Total (I) =
II PEKERJAAN TANAH
1 Pemasangan Bowplank 50.00 m
2 Galian Tanah Biasa (MEKANIS) 9295.63 M³
3 Timbunan Tanah Hasil Galian 50.17 M³
Total (II) =
III PEKERJAAN KONSTRUKSI
1 Pasangan Batu Mortar 1PC : 4 PC 66.51 M³
2 Plesteran 1PC : 2Psr (Tebal 2 Cm) 142.26 m2
3 Pengecoran Buis Beton Camp. K100 (D=1.00 m, T=0.50 m, Tebal=0 370 bh
4 Buis Beton Jarak Angk. - 30 m dan Dpasang 370 bh
5 Beton Siklop (60% Beton Camp = K. 125 ; 40% Batu Belah 93.02 m3
Total (D) =
A Total ( I ) + ( II ) + ( III )
B Nilai PPN 10 %
C Harga Total = ( A ) + ( B )
D Harga Pembulatan
AK
HARGA JUMLAH
SATUAN HARGA
(V) (VI)
12,000,000.00 12,000,000.00
3,250,000.00 3,250,000.00
3,250,000.00 3,250,000.00
6,000,000.00 6,000,000.00
9,707,500.00 9,707,500.00
34,207,500.00
52,660.75 2,633,037.50
20,700.00 192,419,541.00
37,835.00 1,898,181.95
196,950,760.45
1,012,562.02 67,345,499.95
91,220.65 12,977,049.67
312,199.37 115,513,766.90
23,220.00 8,591,400.00
901,258.76 83,835,089.86
288,262,806.37
519,421,066.82
51,942,106.68
571,363,173.51
571,363,000.00
PEMERINTAH PROVINSI SULAWESI TENGGARA
DINAS SUMBER DAYA AIR DAN BINA MARGA
Jl. Haluoleo No. 05 Kompleks Perkantoran Bumi Praja Anduonohu Kendari
"NORMALISASI DAN PERKUATAN TEBING SUNGAI REMBA KEC. KUSAMBI, KAB. MUNA BARAT"
TAHUN ANGGARAN 2019
BACK UP DATA
KONTRAKTOR PELAKSANA
"NORMALISASI DAN PERKUATAN TEBING SUNGAI REMBA KEC. KUSAMBI, KAB. MUNA BARAT"
TAHUN ANGGARAN 2019
LAPORAN HARIAN,
LAPORAN MINGGUAN
MINGGUAN
DAN
BULANAN
KONTRAKTOR PELAKSANA
"NORMALISASI DAN PERKUATAN TEBING SUNGAI REMBA KEC. KUSAMBI, KAB. MUNA BARAT"
TAHUN ANGGARAN 2019
LAPORAN MINGGUAN
KONTRAKTOR PELAKSANA
"NORMALISASI DAN PERKUATAN TEBING SUNGAI REMBA KEC. KUSAMBI, KAB. MUNA BARAT"
TAHUN ANGGARAN 2019
LAPORAN BULANAN
KONTRAKTOR PELAKSANA
"NORMALISASI DAN PERKUATAN TEBING SUNGAI REMBA KEC. KUSAMBI, KAB. MUNA BARAT"
TAHUN ANGGARAN 2019
KURVA REALISASI
PEKERJAAN
98.22
88.75
13.08
2.07
KONTRAKTOR PELAKSANA
"NORMALISASI DAN PERKUATAN TEBING SUNGAI REMBA KEC. KUSAMBI, KAB. MUNA BARAT"
TAHUN ANGGARAN 2019
DOKUMENTASI
PEKERJAAN
KONTRAKTOR PELAKSANA
LAPORAN HARIAN,
MINGGUAN
DAN
BULANAN
KONTRAKTOR PELAKSANA :
LAPORAN HARIAN
KONTRAKTOR PELAKSANA :
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 1 ( 2 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 - - -
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 - - -
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 - - -
5 Biaya K3 Ls. 1.00 - - -
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 - - -
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 - - -
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Konawe Selatan
Lokasi : Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 2 ( 3 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 - - -
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 - - -
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 -
5 Biaya K3 Ls. 1.00 - - -
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 - - -
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 - - -
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 3 ( 4 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 - - -
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 - - -
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 -
5 Biaya K3 Ls. 1.00 - - -
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 - - -
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 - - -
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 4 ( 5 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 - - -
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 - - -
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 - 0.24 0.24
5 Biaya K3 Ls. 1.00 - - -
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 - #VALUE! #VALUE!
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 - - -
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Konawe Selatan Gerimis 14.00 - 16.00
Lokasi : Kab. Konawe Selatan
Hari Ke- : 5 ( 6 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 - - -
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 - - -
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 - - -
5 Biaya K3 Ls. 1.00 - - -
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 - - -
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 - - -
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 6 ( 7 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` - 0.167 0.167
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 - 0.042 0.042
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 - 0.167 0.167
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 - 0.24 0.24
5 Biaya K3 Ls. 1.00 - 0.048 0.048
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 - 6.33 6.33
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 - - -
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 7 ( 8 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.167 0.166 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.042 0.047 0.089
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.167 0.166 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.048 0.047 0.095
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 6.33 0.90 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 - - -
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 8 ( 9 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.089 0.047 0.137
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.095 0.047 0.143
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 - 69.66 69.66
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Konawe Selatan Gerimis 14.00 - 16.00
Lokasi : Kab. Konawe Selatan
Hari Ke- : 9 ( 10 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.137 0.036 0.172
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.143 0.041 0.183
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 69.66 69.66 139.31
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 10 ( 11 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.172 0.041 0.213
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.183 0.041 0.224
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 139.31 69.66 208.97
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 11 ( 12 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.213 0.041 0.254
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.224 0.041 0.265
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 208.97 69.66 278.63
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi Konawe
: Kab. Selatan
Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 12 ( 13 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.254 0.041 0.294
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.265 0.041 0.306
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 278.63 69.66 348.28
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu CV. GEOMETRI ENGINEERING CONSULTANT CV. ZAKY PERKASA
Desa Onewali Kec. Ranometo Kab. Konawe Selatan
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 13 ( 14 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.294 0.041 0.335
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.306 0.041 0.346
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 348.28 69.66 417.94
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 14 ( 15 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
s Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.335 0.041 0.376
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.346 0.041 0.387
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 417.94 69.66 487.59
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 15 ( 16 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.376 0.041 0.417
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.387 0.041 0.428
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 487.59 69.66 557.25
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Konawe Selatan Gerimis 14.00 - 16.00
Lokasi : Kab. Konawe Selatan
Hari Ke- : 16 ( 17 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.417 0.041 0.457
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.428 0.041 0.468
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 557.25 69.66 626.91
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 17 ( 18 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.457 0.041 0.498
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.468 0.041 0.509
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 626.91 139.31 766.22
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 18 ( 19 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.498 0.041 0.539
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.509 0.041 0.550
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 766.22 139.31 905.53
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 19 ( 20 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.539 0.041 0.579
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.550 0.041 0.590
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 905.53 139.31 1,044.84
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 20 ( 21 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.579 0.041 0.620
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.590 0.041 0.631
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,044.84 139.31 1,184.16
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 21 ( 22 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.620 0.041 0.661
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.631 0.041 0.672
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,184.16 139.31 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 22 ( 23 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.661 0.041 0.702
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.672 0.041 0.713
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 23 ( 24 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.702 0.041 0.742
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.713 0.041 0.753
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 24 ( 25 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.742 0.041 0.783
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.753 0.041 0.794
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Konawe Selatan Gerimis 14.00 - 16.00
Lokasi : Kab. Konawe Selatan
Hari Ke- : 25 ( 26 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.783 0.041 0.824
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.794 0.041 0.835
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Kab. Cerah 08.00 - 14.00
Lokasi : Konawe Selatan
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 26 ( 27 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d
Volume Hari Ini Volume Kumulatif
Hari Lalu
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. ` 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.824 0.041 0.864
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 0.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.835 0.041 0.875
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.864 0.041 0.905
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.875 0.041 0.916
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Kab. Konawe Selatan Gerimis 14.00 - 16.00
Lokasi : Kab. Konawe Selatan
Hari Ke- : 28 ( 29 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume
Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.905 0.041 0.946
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.916 0.041 0.957
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab.
Kab. Konawe
Konawe Selatan
Selatan Gerimis 14.00 - 16.00
Hari Ke- : 29 ( 30 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.946 0.041 0.986
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.957 0.041 0.998
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab.
Kab. Konawe
Konawe Selatan
Selatan Gerimis 14.00 - 16.00
Hari Ke- : 30 ( 1 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.986 0.041 1.027
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 0.998 0.041 1.038
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab.
Kab. Konawe
Konawe Selatan
Selatan Gerimis 14.00 - 16.00
Hari Ke- : 31 ( 2 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.027 0.041 1.068
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.038 0.041 1.079
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab.
Kab. Konawe
Konawe Selatan
Selatan Gerimis 14.00 - 16.00
Hari Ke- : 32 ( 3 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.068 0.041 1.109
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.079 0.041 1.120
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab.
Kab. Konawe
Konawe Selatan
Selatan Gerimis 14.00 - 16.00
Hari Ke- : 33 ( 4 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.109 0.041 1.149
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.120 0.041 1.160
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 34 ( 5 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.149 0.041 1.190
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.160 0.041 1.201
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab.
Kab. Konawe
Konawe Selatan
Selatan Gerimis 14.00 - 16.00
Hari Ke- : 35 ( 6 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.190 0.041 1.231
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.201 0.041 1.242
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab.
Kab. Konawe
Konawe Selatan
Selatan Gerimis 14.00 - 16.00
Hari Ke- : 36 ( 7 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.231 0.041 1.271
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.242 0.041 1.282
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab.
Kab. Konawe
Konawe Selatan
Selatan Gerimis 14.00 - 16.00
Hari Ke- : 37 ( 8 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.271 0.041 1.312
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.282 0.041 1.323
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab.
Kab. Konawe
Konawe Selatan
Selatan Gerimis 14.00 - 16.00
Hari Ke- : 38 ( 9 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.312 0.041 1.353
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.323 0.041 1.364
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab.
Kab. Konawe
Konawe Selatan
Selatan Gerimis 14.00 - 16.00
Hari Ke- : 39 ( 10 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.353 0.041 1.394
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.364 0.041 1.405
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab.
Kab. Konawe
Konawe Selatan
Selatan Gerimis 14.00 - 16.00
Hari Ke- : 40 ( 11 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.394 0.041 1.434
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.405 0.041 1.445
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab.
