METODE PERBAIKAN DAN PERKUATAN STRUKTUR


DIPLOMA TEKNIK INFRASTRUKTUR SIPIL
INSTITUT TEKNOLOGI SEPULUH NOPEMBER

Dosen Pengajar :
Afif Navir Refani, ST., MT.

IPITS 2015 10

LECTURE CONTENTS
11. Port and Bridge Assessment
12. Steel Structure Deterioration & Rehabilitation
13. Steel Structure Strengthening - Bracing
14. Steel Structure Strengthening - Composites
15. Concrete Structure Strengthening using steel
member
16. Evaluation 3

IPITS 2015 10

1
11/21/2018

LECTURE CONTRACT
1. Mahasiswa masuk tepat waktu dengan mempersiapkan LCD, Daftar Presensi
dan semua perlengkapan ruangan kuliah.
2. Penilaian Mata Kuliah meliputi :
1. Absensi (Kurang dari 80%, dipastikan tidak akan mendapatkan nilai yang
cukup).
2. Tugas
3. Keaktifan dalam kelas
4. Evaluasi
3. Mahasiswa wajib menanyakan / menghubungi dosen pengajar apabila kuliah
belum dimulai sampai dengan 30 menit dari jadwal yang ada.
4. Diwajibkan saling menghormati antara mahasiswa dan pengajar dengan tidak
membuat kegaduhan dalam bentuk apapun.

IPITS 2015 10

METODE PERBAIKAN DAN PERKUATAN STRUKTUR


DIPLOMA TEKNIK INFRASTRUKTUR SIPIL
INSTITUT TEKNOLOGI SEPULUH NOPEMBER

CHAPTER – 11

STRUCTURAL ASSESSMENT OF PORT AND


BRIDGE
Oleh :
Afif Navir, ST., MT.

2
11/21/2018

STRUCTURAL ASSESSMENT OF JETTY

STRUCTURAL ASSESSMENT OF JETTY


BACKGROUND / STRUCTURAL TEST AT
TECHNICAL DATA VISUAL INSPECTION
SITUATION FIELD AND LABORATORY

GOOD STRUCTURAL ASSESSMENT


DATA EVALUATION
SHOULD SOLVE SOME PROBLEMS /
SITUATION WITH COMPREHENSIVE
APPROACH TO PRODUCT SOME
APPLICABLE SOLUTIONS
STRUCTURAL ANALYSIS

DRAWING AND COST REPAIR AND OR


REPORTING AND
ESTIMATION FOR REPAIR OR STRENGHTENING
CONCLUSION
AND STRENGTHENING RECCOMENDATION

3
11/21/2018

BACKGROUND
(WHY WE NEED STRUCTURAL ASSESSMENT)

ACCIDENT / DURABILITY CAPACITY ASSETS


UPGRADING
FORCE PROBLEMS MONITORING
MAJEURE (ADD MORE LOADS OR
TO EXISTING
STRUCTURE) MAINTENANCE
PURPOSE

TECHNICAL DATA TO SUPPORT JETTY


STRUCTURAL ASSESSMENT PROCESS
Dimensi Dermaga  Dari Gambar As Build

Kriteria Desain Dermaga Untuk mengetahui pembebanan pada eksisting dermaga

Detailing Elemen Struktur Dermaga Dari Gambar As Build, diverifikasi dengan Pengujian

