ASUMSI PERHITUNGAN PEMAIAKAN BEBAN LISTRIK NASDEM TOWER 100%-75%-50% DAN MINIMUM 40 JAM NYALA (JIKA BEBAN PEMAKAIAN

(LEBIH SEDIKIT DARI KWH MINIMUM)

Lantai
Uraian P Chiller Pompa2
23/atap 22 21 20 19 18 17 16 15 10-11-14 12 9 8 7 6 5 4 3 2 GF Existing ML Existing lt2 Existing lt3 Existing lt4

Lighting 0.6 3.9 3.8 4.2 4.8 4.6 5.1 2.1 3.3 11.8 5.2 4.9 4.9 7.3 5.6 4.5 21.0 9.8 1.4 120.0 6.8 6.8 2.2 2.2 994.5 68.2
Outlet 1.0 10.0 9.2 12.4 10.1 14.6 14.4 3.5 4.2 30.8 10.2 10.6 6.9 4.6 27.0 3.2 5.0 2.2 1.7 1.7 1.7 2.2 1.7
P.AC 8.2 50.0 7.1 8.0 8.4 8.4 7.8 3.3 3.7 20.7 7.7 7.1 7.6 5.8 8.3 9.9 3.5 0.3 3.7 4.0 4.0 5.2 4.1
Add AC System 52.0 52.0
Panel 6.4 87.0 7.0 1.3 7.5
Panel Lift 84.0 6.0 22.5
7.5 2.7 36.0 19.0 22.5
Panel dan 18.0 12.6
Equipment 27.0
lainnya
27.0

eff use 100% 125.703 63.87 107.106 24.616 23.27 27.549 27.3 8.9 20.9 63.304 23.059 22.626 19.347 17.7 78.236 17.574 56.06 12.256 6.74 120 12.45 12.46 67.6 117.6 994.5 68.18

eff use 75% 94.28 47.90 80.33 18.46 17.45 20.66 20.48 6.69 15.67 47.48 17.29 16.97 14.51 13.26 58.68 13.18 42.05 9.19 5.06 90.00 9.34 9.35 50.70 88.20 745.88 51.14

eff use 50% 62.85 31.94 53.55 12.31 11.64 13.77 13.65 4.46 10.44 31.65 11.53 11.31 9.67 8.84 39.12 8.79 28.03 6.13 3.37 60.00 6.23 6.23 33.80 58.80 497.25 34.09

eff use 40% 50.28 25.55 42.84 9.85 9.31 11.02 10.92 3.57 8.36 25.32 9.22 9.05 7.74 7.07 31.29 7.03 22.42 4.90 2.70 48.00 4.98 4.98 27.04 47.04 397.80 27.27

Asumsi Total Load (KW)100% 2,139 KW

Power Factor 0,9 1,925 KVA

Asumsi Efective load 75% 1,604 KW

Asumsi Efective load 50% 1,069 KW

Daya PLN Tersambung 2180 KVA 218000

Tariff Adj PLN 1,467.28 Rp

Perbandingan Biaya Pemakaian Listrik dalam %tase Beban

Pemakaian Listrik per-bulan dengan beban 100% Pemakaian Listrik per-bulan dengan beban 75% Pemakaian Listrik per-bulan dengan beban 50%

Asumsi Pemakaian Listrik per-bulan Asumsi Pemakaian Listrik per-bulan Asumsi Pemakaian Listrik per-bulan
(Daya Beban 100% 2.139KW) (Daya Beban 75% 1,604KW) (Daya Beban 50% 1,069KW)

(Watt. jam X 30d X Tariff Adjs PLN X Beban75%) Rp 225,961,026 (Watt. jam X 30d X Tariff Adjs PLN X Beban75%) Rp 204,777,180 (Watt. jam X 30d X Tariff Adjs PLN X Beban25%) Rp 136,518,120
Energy Loss 3% Rp 6,778,831 Energy Loss 3% Rp 6,143,315 Energy Loss 3% Rp 4,095,544 2.034
PPN 10% Rp 22,596,103 PPN 10% Rp 20,477,718 PPN 10% Rp 13,651,812
PPJU 3% Rp 5,423,065 PPJU 3% Rp 4,914,652 PPJU 3% Rp 3,276,435

Total Rp 260,759,024 Total Rp 236,312,866 Total Rp 157,541,910

Asumsi Jika Pemakaian listrik tidak melebihi 40 Jam Nyala adalah sebagai berikut :
Min 40 Jam Nyala = 8720 KWH
2.180 TR 45 450
Asumsi Minimum Charge PLN (X1000) 127,947 Watt 158.258 1,582.58 4,748
(40 Jam Nyala) Jika Pemakaian PLN kurang dari 8720 KWH setiap bulan
Daya Tersambung X T.Adjs PLN X 40 (jam Nyala) Rp 127,946,816
Energy Loss 3% Rp 3,838,404
PPN 10% Rp 12,794,682
PPJU 2,4% Rp 3,070,724

Total Rp 147,650,626