REKAPITULASI RENCANA ANGGARAN BELANJA (RAB)

DESA : TLOGOWARU
KEC. : MERAKURAK KEGIATAN : REHAB KANTOR DESA
KAB. : TUBAN VOLUME : 14,4 X 8 M
PROP. : JAWA TIMUR SUMBER DANA : CSR SI

VOLU SAT HARGA


NO URAIAN PEKERJAAN ANALISA JUMLAH
ME UAN SATUAN

A BIAYA KONSTRUKSI 92,999,567.8

1 PEKERJAAN DINDING Rp. 18,297,318.0

Pasang bata kumbung tbl. 1/2 bata (An.D.04) 198.9 m2 92,001.8 18,297,318.0
camp. 1Pc : 4Ps
2 PEKERJAAN PLESTERAN Rp. 19,520,803.2

Plesteran tbl. 1,5 cm camp. 1Pc : 5Ps (SNI DT 91-0010-2007-04) 301.9 m2 37,868.4 11,430,955.2
Acian (SNI DT 91-0010-2007-11) 301.9 m2 26,800.0 8,089,848.0
3 PEKERJAAN BETON Rp. 28,601,505.5

Rabat beton 1Pc : 3Ps : 5Krl tb 5 cm (SNI DT 91-0008-2007-01) 2.995 m3 765,724.0 2,293,343.4

Kolom praktis beton bertulang K-175 (SNI DT 91-0008-2007-35) 0.394 m3 2,653,346.9 1,044,755.4
(uk 15/15)
Kolom beton bertulang K-225 15/25 (SNI DT 91-0008-2007-40) 2.363 m3 3,439,477.1 8,125,764.7
Beton ring balok K-175 15/15 (SNI DT 91-0008-2007-44) 2.052 m3 2,654,529.4 5,447,094.4

Beton balok Latay K-175 15/15 (SNI DT 91-0008-2007-44) 0.324 m3 2,654,529.4 860,067.5
Beton Kuda-Kuda balok K-175 20/30 (SNI DT 91-0008-2007-50) 4.08 m3 2,654,529.4 10,830,480.1
4 PEKERJAAN KAYU (KY. KAMPER) Rp. 17,590,238.2
Pasang gordeng (SNI DT 91-0011-2007-09) 0.346 m3 8,590,800.0 2,968,980.5
Pasang usuk dan reng (genteng (SNI DT 91-0011-2007-11) 129 m2 113,322.0 14,621,257.7
beton/monier)

Pasang rangka plafond 60x120 cm (SNI DT 91-0011-2007-13) 0 m2 110,895.0 -

Pasang papan lisplank 3/20 (SNI DT 91-0011-2007-14) 0 m2 115,014.5 -


5 PEKERJAAN LANGIT-LANGIT Rp. -

Pas. Plafond Kalsiboard (SNI DT 91-0013-2007-02) 0 m2 34,335.0 -

Pasang lisk Kayu Profil (SNI DT 91-0013-2007-04) 0 m 18,350.0 -

6 PEKERJAAN PENUTUP ATAP Rp. 7,913,306.9


Pasang genteng beton kecil (SNI 03-3436-2002-04) 129 m2 51,700.0 6,670,540.8
Pasang bubungan genteng beton (SNI 03-3436-2002-05) 14.4 m 86,303.2 1,242,766.1
7 PEKERJAAN PLITURAN &PENGECATAN Rp. -
Pengecatan dinding baru (SNI P.C.07) 0 m2 15,532.0 -
Pengecatan genteng (SNI P.C.13) 0 m2 13,218.0 -
8 PEKERJAAN PENUTUP LANTAI Rp. -
Pasang keramik 40 x 40 polos (SNI DT 91-0012-2007-04) 0 m2 164,292.0 -

9 PEKERJAAN LISTRIK (An. Lis.) 1,076,396.0


Instalasi titik lampu (An. Lis.01) 4 Ttk 115,950.0 463,800.0
Instalasi stop kontak (An. Lis.02) 4 Ttk 112,150.0 448,600.0
Pasang stop kontak (An. Lis.03) 4 Ttk 21,299.5 85,198.0
Pasang saklar ganda (An. Lis.04) 2 Ttk 21,199.5 42,399.0
Pasang saklar Tunggal (An. Lis.05) 2 Ttk 18,199.5 36,399.0
10 PEKERJAAN LAIN-LAIN -
kusen dan daun pintu Kayu Kamper set 1,750,000.0 -
Kusen dan daun Jendela Kayu Kamper Double set 1,200,000.0 -
Kusen dan Daun Jendela Kayu Kamper Tunggal set 700,000.0 -
Boven Kayu Kamper ls 400,000.0 -

JUMLAH KESELURUHAN Rp. 92,999,567.8

JUMLAH KESELURUHAN DIBULATKAN Rp. 93,000,000.0

Mengetahui, Disusun Oleh


Kepala Desa Tlogowaru Tim Pelaksana Kegiatan

TURSILA BUDI HANDAYANI, SE ________________________


banyakny
P L T vol p l
a 4

Pasang. pondasi batu kali / brongkol 1Pc :


5Ps 10.67906 0.3 0.20625
Pasang bata kumbung tbl. 1/2 bata camp.
148.8
#DIV/0! 1Pc : 4Ps 3.2 tinggi pas bt kmb

- Rabat beton 1Pc : 3Ps : 5Krl 2.22075 p l t

Sloof Beton Bertulang K-225 1.830375 0.15 0.2


Kolom praktis beton bertulang K-175 (uk. 0.7425
11/11; 15/15) 0.15 0.15 3
Kolom beton bertulang K-225 15/25 1.35 0.25 0.15 3
Beton ring balok K-175 15/15 0 0 0.15 0.15
0.9 0.12 0.12
0.08 0.12 12.7 5

