I A I N P A L A N G K A R A Y A
Perhitungan Interpolasi
Mengacu Peraturan Menteri pekerjaan umum No. 45/PRT/M/2007 Tgl. 27Desember 2007
Tentang: Pedoman Teknis Pembangunan Gedung Negara
Tabel E.2: Daftar Biaya Komponen Kegiatan Pembangunan Bangunan Gedung Negara
Kesimpulan (rupiah)
Biaya konstruksi fisik ............................................................................. 20.436.520.000
Biaya perencanaan ............................................................................. 602.422.988
Biaya pengawasan ............................................................................. 413.520.375
Biaya pengelola proyek ............................................................................. 282.542.703
Total 21.735.006.066
REKAPITULASI
RENCANA ANGGARAN BIAYA
(RAB)
TOTAL 18.578.660.011,40
PPN 10% 1.857.866.001,14
TOTAL + PPN 10% 20.436.526.012,54
PEMBULATAN 20.436.520.000,00
TERBILANG : ## DUA PULUH MILYAR EMPAT RATUS TIGA PULUH ENAM JUTA LIMA RATUS DUA PULUH RIBU RUPIAH##
IBNU ELMI ACHMAD SLAMAT PELU, SH., MH. FADLI RAHMAN, M.Ag
NIP. 19750109 199903 1 002 NIP. 19760112 200003 1 000
RENCANA ANGGARAN BIAYA
(RAB)
HARGA SATUAN
NO. URAIAN PEKERJAAN ANALISA VOLUME SATUAN JMLH HARGA (RP)
(RP)
I. PEKERJAAN PERSIAPAN
1 Pembuatan papan nama kegiatan LS.Papan Nama 1,00 LS 402.500,00 402.500,00
2 Mobilisasi & Demobilisasi (alat excavator dan alat pancang Hidrolik Sistem) LS.Mob demob 1,00 LS 149.500.000,00 149.500.000,00
3 Direksi Keet Lengkap Dengan Furniture & KM/WC A.2.2.1.5 12,00 M2 1.238.652,35 14.863.828,20
4 K-3 & Peralatannya LS.K3 1,00 LS 2.300.000,00 2.300.000,00
5 Dokumentasi dan laporan LS.Dokumentasi 1,00 LS 7.072.500,00 7.072.500,00
6 Ijin-Ijin Yang Berkaitan Dengan Pekerjaan Dan Instansi Terkait LS.Ijin 1,00 LS 3.450.000,00 3.450.000,00
7 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter A.2.2.1.2 415,00 M2 192.575,55 79.918.853,25
8 Pengukuran dan pemasangan 1 m’ Bouwplank A.2.2.1.4 187,50 M1 57.219,17 10.728.594,38
TOTAL I. 268.236.275,83
1 Pengadaan Mini Pile 25x25 cm + ongkos kirim + handling, beton bertulang mutu K-400 LS.mini pile 25x25cm 3.030,00 M1 342.152,38 1.036.721.715,95
2 Pemasangan daya baru 53 Kva ME.pasang daya 53kVA 1,00 LS 81.650.000,00 81.650.000,00
3 Stop kontak + instalasi beton, lt-1 ME.S.K 57,00 Titik 310.500,00 17.698.500,00
4 Stop kontak + instalasi beton, lt-2 ME.S.K 52,00 Titik 310.500,00 16.146.000,00
5 Stop kontak + instalasi beton, lt-3 ME.S.K 58,00 Titik 310.500,00 18.009.000,00
6 Stop kontak AC + instalasi beton, lt-1 ME.S.K.AC 16,00 Titik 506.000,00 8.096.000,00
7 Stop kontak AC + instalasi beton, lt-2 ME.S.K.AC 20,00 Titik 506.000,00 10.120.000,00
8 Stop kontak AC + instalasi beton, lt-3 ME.S.K.AC 16,00 Titik 506.000,00 8.096.000,00
9 Stop kontak lantai + instalasi beton, lt-1 ME.S.K.lantai 21,00 Titik 839.500,00 17.629.500,00
10 Stop kontak lantai + instalasi beton, lt-2 ME.S.K.lantai 24,00 Titik 839.500,00 20.148.000,00
11 Stop kontak lantai + instalasi beton, lt-3 ME.S.K.lantai 18,00 Titik 839.500,00 15.111.000,00
12 Stop kontak LCD proyektor + instalasi, lt-1 ME.S.K 7,00 Titik 310.500,00 2.173.500,00
13 Stop kontak LCD proyektor + instalasi, lt-2 ME.S.K 8,00 Titik 310.500,00 2.484.000,00
14 Stop kontak LCD proyektor + instalasi, lt-3 ME.S.K 6,00 Titik 310.500,00 1.863.000,00
15 Stop kontak antena, lt-1 ME.S.K.Antena 8,00 Titik 304.750,00 2.438.000,00
16 Stop kontak antena, lt-2 ME.S.K.Antena 8,00 Titik 304.750,00 2.438.000,00
17 Stop kontak antena, lt-3 ME.S.K.Antena 6,00 Titik 304.750,00 1.828.500,00
ME.Material bantu
f Material bantu (klem, fisher, sekrup dll.) 1,00 M2 603.750,00 603.750,00
penangkal petir
ME.Bak kontrol
g Pentanahan + bak kontrol 2,00 Titik 14.490.000,00 28.980.000,00
penangkal petir
TOTAL XIV. 1.057.627.917,72
DAFTAR ANALISA SNI
PEKERJAAN PERSIAPAN
2
A.2.2.1.2 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter Satuan M
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.13 Orang/hari 0,2000 65.000,00 13.000,00
Tukang kayu L.07 Orang/hari 0,4000 80.000,00 32.000,00
Kepala tukang kayu L.03 Orang/hari 0,0200 150.000,00 3.000,00
Mandor L.01 Orang/hari 0,0200 210.000,00 4.200,00
Jumlah- 1
......................................................................................... 52.200,00
2 BAHAN
Dolken kayu φ 8-10/400 cm
8-10/400 cm H-2 Batang 1,2500 15.000,00 18.750,00
Semen portland C-11 Kg 2,5000 1.200,00 3.000,00
Seng gelombang E-27 Lbr 1,2000 47.400,00 56.880,00
Pasir beton B-2 M3 0,0050 154.200,00 771,00
Batu pecah 2-3 cm B-1 M3 0,0090 350.000,00 3.150,00
Balok kayu kelas III H-1 M3 0,0072 1.500.000,00 10.800,00
Paku kayu E-20 Kg 0,0600 18.600,00 1.116,00
Meni besi G-8 Kg 0,4500 46.200,00 20.790,00
Jumlah- 2
......................................................................................... 115.257,00
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 167.457,00
5 OVERHEAD + KEUNTUNGAN J-1 15% x Jumlah 4 25.118,55
6 HARGA SATUAN PEKERJAAN (4+5) 192.575,55
