Data Hasil Tracking jalur baru ke arah Lanci Jaya dari Patok 104 L= 2.

096 Meter
Vol. Rabat K175 Vol. Bongkr Pas. Batu
1 Cross 1 = 3m
2 Cross2 = 5m
R0 = 3.5 m 0.28
3 R1 = 4m 0.32
4 R2 = 6m 0.48
5 R3 = 3m 0.24
6 R4 = 10 m 0.80
7 R5 = 5m 0.40
8 R6 = 1.5 m 0.12
9 R7 = 4m 0.24
10 Cross 3 = 6m
11 R8 = 3m 0.24
12 GR 1 (Gorong-Gorong) = 2m 0.56
13 Cross 4 = 7m
14 R9 = 3m 0.32
15 R10 = 4m 0.32
16 R11 = 4m 0.40
17 R12 = 5m 0.40
18 Cross 5 = 3m
19 R13 = 5m 0.48
20 R14 = 6m 0.12
21 GR 2 (Gorong-Gorong) = 1.7 m 0.56
22 R15 = 1.5 m 0.48
23 Cross 6 = 6m
24 R16 = 11.3 m 0.12
25 R17 = 6m 0.90
26 R18 = 13.8 m 0.48
27 Cross 7 = 4m
28 Jembatan 01 = 4
29 Crosing 8 =
30 R19 = 4m 0.32
31 R20 = 1.5 m 0.12
32 R21 = 12 m 0.96
33 R22 = 1.5 m 0.12
34 R23 = 4m 0.32
35 R24 = 3m 0.24
36 Cross 9 = 5m
37 GR 3 (Gorong-Gorong) = 1 t=1,1 m 20.68
38 R25 = 4m 0.32
39 R26 = 6m 0.24
40 R27 = 7m 0.32
41 R28 = 4m 0.48
42 R29 = 4m 0.56
43 Crosing 10 = 4m
44 Jembatan (J02) = 4.5 t=2 m

11.14 21.8
Jembatan dekat Intike = 10 t=3,8

Titik 560 ada kali dangkal alternatifnya -1. Siphon


(Patok 117) -2. Jembatan bentang 17 m kedalaman 2,7

Keterangan
R = Rabat
GR = Gorong-gorong

REKAP
1 Galian Tanah Biasa dengan Alat = 1224 m3
2 Urugan Pasir = 102 m3
3 Urugan Tanah Kembali = 1139 m3
4 Bongkaran Beton K175 = 0.2 m3
5 Pas. Batu 21.8 m3
6 Bongkaran Pas. Batu = 21.8 m3
7 Beton K175 = 11.14 m3
8 Jembatan Perlintasan/ Siphon = 1 bh
Elevati X UTM Y UTM
CRS1 644658.108215 9061734.79822
CRS2 644791.006907 9061576.87712

R1 644872.298853 9061427.20311
R2 644897.802106 9061383.43608
R3 644907.102139 9061366.37466
R4 644933.554862 9061310.44018
R5 644985.621104 9061178.44775
R6 644987.658401 9061162.4062
R7 645003.36811 9061120.1099
CRS3 644916.273688 9061343.89507
R8 645014.96911 9061067.43268
S1 645017.000048 9061017.11021
CRS4 645015.43962 9061011.47574
R9 645011.102884 9060998.77335
R10 645009.402697 9060984.40325
R11 645006.658361 9060954.33381

CRS5 644995.631735 9060884.37179


R13 644991.022251 9060856.18861
R14 644987.559494 9060841.49274
(bahu jalan sempit 0,8 m, p=4m) GR01 644979.048028 9060798.94693
R15 644973.365118 9060746.43899
Jalan Aspal CRS6 644971.438375 9060730.18973
R16 644970.645584 9060723.66799
R17 644968.199985 9060684.3085
R18 644965.563876 9060653.68578
Jalan Beton CRS7 644963.541357 9060609.23801
(bahu jalan=0,8 sepanjang 50 m) J01 644944.012435 9060466.98315
Jalan perkerasan CRS8 644942.156783 9060374.43091
R19 644935.773538 9060310.20348
R20 644934.301058 9060298.04428
R21 644925.731066 9060238.24762
R22 644923.147557 9060223.10643
R23 644917.74083 9060187.07452
R24 644916.263095 9060173.36716
CRS9 644908.597126 9060120.42362
GR02 644905.94035 9060116.11988
R25 644898.19661 9060072.6868
R26 644884.975509 9060037.23435
R27 644869.566934 9060005.99151
R28 644853.399779 9059978.28992
R29 644806.276254 9059879.47757
CRS10 644791.650784 9059851.88132
J02 644763.264167 9059759.41919

JEMB 10 M 110.69 648373.679774 9063095.30251


DOP DÓP 103.53 644744.377724 9059708.94658
: Pipa HDPE di tanam di galian cadas d 562 108.43 648374.228728 9063094.85826
560 91.05 644875.41789 9062282.33533
561 90.75 644944.23299 9060467.09299