Aksesoris Penunjang Dermaga  Tipe Fender / Bollard beserta Spesifikasinya

Mutu Beton Dermaga  Data Perencanaan

Mutu Baja Tulangan Dermaga  Data Perencanaan

Mutu Tiang Pancang  Data Perencanaan untuk menghitung kekuatan Tiang

4
11/21/2018

VISUAL INSPECTION

JETTY FENDER & FOUNDATION /


STRUCTURE BOLLARD PILE CONDITION
INSPECTION INSPECTION INSPECTION

VISUAL INSPECTION
36000

4500 5300 5300 5300 5300 5400 3500


1400 TOP PLATE SURFACE ACCESSORIES

UNDER JETTY
STRUCTURE

PILE CONDITION
10 00°

5
11/21/2018

UPPER JETTY INSPECTION

UNDER JETTY STRUCTURE


INSPECTION

6
11/21/2018

PENGAMATAN VISUAL

Kerusakan Pada Pelat Bagian Bawah

PENGAMATAN VISUAL

Foto Mikrometer Pelat Bagian Bawah

7
11/21/2018

PENGAMATAN VISUAL

Foto Mikrometer Pelat Bagian Bawah

FOTO PENGUKURAN LEBAR RETAK

8
11/21/2018

Hasil Pembacaan Kedalaman Retak dan


Pengukuran Lebar Retak pada Elemen Pelat Bagian Atas, Wilayah
Kering (K)

JARAK PEMBACAAN ULTRASONIC KEDALAMAN LEBAR


ELEMEN
NO. KODE LOKASI H ( μdetik ) RETAK RETAK
STRUKTUR
( mm ) t1 t2 ( mm ) ( mm )

1 PELAT RPK - 1 CD → 9 100 107.3 179.8 81.2 0.2

2 PELAT RPK - 2 BC → 27-28 100 130.6 236.0 56.9 0.1

3 PELAT RPK - 3 MN → 27-28 100 128.1 245.0 35.9 0.19

4 PELAT RPK - 4 CD → 39-40 100 113.1 217.0 34.5 0.2

5 PELAT RPK - 5 CD → 57-58 100 82.6 145.6 65.1 0.14

6 PELAT RPK - 6 AB → 78-79 100 108.6 182.6 80.1 0.18

Rata-rata 59.0 0.168333

Hasil Pembacaan Kedalaman Retak dan Pengukuran Lebar Retak pada


Elemen Pelat Bagian Bawah dan Balok, Wilayah Splash Zone (K)

JARAK PEMBACAAN ULTRASONIC KEDALAMAN LEBAR


ELEMEN
NO. KODE LOKASI H ( μdetik ) RETAK RETAK
STRUKTUR
( Cm ) t1 t2 ( mm ) ( mm )

1 PELAT RPS - 1 BC → 6-7 100 213.0 380.2 61.0

2 PELAT RPS - 2 CD → 6-7 100 116.2 280.4 Retak Tembus

3 BALOK RBS - 1 BC → 7 100 95.5 175.6 51.0

4 PELAT RPS - 3 CD → 17-18 100 98.6 178.2 56.9 0.22

5 BALOK RBS - 2 CD → 18 100 120.4 285.2 Retak Tembus 0.20

6 PELAT RPS - 4 BC → 41-42 100 136.7 285.0 Retak Tembus 0.36

7 BALOK RBS - 3 BC → 42 100 138.7 240.2 70.8 0.20

8 BALOK RBS - 4 CD → 42 100 109.3 271.0 Retak Tembus 0.30

9 PELAT RPS - 5 BC → 78-79 100 219.0 320.0 128.2 0.20

10 PELAT RPS - 6 CD → 78-79 100 104.4 164.7 100.8

11 PELAT RPS - 7 D → 78-79 100 132.6 270.5 Retak Tembus

Rata-rata 78.1 0.246667

9
11/21/2018

Penggambaran Pola Retak Pelat Bawah Zone – I & Zone II


1 2 3 4 5 6 7 8
22 23 24 25 26 27 28 29 30 31 32 33 34
A
A
B
B
C
C
D

D
8 9 10 11 12 13 14 15

E
B

F
C

G
D

H
15 16 17 18 19 20 21 22
I
A

Zone – II
B

Zone – I

Penggambaran Pola Retak Pelat Bawah Zone – III & Zone IVA
34 35 36 37 38 39 40 41 56 57 58 59 60 61 62 63 64

