096 Meter
Vol. Rabat K175 Vol. Bongkr Pas. Batu
1 Cross 1 = 3m
2 Cross2 = 5m
R0 = 3.5 m 0.28
3 R1 = 4m 0.32
4 R2 = 6m 0.48
5 R3 = 3m 0.24
6 R4 = 10 m 0.80
7 R5 = 5m 0.40
8 R6 = 1.5 m 0.12
9 R7 = 4m 0.24
10 Cross 3 = 6m
11 R8 = 3m 0.24
12 GR 1 (Gorong-Gorong) = 2m 0.56
13 Cross 4 = 7m
14 R9 = 3m 0.32
15 R10 = 4m 0.32
16 R11 = 4m 0.40
17 R12 = 5m 0.40
18 Cross 5 = 3m
19 R13 = 5m 0.48
20 R14 = 6m 0.12
21 GR 2 (Gorong-Gorong) = 1.7 m 0.56
22 R15 = 1.5 m 0.48
23 Cross 6 = 6m
24 R16 = 11.3 m 0.12
25 R17 = 6m 0.90
26 R18 = 13.8 m 0.48
27 Cross 7 = 4m
28 Jembatan 01 = 4
29 Crosing 8 =
30 R19 = 4m 0.32
31 R20 = 1.5 m 0.12
32 R21 = 12 m 0.96
33 R22 = 1.5 m 0.12
34 R23 = 4m 0.32
35 R24 = 3m 0.24
36 Cross 9 = 5m
37 GR 3 (Gorong-Gorong) = 1 t=1,1 m 20.68
38 R25 = 4m 0.32
39 R26 = 6m 0.24
40 R27 = 7m 0.32
41 R28 = 4m 0.48
42 R29 = 4m 0.56
43 Crosing 10 = 4m
44 Jembatan (J02) = 4.5 t=2 m
11.14 21.8
Jembatan dekat Intike = 10 t=3,8
Keterangan
R = Rabat
GR = Gorong-gorong
REKAP
1 Galian Tanah Biasa dengan Alat = 1224 m3
2 Urugan Pasir = 102 m3
3 Urugan Tanah Kembali = 1139 m3
4 Bongkaran Beton K175 = 0.2 m3
5 Pas. Batu 21.8 m3
6 Bongkaran Pas. Batu = 21.8 m3
7 Beton K175 = 11.14 m3
8 Jembatan Perlintasan/ Siphon = 1 bh
Elevati X UTM Y UTM
CRS1 644658.108215 9061734.79822
CRS2 644791.006907 9061576.87712
R1 644872.298853 9061427.20311
R2 644897.802106 9061383.43608
R3 644907.102139 9061366.37466
R4 644933.554862 9061310.44018
R5 644985.621104 9061178.44775
R6 644987.658401 9061162.4062
R7 645003.36811 9061120.1099
CRS3 644916.273688 9061343.89507
R8 645014.96911 9061067.43268
S1 645017.000048 9061017.11021
CRS4 645015.43962 9061011.47574
R9 645011.102884 9060998.77335
R10 645009.402697 9060984.40325
R11 645006.658361 9060954.33381