METODE NILAI-HASIL
(Earned-Value Method)
CV (cost variance)
Negative over budget
Positive under budget
SV (schedule variance)
Negative under schedule
Positive ahead schedule
FORMULA CV dan SV
CV = EV – AC
EV (Earned Value) atau BCWP (Budgeted Cost of Work Performed)
AC (Actual Cost) atau ACWP (Actual Cost of Work Performed)
SV = EV – PV
PV (Planned Value) atau BCWS (Budgeted Cost of Work Schedule)
CONTOH KASUS
I II III IV TOTAL
Nilai Rencana (PV) 250 250 250 250 1000
Biaya Aktual (AC) 220 200 250 250 920
Variansi 30 50 0 0 80 (8%)
I II III IV TOTAL
Nilai Rencana (PV) 250 250 250 250 1000
Nilai Hasil (EV) 200 200 200 200 800
Biaya Aktual (AC) 220 200 250 250 920
Variansi Jadwal (SV) -50 -50 -50 -50 -200(20%)
Variansi Biaya (CV) -20 0 -50 -50 -120 (15%)
ANALISIS TERHADAP DATA
Secara akuntansi, proyek mengalami Rp 80 di bawah
rencana atau under budget (Rp1,000 – Rp920).
Namun demikian angka ini belum dapat
menjelaskan nilai pekerjaan aktual yang sudah
dikerjakan.
Variansi jadwal minus Rp200 (= -20%), proyek
terlambat (under schedule).
Variansi biaya minus Rp120 (= -15%), proyek over
budget.