A A

B B

C C

D D

41 42 43 44 45 46 47 48 64 65 66 67 68 69 70 71 72
A A

B B

C C

D D

48 49 50 51 52 53 54 55
72 73 74 75 76 77
A
A

B
B

C
C

D
D

Zone – III Zone – IVA

10
11/21/2018

FENDER

STORM ANCHOR
JUNCTION BOX

STOPPER CRANE
CRANE REL

CRANE & CABLE TRAY

ACCESORIES

PUMP AND NOZZLE

11
11/21/2018

AS - D

AS - C

FOUNDATION
INSPECTION

CODE & REFERENCE


 Standard Design Criteria for Ports in Indonesia 1984.
 PIANC Guidelines for the Design of Fenders System.
 Technical Standards for Port and Harbour Facilities in Japan.
 Standar ketahanan Gempa untuk Jembatan (SNI 2833-2013).
 Tata Cara Perencanaan Struktur Beton (SNI 03-2847-2013).
 Tata Cara Perencanaan Struktur Baja (SNI 03-1729-2015).
 Persyaratan Perancangan Geoteknik (SNI 8460 – 2017)
 American Concrete Institute (ACI 318-11)
 AISC – 07 2010
 American Standard Testing Methode (ASTM)
 Standart-standart lain sejauh tidak bertentangan dengan ketentuan-ketentuan yang berlaku.

12
11/21/2018

STRUCTURAL TEST
AT FIELD

CORROSION
COREDRILL AND ULTRASONIC PULSE REBAR DETECTOR & ULTRASONIC STEEL
HAMMER TEST POTENTIAL AND
STEEL REBAR SAMPLE VELOCITY TEST COVER METER TEST THICKNESS TEST
CARBONATION TEST

LABORATORY TEST PERMEABILITY TEST

POROSITY TEST

CHLOR
PENETRATION TEST

CORROTION RATE
TEST

Concrete PH TEST

Rebar Tensile Test

Concrete
Compressive Test

13
11/21/2018

DATA EVALUATION

 Data Evaluation for pile condition


URAIAN A B C D E F G

Jumlah retak maxsimum/TP titik 9.00 11.00 9.00 8.00 7.00 3.00 2.00

Jumlah retak TP yang terjadi titik 64.00 269.00 232.00 258.00 74.00 6.00 5.00

Panjang retak total cm 6031.86 25352.65 21865.48 24315.93 6974.34 565.49 471.24

Jumlah TP sesuai gambar bh 113.00 57.00 57.00 113.00 57.00 113.00 113.00

Jumlah TP yang tidak dapat


bh 60.00 2.00 9.00 16.00 15.00 39.00 0.00
periksa

Jumlah TP yang dapat periksa bh 53.00 55.00 48.00 97.00 42.00 74.00 113.00

Jumlah TP yang rusak bh 25.00 52.00 47.00 74.00 24.00 39.00 4.00

Presentase kondisi yang rusak


% 47.17% 94.55% 97.92% 76.29% 57.14% 52.70% 3.54%
terhadap jumlah yang diperiksa

DATA EVALUATION
No. Uraian Satuan 1 2 3 4 5
DATA EVALUATION FOR CONCRETE COMPRESSIVE STRENGTH TEST
1 Lokasi Core 1 Core 2 Core 3 Core 4 Core 5
CD-10  2 Tanggal Test 18/10/13 18/10/13 18/10/13 18/10/13 18/10/13
3 lokasi LT. 3 LT. 5 TL. 7 LT. 10 LT. 12
4 Diameter, D mm 94,00 94,00 94,00 94,00 94,00
5 Tinggi, L mm 119,00 119,00 119,00 95,00 119,00
6 Berat gram 1960,00 2025,00 1985,00 1620,00 2075,00
Berat jenis 3
7 ton/m 2,37 2,45 2,40 2,46 2,51
8 Beban Tekan Maksimum, P kg 21200,00 23800,00 21850,00 23250,00 22250,00
Luas Penampang Beton, A 2
9 cm 69,40 69,40 69,40 69,40 69,40
P / A (silinder cor) 2
10 kg/cm 305,49 342,95 314,85 335,03 320,62
11 L/D 1,27 1,27 1,27 1,01 1,27
Faktor Koreksi
12 0,983 0,983 0,983 0,870 0,983
Karena L / D, K 1
Tulangan Melintang
13 φ r mm 10 / 10 8 8 8/8/8 8/8/8
h mm 13 / 44 20 37 8 / 10 / 19 8 / 19 / 45
15 Faktor Koreksi Tulangan, K 2 1,09 1,02 1,04 1,08 1,08
16 Compresive Strength
2
16.a Silinder ∅ 10 cm kg/cm 327,35 344,37 321,79 315,37 339,50
Silinder ∅ 15-30 cm 2
16.b fc '
kg/cm 314,76 331,12 309,41 303,24 326,44
(16.a /1.04) i

