(SNI 03-1744-1989)
Beban (Lbs)
Berat krus + tanah kering (g) 34
800
Berat krus (g) 17
Berat tanah kering (g) 17
Berat air (g) 6
Kadar air (%) 35.29
PENETRASI CBR 600
Waktu Penurunan Pembacaan Beban
(menit) (inch) (div) (lbs)
0.25 0.1260 3.5 192
0.50 0.2520 6.1 333
1.00 0.5000 11 598 400
1.50 0.7520 17 935
2.00 1.0000 21 1153
3.00 1.5000 3 1638
4.00 2.0000 37 2029
6.00 3.0000 51 2794 200
8.00 4.0000 62 3391
10.00 5.0000 69 3784
NILAI CBR
1153 0
0.1 Inch x 100% 38.4%
1000 -0.1 0.0 0.1 0.2 0.3 0.
2029
0.2 Inch x 100% 45.1% Penetrasi (Inch)
1500
Perhitungan
1. Berat isi basah
volume mol = 2914.3 cm3
berat mol = 8900 g
berat mol + tanah = 13950 g
berat isi basah = berat tanah =
volume mol
2. kadar air
Berat krus + tanah basah (g) = 39.50 g
Berat krus + tanah kering (g) = 33.50 g
Berat krus (g) = 16.50 g
Berat tanah kering (g) = (berat krus +tanah kering)-berat krus
Berat air (g) = berat tanah basah-berat tanah kering
Kadar air (%) = berat air/ berat tanah kering x 100%
4. CBR
NILAI CBR
1153
0.1 Inch x 100% 38.4%
1000
2029
0.2 Inch x 100% 45.1%
1500
200
8455 95 8360
000
800
600
0 0
0.1260 192
0.2520 333
400 0.5000 598
0.7520 935
1.0000 1153
1.5000 1638
2.0000 2029
200 3.0000 2794
4.0000 3391
5.0000 3784
0 0.1 1153
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0 1153
0.2 2029
Penetrasi (Inch)
0 2029
87
151
% 271
% 424
523
743
920
1267
1538
1716
5050 = 1.7328 g/cm3
2914.3
1.281 g/cm3
3847
8203
4356
2860
2781
960
1821
79
4.34
PENGUJIAN CBR LABORATORIUM
(SNI 03-1744-1989)
Beban (Lbs)
Berat krus + tanah kering (g) 38
800
Berat krus (g) 17
Berat tanah kering (g) 21
Berat air (g) 0
Kadar air (%) 0.95
PENETRASI CBR 600
Waktu Penurunan Pembacaan Beban
(menit) (inch) (div) (lbs)
0.25 0.0125 0 0
0.50 0.0250 1 10
1.00 0.0500 3 20 400
1.50 0.0750 7 95
2.00 0.1000 14 161
3.00 0.1500 32 281
4.00 0.2000 54 420
6.00 0.3000 127 696 200
8.00 0.4000 212 955
10.00 0.5000 321 1104
NILAI CBR
161 0
0.1 Inch x 100% 5.4%
1000 -0.1 0.0 0.1 0.2 0.3 0.4
420
0.2 Inch x 100% 9.3% Penetrasi (Inch)
1500
Perhitungan
1. Berat isi basah
volume mol = 2914.3 cm3
berat mol = 8900 g
berat mol + tanah = 13350 g
berat isi basah = berat tanah =
volume mol
2. kadar air
Berat krus + tanah basah (g) = 37.70 g
Berat krus + tanah kering (g) = 37.50 g
Berat krus (g) = 16.50 g
Berat tanah kering (g) = (berat krus +tanah kering)-berat krus
Berat air (g) = berat tanah basah-berat tanah kering
Kadar air (%) = berat air/ berat tanah kering x 100%
4. CBR
NILAI CBR
161
0.1 Inch x 100% 5.4%
1000
420
0.2 Inch x 100% 9.3%
1500
1200
8455 95 8360
1000
800
600
0.0125 0
0.0250 10
400 0.0500 20
0.0750 95
0.1000 161
0.1500 281
0.2000 420
200 0.3000 696
0.4000 955
0.5000 1104
0 0.1 161
0.1 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0 161
