REKAPITULASI RENCANA ANGGARAN BIAYA

PEMBANGUNAN GERBANG DAN POS JAGA HALAMAN GEDUNG ART CENTRE


KABUPATEN GARUT
TAHUN ANGGARAN 2019

NO URAIAN PEKERJAAN JUMLAH HARGA


+ PPN 10 %

A. PEKERJAAN PERSIAPAN 8,965,000.00

B. PEKERJAAN PENYELENGGARAAN KEAMANAN DAN KESEHATAN KERJA SERTA KESELAMATAN KO 13,942,500.00

C. PEKERJAAN PAGAR & GERBANG DEPAN 195,815,936.47

D. PEKERJAAN POS JAGA 1


I. PEKERJAAN PONDASI, BETON & DINDING 83,010,023.47
II. PEKERJAAN KUSEN 12,852,699.86
III. PEKERJAAN LANTAI 5,414,694.45
IV. PEKERJAAN PLAFOND 3,601,659.60
V. PEKERJAAN ATAP 3,085,500.00
VI PEKERJAAN SANITAIR 2,925,043.00
VII PEKERJAAN AIR BERSIH DAN AIR KOTOR 17,441,061.00
VIII. PEKERJAAN ELEKTRIKAL 6,377,250.00

E. PEKERJAAN POS JAGA 2


I. PEKERJAAN PONDASI, BETON & DINDING 83,010,023.47
II. PEKERJAAN KUSEN 12,852,699.86
III. PEKERJAAN LANTAI 5,414,694.45
IV. PEKERJAAN PLAFOND 3,601,659.60
V. PEKERJAAN ATAP 3,085,500.00
VI PEKERJAAN SANITAIR 2,925,043.00
VII PEKERJAAN AIR BERSIH DAN AIR KOTOR 9,962,381.00
VIII. PEKERJAAN ELEKTRIKAL 5,882,250.00

F. PEKERJAAN PERBAIKAN HURUF 4,950,000.00

G. PEKERJAAN SALURAN
I SALURAN - S1 150,656,335.06
II SALURAN - S2 111,110,076.55

JUMLAH 746,882,030.84
DIBULATKAN 746,882,000.00

Terbilang : Tujuh Ratus Tiga Puluh Sembilan Juta Tujuh Ratus Enam Puluh Satu Rupiah

Garut, 29 Mei 2019


Dibuat Oleh
CV. ARFA

ANGGA GOJALI
DIREKTUR
LAPORAN MC 100 %
PEMBANGUNAN GEDUNG ART CENTRE ( LANJUTAN )
KABUPATEN GARUT
TAHUN ANGGARAN 2019

JUMLAH HARGA + JUMLAH HARGA +


NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN PPN 10 % PPN 10 % VOLUME SAT HARGA SATUAN PPN 10 % PPN 10 % TAMBAH (Rp) KURANG (Rp)
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 3 4 5 6
A PEKERJAAN PERSIAPAN
1 Pek. Bongkaran dan buangan 1.00 Ls 1,500,000.00 150,000.00 1,650,000.00 1.00 Ls 1,500,000.00 150,000.00 1,650,000.00
2 Mobilisasi alat dan bahan 1.00 Ls 3,000,000.00 300,000.00 3,300,000.00 1.00 Ls 3,000,000.00 300,000.00 3,300,000.00
3 Biaya administrasi = dokumen photo 1.00 Ls 1,500,000.00 150,000.00 1,650,000.00 1.00 Ls 1,500,000.00 150,000.00 1,650,000.00

Jumlah I 600,000.00 6,600,000.00 600,000.00 6,600,000.00


B PEKERJAAN PENYELENGGARAAN KEAMANAN DAN KESEHATAN KERJA SERTA KESELAMATAN KONTRUKSI
I Persiapan K3
1 Penyiapan RK3K Terdiri Atas : Pembuatan Manual Prosedure 1.00 Set 750,000.00 75,000.00 825,000.00 1.00 Set 750,000.00 75,000.00 825,000.00
2 Pembuatan Kartu Identitas Pekerja ( KIP ) 50.00 Org 2,500.00 12,500.00 137,500.00 50.00 Org 2,500.00 12,500.00 137,500.00
Jumlah B-I 87,500.00 962,500.00 87,500.00 962,500.00
II Sosialisasi dan Promosi K3
1 Induski K3 ( Safety Intruction ) Khusus untuk Pekerja Baru 50.00 Org 5,000.00 25,000.00 275,000.00 50.00 Org 5,000.00 25,000.00 275,000.00
2 Pelatihan K3 0.00
- Bekerja di ketinggian 10.00 Org 5,000.00 5,000.00 55,000.00 10.00 5,000.00 5,000.00 55,000.00
- K3 Peralatan Kontruksi & Penggunaan Bahan Kimia ( MSDS ) 10.00 Org 5,000.00 5,000.00 55,000.00 10.00 Org 5,000.00 5,000.00 55,000.00
- Analisis Keselamatan Pekerja 50.00 Org 5,000.00 25,000.00 275,000.00 50.00 Org 5,000.00 25,000.00 275,000.00
- Prilaku Berbasis Keselamatan ( Budaya K3 ) 50.00 Org 5,000.00 25,000.00 275,000.00 50.00 Org 5,000.00 25,000.00 275,000.00
- P3K 2.00 Org 5,000.00 1,000.00 11,000.00 2.00 Org 5,000.00 1,000.00 11,000.00
3 Simulasi K3 50.00 Org 7,500.00 37,500.00 412,500.00 50.00 Org 7,500.00 37,500.00 412,500.00
4 Spanduk ( Banner ) 2.00 Lbr 150,000.00 30,000.00 330,000.00 2.00 Lbr 150,000.00 30,000.00 330,000.00
5 Poster 2.00 Lbr 150,000.00 30,000.00 330,000.00 2.00 Lbr 150,000.00 30,000.00 330,000.00
6 Papan Informasi K3 2.00 Bh 200,000.00 40,000.00 440,000.00 2.00 Bh 200,000.00 40,000.00 440,000.00
Jumlah B-II 223,500.00 2,458,500.00 223,500.00 2,458,500.00
III Alat Pelingdung Diri, Terdiri Atas:
1 Topi Pelingdung ( Safety Helmet ) 50.00 Bh 50,000.00 250,000.00 2,750,000.00 50.00 Bh 50,000.00 250,000.00 2,750,000.00
2 Pelindung Mata ( Goggle Spectekles ) 10.00 Psg 25,000.00 25,000.00 275,000.00 10.00 Psg 25,000.00 25,000.00 275,000.00
3 Tameng Muka (Face Shield) 2.00 Bh 75,000.00 15,000.00 165,000.00 2.00 Bh 75,000.00 15,000.00 165,000.00
4 Pelindung Pernafasan & Mulut ( Masker ) 25.00 Bh 5,000.00 12,500.00 137,500.00 25.00 Bh 5,000.00 12,500.00 137,500.00
5 Sarung Tangan ( Safety Gloves ) 25.00 Psg 5,000.00 12,500.00 137,500.00 25.00 Psg 5,000.00 12,500.00 137,500.00
6 Sepatu Keselamatan ( Safety Shoes ), Untuk Staf 5.00 Psg 125,000.00 62,500.00 687,500.00 5.00 Psg 125,000.00 62,500.00 687,500.00
7 Sepatu Keselamatan ( Rubber Safety Shoes & Toe Cap ) 10.00 Psg 90,000.00 90,000.00 990,000.00 10.00 Psg 90,000.00 90,000.00 990,000.00
8 Penunjang seluruh tubuh (Full Body Harness) 5.00 Bh 350,000.00 175,000.00 1,925,000.00 5.00 350,000.00 175,000.00 1,925,000.00
9 Rompi Keselamatan ( Safety Vest ) 50.00 Bh 25,000.00 125,000.00 1,375,000.00 50.00 Bh 25,000.00 125,000.00 1,375,000.00
10 Pelindung Jatuh (Fall Arrester) 2.00 Bh 100,000.00 20,000.00 220,000.00 2.00 100,000.00 20,000.00 220,000.00
Jumlah B-III 787,500.00 8,662,500.00 787,500.00 8,662,500.00
Jumlah B 1,098,500.00 12,083,500.00 1,098,500.00 12,083,500.00

Halaman2
JUMLAH HARGA + JUMLAH HARGA +
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN PPN 10 % PPN 10 % VOLUME SAT HARGA SATUAN PPN 10 % PPN 10 % TAMBAH (Rp) KURANG (Rp)
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)

C PEKERJAAN PELAKSANAAN
I Pekerjaan Atap
Lantai dasar
Pek. Rangka besi Hollow 4 x 4 cm Untuk Atap area Kubah 39.53 140,228.00 554,294.29 6,097,237.19 6,097,237.19
Pas. Alumunium Composite Panel (ACP) untuk kolom depan 39.53 828,923.24 3,276,574.01 36,042,314.07 36,042,314.07
Lantai satu
1 Pas. Talang air 1/2 lingkaran Ø 20 cm (Mushola + WC Lt. 1) 18.50 M1 131,791.00 243,813.35 2,681,946.85 18.50 131,791.00 243,813.35 2,681,946.85
2 Pek.Acp untuk Lisplank + Penutup talang air 18.52 M2 828,923.24 1,535,165.84 16,886,824.28 18.52 828,923.24 1,535,165.84 16,886,824.28
(Musholah Lt.1)
3 Pek. Rangka besi Hollow 4 x 4 cm untuk Acp Lisplank 18.52 M2 140,228.00 259,702.26 2,856,724.82 18.52 140,228.00 259,702.26 2,856,724.82
(Musholah Lt.1)

Jumlah C-I 22,425,495.95 64,565,047.21 42,139,551.26 0.00


II Pekerjaan Dinding
Lantai Dasar
1 Pek. Rangka besi Hollow 4 x 4 cm Untuk ACP kolom depan 20.75 M2 140,228.00 290,939.59 3,200,335.44 20.75 M3 140,228.00 290,939.59 3,200,335.44
2 Pas. Alumunium Composite Panel (ACP) untuk kolom depan 48.09 M2 828,923.24 3,986,341.60 43,849,757.65 48.09 M3 828,923.24 3,986,341.60 43,849,757.65
3 Pas. High Presure Laminated (HPL) corak 114.22 M2 219,700.65 2,509,310.97 27,602,420.67 114.22 M3 219,700.65 2,509,310.97 27,602,420.67
4 Pek. Perbaikan Kubah Accrylic Entrance 4.00 M2 550,000.00 220,000.00 2,420,000.00 4.00 M2 550,000.00 220,000.00 2,420,000.00
5 Pek. Rangka besi Hollow 4 x 4 cm untuk dinding HPL 128.50 M2 140,228.00 1,801,859.69 19,820,456.55 128.50 M2 140,228.00 1,801,859.69 19,820,456.55
6 Pek.Multiplek 9 mm (Panggung) 148.00 M2 211,668.11 3,132,603.38 34,458,637.15 148.00 M2 211,668.11 3,132,603.38 34,458,637.15
7 Pas. High Presure Laminated (HPL) corak (Panggung) 133.72 M2 219,700.65 2,937,749.21 32,315,241.28 133.72 M2 219,700.65 2,937,749.21 32,315,241.28
8 Perk. Partisi KM/WC + accessories Acier Inox (PVC Cubicle) T=2 m 64.00 M2 2,220,000.00 14,208,000.00 156,288,000.00 64.00 M2 2,220,000.00 14,208,000.00 156,288,000.00
9 Pek. Partisi Urinoir (PVC Cubicle) 3.00 M2 2,220,000.00 666,000.00 7,326,000.00 3.00 M2 2,220,000.00 666,000.00 7,326,000.00
10 Pas. Railing Stainles Tangga bagian belakang T= 75 cm 28.50 M2 800,000.00 2,280,000.00 25,080,000.00 28.50 M2 800,000.00 2,280,000.00 25,080,000.00
11 Pek. Rangka besi Hollow 4 x 4 cm Untuk Gypsum kolom 89.78 M2 140,228.00 1,258,966.98 13,848,636.82 89.78 140,228.00 1,258,966.98 13,848,636.82
12 Pas. Gypsum untuk kolom 89.78 M2 44,690.80 401,234.00 4,413,574.03 89.78 44,690.80 401,234.00 4,413,574.03
13 Pek. Rangka besi Hollow 4 x 4 cm Untuk Gypsum Balok 131.46 M2 140,228.00 1,843,498.99 20,278,488.87 131.46 140,228.00 1,843,498.99 20,278,488.87
14 Pas. Gypsum untuk balok 131.46 M2 44,690.80 587,524.92 6,462,774.13 131.46 44,690.80 587,524.92 6,462,774.13
15 Pek. Rangka besi Hollow 4 x 4 cm Untuk ACP kolom+balok (belakang) M2 27.05 140,228.00 379,375.64 4,173,131.99 4,173,131.99
16 Pas. Alumunium Composite Panel (ACP) untuk kolom + balok M2 27.05 828,923.24 2,242,585.52 24,668,440.68 24,668,440.68
(belakang)
Lantai Satu M3
1 Pek. Rangka besi Hollow 4 x 4 cm Untuk ACP kolom depan 3.32 M2 140,228.00 46,488.39 511,372.25 3.32 M2 140,228.00 46,488.39 511,372.25 -
2 Pas. Alumunium Composite Panel (ACP) untuk kolom depan 79.06 M2 828,923.24 6,553,599.78 72,089,597.54 79.06 828,923.24 6,553,599.78 72,089,597.54 -
4 Pek. Plesteran kamprot halus 1 Pc : 5 Psr M2 14.65 53,390.00 78,216.35 860,379.85 860,379.85
5 Pas. Railing Besi Hollow (Penonton Lt. 1), T= 85 cm 15.17 M2 411,180.00 623,862.86 6,862,491.41 15.17 411,180.00 623,862.86 6,862,491.41

Jumlah C-II 43,347,980.34 476,827,783.78 45,424,294.99 506,529,736.31 29,701,952.52 0.00


III PEKERJAAN KUSEN PINTU DAN JENDELA
Lantai Dasar
1 Pek. Kusen Alumunium 4" Warna coklat Tipe P1 17.00 Unit 3,203,500.00 5,445,950.00 59,905,450.00 17.00 3,203,500.00 5,445,950.00 59,905,450.00
2 Pek. Kusen Alumunium 4" Warna coklat Tipe P3 6.00 Unit 4,948,900.00 2,969,340.00 32,662,740.00 6.00 M2 4,948,900.00 2,969,340.00 32,662,740.00

Halaman3
JUMLAH HARGA + JUMLAH HARGA +
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN PPN 10 % PPN 10 % VOLUME SAT HARGA SATUAN PPN 10 % PPN 10 % TAMBAH (Rp) KURANG (Rp)
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
3 Pek. Kusen Alumunium 4" Warna coklat Tipe P4 16.00 Unit 1,689,600.00 2,703,360.00 29,736,960.00 16.00 1,689,600.00 2,703,360.00 29,736,960.00
4 Pek. Kusen Alumunium 4" Warna coklat Tipe J2 6.00 Unit 3,166,800.00 1,900,080.00 20,900,880.00 6.00 3,166,800.00 1,900,080.00 20,900,880.00
5 Pek. Kusen Alumunium 4" Warna coklat Tipe J3 5.00 Unit 5,702,400.00 2,851,200.00 31,363,200.00 5.00 5,702,400.00 2,851,200.00 31,363,200.00
6 Pek. Kusen Alumunium 4" Warna coklat Tipe BV1 11.00 Unit 540,000.00 594,000.00 6,534,000.00 11.00 540,000.00 594,000.00 6,534,000.00
7 Pek. Kusen Alumunium 4" Warna coklat Tipe BV2 5.00 Unit 1,041,100.00 520,550.00 5,726,050.00 5.00 M2 1,041,100.00 520,550.00 5,726,050.00
Lantai Satu
1 Pek. Kusen Alumunium 4" Warna coklat Tipe P1 2.00 Unit 3,203,500.00 640,700.00 7,047,700.00 2.00 3,203,500.00 640,700.00 7,047,700.00
2 Pek. Kusen Alumunium 4" Warna coklat Tipe P4 8.00 Unit 1,689,600.00 1,351,680.00 14,868,480.00 8.00 1,689,600.00 1,351,680.00 14,868,480.00
3 Pek. Kusen Alumunium 4" Warna coklat Tipe P3 1.00 4,948,900.00 494,890.00 5,443,790.00 1.00 4,948,900.00 494,890.00 5,443,790.00

Jumlah C-III 19,471,750.00 214,189,250.00 19,471,750.00 214,189,250.00 0.00 0.00

IV. PEKERJAAN PLAFOND


Lantai Dasar
1 Pek. Rangka Plafond Besi Hollow 4/4, 4/2 422.72 M2 140,228.00 5,927,678.75 65,204,466.27 422.72 M3 140,228.00 5,927,678.75 65,204,466.27
2 Pek. Plafond Gypsum Board 727.52 M2 44,690.80 3,251,356.70 35,764,923.71 727.52 M3 44,690.80 3,251,356.70 35,764,923.71
3 Pas. Lis Profle Plafond 550.66 M1 18,170.00 1,000,549.22 11,006,041.42 550.66 18,170.00 1,000,549.22 11,006,041.42
Lantai Satu M3
1 Pek. Rangka Plafond Besi Hollow 4/4, 4/2 399.42 M2 140,228.00 5,601,040.06 61,611,440.69 399.42 M3 140,228.00 5,601,040.06 61,611,440.69
2 Pek. Plafond Gypsum Board 431.20 M2 44,690.80 1,927,082.04 21,197,902.48 431.20 M2 44,690.80 1,927,082.04 21,197,902.48
3 Pas. Lis Profle Plafond (Gypsum) 127.02 M1 18,170.00 230,795.34 2,538,748.74 127.02 18,170.00 230,795.34 2,538,748.74
M2
Jumlah C-IV 17,938,502.12 197,323,523.32 17,938,502.12 197,323,523.32 0.00 0.00
V. PEKERJAAN LANTAI
Lantai Dasar
2 Pek. Lantai Granit 60/60, sek. Garuda (Perbaikan) 12.00 M2 276,984.71 332,381.66 3,656,198.23 12.00 276,984.71 332,381.66 3,656,198.23
4 Pek. Lantai Granit 60/60, sek. Garuda (corak) 185.41 M2 276,984.71 5,135,462.79 56,490,090.70 185.41 276,984.71 5,135,462.79 56,490,090.70
Lantai Satu
3 Pek. Keramik Dinding 20/40 T =1,5 m 13.20 M2 232,300.00 306,636.00 3,372,996.00 13.20 232,300.00 306,636.00 3,372,996.00
5 Pek. Waterproofing + Coating Lantai 191.90 M2 166,840.00 3,201,649.76 35,218,147.32 161.72 166,840.00 2,698,140.98 29,679,550.83 5,538,596.49