PEKERJAAN TANAH
3
A.2.3.1.1 Penggalian tanah biasa sedalam 1 m Satuan M
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.12 Orang/hari 0,7500 80.000,00 60.000,00
Mandor L.01 Orang/hari 0,0250 210.000,00 5.250,00
Jumlah- 1
......................................................................................... 65.250,00
2 BAHAN
Jumlah- 2
......................................................................................... -
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 65.250,00
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 9.787,50
6 HARGA SATUAN PEKERJAAN (4+5) 75.037,50
3
A.2.3.1.10 Pemadatan tanah ( per 20 cm) Satuan M
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.12 Orang/hari 0,5000 80.000,00 40.000,00
Mandor L.01 Orang/hari 0,0500 210.000,00 10.500,00
Jumlah- 1
......................................................................................... 50.500,00
2 BAHAN
Jumlah- 2
......................................................................................... -
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 50.500,00
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 7.575,00
6 HARGA SATUAN PEKERJAAN (4+5) 58.075,00
3
A.2.3.1.11 Pengurugan dengan pasir urug Satuan M
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.12 Orang/hari 0,3000 80.000,00 24.000,00
Mandor L.01 Orang/hari 0,0100 210.000,00 2.100,00
Jumlah- 1
......................................................................................... 26.100,00
2 BAHAN
Pasir Urug M3 1,2000 75.000,00 90.000,00
Jumlah- 2
......................................................................................... 90.000,00
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 116.100,00
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 17.415,00
6 HARGA SATUAN PEKERJAAN (4+5) 133.515,00
PEKERJAAN BETON
A.4.1.1.4 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100),
slump (3-6) cm, w/c = 0,87 Satuan M3
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.12 Orang/hari 1,2000 80.000,00 96.000,00
Tukang batu L.06 Orang/hari 0,2000 100.000,00 20.000,00
Kepala tukang batu L.02 Orang/hari 0,0200 150.000,00 3.000,00
Mandor L.01 Orang/hari 0,0600 210.000,00 12.600,00
Jumlah- 1
......................................................................................... 131.600,00
2 BAHAN
Semen portland C-11 Kg 230,0000 1.200,00 276.000,00
Pasir beton B-2 M3 0,6379 154.200,00 98.357,58
Batu pecah 2-3 cm B-1 M3 0,7607 350.000,00 266.259,26
Air A.1 Liter 200,0000 3,00 600,00
Jumlah- 2
......................................................................................... 641.216,84
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 772.816,84
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 115.922,53
6 HARGA SATUAN PEKERJAAN (4+5) 888.739,37
3
A.4.1.1.8 Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 Satuan M
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.12 Orang/hari 1,6500 80.000,00 132.000,00
Tukang batu L.06 Orang/hari 0,2750 100.000,00 27.500,00
Kepala tukang batu L.02 Orang/hari 0,0280 150.000,00 4.200,00
Mandor L.01 Orang/hari 0,0830 210.000,00 17.430,00
Jumlah- 1
......................................................................................... 181.130,00
2 BAHAN
Semen portland C-11 Kg 384,0000 1.200,00 460.800,00
Pasir beton B-2 M3 0,4943 154.200,00 76.218,86
Batu pecah 2-3 cm B-1 M3 0,7696 350.000,00 269.370,38
Air A.1 Liter 215,0000 3,00 645,00
Jumlah- 2
......................................................................................... 807.034,24
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 988.164,24
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 148.224,64
6 HARGA SATUAN PEKERJAAN (4+5) 1.136.388,88
2
A.4.1.1.23 Pemasangan bekisting untuk balok Satuan M
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.13 Orang/hari 0,6600 65.000,00 42.900,00
Tukang kayu L.07 Orang/hari 0,3300 80.000,00 26.400,00
Kepala tukang batu L.02 Orang/hari 0,0330 150.000,00 4.950,00
Mandor L.01 Orang/hari 0,0330 210.000,00 6.930,00
Jumlah- 1
......................................................................................... 81.180,00
2 BAHAN
Papan bakesting H-3 M3 0,0400 1.833.400,00 73.336,00
Paku kayu E-20 Kg 0,4000 18.600,00 7.440,00
Minyak bekisting G-9 Ltr 0,2000 28.000,00 5.600,00
Balok kayu kelas III H-1 M3 0,0180 1.500.000,00 27.000,00
Plywood tebal 9 mm H-4 Lbr 0,3500 200.100,00 70.035,00
Dolken kayu φ 8-10/400 cm
8-10/400 cm H-2 Batang 2,0000 15.000,00 30.000,00
Jumlah- 2
......................................................................................... 213.411,00
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 294.591,00
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 44.188,65
6 HARGA SATUAN PEKERJAAN (4+5) 338.779,65
2
A.4.1.1.26 Pemasangan bekisting untuk tangga Satuan M
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.13 Orang/hari 0,6600 65.000,00 42.900,00