25,503,545.1

4.114
3,076,396.0

###

bop 232,000,432.2

- (93,000,000)

Biaya Operasion 10,000,000


Biaya Konstruks 92,999,000
Biaya Keseluruh 102,999,000 ###
dari 246,700,000 390,000,000
saldo 143,701,000 #REF!
#REF!
4 1.5 1.5 0.75

0.25 0.056

n
0.8 0.8
Ø10-15

Ø10-15
0.15
0.12
1 Ø10-15 0.15 Beugel Ø6-15

11 0.2 0.15

0.12
Ø10-15 Tul. Pokok
Beugel 4Ø10
Ø6-20
Beugel Ø6-15
4Ø8
12
Ø6-20 Tul. Pokok 4Ø8
1 0.25
sloof
Tul. Pokok 4Ø10
2
5

Kuda - kuda 0.19296


Beugel Ø6-15 Penyokong Kuda-K
Beug

0.061344
Tul. Pokok 4Ø10 Tul. P
gel Ø6-15

Pokok
gel 4Ø10
Ø6-20

Pokok 4Ø8

yokong Kuda-Kuda
Beugel Ø6-15

Tul. Pokok 4Ø8


ANALISA HARGA SATUAN PEKERJAAN (SWAKELOLA)
TAHUN ANGGARAN : 2017

HARGA SATUAN KEBUTUHAN BIAYA


NO. URAIAN KOEFISIEN
(Rp.) (Rp.)
1 2 3 4 5 6
PEKERJAAN DINDING (SNI DT 91-0009-2007)
1 198.880 m2 Pasang bata kumbung tbl. 1/2 bata camp. 1Pc : 4Ps
(An.D.02)
Bahan
Batu kumbung 50.000 bh 800.00 9,944.00 7,955,200
PC / Semen 11.500 kg 1,200.00 2,287.12 2,744,544
Pasir pasang 0.043 m3 182,600.00 8.55 1,561,566
Jumlah (1) 12,261,310
Upah kerja
Tukang batu 0.100 Org 80,000.00 19.89 1,591,040
Pekerja 0.300 Org 74,500.00 59.66 4,444,968
Jumlah (2) 6,036,008
Jumlah (1+2) 18,297,318
PEKERJAAN PLESTERAN (SNI DT 91-0010-2007)
2 301.86 m2 Plesteran tbl. 1,5 cm camp. 1Pc : 5Ps (SNI DT 91-0010-2007-04)
Bahan
PC / Semen 5.184 kg 1,200.00 1,564.84 1,877,811
Pasir pasang 0.026 m3 182,600.00 7.85 1,433,111
Jumlah (1) 3,310,921
Upah kerja
Tukang batu 0.150 Org 80,000.00 45.28 3,622,320
Pekerja 0.200 Org 74,500.00 60.37 4,497,714
Jumlah (2) 8,120,034
Jumlah (1+2) 11,430,955
3 301.86 m2 Acian (SNI DT 91-0010-2007-09)
Bahan
PC / Semen 3.250 kg 1,200.00 981.05 1,177,254
Jumlah (1) 1,177,254
Upah kerja
Tukang batu 0.100 Org 80,000.00 30.19 2,414,880
Pekerja 0.200 Org 74,500.00 60.37 4,497,714
Jumlah (2) 6,912,594
Jumlah (1+2) 8,089,848

PEKERJAAN LANGIT-LANGIT (SNI DT 91-0013-2007)


4 0 m2 Pas. Plafond Kalsiboard
(SNI DT 91-0013-2007-02)
Bahan
Kalsiboard tb. 3,5 mm 0.375 lbr 54,600.00 - -
Paku Kalsiboard 0.030 lbr 21,500.00 - -
Jumlah (1) -
Upah kerja
Tukang kayu 0.100 Org 80,000.00 - -
Pekerja 0.070 Org 74,500.00 - -
Jumlah (2) -
Jumlah (1+2) -
5 0 m' Pasang list plafond kayu profil
(SNI DT 91-0013-2007-03)
Bahan
Kayu profil lebar 7 cm 1.050 m' 10,000.00 - -
Paku 0.010 Kg 12,500.00 - -
Jumlah (1) -
Upah kerja
Tukang kayu 0.050 Org 80,000.00 - -
Pekerja 0.050 Org 74,500.00 - -
Jumlah (2) -
Jumlah (1+2) -

6 0.3456 m3 Pasang gordeng


(SNI DT 91-0011-2007-09)
Bahan
Balok kayu kamper 1.100 m3 6,960,000.00 0.38 2,645,914
Paku 3.000 Kg 12,500.00 1.04 12,960
Besi setrip 15.000 Kg 9,500.00 5.18 49,248
Jumlah (1) 2,708,122
Upah kerja
Tukang kayu 7.200 Org 80,000.00 2.49 199,066
Pekerja 2.400 Org 74,500.00 0.83 61,793
Jumlah (2) 260,859
Jumlah (1+2) 2,968,980
7 129.024 m2 Pasang usuk dan reng (genteng beton/monier)
(SNI DT 91-0011-2007-11)
Bahan
Usuk kayu kamper 5/7 0.014 m3 4,850,000.00 1.81 8,760,730
Reng kayu kamper 3/4 0.0057 m3 4,710,000.00 0.74 3,463,907
Paku usuk 0.250 Kg 12,500.00 32.26 403,200
Jumlah (1) 12,627,837
Upah kerja
Tukang kayu 0.100 Org 80,000.00 12.90 1,032,192
Pekerja 0.100 Org 74,500.00 12.90 961,229
Jumlah (2) 1,993,421
Jumlah (1+2) 14,621,258