Jumlah C-V 8,976,130.20 98,737,432.24 5,774,480.45 93,198,835.75 0.00 5,538,596.49


VI. PEKERJAAN PPENGECATAN
Lantai Dasar
1 Pek. Pengecatan Dinding sek. Vinilex 3,132.27 M2 15,906.00 4,982,190.25 54,804,092.78 3,132.27 M2 15,906.00 4,982,190.25 54,804,092.78
2 Pek Pengecatan Plafond sek. Sanlex 813.01 M2 24,509.10 1,992,623.16 21,918,854.79 813.01 M2 24,509.10 1,992,623.16 21,918,854.79
Lantai Satu
1 Pek. Pengecatan Dinding sek. Vinilex 1,168.52 M2 15,906.00 1,858,646.32 20,445,109.54 1,168.52 M' 15,906.00 1,858,646.32 20,445,109.54
2 Pek Pengecatan Plafond sek. Sanlex 465.39 M2 24,509.10 1,140,632.19 12,546,954.10 465.39 M' 24,509.10 1,140,632.19 12,546,954.10
3 Pek. Cat meni besi M2 233.68 23,100.00 539,798.03 5,937,778.31 5,937,778.31

Jumlah C-VI 9,974,091.93 109,715,011.20 8,833,459.74 115,652,789.51 5,937,778.31 0.00

VII. PEKERJAAN ELETRIKAL


Lantai Dasar

Halaman4
JUMLAH HARGA + JUMLAH HARGA +
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN PPN 10 % PPN 10 % VOLUME SAT HARGA SATUAN PPN 10 % PPN 10 % TAMBAH (Rp) KURANG (Rp)
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 Pek. Pas. Instalasi Listrik 140.00 Ttk 115,775.00 1,620,850.00 17,829,350.00 140.00 115,775.00 1,620,850.00 17,829,350.00
2 Pek. Instlasi Titik Stop Kontak 16.00 Ttk 115,775.00 185,240.00 2,037,640.00 16.00 115,775.00 185,240.00 2,037,640.00
3 Pek. Instalasi Air Conditioner (AC) 8.00 Bh 115,775.00 92,620.00 1,018,820.00 8.00 115,775.00 92,620.00 1,018,820.00
4 Pek. Pas. Saklar Tunggal 16.00 Bh 36,905.00 59,048.00 649,528.00 16.00 36,905.00 59,048.00 649,528.00
5 Pek. Saklar seri 10.00 Bh 38,995.00 38,995.00 428,945.00 10.00 38,995.00 38,995.00 428,945.00
6 Pek. Stop Kontak 16.00 Bh 45,000.00 72,000.00 792,000.00 16.00 45,000.00 72,000.00 792,000.00
7 Pek. Pemasangan Lampu Downlight LED 6 watt 44.00 Bh 116,875.00 514,250.00 5,656,750.00 44.00 116,875.00 514,250.00 5,656,750.00
8 Pek. Pemasangan Lampu RM 2 x 18 watt 30.00 Bh 287,375.00 862,125.00 9,483,375.00 30.00 287,375.00 862,125.00 9,483,375.00
9 Pas. MCB Lengkap 1.00 Unit 3,500,000.00 350,000.00 3,850,000.00 1.00 3,500,000.00 350,000.00 3,850,000.00
Lantai Satu
1 Pek. Pas. Instalasi Listrik 107.00 Ttk 115,775.00 1,238,792.50 13,626,717.50 107.00 115,775.00 1,238,792.50 13,626,717.50
2 Pek. Instlasi Titik Stop Kontak 6.00 Ttk 115,775.00 69,465.00 764,115.00 6.00 115,775.00 69,465.00 764,115.00
3 Pek. Instalasi Air Conditioner (AC) 4.00 Bh 115,775.00 46,310.00 509,410.00 4.00 115,775.00 46,310.00 509,410.00
4 Pek. Pas. Saklar Tunggal 6.00 Bh 36,905.00 22,143.00 243,573.00 6.00 36,905.00 22,143.00 243,573.00
5 Pek. Saklar seri 8.00 Bh 38,995.00 31,196.00 343,156.00 8.00 38,995.00 31,196.00 343,156.00
6 Pek. Stop Kontak 6.00 Bh 45,000.00 27,000.00 297,000.00 6.00 45,000.00 27,000.00 297,000.00
7 Pek. Pemasangan Lampu LED 7 watt 8.00 Bh 56,705.00 45,364.00 499,004.00 8.00 56,705.00 45,364.00 499,004.00
8 Pek. Pemasangan Lampu Downlight LED 6 watt 56.00 Bh 116,875.00 654,500.00 7,199,500.00 56.00 116,875.00 654,500.00 7,199,500.00
9 Pek. Pemasangan Lampu RM 2 x 18 watt 13.00 Bh 287,375.00 373,587.50 4,109,462.50 13.00 287,375.00 373,587.50 4,109,462.50

Jumlah C-VII 6,303,486.00 69,338,346.00 6,303,486.00 69,338,346.00 0.00 0.00

VIII PEKERJAAN SANITAIR


Lantai Dasar
1 Pas. Torn Air Kav. 1000 Ltr 4.00 Bh 1,320,000.00 528,000.00 5,808,000.00 4.00 1,320,000.00 528,000.00 5,808,000.00
2 Pek. Menara Air Besi IWF T = 8 m Unit 37,500,000.00 0.00 0.00 1.00 37,500,000.00 3,750,000.00 41,250,000.00 41,250,000.00
3 Pas. Pompa Transfer (boosterpump) 1.00 Bh 15,000,000.00 1,500,000.00 16,500,000.00 1.00 15,000,000.00 1,500,000.00 16,500,000.00
4 Pas. Rumah Pompa 1.00 Bh 450,000.00 45,000.00 495,000.00 1.00 450,000.00 45,000.00 495,000.00
5 Header valve dan asesoris 1.00 Ls 3,500,000.00 350,000.00 3,850,000.00 1.00 3,500,000.00 350,000.00 3,850,000.00
6 Pas. Kloset duduk sek. TOTO 16.00 Bh 1,900,140.00 3,040,224.00 33,442,464.00 16.00 1,900,140.00 3,040,224.00 33,442,464.00
7 Pas. Washtafel sek. TOTO 8.00 Bh 765,521.68 612,417.34 6,736,590.78 8.00 765,521.68 612,417.34 6,736,590.78
8 Pas. Cermin Washtafel 6.00 Bh 250,000.00 150,000.00 1,650,000.00 6.00 250,000.00 150,000.00 1,650,000.00
9 Pas. Floor Drain 20.00 Bh 30,140.00 60,280.00 663,080.00 20.00 30,140.00 60,280.00 663,080.00
10 Pas. Urinoir 12.00 Bh 2,862,048.20 3,434,457.84 37,779,036.24 12.00 2,862,048.20 3,434,457.84 37,779,036.24
11 Pas. Kran Jet Shower + asesoris (bilas kloset duduk) 16.00 Bh 75,000.00 120,000.00 1,320,000.00 16.00 75,000.00 120,000.00 1,320,000.00
12 Pas. Pipa Air Kotor (Perbaikan) 1.00 Ls 1,500,000.00 150,000.00 1,650,000.00 1.00 1,500,000.00 150,000.00 1,650,000.00
13 Pas. Pipa 3" (perbaikan) 20.00 M1 51,382.38 102,764.75 1,130,412.25 20.00 51,382.38 102,764.75 1,130,412.25
14 Ps. Pipa 4" (Perbaikan) 20.00 M1 90,215.13 180,430.25 1,984,732.75 20.00 90,215.13 180,430.25 1,984,732.75
15 Pek. Pengeboran Air Ttk 6,889,091.00 0.00 0.00 1.00 6,889,091.00 688,909.10 7,578,000.10 7,578,000.10
Lantai Satu
1 Pas. Kloset duduk sek. TOTO 4.00 Bh 1,900,140.00 760,056.00 8,360,616.00 4.00 1,900,140.00 760,056.00 8,360,616.00
2 Pas. Washtafel sek. TOTO 2.00 Bh 765,521.68 153,104.34 1,684,147.70 2.00 765,521.68 153,104.34 1,684,147.70
3 Pas. Cermin Washtafel 2.00 Bh 250,000.00 50,000.00 550,000.00 2.00 250,000.00 50,000.00 550,000.00
4 Pas. Floor Drain 21.00 Bh 30,140.00 63,294.00 696,234.00 21.00 30,140.00 63,294.00 696,234.00

Halaman5
JUMLAH HARGA + JUMLAH HARGA +
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN PPN 10 % PPN 10 % VOLUME SAT HARGA SATUAN PPN 10 % PPN 10 % TAMBAH (Rp) KURANG (Rp)
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
5 Pas. Kran Jet Shower + asesoris (bilas kloset duduk) 4.00 Bh 75,000.00 30,000.00 330,000.00 4.00 75,000.00 30,000.00 330,000.00
6 Pas. Kran Air 3/4" 6.00 Bh 67,636.25 40,581.75 446,399.25 6.00 67,636.25 40,581.75 446,399.25
7 Pas. Pipa Air Kotor (Perbaikan) 1.00 Ls 1,500,000.00 150,000.00 1,650,000.00 1.00 1,500,000.00 150,000.00 1,650,000.00
8 Pas. Pipa 3" (perbaikan) 20.00 M1 51,382.38 102,764.75 1,130,412.25 20.00 51,382.38 102,764.75 1,130,412.25
9 Ps. Pipa 4" (Perbaikan) 20.00 M1 90,215.13 180,430.25 1,984,732.75 20.00 90,215.13 180,430.25 1,984,732.75

Jumlah C-VIII 11,803,805.27 129,841,857.97 16,242,714.37 178,669,858.07 48,828,000.10 0.00

JUMLAH TOTAL 1,337,082,200.46 1,458,150,886.17 126,607,282.20 5,538,596.49


DIBULATKAN 1,337,082,000.00 1,458,150,000.00 126,607,000.00 5,538,000.00

SELISIH (121,068,000.00) Rp 121,069,000.00

Garut, 4 November 2019

Mengetahui Diperiksa Oleh Dibuat Oleh


Pejabat Pembuat Komitmen PT. ALOCITA MANDIRI CV 86 Abadi

Gatot Subagio, ST.MT. Iskandar Zulkarnaen Dian Rijal


NIP. 1974120720001212003 Direktur Direktur

Halaman6
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GERBANG DAN POS JAGA HALAMAN GEDUNG ART CENTRE
KABUPATEN GARUT
TAHUN ANGGARAN 2019

JUMLAH HARGA +
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN PPN 10 % PPN 10 %
(Rp.) (Rp.) (Rp.)
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
1 Papan nama Proyek Banner 1.00 Ls 150,000.00 15,000.00 165,000.00
2 Administrasi dan dokumentasi 1.00 Ls 1,500,000.00 150,000.00 1,650,000.00
3 Direksikeet dan Bedeng Pekerja 1.00 Ls 5,000,000.00 500,000.00 5,500,000.00
4 Pek Listrik kerja dan air kerja 1.00 Ls 1,500,000.00 150,000.00 1,650,000.00
Jumlah I 815,000.00 8,965,000.00
II PEKERJAAN PENYELENGGARAAN KEAMANAN DAN KESEHATAN KERJA SERTA KESELAMATAN KONTRUKSI
A Persiapan K3
1 Penyiapan RK3K Terdiri Atas : Pembuatan Manual Prosedure 1.00 Set 225,000.00 22,500.00 247,500.00
2 Pembuatan Kartu Identitas Pekerja ( KIP ) 25.00 Org 10,000.00 25,000.00 275,000.00
Jumlah II A 47,500.00 522,500.00
B Sosialisasi dan Promosi K3
1 Induski K3 ( Safety Intruction ) Khusus untuk Pekerja Baru 25.00 Org 10,000.00 25,000.00 275,000.00
2 Pelatihan K3
- K3 Peralatan Kontruksi & Penggunaan Bahan Kimia ( MSDS ) 5.00 Org 100,000.00 50,000.00 550,000.00
- Analisis Keselamatan Pekerja 25.00 Org 10,000.00 25,000.00 275,000.00
- Prilaku Berbasis Keselamatan ( Budaya K3 ) 25.00 Org 10,000.00 25,000.00 275,000.00
- P3K 1.00 Org 250,000.00 25,000.00 275,000.00
3 Simulasi K3 25.00 Org 10,000.00 25,000.00 275,000.00
4 Spanduk ( Banner ) 2.00 Lbr 150,000.00 30,000.00 330,000.00
5 Poster 2.00 Lbr 150,000.00 30,000.00 330,000.00
6 Papan Informasi K3 4.00 Bh 100,000.00 40,000.00 440,000.00
Jumlah II B 275,000.00 3,025,000.00
C Alat Pelindung Kerja, Terdiri Atas:
1 Batas Area (Restiricted Area) 1 Ls 500,000.00 50,000.00 550,000.00
Jumlah II C 50,000.00 550,000.00
D Alat Pelingdung Diri, Terdiri Atas:
1 Topi Pelingdung ( Safety Helmet ) 25.00 Bh 30,000.00 75,000.00 825,000.00
2 Pelindung Mata ( Goggle Spectekles ) 5.00 Psg 100,000.00 50,000.00 550,000.00
3 Tameng Muka (Face Shield) 2.00 Bh 100,000.00 20,000.00 220,000.00
4 Pelindung Pernafasan & Mulut ( Masker ) 25.00 Bh 10,000.00 25,000.00 275,000.00
5 Sarung Tangan ( Safety Gloves ) 25.00 Psg 10,000.00 25,000.00 275,000.00
6 Sepatu Keselamatan ( Safety Shoes ), Untuk Staf 5.00 Psg 250,000.00 125,000.00 1,375,000.00
7 Sepatu Keselamatan ( Rubber Safety Shoes & Toe Cap ) 20.00 Psg 100,000.00 200,000.00 2,200,000.00
8 Rompi Keselamatan ( Safety Vest ) 25.00 Bh 150,000.00 375,000.00 4,125,000.00
Jumlah II D 895,000.00 9,845,000.00
Jumlah II 1,267,500.00 13,942,500.00

III PEKERJAAN PAGAR & GERBANG DEPAN


1 Galian tanah pondasi 42.34 M3 65,620.00 277,835.08 3,056,185.88
2 Lapisan pasir bawah pondasi t = 5 cm 2.65 M3 152,250.00 40,346.25 443,808.75
3 Aanstamping batu kali t = 15 cm 7.94 M3 315,470.00 250,483.18 2,755,314.98
4 Pas. Pondasi Batu kali 1 Pc : 5 Psr 21.17 M3 616,820.00 1,305,807.94 14,363,887.34
5 Pas. Sloof beton 15/20 2.47 M3 4,385,920.00 1,083,322.24 11,916,544.64
6 Pas. Kolom praktis & ring balk 12/12 3.57 M3 5,301,920.00 1,892,785.44 20,820,639.84
9 Pas. Dinding ½ bata 1 ps : 5 psr 130.32 M2 103,840.00 1,353,242.88 14,885,671.68
11 Pas. Plesteran ciprat 1 pc : 2 psr 76.50 M2 43,730.00 334,534.50 3,679,879.50
12 Pas. Batu susun sirih 72.50 M2 195,620.00 1,418,245.00 15,600,695.00
14 Plesteran 1 Pc : 5 Psr 193.94 M2 53,390.00 1,035,445.66 11,389,902.26
15 Acian 193.94 M2 32,620.00 632,632.28 6,958,955.08
16 Pengecatan dinding pagar, 270.44 M2 21,780.00 589,018.32 6,479,201.52
17 Pas. Pagar besi uk. 220 x 110 cm x 16 unit
Kisi kisi besi ulir D13 mm, jarak as 10 cm
rangka utama pipa galvanis Ø 1,5" t. 3,6 mm,
Finish cat duco 38.72 M2 750,000.00 2,904,000.00 31,944,000.00

18 Pas. Pintu gerbang, uk. 680 x 175 cm, x 2 unit


Kisi kisi besi ulir D13 mm, jarak as 10 cm
rangka utama pipa galvanis Ø 1,5" t. 3,6 mm,
Lengkap Rel, roda, kunci, Finish Cat duco 23.80 M2 750,000.00 1,785,000.00 19,635,000.00

19 Pas. Pintu gerbang, uk. 830 x 175 cm, x 2 unit


Kisi kisi besi ulir D13 mm, jarak as 10 cm
rangka utama pipa galvanis Ø 1,5" t. 3,6 mm,
Lengkap Rel, roda, kunci, Finish Cat duco 29.05 M2 750,000.00 2,178,750.00 23,966,250.00