14
11/21/2018

DATA EVALUATION
 Data evaluation for UPV Test

Struktur bangunan Trestle dan Jetty di DUKS Gresik dihasilkan nilai


potesial tulangan maksimum adalah sebesar -416 mV.

Tabel Batasan Nilai Potensial Tulangan sesuai ASTM C 876

Nilai Potensial Kondisi Tulangan

> - 200 mV Kemungkinan korosi < 10 %

- 200 mV s/d – 350 mV Korosi tidak menentu

< -350 mV Tingkat korosi bisa mencapai 90%

15
11/21/2018

1100
1100

1000
1000

900
900

800
800

700
700

600
600

500
500

400 400

300 300

200 200

100 100
2000 2100 2200 2300 2400 2500
2000 2100 2200 2300

Bagian Atas Bagian Bawah

Kontur Nilai Potensial Tulangan Dari Elemen Struktur Pelat Lantai Atas pada Zone I
As 7 - 10

STRUCTURAL ANALYSIS
• Analisa struktur dermaga dilakukan dengan dua metode
yaitu menggunakan permodelan struktur dengan SAP2000
untuk mengetahui kapasitas elemen struktur dan tiang
pancang dermaga.
• Dan model Plaxis untuk mengetahui stabilitas dermaga dan
analisa defleksi tiang pancang / pondasi akibat pengaruh
beban demaga.

16
11/21/2018

Evaluasi

Alternatif I Alternatif II Alternatif III

Pembesaran & a
Pembersihan
muka Beton Pembersihan Retak

Coating Penutupan Retak Dengan


Plameur

Pemasangan Nepple Untuk


Lubang Grouting Jarak ± 30 Cm

Grouting (Nepple 1) Tekanan


Alur alternatif perbaikan Minimum 60 Bar
kerusakan beton
Grouting (Nepple 1) Berhenti Bila
Bahan Grout Telah Keluar Pada
(Nepple 2) Berikutnya

Grouting Dilanjutkan Pada


Nepple 2 Setelah Nepple 1
Ditutup
REPAIR / Dan Seterusnya

STRENGTHENING Selesai

step 1

Repair III
beton

Analisa Repair/
Perbaikan tulangan baja

Study Repair
jack hammer

Metode Pengecoran Pemilihan Material Rencana Struktur Perancah


& Begisting

Lay Out Perancah

Pengupasan

Cek Kondisi Pemotongan Pembersihan


Akhir Tulangan Tulangan step 2

beton
Pembersihan Akhir Perbaikan Tulangan / dynabolt
Permukaan Beton Ganti inlet grout
outlet grout
papan bekisting

Proteksi Baja baja tulangan


Tulangan dicoating

REPAIR / Bonding
Lama & Baru

STRENGTHENING Pengecoran

17
11/21/2018

REPAIR / STRENGTHENING
 Perbaikan retak-retak maupun spalling yang terjadi pada elemen pelat / balok
dengan cara injeksi epoxy maupun patching dengan cement grout.