8 129.024 m2 Pasang genteng beton kecil


(SNI 03-3436-2002-04)
Bahan
Genteng beton kecil 12.000 bj 2,400.00 1,548.29 3,715,891
Jumlah (1) 3,715,891
Upah kerja
Tukang kayu 0.100 Org 80,000.00 12.90 1,032,192
Pekerja 0.200 Org 74,500.00 25.80 1,922,458
Jumlah (2) 2,954,650
Jumlah (1+2) 6,670,541

9 0 m2 Pasang rangka plafond 60x120 cm


(SNI DT 91-0011-2007-13)
Bahan
Kayu kamper 4/6 0.0142 m3 4,850,000.00 - -
Paku usuk 0.250 Kg 12,500.00 - -
Jumlah (1) -
Upah kerja
Tukang kayu 0.300 Org 80,000.00 - -
Pekerja 0.200 Org 74,500.00 - -
Jumlah (2) -
Jumlah (1+2) -
PEKERJAAN PLITURAN DAN PENGECATAN (SNI P.C)
10 301.86 m2 Pengecatan dinding baru
(SNI P.C.07)
Bahan
Cat dinding (paragon) 0.360 Kg 15,700.00 108.67 1,706,113
Plamir dinding 0.100 Kg 16,000.00 30.19 482,976
Kertas gosok 0.500 Lbr 3,100.00 150.93 467,883
Rol 0.010 Bh 20,000.00 3.02 60,372
Jumlah (1) 2,717,344
Upah kerja
Tukang cat 0.063 Org 80,000.00 19.02 1,521,374
Pekerja 0.020 Org 74,500.00 6.04 449,771
Jumlah (2) 1,971,146
Jumlah (1+2) 4,688,490
11 0 m2 Pengecatan genteng (SNI P.C.13)
Bahan
Cat genteng 0.260 Kg 25,200.00 - -
Kuas 0.010 Bh 13,600.00 - -
Jumlah (1) -
Upah kerja
Tukang cat 0.063 Org 80,000.00 - -
Pekerja 0.020 Org 74,500.00 - -
Jumlah (2) -
Jumlah (1+2) -
PEK. PEK. PENUTUP LANTAI & DINDING (SNI DT 91-0012-2007)
12 0 m2 Pasang keramik 40 x 40 polos (SNI DT 91-0012-2007-07)
Bahan
Keramik 40x40 polos 1.050 m2 50,700.00 - -
PC / Semen 10.000 Kg 1,200.00 - -
Semen warna 1.500 Kg 11,100.00 - -
Pasir pasang 0.045 m3 182,600.00 - -
Jumlah (1) -
Upah kerja
Tukang batu 0.350 Org 80,000.00 - -
Pekerja 0.620 Org 74,500.00 - -
Jumlah (2) -
Jumlah (1+2) -

PEKERJAAN BETON (SNI DT 91-0008-2007)


13 2.995 m3 Rabat beton 1Pc : 3Ps : 5Krl
(SNI DT 91-0008-2007-01)
Bahan
PC / Semen 218.000 kg 1,200.00 652.91 783,492
Pasir cor 0.520 m3 230,000.00 1.56 358,202
Kerikil / Batu pecah 2-3 cm 0.870 m3 277,700.00 2.61 723,589
Jumlah (1) 1,865,283
Upah kerja
Tukang batu 0.250 Org 80,000.00 0.75 59,900
Pekerja 1.650 Org 74,500.00 4.94 368,160
Jumlah (2) 428,060
Jumlah (1+2) 2,293,343
14 2.3625 m3 Kolom beton bertulang K-225 (20/20)
(SNI DT 91-0008-2007-37)
Cor beton 1Pc : 2Ps : 3Krl K 1.000 m3 920,187.12 2.36 2,173,942
Begesting kolom 0.500 m3 2,196,380.00 1.18 2,594,474
Besi beton polos 150 kg 150.000 Kg 9,474.00 354.38 3,357,349
Jumlah 8,125,765
15 0.39375 m3 Kolom praktis beton bertulang K-175 (uk. 11/11; 15/15)
(SNI DT 91-0008-2007-35)
Cor beton 1Pc : 2Ps : 3Krl K 1.000 m3 872,631.94 0.39 343,599
Begesting kolom 0.250 m3 2,196,380.00 0.10 216,206
Besi beton polos 130 kg 130.000 Kg 9,474.00 51.19 484,950
Jumlah 1,044,755
16 2.376 m3 Beton ring balok K-175 (15/20)
(SNI DT 91-0008-2007-44)
Cor beton 1Pc : 2Ps : 3Krl K 1.000 m3 872,631.94 2.38 2,073,373
Begesting balok 0.250 m3 2,959,030.00 0.59 1,757,664
Besi beton polos 110 kg 110.000 Kg 9,474.00 261.36 2,476,125
Jumlah 6,307,162
17 4.08 m3 Beton balok K-225 (20/30)
(SNI DT 91-0008-2007-46)
Cor beton 1Pc : 2Ps : 3Krl K 1.000 m3 920,187.12 4.08 3,754,363
Begesting balok 0.500 m3 2,959,030.00 2.04 6,036,421
Besi beton polos 120 kg 120.000 Kg 9,474.00 489.60 4,638,470
Jumlah 14,429,255
18 6.44 m3 Cor beton 1Pc : 2Ps : 3Krl K-225
(SNI DT 91-0008-2007-08)
Bahan
PC / Semen 371.00 kg 1,200.00 2,390.17 2,868,201
Pasir cor 0.4986 m3 230,000.00 3.21 738,813
Kerikil / Batu pecah 2-3 cm 0.7756 m3 277,700.00 5.00 1,387,612
Jumlah (1) 4,994,626
Upah kerja
Tukang batu 0.275 Org 80,000.00 1.77 141,735
K. Tukang batu 0.028 Org - - -
Pekerja 1.650 Org 74,500.00 10.63 791,944
Mandor 0.083 Org - - -
Jumlah (2) 933,679
Jumlah (1+2) 5,928,306
19 2.77 m3 Cor beton 1Pc : 2Ps : 3Krl K-175
(SNI DT 91-0008-2007-06)
Bahan
PC / Semen 326.00 kg 1,200.00 902.94 1,083,526
Pasir cor 0.5428 m3 230,000.00 1.50 345,787
Kerikil / Batu pecah 2-3 cm 0.7622 m3 277,700.00 2.11 586,253
Jumlah (1) 2,015,566
Upah kerja
Tukang batu 0.275 Org 80,000.00 0.76 60,935
K. Tukang batu 0.028 Org - - -
Pekerja 1.650 Org 74,500.00 4.57 340,472
Mandor 0.083 Org - - -
Jumlah (2) 401,406
Jumlah (1+2) 2,416,972
20 1.28 m3 Begesting kolom
(SNI DT 91-0008-2007-16)
Bahan
Kayu papan begesting 0.320 m3 3,212,000.00 0.41 1,315,314
Paku 3.200 Kg 12,500.00 4.10 51,188
Minyak begesting 1.600 Ltr 25,000.00 2.05 51,188
Kayu meranti usuk 5/7 0.120 m3 3,725,000.00 0.15 572,020
Multiplek 9 mm 2.800 Lbr 122,800.00 3.58 440,008
Jumlah (1) 2,429,717
Upah kerja
Tukang kayu 1.300 Org 80,000.00 1.66 133,088
K. Tukang kayu 0.132 Org - - -
Pekerja 2.600 Org 74,500.00 3.33 247,875
Mandor 0.122 Org - - -
Jumlah (2) 380,963
Jumlah (1+2) 2,810,680