Halaman7
JUMLAH HARGA +
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN PPN 10 % PPN 10 %
(Rp.) (Rp.) (Rp.)
20 Pas. Pintu gerbang, uk. 150 x 160 cm, x 4 unit
Kisi kisi besi ulir D13 mm, jarak as 10 cm
rangka utama pipa galvanis Ø 1,5" t. 3,6 mm,
Lengkap Tiang, engsel & kunci, Finish Cat duco 9.60 M2 750,000.00 720,000.00 7,920,000.00

Jumlah III 17,801,448.77 195,815,936.47

IV. PEKERJAAN POS JAGA 1


A. PEKERJAAN PONDASI, BETON & DINDING
1 Galian pondasi 18.02 M3 65,620.00 118,247.24 1,300,719.64
2 Lapisan pasir bawah pondasi t = 5 cm 1.20 M3 152,250.00 18,270.00 200,970.00
3 Pas. Lantai kerja, t. 5 cm 0.19 M3 744,580.00 14,147.02 155,617.22
4 Aanstamping batu kali t = 15 cm 3.02 M3 315,470.00 95,271.94 1,047,991.34
5 Pas. Pondasi Batu kali 1 Pc : 5 Psr 6.41 M3 616,820.00 395,381.62 4,349,197.82
6 Pas. Pondasi Plat uk. 80X80x25 cm besi 140 kg/m3 0.96 M3 2,959,680.00 284,129.28 3,125,422.08
7 Pas. Sloof beton 15/20 besi 186 kg/m3 0.75 M3 4,454,620.00 334,096.50 3,675,061.50
8 Kolom struktur 15/30 besi 136 kg/m3 1.30 M3 5,936,520.00 771,747.60 8,489,223.60
9 Pas. Kolom 15/15 besi 290 kg/m3 1.16 M3 3,987,470.00 462,546.52 5,088,011.72
10 Balok 15/20 besi 186 kg/m3 0.86 M3 4,800,420.00 412,836.12 4,541,197.32
11 Pas. Ring balk & KP 12/12 besi 115 kg/m3 0.56 M3 3,987,470.00 223,298.32 2,456,281.52
12 Canopy & balok 15/20+12/60 besi 115 kg/m3 0.88 M3 5,307,670.00 467,074.96 5,137,824.56
13 Plat dak beton t. 12 cm besi 93 kg/m3 1.87 M3 3,745,150.00 700,343.05 7,703,773.55
14 Pas. Dinding ½bata 1 Pc : 5 Psr 98.50 M2 103,840.00 1,022,824.00 11,251,064.00
15 Pas. Keramik dinding 25x40 (Glossy) border beda warna 9.80 M2 280,740.00 275,125.20 3,026,377.20
16 Plesteran + kamprot halus 1 Pc : 2 Psr 15.80 M2 43,730.00 69,093.40 760,027.40
17 Plesteran Dinding 1 Pc : 5 Psr & acian 171.40 M2 86,010.00 1,474,211.40 16,216,325.40
18 Pengecatan dinding interior/exterior 187.20 M2 21,780.00 407,721.60 4,484,937.60
Jumlah A 7,546,365.77 83,010,023.47

B. PEKERJAAN KUSEN
1 TYPE - P1 ( 1 UNIT )
Kusen Alumunium 4" Warna Lengkap Assesoris 6.70 M' 105,440.00 70,644.80 777,092.80
Kaca Polos t = 6 mm 1.40 M2 170,650.00 23,891.00 262,801.00
Frame Daun pintu Aluminium uk. 82 x 210 cm 1.72 M2 702,730.00 120,869.56 1,329,565.16
Engsel pintu 4" 1.50 Ps 115,000.00 17,250.00 189,750.00
Lock case + Cylinder + Lever Handle 1.00 Set 357,210.00 35,721.00 392,931.00
Sticker Sandblast kaca 1.40 M2 100,000.00 14,000.00 154,000.00

2 TYPE - P3 ( 1 UNIT )
Kusen Alumunium 4" Warna Lengkap Assesoris 5.90 M' 105,440.00 62,209.60 684,305.60
Daun pintu Metal + rangka uk. 72 x 210 cm 1.51 M2 2,000,000.00 302,000.00 3,322,000.00
Engsel pintu 4" 1.50 Ps 115,000.00 17,250.00 189,750.00
Lock case + Cylinder + Handle pintu KM 1.00 Set 357,210.00 35,721.00 392,931.00
Finish Duco daun pintu 3.02 M2 100,000.00 30,200.00 332,200.00

3 TYPE -J1 ( 1 UNIT )


Kusen Alumunium 4" Warna Lengkap Assesoris 8.55 M' 105,440.00 90,151.20 991,663.20
Kaca Polos t = 5 mm 1.94 M2 124,450.00 24,143.30 265,576.30
Frame daun jendela uk. 50x77 cm x 2 unit 0.77 M2 610,330.00 46,995.41 516,949.51
Engsel Casement 2.00 Ps 186,480.00 37,296.00 410,256.00
Casement handle 2.00 bh 29,400.00 5,880.00 64,680.00

4 TYPE -J2 ( 1 UNIT )


Kusen Alumunium 4" Warna Lengkap Assesoris 5.55 M' 105,440.00 58,519.20 643,711.20
Kaca Polos t = 5 mm 0.80 M2 124,450.00 9,956.00 109,516.00
Frame daun jendela uk. 67x77 cm x 2 unit 1.03 M2 610,330.00 62,863.99 691,503.89
Engsel Casement 2.00 Ps 186,480.00 37,296.00 410,256.00
Casement handle 2.00 Bh 29,400.00 5,880.00 64,680.00

5 TYPE - BV ( 2 UNIT )
Kusen Alumunium 4" Warna Lengkap Assesoris 5.00 M' 105,440.00 52,720.00 579,920.00
Kaca Polos t=5mm 0.56 M2 124,450.00 6,969.20 76,661.20
Jumlah B 1,168,427.26 12,852,699.86

C. PEKERJAAN LANTAI
1 Lapisan pasir bawah lantai t = 5 cm 0.93 M3 152,250.00 14,159.25 155,751.75
2 Lantai keramik 40x40 (Glossy) 6.80 M2 206,960.00 140,732.80 1,548,060.80
3 Lantai keramik 40x40 (Rustic) border beda warna 9.60 M2 218,510.00 209,769.60 2,307,465.60
4 Lantai keramik 25x25 ( Anti slip ) 2.10 M2 206,850.00 43,438.50 477,823.50
5 Plint Lantai, keramik 10x40 ( Glossy ) 21.40 M' 39,320.00 84,144.80 925,592.80
Jumlah C 492,244.95 5,414,694.45

Halaman8
JUMLAH HARGA +
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN PPN 10 % PPN 10 %
(Rp.) (Rp.) (Rp.)
D. PEKERJAAN PLAFOND
1 Pas. Rangka plafond Hollow Galvanis 4 x 4 t = 0.5 mm 17.60 M2 77,090.00 135,678.40 1,492,462.40
2 Plafond Gypsum board 9 mm 15.50 M2 48,170.00 74,663.50 821,298.50
3 Plafond Calcyboard 4 mm 2.10 M2 32,610.00 6,848.10 75,329.10
4 List plafond Gypsum 26.00 M' 23,960.00 62,296.00 685,256.00
5 List plafond profil kayu solid 5.80 M' 16,560.00 9,604.80 105,652.80
6 Pengecatan Plafond 17.60 M2 21,780.00 38,332.80 421,660.80
Jumlah D 327,423.60 3,601,659.60

E. PEKERJAAN ATAP
1 Waterproofing coating dak atap 18.70 M2 150,000.00 280,500.00 3,085,500.00
Jumlah E 280,500.00 3,085,500.00

F. PEKERJAAN SANITAIR
1 Closet Jongkok 1.00 Bh 350,000.00 35,000.00 385,000.00
2 Kran Tembok 1.00 Bh 270,200.00 27,020.00 297,220.00
3 Floor Drain 1.00 Bh 322,140.00 32,214.00 354,354.00
4 Bak Mandi 1.00 Bh 500,000.00 50,000.00 550,000.00
5 Wastafel Gantung Lengkap Cermin 1.00 Bh 1,216,790.00 121,679.00 1,338,469.00
Jumlah F 265,913.00 2,925,043.00

G. PEKERJAAN AIR BERSIH DAN AIR KOTOR


Pekerjaan Instalasi Air Bersih
- Pengeboran Jet Pump lengkap casing & instalasi Suction 1.00 Ls 5,000,000.00 500,000.00 5,500,000.00
& Discharge
- Pompa jet pump 375 w/750 w, H 40 meter, 85 liter/menit 1.00 Ls 2,000,000.00 200,000.00 2,200,000.00
sek. Shimitzu
- Pipa PVC dia.25mm (1") 8.00 M' 25,150.00 20,120.00 221,320.00
- Pipa PVC dia.20 mm(3/4") 4.00 M' 21,330.00 8,532.00 93,852.00
- Pipa PVC dia.15 mm(1/2") 4.00 M' 18,350.00 7,340.00 80,740.00
- Accesoris Pemipaan (Fiting) 1.00 Ls 500,000.00 50,000.00 550,000.00
- Bak kontrol 1.00 Unit 350,000.00 35,000.00 385,000.00
Pekerjaan Instalasi Air Kotor
- Pipa PVC Dia.100(4") 3.00 M' 130,970.00 39,291.00 432,201.00
- Pipa PVC Dia 80 (.3") 2.80 M' 88,230.00 24,704.40 271,748.40
- Pipa PVC Dia 65 (.2.5") 3.60 M' 71,010.00 25,563.60 281,199.60
- Accesoris Pemipaan & Fitting 1.00 ls 750,000.00 75,000.00 825,000.00
- Septic Tank FRP Kapasitas 2 M3 + Pekerjaan Sipil 1.00 Unit 5,000,000.00 500,000.00 5,500,000.00
- Sumur Resapan 1.00 Bh 1,000,000.00 100,000.00 1,100,000.00
Jumlah G 1,585,551.00 17,441,061.00

H. PEKERJAAN ELEKTRIKAL
1 Instalasi penerangan 5.00 Ttk 300,000.00 150,000.00 1,650,000.00
2 Instalasi Kotak kontak 3.00 Ttk 310,000.00 93,000.00 1,023,000.00
3 Down light LED 10Watt 3.00 Bh 180,000.00 54,000.00 594,000.00
4 Lampu gantung LED 10Watt 2.00 Bh 350,000.00 70,000.00 770,000.00
5 Saklar Ganda 2.00 Bh 27,500.00 5,500.00 60,500.00
6 Saklar Tunggal 1.00 Bh 25,000.00 2,500.00 27,500.00
7 Kotak kontak dinding 3.00 Bh 32,500.00 9,750.00 107,250.00
8 Panel lengkap MCB dan Grounding 1.00 Bh 850,000.00 85,000.00 935,000.00
9 BP Listrik 900 VA 1.00 Ls 1,100,000.00 110,000.00 1,210,000.00
Jumlah H 579,750.00 6,377,250.00

V. PEKERJAAN POS JAGA 2


A. PEKERJAAN PONDASI, BETON & DINDING
1 Galian pondasi 18.02 M3 65,620.00 118,247.24 1,300,719.64
2 Lapisan pasir bawah pondasi t = 5 cm 1.20 M3 152,250.00 18,270.00 200,970.00
3 Pas. Lantai kerja, t. 5 cm 0.19 M3 744,580.00 14,147.02 155,617.22
4 Aanstamping batu kali t = 15 cm 3.02 M3 315,470.00 95,271.94 1,047,991.34
5 Pas. Pondasi Batu kali 1 Pc : 5 Psr 6.41 M3 616,820.00 395,381.62 4,349,197.82
6 Pas. Pondasi Plat uk. 80X80x25 cm besi 140 kg/m3 0.96 M3 2,959,680.00 284,129.28 3,125,422.08
7 Pas. Sloof beton 15/20 besi 186 kg/m3 0.75 M3 4,454,620.00 334,096.50 3,675,061.50
8 Kolom struktur 15/30 besi 136 kg/m3 1.30 M3 5,936,520.00 771,747.60 8,489,223.60
9 Pas. Kolom 15/15 besi 290 kg/m3 1.16 M3 3,987,470.00 462,546.52 5,088,011.72
10 Balok 15/20 besi 186 kg/m3 0.86 M3 4,800,420.00 412,836.12 4,541,197.32
11 Pas. Ring balk & KP 12/12 besi 115 kg/m3 0.56 M3 3,987,470.00 223,298.32 2,456,281.52
12 Canopy & balok 15/20+12/60 besi 115 kg/m3 0.88 M3 5,307,670.00 467,074.96 5,137,824.56
13 Plat dak beton t. 12 cm besi 93 kg/m3 1.87 M3 3,745,150.00 700,343.05 7,703,773.55
14 Pas. Dinding ½bata 1 Pc : 5 Psr 98.50 M2 103,840.00 1,022,824.00 11,251,064.00
15 Pas. Keramik dinding 25x40 (Glossy) border beda warna 9.80 M2 280,740.00 275,125.20 3,026,377.20
16 Plesteran + kamprot halus 1 Pc : 2 Psr 15.80 M2 43,730.00 69,093.40 760,027.40
17 Plesteran Dinding 1 Pc : 5 Psr & acian 171.40 M2 86,010.00 1,474,211.40 16,216,325.40
18 Pengecatan dinding interior/exterior 187.20 M2 21,780.00 407,721.60 4,484,937.60
Jumlah A 7,546,365.77 83,010,023.47

Halaman9
JUMLAH HARGA +
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN PPN 10 % PPN 10 %
(Rp.) (Rp.) (Rp.)

B. PEKERJAAN KUSEN
1 TYPE - P1 ( 1 UNIT )
Kusen Alumunium 4" Warna Lengkap Assesoris 6.70 M' 105,440.00 70,644.80 777,092.80
Kaca Polos t = 6 mm 1.40 M2 170,650.00 23,891.00 262,801.00
Frame Daun pintu Aluminium uk. 82 x 210 cm 1.72 M2 702,730.00 120,869.56 1,329,565.16
Engsel pintu 4" 1.50 Ps 115,000.00 17,250.00 189,750.00
Lock case + Cylinder + Lever Handle 1.00 Set 357,210.00 35,721.00 392,931.00
Sticker kaca 1.40 M2 100,000.00 14,000.00 154,000.00

2 TYPE - P3 ( 1 UNIT )
Kusen Alumunium 4" Warna Lengkap Assesoris 5.90 M' 105,440.00 62,209.60 684,305.60
Daun pintu Metal + rangka uk. 72 x 210 cm 1.51 M2 2,000,000.00 302,000.00 3,322,000.00
Engsel pintu 4" 1.50 Ps 115,000.00 17,250.00 189,750.00
Lock case + Cylinder + Handle pintu KM 1.00 Set 357,210.00 35,721.00 392,931.00
Finish Duco daun pintu 3.02 M2 100,000.00 30,200.00 332,200.00

3 TYPE -J1 ( 1 UNIT )


Kusen Alumunium 4" Warna Lengkap Assesoris 8.55 M' 105,440.00 90,151.20 991,663.20
Kaca Polos t = 5 mm 1.94 M2 124,450.00 24,143.30 265,576.30
Frame daun jendela uk. 50x77 cm x 2 unit 0.77 M2 610,330.00 46,995.41 516,949.51
Engsel Casement 2.00 Ps 186,480.00 37,296.00 410,256.00
Casement handle 2.00 bh 29,400.00 5,880.00 64,680.00

4 TYPE -J2 ( 1 UNIT )


Kusen Alumunium 4" Warna Lengkap Assesoris 5.55 M' 105,440.00 58,519.20 643,711.20
Kaca Polos t = 5 mm 0.80 M2 124,450.00 9,956.00 109,516.00
Frame daun jendela uk. 67x77 cm x 2 unit 1.03 M2 610,330.00 62,863.99 691,503.89
Engsel Casement 2.00 Ps 186,480.00 37,296.00 410,256.00
Casement handle 2.00 Bh 29,400.00 5,880.00 64,680.00

5 TYPE - BV ( 2 UNIT )
Kusen Alumunium 4" Warna Lengkap Assesoris 5.00 M' 105,440.00 52,720.00 579,920.00
Kaca Polos t=5mm 0.56 M2 124,450.00 6,969.20 76,661.20
Jumlah B 1,168,427.26 12,852,699.86

C. PEKERJAAN LANTAI
1 Lapisan pasir bawah lantai t = 5 cm 0.93 M3 152,250.00 14,159.25 155,751.75
2 Lantai keramik 40x40 (Glossy) 6.80 M2 206,960.00 140,732.80 1,548,060.80
3 Lantai keramik 40x40 (Rustic) border beda warna 9.60 M2 218,510.00 209,769.60 2,307,465.60
4 Lantai keramik 25x25 ( anti slip ) 2.10 M2 206,850.00 43,438.50 477,823.50
5 Plint Lantai, keramik 10x40 ( Glossy ) 21.40 M' 39,320.00 84,144.80 925,592.80
Jumlah C 492,244.95 5,414,694.45

D. PEKERJAAN PLAFOND
1 Pas. Rangka plafond Hollow Galvanis 4 x 4 t = 0.5 mm 17.60 M2 77,090.00 135,678.40 1,492,462.40
2 Plafond Gypsum board 9 mm 15.50 M2 48,170.00 74,663.50 821,298.50
3 Plafond Calcyboard 4 mm 2.10 M2 32,610.00 6,848.10 75,329.10
4 List plafond Gypsum 26.00 M' 23,960.00 62,296.00 685,256.00
5 List plafond profil kayu solid 5.80 M' 16,560.00 9,604.80 105,652.80
6 Pengecatan Plafond 17.60 M2 21,780.00 38,332.80 421,660.80
Jumlah D 327,423.60 3,601,659.60