Tukang kayu L.07 Orang/hari 0,3300 80.000,00 26.400,00
Kepala tukang batu L.02 Orang/hari 0,0330 150.000,00 4.950,00
Mandor L.01 Orang/hari 0,0330 210.000,00 6.930,00
Jumlah- 1
......................................................................................... 81.180,00
2 BAHAN
Papan bakesting H-3 M3 0,0300 1.833.400,00 55.002,00
Paku kayu E-20 Kg 0,4000 18.600,00 7.440,00
Minyak bekisting G-9 Ltr 0,1500 28.000,00 4.200,00
Balok kayu kelas III H-1 M3 0,0150 1.500.000,00 22.500,00
Plywood tebal 9 mm H-4 Lbr 0,3500 200.100,00 70.035,00
Dolken kayu φ 8-10/400 cm
8-10/400 cm H-2 Batang 2,0000 15.000,00 30.000,00
Jumlah- 2
......................................................................................... 189.177,00
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 270.357,00
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 40.553,55
6 HARGA SATUAN PEKERJAAN (4+5) 310.910,55
A.4.1.1.35 Membuat kolom praktis beton bertulang (11 x 11) cm Satuan M1
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.12 Orang/hari 0,1800 80.000,00 14.400,00
Tukang batu L.06 Orang/hari 0,0200 100.000,00 2.000,00
Tukang kayu L.07 Orang/hari 0,0200 80.000,00 1.600,00
Tukang besi L.09 Orang/hari 0,0200 80.000,00 1.600,00
Kepala tukang batu L.02 Orang/hari 0,0060 150.000,00 900,00
Mandor L.01 Orang/hari 0,0090 210.000,00 1.890,00
Jumlah- 1
......................................................................................... 22.390,00
2 BAHAN
Papan bakesting H-3 M3 0,0020 1.833.400,00 3.666,80
Paku kayu E-20 Kg 0,0100 18.600,00 186,00
Minyak bekisting G-9 Ltr 1,2000 28.000,00 33.600,00
Besi beton polos E-12 Kg 3,0000 11.000,00 33.000,00
Kawat bindrat E-18 Kg 0,4500 19.100,00 8.595,00
Semen portland C-11 Kg 4,0000 1.200,00 4.800,00
Pasir beton B-2 M3 0,0060 154.200,00 925,20
Batu pecah 2-3 cm B-1 M3 0,0090 350.000,00 3.150,00
Jumlah- 2
......................................................................................... 87.923,00
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 110.313,00
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 16.546,95
6 HARGA SATUAN PEKERJAAN (4+5) 126.859,95
1
A.4.1.1.36 Membuat ring balok beton bertulang (10 x 15) cm Satuan M
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.12 Orang/hari 0,2970 80.000,00 23.760,00
Tukang batu L.06 Orang/hari 0,0330 100.000,00 3.300,00
Tukang kayu L.07 Orang/hari 0,0330 80.000,00 2.640,00
Tukang besi L.09 Orang/hari 0,0330 80.000,00 2.640,00
Kepala tukang batu L.02 Orang/hari 0,0100 150.000,00 1.500,00
Mandor L.01 Orang/hari 0,0150 210.000,00 3.150,00
Jumlah- 1
......................................................................................... 36.990,00
2 BAHAN
Papan bakesting H-3 M3 0,0030 1.833.400,00 5.500,20
Paku kayu E-20 Kg 0,0200 18.600,00 372,00
Minyak bekisting G-9 Ltr 1,2 28.000,00 33.600,00
Besi beton polos E-12 Kg 3,6000 11.000,00 39.600,00
Kawat bindrat E-18 Kg 0,0500 19.100,00 955,00
Semen portland C-11 Kg 5,5000 1.200,00 6.600,00
Pasir beton B-2 M3 0,0090 154.200,00 1.387,80
Batu pecah 2-3 cm B-1 M3 0,0150 350.000,00 5.250,00
Jumlah- 2
......................................................................................... 93.265,00
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 130.255,00
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 19.538,25
6 HARGA SATUAN PEKERJAAN (4+5) 149.793,25
PEKERJAAN BESI & ALUMINIUM
A.4.2.1.11 Pemasangan kusen pintu alluminium Satuan M1
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang besi L.14 Orang/hari 0,0430 75.000,00 3.225,00
Tukang Khusus Alumunium L.10 Orang/hari 0,0430 100.000,00 4.300,00
Kepala tukang batu L.02 Orang/hari 0,0043 150.000,00 645,00
Mandor L.01 Orang/hari 0,0021 210.000,00 441,00
Jumlah- 1
......................................................................................... 8.611,00
2 BAHAN
Profil alluminium E-23 M1 1,1000 135.000,00 148.500,00
Skrup fixer E-29 Bh 2,0000 125,71 251,43
Sealant J-3 Tube 0,0600 26.800,00 1.608,00
Jumlah- 2
......................................................................................... 150.359,43
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 158.970,43
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 23.845,56
6 HARGA SATUAN PEKERJAAN (4+5) 182.815,99
PEKERJAAN PLESTERAN
A.4.4.2.2.a Pemasangan plesteran dinding bata ringan t=10mm (premium plester-PM 200 ) Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.12 Orang/hari 0,2000 80.000,00 16.000,00
Tukang batu L.06 Orang/hari 0,1500 100.000,00 15.000,00
Kepala tukang batu L.02 Orang/hari 0,0150 150.000,00 2.250,00
Mandor L.01 Orang/hari 0,0100 210.000,00 2.100,00
Jumlah- 1
......................................................................................... 35.350,00
2 BAHAN
Semen plesteran ready mix bata ringan C-14 Kg 20,0000 1.800,00 36.000,00
Jumlah- 2
......................................................................................... 36.000,00