21 2.63 m3 Begesting balok


(SNI DT 91-0008-2007-17)
Bahan
Kayu papan begesting 0.320 m3 3,212,000.00 0.84 2,707,331
Paku 3.200 Kg 12,500.00 8.43 105,360
Minyak begesting 1.600 Ltr 25,000.00 4.21 105,360
Multiplek 9 mm 2.800 Lbr 122,800.00 7.38 905,675
Kayu meranti usuk 5/7 0.140 m3 3,725,000.00 0.37 1,373,631
Dolken dia. 8 cm / 4m 16.000 Btg 38,000.00 42.14 1,601,472
Jumlah (1) 6,798,828
Upah kerja
Tukang kayu 1.650 Org 80,000.00 4.35 347,688
K. Tukang kayu 0.165 Org - - -
Pekerja 3.300 Org 74,500.00 8.69 647,569
Mandor 0.155 Org - - -
Jumlah (2) 995,257
Jumlah (1+2) 7,794,085
22 1,156.5 m3 Besi beton polos
(SNI DT 91-0008-2007-21)
Bahan
Besi beton polos 1.050 Kg 7,800.00 1,214.35 9,471,919
Kawat bendrat 0.015 Kg 13,500.00 17.35 234,196
Jumlah (1) 9,706,115
Upah kerja
Tukang besi 0.0070 Org 80,000.00 8.10 647,653
K. Tukang besi 0.0007 Org - - -
Pekerja 0.0070 Org 74,500.00 8.10 603,126
Mandor 0.0004 Org - - -
Jumlah (2) 1,250,779
Jumlah (1+2) 10,956,894
23 4 Ttk Instalasi Titik Lampu
(An. Lis.01)
Bahan
Kabel NYA 1 x 2,5 mm 10.000 m' 3,300.00 40.00 132,000.00
Pipa Paralon 5/8 1.000 ljr 14,000.00 4.00
Isolator 0.500 bh 10,600.00 2.00
Fitting Plafon 1.000 bh 3,800.00 4.00
T dos PVC 1.00 bh 250.00 4.00 1,320.00
Jumlah (1) 133,320.00
Upah kerja
Tukang Listrik 0.500 Org 74,500.00 2.00 149,000.00
K. Tukang pipa 0.006 Org - 0.02 -
Pekerja 0.300 Org 74,500.00 1.20 89,400.00
Mandor 0.0018 Org - 0.01
Jumlah (2) 238,400.00
Jumlah (1+2) 371,720.00
24 4 Ttk Instalasi Stop Kontak
(An. Lis.01)
Bahan
Kabel NYA 1 x 2,5 mm 10.000 m' 3,300.00 40.00 132,000.00
Pipa Paralon 5/8 1.000 ljr 14,000.00 4.00 56,000.00
Isolator 0.500 bh 10,600.00 2.00 21,200.00
T dos PVC 1.00 bh 250.00 4.00 1,000.00
Jumlah (1) 210,200.00
Upah kerja
Tukang Listrik 0.500 Org 74,500.00 2.00 149,000.00
K. Tukang pipa 0.006 Org - 0.02 -
Pekerja 0.300 Org 74,500.00 1.20 89,400.00
Mandor 0.0018 Org - 0.01
Jumlah (2) 238,400.00
Jumlah (1+2) 448,600.00
25 4 Ttk Pasang Stop Kontak
(An. Lis.01)
Bahan
Stop Kontak 1.000 Bh 17,500.00 4.00 70,000.00
Jumlah (1) 70,000.00
Upah kerja
Tukang Listrik 0.050 Org 74,500.00 0.20 14,900.00
K. Tukang pipa 0.006 Org - 0.02 -
Pekerja 0.001 Org 74,500.00 0.00 298.00
Mandor 0.0018 Org - 0.01
Jumlah (2) 15,198.00
Jumlah (1+2) 85,198.00
26 2 Ttk Pasang Saklar Ganda
(An. Lis.04)
Bahan
Saklar Ganda 1.000 Bh 17,400.00 4.00 69,600.00
Jumlah (1) 69,600.00
Upah kerja
Tukang Listrik 0.050 Org 74,500.00 0.20 14,900.00
K. Tukang pipa 0.006 Org - 0.02 -
Pekerja 0.001 Org 74,500.00 0.00 298.00
Mandor 0.0018 Org - 0.01
Jumlah (2) 15,198.00
Jumlah (1+2) 84,798.00
27 2 Ttk Pasang Saklar Tunggal
(An. Lis.04)
Bahan
Saklar Ganda 1.000 Bh 14,400.00 4.00 57,600.00
Jumlah (1) 57,600.00
Upah kerja
Tukang Listrik 0.050 Org 74,500.00 0.20 14,900.00
K. Tukang pipa 0.006 Org - 0.02 -
Pekerja 0.001 Org 74,500.00 0.00 298.00
Mandor 0.0018 Org - 0.01
Jumlah (2) 15,198.00
Jumlah (1+2) 72,798.00
390,000,000
REKAP 73,662,136
PINTU 36,000,000
110,127,736
SELISIH 279,872,264
17,500,000