E. PEKERJAAN ATAP
1 Waterproofing coating dak atap 18.70 M2 150,000.00 280,500.00 3,085,500.00
Jumlah E 280,500.00 3,085,500.00

F. PEKERJAAN SANITAIR
1 Closet Jongkok 1.00 Bh 350,000.00 35,000.00 385,000.00
2 Kran Tembok 1.00 Bh 270,200.00 27,020.00 297,220.00
3 Floor Drain 1.00 Bh 322,140.00 32,214.00 354,354.00
4 Bak Mandi 1.00 Bh 500,000.00 50,000.00 550,000.00
5 Wastafel Gantung Lengkap Cermin 1.00 Bh 1,216,790.00 121,679.00 1,338,469.00
Jumlah F 265,913.00 2,925,043.00

Halaman10
JUMLAH HARGA +
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN PPN 10 % PPN 10 %
(Rp.) (Rp.) (Rp.)
G. PEKERJAAN AIR BERSIH DAN AIR KOTOR
Pekerjaan Instalasi Air Bersih
- Pipa PVC dia.25mm (1") + Penyambungan ke Pos Jaga 1 16.00 M' 25,150.00 40,240.00 442,640.00
- Pipa PVC dia.20 mm(3/4") 4.00 M' 21,330.00 8,532.00 93,852.00
- Pipa PVC dia.15 mm(1/2") 4.00 M' 18,350.00 7,340.00 80,740.00
- Accesoris Pemipaan (Fiting) 1.00 Ls 500,000.00 50,000.00 550,000.00
- Bak kontrol 1.00 Unit 350,000.00 35,000.00 385,000.00
Pekerjaan Instalasi Air Kotor
- Pipa PVC Dia.100(4") 3.00 M' 130,970.00 39,291.00 432,201.00
- Pipa PVC Dia 80 (.3") 2.80 M' 88,230.00 24,704.40 271,748.40
- Pipa PVC Dia 65 (.2.5") 3.60 M' 71,010.00 25,563.60 281,199.60
- Accesoris Pemipaan & Fitting 1.00 ls 750,000.00 75,000.00 825,000.00
- Septic Tank FRP Kapasitas 2 M3 + Pekerjaan Sipil 1.00 Unit 5,000,000.00 500,000.00 5,500,000.00
- Sumur Resapan 1.00 Bh 1,000,000.00 100,000.00 1,100,000.00
Jumlah G 905,671.00 9,962,381.00

H. PEKERJAAN ELEKTRIKAL
1 Instalasi penerangan 5.00 Ttk 300,000.00 150,000.00 1,650,000.00
2 Instalasi Kotak kontak 3.00 Ttk 310,000.00 93,000.00 1,023,000.00
3 Down light LED 10Watt 3.00 Bh 180,000.00 54,000.00 594,000.00
4 Lampu gantung LED 10Watt 2.00 Bh 350,000.00 70,000.00 770,000.00
5 Saklar Ganda 2.00 Bh 27,500.00 5,500.00 60,500.00
6 Saklar Tunggal 1.00 Bh 25,000.00 2,500.00 27,500.00
7 Kotak kontak dinding 3.00 Bh 32,500.00 9,750.00 107,250.00
8 Panel lengkap MCB dan Grounding 1.00 Bh 850,000.00 85,000.00 935,000.00
9 Penyambungan ke Pos Jaga 1 1.00 Ls 650,000.00 65,000.00 715,000.00
Jumlah H 534,750.00 5,882,250.00

VI PEKERJAAN PERBAIKAN HURUF


1 Huruf ART CENTER Plat Besi Finish Cat Duco tinggi = 60 cm 9.00 Bh 500,000.00 450,000.00 4,950,000.00
Jumlah VI 450,000.00 4,950,000.00

VII PEKERJAAN SALURAN


A. SALURAN - S1
1 Galian tanah pondasi 88.83 M3 65,620.00 582,902.46 6,411,927.06
2 Lapisan pasir bawah saluran t = 5 cm 4.68 M3 152,250.00 71,253.00 783,783.00
3 Saluran U-Ditch uk. 80x100x120 cm 110.00 M' 1,162,000.00 12,782,000.00 140,602,000.00
4 Pengurugan kembali galian tanah 55.00 M3 47,250.00 259,875.00 2,858,625.00
Jumlah A 13,696,030.46 150,656,335.06

B. SALURAN - S2
1 Galian tanah pondasi 68.15 M3 65,620.00 447,200.30 4,919,203.30
2 Lapisan pasir bawah saluran t = 5 cm 3.59 M3 152,250.00 54,657.75 601,235.25
3 Saluran Box Culvert Heavy Duty, uk. 60x60x100 cm 84.40 M' 1,118,250.00 9,438,030.00 103,818,330.00
4 Pengurugan kembali galian tanah 34.08 M3 47,250.00 161,028.00 1,771,308.00
Jumlah B 10,100,916.05 111,110,076.55

Garut, 29 Mei 2019


Dibuat Oleh
CV. ARFA

ANGGA GOJALI
DIREKTUR

Halaman11
ANALISA HARGA SATUAN PEKERJAAN
PEMBANGUNAN GERBANG DAN POS JAGA HALAMAN GEDUNG ART CENTRE
KABUPATEN GARUT
TAHUN ANGGARAN 2019

NO URAIAN PEKERJAAN HARGA SATUAN

1 Pengukuran dan pemasangan 1 m’ Bouwplank 50,210.00


2 Penggalian 1 m3 tanah biasa sedalam 1 m 65,620.00
3 Penggalian 1 m3 tanah biasa sedalam 2 m 80,320.00
4 Pengurugan kembali 1 m3 galian tanah 47,250.00
5 Pemadatan tanah 1 m3 tanah ( per 20 cm ) 47,250.00
6 Pengurugan 1 m3 dengan tanah urug setempat 47,250.00
7 Pengurugan 1 m3 dengan pasir urug 152,250.00
8 Pemasangan 1 m3 pondasi batu belah campuran 1SP:3PP 683,760.00
9 Pemasangan 1 m3 pondasi batu belah campuran 1SP:5PP 616,820.00
10 Pemasangan 1 m3 batu kosong anstamping 315,470.00
11 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,87 744,580.00
12 Membuat 1 m3 beton mutu f'c = 14.5 Mpa (K175), slump (12 ± 2)cm, w/c = 0,85 885,340.00
13 Membuat 1 m3 beton f'c = 21,7 Mpa (K250),slump (12 ± 2) cm, w/c = 0,56 941,720.00
14 Pembesian 10 kg dengan besi polos atau besi ulir 11,450.00
15 Pemasangan 1 m2 bekisting untuk pondasi 101,110.00
16 Pemasangan 1 m2 bekisting untuk sloof 103,740.00
17 Pemasangan 1 m2 bekisting untuk kolom 171,880.00
18 Pemasangan 1 m2 bekisting untuk balok 174,240.00
19 Pemasangan 1 m2 bekisting untuk lantai 208,630.00
PEKERJAAN POS JAGA -
20 1 M3 Pile Cap type P1 ( 100x100x25 cm ) besi 140 kg/m3 2,959,680.00
21 1 M3 Sloof Sp 15/30 besi 186 kg/m3 4,454,620.00
22 1 M3 Kolom struktur 15/30 besi 136 kg/m3 5,936,520.00
23 1 M3 Kolom 15/15 besi 290 kg/m3 4,306,220.00
23 1 M3 Ring Balok dan Kolom praktis Kp 12/12 besi 115 kg/m3 3,987,470.00
24 1 M3 Ring balk 15/20 besi 186 kg/m3 4,800,420.00
25 1 M3 Canopy & sirip beton 15/20+12/60 besi 115 kg/m3 5,307,670.00
26 1 M3 Plat dak beton t. 12 cm besi 93 kg/m3 3,745,150.00
PEKERJAAN PAGAR & GERBANG DEPAN -
27 1 M3 Sloof SP 15/20 besi 180 kg/m3 4,385,920.00
28 1 M3 Kolom praktis / Ring balok 12/12 besi 260 kg/m3 5,301,920.00
29 Pemasangan 1 m' Saluran S1 U-Ditch uk. 80x100x120 cm 1,162,000.00
30 Pemasangan 1 m' Saluran S2 Box Culvert Heavy Duty, uk. 60x60x100 cm 1,118,250.00
31 Pemasangan 1 kg besi profil 22,830.00
32 Pemasangan 1 m Kusen Aluminium ukuran 4" sek. YKK YBIC t = 1,35 mm Lengkap Assesoris 105,440.00
33 Pemasangan 1 m2 pintu kaca rangka alumunium 702,730.00
34 Pemasangan 1 m2 Daun Jendela Alumunium 610,330.00
35 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 3PP 108,470.00
36 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 5PP 103,840.00
37 Pemasangan 1 m2 dinding bata merah (5x11x12) cm tebal 1 batu campuran 1SP : 5PP 212,850.00
38 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm 55,910.00
39 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm 53,390.00
40 Pemasangan plesteran ciprat 1SP : 2PP 43,730.00
41 Pemasangan 1 m2 acian 32,620.00
42 Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm 206,960.00
43 Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm (Rustic) 218,510.00
44 Pemasangan 1 m' plint granite tile ukuran 10cm x 40cm Polish 39,320.00
45 Pemasangan 1 m2 lantai ubin keramik ukuran 25cm x 25cm 206,850.00
46 Pemasangan 1 m2 Batu Andesit 195,620.00
47 Pemasangan 1 m2 dinding keramik 20cm x 40cm 280,740.00
48 Pemasangan 1 m2 dinding granit 30cm x 60 cm 452,400.00
49 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60cm, plafond 77,090.00
50 Pemasangan 1 m2 langit-langit asbes semen, tebal 4mm 32,610.00
51 Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 mm 48,170.00
52 Pemasangan 1 m' list langit-langit kayu profil 16,560.00
53 Pemasangan 1 m' list kangit-langit profil gypsum 23,960.00

Halaman 12
NO URAIAN PEKERJAAN HARGA SATUAN

54 Pemasangan 1 buah Body Kunci + Cylinder 357,210.00


0 Pemasangan 1 buah Body Kunci + Cylinder (KM/WC) 401,310.00
1 Pemasangan satu pasang engsel pintu 115,000.00
2 Pemasangan satu pasang Lever Hendle 98,730.00
3 Pemasangan 1 buah Engsel Casement 186,480.00
4 Pemasangan 1 buah Rambuncis 29,400.00
5 Pemasangan 1 m2 kaca tebal 5 mm 124,450.00
6 Pemasangan 1 m2 kaca tebal 6 mm 170,650.00
7 Pengecetan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 32,320.00
8 Pengecetan 1 m2 tembok baru / Plapond Interior ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup ) 21,780.00
9 Pemasangan 1 buah wastafel gantung 1,216,790.00
10 Pemasangan 1 buah floor drain 322,140.00
11 Pemasangan 1 buah kran diameter 1/2" atau 3/4" 270,200.00
12 Pemasangan 1 m' pipa PVC tipe AW diameter 1/2" 18,350.00
13 Pemasangan 1 m' pipa PVC tipe AW diameter 3/4" 21,330.00
14 Pemasangan 1 m' pipa PVC tipe AW diameter 1" 25,150.00
15 Pemasangan 1 m' pipa PVC tipe AW diameter 1,1/4" 32,810.00
16 Pemasangan 1 m' pipa PVC tipe AW diameter 1,5" 41,130.00
17 Pemasangan 1 m' pipa PVC tipe AW diameter 2" 63,670.00
18 Pemasangan 1 m' pipa PVC tipe AW diameter 2,5" 71,010.00
19 Pemasangan 1 m' pipa PVC tipe AW diameter 3" 88,230.00
20 Pemasangan 1 m' pipa PVC tipe AW diameter 4" 130,970.00
21 Pemasangan 1 m' pipa PVC tipe AW diameter 6" 275,130.00
22 1 M' Saluran Pasangan Bata + Grevel 214,830.00

Garut, 29 Mei 2019


Dibuat Oleh
CV. ARFA

ANGGA GOJALI
DIREKTUR

Halaman 13
ANALISA HARGA SATUAN PEKERJAAN
PEMBANGUNAN GERBANG DAN POS JAGA HALAMAN GEDUNG ART CENTRE
KABUPATEN GARUT
TAHUN ANGGARAN 2019

1 Pengukuran dan pemasangan 1 m’ Bouwplank


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang Kayu L.02 OH 0.1000 95,000.00 9,500.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 19,000.00
B BAHAN
Kayu balok 5/7 M3 0.0120 1,500,000.00 18,000.00
Paku 2”-3” Kg 0.0200 16,000.00 320.00
Kayu papan 3/20 M3 0.0070 1,500,000.00 10,500.00
JUMLAH HARGA BAHAN 28,820.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 47,820.00


E Overhead & Profit 5% D 2,391.00
F Harga Satuan Pekerjaan (D+E) 50,211.00
G Dibulatkan 50,210.00

2 Penggalian 1 m3 tanah biasa sedalam 1 m


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7500 80,000.00 60,000.00
Mandor L.04 OH 0.0250 100,000.00 2,500.00
JUMLAH TENAGA KERJA 62,500.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 62,500.00


E Overhead & Profit 5% D 3,125.00
F Harga Satuan Pekerjaan (D+E) 65,625.00
G Dibulatkan 65,620.00

Halaman 14
3 Penggalian 1 m3 tanah biasa sedalam 2 m
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 80,000.00 72,000.00
Mandor L.04 OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 76,500.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 76,500.00


E Overhead & Profit 5% D 3,825.00
F Harga Satuan Pekerjaan (D+E) 80,325.00
G Dibulatkan 80,320.00

4 Pengurugan kembali 1 m3 galian tanah


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 80,000.00 40,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 45,000.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,000.00


E Overhead & Profit 5% D 2,250.00
F Harga Satuan Pekerjaan (D+E) 47,250.00
G Dibulatkan 47,250.00

5 Pemadatan tanah 1 m3 tanah ( per 20 cm )


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 80,000.00 40,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 45,000.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,000.00


E Overhead & Profit 5% D 2,250.00
F Harga Satuan Pekerjaan (D+E) 47,250.00
G Dibulatkan 47,250.00

Halaman 15
6 Pengurugan 1 m3 dengan tanah urug setempat
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 80,000.00 40,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 45,000.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,000.00


E Overhead & Profit 5% D 2,250.00
F Harga Satuan Pekerjaan (D+E) 47,250.00
G Dibulatkan 47,250.00

7 Pengurugan 1 m3 dengan pasir urug


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Mandor L.04 OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 25,000.00
B BAHAN
Pasir urug M3 1.200 100,000.00 120,000.00
JUMLAH HARGA BAHAN 120,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 145,000.00


E Overhead & Profit 5% D 7,250.00
F Harga Satuan Pekerjaan (D+E) 152,250.00
G Dibulatkan 152,250.00

Halaman 16
8 Pemasangan 1 m3 pondasi batu belah campuran 1SP:3PP
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang Batu L.02 OH 0.7500 95,000.00 71,250.00
Kepala Tukang L.03 OH 0.0750 100,000.00 7,500.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 206,250.00
B BAHAN
Batu belah M3 1.2000 125,000.00 150,000.00
Semen Portlan Kg 202.0000 1,100.00 222,200.00
Pasir Pasang M3 0.4850 150,000.00 72,750.00
JUMLAH HARGA BAHAN 444,950.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 651,200.00


E Overhead & Profit 5% D 32,560.00
F Harga Satuan Pekerjaan (D+E) 683,760.00
G Dibulatkan 683,760.00

9 Pemasangan 1 m3 pondasi batu belah campuran 1SP:5PP


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang Batu L.02 OH 0.7500 95,000.00 71,250.00
Kepala Tukang L.03 OH 0.0750 100,000.00 7,500.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 206,250.00
B BAHAN
Batu belah M3 1.2000 125,000.00 150,000.00
Semen Portlan Kg 136.0000 1,100.00 149,600.00
Pasir Pasang M3 0.5440 150,000.00 81,600.00
JUMLAH HARGA BAHAN 381,200.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 587,450.00


E Overhead & Profit 5% D 29,372.50
F Harga Satuan Pekerjaan (D+E) 616,822.50
G Dibulatkan 616,820.00

Halaman 17
10 Pemasangan 1 m3 batu kosong anstamping
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7800 80,000.00 62,400.00
Tukang Batu L.02 OH 0.3900 95,000.00 37,050.00
Kepala Tukang L.03 OH 0.0390 100,000.00 3,900.00
Mandor L.04 OH 0.0390 100,000.00 3,900.00
JUMLAH TENAGA KERJA 107,250.00
B BAHAN
Batu belah M3 1.2000 125,000.00 150,000.00
Pasir urug M3 0.4320 100,000.00 43,200.00
JUMLAH HARGA BAHAN 193,200.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 300,450.00


E Overhead & Profit 5% D 15,022.50
F Harga Satuan Pekerjaan (D+E) 315,472.50
G Dibulatkan 315,470.00

11 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 80,000.00 96,000.00
Tukang Batu L.02 OH 0.2000 95,000.00 19,000.00
Kepala Tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 125,300.00
B BAHAN
Semen Portland Kg 230.0000 1,100.00 253,000.00
Pasir Beton M3 0.6379 175,000.00 111,625.00
Kerikil M3 0.7607 275,000.00 209,203.70
(Maks
Air 30mm) Liter 200.0000 50.00 10,000.00
JUMLAH HARGA BAHAN 583,828.70
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 709,128.70