REPAIR / STRENGTHENING

1cm

Pembersihan beton sampai dengan 1 cm


jack hammer

di belakang tulangan terkorosi


Metode pembersihan dengan cara mekanis inlet outlet

tulangan yang sudah


dibersihkan atau diganti

dynabolt papan bekisting

Proses patching dan injek cemen grout dan bekisting

18
11/21/2018

REPAIR / STRENGTHENING
Jacketing Method
300 300

155
Overtopping

470
Plat Precast

Cast in Situ

Non Shrink Grout (75 mm)

Precast Crane Beam

The jacketing material using 75 mm thick of non


permeable, non shrinkage and silica fume layer

REPAIR / STRENGTHENING

Overtopping
470

Plat Precast

METODA JACKETING

19
11/21/2018

STRUCTURAL ASSESSMENT OF BRIDGE

DEPARTMENT OF CIVIL INFRASTRUCTURE ENGINEERING


SEPULUH NOPEMBER INSTITUTE OF TECHNOLOGY

EXPERIMENTAL AND ANALYTICAL ASSESSMENT OF


60M STEEL TRUSS BRIDGE

20
11/21/2018

Introduction

Kalimujur Bridge build to provide an alternative route between Lumajang city and Jember city

Before the bridge used for regular traffic, the loading test and structural assessment were
conducted to observe the actual condition of bridge structure.

These inspection only performed at one Approach Bridge near Lumajang City.

The loading procedure include static and dynamic loading test. The loading test
results was compared with result from structural analysis to provide
comprehensive Analysis.

KALIMUJUR BRIDGE
• Span of approach bridges : 60 m
• Span of main bridges : 128 m
• Total span : 368 m

Lumajang Side Jember Side

21
11/21/2018

KALIMUJUR BRIDGE
55116
5025 5016 5009 5011 5013 5014 5013 5011 5009 5016 5025

2/IGPT-1 2/IGPT-2 2/IGPT-3 2/IGPT-4 2/IGPT-5 2/IGPT-6 2/IGPT-6 2/IGPT-5 2/IGPT-4 2/IGPT-3 2/IGPT-2 2/IGPT-1
2/OGPT-1 TC1 2/OGPT-2 TC2 2/OGPT-3 TC3 2/OGPT-4 TC4 2/OGPT-5 TC5 2/OGPT-6 TC6 2/OGPT-6 TC5 2/OGPT-5 TC4 2/OGPT-4 TC3 2/OGPT-3 TC2 2/OGPT-2 TC1 2/OGPT-1
STP

IWF

IWF

IWF

IWF
IWF

IWF

IWF

IWF

IWF

IWF
IWF

IWF
0

x12

8x10

6
x20

6
400x

400x

400x

400x
12x2

12x1

10x1

8x10
40

40

40

40

400x

400x
10x1

10x1

10x1

12x1

12x1
400x

400x
10
0x25

0x20

0x15

0x15
0x12

150x

245x

275x

320x

325x
220x
325x

320x

275x

245x

150x

360x
150x

150x

200x

250x
11

DG
DG

300x
300x

DG
12

220x
7

DG
DG

DG
8
1

6
5

DG
6350

DG
3

DG
DG
DG

0x12

0x10

0x10

0x10
DG

4
10

2
DG
0x36

DG
DG

DG
DG

DG
DG

400x

DG

DG
11

DG
12

7
10x1

10x1

12x1

12x2
400x
400x

400x

400x

400x
8
6

8x10

12x2
DG
400x

400x

400x

400x

1
10
4

400x
2
12x1

9
8x
x1

x1

x1

x1
40

10
IWF

0
6

0
IW F
IWF

IWF

IWF

IWF

IWF

IWF

IWF

IWF
6
IWF

IWF
BC1 BC2 BC3 BC4 BC5 BC6 BC6 BC5 BC4 BC3 BC2 BC1

2/OGPB-1 2/OGPB-2 2/OGPB-3 2/OGPB-4 2/OGPB-5 2/OGPB-6 2/OGPB-7 2/OGPB-6 2/OGPB-5 2/OGPB-4 2/OGPB-3 2/OGPB-2 2/OGPB-1
2/IGPB-1 2/IGPB-2 2/IGPB-3 2/IGPB-4 2/IGPB-5 2/IGPB-6 2/IGPB-7 2/IGPB-6 2/IGPB-5 2/IGPB-4 2/IGPB-3 2/IGPB-2 2/IGPB-1