4 7 28 3.5 98
3.5 6 21 3.5 73.5
40000 3.5 2 7 3.5 24.5
13800 4.5 3 13.5 3.5 47.25
7851.8 3.5 2 7 3.5 24.5
2.4 2 4.8 1 4.8
3.5 6 21 0.9 18.9
8000 291.45 294
22350 21 1.5 31.5

92001.8

6220.8
4747.6

12000
14900

37868.4

3900

8000
14900

26800

20475 3.5 4 6 84
645 2.7 3.7 0 0
84
8000
5215

34335

4 3.5 60
10500 4.5 3.5 32
125 2.7 4 0

92
4000
3725

18350

7656000
37500
142500

576000
178800

8590800

67900
26847
3125

8000
7450

113322

28,800.00

-
8,000.00
14,900.00
51,700.00

0
68870
3125

24000
14900

110895

5652
1600
1550
200

5040
1490

15532

6552
136

5040
1490

13218

53235
12000
16650
8217

28000
46190

164292

21 4.5 0.3 28.35


261600
119600 28.35
241599

20000
122925

765724

0.25 0.2 3.5 20 3.5


920187.12 0.15 0.15 3.5 10 0.7875
1098190 4.2875
1421100
3439477.12
29,906,937
29,906,937 5,928,306
872631.94
549095
1231620
2653346.94
0.15 0.2 85 2.55
0.15 0.2 33 0.99
872631.94 3.54
739757.5
1042140 0.15 0.2 97.5 2.925
2654529.44

0.2 0.3 72 4.32


920187.12
1479515 0.2 0.3 73.5 4.41
1136880
3536582.12 92,297,129.4 337,429,246.6
listrik 3,131,685.0
PLN 10,000,000.0
bop 232,000,432.2
445,200.00 pintu -
114,678.00 sanitasi -
215,384.12 pembersihan -
-
22,000.00 73,662,136
-
122,925.00

29,906,937
920,187.12 14,429,255

391,200.00
124,844.00
211,662.94

-
22,000.00
-
122,925.00

872,631.94

1,027,840.00
40,000.00
40,000.00
447,000.00
343,840.00

-
104,000.00
-
193,700.00

2,196,380.00

1027840
40000
40000
343840
521500
608000
0
132000
0
245850
0

2959030

8190
202.5

0
560
0
521.5

9474 29,906,937

33,000.00
14,000.00
5,300.00
3,800.00
250.00

-
37,250.00
-
22,350.00
-

115,950.00

33,000.00
14,000.00
5,300.00
250.00

-
37,250.00
-
22,350.00
-

112,150.00

17,500.00

-
3,725.00
-
74.50
-

21,299.50

17,400.00

-
3,725.00
-
74.50
-

21,199.50

14,400.00

-
3,725.00
-
74.50
-

18,199.50

100,033,234.17
0
100,033,234.17
20 0 m3 Pondasi Footplat Beton Bertulang K-225
(SNI DT 91-0008-2007-24)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 920,187.12 -
Begesting pondasi 1.000 m3 968,930.00 -
Besi beton polos 120 kg 120.000 Kg 9,474.00 -
Jumlah

24 0 m3 Pondasi Strous Beton Bertulang K-225


(SNI DT 91-0008-2007-28)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 920,187.12 -
Besi beton polos 120 kg 120.000 Kg 9,474.00 -
Jumlah

27 0 m3 Sloof Beton Bertulang K-225 (20/20)


(SNI DT 91-0008-2007-31)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 920,187.12 -
Begesting sloof 1.000 m3 1,223,348.00 -
Besi beton polos 140 kg 140.000 Kg 9,474.00 -
Jumlah

27 0 m3 Sloof Beton Bertulang K-225 (15/15) teras


(SNI DT 91-0008-2007-31)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 920,187.12 -
Begesting sloof 1.000 m3 1,223,348.00 -
Besi beton polos 140 kg 140.000 Kg 9,474.00 -
Jumlah

31 2.3625 m3 Kolom beton bertulang K-225 (20/20)


(SNI DT 91-0008-2007-37)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 920,187.12 2.36
Begesting kolom 0.500 m3 2,196,508.00 1.18
Besi beton polos 150 kg 150.000 Kg 9,474.00 354.38
Jumlah

33 2.376 m3 Beton ring balok K-175 (15/20)


(SNI DT 91-0008-2007-44)
Cor beton 1Pc : 2Ps : 3Krl K-175 1.000 m3 872,631.94 2.38
Begesting balok 0.250 m3 2,959,158.00 0.59
Besi beton polos 110 kg 110.000 Kg 9,474.00 261.36
Jumlah

35 4.08 m3 Beton balok K-225 (20/30)