E Overhead & Profit 5% D 35,456.44
F Harga Satuan Pekerjaan (D+E) 744,585.14
G Dibulatkan 744,580.00

Halaman 18
12 Membuat 1 m3 beton mutu f'c = 14.5 Mpa (K175), slump (12 ± 2)cm, w/c = 0,85
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 80,000.00 132,000.00
Tukang Batu L.02 OH 0.2750 95,000.00 26,125.00
Kepala Tukang L.03 OH 0.0280 100,000.00 2,800.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 169,225.00
B BAHAN
Semen Portland Kg 326.0000 1,100.00 358,600.00
Pasir Beton M3 0.5429 175,000.00 95,000.00
Kerikil M3 0.7622 275,000.00 209,611.11
(Maks
Air 30mm) Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 673,961.11
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 843,186.11


E Overhead & Profit 5% D 42,159.31
F Harga Satuan Pekerjaan (D+E) 885,345.42
G Dibulatkan 885,340.00

13 Membuat 1 m3 beton f'c = 21,7 Mpa (K250),slump (12 ± 2) cm, w/c = 0,56
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 80,000.00 132,000.00
Tukang Batu L.02 OH 0.2750 95,000.00 26,125.00
Kepala Tukang L.03 OH 0.0280 100,000.00 2,800.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 169,225.00
B BAHAN
Semen Portland Kg 384.0000 1,100.00 422,400.00
Pasir Beton M3 0.4886 175,000.00 85,505.00
Kerikil M3 0.7600 275,000.00 209,000.00
(Maksimum
Air 30mm) Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 727,655.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 896,880.00


E Overhead & Profit 5% D 44,844.00
F Harga Satuan Pekerjaan (D+E) 941,724.00
G Dibulatkan 941,720.00

Halaman 19
14 Pembesian 10 kg dengan besi polos atau besi ulir
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 80,000.00 5,600.00
Tukang Besi L.02 OH 0.0700 95,000.00 6,650.00
Kepala Tukang L.03 OH 0.0070 100,000.00 700.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 13,350.00
B BAHAN
Besi beton Kg 10.5000 8,900.00 93,450.00
(polos/ulir)
Kawat beton Kg 0.1500 15,000.00 2,250.00
JUMLAH HARGA BAHAN 95,700.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 109,050.00


E Overhead & Profit 5% D 5,452.50
F Harga Satuan Pekerjaan (D+E) 114,502.50
G Harga Satuan Pekerjaan (D+E) Per 1 Kg 11,450.25
H Dibulatkan 11,450.00

15 Pemasangan 1 m2 bekisting untuk pondasi


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 80,000.00 41,600.00
Tukang Kayu L.02 OH 0.2600 95,000.00 24,700.00
Kepala Tukang L.03 OH 0.0260 100,000.00 2,600.00
Mandor L.04 OH 0.0260 100,000.00 2,600.00
JUMLAH TENAGA KERJA 71,500.00
B BAHAN
Kayu kelas III (50 %) M3 0.0200 1,000,000.00 20,000.00
Paku 5 – 10 cm Kg 0.3000 14,000.00 4,200.00
Minyak bekisting Liter 0.1000 6,000.00 600.00
JUMLAH HARGA BAHAN 24,800.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 96,300.00


E Overhead & Profit 5% D 4,815.00
F Harga Satuan Pekerjaan (D+E) 101,115.00
G Dibulatkan 101,110.00

Halaman 20
16 Pemasangan 1 m2 bekisting untuk sloof
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 80,000.00 41,600.00
Tukang Kayu L.02 OH 0.2600 95,000.00 24,700.00
Kepala Tukang L.03 OH 0.0260 100,000.00 2,600.00
Mandor L.04 OH 0.0260 100,000.00 2,600.00
JUMLAH TENAGA KERJA 71,500.00
B BAHAN
Kayu kelas III (50%) M3 0.0225 1,000,000.00 22,500.00
Paku 5 cm – 10 cm Kg 0.3000 14,000.00 4,200.00
Minyak bekisting Liter 0.1000 6,000.00 600.00
JUMLAH HARGA BAHAN 27,300.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 98,800.00


E Overhead & Profit 5% D 4,940.00
F Harga Satuan Pekerjaan (D+E) 103,740.00
G Dibulatkan 103,740.00

17 Pemasangan 1 m2 bekisting untuk kolom


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 95,000.00 31,350.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 90,750.00
B BAHAN
Kayu kelas III (50%) M3 0.0200 1,000,000.00 20,000.00
Paku 5 cm – 12 cm Kg 0.4000 12,000.00 4,800.00
Minyak bekisting Liter 0.2000 6,000.00 1,200.00
Balok kayu kelas II (50%) M3 0.0075 1,500,000.00 11,250.00
Plywood tebal 9 mm (50%) Lbr 0.1750 104,000.00 18,200.00
Dolken kayu galam, Batang 1.0000 17,500.00 17,500.00
8–10 cm panjang 4 m (50%) JUMLAH HARGA BAHAN 72,950.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 163,700.00


E Overhead & Profit 5% D 8,185.00
F Harga Satuan Pekerjaan (D+E) 171,885.00
G Dibulatkan 171,880.00

Halaman 21
18 Pemasangan 1 m2 bekisting untuk balok
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 95,000.00 31,350.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 90,750.00
B BAHAN
Kayu kelas III (50%) M3 0.0200 1,000,000.00 20,000.00
Paku 5 cm – 12 cm Kg 0.4000 12,000.00 4,800.00
Minyak bekisting Liter 0.2000 6,000.00 1,200.00
Balok kayu kelas II (50%) M3 0.0090 1,500,000.00 13,500.00
Plywood tebal 9 mm (50%) Lbr 0.1750 104,000.00 18,200.00
Dolken kayu galam, Batang 1.0000 17,500.00 17,500.00
8–10 cm panjang 4 m (50%) JUMLAH HARGA BAHAN 75,200.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 165,950.00


E Overhead & Profit 5% D 8,297.50
F Harga Satuan Pekerjaan (D+E) 174,247.50
G Dibulatkan 174,240.00

19 Pemasangan 1 m2 bekisting untuk lantai


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 95,000.00 31,350.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 90,750.00
B BAHAN
Kayu kelas III (50%) M3 0.0200 1,000,000.00 20,000.00
Paku 5 cm – 12 cm Kg 0.4000 12,000.00 4,800.00
Minyak bekisting Liter 0.2000 6,000.00 1,200.00
Balok kayu kelas II (50%) M3 0.0075 1,500,000.00 11,250.00
Plywood tebal 9 mm (50%) Lbr 0.1750 104,000.00 18,200.00
Dolken kayu galam, Batang 3.0000 17,500.00 52,500.00
8–10 cm panjang 4 m (50%) JUMLAH HARGA BAHAN 107,950.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 198,700.00


E Overhead & Profit 5% D 9,935.00
F Harga Satuan Pekerjaan (D+E) 208,635.00
G Dibulatkan 208,630.00

Halaman 22
PEKERJAAN POS JAGA
20 1 M3 Pile Cap type P1 ( 100x100x25 cm ) besi 140 kg/m3
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
Beton Readymix, mutu K 250 Slamp 10 -12 cm M3 1.0000 941,720.00 941,720.00
Besi Beton Kg 140.0000 11,450.00 1,603,000.00
Bekisting M2 4.0000 103,740.00 414,960.00
Harga Satuan Pekerjaan 2,959,680.00
Dibulatkan 2,959,680.00

21 1 M3 Sloof Sp 15/30 besi 186 kg/m3


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
Beton Readymix, mutu K 250 Slamp 10 -12 cm M3 1.0000 941,720.00 941,720.00
Besi Beton Kg 186.0000 11,450.00 2,129,700.00
Bekisting M2 13.333 103,740.00 1,383,200.00
Harga Satuan Pekerjaan 4,454,620.00
Dibulatkan 4,454,620.00

21 1 M3 Kolom struktur 15/30 besi 136 kg/m3


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
Beton Readymix, mutu K 250 Slamp 10 -12 cm M3 1.0000 941,720.00 941,720.00
Besi Beton Kg 136.0000 11,450.00 1,557,200.00
Bekisting M2 20.000 171,880.00 3,437,600.00
Harga Satuan Pekerjaan 5,936,520.00
Dibulatkan 5,936,520.00

22 1 M3 Kolom 15/15 besi 290 kg/m3


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
Beton Readymix, mutu K 250 Slamp 10 -12 cm M3 1.0000 941,720.00 941,720.00
Besi Beton Kg 290.0000 11,450.00 3,320,500.00
Bekisting M2 13.333 3,300.00 44,000.00
Harga Satuan Pekerjaan 4,306,220.00
Dibulatkan 4,306,220.00

23 1 M3 Ring Balok dan Kolom praktis Kp 12/12 besi 115 kg/m3


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
Beton Readymix, mutu K 250 Slamp 10 -12 cm M3 1.0000 941,720.00 941,720.00
Besi Beton Kg 115.0000 11,450.00 1,316,750.00
Bekisting M2 16.667 103,740.00 1,729,000.00
Harga Satuan Pekerjaan 3,987,470.00
Dibulatkan 3,987,470.00

24 1 M3 Ring balk 15/20 besi 186 kg/m3


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
Beton Readymix, mutu K 250 Slamp 10 -12 cm M3 1.0000 941,720.00 941,720.00
Besi Beton Kg 186.0000 11,450.00 2,129,700.00
Bekisting M2 16.667 103,740.00 1,729,000.00
Harga Satuan Pekerjaan 4,800,420.00
Dibulatkan 4,800,420.00

Halaman 23
25 1 M3 Canopy & sirip beton 15/20+12/60 besi 115 kg/m3
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
Beton Readymix, mutu K 250 Slamp 10 -12 cm M3 1.0000 941,720.00 941,720.00
Besi Beton Kg 115.0000 11,450.00 1,316,750.00
Bekisting M2 17.500 174,240.00 3,049,200.00
Harga Satuan Pekerjaan 5,307,670.00
Dibulatkan 5,307,670.00

26 1 M3 Plat dak beton t. 12 cm besi 93 kg/m3


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
Beton Readymix, mutu K 250 Slamp 10 -12 cm M3 1.0000 941,720.00 941,720.00
Besi Beton Kg 93.0000 11,450.00 1,064,850.00
Bekisting M2 8.333 208,630.00 1,738,583.33
Harga Satuan Pekerjaan 3,745,153.33
Dibulatkan 3,745,150.00

PEKERJAAN PAGAR & GERBANG DEPAN


27 1 M3 Sloof SP 15/20 besi 180 kg/m3
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
Beton Readymix, mutu K 250 Slamp 10 -12 cm M3 1.0000 941,720.00 941,720.00
Besi Beton Kg 180.0000 11,450.00 2,061,000.00
Bekisting M2 13.333 103,740.00 1,383,200.00
Harga Satuan Pekerjaan 4,385,920.00
Dibulatkan 4,385,920.00

28 1 M3 Kolom praktis / Ring balok 12/12 besi 260 kg/m3


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
Beton Readymix, mutu K 250 Slamp 10 -12 cm M3 1.0000 941,720.00 941,720.00
Besi Beton Kg 260.0000 11,450.00 2,977,000.00
Bekisting M2 13.333 103,740.00 1,383,200.00
Harga Satuan Pekerjaan 5,301,920.00
Dibulatkan 5,301,920.00

Halaman 24
29 Pemasangan 1 m' Saluran S1 U-Ditch uk. 80x100x120 cm
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Mandor L.04 OH 0.090 100,000.00 9,000.00
JUMLAH TENAGA KERJA 65,000.00
B BAHAN
Saluran U-Ditch uk. 80x100x120 cm M2 0.833 1,250,000.00 1,041,666.67
JUMLAH HARGA BAHAN 1,041,666.67
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,106,666.67


E Overhead & Profit 5% D 55,333.33
F Harga Satuan Pekerjaan (D+E) 1,162,000.00

30 Pemasangan 1 m' Saluran S2 Box Culvert Heavy Duty, uk. 60x60x100 cm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Mandor L.04 OH 0.090 100,000.00 9,000.00
JUMLAH TENAGA KERJA 65,000.00
B BAHAN
Saluran Box Culvert Heavy Duty, uk. 60x60x100 cm M2 1.000 1,000,000.00 1,000,000.00
JUMLAH HARGA BAHAN 1,000,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,065,000.00


E Overhead & Profit 5% D 53,250.00
F Harga Satuan Pekerjaan (D+E) 1,118,250.00

Halaman 25
31 Pemasangan 1 kg besi profil
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang Las L.03 OH 0.0600 95,000.00 5,700.00
Konstruksi
Kepala tukang L.03 OH 0.0060 100,000.00 600.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 11,400.00
B BAHAN
Besi Profil Kg 1.1500 9,000.00 10,350.00
JUMLAH HARGA BAHAN 10,350.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 21,750.00


E Overhead & Profit 5% D 1,087.50
F Harga Satuan Pekerjaan (D+E) 22,837.50
G Dibulatkan 22,830.00

32 Pemasangan 1 m Kusen Aluminium ukuran 4" sek. YKK YBIC t = 1,35 mm Lengkap Assesoris
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0430 80,000.00 3,440.00
Tukang Khusus L.03 OH 0.0430 95,000.00 4,085.00
Alumunium
Kepala tukang L.03 OH 0.0043 100,000.00 430.00
Mandor L.04 OH 0.0021 100,000.00 210.00
JUMLAH TENAGA KERJA 8,165.00
B BAHAN
Profil alluminium M 1.1000 80,000.00 88,000.00
Skrup fixer Buah 2.0000 630.00 1,260.00
Sealant Tube 0.0600 50,000.00 3,000.00
JUMLAH HARGA BAHAN 92,260.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 100,425.00


E Overhead & Profit 5% D 5,021.25
F Harga Satuan Pekerjaan (D+E) 105,446.25
G Dibulatkan 105,440.00

Halaman 26
33 Pemasangan 1 m2 pintu kaca rangka alumunium
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085 80,000.00 6,800.00
Tukang L.03 OH 0.085 95,000.00 8,075.00
Allumunium/Kaca
Kepala tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 16,275.00
B BAHAN
Pintu alluminium M 4.400 130,000.00 572,000.00
Profil kaca M 4.500 15,000.00 67,500.00
Sealant Tube 0.270 50,000.00 13,500.00
JUMLAH HARGA BAHAN 653,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 669,275.00


E Overhead & Profit 5% D 33,463.75
F Harga Satuan Pekerjaan (D+E) 702,738.75
G Dibulatkan 702,730.00

34 Pemasangan 1 m2 Daun Jendela Alumunium


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085 80,000.00 6,800.00
Tukang L.03 OH 0.085 95,000.00 8,075.00
Allumunium/Kaca
Kepala tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 16,275.00
B BAHAN
Jendela alumunium M 4.400 110,000.00 484,000.00
Profil kaca M 4.500 15,000.00 67,500.00
Sealant Tube 0.270 50,000.00 13,500.00
JUMLAH HARGA BAHAN 565,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 581,275.00


E Overhead & Profit 5% D 29,063.75
F Harga Satuan Pekerjaan (D+E) 610,338.75
G Dibulatkan 610,330.00

Halaman 27
35 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 95,000.00 9,500.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 36,000.00
B BAHAN
Bata merah M3 70.0000 650.00 45,500.00
Semen Portlan Kg 14.3700 1,100.00 15,807.00
Pasir Pasang M3 0.0400 150,000.00 6,000.00
JUMLAH HARGA BAHAN 67,307.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 103,307.00


E Overhead & Profit 5% D 5,165.35
F Harga Satuan Pekerjaan (D+E) 108,472.35
G Dibulatkan 108,470.00

36 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 5PP
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 95,000.00 9,500.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 36,000.00
B BAHAN
Bata merah M3 70.0000 650.00 45,500.00
Semen Portlan Kg 9.6800 1,100.00 10,648.00
Pasir Pasang M3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN 62,898.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 98,898.00


E Overhead & Profit 5% D 4,944.90
F Harga Satuan Pekerjaan (D+E) 103,842.90
G Dibulatkan 103,840.00

Halaman 28
37 Pemasangan 1 m2 dinding bata merah (5x11x12) cm tebal 1 batu campuran 1SP : 5PP
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 80,000.00 48,000.00
Tukang Batu L.02 OH 0.2000 95,000.00 19,000.00
Kepala Tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 72,000.00
B BAHAN
Bata merah M3 140.0000 650.00 91,000.00
Semen Portlan Kg 22.2000 1,100.00 24,420.00
Pasir Pasang M3 0.1020 150,000.00 15,300.00
JUMLAH HARGA BAHAN 130,720.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 202,720.00


E Overhead & Profit 5% D 10,136.00
F Harga Satuan Pekerjaan (D+E) 212,856.00
G Dibulatkan 212,850.00

38 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.03 OH 0.1500 95,000.00 14,250.00
Kepala Tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 41,250.00
B BAHAN
Semen PC Kg 7.7760 1,100.00 8,553.60
Pasir pasang M3 0.0230 150,000.00 3,450.00
JUMLAH HARGA BAHAN 12,003.60
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 53,253.60


E Overhead & Profit 5% D 2,662.68
F Harga Satuan Pekerjaan (D+E) 55,916.28
G Dibulatkan 55,910.00

Halaman 29
39 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.03 OH 0.1500 95,000.00 14,250.00
Kepala Tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 41,250.00
B BAHAN
Semen PC Kg 5.1840 1,100.00 5,702.40
Pasir pasang M3 0.0260 150,000.00 3,900.00
JUMLAH HARGA BAHAN 9,602.40
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 50,852.40


E Overhead & Profit 5% D 2,542.62
F Harga Satuan Pekerjaan (D+E) 53,395.02
G Dibulatkan 53,390.00