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 71.350,00
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 10.702,50
6 HARGA SATUAN PEKERJAAN (4+5) 82.052,50
A.4.4.2.27 Pemasangan acian Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.12 Orang/hari 0,2000 80.000,00 16.000,00
Tukang batu L.06 Orang/hari 0,1000 100.000,00 10.000,00
Kepala tukang batu L.02 Orang/hari 0,0100 150.000,00 1.500,00
Mandor L.01 Orang/hari 0,0100 210.000,00 2.100,00
Jumlah- 1
......................................................................................... 29.600,00
2 BAHAN
Semen portland C-11 Kg 3,2500 1.200,00 3.900,00
Jumlah- 2
......................................................................................... 3.900,00
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 33.500,00
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 5.025,00
6 HARGA SATUAN PEKERJAAN (4+5) 38.525,00
A.4.4.3.motif pola Pemasangan lantai keramik motif pola ukuran 240cm x 240cm Satuan Buah
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.12 Orang/hari 4,0320 80.000,00 322.560,00
Tukang batu L.06 Orang/hari 2,0160 100.000,00 201.600,00
Kepala tukang batu L.02 Orang/hari 0,2016 150.000,00 30.240,00
Mandor L.01 Orang/hari 0,2016 210.000,00 42.336,00
Jumlah- 1
......................................................................................... 596.736,00
2 BAHAN
Keramik motif pola ukuran 240cm x 240cm C-18 M2 1,0000 3.400.000,00 3.400.000,00
Semen portland C-11 Kg 47,1744 1.200,00 56.609,28
Pasir Pasang B-3 M3 0,2592 104.000,00 26.956,80
Semen warna C-12 Kg 9,3312 13.800,00 128.770,56
Jumlah- 2
......................................................................................... 3.612.336,64
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 4.209.072,64
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 631.360,90
6 HARGA SATUAN PEKERJAAN (4+5) 4.840.433,54
A.4.4.3.34.a Pemasangan lantai keramik ukuran 40cm x 40cm Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.12 Orang/hari 0,7000 80.000,00 56.000,00
Tukang batu L.06 Orang/hari 0,3500 100.000,00 35.000,00
Kepala tukang batu L.02 Orang/hari 0,0350 150.000,00 5.250,00
Mandor L.01 Orang/hari 0,0350 210.000,00 7.350,00
Jumlah- 1
......................................................................................... 103.600,00
2 BAHAN
Keramik homogenous 40x40 cm unpolished C-7 M2 1,0500 85.000,00 89.250,00
Semen portland C-11 Kg 8,1900 1.200,00 9.828,00
Pasir Pasang B-3 M3 0,0450 104.000,00 4.680,00
Semen warna C-12 Kg 1,6200 13.800,00 22.356,00
Jumlah- 2
......................................................................................... 126.114,00
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 229.714,00
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 34.457,10
6 HARGA SATUAN PEKERJAAN (4+5) 264.171,10
A.4.5.1.7.a Pemasangan langit-langit calsi board ukuran (120x240x4) mm, tebal 4 mm Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang kayu L.13 Orang/hari 0,1000 65.000,00 6.500,00
Tukang kayu L.07 Orang/hari 0,0500 80.000,00 4.000,00
Kepala tukang kayu L.03 Orang/hari 0,0050 150.000,00 750,00
Mandor L.01 Orang/hari 0,0050 210.000,00 1.050,00
Jumlah- 1
......................................................................................... 12.300,00
2 BAHAN
Calsi board C-5 Lbr 0,3640 51.200,00 18.636,80
Paku skrup gypsum board E-22 Kg 0,1100 48.351,65 5.318,69
Jumlah- 2
......................................................................................... 23.955,49
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 36.255,49
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 5.438,32
6 HARGA SATUAN PEKERJAAN (4+5) 41.693,81
LS-plafond kubah Pemasangan langit-langit gipsum kubah dia. 4 meter terpasang lengkap + pengecatan Satuan LS
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA + BAHAN
Langit-langit gipsum kubah dia. 4 meter terpasang
C-21 LS 1,0000 5.600.000,00 5.600.000,00
lengkap + pengecatan
Jumlah- 2
......................................................................................... 5.600.000,00
2 PERALATAN
Jumlah- 3
......................................................................................... -
3 JUMLAH (1+2+3) 5.600.000,00
4 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 840.000,00
5 HARGA SATUAN PEKERJAAN (4+5) 6.440.000,00
PEKERJAAN PENGECATAN
A.4.7.1.5 Pengecatan bidang kayu baru (1 lapis plamuur, 1 Satuan M2
No. lapis cat dasar, 3 lapisUraian
cat penutup) Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang cat L.15 Orang/hari 0,0700 65.000,00 4.550,00
Tukang Cat L.08 Orang/hari 0,1050 80.000,00 8.400,00
Kepala Tukang Cat L.05 Orang/hari 0,0040 150.000,00 600,00
Mandor L.01 Orang/hari 0,0030 210.000,00 630,00
Jumlah- 1
......................................................................................... 14.180,00
2 BAHAN
Cat menie kayu G-5 Kg 0,2000 38.700,00 7.740,00
Plamir G-10 Kg 0,1500 57.400,00 8.610,00