5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000
60000

Elevation
55160
5025 5016 5009 5011 5013 5014 5013 5011 5009 5016 5025

B B
IWF 400x280x10x16 IWF 400x375x16x20 IWF 400x435x16x24 IWF 400x425x20x30 IWF 400x450x24x30 IWF 400x450x30x30 IWF 400x450x24x30 IWF 400x425x20x30 IWF 400x435x16x24 IWF 400x375x16x20 IWF 400x280x10x16

TC1 TC2 TC3 TC4 TC5 TC6 TC5 TC4 TC3 TC2 TC1
IW

IW

IW

IW

IW

IW

IW

IW

IW

IW

IW
F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1
50

50

50

50

50

50

50

50

50

50

50
x1

x1

x1

x1

x1

x1

x1

x1

x1

x1

x1
50

50

50

50

50

50

50

50

50

50

50
x1

x1

x1

x1

x1

x1

x1

x1

x1

x1

x1
0x

0x

0x

0x

0x

0x

0x

0x

0x

0x

0x
IWF 300x150x6.5x9

IWF 300x150x6.5x9
7

7
9600
9200

7
0x

0x

0x

0x

0x

0x

0x

0x

0x

0x

0x
x1

x1

x1

x1

x1

x1

x1

x1

x1

x1

x1
50

50

50

50

50

50

50

50

50

50

50
x1

x1

x1

x1

x1

x1

x1

x1

x1

x1

x1
50

50

50

50

50

50

50

50

50

50

50
F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1
IW

IW

IW

IW

IW

IW

IW

IW

IW

IW

IW
TC1 TC2 TC3 TC4 TC5 TC6 TC5 TC4 TC3 TC2 TC1

IWF 400x280x10x16 IWF 400x375x16x20 IWF 400x435x16x24 IWF 400x425x20x30 IWF 400x450x24x30 IWF 400x450x30x30 IWF 400x450x24x30 IWF 400x425x20x30 IWF 400x435x16x24 IWF 400x375x16x20 IWF 400x280x10x16
A A

Plan –Top Chord Bracing

Chord uses IWF 400. The IWF 250 and IWF 400 are applied for the stingers. The upper
bracing and floor beam utilize IWF 150 and IWF 750
3

KALIMUJUR BRIDGE
B B
IWF 400x200x8x10 IWF 400x325x10x16 IWF 400x400x16x20 IWF 400x375x16x30 IWF 400x400x20x30 IWF 400x450x20x30 IWF 400x450x20x30 IWF 400x400x20x30 IWF 400x375x16x30 IWF 400x400x16x20 IWF 400x325x10x16 IWF 400x200x8x10
BC1 BC2 BC3 BC4 BC5 BC6 BC6 BC5 BC4 BC3 BC2 BC1
1650 1000455

ST2 ST2 ST2 ST2 ST2 ST2 ST2 ST2 ST2 ST2 ST2 ST2
1650 1000

IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12
ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1
IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12
IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12
ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1
IWF 550x250x10x20
IWF 750x250x10x20

IWF 750x250x10x20

IWF 750x250x10x20

IWF 750x250x10x20

IWF 750x250x10x20

IWF 750x250x10x20

IWF 750x250x10x20

IWF 750x250x10x20

IWF 750x250x10x20

IWF 750x250x10x20

IWF 750x250x10x20
1650

1650

IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12
CG1

CG1

CG1

CG1

CG1

CG1

CG1

CG1

CG1

CG1

CG1

CG2
9200
9600

ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1
1650

1650

IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12
ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1
1000 1650

