SAT. (Rp) (Rp) 1 2 4 5 6 7 A MATERIAL Kayu 5/7 x 2 m 12 batang 15,000 180,000 Paku biasa 2"-5" 2 kg 15,000 30,000 Kayu papan 3/20 x 2 cm 10 lembar 72,000 720,000 Batu Belah 15/20 27 m3 210,000 5,670,000 Semen portland 50 zak 65,000 3,250,000 Pasir pasang 6 rit 1,450,000 8,700,000 Pipa PVC 1.5 inc 6 batang 25,000 150,000 Jumlah Sub V 18,700,000 B Tenaga Kerja Pekerja 20 oh 70,000 1,400,000 Tukang Batu 20 oh 75,000 1,500,000 Kepala Tukang 20 oh 80,000 1,600,000 Mandor 20 oh 90,000 1,800,000 Jumlah Sub V 6,300,000