1 2
Earthquake Hazard:
- Tsunami
- Ground Shaking
- Liquefaction
3 4
Normal fault
8.8
Thrust fault
Ada beberapa daerah Seismic gap diantaranya di lepas pantai Sumatera Barat.
Tahun 1797 terjadi Gempabumi besar Mw 8.9 di wilayah Siberut dan 1833 di
Selatan Pagai serta 1861 di wilayah Nias.
5 6
7 8
ProyekKulon
NYIA NYIAProgo
KulonProject
Progo
9 10
ProyekKulon
NYIA NYIAProgo
KulonProject
Progo ProyekKulon
NYIA NYIAProgo
KulonProject
Progo
11 12
13 14
15 16
17 18
19 20
Ground water surface •Safety Factor for Liquefaction >1.30 based on NCEER method with PGA 0.4g.
•Settlement < 10cm in future 10 years
•Post Improvement requirements:
21 22
Drop height: 15 m to 17 m
23 24
25 26
H
Fase
Fase 222
DC Phase W
(if necessary)
VC Ironing
Fase
Fase 33
27 28
The data shows that the natural sand is quite good. No adverse heaving
observe during DC work. The value of heaving is found to be nominal.
29 30
1
Depth of print (mm)
2
after
Depth of DC print 3
Number of blows
Depth (m)
4
Kriter ia Desain
Pre-SPT
Increment of DC print depth (mm) before 5
before Post-SPT
specification
Number of blows 8
31 32
New Yogyakarta International Airport Impulse Compaction for Land Site Area
Rapid Impulse Compaction for Land Site Area, 2018 New Yogyakarta International Airport
33 34
35 36
Using Vibro-flotation
Ngurah Rai Airport, Denpasar Header Pit 2B
Header Pit 2A
37 38
AREA PEKERJAAN 3 Ha
39 40
Earthquake Hazard:
- Liquefaction
41 42
Terkendala oleh:
-Clearance
-Getaran terhadap bangunan eksisting dan pesawat
43 44
Working Progress
45 46
-2 -2 -2
-3 -3 -3
-4 -4 -4
-5
Depth (m)
Depth (m)
Depth (m)
-5 -5
-6 -6 -6
-7 -7 -7
-8 -8 -8
-9 -9 -9
47 49
KSO Menard-Rekakarya
(with permission from Abuhurairah)
50 51
0.50 m
Saluran-1
RUNWAY 3 TIMBUNAN
TIMBUNAN
Saluran-2
Kolam
Saluran-3 TAXIWAY retensi
`
RUNWAY 2 Stone Column
Pola Segitiga spasi 1,5m, t = 4,5m & 5m
52 53
54 55
56