No Uraian Kegiatan SAT VOL Harga Satuan Jumlah Harga
1 PEMBUATAN TEMPAT USAHA PENGOLAHAN IKAN : a Papan M² 4 2,800,000 11,200,000 b Balok M² 4 2,800,000 11,200,000 c Semen PCS 15 60,000 900,000 d Seng LEMBAR 40 55,000 2,200,000 e Paku KG 15 8,000 120,000 f Pasir M² 1 600,000 600,000 g Batu Gunung M² 1 600,000 600,000 h Upah Tukang - 10,000,000 10.000.000
2 PENGADAAN BARANG PENGOLAHAN IKAN :
a Alat Pendingin Ikan ( Freezer ) Unit 21 4,000,000 84,000,000
3 MESIN PENGOLAHAN SAMPAH PENJUALAN Unit 1 12,000,000 12,000,000
Total 122,820,000 RENCANA ANGGARAN DAN BELANJA
HARGA SATUAN JUMLAH HARGA (
NO ALAT DAN BAHAN VOLUME (Rp) Rp )
1 Mesin Ketinting 12 PK 12 Unit 5.000.000 60.000.000
2 Body/ Perahu 12 Unit 6.000.000 72.000.000 3 Mesin Diesel 24 PK 1 Unit 8.000.000 8.000.000 4 Jaring ( Pukat ) 60 Pis 100 60.000.000 5 Tali Pancing No. 200 100 Ikat 30 3.000.000 6 Kail Pancing 50 Kotak 20 1.000.000 Jumlah Total 204.000.000