Kab. Konawe
Konawe Selatan
Selatan Gerimis 14.00 - 16.00
Hari Ke- : 41 ( 12 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.434 0.041 1.475
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.445 0.041 1.486
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Kab. Konawe Selatan
Lokasi : Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 42 ( 13 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.475 0.041 1.516
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.486 0.041 1.527
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab.
Kab. Konawe
Konawe Selatan
Selatan Gerimis 14.00 - 16.00
Hari Ke- : 43 ( 14 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.333 - 0.333
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.516 0.041 1.556
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 - 0.333
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.527 0.041 1.567
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab.
Kab. Konawe
Konawe Selatan
Selatan Gerimis 14.00 - 16.00
Hari Ke- : 44 ( 15 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.333 0.167 0.500
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.556 0.041 1.597
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.333 0.333 0.666
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.567 0.041 1.608
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab. Konawe
Kab. Konawe Selatan
Selatan Gerimis 14.00 - 16.00
Hari Ke- : 45 ( 16 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.500 0.402 0.901
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.597 0.041 1.638
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.666 0.332 0.999
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.608 0.041 1.649
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab.
Kab. Konawe
Konawe Selatan
Selatan Gerimis 14.00 - 16.00
Hari Ke- : 46 ( 17 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.901 0.402 1.303
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.638 0.041 1.678
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 0.999 0.332 1.331
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.649 0.041 1.690
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab.
Kab. Konawe
Konawe Selatan
Selatan Gerimis 14.00 - 16.00
Hari Ke- : 47 ( 18 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 1.303 0.402 1.705
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.678 0.041 1.719
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 1.331 0.332 1.663
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.690 0.041 1.730
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Lokasi : Kab.
Kab. Konawe
Konawe Selatan
Selatan Gerimis 14.00 - 16.00
Hari Ke- : 48 ( 19 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 1.705 0.402 2.107
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.719 0.041 1.760
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 1.663 0.332 1.996
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.730 0.041 1.771
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 7.23
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Kudu-Kudu Desa Onewali Kec. Ranometo Cerah 08.00 - 14.00
Kab. Konawe Selatan
Lokasi : Kab. Konawe Selatan Gerimis 14.00 - 16.00
Hari Ke- : 49 ( 20 Desember ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen Kg
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume
Volume s/d Hari Lalu Volume Kumulatif
Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 2.107 0.402 1.000
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 1.760 0.041 1.000
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 1.996 0.332 1.000
4 Pemeriksaan dan Pengujian Laboratorium Ls. 1.00 0.236 - 0.24
5 Biaya K3 Ls. 1.00 1.771 0.041 1.000
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 38.00 7.23 - 38.00
2 Galian Tanah Biasa Ked 0 s/d 1 m M³ - - - -
3 Galian Tanah Biasa (MEKANIS) M³ 1,950.38 1,323.47 - 1,323.47
4 Timbunan Tanah Kembali Hasil Galian M³ - - - -
ASYARY SUYANTO, ST
SAFAR, ST HIBARDIN, ST Pelaksana Lapangan
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 09.00
Lokasi : : Gerimis 09.00 - 13.00
Hari Ke- : 1 ( 1 Oktober ) Cerah 13.00 - 16.00
Tahun : 2021 Gerimis
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator 1 Unit Semen M'
Operator 1 org Rol Meter 1 Bh Batu Pecah 24.91 M³
Pembantu Operator 1 org Gerobak Dorong 1 Unit Pab.Bronjong 24.91 M³
Kepala Tukang 1 org Sekop 2 Bh
Tukang Batu org Linggis 1 Bh
Buruh 8 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 - 0.011 0.011
3 Shop Drawing dan Ass Built Drawing Ls. 1.00Volume Hari Ini - #VALUE!
II PEKERJAAN TANAH
0 0
Normalisasi dan Perkuatan Tebing Sungai
Desa Awo, Kec. Wolo, Kab. Kolaka
#REF! 0 -
#REF! Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 14.00
Lokasi :: Gerimis 14.00 - 16.00
Hari Ke- : 2 ( 2 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen M'
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.011 0.011 0.022
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
II PEKERJAAN TANAH
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 14.00
Lokasi :: Gerimis 14.00 - 16.00
Hari Ke- : 3 ( 3 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen M'
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.022 0.011 0.033
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.022 0.011 0.033
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 9.56 4.61 14.17
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 14.00
Lokasi : : Gerimis 14.00 - 16.00
Hari Ke- : 4 ( 4 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen M'
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.033 0.011 0.044
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.033 0.011 0.044
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 14.17 4.61 18.78
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 14.00
Lokasi : : Gerimis 14.00 - 16.00
Hari Ke- : 5 ( 5 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen M'
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.044 0.011 0.055
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.044 0.011 0.055
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 18.78 4.61 23.40
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 14.00
Lokasi : : Gerimis 14.00 - 16.00
Hari Ke- : 6 ( 6 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen M'
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.055 0.011 0.066
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.055 0.011 0.066
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 23.40 4.61 28.01
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 14.00
Lokasi : : Gerimis 14.00 - 16.00
Hari Ke- : 7 ( 7 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen M'
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3
4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.066 0.011 0.077
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.066 0.011 0.077
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 28.01 4.61 32.62
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 8 ( 8 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.077 0.011 0.088
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.077 0.011 0.088
II PEKERJAAN TANAH
I
Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 32.62 4.61 37.24
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 11.00
Lokasi : : Gerimis 11.00 - 14.00
Hari Ke- : 9 ( 9 Oktober ) Hujan 14.00 - 16.00
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.088 0.011 0.099
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.088 0.011 0.099
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 37.24 4.61 41.85
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 16.00
Lokasi :: Gerimis
Hari Ke- : 10 ( 10 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.099 0.011 0.110
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.099 0.011 0.110
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 41.85 4.61 46.46
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 16.00
Lokasi :: Gerimis
Hari Ke- : 11 ( 11 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.110 0.011 0.121
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.110 0.011 0.121
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 46.46 4.61 51.07
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Kondisi Cuaca Jam s/d
Instansi : Dinas Sumber Daya Air dan Bina Marga
Pekerjaan : :
Cerah 08.00 - 16.00
Lokasi :: Gerimis
Hari Ke- : 12 ( 12 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.121 0.011 0.132
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.121 0.011 0.132
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 51.07 4.61 55.69
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 16.00
Lokasi :: Gerimis
Hari Ke- : 13 ( 13 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 3 Pemakaian Bahan
2 Pemakaian Alat
Pelaksana Lapangan 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.132 0.011 0.143
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.132 0.011 0.143
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 55.69 4.61 60.30
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 11.00
Lokasi :: Gerimis 11.00 - 14.00
Hari Ke- : 14 ( 14 Oktober ) Hujan 14.00 - 16.00
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.143 0.011 0.154
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.143 0.011 0.154
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 60.30 4.61 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 16.00
Lokasi :: Gerimis
Hari Ke- : 15 ( 15 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1
Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2
Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.154 0.011 0.165
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.154 0.011 0.165
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 16.00
Lokasi :: Gerimis
Hari Ke- : 16 ( 16 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.165 0.011 0.176
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.165 0.011 0.176
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2
Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3
Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 11.00
Lokasi : : Gerimis 11.00 - 14.00
Hari Ke- : 17 ( 17 Oktober ) Hujan 14.00 - 16.00
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.176 0.011 0.187
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.176 0.011 0.187
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 16.00
Lokasi :: Gerimis
Hari Ke- : 18 ( 18 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.187 0.011 0.198
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.187 0.011 0.198
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 16.00
Lokasi :: Gerimis
Hari Ke- : 19 ( 19 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.198 0.011 0.209
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.198 0.011 0.209
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 16.00
Gerimis
Lokasi ::
Hujan
Hari Ke- : 20 ( 20 Oktober )
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.209 0.011 0.220
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.209 0.011 0.220
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 21 ( 21 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 12.00
Lokasi :: Gerimis 12.00 - 13.00
Hari Ke- : 22 ( 22 Oktober ) Hujan 13.00 - 16.00
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator 1 Unit Semen M'
Operator 1 org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator 1 org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop 2 Bh
Tukang Batu org Linggis 1 Bh
Buruh 4 org Palu 1 Bh
Bobot Pekerjaan
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.231 0.011 0.242
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.231 0.011 0.242
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 23 ( 23 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator 1 Unit Semen M'
Operator 1 org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator 1 org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop 2 Bh
Tukang Batu org Linggis 1 Bh
Buruh 4 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.242 0.011 0.253
3
Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.242 0.011 0.253
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 16.00
Lokasi :: Gerimis
Hari Ke- : 24 ( 24 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator 1 Unit Semen M'
Operator 1 org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator 1 org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop 2 Bh
Tukang Batu org Linggis 1 Bh
Buruh 4 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.253 0.011 0.264
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.253 0.011 0.264
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 16.00
Lokasi :: Gerimis
Hari Ke- : 25 ( 25 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator 1 Unit Semen M'
Operator 1 org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator 1 org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop 2 Bh
Tukang Batu org Linggis 1 Bh
Buruh 4 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.264 0.011 0.275
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.264 0.011 0.275
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 26 ( 26 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator 1 Unit Semen M'
Operator 1 org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator 1 org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop 2 Bh
Tukang Batu org Linggis 1 Bh
Buruh 4 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.275 0.011 0.286
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.275 0.011 0.286
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 16.00
Lokasi :: Gerimis
Hari Ke- : 27 ( 27 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator 1 Unit Semen M'
Operator 1 org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator 1 org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop 2 Bh
Tukang Batu org Linggis 1 Bh
Buruh 4 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.286 0.011 0.297
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.286 0.011 0.297
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan : : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 28 ( 28 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan 1 org Excavator 1 Unit Semen M'
Operator 1 org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator 1 org Gerobak Dorong 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop 2 Bh
Tukang Batu org Linggis 1 Bh
Buruh 4 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume Volume
Hari Lalu Hari Ini Kumulatif
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.297 0.011 0.308
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.297 0.011 0.308
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 09.00
Lokasi : : Gerimis 09.00 - 13.00
Hari Ke- : 29 ( 29 Oktober ) Cerah 13.00 - 16.00
Tahun : 2021 Gerimis
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator 1 Unit Semen M'
Operator 1 org Rol Meter 1 Bh Batu Pecah 0.00 M³
Pembantu Operator 1 org Gerobak Dor 1 Unit Pab.Bronjong 0.00 M³
Kepala Tukang 1 org Sekop 2 Bh
Tukang Batu org Linggis 1 Bh
Buruh 8 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - - -
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.308 0.011 0.319
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
II PEKERJAAN TANAH
0 0
Normalisasi dan Perkuatan Tebing Sungai
Desa Awo, Kec. Wolo, Kab. Kolaka
#REF! 0 -
#REF! Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 14.00
Lokasi : : Gerimis 14.00 - 16.00
Hari Ke- : 30 ( 30 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen M'
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 - 0.002 0.002
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.319 0.011 0.330
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! 0.000 #VALUE!