(SNI DT 91-0008-2007-46)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 920,187.12 4.08
Begesting balok 0.500 m3 2,959,158.00 2.04
Besi beton polos 120 kg 120.000 Kg 9,474.00 489.60
Jumlah

37 0 m3 Beton plat lantai K-225 tb. 10 dan 12 cm


(SNI DT 91-0008-2007-51)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 920,187.12 -
Begesting lantai 0.500 m3 3,226,658.00 -
Besi beton polos 110 kg 110.000 Kg 9,474.00 -
Jumlah

39 0 m3 Beton tangga K-225


(SNI DT 91-0008-2007-53)
Cor beton 1Pc : 2Ps : 3Krl K-225 1.000 m3 918,775.80 -
Begesting tangga 0.500 m3 2,366,275.00 -
Besi beton polos 150 kg 150.000 Kg 9,190.00 -
Jumlah

15 - m3 Begesting untuk tangga


(SNI DT 91-0008-2007-19)
Bahan
Kayu papan begesting 0.250 m3 3,212,000.00 -
Paku 3.000 Kg 12,500.00 -
Minyak begesting 1.200 Ltr 25,000.00 -
Kayu meranti usuk 5/7 0.105 m3 3,725,000.00 -
Multiplek 9 mm 2.500 Lbr 122,800.00 -
Dolken dia. 8 cm / 4m 14.000 Btg 38,000.00 -
Jumlah (1)
Upah kerja
Tukang kayu 1.650 Org 63,000.00 -
K. Tukang kayu 0.165 Org - -
Pekerja 3.300 Org 49,000.00 -
Mandor 0.155 Org - -
Jumlah (2)
Jumlah (1+2)
8 6.44 m3 Cor beton 1Pc : 2Ps : 3Krl K-225
(SNI DT 91-0008-2007-08)
- Bahan
- PC / Semen 371.00 kg 1,200.00
- Pasir cor 0.4986 m3 230,000.00
- Kerikil / Batu pecah 2-3 c 0.7756 m3 277,700.00
Jumlah (1)
Upah kerja
Tukang batu 0.275 Org 80,000.00
- K. Tukang batu 0.028 Org -
- Pekerja 1.650 Org 74,500.00
- Mandor 0.083 Org -
Jumlah (2)
Jumlah (1+2)

- 6 2.38 m3 Cor beton 1Pc : 2Ps : 3Krl K-175


- (SNI DT 91-0008-2007-06)
- Bahan
- PC / Semen 326.00 kg 1,200.00
Pasir cor 0.5428 m3 230,000.00
Kerikil / Batu pecah 2-3 c 0.7622 m3 277,700.00
Jumlah (1)
- Upah kerja
- Tukang batu 0.275 Org 80,000.00
- K. Tukang batu 0.028 Org -
- Pekerja 1.650 Org 74,500.00
Mandor 0.083 Org -
Jumlah (2)
Jumlah (1+2)
2,173,942
2,594,625 10 - m3 Begesting pondasi
3,357,349 (SNI DT 91-0008-2007-14)
8,125,916 Bahan
Kayu papan begesting 0.200 m3 3,212,400
Paku 1.500 Kg 12,500
Minyak begesting 0.400 Ltr 25,000
2,073,373 Jumlah (1)
1,757,740 Upah kerja
2,476,125 Tukang kayu 1.300 Org 80,000.00
6,307,238 K. Tukang kayu 0.130 Org -
Pekerja 2.600 Org 74,500.00
Mandor 0.122 Org -
Jumlah (2)
3,754,363 Jumlah (1+2)
6,036,682
4,638,470 11 - m3 Begesting sloof
14,429,516 (SNI DT 91-0008-2007-15)
Bahan
Kayu papan begesting 0.270 m3 3,212,400
Paku 1.800 Kg 12,500
- Minyak begesting 0.600 Ltr 25,000
- Jumlah (1)
- Upah kerja
- Tukang kayu 1.560 Org 80,000.00
K. Tukang kayu 0.156 Org -
Pekerja 2.600 Org 74,500.00
Mandor 0.120 Org -
28,862,670 Jumlah (2)
Jumlah (1+2)

- 12 1.18 m3 Begesting kolom


- (SNI DT 91-0008-2007-16)
- Bahan
- Kayu papan begesting 0.320 m3 3,212,400
Paku 3.200 Kg 12,500
Minyak begesting 1.600 Ltr 25,000
Kayu meranti usuk 5/7 0.120 m3 3,725,000
Multiplek 8 mm 2.800 Lbr 122,800.00
- Jumlah (1)
- Upah kerja
- Tukang kayu 1.300 Org 80,000.00
- K. Tukang kayu 0.132 Org -
- Pekerja 2.600 Org 74,500.00
- Mandor 0.122 Org -
- Jumlah (2)
Jumlah (1+2)
-
- 13 2.63 m3 Begesting balok
- (SNI DT 91-0008-2007-17)
- Bahan
- Kayu papan begesting 0.320 m3 3,212,400
- Paku 3.200 Kg 12,500
Minyak begesting 1.600 Ltr 25,000
Multiplek 8 mm 2.800 Lbr 122,800
Kayu meranti usuk 5/7 0.140 m3 3,725,000
Dolken dia. 8 cm / 4m 16.000 Btg 38,000.00
Jumlah (1)
Upah kerja
Tukang kayu 1.650 Org 80,000.00
K. Tukang kayu 0.165 Org -
Pekerja 3.300 Org 74,500.00
Mandor 0.155 Org -
Jumlah (2)
Jumlah (1+2)

