kegiatan Aerial Mapping