II PEKERJAAN TANAH
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 14.00
Lokasi : : Gerimis 14.00 - 16.00
Hari Ke- : 31 ( 31 Oktober ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen M'
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.002 0.002 0.004
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.330 0.011 0.341
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! 0.000 #VALUE!
4 Biaya K3 Ls. 1.00 0.330 0.011 0.341
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 14.00
Lokasi : : Gerimis 14.00 - 16.00
Hari Ke- : 32 ( 1 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen M'
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.004 0.002 0.006
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.341 0.011 0.352
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! 0.000 #VALUE!
4 Biaya K3 Ls. 1.00 0.341 0.011 0.352
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 14.00
Lokasi : : Gerimis 14.00 - 16.00
Hari Ke- : 33 ( 2 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen M'
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.006 0.002 0.008
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.352 0.011 0.363
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! 0.000 #VALUE!
4 Biaya K3 Ls. 1.00 0.352 0.011 0.363
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 14.00
Lokasi : : Gerimis 14.00 - 16.00
Hari Ke- : 34 ( 3 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen M'
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.008 0.002 0.009
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.363 0.011 0.374
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! 0.000 #VALUE!
4 Biaya K3 Ls. 1.00 0.363 0.011 0.374
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 14.00
Lokasi : : Gerimis 14.00 - 16.00
Hari Ke- : 35 ( 4 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapangan org Excavator Unit Semen M'
Operator org Rol Meter Bh Batu Pecah M³
Pembantu Operator org Gerobak Dorong Unit Pab.Bronjong M³
Kepala Tukang org Sekop Bh
Tukang Batu org Linggis Bh
Buruh org Palu Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3
4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.009 0.002 0.011
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.374 0.011 0.385
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! 0.000 #VALUE!
4 Biaya K3 Ls. 1.00 0.374 0.011 0.385
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 36 ( 5 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.011 0.002 0.013
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.385 0.011 0.396
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! 0.000 #VALUE!
4 Biaya K3 Ls. 1.00 0.385 0.011 0.396
II PEKERJAAN TANAH
I
Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 11.00
Lokasi : : Gerimis 11.00 - 14.00
Hari Ke- : 37 ( 6 November ) Hujan 14.00 - 16.00
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.013 0.002 0.015
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.396 0.011 0.407
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! 0.000 #VALUE!
4 Biaya K3 Ls. 1.00 0.396 0.011 0.407
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 38 ( 7 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.015 0.002 0.017
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.407 0.011 0.418
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! 0.000 #VALUE!
4 Biaya K3 Ls. 1.00 0.407 0.011 0.418
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 39 ( 8 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.017 0.002 0.019
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.418 0.011 0.429
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! 0.000 #VALUE!
4 Biaya K3 Ls. 1.00 0.418 0.011 0.429
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Kondisi Cuaca Jam s/d
Instansi : Dinas Sumber Daya Air dan Bina Marga
Pekerjaan: :
Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 40 ( 9 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.019 0.002 0.021
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.429 0.011 0.440
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! 0.000 #VALUE!
4 Biaya K3 Ls. 1.00 0.429 0.011 0.440
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 41 ( 10 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 3 Pemakaian Bahan
2 Pemakaian Alat
Pelaksana Lapanga 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.021 0.002 0.023
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.440 0.011 0.451
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! 0.000 #VALUE!
4 Biaya K3 Ls. 1.00 0.440 0.011 0.451
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 11.00
Lokasi : : Gerimis 11.00 - 14.00
Hari Ke- : 42 ( 11 November ) Hujan 14.00 - 16.00
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.023 0.002 0.025
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.451 0.011 0.462
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! 0.000 #VALUE!
4 Biaya K3 Ls. 1.00 0.451 0.011 0.462
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 0.04
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 43 ( 12 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1
Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.025 - 0.025
2
Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.462 - 0.462
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.462 - 0.462
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 - 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 0.04 Err:509 Err:509
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 - 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 44 ( 13 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.025 - 0.025
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.462 - 0.462
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.462 - 0.462
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 - 0.40
2 Err:509
Galian Tanah Biasa (MEKANIS) M³ 1798.74 Err:509 Err:509
3 -
Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 11.00
Lokasi : : Gerimis 11.00 - 14.00
Hari Ke- : 45 ( 14 November ) Hujan 14.00 - 16.00
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.025 - 0.025
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.462 - 0.462
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.462 - 0.462
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 - 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 Err:509 Err:509 Err:509
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 - 64.91
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 46 ( 15 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.025 - 0.025
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.462 - 0.462
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.462 - 0.462
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 - 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 Err:509 Err:509 Err:509
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 - 64.91
#REF! 0 -
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 16.00
Lokasi :: Gerimis
Hari Ke- : 47 ( 16 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.025 - 0.025
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.462 - 0.462
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.462 - 0.462
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 - 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 Err:509 Err:509 Err:509
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 - 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 16.00
Gerimis
Lokasi ::
Hujan
Hari Ke- : 48 ( 17 November )
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator Unit Semen M'
Operator org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop Bh
Tukang Batu org Linggis Bh
Buruh 2 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.025 - 0.025
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.462 - 0.462
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.462 - 0.462
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 - 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 Err:509 Err:509 Err:509
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 - 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 49 ( 18 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 - 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 Err:509 Err:509 Err:509
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 - 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 12.00
Lokasi : : Gerimis 12.00 - 13.00
Hari Ke- : 50 ( 19 November ) Hujan 13.00 - 16.00
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator 1 Unit Semen M'
Operator 1 org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator 1 org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop 2 Bh
Tukang Batu org Linggis 1 Bh
Buruh 4 org Palu 1 Bh
Bobot Pekerjaan
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.025 - 0.025
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.462 - 0.462
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.462 - 0.462
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 - 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 Err:509 Err:509 Err:509
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 - 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 51 ( 20 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator 1 Unit Semen M'
Operator 1 org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator 1 org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop 2 Bh
Tukang Batu org Linggis 1 Bh
Buruh 4 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.025 - 0.025
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.462 - 0.462
3
Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.462 - 0.462
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 - 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 Err:509 Err:509 Err:509
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 - 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 52 ( 21 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator 1 Unit Semen M'
Operator 1 org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator 1 org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop 2 Bh
Tukang Batu org Linggis 1 Bh
Buruh 4 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.025 - 0.025
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.462 - 0.462
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.462 - 0.462
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 - 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 Err:509 Err:509 Err:509
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 - 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 53 ( 22 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator 1 Unit Semen M'
Operator 1 org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator 1 org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop 2 Bh
Tukang Batu org Linggis 1 Bh
Buruh 4 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.025 - 0.025
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.462 - 0.462
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.462 - 0.462
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 - 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 Err:509 Err:509 Err:509
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 - 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 54 ( 23 November ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator 1 Unit Semen M'
Operator 1 org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator 1 org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop 2 Bh
Tukang Batu org Linggis 1 Bh
Buruh 4 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.025 - 0.025
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.462 - 0.462
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.462 - 0.462
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 - 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 Err:509 Err:509 Err:509
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 - 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 55 ( 29 September ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator 1 Unit Semen M'
Operator 1 org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator 1 org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop 2 Bh
Tukang Batu org Linggis 1 Bh
Buruh 4 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.025 - 0.025
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.462 - 0.462
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.462 - 0.462
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 - 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 Err:509 Err:509 Err:509
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 - 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Harian
Instansi : Dinas Sumber Daya Air dan Bina Marga Kondisi Cuaca Jam s/d
Pekerjaan: : Cerah 08.00 - 16.00
Lokasi : : Gerimis
Hari Ke- : 56 ( 30 September ) Hujan
Tahun : 2021 Banjir
Kondisi Lapangan/Lokasi
No. Uraian Jmlh Sat. No. Uraian Jmlh Sat. No. Uraian Vol. Sat.
1 Tenaga Kerja 2 Pemakaian Alat 3 Pemakaian Bahan
Pelaksana Lapanga 1 org Excavator 1 Unit Semen M'