Cat dasar G-2 Kg 0,1700 24.800,00 4.216,00
Cat penutup G-6 Kg 0,3500 24.800,00 8.680,00
Kuas G-7 Bh 0,0100 33.000,00 330,00
Thinner G-12 Ltr 0,0300 18.900,00 567,00
Ampelas G-1 Lbr 0,2000 16.700,00 3.340,00
Jumlah- 2
......................................................................................... 33.483,00
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 47.663,00
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 7.149,45
6 HARGA SATUAN PEKERJAAN (4+5) 54.812,45
PEKERJAAN MEKANIKAL
ME.SLO Jaminan instalasi listrik dan SLO Satuan LS
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Jumlah- 1
......................................................................................... -
2 BAHAN
Jaminan instalasi listrik dan SLO EL-047 LS 1,0000 15.000.000,00 15.000.000,00
Jumlah- 2
......................................................................................... 15.000.000,00
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 15.000.000,00
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 2.250.000,00
6 HARGA SATUAN PEKERJAAN (4+5) 17.250.000,00
ME.pasang daya
Pemasangan daya baru 53 kVA Satuan LS
53kVA
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Jumlah- 1
......................................................................................... -
2 BAHAN
Pemasangan daya baru 53 kVA EL-048 LS 1,0000 71.000.000,00 71.000.000,00
Jumlah- 2
......................................................................................... 71.000.000,00
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 71.000.000,00
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 10.650.000,00
6 HARGA SATUAN PEKERJAAN (4+5) 81.650.000,00
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Jumlah- 1
......................................................................................... -
2 BAHAN
Accesories, Fitting dan material bantu, untuk grounding EL-003 Ls 1,0000 354.578,75 354.578,76
Jumlah- 2
......................................................................................... 354.578,76
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 354.578,76
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 53.186,81
6 HARGA SATUAN PEKERJAAN (4+5) 407.765,57
ME.Acc SDP Accessories, fitting dan alat bantu, untuk SDP Satuan Ls
No. lantai-1 Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Jumlah- 1
......................................................................................... -
2 BAHAN
Accessories, fitting dan alat bantu, untuk SDP lantai-1 EL-022 Ls 1,0000 331.885,71 331.885,72
Jumlah- 2
......................................................................................... 331.885,72
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 331.885,72
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 49.782,86
6 HARGA SATUAN PEKERJAAN (4+5) 381.668,58
ME.Busbar tembaga
Busbar tembaga 3x35x400 Satuan Btng
3x35x400
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Jumlah- 1
......................................................................................... -
2 BAHAN
Busbar tembaga 3x35x400 EL-008 Btng 1,0000 656.857,14 656.857,15
Jumlah- 2
......................................................................................... 656.857,15
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 656.857,15
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 98.528,57
6 HARGA SATUAN PEKERJAAN (4+5) 755.385,72
ME.Busbar tembaga
Busbar tembaga 3x20x400 Satuan Btng
3x20x400
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Jumlah- 1
......................................................................................... -
2 BAHAN
Busbar tembaga 3x20x400 EL-020 Btng 1,0000 656.857,14 656.857,15
Jumlah- 2
......................................................................................... 656.857,15
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 656.857,15
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 98.528,57
6 HARGA SATUAN PEKERJAAN (4+5) 755.385,72
LS- baja ringan Memasang rangka baja ringan untuk atap multi Satuan M2
No. sirap Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang besi L.14 Orang/hari 0,2000 75.000,00 15.000,00
Tukang besi L.09 Orang/hari 0,4500 80.000,00 36.000,00
Kepala tukang besi L.04 Orang/hari 0,0100 150.000,00 1.500,00
Mandor L.01 Orang/hari 0,0500 210.000,00 10.500,00
Jumlah- 1
......................................................................................... 63.000,00
2 BAHAN
Batang C-75 tebal 0,80 mm E-9 M1 1,4800 15.000,00 22.200,00
Batang C-75 tebal 0,60 mm E-10 M1 2,2300 11.500,00 25.645,00
Baut screw driver E-11 Buah 38,0000 140,00 5.320,00
Dinabolt dia 12mm (10-15cm) E-16 Buah 1,6000 9.670,33 15.472,53
Roof batten reng 150-R40.60 T=0,60 mm E-26 M1 8,7500 9.500,00 83.125,00
Tools baja ringan E-30 Ls 1,0000 800,00 800,00
Jumlah- 2
......................................................................................... 152.562,53
