I PEKERJAAN KONSTRUKSI
1 Pipa Hollow 4/6 9.00 lnjr 242,600.00 2,183,400.00
2 Pipa AIR 2" 13.50 m' 231,080.00 3,119,580.00
3 Pipa AIR 1 1/2" 11.00 m' 115,210.00 1,267,310.00
4 Atap Galvalum 14.89 m2 118,050.00 1,757,764.50
5 Pagar BRC t. 120cm 3.00 bh 297,800.00 893,400.00
6 Pipa AIR 2" ( Cerobong Asap ) 5.00 m' 115,020.00 575,100.00
7 Grounding 2.00 set 375,000.00 750,000.00
8 Rabatan Beton tumbuk - m3 737,190.00 -
9 Pengelasan 630.00 cm 2,802.00 1,765,260.00
10 Pengecatan besi 18.00 m2 53,120.00 956,160.00
SUB TOTAL 13,267,974.50
REKAPITUASI :
I PEKERJAAN KONSTRUKSI 13,267,974.50
Jumlah 13,267,974.50
PPN 10% 1,326,797.45
Jumlah Total 14,594,771.95
Dibulatkan 14,594,700.00
Terbilang :
Mengetahui
Kuasa Pengguna Anggaran Penanggungjawab
Kepala Bidang SDK Kepala Puskesmas Songgon
I PEKERJAAN KONSTRUKSI
1 Pipa Hollow 4/6 9.00 lnjr 242,600.00
2 Pipa AIR 2" 13.50 m' 231,080.00
3 Pipa AIR 1 1/2" 11.00 m' 115,210.00
4 Atap Galvalum 14.89 m2 118,050.00
5 Pagar BRC t. 120cm 3.00 bh 297,800.00
6 Pipa AIR 2" ( Cerobong Asap ) 5.00 m' 115,020.00
7 Grounding 2.00 set 375,000.00
8 Rabatan Beton tumbuk - m3 737,190.00
9 Pengelasan 630.00 cm 2,802.00
10 Pengecatan besi 18.00 m2 53,120.00
SUB TOTAL
REKAPITUASI :
I PEKERJAAN KONSTRUKSI
Jumlah
PPN 10%
Jumlah Total
Dibulatkan
Terbilang :
Mengetahui
Kuasa Pengguna Anggaran Penanggungjawab
Kepala Bidang SDK Kepala Puskesmas Songgon
JUMLAH
2,183,400.00
3,119,580.00
1,267,310.00
1,757,764.50
893,400.00
575,100.00
750,000.00
-
1,765,260.00
956,160.00
13,267,974.50
13,267,974.50
13,267,974.50
1,326,797.45
14,594,771.95
14,594,700.00 14,594,836.00
136.00
esmas Songgon
TYO,S.Kep.Ners
22 199803 1 004