Operator 1 org Rol Meter 1 Bh Batu Pecah M³
Pembantu Operator 1 org Gerobak Dor 1 Unit Pab.Bronjong M³
Kepala Tukang 1 org Sekop 2 Bh
Tukang Batu org Linggis 1 Bh
Buruh 4 org Palu 1 Bh
Bobot Pekerjaan
No. Uraian Pekerjaan Sat. Volume Volume s/d Volume
Volume Kumulatif
Hari Lalu Hari Ini
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat Ls. 1.00 0.025 - 0.025
2 Administrasi Pelaporan dan Dokumentasi Ls. 1.00 0.462 - 0.462
3 Shop Drawing dan Ass Built Drawing Ls. 1.00 #VALUE! - #VALUE!
4 Biaya K3 Ls. 1.00 0.462 - 0.462
II PEKERJAAN TANAH
I Galian Tanah Biasa Ked 0 s/d 1 m M³ 77.50 0.40 - 0.40
2 Galian Tanah Biasa (MEKANIS) M³ 1798.74 Err:509 Err:509 Err:509
3 Timbunan Tanah Kembali Hasil Galian M³ 96.87 64.91 - 64.91
#REF! 0 -
Pengawas Teknis Pengawas Lapangan Pelaksana Lapangan
LAPORAN KEMAJUAN PEKERJAAN
Laporan Mingguan
Periode : 02 November - 08 November2021
Instansi : Dinas Sumber Daya Air dan Bina Marga
Pekerjaan : Normalisasi dan Perkuatan Tebing Sungai Desa Lalume Kec. Pakue Kab. Kolaka Utara
Lokasi : Desa Lalume, Kec. Pakue
Tahun : 2021 Minggu Ke- 1
Bobot Minggu Lalu Bobot Minggu Ini Bobot S/d Minggu Ini
Bobot Bobot Bobot Bobot Bobot Bobot
NO URAIAN PEKERJAAN VOL. SAT. Jmlh. Harga Tertimbang Realisasi Jmlh. Harga Tertimbang Realisasi Jmlh. Harga Tertimbang Realisasi
( Rp ) (%) (%) ( Rp ) (%) (%) ( Rp ) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat 1.00 Ls. - - - 6,000,000.00 50.00 1.16 6,000,000.00 50.00 1.16
2 Administrasi Pelaporan dan Dokumentasi 1.00 Ls. - - - 406,250.00 12.50 0.08 406,250.00 12.50 0.08
3 Shop Drawing dan Ass Built Drawing 1.00 Ls. - - - 1,625,000.00 50.00 0.31 1,625,000.00 50.00 0.31
4 Pemeriksaan dan Pengujian Laboratorium 0.00 Ls. - - - - - - - - -
5 Biaya K3 1.00 Ls. - - - 1,386,785.71 14.29 0.27 1,386,785.71 14.29 0.27
Total = (I) - - 9,418,035.71 1.81 9,418,035.71 1.81
II PEKERJAAN TANAH
1 Pemasangan Bowplank 38.00 M³ - - - 4,853,750.00 50.00 0.25 4,853,750.00 50.00 0.25
2 Galian Tanah Biasa Ked 0 s/d 1 m - M³ - - - - - - - - -
3 Galian Tanah Biasa (MEKANIS) 1,950.38 M³ - - - - - - - - -
4 Timbunan Tanah Didatangkan Dari Luar - M³ - - - - - - - - -
Total = (II) - - 4,853,750.00 50.00 0.25 4,853,750.00 50.00 0.25
III PEKERJAAN KONSTRUKSI
1 Pasangan Batu Mortar 1PC : 4 PC 100.51 M³ - - - - - - - - -
2 Pasangan Pipa Drain/Suling 2'' 28.50 M³ - - - - - - - - -
3 Pembesian - M³ - - - - - - - - -
4 Plesteran 1PC : 2Psr (Tebal 20mm) 116.81 M³ - - - - - - - - -
5 Pengecoran Beton K250 (Fc=21.7 Mpa) - M³ - - - - - - - - -
6 Bekisting Dengan Perancah (Jat 60cm) - M³ - - - - - - - - -
Total = (III) - - - - - -
TOTAL HARGA (I) + (II) + (III) = - 14,271,785.71 14,271,785.71
NILAI PPN 10 % = - 1,427,178.57 1,427,178.57
- 2.07 2.07
TOTAL HARGA + PPN 10% = - 15,698,964.29 15,698,964.29
TOTAL HARGA PEMBULATAN = - 15,698,000.00 15,698,000.00
Lalume, 08 November2021
Mengetahui : Diperiksa Oleh : Dibuat Oleh :
Pejabat Pelaksana Teknis Kegaiatan (PPTK) Pengawas Teknis Konsultan Pengawas Kontraktor Pelaksana
: Normalisasi dan Perkuatan Tebing Sungai Desa Lalume Kec. Pakue Kab. CV. GEOMETRI ENGINEERING CONSULTANT CV. ZAKY PERKASA
Kolaka Utara
Bobot Minggu Lalu Bobot Minggu Ini Bobot S/d Minggu Ini
Bobot Bobot Bobot Bobot Bobot Bobot
NO URAIAN PEKERJAAN VOL. SAT. Jmlh. Harga Tertimbang Realisasi Jmlh. Harga Tertimbang Realisasi Jmlh. Harga Tertimbang Realisasi
II PEKERJAAN TANAH
1 Pemasangan Bowplank 38.00 M³ 4,853,750.00 50.00 0.25 1,316,518.75 50.00 0.25 6,170,268.75 100.00 0.51
3 Galian Tanah Biasa (MEKANIS) 1,950.38 M³ - - - 48,104,885.25 25.00 9.26 48,104,885.25 25.00 9.26
4 Timbunan Tanah Didatangkan Dari Luar - M³ - - - - - - - - -
Total = (II) 4,853,750.00 0.25 48,104,885.25 50.00 0.25 54,275,154.00 125.00 9.77
III PEKERJAAN KONSTRUKSI
1 Pasangan Batu Mortar 1PC : 4 PC 100.51 M³ - - - - - - - - -
2 Plesteran 1PC : 2Psr (Tebal 2 Cm) 28.50 M³ - - - - - - - - -
3 Pengecoran Buis Beton Camp. K100 (D=1.00 m, T=0.50 m, - M³ - - - - - - - - -
4 Buis Beton Jarak Angk. - 30 m dan Dpasang 116.81 M³ - - - - - - - - -
6 Beton Siklop (60% Beton Camp = K. 125 ; 40% Batu Belah - M³ - - - - - - - - -
Total = (III) - - - - - -
TOTAL HARGA (I) + (II) + (III) = 14,271,785.71 55,897,920.96 71,486,225.43
NILAI PPN 10 % = 1,427,178.57 5,589,792.10 7,148,622.54
2.07 1.93 13.08
TOTAL HARGA + PPN 10% = 15,698,964.29 61,487,713.06 78,634,847.97
TOTAL HARGA PEMBULATAN = 15,600,000.00 61,487,000.00 78,634,000.00
Lalume, 15 November2021
Mengetahui : Diperiksa Oleh : Dibuat Oleh :
Pejabat Pelaksana Teknis Kegaiatan (PPTK) Pengawas Teknis Konsultan Pengawas Kontraktor Pelaksana
: Normalisasi dan Perkuatan Tebing Sungai Desa Lalume Kec. Pakue Kab. CV. GEOMETRI ENGINEERING CONSULTANT CV. ZAKY PERKASA
Kolaka Utara
II PEKERJAAN TANAH
1 Pemasangan Bowplank 38.00 M³ 6,170,268.75 100.00 0.51 - - - 6,170,268.75 100.00 0.51
3 Galian Tanah Biasa (MEKANIS) 1,950.38 M³ 48,104,885.25 25.00 9.26 48,104,885.25 25.00 9.26 96,209,770.50 50.00 18.52
4 Timbunan Tanah Didatangkan Dari Luar - M³ - - - - - - - - -
Total = (II) 6,170,268.75 0.51 48,104,885.25 - 9.26 102,380,039.25 150.00 19.03
III PEKERJAAN KONSTRUKSI
1 Pasangan Batu Mortar 1PC : 4 PC 100.51 M³ - - - 22,448,499.98 33.33 4.32 22,448,499.98 33.33 4.32
2 Plesteran 1PC : 2Psr (Tebal 2 Cm) 28.50 M³ - - - - - - - - -
3 Pengecoran Buis Beton Camp. K100 (D=1.00 m, T=0.50 m, - M³ - - - 28,878,441.73 25.00 5.56 28,878,441.73 25.00 5.56
4 Buis Beton Jarak Angk. - 30 m dan Dpasang 116.81 M³ - - - - - - - - -
6 Beton Siklop (60% Beton Camp = K. 125 ; 40% Batu Belah - M³ - - - - - - - - -
Total = (III) - - 51,326,941.71 9.88 51,326,941.71 9.88
TOTAL HARGA (I) + (II) + (III) = 22,232,768.75 101,224,862.67 171,562,516.67
NILAI PPN 10 % = 2,223,276.88 10,122,486.27 17,156,251.67
3.82 19.49 32.57
TOTAL HARGA + PPN 10% = 24,456,045.63 111,347,348.94 188,718,768.34
TOTAL HARGA PEMBULATAN = 24,400,000.00 111,347,000.00 188,718,000.00
Lalume, 22 November2021
Mengetahui : Diperiksa Oleh : Dibuat Oleh :
Pejabat Pelaksana Teknis Kegaiatan (PPTK) Pengawas Teknis Konsultan Pengawas Kontraktor Pelaksana
: Normalisasi dan Perkuatan Tebing Sungai Desa Lalume Kec. Pakue Kab. CV. GEOMETRI ENGINEERING CONSULTANT CV. ZAKY PERKASA
Kolaka Utara
Bobot Minggu Lalu Bobot Minggu Ini Bobot S/d Minggu Ini
Bobot Bobot Bobot Bobot Bobot Bobot
NO URAIAN PEKERJAAN VOL. SAT. Jmlh. Harga Jmlh. Harga Jmlh. Harga
Tertimbang Realisasi Tertimbang Realisasi Tertimbang Realisasi
( Rp ) (%) (%) ( Rp ) (%) (%) ( Rp ) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat 1.00 Ls. 6,000,000.00 50.00 1.16 - - - 6,000,000.00 50.00 1.16
2 Administrasi Pelaporan dan Dokumentasi 1.00 Ls. 1,218,750.00 37.50 0.23 406,250.00 12.50 0.08 1,625,000.00 50.00 0.31
3 Shop Drawing dan Ass Built Drawing 1.00 Ls. 1,625,000.00 50.00 0.31 - - - 1,625,000.00 50.00 0.31
4 Pemeriksaan dan Pengujian Laboratorium 0.00 Ls. 6,000,000.00 100.00 1.16 - - - 6,000,000.00 100.00 1.16
5 Biaya K3 1.00 Ls. 3,011,785.71 42.86 0.80 1,386,785.71 14.29 0.27 4,398,571.43 57.14 1.07
Total = (I) 17,855,535.71 3.66 1,793,035.71 0.35 19,648,571.43 4.00
II PEKERJAAN TANAH