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 215.562,53
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 32.334,38
6 HARGA SATUAN PEKERJAAN (4+5) 247.896,91
Jumlah- 1
......................................................................................... 2.900.000,00
2 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 435.000,00
3 HARGA SATUAN PEKERJAAN (4+5) 3.335.000,00
LS-kaca tempered
Pemasangan kaca tempered 12mm Satuan M2
12mm
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 BAHAN + TENAGA
Pemasangan kaca tempered 12mm LS-012 M2 1,0000 1.360.256,58 1.360.256,58
Jumlah- 1
......................................................................................... 1.360.256,58
2 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 204.038,49
3 HARGA SATUAN PEKERJAAN (4+5) 1.564.295,07
LS-pintu HPL Membuat dan memasang daun pintu panel HPL Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 BAHAN + TENAGA
Daun pintu panel HPL LS-013 M2 1,0500 1.400.000,00 1.470.000,00
Jumlah- 1
......................................................................................... 1.470.000,00
2 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 220.500,00
3 HARGA SATUAN PEKERJAAN (4+5) 1.690.500,00
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 BAHAN + TENAGA
Termination kit EL-041 LS 1,0500 2.500.000,00 2.625.000,00
Jumlah- 1
......................................................................................... 2.625.000,00
2 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 393.750,00
3 HARGA SATUAN PEKERJAAN (4+5) 3.018.750,00
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 BAHAN + TENAGA
Fiberglass mast EL-042 LS 1,0500 750.000,00 787.500,00
Jumlah- 1
......................................................................................... 787.500,00
2 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 118.125,00
3 HARGA SATUAN PEKERJAAN (4+5) 905.625,00
ME.Triaxial Down
Triaxial Down Conductor Satuan M1
Conductor
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 BAHAN + TENAGA
Triaxial Down Conductor EL-043 M1 1,0500 110.000,00 115.500,00
Jumlah- 1
......................................................................................... 115.500,00
2 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 17.325,00
3 HARGA SATUAN PEKERJAAN (4+5) 132.825,00
ME.Light even
Lighting even control Satuan LS
control
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 BAHAN + TENAGA
Lighting even control EL-044 LS 1,0500 8.000.000,00 8.400.000,00
Jumlah- 1
......................................................................................... 8.400.000,00
2 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 1.260.000,00
3 HARGA SATUAN PEKERJAAN (4+5) 9.660.000,00
ME.Material bantu
Material bantu (klem, fisher, sekrup dll.) Satuan M2
penangkal petir
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 BAHAN + TENAGA
Material bantu (klem, fisher, sekrup dll.) EL-045 LS 1,0500 500.000,00 525.000,00
Jumlah- 1
......................................................................................... 525.000,00
2 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 78.750,00
3 HARGA SATUAN PEKERJAAN (4+5) 603.750,00
ME.Bak kontrol
Pentanahan + bak kontrol Satuan Titik
penangkal petir
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 BAHAN + TENAGA
Pentanahan + bak kontrol EL-046 Titik 1,0500 12.000.000,00 12.600.000,00
Jumlah- 1
......................................................................................... 12.600.000,00
2 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 1.890.000,00
3 HARGA SATUAN PEKERJAAN (4+5) 14.490.000,00
LS.ornamen
Pemasangan ornamen telawang Satuan Unit
talabang
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 BAHAN + TENAGA
Ornamen telawang LS-015 M2 1,0000 14.507.912,09 14.507.912,09
Jumlah- 1
......................................................................................... 14.507.912,09
2 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 2.176.186,81
3 HARGA SATUAN PEKERJAAN (4+5) 16.684.098,90
LS.roster GRC Pemasangan dinding ornamen roster GRC pola islami Satuan M2
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 TENAGA
Pembantu tukang batu L.12 Orang/hari 0,3000 80.000,00 24.000,00
Tukang batu L.06 Orang/hari 0,1000 100.000,00 10.000,00
Kepala tukang batu L.02 Orang/hari 0,0100 150.000,00 1.500,00
Mandor L.01 Orang/hari 0,0150 210.000,00 3.150,00
Jumlah- 1
......................................................................................... 38.650,00
2 BAHAN
Roster GRC LS-016 M2 1,0500 780.000,00 819.000,00
Semen portland C-11 Kg 11,5000 1.200,00 13.800,00
Pasir Pasang B-3 M3 0,0430 104.000,00 4.472,00
Jumlah- 2
......................................................................................... 837.272,00
3 PERALATAN
Jumlah- 3
......................................................................................... -
4 JUMLAH (1+2+3) 875.922,00