14 - m3 Begesting plat lantai dack


(SNI DT 91-0008-2007-18)
Bahan
Kayu papan begesting 0.320 m3 3,212,400
Paku 3.200 Kg 12,500
Minyak begesting 1.600 Ltr 25,000
Kayu meranti usuk 5/7 0.120 m3 3,725,000
Multiplek 8 mm 2.800 Lbr 122,800
Dolken dia. 8 cm / 4m 25.000 Btg 38,000
Jumlah (1)
Upah kerja
Tukang kayu 1.650 Org 80,000.00
K. Tukang kayu 0.165 Org -
Pekerja 3.300 Org 74,500.00
Mandor 0.155 Org -
Jumlah (2)
Jumlah (1+2)

17 1,105.34 m3 Besi beton polos


(SNI DT 91-0008-2007-21)
Bahan
Besi beton polos 1.050 Kg 7,800.00
Kawat bendrat 0.015 Kg 13,500.00
Jumlah (1)
Upah kerja
Tukang besi 0.0070 Org 80,000.00
K. Tukang besi 0.0007 Org -
Pekerja 0.0070 Org 74,500.00
Mandor 0.0004 Org -
Jumlah (2)
Jumlah (1+2)

pekerja 34.05 74,500 2,536,823


tkg 16.04 80,000 1,283,533

semen 3,164.74 1,200 3,797,692


ky meranti 0.51 3,725,000 1,901,650
dolken 42.14 38,000 1,601,472
ky bek 1.22 3,212,400 3,921,955
minyak 6.10 25,000 152,610
psr cor 4.50 230,000.00 1,035,442
bt krikil 6.81 277,700.00 1,890,523
multiplek 10.68 122,800 1,311,836
besi 1,160.60 7,800 9,052,694
bendrat 16.58 13,500 223,830
paku 12.21 12,500 152,610
2,390.17 2,868,201 445,200.00
3.21 738,813 114,678.00
5.00 1,387,612 215,384.12
Jumlah (1) 4,994,626
-
1.77 141,735 22,000.00
0.18 - -
10.63 791,944 122,925.00
0.53 -
Jumlah (2) 933,679
Jumlah (1+2) 5,928,306 920,187.12

774.58 929,491 391,200.00 4.50


1.29 296,629 124,844.00
1.81 502,911 211,662.94
Jumlah (1) 1,729,032
-
0.65 52,272 22,000.00
0.07 - -
3.92 292,070 122,925.00
0.20 -
Jumlah (2) 344,342
Jumlah (1+2) 2,073,373 872,631.94

- - 642,480.00
- - 18,750.00
- - 10,000.00
Jumlah (1) -
-
- - 104,000.00
- - -
- - 193,700.00
- -
Jumlah (2) -
Jumlah (1+2) - 968,930.00
- - 867,348.00
- - 22,500.00
- - 15,000.00
Jumlah (1) -
-
- - 124,800.00
- - -
- - 193,700.00
- -
Jumlah (2) -
Jumlah (1+2) - 1,223,348.00

0.38 1,214,287 1,027,968.00


3.78 47,250 40,000.00
1.89 47,250 40,000.00
0.14 528,019 447,000.00
3.31 406,161 343,840.00
Jumlah (1) 2,242,967
-
1.54 122,850 104,000.00
0.16 - -
3.07 228,808 193,700.00
0.14 -
Jumlah (2) 351,658
Jumlah (1+2) 2,594,625 2,196,508.00

0.84 2,707,668 1,027,968.00


8.43 105,360 40,000.00
4.21 105,360 40,000.00
7.38 905,675 343,840.00
0.37 1,373,631 521,500.00
42.14 1,601,472 608,000.00
Jumlah (1) 6,799,165
-
4.35 347,688 132,000.00
0.43 - -
8.69 647,569 245,850.00
0.41 - -
Jumlah (2) 995,257 2,959,158.00
Jumlah (1+2) 7,794,422

- - 1,027,968.00
- - 40,000.00
- - 40,000.00
- - 447,000.00
- - 343,840.00
- - 950,000.00
Jumlah (1) -
-
- - 132,000.00
- - -
- - 245,850.00
- - -
Jumlah (2) - 3,226,658.00
Jumlah (1+2) -

1,160.60 9,052,694 8,190.00


16.58 223,830 202.50
Jumlah (1) 9,276,524

7.74 618,988 560.00


0.77 - -
7.74 576,432 521.50
0.44 - -
Jumlah (2) 1,195,420
Jumlah (1+2) 10,471,944 9,474.00

28,862,670
-
28,862,182
(488)

