RENCANA ANGGARAN PEMELIHARAAN ALAT ELEKTROMEDIK

RUMAH SAKIT BELLA BEKASI TAHUN 2021

NO Bulan Keterangan Unit Jumlah Harga Biaya Keterangan


1 Maret Servic kontrak Autoclave CSSD 1 30,000,000 30,000,000 belum di servic selama 5 thn
2 Maret Servic kontrak Autoclave Basah CSSD 1 30,000,000 30,000,000 belum di servic selama 5 thn
3 Maret Pembelian Door Jaket (utk Autoclave) CSSD 2 10,000,000 20,000,000 wajib ganti tahunan
4 Mengganti safety valve (utk Autoclave) CSSD 2 15,000,000 30,000,000 wajib ganti tahunan
5 Maintenance Alat Radiologi :
6 1. CT-Scan Radiologi 1 150,000,000 150,000,000
7 2. X-Ray Radiologi 1 80,000,000 80,000,000 belum di servic selama 5 thn
8 3. C-Arm Radiologi 1 80,000,000 80,000,000 belum di servic selama 5 thn
9 Uji Kesesuaian Radiologi 1 30,000,000 30,000,000 Rutin tahunan
10 Servuc Kontrak Dental Unit Poli Gigi 1 15,000,000 15,000,000 Rutin tahunan
11 Servic Kontrak Ventilator ICU 1 35,000,000 35,000,000 belum di servic selama 5 thn
12 Kalibrasi Seluruh unit 1 200,000,000 200,000,000 Rutin tahunan
13 Kalibrasi tahap 2 Farmasi 1 20,000,000 20,000,000 Rutin tahunan
14 Hepa Filter ICU, Ranap 2 25,000,000 50,000,000 Permintaan unit
15 Filter (hepa filter) ICU, Ranap 8 400,000 3,200,000 Pengecekan bulanan
16 Board elktrostimulator Fisiotherapy 1 20,000,000 20,000,000 Rekomendasi vendor
17 Manset tensi digital Ranap, IGD, ICU 6 500,000 3,000,000 Pengecekan bulanan
18 mengganti sensor saturasi Ranap, IGD, ICU 4 2,000,000 8,000,000 Pengecekan bulanan
19 Mengganti Engkol bed pasien Ranap 4 500,000 2,000,000 stok habis
20 Pembelian peralatan untuk alkes IPSRS 1 10,000,000 10,000,000 Rutin tahunan
21 Mengganti O2 sensor Ventilator ICU 4 5,000,000 20,000,000 Rutin tahunan
22 Mengganti O2 sensor mesin anasthesi OK 2 5,000,000 10,000,000 Rutin tahunan
23 Board processor USG Esaote Poli Jantung 1 98,000,000 98,000,000 Rekomendasi vendor
24 Baterai pasien monitor IGD & ICU 8 2,500,000 20,000,000 pengaktifan pasien monitor transfer
25 Perbaikan ECG treadmill MCU 1 1,500,000 1,500,000 rusak
26 Engkol Bed pasien Ranap 3 500,000 1,500,000 Rusak (stok habis)
27 Biaya Tak Terduga Aset 1 50,000,000 50,000,000
28 0
29
30 Jumlah 1,017,200,000
SISA #REF!
Ket :
Sudah Direalisasikan
Dalam Proses