1 Pemasangan Bowplank 38.00 M³ 6,170,268.75 100.00 0.51 - - - 6,170,268.75 100.00 0.51
3 Galian Tanah Biasa (MEKANIS) 1,950.38 M³ 96,209,770.50 50.00 18.52 - - - 96,209,770.50 50.00 18.52
4 Timbunan Tanah Didatangkan Dari Luar - M³ - - - 949,090.98 50.00 0.18 949,090.98 50.00 0.18
Total = (II) 102,380,039.25 19.03 949,090.98 - 0.18 103,329,130.23 200.00 19.21
III PEKERJAAN KONSTRUKSI
1 Pasangan Batu Mortar 1PC : 4 PC 100.51 M³ 22,448,499.98 33.33 4.32 22,448,499.98 33.33 4.32 44,896,999.97 66.67 8.64
2 Plesteran 1PC : 2Psr (Tebal 2 Cm) 28.50 M³ - - - - - - - - -
3 Pengecoran Buis Beton Camp. K100 (D=1.00 m, T=0.50 m, - M³ 28,878,441.73 25.00 5.56 28,878,441.73 25.00 5.56 57,756,883.45 50.00 11.12
4 Buis Beton Jarak Angk. - 30 m dan Dpasang 116.81 M³ - - - - - - - - -
6 Beton Siklop (60% Beton Camp = K. 125 ; 40% Batu Belah - M³ - - - - - - - - -
Total = (III) 51,326,941.71 9.88 51,326,941.71 9.88 102,653,883.42 19.76
TOTAL HARGA (I) + (II) + (III) = 171,562,516.67 54,069,068.40 225,631,585.07
NILAI PPN 10 % = 17,156,251.67 5,406,906.84 22,563,158.51
32.57 10.41 42.98
TOTAL HARGA + PPN 10% = 188,718,768.34 59,475,975.24 248,194,743.58
TOTAL HARGA PEMBULATAN = 188,700,000.00 59,475,000.00 248,194,000.00
102,653,883.42 Lalume, 29 November2021
Mengetahui : Diperiksa Oleh : Dibuat Oleh :
Pejabat Pelaksana Teknis Kegaiatan (PPTK) Pengawas Teknis Konsultan Pengawas Kontraktor Pelaksana
: Normalisasi dan Perkuatan Tebing Sungai Desa Lalume Kec. Pakue Kab. CV. GEOMETRI ENGINEERING CONSULTANT CV. ZAKY PERKASA
Kolaka Utara
II PEKERJAAN TANAH
1 Pemasangan Bowplank 38.00 M³ 6,170,268.75 100.00 0.51 - - - 6,170,268.75 100.00 0.51
3 Galian Tanah Biasa (MEKANIS) 1,950.38 M³ 96,209,770.50 50.00 18.52 48,104,885.25 25.00 9.26 144,314,655.75 75.00 27.78
4 Timbunan Tanah Didatangkan Dari Luar - M³ 949,090.98 50.00 0.18 - - - 949,090.98 50.00 0.18
Total = (II) 103,329,130.23 19.21 48,104,885.25 - 9.26 151,434,015.48 - 28.47
III PEKERJAAN KONSTRUKSI
1 Pasangan Batu Mortar 1PC : 4 PC 100.51 M³ 44,896,999.97 66.67 8.64 22,448,499.98 33.33 4.32 67,345,499.95 100.00 12.97
2 Plesteran 1PC : 2Psr (Tebal 2 Cm) 28.50 M³ - - - 12,977,049.67 100.00 2.50 12,977,049.67 100.00 2.50
3 Pengecoran Buis Beton Camp. K100 (D=1.00 m, T=0.50 m, - M³ 57,756,883.45 50.00 11.12 28,878,441.73 25.00 5.56 86,635,325.18 75.00 16.68
4 Buis Beton Jarak Angk. - 30 m dan Dpasang 116.81 M³ - - - - - - - - -
6 Beton Siklop (60% Beton Camp = K. 125 ; 40% Batu Belah - M³ - - - - - - - - -
Total = (III) 102,653,883.42 19.76 - 12.38 166,957,874.79 32.14
TOTAL HARGA (I) + (II) + (III) = 225,631,585.07 49,897,920.96 339,833,497.41
NILAI PPN 10 % = 22,563,158.51 4,989,792.10 33,983,349.74
42.98 21.99 64.97
TOTAL HARGA + PPN 10% = 248,194,743.58 54,887,713.06 373,816,847.15
TOTAL HARGA PEMBULATAN = 248,100,000.00 54,887,000.00 373,816,000.00
Lalume, 06 Desember2021
Mengetahui : Diperiksa Oleh : Dibuat Oleh :
Pejabat Pelaksana Teknis Kegaiatan (PPTK) Pengawas Teknis Konsultan Pengawas Kontraktor Pelaksana
: Normalisasi dan Perkuatan Tebing Sungai Desa Lalume Kec. Pakue Kab. CV. GEOMETRI ENGINEERING CONSULTANT CV. ZAKY PERKASA
Kolaka Utara
II PEKERJAAN TANAH
1 Pemasangan Bowplank 38.00 M³ 6,170,268.75 100.00 0.51 - - - 6,170,268.75 100.00 0.51
3 Galian Tanah Biasa (MEKANIS) 1,950.38 M³ 144,314,655.75 75.00 27.78 48,104,885.25 25.00 9.26 192,419,541.00 100.00 37.05
4 Timbunan Tanah Didatangkan Dari Luar - M³ 949,090.98 50.00 0.18 - - - 949,090.98 50.00 0.18
Total = (II) 6,170,268.75 0.51 48,104,885.25 - 9.26 199,538,900.73 250.00 37.73
III PEKERJAAN KONSTRUKSI
1 Pasangan Batu Mortar 1PC : 4 PC 100.51 M³ 67,345,499.95 100.00 12.97 - - - 67,345,499.95 100.00 12.97
2 Plesteran 1PC : 2Psr (Tebal 2 Cm) 28.50 M³ 12,977,049.67 100.00 2.50 - - - 12,977,049.67 100.00 2.50
3 Pengecoran Buis Beton Camp. K100 (D=1.00 m, T=0.50 m, - M³ 86,635,325.18 75.00 16.68 28,878,441.73 25.00 5.56 115,513,766.90 100.00 22.24
4 Buis Beton Jarak Angk. - 30 m dan Dpasang 116.81 M³ - - - 2,863,800.00 33.33 0.55 2,863,800.00 33.33 0.55
6 Beton Siklop (60% Beton Camp = K. 125 ; 40% Batu Belah - M³ - - - 41,917,544.93 50.00 8.07 41,917,544.93 50.00 8.07
Total = (III) - 32.14 73,659,786.65 14.18 240,617,661.45 46.32
TOTAL HARGA (I) + (II) + (III) = 27,611,875.89 123,557,707.62 463,391,205.03
NILAI PPN 10 % = 2,761,187.59 12,355,770.76 46,339,120.50
37.00 23.79 88.75
TOTAL HARGA + PPN 10% = 30,373,063.48 135,913,478.38 509,730,325.53
TOTAL HARGA PEMBULATAN = 30,300,000.00 135,913,000.00 509,730,000.00
Lalume, 13 Desember 2021
Mengetahui : Diperiksa Oleh : Dibuat Oleh :
Pejabat Pelaksana Teknis Kegaiatan (PPTK) Pengawas Teknis Konsultan Pengawas Kontraktor Pelaksana
: Normalisasi dan Perkuatan Tebing Sungai Desa Lalume Kec. Pakue Kab. CV. GEOMETRI ENGINEERING CONSULTANT CV. ZAKY PERKASA
Kolaka Utara
Bobot Minggu Lalu Bobot Minggu Ini Bobot S/d Minggu Ini
Bobot Bobot Bobot Bobot Bobot Bobot
NO URAIAN PEKERJAAN VOL. SAT. Jmlh. Harga Jmlh. Harga Jmlh. Harga
Tertimbang Realisasi Tertimbang Realisasi Tertimbang Realisasi
( Rp ) (%) (%) ( Rp ) (%) (%) ( Rp ) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat 1.00 Ls. 6,000,000.00 50.00 1.16 - - - 6,000,000.00 50.00 1.16
2 Administrasi Pelaporan dan Dokumentasi 1.00 Ls. 2,437,500.00 75.00 0.47 406,250.00 12.50 0.08 2,843,750.00 87.50 0.55
3 Shop Drawing dan Ass Built Drawing 1.00 Ls. 1,625,000.00 50.00 0.31 1,625,000.00 50.00 0.31 3,250,000.00 100.00 0.63
4 Pemeriksaan dan Pengujian Laboratorium 0.00 Ls. 6,000,000.00 100.00 1.16 - - - 6,000,000.00 100.00 1.16
5 Biaya K3 1.00 Ls. 7,172,142.86 85.71 1.60 1,386,785.71 14.29 0.27 8,558,928.57 100.00 1.87
Total = (I) 23,234,642.86 4.69 3,418,035.71 0.66 26,652,678.57 5.35
II PEKERJAAN TANAH
1 Pemasangan Bowplank 38.00 M³ 6,170,268.75 100.00 0.51 - - - 6,170,268.75 100.00 0.51
3 Galian Tanah Biasa (MEKANIS) 1,950.38 M³ 192,419,541.00 100.00 37.05 - - - 192,419,541.00 100.00 37.05
4 Timbunan Tanah Didatangkan Dari Luar - M³ 949,090.98 50.00 0.18 949,090.98 50.00 0.18 1,898,181.95 100.00 0.37
Total = (II) 6,170,268.75 0.51 - - 0.18 200,487,991.70 300.00 37.92
III PEKERJAAN KONSTRUKSI
1 Pasangan Batu Mortar 1PC : 4 PC 100.51 M³ 67,345,499.95 100.00 12.97 - - - 67,345,499.95 100.00 12.97
2 Plesteran 1PC : 2Psr (Tebal 2 Cm) 28.50 M³ 12,977,049.67 100.00 2.50 - - - 12,977,049.67 100.00 2.50
3 Pengecoran Buis Beton Camp. K100 (D=1.00 m, T=0.50 m, - M³ 115,513,766.90 100.00 22.24 - - - 115,513,766.90 100.00 22.24
4 Buis Beton Jarak Angk. - 30 m dan Dpasang 116.81 M³ 2,863,800.00 33.33 0.55 2,863,800.00 33.33 0.55 5,727,600.00 66.67 1.10
6 Beton Siklop (60% Beton Camp = K. 125 ; 40% Batu Belah - M³ 41,917,544.93 50.00 8.07 41,917,544.93 50.00 8.07 83,835,089.86 100.00 16.14
Total = (III) 41,917,544.93 46.32 41,917,544.93 8.62 285,399,006.37 54.95
TOTAL HARGA (I) + (II) + (III) = 71,322,456.53 45,335,580.64 512,539,676.65
NILAI PPN 10 % = 7,132,245.65 4,533,558.06 51,253,967.66
51.53 9.46 98.22
TOTAL HARGA + PPN 10% = 78,454,702.19 49,869,138.71 563,793,644.31
TOTAL HARGA PEMBULATAN = 78,400,000.00 49,869,000.00 563,793,000.00
Lalume, 20 Desember 2021