40 Pemasangan plesteran ciprat 1SP : 2PP


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.03 OH 0.1000 95,000.00 9,500.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 36,000.00
B BAHAN
Semen PC Kg 4.3200 1,100.00 4,752.00
Pasir pasang M3 0.0060 150,000.00 900.00
JUMLAH HARGA BAHAN 5,652.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 41,652.00


E Overhead & Profit 5% D 2,082.60
F Harga Satuan Pekerjaan (D+E) 43,734.60
G Dibulatkan 43,730.00

Halaman 30
41 Pemasangan 1 m2 acian
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang Batu L.03 OH 0.1000 95,000.00 9,500.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 27,500.00
B BAHAN
Semen PC Kg 3.2500 1,100.00 3,575.00
JUMLAH HARGA BAHAN 3,575.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 31,075.00


E Overhead & Profit 5% D 1,553.75
F Harga Satuan Pekerjaan (D+E) 32,628.75
G Dibulatkan 32,620.00

42 Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2400 80,000.00 19,200.00
Tukang Batu L.02 OH 0.1200 95,000.00 11,400.00
Kepala tukang L.03 OH 0.0120 100,000.00 1,200.00
Mandor L.04 OH 0.1200 100,000.00 12,000.00
JUMLAH TENAGA KERJA 43,800.00
B BAHAN
Keramik ukuran 40cm x 40cm Bh 6.8750 17,600.00 121,000.00
Semen Portlan Kg 9.6000 1,100.00 10,560.00
Semen warna Kg 1.5000 10,000.00 15,000.00
Pasir pasang M3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN 153,310.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 197,110.00


E Overhead & Profit 5% D 9,855.50
F Harga Satuan Pekerjaan (D+E) 206,965.50
G Dibulatkan 206,960.00

Halaman 31
43 Pemasangan 1 m2 lantai keramik ukuran 40cm x 40cm (Rustic)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2400 80,000.00 19,200.00
Tukang Batu L.02 OH 0.1200 95,000.00 11,400.00
Kepala tukang L.03 OH 0.0120 100,000.00 1,200.00
Mandor L.04 OH 0.1200 100,000.00 12,000.00
JUMLAH TENAGA KERJA 43,800.00
B BAHAN
Keramik ukuran 40cm x 40cm Bh 6.8750 19,200.00 132,000.00
Semen Portlan Kg 9.6000 1,100.00 10,560.00
Semen warna Kg 1.5000 10,000.00 15,000.00
Pasir pasang M3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN 164,310.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 208,110.00


E Overhead & Profit 5% D 10,405.50
F Harga Satuan Pekerjaan (D+E) 218,515.50
G Dibulatkan 218,510.00

44 Pemasangan 1 m' plint granite tile ukuran 10cm x 40cm Polish


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 80,000.00 7,200.00
Tukang Batu L.02 OH 0.0900 95,000.00 8,550.00
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 17,150.00
B BAHAN
Plint keramik 10/40 Bh 3.0000 5,866.67 17,600.00
Semen Portlan Kg 1.1400 1,100.00 1,254.00
Semen warna Kg 0.1000 10,000.00 1,000.00
Pasir pasang M3 0.0030 150,000.00 450.00
JUMLAH HARGA BAHAN 20,304.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 37,454.00


E Overhead & Profit 5% D 1,872.70
F Harga Satuan Pekerjaan (D+E) 39,326.70
G Dibulatkan 39,320.00

Halaman 32
45 Pemasangan 1 m2 lantai ubin keramik ukuran 25cm x 25cm
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 80,000.00 20,000.00
Tukang Batu L.02 OH 0.1250 95,000.00 11,875.00
Kepala tukang L.03 OH 0.0130 100,000.00 1,300.00
Mandor L.04 OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 34,475.00
B BAHAN
Ubin keramik Bh 17.6000 7,500.00 132,000.00
Semen Portlan Kg 9.8000 1,100.00 10,780.00
Semen warna Kg 1.3000 10,000.00 13,000.00
Pasir pasang M3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN 162,530.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 197,005.00


E Overhead & Profit 5% D 9,850.25
F Harga Satuan Pekerjaan (D+E) 206,855.25
G Dibulatkan 206,850.00

46 Pemasangan 1 m2 Batu Andesit


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2400 80,000.00 19,200.00
Tukang Batu L.02 OH 0.1200 95,000.00 11,400.00
Kepala tukang L.03 OH 0.0120 100,000.00 1,200.00
Mandor L.04 OH 0.0120 100,000.00 1,200.00
JUMLAH TENAGA KERJA 33,000.00
B BAHAN
Batu Andesit 30x30 cm M2 1.1000 110,000.00 121,000.00
Semen Portlan Kg 9.6000 1,100.00 10,560.00
Semen warna Kg 1.5000 10,000.00 15,000.00
Pasir pasang M3 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN 153,310.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 186,310.00


E Overhead & Profit 5% D 9,315.50
F Harga Satuan Pekerjaan (D+E) 195,625.50
G Dibulatkan 195,620.00

Halaman 33
47 Pemasangan 1 m2 dinding keramik 20cm x 40cm
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang Batu L.02 OH 0.450 95,000.00 42,750.00
Kepala tukang L.03 OH 0.045 100,000.00 4,500.00
Mandor L.04 OH 0.045 100,000.00 4,500.00
JUMLAH TENAGA KERJA 123,750.00
B BAHAN
Keramik artistik Bh 13.250 8,400.00 111,300.00
Semen Portlan Kg 9.300 1,100.00 10,230.00
Pasir Pasang M3 0.018 150,000.00 2,700.00
Semen warna Kg 1.940 10,000.00 19,400.00
JUMLAH HARGA BAHAN 143,630.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 267,380.00


E Overhead & Profit 5% D 13,369.00
F Harga Satuan Pekerjaan (D+E) 280,749.00
G Dibulatkan 280,740.00

48 Pemasangan 1 m2 dinding granit 30cm x 60 cm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang Batu L.02 OH 0.450 95,000.00 42,750.00
Kepala tukang L.03 OH 0.045 100,000.00 4,500.00
Mandor L.04 OH 0.045 100,000.00 4,500.00
JUMLAH TENAGA KERJA 123,750.00
B BAHAN
Granit Motif Batu 30/60 Bh 6.111 44,964.03 274,780.18
Semen Portlan Kg 9.300 1,100.00 10,230.00
Pasir Pasang M3 0.018 150,000.00 2,700.00
Semen warna Kg 1.940 10,000.00 19,400.00
JUMLAH HARGA BAHAN 307,110.18
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 430,860.18


E Overhead & Profit 5% D 21,543.01
F Harga Satuan Pekerjaan (D+E) 452,403.18
G Dibulatkan 452,400.00

Halaman 34
49 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60cm, plafond
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1750 80,000.00 14,000.00
Tukang Besi L.02 OH 0.1750 95,000.00 16,625.00
Kepala Tukang L.03 OH 0.0175 100,000.00 1,750.00
Mandor L.04 OH 0.0090 100,000.00 900.00
JUMLAH TENAGA KERJA 33,275.00
B BAHAN
Rangka metal M1 4.0000 9,125.00 36,500.00
hollow 40.40.0,5 mm
Assesoris Ls 0.1000 36,500.00 3,650.00
(perkuatan, las dll) JUMLAH HARGA BAHAN 40,150.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 73,425.00


E Overhead & Profit 5% D 3,671.25
F Harga Satuan Pekerjaan (D+E) 77,096.25
G Dibulatkan 77,090.00

50 Pemasangan 1 m2 langit-langit asbes semen, tebal 4mm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0300 80,000.00 2,400.00
Tukang kayu L.02 OH 0.0700 95,000.00 6,650.00
Kepala tukang L.03 OH 0.0070 100,000.00 700.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 10,150.00
B BAHAN
Asbes semen Lbr 0.3640 57,000.00 20,748.00
Paku tripleks Kg 0.0100 16,000.00 160.00
JUMLAH HARGA BAHAN 20,908.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 31,058.00


E Overhead & Profit 5% D 1,552.90
F Harga Satuan Pekerjaan (D+E) 32,610.90
G Dibulatkan 32,610.00

Halaman 35
51 Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 mm
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.02 OH 0.0500 95,000.00 4,750.00
Kepala tukang L.03 OH 0.0050 100,000.00 500.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 13,750.00
B BAHAN
Gypsum board Lembar 0.3640 70,000.00 25,480.00
Finishing (plaster board,dempul) Ls 1.0000 5,000.00 5,000.00
Paku skrup Kg 0.1100 15,000.00 1,650.00
JUMLAH HARGA BAHAN 32,130.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,880.00


E Overhead & Profit 5% D 2,294.00
F Harga Satuan Pekerjaan (D+E) 48,174.00
G Dibulatkan 48,170.00

52 Pemasangan 1 m' list langit-langit kayu profil


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 80,000.00 4,000.00
Tukang Kayu L.02 OH 0.0500 95,000.00 4,750.00
Kepala tukang L.03 OH 0.0050 100,000.00 500.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 9,550.00
B BAHAN
List kayu profil M 1.0500 5,800.00 6,090.00
Paku Kg 0.0100 14,000.00 140.00
JUMLAH HARGA BAHAN 6,230.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 15,780.00


E Overhead & Profit 5% D 789.00
F Harga Satuan Pekerjaan (D+E) 16,569.00
G Dibulatkan 16,560.00

Halaman 36
53 Pemasangan 1 m' list kangit-langit profil gypsum
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 80,000.00 4,000.00
Tukang Kayu L.02 OH 0.0500 95,000.00 4,750.00
Kepala tukang L.03 OH 0.0050 100,000.00 500.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 9,550.00
B BAHAN
List profil gypsum M 1.0500 12,500.00 13,125.00
Paku Kg 0.0100 15,000.00 150.00
JUMLAH HARGA BAHAN 13,275.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 22,825.00


E Overhead & Profit 5% D 1,141.25
F Harga Satuan Pekerjaan (D+E) 23,966.25
G Dibulatkan 23,960.00

54 Pemasangan 1 buah Body Kunci + Cylinder


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0050 80,000.00 400.00
Tukang kayu L.02 OH 0.5000 95,000.00 47,500.00
Kepala tukang L.03 OH 0.0500 100,000.00 5,000.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 53,200.00
B BAHAN
Kunci silinder Bh 1.0000 287,000.00 287,000.00
JUMLAH HARGA BAHAN 287,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 340,200.00


E Overhead & Profit 5% D 17,010.00
F Harga Satuan Pekerjaan (D+E) 357,210.00
G Dibulatkan 357,210.00

Halaman 37
55 Pemasangan 1 buah Body Kunci + Cylinder (KM/WC)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0050 80,000.00 400.00
Tukang kayu L.02 OH 0.5000 95,000.00 47,500.00
Kepala tukang L.03 OH 0.0500 100,000.00 5,000.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 53,200.00
B BAHAN
Kunci silinder Bh 1.0000 329,000.00 329,000.00
JUMLAH HARGA BAHAN 329,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 382,200.00


E Overhead & Profit 5% D 19,110.00
F Harga Satuan Pekerjaan (D+E) 401,310.00
G Dibulatkan 401,310.00

56 Pemasangan satu pasang engsel pintu


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.00 1,200.00
Tukang kayu L.02 OH 0.1500 95,000.00 14,250.00
Kepala tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 17,030.00
B BAHAN
Engsel pintu Bh 1.0000 92,500.00 92,500.00
JUMLAH HARGA BAHAN 92,500.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 109,530.00


E Overhead & Profit 5% D 5,476.50
F Harga Satuan Pekerjaan (D+E) 115,006.50
G Dibulatkan 115,000.00

Halaman 38
57 Pemasangan satu pasang Lever Hendle
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.00 1,200.00
Tukang kayu L.02 OH 0.1500 95,000.00 14,250.00
Kepala tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 17,030.00
B BAHAN
Lever Hendle Bh 1.0000 77,000.00 77,000.00
JUMLAH HARGA BAHAN 77,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 94,030.00


E Overhead & Profit 5% D 4,701.50
F Harga Satuan Pekerjaan (D+E) 98,731.50
G Dibulatkan 98,730.00

58 Pemasangan 1 buah Engsel Casement


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 80,000.00 800.00
Tukang kayu L.02 OH 0.1000 95,000.00 9,500.00
Kepala tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0005 100,000.00 50.00
JUMLAH TENAGA KERJA 11,350.00
B BAHAN
Engsel kupu-kupu Bh 1.0000 166,250.00 166,250.00
JUMLAH HARGA BAHAN 166,250.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 177,600.00


E Overhead & Profit 5% D 8,880.00
F Harga Satuan Pekerjaan (D+E) 186,480.00
G Dibulatkan 186,480.00

Halaman 39
59 Pemasangan 1 buah Rambuncis
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 80,000.00 800.00
Tukang kayu L.02 OH 0.1000 95,000.00 9,500.00
Kepala tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 11,800.00
B BAHAN
Rambuncis Bh 1.0000 16,200.00 16,200.00
JUMLAH HARGA BAHAN 16,200.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 28,000.00


E Overhead & Profit 5% D 1,400.00
F Harga Satuan Pekerjaan (D+E) 29,400.00
G Dibulatkan 29,400.00

60 Pemasangan 1 m2 kaca tebal 5 mm


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.00 1,200.00
Tukang kayu L.02 OH 0.1500 95,000.00 14,250.00
Kepala tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 17,030.00
B BAHAN
Kaca tebal 5 mm M2 1.1000 90,000.00 99,000.00
Sealant Kg 0.0500 50,000.00 2,500.00
JUMLAH HARGA BAHAN 101,500.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 118,530.00


E Overhead & Profit 5% D 5,926.50
F Harga Satuan Pekerjaan (D+E) 124,456.50
G Dibulatkan 124,450.00

Halaman 40
61 Pemasangan 1 m2 kaca tebal 6 mm
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.00 1,200.00
Tukang kayu L.02 OH 0.1500 95,000.00 14,250.00
Kepala tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 17,030.00
B BAHAN
Kaca tebal 6 mm M2 1.1000 130,000.00 143,000.00
Sealant Kg 0.0500 50,000.00 2,500.00
JUMLAH HARGA BAHAN 145,500.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 162,530.00


E Overhead & Profit 5% D 8,126.50
F Harga Satuan Pekerjaan (D+E) 170,656.50
G Dibulatkan 170,650.00

62 Pengecetan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 80,000.00 5,600.00
Tukang cat L.02 OH 0.0090 95,000.00 855.00
Kepala tukang L.03 OH 0.0060 100,000.00 600.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 7,355.00
B BAHAN
Cat menie Kg 0.2000 19,000.00 3,800.00
Plamuur Kg 0.1500 17,500.00 2,625.00
Cat dasar Kg 0.1700 25,000.00 4,250.00
Cat penutup Kg 0.2600 45,000.00 11,700.00
Kuas Bh 0.0100 12,500.00 125.00
Pengencer Kg 0.0300 4,500.00 135.00
Ampelas Lbr 0.2000 4,000.00 800.00
JUMLAH HARGA BAHAN 23,435.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 30,790.00


E Overhead & Profit 5% D 1,539.50
F Harga Satuan Pekerjaan (D+E) 32,329.50
G Dibulatkan 32,320.00

Halaman 41
63 Pengecetan 1 m2 tembok baru / Plapond Interior ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup )
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 80,000.00 1,600.00
Tukang cat L.02 OH 0.0630 95,000.00 5,985.00
Kepala tukang L.03 OH 0.0063 100,000.00 630.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 8,515.00
B BAHAN
Plamuur Kg 0.1000 14,325.00 1,432.50
Cat dasar Kg 0.1000 30,000.00 3,000.00
Cat Tembok sek. Catylac Kg 0.2600 30,000.00 7,800.00
JUMLAH HARGA BAHAN 12,232.50
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 20,747.50


E Overhead & Profit 5% D 1,037.38
F Harga Satuan Pekerjaan (D+E) 21,784.88
G Dibulatkan 21,780.00

64 Pemasangan 1 buah wastafel gantung


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 80,000.00 96,000.00
Tukang batu L.02 OH 1.4500 95,000.00 137,750.00
Kepala tukang L.03 OH 0.1500 100,000.00 15,000.00
Mandor L.04 OH 0.0600 100,000.00 6,000.00
JUMLAH TENAGA KERJA 254,750.00
B BAHAN
Wastafel Unit 1.0000 800,000.00 800,000.00
Semen Portland Kg 6.0000 1,100.00 6,600.00
Pasir pasang M3 0.0100 150,000.00 1,500.00
Perlengkapan % 0.1200 800,000.00 96,000.00
JUMLAH HARGA BAHAN 904,100.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,158,850.00


E Overhead & Profit 5% D 57,942.50
F Harga Satuan Pekerjaan (D+E) 1,216,792.50
G Dibulatkan 1,216,790.00

Halaman 42
65 Pemasangan 1 buah floor drain
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 80,000.00 800.00
Tukang batu L.02 OH 0.1000 95,000.00 9,500.00
Kepala tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 11,800.00
B BAHAN
Floor drain Unit 1.0000 295,000.00 295,000.00
JUMLAH HARGA BAHAN 295,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 306,800.00


E Overhead & Profit 5% D 15,340.00
F Harga Satuan Pekerjaan (D+E) 322,140.00
G Dibulatkan 322,140.00

66 Pemasangan 1 buah kran diameter 1/2" atau 3/4"


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 80,000.00 800.00
Tukang batu L.02 OH 0.4000 95,000.00 38,000.00
Kepala tukang L.03 OH 0.0400 100,000.00 4,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 43,300.00
B BAHAN
Kran air M 1.000 214,000.00 214,000.00
Sealtape Buah 0.025 1,500.00 37.50
JUMLAH HARGA BAHAN 214,037.50
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 257,337.50