5 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 131.388,30
6 HARGA SATUAN PEKERJAAN (4+5) 1.007.310,30
LS.mini pile 1
Pengadaan Mini Pile 25x25 cm, beton bertulang mutu K-400 Satuan M
25x25cm
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 BAHAN + TENAGA
1
LS.pemancangan Pemancangan Mini Pile Satuan M
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 BAHAN + TENAGA
Pemancangan Mini Pile LS-015 M1 1,0000 108.710,62 108.710,63
Jumlah- 1
......................................................................................... 108.710,63
2 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 16.306,59
3 HARGA SATUAN PEKERJAAN (4+5) 125.017,22
LS.las tiang
Sambungan las plat joint Satuan Buah
pancang
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 BAHAN + TENAGA
Sambungan las plat joint LS-016 Titik 1,0000 51.494,51 51.494,51
Jumlah- 1
......................................................................................... 51.494,51
2 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 7.724,18
3 HARGA SATUAN PEKERJAAN (4+5) 59.218,69
LS.bobokan tiang
Bobokan tiang pancang Satuan Buah
pancang
No. Uraian Kode Satuan Koef Hrg Sat (Rp) Jmlh Hrg (Rp)
1 BAHAN + TENAGA
Bobokan tiang pancang LS-017 Titik 1,0000 126.745,14 126.745,15
Jumlah- 1
......................................................................................... 126.745,15
2 OVERHEAD + KEUNTUNGAN 15% x Jumlah 4 19.011,77
3 HARGA SATUAN PEKERJAAN (4+5) 145.756,92
0 1 2 3 4
A. TENAGA
1 Mandor L.01 210.000,00 Orang/hari
2 Kepala tukang batu L.02 150.000,00 Orang/hari
3 Kepala tukang kayu L.03 150.000,00 Orang/hari
4 Kepala tukang besi L.04 150.000,00 Orang/hari
5 Kepala Tukang Cat L.05 150.000,00 Orang/hari
6 Tukang batu L.06 100.000,00 Orang/hari
7 Tukang kayu L.07 80.000,00 Orang/hari
8 Tukang Cat L.08 80.000,00 Orang/hari
9 Tukang besi L.09 80.000,00 Orang/hari
10 Tukang Khusus Alumunium L.10 100.000,00 Orang/hari
11 Tukang Allumunium/Kaca L.11 100.000,00 Orang/hari
12 Pembantu tukang batu L.12 80.000,00 Orang/hari
13 Pembantu tukang kayu L.13 65.000,00 Orang/hari
14 Pembantu tukang besi L.14 75.000,00 Orang/hari
15 Pembantu tukang cat L.15 65.000,00 Orang/hari
B BAHAN
- BAHAN AIR
1 Air A.1 3,00 Liter
- BAHAN GALIAN
1 Batu pecah 2-3 cm B-1 350.000,00 M3
2 Pasir beton B-2 154.200,00 M3
3 Pasir Pasang B-3 104.000,00 M3
4 Pasir Urug B-4 75.000,00 M3
- BAHAN BESI
1 Assesoris rangka hollow (perkuatan, las dll) E-1 10.000,00 LS
2 Besi hollow ACP 40x60x2,1 mm E-2 35.000,00 M1
3 Besi hollow ACP 40x60x1,1 mm E-3 32.000,00 M1
4 Braket siku ACP 40x40x4 mm E-4 34.000,00 M1
5 Braket ACP E-5 400,00 Buah
6 Skrup ACP E-6 200,00 Buah
7 Alumunium Composite Panel (ACP) E-7 1.200.000,00 Lembar
8 Brazing ACP E-8 72.500,00 Buah
9 Batang C-75 tebal 0,80 mm E-9 15.000,00 M1
10 Batang C-75 tebal 0,60 mm E-10 11.500,00 M1
11 Baut screw driver E-11 140,00 Buah
12 Besi beton polos E-12 11.000,00 Kg
13 Besi beton ulir E-13 19.000,00 Kg
14 Jaring kawat baja dilas (wiremesh) E-14 14.000,00 Kg
15 Besi strip E-15 15.000,00 Kg
16 Dinabolt dia 12mm (10-15cm) E-16 9.670,33 Buah
17 Font stainless E-17 10.000,00 Cm
18 Kawat bindrat E-18 19.100,00 Kg
19 Nok atap multisirap E-19 180.714,29 M1
20 Paku kayu E-20 18.600,00 Kg
21 Paku anti karat/ genteng multisirap E-21 22.200,00 Kg
22 Paku skrup Gypsum board E-22 48.351,65 Kg
23 Profil alluminium E-23 135.000,00 M1
24 Sunsreen alumunium E-24 350.000,00 M2
25 Rangka metal hollow 40.40.2 mm E-25 8.166,67 M1
26 Roof batten reng 150-R40.60 T=0,60 mm E-26 9.500,00 M1
27 Seng gelombang E-27 47.400,00 Lbr
28 Seng plat E-28 40.000,00 Lbr
29 Skrup fixer E-29 125,71 Bh
30 Tools baja ringan E-30 800,00 Ls
31 Tangga besi galvanis lengkap E-31 900.000,00 M2
32 Grill besi lengkap E-32 270.000,00 M1
33 Plat bondex E-35 120.000,00 M2
-
- BAHAN KUNCI -
1 Door holder F-1 260.000,00 Pasang
2 Engsel kupu-kupu F-2 52.500,00 Bh
3 Engsel pintu F-3 100.000,00 Bh
4 Kait angin F-4 46.900,00 Bh
5 Kunci slot rambuncis F-5 21.500,00 Bh
6 Kunci tanam biasa F-6 167.500,00 Bh
7 Door closer F-7 180.000,00 Bh
-
- BAHAN CAT, FINISHING LANTAI DAN DINDING -
1 Ampelas G-1 16.700,00 Lbr
2 Cat dasar G-2 24.800,00 Kg
3 Cat dasar alkali killer G-3 70.200,00 Kg
4 Cat tembok weather shield G-4 106.400,00 Kg
5 Cat menie kayu G-5 38.700,00 Kg
6 Cat penutup G-6 24.800,00 Kg
7 Kuas G-7 33.000,00 Bh
NO JENIS TENAGA / BAHAN KODE HARGA SATUAN
- BAHAN KAYU
1 Balok kayu kelas III H-1 1.500.000,00 M3
2 Dolken kayu φ 8-10/400 cm
8-10/400 cm H-2 15.000,00 Batang
3 Papan bakesting H-3 1.833.400,00 M3
4 Plywood tebal 4 mm H-4 90.100,00 Lbr
5 Plywood tebal 9 mm H-4 200.100,00 Lbr
6 Penjaga jarak bekisting/spacer H-5 5.000,00 Buah
7 Plywood tebal 12 mm H-7 231.400,00 Lbr
8 HPL H-8 200.000,00 Lbr
9 Plywood tebal 18 mm H-8 288.000,00 Lbr
10 Parquet H-9 309.000,00 M2
- KACA
1 tempered 12 mm J-1 7.000.000,00 M2
2 Profil karet kaca J-2 5.000,00 M1
3 Sealant J-3 26.800,00 Tube
4 Jendela naco + rangka J-3 450.000,00 Set
5 kaca 5 mm J-4 110.000,00 M2