Mengetahui : Diperiksa Oleh : Dibuat Oleh :
Pejabat Pelaksana Teknis Kegaiatan (PPTK) Pengawas Teknis Konsultan Pengawas Kontraktor Pelaksana
: Normalisasi dan Perkuatan Tebing Sungai Desa Lalume Kec. Pakue Kab. CV. GEOMETRI ENGINEERING CONSULTANT CV. ZAKY PERKASA
Kolaka Utara
II PEKERJAAN TANAH
1 Pemasangan Bowplank 38.00 M³ 6,170,268.75 100.00 0.51 - - - 6,170,268.75 100.00 0.51
3 Galian Tanah Biasa (MEKANIS) 1,950.38 M³ 192,419,541.00 100.00 37.05 - - - 192,419,541.00 100.00 37.05
4 Timbunan Tanah Didatangkan Dari Luar - M³ 1,898,181.95 100.00 0.37 - - - 1,898,181.95 100.00 0.37
Total = (II) 6,170,268.75 0.51 - - 0.18 200,487,991.70 300.00 37.92
III PEKERJAAN KONSTRUKSI
1 Pasangan Batu Mortar 1PC : 4 PC 100.51 M³ 67,345,499.95 100.00 12.97 - - - 67,345,499.95 100.00 12.97
2 Plesteran 1PC : 2Psr (Tebal 2 Cm) 28.50 M³ 12,977,049.67 100.00 2.50 - - - 12,977,049.67 100.00 2.50
3 Pengecoran Buis Beton Camp. K100 (D=1.00 m, T=0.50 m, - M³ 115,513,766.90 100.00 22.24 - - - 115,513,766.90 100.00 22.24
4 Buis Beton Jarak Angk. - 30 m dan Dpasang 116.81 M³ 5,727,600.00 66.67 1.10 2,863,800.00 33.33 0.55 8,591,400.00 100.00 1.65
6 Beton Siklop (60% Beton Camp = K. 125 ; 40% Batu Belah - M³ 83,835,089.86 100.00 16.14 - - - 83,835,089.86 100.00 16.14
Total = (III) 83,835,089.86 54.95 - 0.55 288,262,806.37 55.50
TOTAL HARGA (I) + (II) + (III) = 116,658,037.18 6,406,250.00 521,809,726.65
NILAI PPN 10 % = 11,665,803.72 640,625.00 52,180,972.66
60.80 1.39 100.00
TOTAL HARGA + PPN 10% = 128,323,840.89 7,046,875.00 573,990,699.31
TOTAL HARGA PEMBULATAN = 128,300,000.00 7,046,000.00 573,990,000.00
Lalume, 22 Desember2021
Mengetahui : Diperiksa Oleh : Dibuat Oleh :
Pejabat Pelaksana Teknis Kegaiatan (PPTK) Pengawas Teknis Konsultan Pengawas Kontraktor Pelaksana
: Normalisasi dan Perkuatan Tebing Sungai Desa Lalume Kec. Pakue Kab. CV. GEOMETRI ENGINEERING CONSULTANT CV. ZAKY PERKASA
Kolaka Utara
Bobot Minggu Lalu Bobot Minggu Ini Bobot S/d Minggu Ini
Bobot Bobot Bobot Bobot Bobot Bobot
NO URAIAN PEKERJAAN VOL. SAT. Jmlh. Harga Jmlh. Harga Jmlh. Harga
Tertimbang Realisasi Tertimbang Realisasi Tertimbang Realisasi
( Rp ) (%) (%) ( Rp ) (%) (%) ( Rp ) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat 1.00 Ls. 12,000,000.00 100.00 2.31 - - - 12,000,000.00 100.00 2.31
2 Administrasi Pelaporan dan Dokumentasi 1.00 Ls. 3,250,000.00 100.00 0.63 - - - 3,250,000.00 100.00 0.63
3 Shop Drawing dan Ass Built Drawing 1.00 Ls. 3,250,000.00 100.00 0.63 #DIV/0! - - #DIV/0! 100.00 0.63
4 Pemeriksaan dan Pengujian Laboratorium 1.00 Ls. 6,000,000.00 100.00 1.16 -
5 Biaya K3 1.00 Ls. 8,558,928.57 100.00 1.87 #DIV/0! - - #DIV/0! 100.00 1.87
Total = (I) 33,058,928.57 6.59 #DIV/0! - #DIV/0! 5.43
II PEKERJAAN TANAH
1 Pemasangan Bowplank M³ 6,170,268.75 100.00 0.51 - - - 6,170,268.75 100.00 0.51
2 Galian Tanah Biasa Ked 0 s/d 1 m - M³ 192,419,541.00 100.00 37.05 - - - 192,419,541.00 100.00 37.05
3 Galian Tanah Biasa (MEKANIS) 1,950.38 M³ 1,898,181.95 100.00 0.37 - - - 1,898,181.95 100.00 0.37
4 Timbunan Tanah Didatangkan Dari Luar - M³ 200,487,991.70 300.00 37.92 - - - - - -
Total = (II) 400,975,983.40 75.83 - - - 200,487,991.70 300.00 37.92
III PEKERJAAN KONSTRUKSI
1 Pasangan Batu Mortar 1PC : 4 PC 100.51 M³ 12,977,049.67 100.00 2.50 #DIV/0! - - #DIV/0! 100.00 2.50
2 Pasangan Pipa Drain/Suling 2'' 28.50 M³ 115,513,766.90 100.00 22.24 #DIV/0! - - #DIV/0! 100.00 22.24
3 Pembesian - M³ 8,591,400.00 100.00 1.65 - - - - - -
4 Plesteran 1PC : 2Psr (Tebal 20mm) 116.81 M³ 83,835,089.86 100.00 16.14 - - - - - -
5 Pengecoran Beton K250 (Fc=21.7 Mpa) - M³ 288,262,806.37 - 55.50 - - - - - -
6 Bekisting Dengan Perancah (Jat 60cm) - M³ 521,809,726.65 - 100.00 - - - - - -
Total = (III) 1,030,989,839.44 198.03 #DIV/0! - #DIV/0! 200.00 24.74
TOTAL HARGA (I) + (II) + (III) = 1,465,024,751.42 #DIV/0! #DIV/0!
NILAI PPN 10 % = 146,502,475.14 #DIV/0! #DIV/0!
280.45 - 68.09
TOTAL HARGA + PPN 10% = 1,611,527,226.56 #DIV/0! #DIV/0!
TOTAL HARGA PEMBULATAN = 1,611,500,000.00 #DIV/0! #DIV/0!
Onewali, 29 November2021
Mengetahui : Diperiksa Oleh : Dibuat Oleh :
Pejabat Pelaksana Teknis Kegaiatan (PPTK) Pengawas Teknis Konsultan Pengawas Kontraktor Pelaksana
Normalisasi dan Perkuatan Tebing Sungai Awo Desa Awo , Kec. Kodeha, CV. ARTMA CONSULTAN CV. ISRA JAYA
Kab. Kolaka Utara
Bobot Minggu Lalu Bobot Minggu Ini Bobot S/d Minggu Ini
Bobot Bobot Bobot Bobot Bobot Bobot
NO URAIAN PEKERJAAN VOL. SAT. Jmlh. Harga Jmlh. Harga Jmlh. Harga
Tertimbang Realisasi Tertimbang Realisasi Tertimbang Realisasi
( Rp ) (%) (%) ( Rp ) (%) (%) ( Rp ) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat 1.00 Ls. #DIV/0! - - - - - #DIV/0! 0.00 0.00
2 Administrasi Pelaporan dan Dokumentasi 1.00 Ls. - Onewali,
- 29 November2021 - - - 0.00 0.00 #VALUE!
3 Shop Drawing dan Ass Built Drawing 1.00 Ls. - Dibuat Oleh : - - - - 0.00 #VALUE! 0.00
4 Biaya K3 1.00 Ls. Kontraktor
- Pelaksana - ### ### ### ### #VALUE! 3000000.00
Total = (I) #DIV/0! - ### 3000000.00 #DIV/0! #VALUE!
II PEKERJAAN TANAH
1 Galian Tanah Biasa Ked 0 s/d 1 m 77.50 M³ - - - #REF! #REF! - #REF! #REF! -
2 Galian Tanah Biasa (MEKANIS) 1,798.74 M³ - - - - - - 0.00 - -
3 Timbunan Tanah Kembali Hasil Galian 96.87 M³ ASYARY
- SUYANTO, ST - - - - - #VALUE! -
Total = (II) - - #REF! - #REF! -
III PEKERJAAN KONSTRUKSI
1 Pasangan Bronjong UIC 2 X 1 X 0.5 M ( Pabrikasi) 697.50 M³ #VALUE! #VALUE! #VALUE! - - - #VALUE! #VALUE! #VALUE!
Total = (III) #VALUE! #VALUE! - - #VALUE! #VALUE!
TOTAL HARGA (I) + (II) + (III) = #DIV/0! #REF! #DIV/0!
NILAI PPN 10 % = #DIV/0! #REF! #DIV/0!
#VALUE! 3000000.00 #VALUE!
TOTAL HARGA + PPN 10% = #DIV/0! #REF! #DIV/0!
TOTAL HARGA PEMBULATAN = #DIV/0! #REF! #DIV/0!
Awo, 28 Oktober 2021
Mengetahui : Diperiksa Oleh : Dibuat Oleh :
Pejabat Pelaksana Teknis Kegaiatan (PPTK) Pengawas Teknis Konsultan Pengawas Kontraktor Pelaksana
Normalisasi dan Perkuatan Tebing Sungai Awo Desa Awo , Kec. Kodeha, CV. ARTMA CONSULTAN 100
Kab. Kolaka Utara
Bobot Minggu Lalu Bobot Minggu Ini Bobot S/d Minggu Ini
Bobot Bobot Bobot Bobot Bobot Bobot
NO URAIAN PEKERJAAN VOL. SAT. Jmlh. Harga Jmlh. Harga Jmlh. Harga
Tertimbang Realisasi Tertimbang Realisasi Tertimbang Realisasi
( Rp ) (%) (%) ( Rp ) (%) (%) ( Rp ) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat 1.00 Ls. #DIV/0! - - - - - #DIV/0! 0.00 0.00
2 Administrasi Pelaporan dan Dokumentasi 1.00 Ls. - - #VALUE! - - - 0.00 0.00 #VALUE!
3 Shop Drawing dan Ass Built Drawing 1.00 Ls. - #VALUE! - - - - 0.00 #VALUE! 0.00
4 Biaya K3 1.00 Ls. ### #VALUE! 3,000,000.00 8,633,000.91 88.93 1.66 ### #VALUE! 3000001.66
Total = (I) #DIV/0! #VALUE! 8,633,000.91 1.66 #DIV/0! #VALUE!
II PEKERJAAN TANAH
1 Galian Tanah Biasa Ked 0 s/d 1 m 77.50 M³ #REF! #REF! - #REF! #REF! - #REF! #REF! -
2 Galian Tanah Biasa (MEKANIS) 1,798.74 M³ - - - - - - 0.00 - -
3 Timbunan Tanah Kembali Hasil Galian 96.87 M³ - #VALUE! - - - - - #VALUE! -
Total = (II) #REF! - #REF! - #REF! -
III PEKERJAAN KONSTRUKSI
1 Pasangan Bronjong UIC 2 X 1 X 0.5 M ( Pabrikasi) 697.50 M³ #VALUE! #VALUE! #VALUE! - - - #VALUE! #VALUE! #VALUE!
Total = (III) #VALUE! #VALUE! - - #VALUE! #VALUE!