E Overhead & Profit 5% D 12,866.88
F Harga Satuan Pekerjaan (D+E) 270,204.38
G Dibulatkan 270,200.00

Halaman 43
67 Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0360 80,000.00 2,880.00
Tukang batu L.02 OH 0.0600 95,000.00 5,700.00
Kepala tukang L.03 OH 0.0060 100,000.00 600.00
Mandor L.04 OH 0.0020 100,000.00 200.00
JUMLAH TENAGA KERJA 9,380.00
B BAHAN
Pipa PVC 1/2” M 1.2000 5,000.00 6,000.00
Perlengkapan % 0.3500 6,000.00 2,100.00
JUMLAH HARGA BAHAN 8,100.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 17,480.00


E Overhead & Profit 5% D 874.00
F Harga Satuan Pekerjaan (D+E) 18,354.00
G Dibulatkan 18,350.00

68 Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0360 80,000.00 2,880.00
Tukang batu L.02 OH 0.0600 95,000.00 5,700.00
Kepala tukang L.03 OH 0.0060 100,000.00 600.00
Mandor L.04 OH 0.0020 100,000.00 200.00
JUMLAH TENAGA KERJA 9,380.00
B BAHAN
Pipa PVC 3/4” M 1.2000 6,750.00 8,100.00
Perlengkapan % 0.3500 8,100.00 2,835.00
JUMLAH HARGA BAHAN 10,935.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 20,315.00


E Overhead & Profit 5% D 1,015.75
F Harga Satuan Pekerjaan (D+E) 21,330.75
G Dibulatkan 21,330.00

Halaman 44
69 Pemasangan 1 m' pipa PVC tipe AW diameter 1"
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0360 80,000.00 2,880.00
Tukang batu L.02 OH 0.0600 95,000.00 5,700.00
Kepala tukang L.03 OH 0.0060 100,000.00 600.00
Mandor L.04 OH 0.0020 100,000.00 200.00
JUMLAH TENAGA KERJA 9,380.00
B BAHAN
Pipa PVC 1” M 1.2000 9,000.00 10,800.00
Perlengkapan % 0.3500 10,800.00 3,780.00
JUMLAH HARGA BAHAN 14,580.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 23,960.00


E Overhead & Profit 5% D 1,198.00
F Harga Satuan Pekerjaan (D+E) 25,158.00
G Dibulatkan 25,150.00

70 Pemasangan 1 m' pipa PVC tipe AW diameter 1,1/4"


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0360 80,000.00 2,880.00
Tukang batu L.02 OH 0.0600 95,000.00 5,700.00
Kepala tukang L.03 OH 0.0060 100,000.00 600.00
Mandor L.04 OH 0.0020 100,000.00 200.00
JUMLAH TENAGA KERJA 9,380.00
B BAHAN
Pipa PVC 1” M 1.2000 13,500.00 16,200.00
Perlengkapan % 0.3500 16,200.00 5,670.00
JUMLAH HARGA BAHAN 21,870.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 31,250.00


E Overhead & Profit 5% D 1,562.50
F Harga Satuan Pekerjaan (D+E) 32,812.50
G Dibulatkan 32,810.00

Halaman 45
71 Pemasangan 1 m' pipa PVC tipe AW diameter 1,5"
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 80,000.00 4,320.00
Tukang batu L.02 OH 0.0900 95,000.00 8,550.00
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 14,070.00
B BAHAN
Pipa PVC 1,5” M 1.2000 15,500.00 18,600.00
Perlengkapan % 0.3500 18,600.00 6,510.00
JUMLAH HARGA BAHAN 25,110.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 39,180.00


E Overhead & Profit 5% D 1,959.00
F Harga Satuan Pekerjaan (D+E) 41,139.00
G Dibulatkan 41,130.00

72 Pemasangan 1 m' pipa PVC tipe AW diameter 2"


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 80,000.00 4,320.00
Tukang batu L.02 OH 0.0900 95,000.00 8,550.00
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 14,070.00
B BAHAN
Pipa PVC 2” M 1.2000 28,750.00 34,500.00
Perlengkapan % 0.3500 34,500.00 12,075.00
JUMLAH HARGA BAHAN 46,575.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 60,645.00


E Overhead & Profit 5% D 3,032.25
F Harga Satuan Pekerjaan (D+E) 63,677.25
G Dibulatkan 63,670.00

Halaman 46
73 Pemasangan 1 m' pipa PVC tipe AW diameter 2,5"
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 80,000.00 6,480.00
Tukang batu L.02 OH 0.1350 95,000.00 12,825.00
Kepala tukang L.03 OH 0.0135 100,000.00 1,350.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 21,055.00
B BAHAN
Pipa PVC 2,5” M 1.2000 28,750.00 34,500.00
Perlengkapan % 0.3500 34,500.00 12,075.00
JUMLAH HARGA BAHAN 46,575.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 67,630.00


E Overhead & Profit 5% D 3,381.50
F Harga Satuan Pekerjaan (D+E) 71,011.50
G Dibulatkan 71,010.00

74 Pemasangan 1 m' pipa PVC tipe AW diameter 3"


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 80,000.00 6,480.00
Tukang batu L.02 OH 0.1350 95,000.00 12,825.00
Kepala tukang L.03 OH 0.0135 100,000.00 1,350.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 21,055.00
B BAHAN
Pipa PVC 3” M 1.2000 38,875.00 46,650.00
Perlengkapan % 0.3500 46,650.00 16,327.50
JUMLAH HARGA BAHAN 62,977.50
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 84,032.50


E Overhead & Profit 5% D 4,201.63
F Harga Satuan Pekerjaan (D+E) 88,234.13
G Dibulatkan 88,230.00

Halaman 47
75 Pemasangan 1 m' pipa PVC tipe AW diameter 4"
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 80,000.00 6,480.00
Tukang batu L.02 OH 0.1350 95,000.00 12,825.00
Kepala tukang L.03 OH 0.0135 100,000.00 1,350.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 21,055.00
B BAHAN
Pipa PVC 4” M 1.2000 64,000.00 76,800.00
Perlengkapan % 0.3500 76,800.00 26,880.00
JUMLAH HARGA BAHAN 103,680.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 124,735.00


E Overhead & Profit 5% D 6,236.75
F Harga Satuan Pekerjaan (D+E) 130,971.75
G Dibulatkan 130,970.00

76 Pemasangan 1 m' pipa PVC tipe AW diameter 6"


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 80,000.00 6,480.00
Tukang batu L.02 OH 0.1350 95,000.00 12,825.00
Kepala tukang L.03 OH 0.0135 100,000.00 1,350.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 21,055.00
B BAHAN
Pipa PVC 6” M 1.2000 148,750.00 178,500.00
Perlengkapan % 0.3500 178,500.00 62,475.00
JUMLAH HARGA BAHAN 240,975.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 262,030.00


E Overhead & Profit 5% D 13,101.50
F Harga Satuan Pekerjaan (D+E) 275,131.50
G Dibulatkan 275,130.00

Halaman 48
77 1 M' Saluran Pasangan Bata + Grevel
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
Galian Tanah M3 0.1500 62,500.00 9,375.00
Grevel Bh 1.0000 72,600.00 72,600.00
Pas. Bata 1 : 5 M2 0.6000 98,898.00 59,338.80
Pas. Plesteran + Acian 1 : 5 M2 0.6000 81,927.40 49,156.44
Upah Kerja Ls 0.1000 141,313.80 14,131.38
Jumlah (A+B+C) 204,601.62
Overhead & Profit 5% D 10,230.08
Harga Satuan Pekerjaan (D+E) 214,831.70
Dibulatkan 214,830.00

Garut, 29 Mei 2019


Dibuat Oleh
CV. ARFA

ANGGA GOJALI
DIREKTUR

Halaman 49
DAFTAR UPAH PEKERJA BANGUNAN
PEMBANGUNAN GERBANG DAN POS JAGA HALAMAN GEDUNG ART CENTRE
KABUPATEN GARUT
TAHUN ANGGARAN 2019

KODE JENIS PEKERJA HARGA UPAH SATUAN WAKTU


Rp.

L.01 PEKERJA 80,000.00 1 ORANG/ HR/ 8 JAM


L.02 TUKANG GALI 95,000.00 1 ORANG/ HR/ 8 JAM
L.02 TUKANG BATU 95,000.00 1 ORANG/ HR/ 8 JAM
L.02 TUKANG KAYU 95,000.00 1 ORANG/ HR/ 8 JAM
L.02 TUKANG CAT / PELITUR 95,000.00 1 ORANG/ HR/ 8 JAM
L.02 TUKANG BESI BETON 95,000.00 1 ORANG/ HR/ 8 JAM
L.02 TUKANG BESI PROFIL 95,000.00 1 ORANG/ HR/ 8 JAM
L.02 TUKANG KHUSUS ALUMINIUM 95,000.00 1 ORANG/ HR/ 8 JAM
L.02 TUKANG TAMAN 95,000.00 1 ORANG/ HR/ 8 JAM
L.02 TUKANG LISTRIK 95,000.00 1 ORANG/ HR/ 8 JAM
L.03 KEPALA TUKANG 100,000.00 1 ORANG/ HR/ 8 JAM
L.04 MANDOR 100,000.00 1 ORANG/ HR/ 8 JAM
L.05 SUPIR 120,000.00 1 ORANG/ HR/ 8 JAM
L.06 OPERATOR 120,000.00 1 ORANG/ HR/ 8 JAM

Garut, 29 Mei 2019


Dibuat Oleh
CV. ARFA

ANGGA GOJALI
DIREKTUR
DAFTAR HARGA BAHAN BANGUNAN
PEMBANGUNAN GERBANG DAN POS JAGA HALAMAN GEDUNG ART CENTRE
KABUPATEN GARUT
TAHUN ANGGARAN 2019

NO. JENIS BAHAN BANGUNAN SAT HARGA SATUAN


Rp.

A. AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


1 Pasir Urug M3 100,000.00
2 Tanah Urug / Merah M3 75,000.00
3 Sirtu M3 100,000.00
4 Pasir Pasang M3 150,000.00
5 Pasir Beton M3 175,000.00
6 Batu Pecah Mesin 1/2 M3 275,000.00
7 Batu Pecah Mesin 2/3 M3 275,000.00
8 Batu Pecah 5 - 7 cm M3 275,000.00
9 Batu Belah Pondasi M3 125,000.00
10 Batu Pecah 15 - 20 cm M3 175,000.00
11 Bata Merah Bakar Bh 650.00
12 Batu Tempel Andesit Susun Sirih M2 110,000.00
13 Semen PC Tiga Roda / 50 kg Tiga Roda, Holcim, Gresik Kg 1,100.00
14 Semen Warna Kg 10,000.00
15 Beton Readymix, mutu K 250 Slamp 10 -12 cm M3 900,000.00

B. BAHAN FINISHING :
LABURAN, PENGISI DAN ALATNYA
1 Plamir Tembok sek. ICI Kg 14,325.00
2 Cat Tembok sek. Catylac Ltr 30,000.00
3 Cat Tembok sek. Catylac Plapond Ltr 30,000.00
4 Rool Cat Tembok Bh 15,000.00
5 Kwas 3" Bh 12,500.00
6 Terpentin Ltr 4,500.00
7 Tiner A Ltr 16,400.00
8 Ampelas Lbr 4,000.00
9 Dempul Kayu Cap Kucing Kg 17,500.00
10 Dempul Besi Kg 45,000.00
11 Meni Kayu / Besi Kg 19,000.00
12 Zincromat Kg 30,000.00
13 Cat Dasar Kayu Kg 25,000.00
14 Cat Kayu SEIV Kg 45,000.00
15 Cat Besi SEIV Kg 45,000.00

C. BAHAN KAYU BERIKUT BAHAN JADINYA


1 Kayu Balok Borneo M3 4,250,000.00
2 Kayu Papan Borneo M3 4,250,000.00
3 Kayu Hutan Kelas I ( Terentang,Segeng, Mahoni, Laban ) M3 1,500,000.00
4 Kayu Albasia M3 1,000,000.00
5 List profil kamper 4 cm M' 5,800.00
6 Dolken 8 s/d 10 Btng 17,500.00

D. BAHAN SALURAN AIR KOTOR / BERSIH


1 Grafel U 30 cm' M' 72,600.00
2 Buis Beton dia 1.00 m Bh 500,000.00
3 Lapisan ijuk t= 50 cm M3 200,000.00
4 Saluran U-Ditch uk. 80x100x120 cm Bh 1,250,000.00
5 Saluran Box Culvert Heavy Duty, uk. 60x60x100 cm Bh 1,000,000.00

HALAMAN 51
NO. JENIS BAHAN BANGUNAN SAT HARGA SATUAN
Rp.
E. BAHAN KAYU LAPIS
1 Teak Wod 4 mm 120 x 240 Lbr 120,000.00
2 Triplek 3 mm 120 x 240 Lbr 45,000.00
3 Triplek 4 mm 120 x 240 Lbr 53,500.00
4 Triplek 5 mm 120 x 240 Lbr 69,000.00
5 Multiplek 9 mm 120 x 240 Lbr 104,000.00
6 Multiplek 12 mm 120 x 240 Lbr 145,000.00
7 Multiplek 15 mm 120 x 240 Lbr 174,500.00
8 Multiplek 18 mm 120 x 240 Lbr 202,500.00
9 Lem Kuning Aibon Kg 25,000.00
10 Formika 120 x 240 Lbr 120,000.00

F. BAHAN PENUTUP RANGKA PLAFOND + PARTISI


Penutup Plapond sek. Jaya Board, Elefhant,
1 GRC t = 4 mm Lbr 57,000.00
2 Gypsumboard 9 mm sek. Jaya Board Lbr 70,000.00
3 List Profil Gypsum M' 12,500.00

G. BAHAN LANTAI DAN PELAPIS DINDING


1 Keramik 40 x 40 KW I DN sek. Roman Bh 17,600.00
2 Keramik 40 x 40 KW I DN sek. Roman (Rustic) Bh 19,200.00
3 Granite Tile 30 x 60 KW I DN sek. Granito Bh 44,964.03
4 Keramik 25 x 25 KW I DN sek. Roman Bh 7,500.00
5 Keramik 40 x 40 KW I DN (Rock tile) Bh 13,600.00
6 Plint keramik 10 x 40 KW I DN Polish Bh 5,866.67
7 Keramik 20 x 40 Dinding KM KWI DN Corak Gol B Bh 8,400.00

H. BAHAN LOGAM DAN BAHAN JADINYA


1 Baja Tulangan Polos, BJTP, U24, fy240 Mpa Kg 8,800.00
2 Baja Tulangan Deform/Ulir, BJTD, fy400 Mpa Kg 9,000.00
3 Wire Mesh M7 (5.4*2.1) Mutu Baja U50 Kg 9,800.00
4 Wire Mesh M6 (5.4*2.1) Mutu Baja U50 Kg 9,800.00
5 IWF Ex DN SII Kg 11,300.00
6 Besi Profil DN SII Kg 9,000.00
7 Besi C Lip Chanel Kg 9,000.00
8 Plat Besi Kg 13,000.00
9 Kawat Beton Kg 15,000.00
10 Lem Kuning (aibond) Kg 25,000.00
11 Lem Fox Kg 14,000.00
12 Kusen Aluminium Warna ukuran 4" sek. Alexindo Lengkap Assesories M' 80,000.00
13 Frame Daun Pintu sek. Alexind Lengkap Assesories M' 130,000.00
14 Frame Daun Jendela sek. Alexindo Lengkap Assesories M' 110,000.00
15 Pintu Alumunium strip lebar 8 cm sek. Alexindo M' 30,000.00
16 Profil kaca sek. Alexindo M' 15,000.00
17 Skruf Fixer Bh 630.00
18 Sealent sek. Dow Corning Tube 50,000.00
19 Besi Hollow Galvanis 4 x 4 t = 0,5 mm M' 9,125.00

I. BAHAN ALAT PENGANTUNG DAN KUNCI


1 Lever Handle Type LHTR - DKS - 84030 - OVAL - SSS Ps 77,000.00
2 Body Kunci + Cylinder Type MTS - DKS - 8585 - RL - SN Set 173,000.00
Type CYL - DKS - D 60 mm - DC - SN Set 114,000.00
3 Body Kunci + Cylinder Type MTS - IL - DL - 84030 - SSS (Pintu Km/wc) Set 197,500.00
Type CYL - BK - DL - 60 mm - SN (Pintu Km/wc) Set 131,500.00
4 Escutheon Type ECSN - DKS - 855 - PSS Ps 60,000.00
5 Rambucis Type CH - 423 - RWH Bh 16,200.00
6 Engsel Pintu Type ES - S/S - EL - 4 " X 3 " X 3 mm - 2 BB Ps 92,500.00
7 Engsel Casement Type FS - DKS - 16" Ps 166,250.00

HALAMAN 52
NO. JENIS BAHAN BANGUNAN SAT HARGA SATUAN
Rp.
J. BAHAN KACA
1 Kaca Polos 5 mm M2 90,000.00
2 Kaca es 5 mm M2 125,000.00
3 Kaca Polos 6 mm M2 130,000.00

K. BAHAN PAKU DAN MUR BAUT


1 Paku 1 cm s/d 3 cm Kg 16,000.00
2 Paku 4 cm s/d 7 cm Kg 14,000.00
3 Paku 8 cm s/d 12 cm Kg 12,000.00
4 Paku Sekrup Kg 15,000.00