1000 1650

IWF 750x250x10x20 IWF 750x250x10x20 IWF 750x250x10x20 IWF 750x250x10x20 IWF 750x250x10x20 IWF 750x250x10x20 IWF 750x250x10x20 IWF 750x250x10x20 IWF 750x250x10x20 IWF 750x250x10x20 IWF 750x250x10x20
IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12 IWF 400x180x8x12
ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1 ST1
IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12 IWF 250x180x8x12
ST2 ST2 ST2 ST2 ST2 ST2 ST2 ST2 ST2 ST2 ST2 ST2
BC1 BC2 BC3 BC4 BC5 BC6 BC6 BC5 BC4 BC3 BC2 BC1
IWF 400x200x8x10 IWF 400x325x10x16 IWF 400x400x16x20 IWF 400x375x16x30 IWF 400x400x20x30 IWF 400x450x20x30 IWF 400x450x20x30 IWF 400x400x20x30 IWF 400x375x16x30 IWF 400x400x16x20 IWF 400x325x10x16 IWF 400x200x8x10

A 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 A
60000

Plan – Bottom Chord

Specification of Steel Material


Notation Yield Strength (MPa)
Tensile
Thickness of Rolled Steel
Strength
16mm to
< 16 mm > 40 mm (MPa)
40mm
SS 400 245 min 245 min 215 min 400 to 510
SM 490YB 365 min 365 min 336 min 490 t0 610

22
11/21/2018

Experimental Program
Test Instrument
• Six strain gauges
• Three Displacement Transducers
• Data Logger
• Dynamic Accelerator
TC1 TC2 TC3 TC4 TC5 TC6 TC5 TC4 TC3 TC2 TC1

BC1 BC2 BC3 BC4 BC5 BC6 BC6 BC5 BC4 BC3 BC2 BC1

SGBC6U

Strain Gauges
Displacement Transducers

Experimental Program
Loading Test Procedurs (Static)

The applied load only 63% from Uniform Distribution Load (162 ton)

The actual total static load was divided into 10 two-axle dump truck
with gross weight of each vehicle were ranged from 15 tons to 17 tons.

The recording of dump truck gross weights were conducted at Mutiara


Halim Company.

Four loading stage and three unloading stage were applied during static
loading test. In each stage the measurement of deformation and strain
were recorded.
46

23
11/21/2018

Experimental Program
Loading Test Procedurs (Static)

Stage 1 Total Load :


0 Truck 0 Ton
Loading Stage

Stage 2 Total Load :


4 Truck 64.84 Ton

Stage 3 Total Load :


8 Truck 131.05 Ton

Stage 4 Total Load :


10 Truck 162.20 Ton

Stage 5 Total Load :


Unloading Stage

8 Truck 131.05 Ton

Stage 6 Total Load :


4 Truck 64.84 Ton

Stage 7 Total Load :


0 Truck 0 Ton

47

Experimental Program
Loading Test Procedurs (Dynamic)
The dynamic loading test
When truck crossover the
procedure were conducted
bridge the vertical
by measure the vibration on
acceleration on bridge were
the bridge that caused by
recorded with acceleration
truck motion on speed
transducer and data logger.
range from 30-40 km/h.

The actual bridge frequency


The actual bridge frequency
is higher than estimated
will be compared with
frequency means that actual
natural frequency that
stiffness of bridge is higher
estimated from structure
than calculated in structural
analysis.
analysis and vice versa.

48

24
11/21/2018

Test Result and Discussion


The recording of bridge displacement data
Load DT1 DT2 Total Station
Stage
(ton) (mm) (mm) (mm)
1 0 0.00 0.00 0.00
2 64.84 13.08 13.90 26.60
3 131.05 23.10 25.98 35.60
4 162.20 23.96 27.06 37.40
5 131.05 22.89 25.78 35.49
6 64.84 13.11 13.80 26.45
7 0 0.01 0.00 0.00
DT1: Displacement Transducer 1; DT2 : Displacement
Transducer 2

49

Test Result and Discussion


The recording of bridge displacement data

10

Loading Stage Unloading Stage


(64.84 ton)
End of Stage 2

(131.05 ton)
End of Stage 3

(162.20 ton)
End of Stage 4

(131.05 ton)
End of Stage 5

(64.84 ton)
End of Stage6

0
Displacement (mm)

-10

-20

DT1
DT2

-30
0 25 50 75 100 125 150 175 200
Time (second)