3,820,356
3,820,356

25,042,314
28,862,670
RINCIAN RENCANA ANGGARAN BIAYA
DESA TLOGOWARU KECAMATAN MERAKURAK KABUPATEN TUBAN
TAHUN ANGGARAN 2018
Kegiatan : REHAB KANTOR DESA
Volume Kegiatan : 14,4 X 8 m
Waktu Pelaksanaan : 90 Hari
Harga Jumlah Total
NO URAIAN Volume Satuan
Satuan (Rp) Rp
1 2 3 4 5 6=3x5
BIAYA KONSTRUKSI 93,000,000
I Belanja Bahan Konstruksi 62,907,500
1 - Semen 204.00 sak 48,000 9,792,000
2 - Pasir Pasang 16.00 m3 182,600 2,921,600
3 - Batu Pecah 10.00 m3 277,700 2,777,000
5 - Pasir Cor 6.00 m3 230,000 1,380,000
6 - Batu Kumbung 9,944 bj 800 7,955,200
7 - Cat dinding paragon 108.00 kg 15,700 1,695,600
8 - Plamir dinding 30.00 kg 16,000 480,000
9 - Kertas gosok 141.00 lbr 3,100 437,100
10 - Rol 3.00 bj 20,000 60,000
12 - Besi Beton 1,213.00 kg 7,800 9,461,400
13 - Bendrat 18.00 kg 13,500 243,000
14 - Kayu papan begesting 1.00 m3 3,212,000 3,212,000
15 - Paku 24.00 kg 12,500 300,000
16 - Minyak begesting 4.00 ltr 25,000 100,000
17 - Kayu meranti usuk 5/7 0.50 m3 3,725,000 1,862,500
18 - Multiplek 9 mm 9.00 lbr 122,800 1,105,200
19 - Dolken 10.00 btg 38,000 380,000
20 - Balok kayu kamper 0.30 m3 6,960,000 2,088,000
21 - Besi setrip 5.00 kg 9,500 47,500
22 - Usuk kayu kamper 5/7 1.80 m3 4,850,000 8,730,000
23 - Reng kayu kamper 3/4 0.70 m3 4,710,000 3,297,000
24 - Genteng Beton 1,548.00 bj 2,400 3,715,200
25 - Genteng Bubungan 50.00 bj 6,200 310,000
26 - Kabel NYA 1 x 2,5 mm 80.00 m' 3,300 264,000
27 - Pipa paralon 5/8 8.00 Ljr 14,000 112,000
28 - Isolator 4.00 Bh 10,600 42,400
29 - Fiting plafon 4.00 Bh 800 3,200
30 - T dos PVC 8.00 Bh 250 2,000
31 - Stop kontak 4.00 bh 17,500 70,000
32 - Saklar ganda 2.00 bh 17,400 34,800
33 - Saklar tunggal 2.00 bh 14,400 28,800
II Belanja Tenaga Kerja 30,092,500
1 - Tukang 148.00 OH 80,000 11,840,000
2 - Tukang Listrik 5.00 OH 74,500 372,500
3 - Pekerja 240.00 OH 74,500 17,880,000
TOTAL BIAYA 93,000,000
Tlogowaru, Juni 2018
Disetujui/Mengesahkan Disusun Oleh
Kepala Desa Tlogowaru Tim Pelaksana Kegiatan

TURSILA BUDI HANDAYANI, SE ( )


679.00
64.68
25.30843328 25,163,000
16.07367988 12400 688.8888888889
14320 46600
206.208
57.28
286.4
5.728
2619.0003
37.41429
1.96873 7700
101.662625 0
6.30062
0.2884425
6.3518
30.428
0.528 #REF!
7.2
2.408 336000000
0.9804
2064
0
250
25
12.5
15
25
10
5
5
(30,092,500)
529.39485575
14.00
922.46
-
atap galvalum 105.8 275000 29,095,000
tangga 3 0 -
kusen jendela+ 3 1500000 4,500,000
plafond 96 140000 13,440,000
33,595,000
RINCIAN RENCANA ANGGARAN BIAYA
DESA TLOGOWARU KECAMATAN MERAKURAK KABUPATEN TUBAN
TAHUN ANGGARAN 2018
Kegiatan : REHAB KANTOR DESA
Volume Kegiatan : 14,4 X 8 m
Waktu Pelaksanaan : 90 Hari
Harga Jumlah Total
NO URAIAN Volume Satuan
Satuan (Rp) Rp
1 2 3 4 5 6=3x5
BIAYA KONSTRUKSI 55,000,000
I Belanja Bahan Konstruksi 36,694,000
1 - Semen 178.00 sak 48,000 8,544,000
2 - Pasir Pasang 11.00 m3 182,600 2,008,600
3 - Batu Pecah 10.00 m3 277,700 2,777,000
5 - Pasir Cor 6.00 m3 230,000 1,380,000
6 - Batu Kumbung 9,944 bj 800 7,955,200
12 - Besi Beton 615.00 kg 7,800 4,797,000
13 - Bendrat 12.00 kg 13,500 162,000
14 - Kayu papan begesting 1.00 m3 3,212,000 3,212,000
15 - Paku 22.00 kg 12,500 275,000
16 - Minyak begesting 4.00 ltr 25,000 100,000
17 - Kayu meranti usuk 5/7 0.50 m3 3,725,000 1,862,500
18 - Multiplek 9 mm 9.00 lbr 122,800 1,105,200
19 - Dolken 10.00 btg 38,000 380,000
20 - Balok kayu kamper 0.30 m3 6,960,000 2,088,000
21 - Besi setrip 5.00 kg 9,500 47,500
II Belanja Tenaga Kerja 18,306,000
1 - Tukang 91.00 OH 80,000 7,280,000
3 - Pekerja 148.00 OH 74,500 11,026,000
TOTAL BIAYA 55,000,000
Tlogowaru, Juni 2018
Disetujui/Mengesahkan Disusun Oleh
Kepala Desa Tlogowaru Tim Pelaksana Kegiatan

TURSILA BUDI HANDAYANI, SE ( )


-
-
-
Compatibility Report for kantor desa csr.xls
Run on 27/01/2019 16:40

The following features in this workbook are not supported by earlier versions
of Excel. These features may be lost or degraded when opening this workbook
in an earlier version of Excel or if you save this workbook in an earlier file
format.

Minor loss of fidelity # of occurrences

Some formulas in this workbook are linked to other workbooks that are 202
closed. When these formulas are recalculated in earlier versions of Excel
without opening the linked workbooks, characters beyond the 255-character
limit cannot be returned.
analisa'!N395:N396

analisa'!H612:H615

analisa'!H628
analisa'!H639:H642

analisa'!H653:H656

analisa'!H663
analisa'!H667:H670

analisa'!H685:H687

analisa'!H701:H703

analisa'!H714:H716
analisa'!H727:H729

analisa'!H740:H742

93 juta'!J104
93 juta'!I105:I109
93 juta'!G112:G113

Some cells or styles in this workbook contain formatting that is not supported 128
by the selected file format. These formats will be converted to the closest
format available.
Version

Excel 97-2003
Excel 97-2003
Excel 97-2003
Excel 97-2003

Excel 97-2003

Anda mungkin juga menyukai