- SEWA PERALATAN
1 Sewa scalfholding (untuk ACP) bongkar pasang Alat-001 48.000,00 Buah
- ELEKTRIKAL
1 Zadle klem EL-001 1.394,38 buah
2 Pengeboran 12 m EL-002 650.000,00 Titik
3 Accesories, Fitting dan material bantu, untuk grounding EL-003 354.578,75 Ls
4 Box Panel uk. 60x120x25 EL-004 1.840.352,38 Unit
5 MCCB 3p, 250 A EL-005 3.003.104,76 Unit
6 Kabel NYY 4x35 mm EL-006 187.261,90 M'
7 Kabel NYM 3x2,5 mm EL-007 10.000,00 M'
8 Busbar tembaga 3x35x400 EL-008 656.857,14 Btng
9 Isolator panel EL-009 60.439,56 Btng
10 Selector Volt EL-010 145.200,00 Unit
11 Volt meter EL-011 216.071,43 Unit
12 Ampere meter EL-012 215.495,24 Unit
13 CT TR EL-013 242.000,00 Unit
14 Lampu indikator EL-014 25.928,57 Unit
15 Jasa Perakitan MDP EL-015 864.285,71 Ls
16 Accessories, fitting dan alat bantu, untuk MDP EL-016 331.885,71 Ls
17 Box Panel uk. 60x80x20 EL-017 390.000,00 Unit
18 NFB 3P, 80A EL-018 1.434.714,29 Unit
19 MCB 1P, 6A, 10A, dan 16A EL-019 40.500,00 Unit
20 Busbar tembaga 3x20x400 EL-020 656.857,14 Btng
21 Jasa Perakitan SDP EL-021 864.285,71 Ls
22 Accessories, fitting dan alat bantu, untuk SDP lantai-1 EL-022 331.885,71 Ls
23 Duct standart tipe C SOS SD-3005 EL-023 611.487,18 Btng
24 Horizontal Cross EL-024 392.961,90 Buah
25 Gantungan duct EL-025 20.146,52 Buah
26 Joint duct EL-026 28.809,52 Buah
27 Kabel data UTP cat 5e EL-027 1.449.340,66 Roll
28 Kabel telepon 2x2x0,6 EL-028 1.571.428,57 Roll
29 Stop kontak + instalasi beton EL-029 270.000,00 Titik
30 Stop kontak AC + instalasi beton EL-030 440.000,00 Titik
31 Stop kontak lantai + instalasi beton EL-031 730.000,00 Titik
32 Stop kontak antena EL-032 265.000,00 Titik
33 Schakelar (tunggal) EL-033 12.300,00 Buah
34 Schakelar (seri) EL-034 16.400,00 Buah
35 Lampu PL 14 watt + armatur down light 4" EL-035 169.230,77 Buah
NO JENIS TENAGA / BAHAN KODE HARGA SATUAN
Toilet dekan
Rg. Panel
Klinik Kesehatan
Toilet Pria rg. dekan rg. rapat rg. Bagian Tata Usaha, gudang
rg. penelitian dan pengabdian pada masyarakat
Subbagian Administrasi Umum dan Keuangan, Pantry
(PPM)
Subbagian Akademik, Kemahasiswaan, dan Alumni
rg. dosen
0,85
24,50
FAKULTAS TARBIYAH DAN ILMU KEGURUAN
34,70
8,35
2,00
2,90
NAMA GAMBAR
TANGGAL SKALA
- 1 : 200
NO. LEMBAR JUMLAH GAMBAR
01
5,00 4,00 3,00 6,00
1,00 2,00 6,00 1,50 1,50 1,50 1,50
1,50
3,00
3,00
4,00
1,50
Toilet Wanita Toilet Pria
1,00
3,00
Wakil Dekan
Wakil Dekan
2,00
Bidang Administrasi Umum, Toilet dekan
Bidang Akademik
Perencanaan, dan Keuangan
6,00
rg. dekan
5,00
2,00
3,00
1,00
1,00
rg. rapat
5,00
6,00
5,00
Wakil Dekan
Bidang Kemahasiswaan Penjaminan mutu
dan Kerjasama
Rg. Kepala Jurusan / Rg. Kepala Jurusan / rg. penelitian dan pengabdian pada masyarakat
3,00
5,00
Kepala Prodi Kepala Prodi (PPM)
4,00
1,00
1,00
4,00
rg. dosen
10,00
3,00
Klinik Kesehatan
5,00
Musholla Pantry
Rg. Panel
2,00
3,00
1,00
2,00 3,00
3,00 3,00 2,00 1,00
9,00
skala :
0 150 300
NAMA GAMBAR
DENAH LANTAI-1
TANGGAL SKALA
- 1 : 150
NO. LEMBAR JUMLAH GAMBAR
02
5,00 4,00 3,00 6,00
1,00 2,00 6,00 1,50 1,50 1,50 1,50
1,50
3,00
3,00
4,00
1,50
Toilet Wanita Toilet Pria
1,00
3,00
Wakil Dekan
Wakil Dekan
2,00
Bidang Administrasi Umum, Toilet dekan
Bidang Akademik
Perencanaan, dan Keuangan
6,00
rg. dekan
5,00
2,00
3,00
1,00
1,00
rg. rapat
5,00
6,00
5,00
Wakil Dekan
Bidang Kemahasiswaan Penjaminan mutu
dan Kerjasama
Rg. Kepala Jurusan / Rg. Kepala Jurusan / rg. penelitian dan pengabdian pada masyarakat
3,00
5,00
Kepala Prodi Kepala Prodi (PPM)
4,00
1,00
1,00
4,00
rg. dosen
10,00
3,00
Klinik Kesehatan
5,00
Musholla Pantry
Rg. Panel
2,00
3,00
1,00
2,00 3,00
3,00 3,00 2,00 1,00
9,00
skala :
0 150 300
NAMA GAMBAR
DENAH LANTAI-2
TANGGAL SKALA
- 1 : 150
NO. LEMBAR JUMLAH GAMBAR
03
5,00 4,00 3,00 6,00
1,00 2,00 6,00 1,50 1,50 1,50 1,50
1,50
3,00
3,00
4,00
1,50
Toilet Wanita Toilet Pria
1,00
3,00
Wakil Dekan
Wakil Dekan
2,00
Bidang Administrasi Umum, Toilet dekan
Bidang Akademik
Perencanaan, dan Keuangan
6,00
rg. dekan
5,00
2,00
3,00
1,00
1,00
rg. rapat
5,00
6,00
5,00
Wakil Dekan
Bidang Kemahasiswaan Penjaminan mutu
dan Kerjasama
Rg. Kepala Jurusan / Rg. Kepala Jurusan / rg. penelitian dan pengabdian pada masyarakat
3,00
5,00
Kepala Prodi Kepala Prodi (PPM)
4,00
1,00
1,00
4,00
rg. dosen
10,00
3,00
Klinik Kesehatan
5,00
Musholla Pantry
Rg. Panel
2,00
3,00
1,00
2,00 3,00
3,00 3,00 2,00 1,00
9,00
skala :
0 150 300
NAMA GAMBAR
DENAH LANTAI-3
TANGGAL SKALA
- 1 : 150
NO. LEMBAR JUMLAH GAMBAR
04
TAMPAK - 1
skala :
0 150 300
NAMA GAMBAR
TAMPAK - 1
TANGGAL SKALA
- 1 : 150
NO. LEMBAR JUMLAH GAMBAR
05
skala :
0 150 300
NAMA GAMBAR
TAMPAK - 2
TANGGAL SKALA
- 1 : 150
NO. LEMBAR JUMLAH GAMBAR
06
skala :
0 150 300
NAMA GAMBAR
TAMPAK - 3
TANGGAL SKALA
- 1 : 150
NO. LEMBAR JUMLAH GAMBAR
07
skala :
0 150 300
NAMA GAMBAR
TAMPAK - 4
TANGGAL SKALA
- 1 : 150
NO. LEMBAR JUMLAH GAMBAR
08
NAMA GAMBAR
PERSPEKTIF-1
TANGGAL SKALA
- 1 : NTS
NO. LEMBAR JUMLAH GAMBAR
08
I A I N P A L A N G K A R A Y A
YAN
ARIBOWO, ST
Arsitek I A I N P A L A N G K A R A Y A