TOTAL HARGA (I) + (II) + (III) = #DIV/0! #REF! #DIV/0!
NILAI PPN 10 % = #DIV/0! #REF! #DIV/0!
#VALUE! 1.66 #VALUE!
TOTAL HARGA + PPN 10% = #DIV/0! #REF! #DIV/0!
TOTAL HARGA PEMBULATAN = #DIV/0! #REF! #DIV/0!
Awo, 04 November 2021
Mengetahui : Diperiksa Oleh : Dibuat Oleh :
Pejabat Pelaksana Teknis Kegaiatan (PPTK) Pengawas Teknis Konsultan Pengawas Kontraktor Pelaksana
Normalisasi dan Perkuatan Tebing Sungai Awo Desa Awo , Kec. Kodeha, CV. ARTMA CONSULTAN 100
Kab. Kolaka Utara
Bobot Minggu Lalu Bobot Minggu Ini Bobot S/d Minggu Ini
Bobot Bobot Bobot Bobot Bobot Bobot
NO URAIAN PEKERJAAN VOL. SAT. Jmlh. Harga Jmlh. Harga Jmlh. Harga
Tertimbang Realisasi Tertimbang Realisasi Tertimbang Realisasi
( Rp ) (%) (%) ( Rp ) (%) (%) ( Rp ) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat 1.00 Ls. #DIV/0! - - - - - #DIV/0! 0.00 0.00
2 Administrasi Pelaporan dan Dokumentasi 1.00 Ls. - - #VALUE! - - - 0.00 0.00 #VALUE!
3 Shop Drawing dan Ass Built Drawing 1.00 Ls. - #VALUE! - - - - 0.00 #VALUE! 0.00
4 Biaya K3 1.00 Ls. ### #VALUE! 3,000,001.66 - - - ### #VALUE! 3000001.66
Total = (I) #DIV/0! #VALUE! - 0.00 #DIV/0! #VALUE!
II PEKERJAAN TANAH
1 Galian Tanah Biasa Ked 0 s/d 1 m 77.50 M³ #REF! #REF! - #REF! #REF! - #REF! #REF! -
2 Galian Tanah Biasa (MEKANIS) 1,798.74 M³ - - - - - - 0.00 - -
3 Timbunan Tanah Kembali Hasil Galian 96.87 M³ - #VALUE! - - - - - #VALUE! -
Total = (II) #REF! - #REF! - #REF! -
III PEKERJAAN KONSTRUKSI
1 Pasangan Bronjong UIC 2 X 1 X 0.5 M ( Pabrikasi) 697.50 M³ #VALUE! #VALUE! #VALUE! - - - #VALUE! #VALUE! #VALUE!
Total = (III) #VALUE! #VALUE! - - #VALUE! #VALUE!
TOTAL HARGA (I) + (II) + (III) = #DIV/0! #REF! #DIV/0!
NILAI PPN 10 % = #DIV/0! #REF! #DIV/0!
#VALUE! 0.00 #VALUE!
TOTAL HARGA + PPN 10% = #DIV/0! #REF! #DIV/0!
TOTAL HARGA PEMBULATAN = #DIV/0! #REF! #DIV/0!
Awo, 11 November 2021
Mengetahui : Diperiksa Oleh : Dibuat Oleh :
Pejabat Pelaksana Teknis Kegaiatan (PPTK) Pengawas Teknis Konsultan Pengawas Kontraktor Pelaksana
Normalisasi dan Perkuatan Tebing Sungai Awo Desa Awo , Kec. Kodeha, CV. ARTMA CONSULTAN 100
Kab. Kolaka Utara
Bobot Minggu Lalu Bobot Minggu Ini Bobot S/d Minggu Ini
Bobot Realisasi Bobot Bobot Realisasi Bobot Bobot Bobot
NO URAIAN PEKERJAAN VOL. SAT. Jlh. Harga Tertimbang Jlh. Harga Tertimbang Jlh. Harga Realisasi Tertimbang
( Rp ) (%) (%) ( Rp ) (%) (%) ( Rp ) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13
I PEKERJAAN PENDAHULUAN
1.00 Mobilisasi dan Demobilisasi Alat 1 Ls. #DIV/0! - - 6,000,000.00 50.00 1.16 #DIV/0! 50.00 1.16
2.00 Administrasi Pelaporan dan Dokumentasi 1 Ls. - - #VALUE! 406,250.00 12.50 0.08 406,250.00 12.50 #VALUE!
3.00 Shop Drawing dan Ass Built Drawing 1 Ls. - #VALUE! - - - - - #VALUE! -
15,582,640,637,732.90 #VALUE! 3,000,001.66 6,406,250.00 1.23 #DIV/0! #VALUE!
II PEKERJAAN TANAH
1.00 Galian Tanah Biasa Ked 0 s/d 1 m 26 M³ - - - #REF! #REF! - #REF! #REF! -
2.00 Galian Tanah Biasa (MEKANIS) 20,432 M³ #REF! #REF! - Err:509 Err:509 Err:509 #REF! #REF! Err:509
3.00 Timbunan Tanah Didatangkan Dari Luar 33 M³ - - - - - - - - -
- #VALUE! - #REF! Err:509 #REF! Err:509
III PEKERJAAN KONSTRUKSI
1.00 Tiang Pancang Pondasi Bronjong 624 M' - - - - - - - - -
2.00 Pasangan Bronjong VIC 2 X 1 X 0.5 M ( Pabrikasi) 234 M³ #VALUE! #VALUE! #VALUE! #REF! #REF! - #VALUE! #VALUE! #VALUE!
Total = (I)+(II)+(III) #VALUE! - #VALUE! - - - #VALUE! - #VALUE!
TOTAL HARGA (I) + (II) + (III) = #DIV/0! #REF! #DIV/0!
NILAI PPN 10 % = #DIV/0! #REF! #DIV/0!
#VALUE! Err:509 #VALUE!
TOTAL HARGA + PPN 10% = #DIV/0! #REF! #DIV/0!
TOTAL HARGA PEMBULATAN = #DIV/0! #REF! #DIV/0!
Bobot Minggu Lalu Bobot Minggu Ini Bobot S/d Minggu Ini
Bobot Realisasi Bobot Bobot Realisasi Bobot Bobot Bobot
NO URAIAN PEKERJAAN VOL. SAT. Jlh. Harga Tertimbang Jlh. Harga Tertimbang Jlh. Harga Realisasi Tertimbang
( Rp ) (%) (%) ( Rp ) (%) (%) ( Rp ) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13
I PEKERJAAN PENDAHULUAN
1.00 Mobilisasi dan Demobilisasi Alat 1 Ls. #DIV/0! 50.00 1.16 - - - #DIV/0! 50.00 1.16
2.00 Administrasi Pelaporan dan Dokumentasi 1 Ls. 406,250.00 12.50 #VALUE! 406,250.00 12.50 0.08 812,500.00 25.00 #VALUE!
3.00 Shop Drawing dan Ass Built Drawing 1 Ls. - #VALUE! - - - - - #VALUE! -
#DIV/0! - #VALUE! 406,250.00 0.08 #DIV/0! #VALUE!
II PEKERJAAN TANAH
1.00 Galian Tanah Biasa Ked 0 s/d 1 m 26 M³ #REF! #REF! - #REF! #REF! - #REF! #REF! -
2.00 Galian Tanah Biasa (MEKANIS) 20,432 M³ #REF! #REF! Err:509 Err:509 Err:509 Err:509 #REF! #REF! Err:509
3.00 Timbunan Tanah Didatangkan Dari Luar 33 M³ - - - - - - - - -
#REF! - Err:509 #REF! Err:509 #REF! Err:509
III PEKERJAAN KONSTRUKSI
1.00 Tiang Pancang Pondasi Bronjong 624 M' - - - - - - - - -
2.00 Pasangan Bronjong VIC 2 X 1 X 0.5 M ( Pabrikasi) 234 M³ #VALUE! #VALUE! #VALUE! #REF! #REF! - #VALUE! #VALUE! #VALUE!
Total = (I)+(II)+(III) #VALUE! - #VALUE! - - - #VALUE! - #VALUE!
TOTAL HARGA (I) + (II) + (III) = #DIV/0! #REF! #DIV/0!
NILAI PPN 10 % = #DIV/0! #REF! #DIV/0!
#VALUE! Err:509 #VALUE!
TOTAL HARGA + PPN 10% = #DIV/0! #REF! #DIV/0!
TOTAL HARGA PEMBULATAN = #DIV/0! #REF! #DIV/0!