L. BAHAN PERPIPAAN
1 Pipa PVC type AW Ø 1/2" (15 mm2) Btng 20,000.00
2 Pipa PVC type AW Ø 3/4" (20 mm2) Btng 27,000.00
3 Pipa PVC type AW Ø 1" (25 mm2) Btng 36,000.00
4 Pipa PVC type AW Ø 1 1/4" (32 mm2) Btng 54,000.00
5 Pipa PVC type AW Ø 1 1/2" (40 mm2) Btng 62,000.00
6 Pipa PVC type AW Ø 2" (50 mm2) Btng 78,500.00
7 Pipa PVC type AW Ø 2 1/2" (65 mm2) Btng 115,000.00
8 Pipa PVC type AW Ø 3" (80 mm2) Btng 155,500.00
9 Pipa PVC type AW Ø 4" (100 mm2) Btng 256,000.00
10 Pipa PVC type AW Ø 5" (125 mm2) Btng 425,500.00
11 Pipa PVC type AW Ø 6" (150 mm2) Btng 595,000.00
12 Pipa PVC type AW Ø 8" (216 mm2) Btng 998,000.00
13 Lem Paralon Tb 3,500.00
14 Solatip Leideng Glng 1,500.00

M. BAHAN SANITAIR
1 Floor Drain TX1AN sek. Toto Bh 295,000.00
2 Kran Tembok T23 B13 V7NB sek Toto dia. 1/2 " Bh 214,000.00
3 Wastafel Gantung Lengkap Cermin Unit 800,000.00

N. BAHAN BAKAR DAN PELUMAS


1 Minyak Bekisting Ltr 6,000.00

Garut, 29 Mei 2019


Dibuat Oleh
CV. ARFA

ANGGA GOJALI
DIREKTUR

HALAMAN 53
JADWAL RENCANA PELAKSANAAN
PEMBANGUNAN GERBANG DAN POS JAGA HALAMAN GEDUNG ART CENTRE
KABUPATEN GARUT
TAHUN ANGGARAN 2019

BULAN KE 1 BULAN KE 2
NO URAIAN PEKERJAAN BOBOT MINGGU KE MINGGU KE
KET
1 2 3 4 5 1 2 3 4 5
7 Hk 7 Hk 7 Hk 7 Hk 7 Hk 7 Hk 7 Hk 7 Hk 7 Hk 7 Hk

A. PEKERJAAN PERSIAPAN 1.20 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12

B. PEKERJAAN PENYELENGGARAAN KEAMANAN DAN KESEHATAN KERJA SERTA KESELAMATAN K 1.87 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19

C. PEKERJAAN PAGAR & GERBANG DEPAN 26.22 1.31 2.62 3.93 5.24 5.24 3.93 2.62 1.31

D. PEKERJAAN POS JAGA 1


I. PEKERJAAN PONDASI, BETON & DINDING 11.11 0.56 1.11 2.22 2.78 2.78 1.67
II. PEKERJAAN KUSEN 1.72 1.72
III. PEKERJAAN LANTAI 0.72 0.72
IV. PEKERJAAN PLAFOND 0.48 0.48
V. PEKERJAAN ATAP 0.41 0.41
VI PEKERJAAN SANITAIR 0.39 0.39
VII PEKERJAAN AIR BERSIH DAN AIR KOTOR 2.34 0.12 2.22
VIII. PEKERJAAN ELEKTRIKAL 0.85 0.04 0.81

E. PEKERJAAN POS JAGA 2


I. PEKERJAAN PONDASI, BETON & DINDING 11.11 0.56 1.11 2.22 2.78 2.78 1.67
II. PEKERJAAN KUSEN 1.72 1.72
III. PEKERJAAN LANTAI 0.72 0.72
IV. PEKERJAAN PLAFOND 0.48 0.48
V. PEKERJAAN ATAP 0.41 0.41
VI PEKERJAAN SANITAIR 0.39 0.39
VII PEKERJAAN AIR BERSIH DAN AIR KOTOR 1.33 0.07 1.27
VIII. PEKERJAAN ELEKTRIKAL 0.79 0.04 0.75

F. PEKERJAAN PERBAIKAN HURUF 0.66 0.66

G. PEKERJAAN SALURAN
I SALURAN - S1 20.17 2.02 3.03 4.03 5.04 4.03 2.02
II SALURAN - S2 14.88 1.49 2.23 2.98 2.23 1.49 1.49 1.49 1.49

JUMLAH 0.31 6.23 10.41 15.69 18.65 17.46 13.64 11.98 5.33 0.31
JUMLAH KOMULATIF 0.31 6.54 16.95 32.64 51.29 68.75 82.39 94.37 99.69 100.00

Garut , 12 Juli 2019


Di Buat Oleh
CV. ARFA

ANGGA GOJALI
Direktur
TKDN
PEMBANGUNAN GERBANG DAN POS JAGA HALAMAN GEDUNG ART CENTRE
KABUPATEN GARUT
TAHUN ANGGARAN 2019

Nilai Gabungan Barang/Jasa ( Rp. ) TKDN


Total
NO URAIAN PEKERJAAN
DN LN Ribu Barang/Jasa Gabungan
% KDN
Rp.
1 2 3 4 5 6

A. PEKERJAAN PERSIAPAN 8,965,000.0000 8,965,000.00 100% 1.20% 1.20%

B. PEKERJAAN PENYELENGGARAAN KEAMANAN DAN KESEHATAN KERJA SERTA KESELAMATAN KO 13,942,500.0000 13,942,500.00 100% 1.87% 1.87%

C. PEKERJAAN PAGAR & GERBANG DEPAN 195,815,936.4700 195,815,936.47 100% 26.22% 26.22%

D. PEKERJAAN POS JAGA 1


I. PEKERJAAN PONDASI, BETON & DINDING 83,010,023.4700 83,010,023.47 100% 11.11% 11.11%
II. PEKERJAAN KUSEN 12,852,699.8600 12,852,699.86 100% 1.72% 1.72%
III. PEKERJAAN LANTAI 5,414,694.4500 5,414,694.45 100% 0.72% 0.72%
IV. PEKERJAAN PLAFOND 3,601,659.6000 3,601,659.60 100% 0.48% 0.48%
V. PEKERJAAN ATAP 3,085,500.0000 3,085,500.00 100% 0.41% 0.41%
VI PEKERJAAN SANITAIR 2,925,043.0000 2,925,043.00 100% 0.39% 0.39%
VII PEKERJAAN AIR BERSIH DAN AIR KOTOR 17,441,061.0000 17,441,061.00 100% 2.34% 2.34%
VIII. PEKERJAAN ELEKTRIKAL 6,377,250.0000 6,377,250.00 100% 0.85% 0.85%

E. PEKERJAAN POS JAGA 2


I. PEKERJAAN PONDASI, BETON & DINDING 83,010,023.4700 83,010,023.47 100% 11.11% 11.11%
II. PEKERJAAN KUSEN 12,852,699.8600 12,852,699.86 100% 1.72% 1.72%
III. PEKERJAAN LANTAI 5,414,694.4500 5,414,694.45 100% 0.72% 0.72%
IV. PEKERJAAN PLAFOND 3,601,659.6000 3,601,659.60 100% 0.48% 0.48%
V. PEKERJAAN ATAP 3,085,500.0000 3,085,500.00 100% 0.41% 0.41%
VI PEKERJAAN SANITAIR 2,925,043.0000 2,925,043.00 100% 0.39% 0.39%
VII PEKERJAAN AIR BERSIH DAN AIR KOTOR 9,962,381.0000 9,962,381.00 100% 1.33% 1.33%
VIII. PEKERJAAN ELEKTRIKAL 5,882,250.0000 5,882,250.00 100% 0.79% 0.79%

F. PEKERJAAN PERBAIKAN HURUF 4,950,000.0000 4,950,000.00 100% 0.66% 0.66%

G. PEKERJAAN SALURAN
I SALURAN - S1 150,656,335.0600 150,656,335.06 100% 20.17% 20.17%
II SALURAN - S2 111,110,076.5500 111,110,076.55 100% 14.88% 14.88%

JUMLAH 746,882,030.8400 746882031 100% 100%

746,882,030.84
% TKDN (Gabungan Barang dan Jasa) =
746,882,030.84
= 100%
Garut, 29 Mei 2019
Dibuat Oleh
CV. ARFA

ANGGA GOJALI
DIREKTUR
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GERBANG DAN POS JAGA HALAMAN GEDUNG ART CENTRE
KABUPATEN GARUT
TAHUN ANGGARAN 2019

NO URAIAN PEKERJAAN VOLUME SAT

1 2 3

A PEKERJAAN PERSIAPAN
1 Pek. Bongkaran dan buangan 1.00 Ls
2 Mobilisasi alat dan bahan 1.00 Ls
3 Biaya administrasi = dokumen photo 1.00 Ls
1.00 Ls
Jumlah I
B PEKERJAAN PENYELENGGARAAN KEAMANAN DAN KESEHATAN KERJA SERTA KESELAMATAN KONTRUKSI
I Persiapan K3
1 Penyiapan RK3K Terdiri Atas : Pembuatan Manual Prosedure Set
2 Pembuatan Kartu Identitas Pekerja ( KIP ) Org
Jumlah B-I
II Sosialisasi dan Promosi K3
1 Induski K3 ( Safety Intruction ) Khusus untuk Pekerja Baru Org
2 Pelatihan K3
- Bekerja di ketinggian Org
- K3 Peralatan Kontruksi & Penggunaan Bahan Kimia ( MSDS ) Org
- Analisis Keselamatan Pekerja Org
- Prilaku Berbasis Keselamatan ( Budaya K3 ) Org
- P3K Org
3 Simulasi K3 Lbr
4 Spanduk ( Banner ) Lbr
5 Poster Bh
6 Papan Informasi K3
Jumlah B-II
III Alat Pelingdung Diri, Terdiri Atas:
1 Topi Pelingdung ( Safety Helmet )
2 Pelindung Mata ( Goggle Spectekles )
3 Tameng Muka (Face Shield)
4 Pelindung Pernafasan & Mulut ( Masker )
5 Sarung Tangan ( Safety Gloves )
6 Sepatu Keselamatan ( Safety Shoes ), Untuk Staf
7 Sepatu Keselamatan ( Rubber Safety Shoes & Toe Cap )
8 Penunjang seluruh tubuh (Full Body Harness)
9 Rompi Keselamatan ( Safety Vest )
10 Pelindung Jatuh (Fall Arrester)
Jumlah B-III
Jumlah B

C PEKERJAAN PELAKSANAAN
I Pekerjaan Atap
1 Pas. Talang air 1/2 lingkaran Ø 20 cm (Mushola + WC Lt. 1) 18.50 m1

Pek. Lisplank (acp) Musholah Lt. 1 baru


Pek rangka besi hollow 4 x 4 cm untuk acp lisplang mushola Lt.1 baru
Pek. Acrylic penutup talang air hujan baru m2
Pek rangka besi hollow 4 x 4 cm untuk acrylic talang air hujan baru m2

II Pekerjaan Dinding
Lantai Dasar
1 Pek. Rangka besi Hollow 4 x 4 cm Untuk ACP kolom depan 20.75 m2
pintu masuk

kolom entrance baru


Plafond perbaikan
lisplang entrance kubah perbaikan
balok belakang gedung baru
kolom belakang gedung baru

balok belakang gedung baru


kolom belakang gedung baru

2 Pas. Alumunium Composite Panel (ACP) untuk kolom depan 48.09 m2


kolom Pintu masuk perbaikan

Halaman56
NO URAIAN PEKERJAAN VOLUME SAT

Balok pintu masuk baru


balok belakang gedung baru
kolom belakang gedung baru

balok belakang gedung baru


kolom belakang gedung baru

3 Pas. High Presure Laminated (HPL) corak 114.22 m2

tribun bawah (kanan kiri)


tribun bawah (depan)
kolom HPL (kanan kiri depan)
kolom HPL (tengan)
pigura pintu masuk

4 Pek. Perbaikan Kubah Accrylic Entrance 4.00 m2

5 Pek. Rangka besi Hollow 4 x 4 cm untuk dinding HPL 128.50 m2

6 Pek.Multiplek 9 mm (Panggung) 148.00 m2

7 Pas. High Presure Laminated (HPL) corak (Panggung) 133.72 m2

8 Perk. Partisi KM/WC + accessories Acier Inox (PVC Cubicle) T=2 m 64.00 m2
belakang panggung
toilet
ruangan
koridor (kanan kiri)
toilet

9 Pek. Partisi Urinoir (PVC Cubicle) 3.00 m2

10 Pas. Railing Stainles Tangga bagian belakang T= 75 cm 28.50 m2

railing tangga depan perbaikan

11 Pek. Rangka besi hollow 4 x 4 cm untuk kolom baru


loby

toilet
sudut ruang

koridor samping kiri kanan


koridor belakang panggung
ruang belakan panggung

Halaman57
NO URAIAN PEKERJAAN VOLUME SAT

12 Pek. Gypsum Board Kolom baru M2

13 Pek. Rangka besi hollow 4 x 4 cm untuk balok baru M2


lobi
ruang utama
panggung a
b
c

14 Pek. Gypsum Board balok baru M2

Lantai Satu

1 Pek. Rangka besi Hollow 4 x 4 cm Untuk ACP kolom depan 3.32 M2

samping kanan
samping kiri

2 Pas. Alumunium Composite Panel (ACP) untuk kolom depan 79.06 m2

samping kanan

samping kiri

balok kanan
balok kiri

kolom entrance

4 Pek. Plesteran kamprot halus 1pc : 5 Psr 8.00 m2

3 Pas. Railing Stainles + Acrylic (Penonton Lt. 1), T= 75 cm - m2


railing stainles+acrylicc tribun

III PEKERJAAN KUSEN PINTU DAN JENDELA


Lantai Dasar
1 Pek. Kusen Alumunium 4" Warna coklat Tipe P1 17.00

2 Pek. Kusen Alumunium 4" Warna coklat Tipe P3 6.00

3 Pek. Kusen Alumunium 4" Warna coklat Tipe P4 16.00

4 Pek. Kusen Alumunium 4" Warna coklat Tipe J2 6.00

5 Pek. Kusen Alumunium 4" Warna coklat Tipe J3 5.00

6 Pek. Kusen Alumunium 4" Warna coklat Tipe BV1 11.00

7 Pek. Kusen Alumunium 4" Warna coklat Tipe BV2 5.00

Halaman58
NO URAIAN PEKERJAAN VOLUME SAT

66.00

Lantai Satu
1 Pek. Kusen Alumunium 4" Warna coklat Tipe P1 2.00

2 Pek. Kusen Alumunium 4" Warna coklat Tipe P4 8.00

3 Pek. Kusen Alumunium 4" Warna coklat Tipe P3 baru

IV. PEKERJAAN PLAFOND


Lantai Dasar
1 Pek. Rangka Plafond Besi Hollow 4/4, 4/2 422.72 m2

Halaman59
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GERBANG DAN POS JAGA HALAMAN GEDUNG ART CENTRE
KABUPATEN GARUT
TAHUN ANGGARAN 2019

NO URAIAN PEKERJAAN VOLUME SAT

1 2 3

A PEKERJAAN PERSIAPAN
1 Pek. Bongkaran dan buangan 1.00 Ls
2 Mobilisasi alat dan bahan 1.00 Ls
3 Biaya administrasi = dokumen photo 1.00 Ls
1.00 Ls
Jumlah I
B PEKERJAAN PENYELENGGARAAN KEAMANAN DAN KESEHATAN KERJA SERTA KESELAMATAN KONTRUKSI
I Persiapan K3
1 Penyiapan RK3K Terdiri Atas : Pembuatan Manual Prosedure 1.00 Set
2 Pembuatan Kartu Identitas Pekerja ( KIP ) 50.00 Org
Jumlah B-I
II Sosialisasi dan Promosi K3
1 Induski K3 ( Safety Intruction ) Khusus untuk Pekerja Baru 50.00 Org
2 Pelatihan K3
- Bekerja di ketinggian 10.00 Org
- K3 Peralatan Kontruksi & Penggunaan Bahan Kimia ( MSDS ) 10.00 Org
- Analisis Keselamatan Pekerja 50.00 Org
- Prilaku Berbasis Keselamatan ( Budaya K3 ) 50.00 Org
- P3K 2.00 Org
3 Simulasi K3 50.00 Org
4 Spanduk ( Banner ) 2.00 Lbr
5 Poster 2.00 Lbr
6 Papan Informasi K3 2.00 Bh
Jumlah B-II
III Alat Pelingdung Diri, Terdiri Atas:
1 Topi Pelingdung ( Safety Helmet ) 50.00 Bh
2 Pelindung Mata ( Goggle Spectekles ) 10.00 Psg
3 Tameng Muka (Face Shield) 2.00 Bh
4 Pelindung Pernafasan & Mulut ( Masker ) 25.00 Bh
5 Sarung Tangan ( Safety Gloves ) 25.00 Psg
6 Sepatu Keselamatan ( Safety Shoes ), Untuk Staf 5.00 Psg
7 Sepatu Keselamatan ( Rubber Safety Shoes & Toe Cap ) 10.00 Psg
8 Penunjang seluruh tubuh (Full Body Harness) 5.00 Bh
9 Rompi Keselamatan ( Safety Vest ) 50.00 Bh
10 Pelindung Jatuh (Fall Arrester) 2.00 Bh
Jumlah B-III
Jumlah B

C PEKERJAAN PELAKSANAAN
I Pekerjaan Atap
Lantai Dasar
1 Pek. Rangka Hollow 4 x 4 cm untuk ACP atap (AREA TERAS) BARU
plafon
lis luar
lis dalam

2 Pek. ACP atap (AREA TERAS) BARU


plafon
lis luar
lis dalam

Lantai Satu
1 Pas. Talang air 1/2 lingkaran Ø 20 cm (Mushola + WC Lt. 1) 18.50 m1