0.2 420
Penetrasi (Inch)
0 420
%
%
4450 = 1.527 g/cm3
2914.3
1.513 g/cm3
3847
8203
4356
2860
2781
960
1821
79
4.34
PENGUJIAN CBR LABORATORIUM
(SNI 03-1744-1989)
Beban (Lbs)
Berat krus + tanah kering (g) 38
800
Berat krus (g) 17
Berat tanah kering (g) 21
Berat air (g) 0
Kadar air (%) 0.95
PENETRASI CBR 600
Waktu Penurunan Pembacaan Beban
(menit) (inch) (div) (lbs)
0.25 0.0125 0 0
0.50 0.0250 1 0
1.00 0.0500 3 20 400
1.50 0.0750 7 95
2.00 0.1000 14 161
3.00 0.1500 32 281
4.00 0.2000 54 420
6.00 0.3000 127 696 200
8.00 0.4000 212 955
10.00 0.5000 321 1104
NILAI CBR
161 0
0.1 Inch x 100% 5.4%
1000 -0.1 0.0 0.1 0.2 0.3 0.4
420
0.2 Inch x 100% 9.3% Penetrasi (Inch)
1500
Perhitungan
1. Berat isi basah
volume mol = 2914.3 cm3
berat mol = 8900 g
berat mol + tanah = 13350 g
berat isi basah = berat tanah =
volume mol
2. kadar air
Berat krus + tanah basah (g) = 37.70 g
Berat krus + tanah kering (g) = 37.50 g
Berat krus (g) = 16.50 g
Berat tanah kering (g) = (berat krus +tanah kering)-berat krus
Berat air (g) = berat tanah basah-berat tanah kering
Kadar air (%) = berat air/ berat tanah kering x 100%
4. CBR
NILAI CBR
161
0.1 Inch x 100% 5.4%
1000
420
0.2 Inch x 100% 9.3%
1500
1200
8455 95 8360
1000
800
600
0.0125 0
0.0250 0
400 0.0500 20
0.0750 95
0.1000 161
0.1500 281
0.2000 420
200 0.3000 696
0.4000 955
0.5000 1104
0 0.1 161
0.1 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0 161
0.2 420
Penetrasi (Inch)
0 420
%
%
4450 = 1.527 g/cm3
2914.3
1.513 g/cm3
3847
8203
4356
2860
2781
960
1821
79
4.34
PENGUJIAN CBR LABORATORIUM
(SNI 03-1744-1989)
Tumbukan : 10 kali
Proving Ring : 31.56 Lbs/div
BERAT ISI 800
Volume mol (cm3) 2048
Berat mol (g) 3847
Berat mol + tanah (g) 8203
Berat tanah (g) 4356
Berat isi basah (g/cm3) 2.127
Berat isi kering (g/cm3) 2.001
KADAR AIR 600
Berat krus + tanah basah (g) 1098
Beban (Lbs)
Berat krus + tanah kering (g) 1040
Berat krus (g) 121
Berat tanah kering (g) 920
Berat air (g) 58
Kadar air (%) 6.31
PENETRASI CBR 400
Waktu Penurunan Pembacaan Beban
(menit) (inch) (div) (lbs)
0.25 0.0125 0 0
0.50 0.0250 0 0
1.00 0.0500 2 63
1.50 0.0750 4 126
2.00 0.1000 5 158 200
3.00 0.1500 6 189
4.00 0.5000 7 221
6.00 0.6000 10 316
8.00 0.4000 15 473
10.00 0.5000 25 789
NILAI CBR
158 0
0.1 Inch x 100% 5.3%
3000 0.0 0.1 0.2 0.3 0.4 0.5
221
0.2 Inch x 100% 4.9% Penetrasi (Inch)
4500
2860
2781
960
1821
79
4.34
0.0125 0
0.0250 0
0.0500 63
0.0750 126
0.1000 158
0.1500 189
0.5000 221
0.6000 316
0.4000 473
0.5000 789
0.1 158
0 158
0.2 221
0 221
PERHITUNGAN CBR RENDAMAN
- 0.01 x 37
= 0.65042
Cs2 = 4.47112
Dari kedua hasil tersebut dapat diperoleh CBR tanah dasar yang akan digunakan untuk perencanaan d
84 84
96 + 5.2 - 0.5 10-3
96 96