50

25
11/21/2018

Test Result and Discussion


The strain reading during static loading test
0.002

Yield Strength SM 490 B = 355 MPa


0.0015

(64.84 ton)
End of Stage 2

(131.05 ton)
End of Stage 3

(162.20 ton)
End of Stage 4

(131.05 ton)
End of Stage 5

(64.84 ton)
End of Stage 6
0.001

0.0005
Strain

-0.0005
DG1S
-0.001 DG2S
BC6S
-0.0015 Yield strength SM 490B = -355 MPa

-0.002
0 25 50 75 100 125 150 175
Time (second)

51

Test Result and Discussion


Vertical acceleration time history response of
approaches bridge of kalimujur bridge
0.05

0.025
Acceleration (m/sec2)

-0.025

-0.05
0 50 100 150 200 250 300 350
Time (sec)

52

26
11/21/2018

Test Result and Discussion


Magnitude–Frequency relationship of the bridge
40

30
Magnitude

20

10

0
0 5 10 15 20
Frequency (Hz)

The vertical acceleration were measured by acceleration transducer and


recorded in data logger. In order to obtain the bridge frequency the
acceleration data were processed using Fast Fourier Transformation (FFT)
method.
From the FFT method showed that the bridge frequency was 1.46 Hz
53

Structural Analysis
• Three-dimensional finite element of the bridge was
described and the procedures of static and dynamic loading
test were approached in modelling and analysis procedure.
• The truss members, stringers and floor beams were
modelled used 3-D frame elements. The bridge concrete
floor deck was represented as load that applied to stringers.
• The loading on model were represented by placing point
load with a load value of gross weight of two axle dump
truck

54

27
11/21/2018

Structural Analysis
• The actual deformation data that recorded was taken from total
station. Since this deformation data was more conservative that
Δ a c t u a l

deformation reading from displacement tranducers.


Δ p r e d i c t i o n

• The ratio displacement actual to displacement prediction were range


on 0.96 to 1.00
• This deformation comparison showed similar value between actual
and prediction displacement.

Stage
Load Δ actual Δ prediction Δ actual Δ prediction
(ton) (mm) (mm)
2 64.84 26.60 27.60 0.96
3 131.05 35.60 35.60 1.00
4 162.20 37.40 38.26 0.97
5 131.05 35.49 35.60 0.99
6 64.84 26.45 27.60 0.96

55

Structural Analysis
• The stress result from structural analysis exhibited
element DG1S, DG2S and BC6S were not reached yield
Δ a c t u a l

condition
Δ p r e d i c t i o n

• The comparison stress at peak applied load showed that


the actual stress that occurred in DG1S, DG2S and BC6S
were lower than predicted in structural analysis.
• It means that the stiffness of bridge was higher than
structural analysis

𝜎 𝜎 𝜎
Element 𝜎
(MPa) (MPa)
DG1S(IWF400x360x12x20) 23.40 32.70 0.72
DG2S (IWF400x300x12x16) 25.40 44.92 0.57
BC6S (IWF400x450x20x30). 29.00 51.03 0.57

56

28
11/21/2018

Conclusion

Δ a c t u a l Seven stages on static loading test were performed with peak applied
force was 63% of UDL. Visual inspections were conducted in each
1
Δ p r e d i c t i o n

load stage, and no damage occurred during static loading test.

The bridge showed elastic behaviour and the recorded stress at


2 elements that installed with strain gauges were conformed with
similar response.

The recorded bridge deformation and element stress from static


3 loading test were lower than bridge deformation and element stress
that estimated from structural analysis.

57

Conclusion

Δ a c t u a l
The natural frequency from structural analysis
Δ

4
p r e d i c t i o n

showed lower valued than frequency recorded during


the dynamic load test.

All these results showed that the actual bridge


5 exhibited more stiffness than predicted from
analysis.

The overall evaluation of the approach bridge of


6 Kalimujur bridges showed that this bridge is safe to
service regular traffic.