LA ODE BADILLA, ST., MT Ancia Yusran, ST Konsultan Pengawas CV. ZAKY PERKASA
Nip. 19670520 200003 1 007 pengawas Teknis CV. GEOMETRI ENGINEERING CONSULTANT 0.00
LAPORAN KEMAJUAN PEKERJAAN
Laporan Bulanan
PERIODE : 29 Oktober - 11 September, 2021
Instansi 0
Pekerjaan 0
Lokasi 0
Tahun 0
Bulan Ke- 4
KONTRAK VOLUME BULAN LALU VOLUME BULAN INI VOLUME S/D BULAN INI
NO URAIAN PEKERJAAN Vol Sat. Hrg. Satuan Jlh. Harga Bobot Jlh. Harga Tertimbang Realisasi Jlh. Harga Tertimbang Realisasi Jlh. Harga Tertimbang Realisasi
(Rp) (Rp) (%) (Rp) (%) (%) (Rp) (%) (%) (Rp) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 12 14 15 16
I PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat 1 Ls. 14,050,000.00 14,050,000.00 2.70 12,000,000.00 100.00 2.31 - - - 12,000,000.00 100.00 2.31
2 Administrasi Pelaporan dan Dokumentasi 1 Ls. 3,487,668.00 3,487,668.00 0.67 3,656,250.00 112.50 0.70 - - - 3,656,250.00 112.50 0.70
3 Shop Drawing dan Ass Built Drawing 1 Ls. 3,500,000.00 3,500,000.00 0.67 3,250,000.00 100.00 0.63 - - - 3,250,000.00 100.00 0.63
4 Biaya K3 0 Ls. 9,416,000.00 0.00 0.00 ### ### 3,000,001.16 8,633,000.91 88.93 1.66 ### ### ###
21,037,668.00 4.05 18,906,250.00 3,000,004.80 8,633,000.91 1.66 ### ###
II PEKERJAAN TANAH
1 Galian Tanah Biasa Ked 0 s/d 1 m 0.00 M³ 64,300.00 0.00 0.00 15,729,039.89 8.17 3.03 - - - 15,729,039.89 8.17 3.03
2 Galian Tanah Biasa (MEKANIS) 50.00 M³ 23,000.00 1,150,000.00 0.22 Err:508 Err:508 Err:508 - - - Err:508 Err:508 Err:508
3 Timbunan Tanah Kembali Hasil Galian 9,295.63 M³ 37,600.00 349,515,688.00 67.29 #REF! #REF! 37.05 #REF! #REF! - #REF! #REF! 37.05
350,665,688.00 67.51 Err:508 Err:508 #REF! - Err:508 Err:508
III PEKERJAAN KONSTRUKSI
1 Pasangan Bronjong VIC 2 X 1 X 0.5 M ( Pabrikasi) 0.00 M³ 648,100.00 0.00 0.00 #REF! #REF! - #REF! #REF! - #REF! #REF! -
Total = (I)+(II)+(III) 0.00 0.00 #REF! - #REF! - #REF! -
TOTAL HARGA (A) + (B) + (C) + (D) = 371,703,356.00 71.56 Err:508 #REF! Err:508
NILAI PPN 10 % = 37,170,335.60 Err:508 #REF! Err:508
Err:508 1.66 Err:508
TOTAL HARGA + PPN 10% = 408,873,691.60 Err:508 #REF! Err:508
TOTAL HARGA PEMBULATAN = 408,873,000.00 Err:508 #REF! Err:508
Awo, 11 November 2021
Mengetahui : Diperiksa Oleh : Dibuat Oleh :
Pejabat Pelaksana Teknis Kegaiatan (PPTK) Pengawas Teknis Konsultan Pengawas Kontraktor Pelaksana
Normalisasi dan Perkuatan Tebing Sungai Desa Ponrewaru, Kec. Wolo, Kab. 0 571363173.50684
Kolaka
LA ODE BADILLA, ST., MT Ancia Yusran, ST Konsultan Pengawas CV. ZAKY PERKASA
Nip. 19670520 200003 1 007 pengawas Teknis CV. GEOMETRI ENGINEERING CONSULTANT 0.00
Kurva S "Time Schedule dan Realisasi Pekerjaan"
Instansi : Dinas Sumber Daya Air dan Bina
Pekerjaan : Normalisasi dan Perkuatan Tebing
Lokasi : Desa Lalume, Kec. Pakue
Tahun : 2021 17 24 31 7 14 21 28 5
8.07 8.07
A Total Harga 519,421,066.82 100
Bobot Rencana MC-0 ( % ) 1.23 17.77 17.33 23.97 16.31 6.60 7.47 9.32
Bobot Rencan MC 100 ( % ) 2.07 11.02 19.49 10.41 21.99 23.79 9.46 1.78
Kumulatif Rencana MC-0 ( % ) 1.23 19.00 36.33 60.30 76.61 83.21 90.68 100.00
Kumulatif Realisasi MC 100 ( % ) 2.07 13.08 32.57 42.98 64.97 88.75 98.22 100.00
Deviasi ( % ) 0.83 -5.92 -3.76 -17.32 -11.64 5.54 7.54 0.00
Diperiksa Oleh : LALUME, 22 Desember 2021
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan (PPTK) Pengawas Teknis Konsultan Pengawas : Kontraktor Pelaksana :
Normalisasi dan Perkuatan Tebing Sungai Desa Lalume Kec. Pakue
Kab. Kolaka Utara CV. GEOMETRI ENGINEERING CONSULTANT CV. ZAKY PERKASA
17,965,900.00
6,500,000.00 3.60
3,000,000.00 1.66
3,000,000.00 1.66
- 0.00
5,465,900.00 3.03
- 0.00
42,038,113.67 23.29
- 0.00
118,312,693.43
108,560,479.22 60.14
1,215,126.00 0.67
42.98
180,500,757.10
32.57
13.08
2.07
Jadwal Pelaksanaan Kegiatan
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan (PPTK) Diperiksa Oleh : Konsultan Pengawas : Kontraktor Pelaksana :
NORMALISASI DNA PERKUATAN TEBING SUNGAI REMBA DINAS Pengawas Lapangan CV. FORMULASI KONSULTAN CV. GRAHA MEDIA
SUMBER DAYA AIR DAN BINA MARGA PROV. SULTRA
50
L.1 = 0.5 M2
2 L.2 = 0.5 M2
50
3 L.3 = 0.5 M2
50
L.4 = 0.5 M2
4 L.5 = 0.5 M2
50
5 L.6 = 0.5 M2
50
L.7 = 0.5 M2
6 7 L.8 = 0.5 M2
50
8 L.9 = 0.5 M2
50
L.10 = 0.5 M2
9
50
L.11= 0.5 M2
10 L.12 = 1 M2
50
L.13 = 0.5 M2
11
50
L.14 = 0.5 M2
12 7.5 M2 Total Luas
50
13
14
50
Ponrewaru, 20 Oktober 2021
Pejabat Pelaksana Teknis Kegiatan (PPTK) Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
Normalisasi dan Perkuatan Tebing Sungai Desa Ponrewaru, Kec. Wolo, Kab. CV. GEOMETRI ENGINEERING CONSULTANT CV. ZAKY PERKASA
Kolaka
LA ODE BADILLA, ST., MT ANCIA YUSRAN, ST YUSUF KUSWANTO,ST ILHAM, ST
Nip. 19670520 200003 1 007 Pengawas Teknis Pengawas Lapangan Direktur
BACK UP DATA VOLUME PEKERJAAN
Instansi : Dinas Sumber Daya Air dan Bina Marga
Pekerjaan 0
Lokasi 0
Tahun : 09 November - 15 November2021
6 7
10
11
12
13
120
100
14
50 50
Pek. Galian Tanah Biasa 200
342 X 2 2 684
200
200
Kusambi, 9 Oktober 2019
Pek. Galian Tanah Biasa (mekanis) Pek. Galian Tanah Biasa (mekanis)
17.3
Segmen 1
Luas Penampang Rata2 (M2) Panjang (M) Volume (M3)
(I) ( II ) ( I ) X ( II )
144
(( 𝑳. 𝑨𝒕𝒂𝒔+𝑳.
𝑩𝒂𝒘𝒂𝒉 ))/𝟐 x Tinggi
Segmen 1
279
1.44 + 2.50
x 2.79
2
= 5.4963 10 54.96
250
(( 𝑳. 𝑨𝒕𝒂𝒔+𝑳.
𝑩𝒂𝒘𝒂𝒉 ))/𝟐 x Tinggi
Segmen 2
337
4.25 + 10.75
x 3.37
1075 2
= 25.275 10 252.75
No. Sta. Gambar
Pek. Galian Tanah Biasa (mekanis) Pek. Galian Tanah Biasa (mekanis)
17.00
(( 𝑳. 𝑨𝒕𝒂𝒔+𝑳.
𝑩𝒂𝒘𝒂𝒉 ))/𝟐 x Tinggi
308
Segmen 1
2.07 + 4.61
x 3.08
2
461 = 10.2872 8 82.30
(( 𝑳. 𝑨𝒕𝒂𝒔+𝑳.
𝑩𝒂𝒘𝒂𝒉 ))/𝟐 x Tinggi
Segmen 2
364
4.79 + 7.22
x 3.64
2
= 21.8582 8 174.87
722
No. Sta. Gambar
Pek. Galian Tanah Biasa (mekanis) Pek. Galian Tanah Biasa (mekanis)
16.90
330
Segmen 1 4.28 + 4.29
x 3.30
2
= 14.1405 2 28.28
429
(( 𝑳. 𝑨𝒕𝒂𝒔+𝑳.
𝑩𝒂𝒘𝒂𝒉 ))/𝟐 x Tinggi
Segmen 2
360
6.29 + 7.70
x 3.60
2
770 = 25.182 2 50.36
17.3
173 Segmen 1
5.82 + 2.90
290 x 1.73
2
= 7.5428 10 75.43
Segmen 2
5.68 + 3.38
338 2
x 1.02
= 4.6206 10 46.21
No. Sta. Gambar
17.00
494 (( 𝑳. 𝑨𝒕𝒂𝒔+𝑳.
𝑩𝒂𝒘𝒂𝒉 ))/𝟐 x Tinggi
Segmen 1
130
4.98 + 1.51
x 1.30
151 2
= 4.2185 8 33.75
16.90
223 (( 𝑳. 𝑨𝒕𝒂𝒔+𝑳.
Segmen 1 𝑩𝒂𝒘𝒂𝒉 ))/𝟐 Segmen 2 x Tinggi
104
2.23 + 0.98
x 1.04
2
98 = 1.6692 2 3.34
Segmen 2
4.10 + 1.23
123 2
x 1.02
= 2.7183 2 5.44
DOKUMENTASI
PEKERJAAN
Kontraktor Pelaksana :
DOKUMENTASI KEGIATAN
PEKERJAAN :
NORMALISASI DAN PERKUATAN TEBING SUNGAI
DESA PONREWARU KEC. WOLO, KAB. KOLAKA
LOKASI : KAB. KOLAKA
KONTRAKTOR PELAKSANA
PEKERJAAN :
NORMALISASI DAN PERKUATAN TEBING SUNGAI
DESA PONREWARU KEC. WOLO, KAB. KOLAKA
LOKASI : KAB. KOLAKA
KONTRAKTOR PELAKSANA
KONSULTAN PENGAWAS K
2021
PEKERJAAN :
"PENGAWASAN NORMALISASI DAN PERKUATAN TEBING SUNGAI
KUDU-KUDU DESA ONEWALI KEC. RANOMETO KAB. KONAWE
SELATAN"
LAPORAN BULANAN
KONSULTAN PENGAWAS
2021
Instansi 0 :
Pekerjaan 0 :
Lokasi 0 :
Tahun : Normalisasi :
II -
PEKERJAAN TANAH 33,539,385.01 103.78 1.21
III 0
Pasangan Batu Mortar 1PC : 122,995,472.09 380.57 60.14
0.00
1.80 1.80
2.51 2.51 2.51 2.51 2.51 2.51 2.51
0.24 0.24 0.24 0.24 0.24 0.24 0.24
4.64
4.64 4.64
4.64 4.64
0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
103.78
1.21
5.51
0.00
0.75 0.75
11.64 11.64
95.24
0.00
e2
8
0.00
2.51
4.64
###
0.00 ### 3.60
### 1.66
### 1.66
- 0.00
### 3.03
###
### 1.21
- 0.00
### 23.29
- 0.00
###
### 60.14
### 0.67
- 0.00
### 4.73
- 0.00
- 0.00
###
7.16
-
1,000.00
-
-1,000.00
wali, 20 Desember 2021
tor Pelaksana :
S PRIMA MANDIRI
SUYANTO, ST
ana Lapangan